Está en la página 1de 12

1.

00 OBRAS PROVISIONALES
1.01. caseta de guardiania

2.00. TRABAJOS PRELIMINARES.


2.01. limpieza de terreno.
uni. m2
cant. 90.45

2.02. trazo niveles y replanteo


2.02.01. trazo niveles y replanteo preliminar. UNIDAD m2

LARGO
EJE TRAMO ANCHO L1 L2 AREA
1-1 A-B 0.45 2.2 0.990
1-1 B-D 0.7 2.19 2.16 1.523
2-2 B-D 0.7 2.52 2.49 1.754
3-3 A-B 0.45 1.3 0.585
4-4 A-D 0.7 4.58 4.55 3.196
5-5 A-D 0.25 2.1 2.09 0.524
6-6 A-D 0.45 3.81 3.79 1.710
7-7 A-D 0.7 4.18 4.15 2.916
A-A 1-3 0.45 3.13 1.409
A-A 3-4 0.45 1.76 0.792
A-A 4-5 0.45 1.35 0.608
A-A 5-6 0.45 3.15 1.418
A-A 6-7 0.45 3.03 1.364
D-D 1-2 0.45 2.27 1.022
D-D 2-4 0.45 2.74 1.233
D-D 4-5 0.45 1.05 1.03 0.468
D-D 5-6 0.45 4.41 4.43 1.989
D-D 6-7 0.45 1.53 0.689
B-B 1-2 0.45 2.98 1.341
C BAÑO 0.45 3.64 1.638
C BAÑO 0.45 1.49 1.46 0.664
ZAPATAS
Z1 0.9 1 0.900
Z2 0.7 1.3 0.910
Z3 0.7 1.68 1.176
Z4 0.9 1.2 1.080
Z escalera 0.5 0.68 0.340
VC 1 0.296
TOTAL 32.530

2.02.01. trazo niveles y replanteo en proseso de obra.

UNIDAD m2
piso 1 73.97
AREA
AREA piso2 66.22
piso3 66.22
TOTAL 206.41

3.00. MOVIMIENTO DE TIERRAS.

3.02. excavaciones
3.02.01. excavacion de zanja H=1.00m UNIDAD m3

LARGO
EJE TRAMO ANCHO AREA
L1 L2
1-1 A-B 0.45 2.2 0.990
1-1 B-D 0.7 2.19 2.16 1.523
2-2 B-D 0.7 2.52 2.49 1.754
3-3 A-B 0.45 1.3 0.585
4-4 A-D 0.7 4.58 4.55 3.196
5-5 A-D 0.25 2.1 2.09 0.524
6-6 A-D 0.45 3.81 3.79 1.710
7-7 A-D 0.7 4.18 4.15 2.916
A-A 1-3 0.45 3.13 1.409
A-A 3-4 0.45 1.76 0.792
A-A 4-5 0.45 1.35 0.608
A-A 5-6 0.45 3.15 1.418
A-A 6-7 0.45 3.03 1.364
D-D 1-2 0.45 2.27 1.022
D-D 2-4 0.45 2.74 1.233
D-D 4-5 0.45 1.05 1.03 0.468
D-D 5-6 0.45 4.41 4.43 1.989
D-D 6-7 0.45 1.53 0.689
B-B 1-2 0.45 2.98 1.341
C BAÑO 0.45 3.64 1.638
C BAÑO 0.45 1.49 1.46 0.664
V.C 0.296

3.02.02. excavacion para zapatas. UNIDAD m3

ZAPATA ANCHO LARGO AREA ALTURA VOLUMEN


Z1 0.9 1 0.9 0.9 0.81
Z2 0.7 1.3 0.91 0.9 0.819
Z3 0.7 1.68 1.176 0.9 1.0584
Z4 0.9 1.2 1.08 0.9 0.972
Z escalera 0.5 0.68 0.34 0.5 0.17
TOTAL 3.8294

