PRESUPUESTO DE OBRA OFERTADO

MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS DE LA CA


OBRA: UNION: C 3, CALLE MARISCAL CASTILLA: C 3-4-5 y 6, DE LA LOCALIDAD DE TUCUME, DISTRITO DE TUCUME, PROVINC

FECHA: Nov-2017

ITEM PARTIDA

01.01.00 OBRAS PROVISIONALES

01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M.

01.01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO

01.01.03 SEÑALIZACION Y DESVIO DE TRANSITO

01.02.00 TRABAJOS PRELIMINARES

01.02.01 TRAZOS, NIVELACION y REPLANTEO INICIAL

01.02.02 TRAZOS, NIVELACION y REPLANTEO DURANTE EJECUCION OBRA

01.02.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8"

01.03.00 MOVIMIENTO DE TIERRAS

01.03.01 EXCAVACION DE ZANJAS

01.03.01.0EXCAVACION ZANJA c/MAQUINA p/TUBERIA Ø = 110 mm a 250 mm; a = 0.60 m; h = 1.50 m

01.03.02 REFINE y NIVELACION DE ZANJAS

01.03.02.0REFINE y NIVELACION ZANJA p/TUBERIA Ø 110 a 250 mm

01.03.03 CAMA DE APOYO P/TUBERIAS

01.03.03.0CAMA APOYO p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE a = 0.15 m

01.03.04 RELLENO, APISONADO y COMPACTACION LATERAL CON MATERIAL DE PRESTAMO


01.03.04.0RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 110 mm c/RIPIO CORRIENTE

01.03.04.0RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 160 mm c/RIPIO CORRIENTE

01.03.05 RELLENO y COMPACTACION S/CLAVE TUBO C/MATERIAL DE PRESTAMO

01.03.05.0RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE

01.03.06 RELLENO y COMPACTACION CON MATERIAL PROPIO SELECCIONADO

01.03.06.0RELLENO y COMPACTACION c/MATERIAL PROPIO SELECCIONADO y PRESTAMO CAPAS c/0.20 m; a = var

01.03.07 ACARREO y ELIMINACION MATERIAL EXCEDENTE

01.03.07.0ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km


01.04.00 SUMINISTRO e INSTALACION DE TUBERIAS y ACCESORIOS

01.04.01 SUMINISTRO e INSTALACION DE TUBERIAS PVC C-7.5

01.04.01.0SUMINISTRO e INSTALACION TUBERIA DN 110 mm PVC UF CL 7.5; h = 1.50 m; c/3% desperdicio

01.04.01.0SUMINISTRO e INSTALACION TUBERIA DN 160 mm PVC UF CL 7.5; h = 1.50 m; c/3% desperdicio

01.04.02 SUMINISTRO e INSTALACION DE ACCESORIOS

01.04.02.0SUMINISTRO e INSTALACION VALVULA Ø 110 mm f°f° ISO (equipada)

01.04.02.0SUMINISTRO e INSTALACION VALVULA Ø 160 mm f°f° ISO (equipada)

01.04.02.0SUMINISTRO e INSTALACION TEE Ø 110 mm x 110 mm PVC UF ISO (equipada)

01.04.02.0SUMINISTRO e INSTALACION TEE Ø 160 mm x 160 mm PVC UF ISO (equipada)

01.04.02.0SUMINISTRO e INSTALACION CRUZ Ø 110 mm x 110 mm PVC UF ISO (equipada)

01.04.02.0SUMINISTRO E INSTALACION CRUZ Ø 110 mm x 90 mm PVC UF ISO (equipada)

01.04.02.0SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 110 mm PVC UF ISO (equipada)

01.04.02.0SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 160 mm PVC UF ISO (equipada)

01.04.02.0SUMINISTRO e INSTALACION TAPON Ø 110 mm PVC-UF ISO (equipado)

01.04.02.1SUMINISTRO e INSTALACION TAPON Ø 160 mm PVC-UF ISO (equipado)

01.04.02.1SUMINISTRO e INSTALACION REDUCCION Ø 160 mm x 110 mm PVC UF ISO ( equipada )

01.04.02.1SUMINISTRO E INSTALACION REDUCCION Ø 110 mm x 90 mm PVC UF ISO (equipada)

01.04.02.1SUMINISTRO e INSTALACION GRIFO CONTRA INCENDIO f°f° ISO (equipado)

01.05.00 PRUEBAS HIDRAULICAS y DE DESINFECCION

01.05.01 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 110 mm PVC


01.05.02 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 160 mm PVC/HDPE
01.06.00 VARIOS
01.06.01 CAJA CONCRETO p/PROTECCION VALVULA
01.06.02 TAPA CONCRETO ARMADO p/PROTECCION VALVULA
02.00.00 CONEXIONES DOMICILIARIAS
02.01.00 TRABAJOS PRELIMINARES
02.01.01 TRAZOS, NIVELACION y REPLANTEO INICIAL
02.01.02 DEMOLICION VEREDA CONCRETO (e = 0.10 m)
02.01.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8"
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m; h = 1.00 m
02.02.02 REFINE y NIVELACION FONDO ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m
02.02.03 CAMA APOYO P/TUBERIA Ø 1/2" c/ARENA FINA; e = 0.05 m; a = 0.40 m
02.02.04 RELLENO y APISONADO p/TUBERIA Ø 1/2" c/ARENA FINA; h = 0.30 m
02.02.05 RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 1/2"
02.02.06 ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km
02.03.00 SUMINISTRO e INSTALACION DE TUBERIAS
02.03.01 SUMINISTRO e INSTALACION TUBERIA Ø 1/2" PVC SP CL 10
02.03.02 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA Ø 1/2" PVC
02.04.00 SUMINISTRO e INSTALACION DE ACCESORIOS
02.04.01 SUMINISTRO e INSTALACION ABRAZADERA 110 mm x 1/2" PVC (equipada)
02.04.02 SUMINISTRO e INSTALACION ABRAZADERA 160 mm x 1/2" PVC (equipada)
02.04.03 SUMINISTRO e INSTALACION ACCESORIOS p/CONEXION DOMICILIARIA Ø 1/2"
02.04.04 SUMINISTRO e INSTALACION CAJA p/MEDIDOR AGUA INC. LOSA CONCRETO 1x1
02.04.05 SUMINISTRO e INSTALACION DE MEDIDOR Ø 1/2"
03.00.00 REPOSICION DE VEREDAS Y PAVIMENTOS
03.01.00 REPOSICION VEREDA c/CONCRETO f' = 140 Kg/cm² (8.50 cm); PASTA (1.50 cm) 1:5; inc./encof/des
03.02.00 REPOSICION DE PAVIMENTO DE CONCRETO, e=8"
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
I.G.V.
TOTAL PRESUPUESTO
OFERTADO

ES DOMICILIARIAS DE LA CALLE A.B. LEGUIA: C 5 – 6 , CALLE CONVENTO, CALLE 16 DE FEBRERO: C 5, CALLE


TRITO DE TUCUME, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE.

PRECIO
UND METRADO UNITARIO PRECIO PARCIAL
DESAG.

Und 1.00 1,755.92 1,755.92

m2 24.00 350.00 8,400.00

Und 1.00 1,112.20 1,112.20

m 863.00 1.30 1,121.90

m 863.00 2.30 1,984.90

m2 101.50 10.71 1,087.07

m 863.00 9.37 8,086.31

m 863.00 3.67 3,167.21

m 863.00 4.99 4,306.37

m 617.5 9.75 6,020.63

m 245.5 11.2 2,749.60

m 863 15.27 13,178.01

m 863 18.81 16,233.03

m3 588.47 13.95 8,209.16


m 617.5 15.88 9,805.90

m 245.5 30.75 7,549.13

Und 3.00 606.20 1,818.60

Und 1.00 898.06 898.06

Und 2.00 154.20 308.40

Und 1.00 369.38 369.38

Und 3.00 310.84 932.52

Und 1.00 485.08 485.08

Und 1.00 967.08 967.08

Und 1.00 744.08 744.08

Und 2.00 115.19 230.38

Und 1.00 166.44 166.44

Und 2.00 102.20 204.40

Und 1.00 174.32 174.32

Und 1.00 1381.23 1,381.23

m 617.50 2.44 1,506.70


m 245.50 3.62 888.71

Und 4.00 238.22 952.88


Und 4.00 117.54 470.16

m 694.00 1.30 902.20


m2 41.34 32.32 1,336.11
m2 79.20 11.41 903.67

m 694.00 16.32 11,326.08


m 694.00 3.06 2,123.64
m 694.00 2.76 1,915.44
m 694.00 4.30 2,984.20
m 694.00 7.30 5,066.20
m3 360.88 13.95 5,034.28

m 694.00 2.09 1,450.46


m 694.00 2.35 1,630.90

Und 126.00 20.57 2,591.82


Und 33.00 30.74 1,014.42
Und 159.00 43.15 6,860.85
Und 159.00 102.77 16,340.43
Und 159.00 142.41 22,643.19

m2 41.34 56.30 2,327.44


m2 180.70 140.53 25,393.77
219,110.84
8.00% 17,528.87
7.00% 15,337.76
251,977.47
18.00% 45,355.94
297,333.41
CALENDARIO DE AVANCE DE OBRA VALORIZADO PROGRAMADO OFE

MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS DE LA C


OBRA: CONVENTO, CALLE 16 DE FEBRERO: C 5, CALLE UNION: C 3, CALLE MARISCAL CASTILLA: C 3-4-5 y 6, DE LA LOCALID
TUCUME, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE.

