COMPUTOS METRICOS

MATERIAL DOSIFICACION COEF. APORTE VOL. REAL CANT. Por M3 % PERDIDA TOTAL/M3 KG BOLSAS/M3

CEMENTO 1 0.47 0.47 0.24 0.007 0.249 336.68 7.00

RIPIO 3 0.6 1.8 0.73 0.022 0.748

ARENA 2 0.63 1.26 0.48 0.015 0.499

AGUA(12%) 0.6 1 0.6 0.15 0.004 0.150

6.6 4.13

M3
P.U. CEMENTO 1350 KG/M3 LARGO ESPESOR ANCHO VOLUMEN TOTAL DE CEMENTO
% PERDIDA 3% 5.5 0.4 1.5 6.6 1.65
7.5 0.4 1.5 4.5 1.12
7.5 0.4 1.5 9 2.24
PAREDES
3.75 0.4 1.5 4.5 1.12
8.9 0.4 3 21.36 5.33
7.5 0.4 3 9 2.24
8.3 0.4 5.9 19.588 4.89
BASE 8.9 0.4 8.3 29.548 7.37
7.7 0.4 8.3 25.564 6.38
32.34

KG CEMENTO 43654.29297821
BOLSAS 873
M3 M3 M3
TOTAL RIPIO TOTAL AGUA TOTAL ARENA
4.94 0.988 3.292 X2
3.37 0.673 2.245
6.73 1.347 4.489 X2
3.37 0.673 2.245 X2
15.98 3.196 10.654 X2
6.73 1.347 4.489
14.66 2.931 9.770
22.107341404 4.4214682809 14.7382276029
19.126576271 3.8253152542 12.7510508475
97.01 19.40 64.67