EXCAVACION TOTAL 29.14055


3.03. RELLENOS
3.03.01. relleno con material propio.

LARGO
EJE TRAMO ANCHO AREA
L1 L2
1-1 A-B 0.2 2.2 0.440
1-1 B-D 0.55 2.18 2.16 1.194
2-2 B-D 0.18 2.07 2.06 0.372
B-D 0.18 1.9 1.89 0.341
PUERTA 0.25 0.88 0.220
3-3 A-B 0.15 2.9 0.435
PUERTA 0.15 0.8 0.120
4-4 A-D 0.28 4.28 4.26 1.196
A-D 0.28 4.26 4.25 1.191
PUERTA 0.15 0.89 0.134
5-5 A-D 0.25 2.1 2.09 0.524
6-6 A-D 0.15 4.11 4.106 0.616
A-D 0.15 4.1 4.11 0.616
PUERTA 0.15 0.9 0.135
7-7 A-D 0.55 3.88 3.86 2.129
A-A 1-3 0.3 3.13 0.939
A-A 3-4 0.3 1.76 0.528
A-A 4-5 0.3 1.35 0.405
A-A 5-6 0.3 3.5 1.050
A-A 6-7 0.3 1.53 0.459
PUERTA 0.15 0.6 0.090
D-D 1-2 0.3 2.27 0.681
D-D 2-4 0.3 2.74 0.822
D-D 4-5 0.3 1.05 1.03 0.312
D-D 5-6 0.3 4.41 4.43 1.326
D-D 6-7 0.3 1.53 0.459
B-B 1-2 0.15 5.55 0.833
C BAÑO 0.15 4.089 0.613
C BAÑO 0.15 3.496 0.524
0.15 1.174 1.164 0.175
0.15 0.892 0.883 0.133
V.C 0.296

ZAPATA ANCHO LARGO AREA ALTURA VOLUMEN


Z1 0.85 0.75 0.6375 0.5 0.31875
0.22 1.03 0.2266 0.5 0.1133
Z2
0.23 1.53 0.3519 0.5 0.17595
Z3 1.3 0.55 0.715 0.5 0.3575
0.9 1.2 1.08 0.5 0.54
Z4 -0.15 0.35 -0.0525 0.5 -0.02625
-0.2 0.45 -0.09 0.5 -0.045
TOTAL 1.43425
RELLENO TOTAL 4.73193

3.03.02. relleno con material de prestamo.

3.03.02. relleno con material de prestamo.

AREA
PISOS 62.427
PUERTAS 0.963
TOTAL 63.39 m2

3.04. ELIMINACION DE MATERIAL EXCEDENTE.

EXCAVACION COEF. E.S. RELLENO COEF. E.S.


29.14055 1.25 36.4256875 4.73193 1.389 6.57265077

3.05. NIVELACION INTERIOR Y APISONADO.

4.00. OBRAS DE CONCRETO SIMPLE

4.01. CIMIENTOS CORRIDOS C:H, 1:10 + 30% P.G Ø max 8"

LARGO
EJE TRAMO ANCHO AREA
L1 L2
1-1 A-B 0.45 2.2 0.990
1-1 B-D 0.7 2.19 2.16 1.523
2-2 B-D 0.7 2.52 2.49 1.754
3-3 A-B 0.45 1.3 0.585
4-4 A-D 0.7 4.58 4.55 3.196
6-6 A-D 0.45 3.81 3.79 1.710
7-7 A-D 0.7 4.18 4.15 2.916
A-A 1-3 0.45 3.13 1.409
A-A 3-4 0.45 1.76 0.792
A-A 4-5 0.45 1.35 0.608
A-A 5-6 0.45 3.15 1.418
A-A 6-7 0.45 3.03 1.364
D-D 1-2 0.45 2.27 1.022
D-D 2-4 0.45 2.74 1.233
D-D 4-5 0.45 1.05 1.03 0.468
D-D 5-6 0.45 4.41 4.43 1.989
D-D 6-7 0.45 1.53 0.689
B-B 1-2 0.45 2.98 1.341
C1 0.45 1.819 0.819
C BAÑO
C BAÑO C2 0.45 1.816 0.817
C3 0.45 1.49 1.46 0.664