ITEM PARTIDA UND

01.01.00 OBRAS PROVISIONALES


01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M. Und
01.01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO m2
01.01.03 SEÑALIZACION Y DESVIO DE TRANSITO Und
01.02.00 TRABAJOS PRELIMINARES
01.02.01 TRAZOS, NIVELACION y REPLANTEO INICIAL m
01.02.02 TRAZOS, NIVELACION y REPLANTEO DURANTE EJECUCION OBRA m
01.02.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2
01.03.00 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACION DE ZANJAS
01.03.01.01EXCAVACION ZANJA c/MAQUINA p/TUBERIA Ø = 110 mm a 250 mm; a = 0.60 m; h = 1. m
01.03.02 REFINE y NIVELACION DE ZANJAS
01.03.02.01REFINE y NIVELACION ZANJA p/TUBERIA Ø 110 a 250 mm m
01.03.03 CAMA DE APOYO P/TUBERIAS
01.03.03.01CAMA APOYO p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE a = 0.15 m m
01.03.04 RELLENO, APISONADO y COMPACTACION LATERAL CON MATERIAL DE PRESTAMO

01.03.04.01RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 110 mm c/RIPIO CORRIENTE m


01.03.04.02RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 160 mm c/RIPIO CORRIENTE m
01.03.05 RELLENO y COMPACTACION S/CLAVE TUBO C/MATERIAL DE PRESTAMO
01.03.05.01RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE m
01.03.06 RELLENO y COMPACTACION CON MATERIAL PROPIO SELECCIONADO
01.03.06.01RELLENO y COMPACTACION c/MATERIAL PROPIO SELECCIONADO y PRESTAMO CAPAS c/0.20m

01.03.07 ACARREO y ELIMINACION MATERIAL EXCEDENTE


01.03.07.01ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km m3
01.04.00 SUMINISTRO e INSTALACION DE TUBERIAS y ACCESORIOS
01.04.01 SUMINISTRO e INSTALACION DE TUBERIAS PVC C-7.5
01.04.01.01SUMINISTRO e INSTALACION TUBERIA DN 110 mm PVC UF CL 7.5; h = 1.50 m; c/3% des m
01.04.01.02SUMINISTRO e INSTALACION TUBERIA DN 160 mm PVC UF CL 7.5; h = 1.50 m; c/3% des m
01.04.02 SUMINISTRO e INSTALACION DE ACCESORIOS
01.04.02.01SUMINISTRO e INSTALACION VALVULA Ø 110 mm f°f° ISO (equipada) Und
01.04.02.02SUMINISTRO e INSTALACION VALVULA Ø 160 mm f°f° ISO (equipada) Und
01.04.02.03SUMINISTRO e INSTALACION TEE Ø 110 mm x 110 mm PVC UF ISO (equipada) Und
01.04.02.04SUMINISTRO e INSTALACION TEE Ø 160 mm x 160 mm PVC UF ISO (equipada) Und
01.04.02.05SUMINISTRO e INSTALACION CRUZ Ø 110 mm x 110 mm PVC UF ISO (equipada) Und
01.04.02.06SUMINISTRO E INSTALACION CRUZ Ø 110 mm x 90 mm PVC UF ISO (equipada) Und
01.04.02.07SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 110 mm PVC UF ISO (equipada) Und
01.04.02.08SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 160 mm PVC UF ISO (equipada) Und
01.04.02.09SUMINISTRO e INSTALACION TAPON Ø 110 mm PVC-UF ISO (equipado) Und
01.04.02.10SUMINISTRO e INSTALACION TAPON Ø 160 mm PVC-UF ISO (equipado) Und
01.04.02.11SUMINISTRO e INSTALACION REDUCCION Ø 160 mm x 110 mm PVC UF ISO ( equipada Und
01.04.02.12SUMINISTRO E INSTALACION REDUCCION Ø 110 mm x 90 mm PVC UF ISO (equipada) Und
01.04.02.13SUMINISTRO e INSTALACION GRIFO CONTRA INCENDIO f°f° ISO (equipado) Und
01.05.00 PRUEBAS HIDRAULICAS y DE DESINFECCION
01.05.01 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 110 mm PVC m
01.05.02 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 160 mm PVC/HDPE m
01.06.00 VARIOS
01.06.01 CAJA CONCRETO p/PROTECCION VALVULA Und
01.06.02 TAPA CONCRETO ARMADO p/PROTECCION VALVULA Und
02.00.00 CONEXIONES DOMICILIARIAS
02.01.00 TRABAJOS PRELIMINARES
02.01.01 TRAZOS, NIVELACION y REPLANTEO INICIAL m
02.01.02 DEMOLICION VEREDA CONCRETO (e = 0.10 m) m2
02.01.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m; h = 1.00 m m
02.02.02 REFINE y NIVELACION FONDO ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m m
02.02.03 CAMA APOYO P/TUBERIA Ø 1/2" c/ARENA FINA; e = 0.05 m; a = 0.40 m m
02.02.04 RELLENO y APISONADO p/TUBERIA Ø 1/2" c/ARENA FINA; h = 0.30 m m
02.02.05 RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 1/2" m
02.02.06 ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km m3
02.03.00 SUMINISTRO e INSTALACION DE TUBERIAS
02.03.01 SUMINISTRO e INSTALACION TUBERIA Ø 1/2" PVC SP CL 10 m
02.03.02 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA Ø 1/2" PVC m
02.04.00 SUMINISTRO e INSTALACION DE ACCESORIOS
02.04.01 SUMINISTRO e INSTALACION ABRAZADERA 110 mm x 1/2" PVC (equipada) Und
02.04.02 SUMINISTRO e INSTALACION ABRAZADERA 160 mm x 1/2" PVC (equipada) Und
02.04.03 SUMINISTRO e INSTALACION ACCESORIOS p/CONEXION DOMICILIARIA Ø 1/2" Und
02.04.04 SUMINISTRO e INSTALACION CAJA p/MEDIDOR AGUA INC. LOSA CONCRETO 1x1 Und
02.04.05 SUMINISTRO e INSTALACION DE MEDIDOR Ø 1/2" Und
03.00.00 REPOSICION DE VEREDAS Y PAVIMENTOS
03.01.00 REPOSICION VEREDA c/CONCRETO f' = 140 Kg/cm² (8.50 cm); PASTA (1.50 cm) 1:5; inc. m2
03.02.00 REPOSICION DE PAVIMENTO DE CONCRETO, e=8" m2
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
AVANCE DE OBRA MENSUAL
% AVANCE DE OBRA MENSUAL
AVANCE DE OBRA ACUMULADO
% AVANCE DE OBRA ACUMULADO
PROGRAMADO OFERTADO

NES DOMICILIARIAS DE LA CALLE A.B. LEGUIA: C 5 – 6 , CALLE


C 3-4-5 y 6, DE LA LOCALIDAD DE TUCUME, DISTRITO DE

AVANCE PROGRAMADO MENS


PRESUPUESTADO
MES 1 MES 2

METRADO P.UNIT. P.PARCIAL METRADO MONTO METRADO MONTO

1.00 1,755.92 1,755.92 1.00 1,755.92

24.00 350.00 8,400.00 24.00 8,400.00

1.00 1,112.20 1,112.20 1.00 1,112.20

863.00 1.30 1,121.90 863.00 1,121.90

863.00 2.30 1,984.90 863.00 1,984.90

101.50 10.71 1,087.07 101.50 1,087.07

863.00 9.37 8,086.31 863.00 8,086.31

863.00 3.67 3,167.21 863.00 3,167.21

863.00 4.99 4,306.37 863.00 4,306.37

617.5 9.75 6,020.63 377.17 3,677.38 240.33 2,343.25

245.5 11.2 2,749.60 245.50 2,749.60

863 15.27 13,178.01 863.00 13,178.01

863 18.81 16,233.03 863.00 16,233.03

588.47 13.95 8,209.16 588.47 8,209.16


617.5 15.88 9,805.90 617.50 9,805.90

245.5 30.75 7,549.13 245.50 7,549.13

3.00 606.20 1,818.60 3.00 1,818.60

1.00 898.06 898.06 1.00 898.06

2.00 154.20 308.40 2.00 308.40

1.00 369.38 369.38 1.00 369.38

3.00 310.84 932.52 3.00 932.52

1.00 485.08 485.08 1.00 485.08

1.00 967.08 967.08 1.00 967.08

1.00 744.08 744.08 1.00 744.08

2.00 115.19 230.38 2.00 230.38

1.00 166.44 166.44 1.00 166.44

2.00 102.20 204.40 2.00 204.40

1.00 174.32 174.32 1.00 174.32

1.00 1381.23 1,381.23 1.00 1,381.23

617.50 2.44 1,506.70 617.50 1,506.70

245.50 3.62 888.71 245.50 888.71

4.00 238.22 952.88 4.00 952.88

4.00 117.54 470.16 4.00 470.16

694.00 1.30 902.20 694.00 902.20

41.34 32.32 1,336.11 41.34 1,336.11

79.20 11.41 903.67 79.20 903.67

694.00 16.32 11,326.08 108.43 1,769.50 585.57 9,556.58

694.00 3.06 2,123.64 271.31 830.20 422.69 1,293.44

694.00 2.76 1,915.44 388.51 1,072.29 305.49 843.15

694.00 4.30 2,984.20 694.00 2,984.20

694.00 7.30 5,066.20 694.00 5,066.20


360.88 13.95 5,034.28 360.88 5,034.28

694.00 2.09 1,450.46 152.73 319.20 541.27 1,131.26

694.00 2.35 1,630.90 694.00 1,630.90

126.00 20.57 2,591.82 126.00 2,591.82

33.00 30.74 1,014.42 33.00 1,014.42

159.00 43.15 6,860.85 95.29 4,111.78

159.00 102.77 16,340.43 117.50 12,075.70

159.00 142.41 22,643.19 142.16 20,244.80

41.34 56.30 2,327.44

180.70 140.53 25,393.77


219,110.84 71,685.88 110,291.58
8.00% 17,528.87 5,734.87 8,823.33
7.00% 15,337.76 5,018.01 7,720.41
251,977.47 82,438.76 126,835.32
82,438.76 126,835.32
32.72% 50.34%
82,438.76 209,274.08
32.72% 83.05%
CE PROGRAMADO MENSUAL

MES 3 MES 4

METRADO MONTO METRADO MONTO


63.71 2,749.07
41.50 4,264.73
16.84 2,398.39

41.34 2,327.44
180.70 25,393.77
9,412.19 27,721.21
752.98 2,217.70
658.85 1,940.48
10,824.02 31,879.39
10,824.02 31,879.39
4.30% 12.65%
220,098.10 251,977.49
87.35% 100.00%
VALORIZACION DE AVANCE DE OBRA N° 01

OBRA:

Fecha

ITEM

01.01.00
01.01.01
01.01.02
01.01.03
01.02.00
01.02.01
01.02.02
01.02.03
01.03.00
01.03.01
01.03.01.01
01.03.02
01.03.02.01
01.03.03
01.03.03.01
01.03.04
01.03.04.01
01.03.04.02
01.03.05
01.03.05.01
01.03.06
01.03.06.01
01.03.07
01.03.07.01
01.04.00
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.02.04
01.04.02.05
01.04.02.06
01.04.02.07
01.04.02.08
01.04.02.09
01.04.02.10
01.04.02.11
01.04.02.12
01.04.02.13
01.05.00
01.05.01
01.05.02
01.06.00
01.06.01
01.06.02
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
02.02.00
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03.00
02.03.01
02.03.02
02.04.00
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
03.00.00
03.01.00
03.02.00
VALORIZACION DE AVANCE DE OBRA N° 01

MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS DE LA CALLE A.B. LE
16 DE FEBRERO: C 5, CALLE UNION: C 3, CALLE MARISCAL CASTILLA: C 3-4-5 y 6, DE LA LOCALIDAD DE TUCUME, DISTRITO DE T
DEPARTAMENTO DE LAMBAYEQUE.

Dec-17

PARTIDA

OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M.
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
SEÑALIZACION Y DESVIO DE TRANSITO
TRABAJOS PRELIMINARES
TRAZOS, NIVELACION y REPLANTEO INICIAL
TRAZOS, NIVELACION y REPLANTEO DURANTE EJECUCION OBRA
DEMOLICION DE PAVIMENTO DE CONCRETO DE 8"
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
EXCAVACION ZANJA c/MAQUINA p/TUBERIA Ø = 110 mm a 250 mm; a = 0.60 m; h = 1.50 m
REFINE y NIVELACION DE ZANJAS
REFINE y NIVELACION ZANJA p/TUBERIA Ø 110 a 250 mm
CAMA DE APOYO P/TUBERIAS
CAMA APOYO p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE a = 0.15 m
RELLENO, APISONADO y COMPACTACION LATERAL CON MATERIAL DE PRESTAMO
RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 110 mm c/RIPIO CORRIENTE
RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 160 mm c/RIPIO CORRIENTE
RELLENO y COMPACTACION S/CLAVE TUBO C/MATERIAL DE PRESTAMO
RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE
RELLENO y COMPACTACION CON MATERIAL PROPIO SELECCIONADO
RELLENO y COMPACTACION c/MATERIAL PROPIO SELECCIONADO y PRESTAMO CAPAS c/0.20 m; a = variable hast
ACARREO y ELIMINACION MATERIAL EXCEDENTE
ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km
SUMINISTRO e INSTALACION DE TUBERIAS y ACCESORIOS
SUMINISTRO e INSTALACION DE TUBERIAS PVC C-7.5
SUMINISTRO e INSTALACION TUBERIA DN 110 mm PVC UF CL 7.5; h = 1.50 m; c/3% desperdicio
SUMINISTRO e INSTALACION TUBERIA DN 160 mm PVC UF CL 7.5; h = 1.50 m; c/3% desperdicio
SUMINISTRO e INSTALACION DE ACCESORIOS
SUMINISTRO e INSTALACION VALVULA Ø 110 mm f°f° ISO (equipada)
SUMINISTRO e INSTALACION VALVULA Ø 160 mm f°f° ISO (equipada)
SUMINISTRO e INSTALACION TEE Ø 110 mm x 110 mm PVC UF ISO (equipada)
SUMINISTRO e INSTALACION TEE Ø 160 mm x 160 mm PVC UF ISO (equipada)
SUMINISTRO e INSTALACION CRUZ Ø 110 mm x 110 mm PVC UF ISO (equipada)
SUMINISTRO E INSTALACION CRUZ Ø 110 mm x 90 mm PVC UF ISO (equipada)
SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 110 mm PVC UF ISO (equipada)
SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 160 mm PVC UF ISO (equipada)
SUMINISTRO e INSTALACION TAPON Ø 110 mm PVC-UF ISO (equipado)
SUMINISTRO e INSTALACION TAPON Ø 160 mm PVC-UF ISO (equipado)
SUMINISTRO e INSTALACION REDUCCION Ø 160 mm x 110 mm PVC UF ISO ( equipada )
SUMINISTRO E INSTALACION REDUCCION Ø 110 mm x 90 mm PVC UF ISO (equipada)
SUMINISTRO e INSTALACION GRIFO CONTRA INCENDIO f°f° ISO (equipado)
PRUEBAS HIDRAULICAS y DE DESINFECCION
DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 110 mm PVC
DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 160 mm PVC/HDPE
VARIOS
CAJA CONCRETO p/PROTECCION VALVULA
TAPA CONCRETO ARMADO p/PROTECCION VALVULA
CONEXIONES DOMICILIARIAS
TRABAJOS PRELIMINARES
TRAZOS, NIVELACION y REPLANTEO INICIAL
DEMOLICION VEREDA CONCRETO (e = 0.10 m)
DEMOLICION DE PAVIMENTO DE CONCRETO DE 8"
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m; h = 1.00 m
REFINE y NIVELACION FONDO ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m
CAMA APOYO P/TUBERIA Ø 1/2" c/ARENA FINA; e = 0.05 m; a = 0.40 m
RELLENO y APISONADO p/TUBERIA Ø 1/2" c/ARENA FINA; h = 0.30 m
RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 1/2"
ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km
SUMINISTRO e INSTALACION DE TUBERIAS
SUMINISTRO e INSTALACION TUBERIA Ø 1/2" PVC SP CL 10
DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA Ø 1/2" PVC
SUMINISTRO e INSTALACION DE ACCESORIOS
SUMINISTRO e INSTALACION ABRAZADERA 110 mm x 1/2" PVC (equipada)
SUMINISTRO e INSTALACION ABRAZADERA 160 mm x 1/2" PVC (equipada)
SUMINISTRO e INSTALACION ACCESORIOS p/CONEXION DOMICILIARIA Ø 1/2"
SUMINISTRO e INSTALACION CAJA p/MEDIDOR AGUA INC. LOSA CONCRETO 1x1
SUMINISTRO e INSTALACION DE MEDIDOR Ø 1/2"
REPOSICION DE VEREDAS Y PAVIMENTOS
REPOSICION VEREDA c/CONCRETO f' = 140 Kg/cm² (8.50 cm); PASTA (1.50 cm) 1:5; inc./encof/desencof/base
REPOSICION DE PAVIMENTO DE CONCRETO, e=8"
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
N° 01

LIARIAS DE LA CALLE A.B. LEGUIA: C 5 – 6 , CALLE CONVENTO, CALLE


DE TUCUME, DISTRITO DE TUCUME, PROVINCIA DE LAMBAYEQUE,

PRESUPUESTADO AVANCE ACUMULADO ANTERIOR


UND
METRADO P.UNIT.DES. P.PARCIAL METRADO MONTO %

Und 1.00 1,755.92 1,755.92 0.00 0%


m2 24.00 350.00 8,400.00 0.00 0%
Und 1.00 1,112.20 1,112.20 0.00 0%

m 863.00 1.30 1,121.90 0.00 0%


m 863.00 2.30 1,984.90 0.00 0%
m2 101.50 10.71 1,087.07 0.00 0%

m 863.00 9.37 8,086.31 0.00 0%

m 863.00 3.67 3,167.21 0.00 0%

m 863.00 4.99 4,306.37 0.00 0%

m 617.5 9.75 6,020.63 0.00 0%


m 245.5 11.2 2,749.60 0.00 0%

m 863 15.27 13,178.01 0.00 0%

m 863 18.81 16,233.03 0.00 0%

m3 588.47 13.95 8,209.16 0.00 0%

m 617.5 15.88 9,805.90 0.00 0%


m 245.5 30.75 7,549.13 0.00 0%

Und 3.00 606.20 1,818.60 0.00 0%


Und 1.00 898.06 898.06 0.00 0%
Und 2.00 154.20 308.40 0.00 0%
Und 1.00 369.38 369.38 0.00 0%
Und 3.00 310.84 932.52 0.00 0%
Und 1.00 485.08 485.08 0.00 0%
Und 1.00 967.08 967.08 0.00 0%
Und 1.00 744.08 744.08 0.00 0%
Und 2.00 115.19 230.38 0.00 0%
Und 1.00 166.44 166.44 0.00 0%
Und 2.00 102.20 204.40 0.00 0%
Und 1.00 174.32 174.32 0.00 0%
Und 1.00 1381.23 1,381.23 0.00 0%

m 617.50 2.44 1,506.70 0.00 0%


m 245.50 3.62 888.71 0.00 0%

Und 4.00 238.22 952.88 0.00 0%


Und 4.00 117.54 470.16 0.00 0%

m 694.00 1.30 902.20 0.00 0%


m2 41.34 32.32 1,336.11 0.00 0%
m2 79.20 11.41 903.67 0.00 0%

m 694.00 16.32 11,326.08 0.00 0%


m 694.00 3.06 2,123.64 0.00 0%
m 694.00 2.76 1,915.44 0.00 0%
m 694.00 4.30 2,984.20 0.00 0%
m 694.00 7.30 5,066.20 0.00 0%
m3 360.88 13.95 5,034.28 0.00 0%

m 694.00 2.09 1,450.46 0.00 0%


m 694.00 2.35 1,630.90 0.00 0%

Und 126.00 20.57 2,591.82 0.00 0%


Und 33.00 30.74 1,014.42 0.00 0%
Und 159.00 43.15 6,860.85 0.00 0%
Und 159.00 102.77 16,340.43 0.00 0%
Und 159.00 142.41 22,643.19 0.00 0%

m2 41.34 56.30 2,327.44 0.00 0%


m2 180.70 140.53 25,393.77 0.00 0%
219,110.84 0.00
8.00% 17,528.87 0.00
7.00% 15,337.76 0.00
251,977.47 0.00
AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO POR EJECUTAR
METRADO MONTO % METRADO MONTO % METRADO

1.00 1,755.92 100% 1.00 1,755.92 100% 0.00


24.00 8,400.00 100% 24.00 8,400.00 100% 0.00
1.00 1,112.20 100% 1.00 1,112.20 100% 0.00

863.00 1,121.90 100% 863.00 1,121.90 100% 0.00


863.00 1,984.90 100% 863.00 1,984.90 100% 0.00
101.50 1,087.07 100% 101.50 1,087.07 100% 0.00