4.02. SOBRECIMIENTO.

4.02.01. CIMIENTOS CORRIDOS C:H, 1:8 + 25% P.M Ø max 6"

LARGO
EJE TRAMO ANCHO AREA
L1 L2
1-1 A-B 0.25 2.1 0.525
1-1 B-D 0.15 1.79 0.269
2-2 B-D 0.25 0.83 0.82 0.206
3-3 A-B 0.15 1.3 0.195
A-B 0.15 0.65 0.098
4-4 A-D 0.15 2.82 0.423
5-5 A-D 0.25 0.95 0.238
6-6 A-D 0.15 1.78 0.267
A-D 0.15 1.43 1.42 0.214
7-7 A-D 0.25 3.45 0.863
A-A 1-3 0.15 3.63 0.545
1-3 0.15 0.3 0.045
A-A 3-4 0.15 2.18 0.327
3-4 0.15 0.25 0.038
A-A 4-5 0.15 1.85 0.278
A-A 5-6 0.15 3.73 0.560
5-6 0.15 0.35 0.053
A-A 6-7 0.15 1.28 0.192
D-D 1-2 0.15 2.89 0.434
D-D 2-4 0.15 3.09 0.464
D-D 4-5 0.15 1.85 0.278
4-5 0.15 0.53 0.080
4-5 0.15 0.52 0.078
D-D 5-6 0.15 3.85 0.578
D-D 6-7 0.15 3.26 0.489
B-B 1-2 0.15 2.8 0.420
C1 0.15 1.393 0.209
C BAÑO C2 0.15 1.18 0.177
C3 0.15 2.141 0.321

4.02.02. ENCOFRADO Y DESENCOFRADO

LARGO Nª CARAS AREA


EJE TRAMO ALTURA
L1
1-1 A-B 0.5 2.1 2 2.100
1-1 B-D 0.5 1.79 2 1.790
2-2 B-D 0.5 0.83 1 0.415
B-D 0.5 0.82 1 0.410
3-3 A-B 0.5 1.3 2 1.300
A-B 0.3 0.65 2 0.390
4-4 A-D 0.5 2.82 2 2.820
5-5 A-D 0.8 0.95 2 1.520
6-6 A-D 0.5 1.78 2 1.780
A-D 0.5 1.43 1 0.715
A-D 0.5 1.42 1 0.710
7-7 A-D 0.5 3.45 2 3.450
A-A 1-3 0.5 3.63 2 3.630
1-3 0.3 0.3 2 0.180
A-A 3-4 0.5 2.18 2 2.180
3-4 0.3 0.25 2 0.150
A-A 4-5 0.5 1.85 2 1.850
A-A 5-6 0.5 3.73 2 3.730
5-6 0.3 0.35 2 0.210
A-A 6-7 0.5 1.28 2 1.280
D-D 1-2 0.5 2.89 2 2.890
D-D 2-4 0.5 3.09 2 3.090
D-D 4-5 0.5 1.85 2 1.850
4-5 0.3 0.53 2 0.318
4-5 0.3 0.52 2 0.312
D-D 5-6 0.5 3.85 2 3.850
D-D 6-7 0.5 3.26 2 3.260
B-B 1-2 0.5 2.8 2 2.800
C1 0.5 1.393 2 1.393
C BAÑO C2 0.5 1.18 2 1.180
C3 0.5 2.141 2 2.141
TOTAL 53.694 m2
ALTURA VOL.

0.9 0.891
0.9 1.37025
0.9 1.57815
0.9 0.5265
0.9 2.87595
0.9 0.471375
0.9 1.539
0.9 2.62395
0.9 1.26765
0.9 0.7128
0.9 0.54675
0.9 1.27575
0.9 1.22715
0.9 0.91935
0.9 1.1097
0.9 0.4212
0.9 1.7901
0.9 0.61965
0.9 1.2069
0.9 1.4742
0.9 0.597375
0.9 0.2664
TOTAL 25.31115

m3
ALTURA VOL.