863.00 8,086.31 100% 863.00 8,086.31 100% 0.00

863.00 3,167.21 100% 863.00 3,167.21 100% 0.00

863.00 4,306.37 100% 863.00 4,306.37 100% 0.00

377.17 3,677.38 61% 377.17 3,677.38 61% 240.33


0 0 0% 0.00 0.00 0% 245.50

0 0 0% 0.00 0.00 0% 863.00

0 0 0% 0.00 0.00 0% 863.00

0 0 0% 0.00 0.00 0% 588.47

617.50 9,805.90 100% 617.50 9,805.90 100% 0.00


245.50 7,549.13 100% 245.50 7,549.13 100% 0.00

3.00 1,818.60 100% 3.00 1,818.60 100% 0.00


1.00 898.06 100% 1.00 898.06 100% 0.00
2.00 308.40 100% 2.00 308.40 100% 0.00
1.00 369.38 100% 1.00 369.38 100% 0.00
3.00 932.52 100% 3.00 932.52 100% 0.00
1.00 485.08 100% 1.00 485.08 100% 0.00
1.00 967.08 100% 1.00 967.08 100% 0.00
1.00 744.08 100% 1.00 744.08 100% 0.00
2.00 230.38 100% 2.00 230.38 100% 0.00
1.00 166.44 100% 1.00 166.44 100% 0.00
2.00 204.40 100% 2.00 204.40 100% 0.00
1.00 174.32 100% 1.00 174.32 100% 0.00
1.00 1,381.23 100% 1.00 1,381.23 100% 0.00

617.50 1,506.70 100% 617.50 1,506.70 100% 0.00


245.50 888.71 100% 245.50 888.71 100% 0.00

4.00 952.88 100% 4.00 952.88 100% 0.00


4.00 470.16 100% 4.00 470.16 100% 0.00

694.00 902.20 100% 694.00 902.20 100% 0.00


41.34 1,336.11 100% 41.34 1,336.11 100% 0.00
79.20 903.67 100% 79.20 903.67 100% 0.00

108.43 1,769.50 16% 108.43 1,769.50 16% 585.57


271.31 830.20 39% 271.31 830.20 39% 422.69
388.51 1,072.29 56% 388.51 1,072.29 56% 305.49
0 0 0% 0.00 0.00 0% 694.00
0 0 0% 0.00 0.00 0% 694.00
0 0 0% 0.00 0.00 0% 360.88

152.73 319.20 22% 152.73 319.20 22% 541.27


0 0 0% 0.00 0.00 0% 694.00

0 0 0% 0.00 0.00 0% 126.00


0 0 0% 0.00 0.00 0% 33.00
0 0 0% 0.00 0.00 0% 159.00
0 0 0% 0.00 0.00 0% 159.00
0 0 0% 0.00 0.00 0% 159.00

0 0 0% 0.00 0.00 0% 41.34


0 0 0% 0.00 0.00 0% 180.70
71,685.88 71,685.88
5,734.87 5,734.87
5,018.01 5,018.01
82,438.76 82,438.76
SALDO POR EJECUTAR
MONTO %

0.00 0%
0.00 0%
0.00 0%

0.00 0%
0.00 0%
0.00 0%

0.00 0%

0.00 0%

0.00 0%

2,343.25 39%
2,749.60 100%

13,178.01 100%

16,233.03 100%

8,209.16 100%

0.00 0%
0.00 0%

0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%

0.00 0%
0.00 0%

0.00 0%
0.00 0%

0.00 0%
0.00 0%
0.00 0%

9,556.58 84%
1,293.44 61%
843.15 44%
2,984.20 100%
5,066.20 100%
5,034.28 100%

1,131.26 78%
1,630.90 100%

2,591.82 100%
1,014.42 100%
6,860.85 100%
16,340.43 100%
22,643.19 100%

2,327.44 100%
25,393.77 100%
147,424.97
11,794.00
10,319.75
169,538.72
7.41 37.05
1.40 7
21.01 105.05
4.67 23.35
0
136.10 680.5
17.45 87.25
0
VALORIZACION DE AVANCE DE OBRA N° 02

MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS DE LA CA


OBRA: CONVENTO, CALLE 16 DE FEBRERO: C 5, CALLE UNION: C 3, CALLE MARISCAL CASTILLA: C 3-4-5 y 6, DE LA LOCALIDA
PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE.
Fecha Jan-18

ITEM PARTIDA

01.01.00 OBRAS PROVISIONALES


CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M.
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
SEÑALIZACION Y DESVIO DE TRANSITO
TRABAJOS PRELIMINARES
TRAZOS, NIVELACION y REPLANTEO INICIAL
TRAZOS, NIVELACION y REPLANTEO DURANTE EJECUCION OBRA
DEMOLICION DE PAVIMENTO DE CONCRETO DE 8"
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
EXCAVACION ZANJA c/MAQUINA p/TUBERIA Ø = 110 mm a 250 mm; a = 0.60 m; h = 1.50 m
REFINE y NIVELACION DE ZANJAS
REFINE y NIVELACION ZANJA p/TUBERIA Ø 110 a 250 mm
CAMA DE APOYO P/TUBERIAS
CAMA APOYO p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE a = 0.15 m
RELLENO, APISONADO y COMPACTACION LATERAL CON MATERIAL DE PRESTAMO
RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 110 mm c/RIPIO CORRIENTE
RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 160 mm c/RIPIO CORRIENTE
RELLENO y COMPACTACION S/CLAVE TUBO C/MATERIAL DE PRESTAMO
RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE
RELLENO y COMPACTACION CON MATERIAL PROPIO SELECCIONADO
RELLENO y COMPACTACION c/MATERIAL PROPIO SELECCIONADO y PRESTAMO CAPAS c/0.20 m; a = v
ACARREO y ELIMINACION MATERIAL EXCEDENTE
ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km
SUMINISTRO e INSTALACION DE TUBERIAS y ACCESORIOS
SUMINISTRO e INSTALACION DE TUBERIAS PVC C-7.5
SUMINISTRO e INSTALACION TUBERIA DN 110 mm PVC UF CL 7.5; h = 1.50 m; c/3% desperdicio
SUMINISTRO e INSTALACION TUBERIA DN 160 mm PVC UF CL 7.5; h = 1.50 m; c/3% desperdicio
SUMINISTRO e INSTALACION DE ACCESORIOS
SUMINISTRO e INSTALACION VALVULA Ø 110 mm f°f° ISO (equipada)
SUMINISTRO e INSTALACION VALVULA Ø 160 mm f°f° ISO (equipada)
SUMINISTRO e INSTALACION TEE Ø 110 mm x 110 mm PVC UF ISO (equipada)
SUMINISTRO e INSTALACION TEE Ø 160 mm x 160 mm PVC UF ISO (equipada)
SUMINISTRO e INSTALACION CRUZ Ø 110 mm x 110 mm PVC UF ISO (equipada)
SUMINISTRO E INSTALACION CRUZ Ø 110 mm x 90 mm PVC UF ISO (equipada)
SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 110 mm PVC UF ISO (equipada)
SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 160 mm PVC UF ISO (equipada)
SUMINISTRO e INSTALACION TAPON Ø 110 mm PVC-UF ISO (equipado)
SUMINISTRO e INSTALACION TAPON Ø 160 mm PVC-UF ISO (equipado)
SUMINISTRO e INSTALACION REDUCCION Ø 160 mm x 110 mm PVC UF ISO ( equipada )
SUMINISTRO E INSTALACION REDUCCION Ø 110 mm x 90 mm PVC UF ISO (equipada)
SUMINISTRO e INSTALACION GRIFO CONTRA INCENDIO f°f° ISO (equipado)
PRUEBAS HIDRAULICAS y DE DESINFECCION
DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 110 mm PVC
DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 160 mm PVC/HDPE
VARIOS
CAJA CONCRETO p/PROTECCION VALVULA
TAPA CONCRETO ARMADO p/PROTECCION VALVULA
CONEXIONES DOMICILIARIAS
TRABAJOS PRELIMINARES
TRAZOS, NIVELACION y REPLANTEO INICIAL
DEMOLICION VEREDA CONCRETO (e = 0.10 m)
DEMOLICION DE PAVIMENTO DE CONCRETO DE 8"
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m; h = 1.00 m
REFINE y NIVELACION FONDO ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m
CAMA APOYO P/TUBERIA Ø 1/2" c/ARENA FINA; e = 0.05 m; a = 0.40 m
RELLENO y APISONADO p/TUBERIA Ø 1/2" c/ARENA FINA; h = 0.30 m
RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 1/2"
ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km
SUMINISTRO e INSTALACION DE TUBERIAS
SUMINISTRO e INSTALACION TUBERIA Ø 1/2" PVC SP CL 10
DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA Ø 1/2" PVC
SUMINISTRO e INSTALACION DE ACCESORIOS
SUMINISTRO e INSTALACION ABRAZADERA 110 mm x 1/2" PVC (equipada)
SUMINISTRO e INSTALACION ABRAZADERA 160 mm x 1/2" PVC (equipada)
SUMINISTRO e INSTALACION ACCESORIOS p/CONEXION DOMICILIARIA Ø 1/2"
SUMINISTRO e INSTALACION CAJA p/MEDIDOR AGUA INC. LOSA CONCRETO 1x1
SUMINISTRO e INSTALACION DE MEDIDOR Ø 1/2"
REPOSICION DE VEREDAS Y PAVIMENTOS
REPOSICION VEREDA c/CONCRETO f' = 140 Kg/cm² (8.50 cm); PASTA (1.50 cm) 1:5; inc./encof/de
REPOSICION DE PAVIMENTO DE CONCRETO, e=8"
COSTO DIRECTO
GASTOS GENERALES FIJOS
UTILIDAD
SUB TOTAL
OBRA N° 02

NES DOMICILIARIAS DE LA CALLE A.B. LEGUIA: C 5 – 6 , CALLE


: C 3-4-5 y 6, DE LA LOCALIDAD DE TUCUME, DISTRITO DE TUCUME,

Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha

PRESUPUESTADO AVANCE ACUMULADO ANTERIOR


UND
METRADO P.UNIT.OF P.PARCIAL METRADO MONTO %

Und 1.00 1,755.92 1,755.92 1.00 1,755.92 100%


m2 24.00 350.00 8,400.00 24.00 8,400.00 100%
Und 1.00 1,112.20 1,112.20 1.00 1,112.20 100%

m 863.00 1.30 1,121.90 863.00 1,121.90 100%


m 863.00 2.30 1,984.90 863.00 1,984.90 100%
m2 101.50 10.71 1,087.07 101.50 1,087.07 100%

m 863.00 9.37 8,086.31 863.00 8,086.31 100%

m 863.00 3.67 3,167.21 863.00 3,167.21 100%

m 863.00 4.99 4,306.37 863.00 4,306.37 100%

m 617.5 9.75 6,020.63 377.17 3,677.38 61%


m 245.5 11.2 2,749.60 0.00 0.00 0%

m 863 15.27 13,178.01 0.00 0.00 0%

m 863 18.81 16,233.03 0.00 0.00 0%

m3 588.47 13.95 8,209.16 0.00 0.00 0%

m 617.5 15.88 9,805.90 617.50 9,805.90 100%


m 245.5 30.75 7,549.13 245.50 7,549.13 100%

Und 3.00 606.20 1,818.60 3.00 1,818.60 100%


Und 1.00 898.06 898.06 1.00 898.06 100%
Und 2.00 154.20 308.40 2.00 308.40 100%
Und 1.00 369.38 369.38 1.00 369.38 100%
Und 3.00 310.84 932.52 3.00 932.52 100%
Und 1.00 485.08 485.08 1.00 485.08 100%
Und 1.00 967.08 967.08 1.00 967.08 100%
Und 1.00 744.08 744.08 1.00 744.08 100%
Und 2.00 115.19 230.38 2.00 230.38 100%
Und 1.00 166.44 166.44 1.00 166.44 100%
Und 2.00 102.20 204.40 2.00 204.40 100%
Und 1.00 174.32 174.32 1.00 174.32 100%
Und 1.00 1381.23 1,381.23 1.00 1,381.23 100%

m 617.50 2.44 1,506.70 617.50 1,506.70 100%


m 245.50 3.62 888.71 245.50 888.71 100%

Und 4.00 238.22 952.88 4.00 952.88 100%


Und 4.00 117.54 470.16 4.00 470.16 100%

m 694.00 1.30 902.20 694.00 902.20 100%


m2 41.34 32.32 1,336.11 41.34 1,336.11 100%
m2 79.20 11.41 903.67 79.20 903.67 100%

m 694.00 16.32 11,326.08 108.43 1,769.50 16%


m 694.00 3.06 2,123.64 271.31 830.20 39%
m 694.00 2.76 1,915.44 388.51 1,072.29 56%
m 694.00 4.30 2,984.20 0.00 0.00 0%
m 694.00 7.30 5,066.20 0.00 0.00 0%
m3 360.88 13.95 5,034.28 0.00 0.00 0%

m 694.00 2.09 1,450.46 152.73 319.20 22%


m 694.00 2.35 1,630.90 0.00 0.00 0%

Und 126.00 20.57 2,591.82 0.00 0.00 0%


Und 33.00 30.74 1,014.42 0.00 0.00 0%
Und 159.00 43.15 6,860.85 0.00 0.00 0%
Und 159.00 102.77 16,340.43 0.00 0.00 0%
Und 159.00 142.41 22,643.19 0.00 0.00 0%

m2 41.34 56.30 2,327.44 0.00 0.00 0%


m2 180.70 140.53 25,393.77 0.00 0.00 0%
219,110.84 71,685.88
8.00% 17,528.87 5,734.87
7.00% 15,337.76 5,018.01
251,977.47 82,438.76
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17

AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO POR EJECUTAR


METRADO MONTO % METRADO MONTO % METRADO

0.00 0% 1.00 1,755.92 100% 0.00


0.00 0% 24.00 8,400.00 100% 0.00
0.00 0% 1.00 1,112.20 100% 0.00

0.00 0% 863.00 1,121.90 100% 0.00


0.00 0% 863.00 1,984.90 100% 0.00
0.00 0% 101.50 1,087.07 100% 0.00

0.00 0% 863.00 8,086.31 100% 0.00

0.00 0% 863.00 3,167.21 100% 0.00

0.00 0% 863.00 4,306.37 100% 0.00

240.33 2,343.25 39% 617.50 6,020.63 100% 0.00


245.50 2,749.60 100% 245.50 2,749.60 100% 0.00

863.00 13,178.01 100% 863.00 13,178.01 100% 0.00

863.00 16,233.03 100% 863.00 16,233.03 100% 0.00

588.47 8,209.16 100% 588.47 8,209.16 100% 0.00

0.00 0% 617.50 9,805.90 100% 0.00


0.00 0% 245.50 7,549.13 100% 0.00

0.00 0% 3.00 1,818.60 100% 0.00


0.00 0% 1.00 898.06 100% 0.00
0.00 0% 2.00 308.40 100% 0.00
0.00 0% 1.00 369.38 100% 0.00
0.00 0% 3.00 932.52 100% 0.00
0.00 0% 1.00 485.08 100% 0.00
0.00 0% 1.00 967.08 100% 0.00
0.00 0% 1.00 744.08 100% 0.00
0.00 0% 2.00 230.38 100% 0.00
0.00 0% 1.00 166.44 100% 0.00
0.00 0% 2.00 204.40 100% 0.00
0.00 0% 1.00 174.32 100% 0.00
0.00 0% 1.00 1,381.23 100% 0.00

0.00 0% 617.50 1,506.70 100% 0.00


0.00 0% 245.50 888.71 100% 0.00

0.00 0% 4.00 952.88 100% 0.00


0.00 0% 4.00 470.16 100% 0.00

0.00 0% 694.00 902.20 100% 0.00


0.00 0% 41.34 1,336.11 100% 0.00
0.00 0% 79.20 903.67 100% 0.00

585.57 9,556.58 84% 694.00 11,326.08 100% 0.00


422.69 1,293.44 61% 694.00 2,123.64 100% 0.00
305.49 843.15 44% 694.00 1,915.44 100% 0.00
694.00 2,984.20 100% 694.00 2,984.20 100% 0.00
694.00 5,066.20 100% 694.00 5,066.20 100% 0.00
360.88 5,034.28 100% 360.88 5,034.28 100% 0.00

541.27 1,131.26 78% 694.00 1,450.46 100% 0.00


694.00 1,630.90 100% 694.00 1,630.90 100% 0.00

126.00 2,591.82 100% 126.00 2,591.82 100% 0.00


33.00 1,014.42 100% 33.00 1,014.42 100% 0.00
95.29 4,111.78 60% 95.29 4,111.78 60% 63.71
117.50 12,075.70 74% 117.50 12,075.70 74% 41.50
142.16 20,244.80 89% 142.16 20,244.80 89% 16.84

0.00 0% 0.00 0.00 0% 41.34


0.00 0% 0.00 0.00 0% 180.70
110,291.58 181,977.44
8,823.33 14,558.20
7,720.41 12,738.42
126,835.32 209,274.06
Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha

SALDO POR EJECUTAR


MONTO %

0.00 0%
0.00 0%
0.00 0%

0.00 0%
0.00 0%
0.00 0%

0.00 0%

0.00 0%

0.00 0%

0.00 0%
0.00 0%

0.00 0%

0.00 0%

0.00 0%

0.00 0%
0.00 0%

0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%

0.00 0%
0.00 0%

0.00 0%
0.00 0%

0.00 0%
0.00 0%
0.00 0%

0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
0.00 0%

0.00 0%
0.00 0%

0.00 0%
0.00 0%
2,749.07 40%
4,264.73 26%
2,398.39 11%

2,327.44 100%
25,393.77 100%
37,133.40
2,970.67
2,599.34
42,703.41
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha Dec-17 Fecha
Dec-17
VALORIZACION DE AVANCE DE OBRA N° 03

MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS DE LA CA


OBRA: CALLE CONVENTO, CALLE 16 DE FEBRERO: C 5, CALLE UNION: C 3, CALLE MARISCAL CASTILLA: C 3-4-5 y 6, DE LA LOC
DISTRITO DE TUCUME, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE.