0.2 0.088
0.2 0.2387
0.2 0.07434
0.2 0.06822
0.2
0.2 0.087
0.2
0.2
0.2 0.23828
0.2
0.2 0.10475
0.2 0.12324
0.2
0.2
0.2 0.4257
0.2 0.1878
0.2 0.1056
0.2 0.081
0.2 0.21
0.2 0.0918
0.2
0.2 0.1362
0.2 0.1644
0.2 0.0624
0.2 0.2652
0.2 0.0918
0.2 0.1665
0.2 0.12267
0.2 0.10488
0.2
0.2
0.2 0.0592
TOTAL 3.29768
m3

ELIMIN.
material tierra comun
29.8530367 m3

ALTURA VOL.

0.7 0.693
0.7 1.06575
0.7 1.22745
0.7 0.4095
0.7 2.23685
0.7 1.197
0.7 2.04085
0.7 0.98595
0.7 0.5544
0.7 0.42525
0.7 0.99225
0.7 0.95445
0.7 0.71505
0.7 0.8631
0.7 0.3276
0.7 1.3923
0.7 0.48195
0.7 0.9387
0.7 0.572985
0.7 0.57204
0.7 0.464625
TOTAL 19.11105 m3

ALTURA VOL.

0.5 0.2625
0.5 0.13425
0.5 0.103125
0.5 0.0975
0.3 0.02925
0.5 0.2115
0.8 0.19
0.5 0.1335
0.5 0.106875
0.5 0.43125
0.5 0.27225
0.3 0.0135
0.5 0.1635
0.3 0.01125
0.5 0.13875
0.5 0.27975
0.3 0.01575
0.5 0.096
0.5 0.21675
0.5 0.23175
0.5 0.13875
0.3 0.02385
0.3 0.0234
0.5 0.28875
0.5 0.2445
0.5 0.21
0.5 0.104475
0.5 0.0885
0.5 0.160575
TOTAL 4.4218 m3
PARTIDA ESPECIFICACIONES UNID. CANT.

01.00.00 OBRAS PROVISIONALES


01.01.00 CONSTRUCCIONES PROVISIONALES
01.01.02 Almacén Glb 1.00
01.01.08 Carteles Est 1.00
01.02.00 INSTALACIONES PROVISIONALES
01.02.01 Agua para la Construcción Glb 1.00
01.02.03 Energía Electrica Glb 1.00

02.00.00 TRABAJOS PRELIMINARES


02.01.00 LIMPIEZA DEL TERRENO
02.01.01 Eliminación de basura y elementos sueltos livianos m2 90.45
02.07.00 TRAZOS, NIVELES Y REPLANTEO
02.07.02 Trazos, Nvieles y Replanteo Preliminar m2 32.53
02.07.03 Trazos, Nvieles y Replanteo Preliminar en obra m2 206.41

03.00.00 MOVIMIENTOS DE TIERRA


03.02.00 EXCAVACIONES
03.02.02 Excavación de Zanjas m3 29.14
03.04.00 RELLENOS
03.04.01 Rellenos con material propio m3 4.73
03.04.02 Relleno con material de préstamo m3 6.02
03.05.00 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 29.85
03.06.00 NIVELACIÓN INTERIOR Y APISONADO m2 63.39

04.00.00 OBRAS DE CONCRETO SIMPLE


04.01.00 CIMIENTOS CORRIDOS 1:10 + 30% PG < 6" m3 19.11
04.07.00 SOBRECIMIENTOS
04.07.01 Concreto mezcla 1:8 + 25% de PM <3" m3 4.42
04.07.02 Encofrado y Desencofrado m2 53.69
COSTO
TOTAL
UNITARIO PARCIAL

También podría gustarte