ITEM PARTIDA UND

01.01.00 OBRAS PROVISIONALES


01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M. Und
01.01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO m2
01.01.03 SEÑALIZACION Y DESVIO DE TRANSITO Und
01.02.00 TRABAJOS PRELIMINARES
01.02.01 TRAZOS, NIVELACION y REPLANTEO INICIAL m
01.02.02 TRAZOS, NIVELACION y REPLANTEO DURANTE EJECUCION OBRA m
01.02.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2
01.03.00 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACION DE ZANJAS
01.03.01.0EXCAVACION ZANJA c/MAQUINA p/TUBERIA Ø = 110 mm a 250 mm; a = 0.60 m; h m
01.03.02 REFINE y NIVELACION DE ZANJAS
01.03.02.0REFINE y NIVELACION ZANJA p/TUBERIA Ø 110 a 250 mm m
01.03.03 CAMA DE APOYO P/TUBERIAS
01.03.03.0CAMA APOYO p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE a = 0.15 m m
01.03.04
RELLENO, APISONADO y COMPACTACION LATERAL CON MATERIAL DE PRESTAMO
01.03.04.0RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 110 mm c/RIPIO CORRIE m
01.03.04.0RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 160 mm c/RIPIO CORRIE m
01.03.05 RELLENO y COMPACTACION S/CLAVE TUBO C/MATERIAL DE PRESTAMO
01.03.05.0RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRI m
01.03.06 RELLENO y COMPACTACION CON MATERIAL PROPIO SELECCIONADO
01.03.06.0RELLENO y COMPACTACION c/MATERIAL PROPIO SELECCIONADO y PRESTAMO CAPAS c/0
m
01.03.07 ACARREO y ELIMINACION MATERIAL EXCEDENTE
01.03.07.0ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km m3
01.04.00 SUMINISTRO e INSTALACION DE TUBERIAS y ACCESORIOS
01.04.01 SUMINISTRO e INSTALACION DE TUBERIAS PVC C-7.5
01.04.01.0SUMINISTRO e INSTALACION TUBERIA DN 110 mm PVC UF CL 7.5; h = 1.50 m; c/3% m
01.04.01.0SUMINISTRO e INSTALACION TUBERIA DN 160 mm PVC UF CL 7.5; h = 1.50 m; c/3% m
01.04.02 SUMINISTRO e INSTALACION DE ACCESORIOS
01.04.02.0SUMINISTRO e INSTALACION VALVULA Ø 110 mm f°f° ISO (equipada) Und
01.04.02.0SUMINISTRO e INSTALACION VALVULA Ø 160 mm f°f° ISO (equipada) Und
01.04.02.0SUMINISTRO e INSTALACION TEE Ø 110 mm x 110 mm PVC UF ISO (equipada) Und
01.04.02.0SUMINISTRO e INSTALACION TEE Ø 160 mm x 160 mm PVC UF ISO (equipada) Und
01.04.02.0SUMINISTRO e INSTALACION CRUZ Ø 110 mm x 110 mm PVC UF ISO (equipada) Und
01.04.02.0SUMINISTRO E INSTALACION CRUZ Ø 110 mm x 90 mm PVC UF ISO (equipada) Und
01.04.02.0SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 110 mm PVC UF ISO (equipada) Und
01.04.02.0SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 160 mm PVC UF ISO (equipada) Und
01.04.02.0SUMINISTRO e INSTALACION TAPON Ø 110 mm PVC-UF ISO (equipado) Und
01.04.02.1SUMINISTRO e INSTALACION TAPON Ø 160 mm PVC-UF ISO (equipado) Und
01.04.02.1SUMINISTRO e INSTALACION REDUCCION Ø 160 mm x 110 mm PVC UF ISO ( equip Und
01.04.02.1SUMINISTRO E INSTALACION REDUCCION Ø 110 mm x 90 mm PVC UF ISO (equipad Und
01.04.02.1SUMINISTRO e INSTALACION GRIFO CONTRA INCENDIO f°f° ISO (equipado) Und
01.05.00 PRUEBAS HIDRAULICAS y DE DESINFECCION
01.05.01 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 110 mm PVC m
01.05.02 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 160 mm PVC/HDPE m
01.06.00 VARIOS
01.06.01 CAJA CONCRETO p/PROTECCION VALVULA Und
01.06.02 TAPA CONCRETO ARMADO p/PROTECCION VALVULA Und
02.00.00 CONEXIONES DOMICILIARIAS
02.01.00 TRABAJOS PRELIMINARES
02.01.01 TRAZOS, NIVELACION y REPLANTEO INICIAL m
02.01.02 DEMOLICION VEREDA CONCRETO (e = 0.10 m) m2
02.01.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m; h = 1.00 m m
02.02.02 REFINE y NIVELACION FONDO ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m m
02.02.03 CAMA APOYO P/TUBERIA Ø 1/2" c/ARENA FINA; e = 0.05 m; a = 0.40 m m
02.02.04 RELLENO y APISONADO p/TUBERIA Ø 1/2" c/ARENA FINA; h = 0.30 m m
02.02.05 RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 1/2" m
02.02.06 ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km m3
02.03.00 SUMINISTRO e INSTALACION DE TUBERIAS
02.03.01 SUMINISTRO e INSTALACION TUBERIA Ø 1/2" PVC SP CL 10 m
02.03.02 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA Ø 1/2" PVC m
02.04.00 SUMINISTRO e INSTALACION DE ACCESORIOS
02.04.01 SUMINISTRO e INSTALACION ABRAZADERA 110 mm x 1/2" PVC (equipada) Und
02.04.02 SUMINISTRO e INSTALACION ABRAZADERA 160 mm x 1/2" PVC (equipada) Und
02.04.03 SUMINISTRO e INSTALACION ACCESORIOS p/CONEXION DOMICILIARIA Ø 1/2" Und
02.04.04 SUMINISTRO e INSTALACION CAJA p/MEDIDOR AGUA INC. LOSA CONCRETO 1x1 Und
02.04.05 SUMINISTRO e INSTALACION DE MEDIDOR Ø 1/2" Und
03.00.00 REPOSICION DE VEREDAS Y PAVIMENTOS
03.01.00 REPOSICION VEREDA c/CONCRETO f' = 140 Kg/cm² (8.50 cm); PASTA (1.50 cm) 1:5; m2
03.02.00 REPOSICION DE PAVIMENTO DE CONCRETO, e=8" m2
COSTO DIRECTO
GASTOS GENERALES FIJOS
UTILIDAD
SUB TOTAL
BRA N° 03

XIONES DOMICILIARIAS DE LA CALLE A.B. LEGUIA: C 5 – 6 ,


CASTILLA: C 3-4-5 y 6, DE LA LOCALIDAD DE TUCUME,
EQUE.

PRESUPUESTADO AVANCE ACUMULADO ANTERIOR AVANCE ACTUA


METRADO P.UNIT.OF P.PARCIAL METRADO MONTO % METRADO

1.00 1,755.92 1,755.92 1 1,755.92 100%


24.00 350.00 8,400.00 24 8,400.00 100%
1.00 1,112.20 1,112.20 1 1,112.20 100%

863.00 1.30 1,121.90 863 1,121.90 100%


863.00 2.30 1,984.90 863 1,984.90 100%
101.50 10.71 1,087.07 101.5 1,087.07 100%

863.00 9.37 8,086.31 863 8,086.31 100%

863.00 3.67 3,167.21 863 3,167.21 100%

863.00 4.99 4,306.37 863 4,306.37 100%

617.5 9.75 6,020.63 617.50 6,020.63 100%


245.5 11.2 2,749.60 245.50 2,749.60 100%

863 15.27 13,178.01 863 13,178.01 100%

863 18.81 16,233.03 863 16,233.03 100%

588.47 13.95 8,209.16 588.47 8,209.16 100%

617.5 15.88 9,805.90 617.5 9,805.90 100%


245.5 30.75 7,549.13 245.5 7,549.13 100%

3.00 606.20 1,818.60 3 1,818.60 100%


1.00 898.06 898.06 1 898.06 100%
2.00 154.20 308.40 2 308.40 100%
1.00 369.38 369.38 1 369.38 100%
3.00 310.84 932.52 3 932.52 100%
1.00 485.08 485.08 1 485.08 100%
1.00 967.08 967.08 1 967.08 100%
1.00 744.08 744.08 1 744.08 100%
2.00 115.19 230.38 2 230.38 100%
1.00 166.44 166.44 1 166.44 100%
2.00 102.20 204.40 2 204.40 100%
1.00 174.32 174.32 1 174.32 100%
1.00 1381.23 1,381.23 1 1,381.23 100%

617.50 2.44 1,506.70 617.5 1,506.70 100%


245.50 3.62 888.71 245.5 888.71 100%

4.00 238.22 952.88 4 952.88 100%


4.00 117.54 470.16 4 470.16 100%

694.00 1.30 902.20 694 902.20 100%


41.34 32.32 1,336.11 41.34 1,336.11 100%
79.20 11.41 903.67 79.2 903.67 100%

694.00 16.32 11,326.08 694 11,326.08 100%


694.00 3.06 2,123.64 694 2,123.64 100%
694.00 2.76 1,915.44 694 1,915.44 100%
694.00 4.30 2,984.20 694 2,984.20 100%
694.00 7.30 5,066.20 694 5,066.20 100%
360.88 13.95 5,034.28 360.88 5,034.28 100%

694.00 2.09 1,450.46 694 1,450.46 100%


694.00 2.35 1,630.90 694 1,630.90 100%

126.00 20.57 2,591.82 126 2,591.82 100%


33.00 30.74 1,014.42 33 1,014.42 100%
159.00 43.15 6,860.85 95.29038239 4,111.78 60% 63.71
159.00 102.77 16,340.43 117.5021894 12,075.70 74% 41.50
159.00 142.41 22,643.19 142.1585563 20,244.80 89% 16.84

41.34 56.30 2,327.44 0 0.00 0%


180.70 140.53 25,393.77 0 0.00 0%
219,110.84 181,977.44
8.00% 17,528.87 14,558.20
7.00% 15,337.76 12,738.42
251,977.47 209,274.06
AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO POR EJECUTAR
MONTO % METRADO MONTO % METRADO MONTO

0.00 0% 1.00 1,755.92 100% 0.00 0.00


0.00 0% 24.00 8,400.00 100% 0.00 0.00
0.00 0% 1.00 1,112.20 100% 0.00 0.00

0.00 0% 863.00 1,121.90 100% 0.00 0.00


0.00 0% 863.00 1,984.90 100% 0.00 0.00
0.00 0% 101.50 1,087.07 100% 0.00 0.00

0.00 0% 863.00 8,086.31 100% 0.00 0.00

0.00 0% 863.00 3,167.21 100% 0.00 0.00

0.00 0% 863.00 4,306.37 100% 0.00 0.00

0.00 0% 617.50 6,020.63 100% 0.00 0.00


0.00 0% 245.50 2,749.60 100% 0.00 0.00

0.00 0% 863.00 13,178.01 100% 0.00 0.00

0.00 0% 863.00 16,233.03 100% 0.00 0.00

0.00 0% 588.47 8,209.16 100% 0.00 0.00

0.00 0% 617.50 9,805.90 100% 0.00 0.00


0.00 0% 245.50 7,549.13 100% 0.00 0.00

0.00 0% 3.00 1,818.60 100% 0.00 0.00


0.00 0% 1.00 898.06 100% 0.00 0.00
0.00 0% 2.00 308.40 100% 0.00 0.00
0.00 0% 1.00 369.38 100% 0.00 0.00
0.00 0% 3.00 932.52 100% 0.00 0.00
0.00 0% 1.00 485.08 100% 0.00 0.00
0.00 0% 1.00 967.08 100% 0.00 0.00
0.00 0% 1.00 744.08 100% 0.00 0.00
0.00 0% 2.00 230.38 100% 0.00 0.00
0.00 0% 1.00 166.44 100% 0.00 0.00
0.00 0% 2.00 204.40 100% 0.00 0.00
0.00 0% 1.00 174.32 100% 0.00 0.00
0.00 0% 1.00 1,381.23 100% 0.00 0.00

0.00 0% 617.50 1,506.70 100% 0.00 0.00


0.00 0% 245.50 888.71 100% 0.00 0.00

0.00 0% 4.00 952.88 100% 0.00 0.00


0.00 0% 4.00 470.16 100% 0.00 0.00

0.00 0% 694.00 902.20 100% 0.00 0.00


0.00 0% 41.34 1,336.11 100% 0.00 0.00
0.00 0% 79.20 903.67 100% 0.00 0.00

0.00 0% 694.00 11,326.08 100% 0.00 0.00


0.00 0% 694.00 2,123.64 100% 0.00 0.00
0.00 0% 694.00 1,915.44 100% 0.00 0.00
0.00 0% 694.00 2,984.20 100% 0.00 0.00
0.00 0% 694.00 5,066.20 100% 0.00 0.00
0.00 0% 360.88 5,034.28 100% 0.00 0.00

0.00 0% 694.00 1,450.46 100% 0.00 0.00


0.00 0% 694.00 1,630.90 100% 0.00 0.00

0.00 0% 126.00 2,591.82 100% 0.00 0.00


0.00 0% 33.00 1,014.42 100% 0.00 0.00
2,749.07 40% 159.00 6,860.85 100% 0.00 0.00
4,264.73 26% 159.00 16,340.43 100% 0.00 0.00
2,398.39 11% 159.00 22,643.19 100% 0.00 0.00

0.00 0% 0.00 0.00 0% 41.34 2,327.44


0.00 0% 0.00 0.00 0% 180.70 25,393.77
9,412.19 191,389.63 27,721.21
752.98 15,311.17 2,217.70
658.85 13,397.27 1,940.48
10,824.02 220,098.07 31,879.39
R EJECUTAR
%

0%
0%
0%

0%
0%
0%

0%

0%

0%

0%
0%

0%

0%

0%

0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%

0%
0%

0%
0%
0%

0%
0%
0%
0%
0%
0%

0%
0%

0%
0%
0%
0%
0%

100%
100%
VALORIZACION DE AVANCE DE OBRA N° 04

MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS DE LA CA


OBRA: LEGUIA: C 5 – 6 , CALLE CONVENTO, CALLE 16 DE FEBRERO: C 5, CALLE UNION: C 3, CALLE MARISCAL CASTILLA: C 3-4
LOCALIDAD DE TUCUME, DISTRITO DE TUCUME, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE.

PRESUPUESTADO
ITEM PARTIDA UND
METRADO
01.01.00 OBRAS PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M. Und 1.00
01.01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO m2 24.00
01.01.03 SEÑALIZACION Y DESVIO DE TRANSITO Und 1.00
01.02.00 TRABAJOS PRELIMINARES
01.02.01 TRAZOS, NIVELACION y REPLANTEO INICIAL m 863.00
01.02.02 TRAZOS, NIVELACION y REPLANTEO DURANTE EJECUCION OBRA m 863.00
01.02.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 101.50
01.03.00 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACION DE ZANJAS
01.03.01.0EXCAVACION ZANJA c/MAQUINA p/TUBERIA Ø = 110 mm a 250 mm; a = 0m 863.00
01.03.02 REFINE y NIVELACION DE ZANJAS
01.03.02.0REFINE y NIVELACION ZANJA p/TUBERIA Ø 110 a 250 mm m 863.00
01.03.03 CAMA DE APOYO P/TUBERIAS
01.03.03.0CAMA APOYO p/TUBERIA Ø 110 mm a 250 mm c/RIPIO CORRIENTE a = m 863.00
01.03.04
RELLENO, APISONADO y COMPACTACION LATERAL CON MATERIAL DE PRESTAMO
01.03.04.0RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 110 mm c/RIP m 617.5
01.03.04.0RELLENO LATERAL Y APISONADO DE ZANJA p/TUBERIA Ø 160 mm c/RIP m 245.5
01.03.05 RELLENO y COMPACTACION S/CLAVE TUBO C/MATERIAL DE PRESTAMO
01.03.05.0RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 110 mm a 250 mm c/RI m 863
01.03.06 RELLENO y COMPACTACION CON MATERIAL PROPIO SELECCIONADO
01.03.06.0RELLENO y COMPACTACION c/MATERIAL PROPIO SELECCIONADO y PRESTAMO
m 863
01.03.07 ACARREO y ELIMINACION MATERIAL EXCEDENTE
01.03.07.0ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km m3 588.47
01.04.00 SUMINISTRO e INSTALACION DE TUBERIAS y ACCESORIOS
01.04.01 SUMINISTRO e INSTALACION DE TUBERIAS PVC C-7.5
01.04.01.0SUMINISTRO e INSTALACION TUBERIA DN 110 mm PVC UF CL 7.5; h = 1. m 617.5
01.04.01.0SUMINISTRO e INSTALACION TUBERIA DN 160 mm PVC UF CL 7.5; h = 1. m 245.5
01.04.02 SUMINISTRO e INSTALACION DE ACCESORIOS
01.04.02.0SUMINISTRO e INSTALACION VALVULA Ø 110 mm f°f° ISO (equipada) Und 3.00
01.04.02.0SUMINISTRO e INSTALACION VALVULA Ø 160 mm f°f° ISO (equipada) Und 1.00
01.04.02.0SUMINISTRO e INSTALACION TEE Ø 110 mm x 110 mm PVC UF ISO (equ Und 2.00
01.04.02.0SUMINISTRO e INSTALACION TEE Ø 160 mm x 160 mm PVC UF ISO (equ Und 1.00
01.04.02.0SUMINISTRO e INSTALACION CRUZ Ø 110 mm x 110 mm PVC UF ISO (eq Und 3.00
01.04.02.0SUMINISTRO E INSTALACION CRUZ Ø 110 mm x 90 mm PVC UF ISO (equ Und 1.00
01.04.02.0SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 110 mm PVC UF ISO (eq Und 1.00
01.04.02.0SUMINISTRO E INSTALACION CRUZ Ø 160 mm x 160 mm PVC UF ISO (eq Und 1.00
01.04.02.0SUMINISTRO e INSTALACION TAPON Ø 110 mm PVC-UF ISO (equipado) Und 2.00
01.04.02.1SUMINISTRO e INSTALACION TAPON Ø 160 mm PVC-UF ISO (equipado) Und 1.00
01.04.02.1SUMINISTRO e INSTALACION REDUCCION Ø 160 mm x 110 mm PVC UF ISUnd 2.00
01.04.02.1SUMINISTRO E INSTALACION REDUCCION Ø 110 mm x 90 mm PVC UF IS Und 1.00
01.04.02.1SUMINISTRO e INSTALACION GRIFO CONTRA INCENDIO f°f° ISO (equipad Und 1.00
01.05.00 PRUEBAS HIDRAULICAS y DE DESINFECCION
01.05.01 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 110 mm P m 617.50
01.05.02 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA DN 160 mm P m 245.50
01.06.00 VARIOS
01.06.01 CAJA CONCRETO p/PROTECCION VALVULA Und 4.00
01.06.02 TAPA CONCRETO ARMADO p/PROTECCION VALVULA Und 4.00
02.00.00 CONEXIONES DOMICILIARIAS
02.01.00 TRABAJOS PRELIMINARES
02.01.01 TRAZOS, NIVELACION y REPLANTEO INICIAL m 694.00
02.01.02 DEMOLICION VEREDA CONCRETO (e = 0.10 m) m2 41.34
02.01.03 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 79.20
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m; h = 1.00 m 694.00
02.02.02 REFINE y NIVELACION FONDO ZANJA p/TUBERIA Ø 1/2"; a = 0.40 m m 694.00
02.02.03 CAMA APOYO P/TUBERIA Ø 1/2" c/ARENA FINA; e = 0.05 m; a = 0.40 m m 694.00
02.02.04 RELLENO y APISONADO p/TUBERIA Ø 1/2" c/ARENA FINA; h = 0.30 m m 694.00
02.02.05 RELLENO y COMPACTACION ZANJA p/TUBERIA Ø 1/2" m 694.00
02.02.06 ACARREO y ELIMINACION MATERIAL EXCEDENTE Dist. min = 5.0 Km m3 360.88
02.03.00 SUMINISTRO e INSTALACION DE TUBERIAS
02.03.01 SUMINISTRO e INSTALACION TUBERIA Ø 1/2" PVC SP CL 10 m 694.00
02.03.02 DOBLE PRUEBA HIDRAULICA y DESINFECCION p/TUBERIA Ø 1/2" PVC m 694.00
02.04.00 SUMINISTRO e INSTALACION DE ACCESORIOS
02.04.01 SUMINISTRO e INSTALACION ABRAZADERA 110 mm x 1/2" PVC (equipad Und 126.00
02.04.02 SUMINISTRO e INSTALACION ABRAZADERA 160 mm x 1/2" PVC (equipad Und 33.00
02.04.03 SUMINISTRO e INSTALACION ACCESORIOS p/CONEXION DOMICILIARIA Ø Und 159.00
02.04.04 SUMINISTRO e INSTALACION CAJA p/MEDIDOR AGUA INC. LOSA CONCRE Und 159.00
02.04.05 SUMINISTRO e INSTALACION DE MEDIDOR Ø 1/2" Und 159.00
03.00.00 REPOSICION DE VEREDAS Y PAVIMENTOS
03.01.00 REPOSICION VEREDA c/CONCRETO f' = 140 Kg/cm² (8.50 cm); PASTA (1.50
m2 41.34
03.02.00 REPOSICION DE PAVIMENTO DE CONCRETO, e=8" m2 180.70
COSTO DIRECTO
GASTOS GENERALES FIJOS 8.00%
UTILIDAD 7.00%
SUB TOTAL
° 04

EXIONES DOMICILIARIAS DE LA CALLE A.B.


, CALLE MARISCAL CASTILLA: C 3-4-5 y 6, DE LA
PARTAMENTO DE LAMBAYEQUE.

PRESUPUESTADO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL


P.UNIT.OF P.PARCIAL METRADO MONTO % METRADO

1,755.92 1,755.92 1 1,755.92 100%


350.00 8,400.00 24 8,400.00 100%
1,112.20 1,112.20 1 1,112.20 100%

1.30 1,121.90 863 1,121.90 100%


2.30 1,984.90 863 1,984.90 100%
10.71 1,087.07 101.5 1,087.07 100%

9.37 8,086.31 863 8,086.31 100%

3.67 3,167.21 863 3,167.21 100%

4.99 4,306.37 863 4,306.37 100%

9.75 6,020.63 617.5 6,020.63 100%


11.2 2,749.60 245.5 2,749.60 100%

15.27 13,178.01 863 13,178.01 100%

18.81 16,233.03 863 16,233.03 100%

13.95 8,209.16 588.47 8,209.16 100%

15.88 9,805.90 617.5 9,805.90 100%


30.75 7,549.13 245.5 7,549.13 100%

606.20 1,818.60 3 1,818.60 100%


898.06 898.06 1 898.06 100%
154.20 308.40 2 308.40 100%
369.38 369.38 1 369.38 100%
310.84 932.52 3 932.52 100%
485.08 485.08 1 485.08 100%
967.08 967.08 1 967.08 100%
744.08 744.08 1 744.08 100%
115.19 230.38 2 230.38 100%
166.44 166.44 1 166.44 100%
102.20 204.40 2 204.40 100%
174.32 174.32 1 174.32 100%
1381.23 1,381.23 1 1,381.23 100%

2.44 1,506.70 617.5 1,506.70 100%


3.62 888.71 245.5 888.71 100%

238.22 952.88 4 952.88 100%


117.54 470.16 4 470.16 100%

1.30 902.20 694 902.20 100%


32.32 1,336.11 41.34 1,336.11 100%
11.41 903.67 79.2 903.67 100%

16.32 11,326.08 694 11,326.08 100%


3.06 2,123.64 694 2,123.64 100%
2.76 1,915.44 694 1,915.44 100%
4.30 2,984.20 694 2,984.20 100%
7.30 5,066.20 694 5,066.20 100%
13.95 5,034.28 360.88 5,034.28 100%

2.09 1,450.46 694 1,450.46 100%


2.35 1,630.90 694 1,630.90 100%

20.57 2,591.82 126 2,591.82 100%


30.74 1,014.42 33 1,014.42 100%
43.15 6,860.85 159 6,860.85 100%
102.77 16,340.43 159 16,340.43 100%
142.41 22,643.19 159 22,643.19 100%

56.30 2,327.44 0.00 0.00 0% 41.34


140.53 25,393.77 0.00 0.00 0% 180.70
219,110.84 191,389.63
17,528.87 15,311.17
15,337.76 13,397.27
251,977.47 220,098.07
AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO POR EJECUTAR
MONTO % METRADO MONTO % METRADO MONTO

0.00 0% 1.00 1,755.92 100% 0.00 0.00


0.00 0% 24.00 8,400.00 100% 0.00 0.00
0.00 0% 1.00 1,112.20 100% 0.00 0.00

0.00 0% 863.00 1,121.90 100% 0.00 0.00


0.00 0% 863.00 1,984.90 100% 0.00 0.00
0.00 0% 101.50 1,087.07 100% 0.00 0.00

0.00 0% 863.00 8,086.31 100% 0.00 0.00

0.00 0% 863.00 3,167.21 100% 0.00 0.00

0.00 0% 863.00 4,306.37 100% 0.00 0.00

0.00 0% 617.50 6,020.63 100% 0.00 0.00


0.00 0% 245.50 2,749.60 100% 0.00 0.00

0.00 0% 863.00 13,178.01 100% 0.00 0.00

0.00 0% 863.00 16,233.03 100% 0.00 0.00

0.00 0% 588.47 8,209.16 100% 0.00 0.00

0.00 0% 617.50 9,805.90 100% 0.00 0.00


0.00 0% 245.50 7,549.13 100% 0.00 0.00

0.00 0% 3.00 1,818.60 100% 0.00 0.00


0.00 0% 1.00 898.06 100% 0.00 0.00
0.00 0% 2.00 308.40 100% 0.00 0.00
0.00 0% 1.00 369.38 100% 0.00 0.00
0.00 0% 3.00 932.52 100% 0.00 0.00
0.00 0% 1.00 485.08 100% 0.00 0.00
0.00 0% 1.00 967.08 100% 0.00 0.00
0.00 0% 1.00 744.08 100% 0.00 0.00
0.00 0% 2.00 230.38 100% 0.00 0.00
0.00 0% 1.00 166.44 100% 0.00 0.00
0.00 0% 2.00 204.40 100% 0.00 0.00
0.00 0% 1.00 174.32 100% 0.00 0.00
0.00 0% 1.00 1,381.23 100% 0.00 0.00

0.00 0% 617.50 1,506.70 100% 0.00 0.00


0.00 0% 245.50 888.71 100% 0.00 0.00

0.00 0% 4.00 952.88 100% 0.00 0.00


0.00 0% 4.00 470.16 100% 0.00 0.00

0.00 0% 694.00 902.20 100% 0.00 0.00


0.00 0% 41.34 1,336.11 100% 0.00 0.00
0.00 0% 79.20 903.67 100% 0.00 0.00

0.00 0% 694.00 11,326.08 100% 0.00 0.00


0.00 0% 694.00 2,123.64 100% 0.00 0.00
0.00 0% 694.00 1,915.44 100% 0.00 0.00
0.00 0% 694.00 2,984.20 100% 0.00 0.00
0.00 0% 694.00 5,066.20 100% 0.00 0.00
0.00 0% 360.88 5,034.28 100% 0.00 0.00

0.00 0% 694.00 1,450.46 100% 0.00 0.00


0.00 0% 694.00 1,630.90 100% 0.00 0.00

0.00 0% 126.00 2,591.82 100% 0.00 0.00


0.00 0% 33.00 1,014.42 100% 0.00 0.00
0.00 0% 159.00 6,860.85 100% 0.00 0.00
0.00 0% 159.00 16,340.43 100% 0.00 0.00
0.00 0% 159.00 22,643.19 100% 0.00 0.00

2,327.44 100% 41.34 2,327.44 100% 0.00 0.00


25,393.77 100% 180.70 25,393.77 100% 0.00 0.00
27,721.21 219,110.84 0.00
2,217.70 17,528.87 0.00
1,940.48 15,337.76 0.00
31,879.39 251,977.47 0.00
R EJECUTAR
%

0%
0%
0%

0%
0%
0%

0%

0%

0%

0%
0%

0%

0%

0%

0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%

0%
0%

0%
0%
0%

0%
0%
0%
0%
0%
0%

0%
0%

0%
0%
0%
0%
0%

0%
0%
CALENDARIO DE AVANCE DE OBRA
MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS DE LA
CALLE A.B. LEGUIA: C 5 – 6 , CALLE CONVENTO, CALLE 16 DE FEBRERO: C 5, CALLE UNION: C 3, CALLE MARISCAL
OBRA: CASTILLA: C 3-4-5 y 6, DE LA LOCALIDAD DE TUCUME, DISTRITO DE TUCUME, PROVINCIA DE LAMBAYEQUE,
DEPARTAMENTO DE LAMBAYEQUE.
MONTO DEL PRESUPUESTO BASE:
MONTO CONTRATADO: 0.00

AVANCE DE OBRA MENSUAL AVANCE DE OBRA ACUMULADO


N° MES
REAL PROGRAMADO REAL
1 Feb-16 82,438.76 82,438.76 82,438.76
2 Mar-16 126,835.32 126,835.32 209,274.08
3 Apr-16 10,824.02 10,824.02 220,098.10
4 May-16 31,879.39 31,879.39 251,977.49
251,977.49 251,977.49
CONEXIONES DOMICILIARIAS DE LA
ALLE UNION: C 3, CALLE MARISCAL
PROVINCIA DE LAMBAYEQUE,

NCE DE OBRA ACUMULADO


PROGRAMADO
82,438.76
209,274.08
220,098.10
251,977.49
FÓRMULA POLINÓMICA DE REAJUSTE

MEJORAMIENTO DE LAS REDES DE AGUA POTABLE Y ALCANTARILLADO CON CONEXIONES DOMICILIARIAS DE LA


CALLE A.B. LEGUIA: C 5 – 6 , CALLE CONVENTO, CALLE 16 DE FEBRERO: C 5, CALLE UNION: C 3, CALLE MARISCAL
OBRA: CASTILLA: C 3-4-5 y 6, DE LA LOCALIDAD DE TUCUME, DISTRITO DE TUCUME, PROVINCIA DE LAMBAYEQUE,
DEPARTAMENTO DE LAMBAYEQUE.

COEFICIENTE
SIMB. DESCRIPCION IU FACTOR
%
J MANO DE OBRA INC. LEYES SOCIALES 47 0.092 100.00%
F FLETE TERRESTRE 32 0.050 100.00%
HAF HORMIGON 38 0.112 74.30%
AGREGADO FINO 04 25.70%
AG AGREGADO GRUESO 05 0.247 100.00%
M MALLA DE ACERO 46 0.124 100.00%
EQ MAQUINARIA Y EQUIPO NACIONAL 48 0.175 16.60%
MAQUINARIA Y EQUIPO IMPORTADO 49 83.40%
GU INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.200 100.00%
k= 1.000
ONEXIONES DOMICILIARIAS DE LA
LE UNION: C 3, CALLE MARISCAL
ROVINCIA DE LAMBAYEQUE,

COEFICIENTE Io Ir K Ir K Ir K
INCID. Oct-16 Feb-16 Feb-16 Mar-16 Mar-16 Apr-16 Apr-16
0.092 562.24 563.25 0.092 563.25 0.092 563.25 0.092
0.050 462.71 463.60 0.050 463.60 0.050 465.79 0.050
0.083 573.15 568.26 0.082 569.72 0.083 568.97 0.082
0.029 587.87 591.00 0.029 588.80 0.029 590.67 0.029
0.247 604.91 603.02 0.246 602.70 0.246 602.64 0.246
0.124 488.86 490.07 0.124 482.23 0.122 480.79 0.122
0.029 368.83 367.86 0.029 365.19 0.029 365.31 0.029
0.146 303.44 299.32 0.144 293.65 0.141 293.92 0.141
0.200 433.63 437.38 0.202 438.80 0.202 444.52 0.205
1.000 K02-16 0.998 K03-16 0.994 K04-16 0.996
Ir K Ir K Ir K
May-16 May-16 Jun-16 Jun-16 Jul-16 Jul-16
563.25 0.092 563.25 0.092 563.25 0.092
465.79 0.050 465.79 0.050 467.18 0.050
571.18 0.083 571.89 0.083 570.45 0.083
593.62 0.029 593.66 0.029 592.87 0.029
609.91 0.249 609.74 0.249 611.54 0.250
481.19 0.122 481.76 0.122 481.51 0.122
365.67 0.029 366.67 0.029 367.13 0.029
292.48 0.141 295.46 0.142 294.92 0.142
443.37 0.204 441.50 0.204 440.79 0.203
K05-16 0.999 K06-16 1.000 K07-16 1.000
CÁLCULO DE REAJUSTES

CONSTRUCCION DE DEFENSA RIBEREÑA CON MUROS DE GAVIONES EN EL RIO LOCUMBA -


OBRA: PROVINCIA DE JORGE BASADRE - DEPARTAMENTO DE TACNA
MONTO DEL PRESUPUESTO BASE:
MONTO CONTRATADO: 0.00

MONTO VALORIZADO MONTO ACUMULADO


N° MES K
REAL PROGRAMADO REAL PROGRAMADO
1 Feb-16 82,438.76 82,438.76 82,438.76 82,438.76 1.005
2 Mar-16 126,835.32 126,835.32 209,274.08 209,274.08 1.002
3 Apr-16 10,824.02 10,824.02 220,098.10 220,098.10 0.996
4 May-16 31,879.39 31,879.39 251,977.49 251,977.49 1.003
251,977.49 251,977.49
ES

REAJUSTE
REAL PROGRAMADO RECONOCIDO
412.19 412.19 412.19
253.67 253.67 253.67
-43.30 -43.30 0.00
95.64 95.64 0.00
718.20 718.20 665.86