Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Marking Scheme
PEPERIKSAAN PERCUBAAN STPM NEGERI PAHANG 2010
Mathematics T Paper 2 ( 954 / 2 )
1(a)
M1
Factor
Formula
M1
***
,
= 90 , 180 , =90
= 180
1 (b) M1
M1
M1
A1
2
Question Scheme Marks
2 (a)
(2) (1)
.......(1)
= 53 8’
.......(2)
M1
R =5
A1
= 323 8’
When x = 0 , 360 , , y = 4
D1 [ shape ]
D1 [ points ]
B1
B1
Question Scheme Marks
3
2
D1 [ draw
line y=1
and y=0 ]
4 (a)
=
=
=
=
M1
= + A1
= 36
4.(b)
M1
or
A1
= or 13.499 or 13.5
M1
A1
5
Question Scheme Marks
Initial time , t = 0 ,
5(a)
B1
=5
Initial rate is 5 liters per hour.
5 (b)
M1 (separate variables)
M1( correct
integration)
M1 (use limits / find C )
A1
5 (c) t = 40 minutes , t = , t= hour
M1
A1
v = 3.8164 litres
5 (d) When v= 4 ,
M1 ( Quadratic )
***
M1 ( Factorise )
, ∴ t = ln 2 hours
t = 42 minutes
M1 ( value for )
A1
6
Question Scheme Marks
6(a)
D1 [ arrows
]
D1 [ shape ]
6(a)
M1
[cosine rule]
M1
[sine rule]
= 31 24’
6(b)
D1
7
M1
A1
= 21.9912 km or 21.9 km
6(c) M1
Time =
A1
Time = 1.5095 hour
4 1 4 2 M1
7. (a) (i) P(A B' ) P(A/B' ) P(B' ) Use of
5 2 10 5 P (A/B ' )P (B' )
A1
=0 A1
(A B)
(iii) P (A/B) P 0 B1
P(B)
[5]
(b) Since P (A/B) P (A) or equivalent B1
Alternative P(M >3 L >4) = P(M>3) + P(L >4) P(M>3) P(L >4) Or
B1M1B1A1 [4]
(c) Let T be the total number of M and L size t-shirts sold in half a
year.
B1 (Normal )&
T~Po(30) T~N(30,30) approx as 30 > 5 B1(both mean
To earn a profit of more than RM200, the club must sell more and variance)
than 40 tee shirts. P(T > 40) P(T > 40.5) c.c. B1(cc)
Alternative Solution :
Let T be the total number of M and L size t-shirts sold in half a
9
year.
T ~ Po(30). T~N(30,30) approx as 30 > 5
Required probability = P (E > 200) P(T > 200.5) c.c. M1stdz & cc
A1 [5]
T - μ 200.5 - 150
= P( > ) = P(Z > 1.844) = 0.03259 or 0.0326
σ 750
10(a) 11 2 8x
4
E(X )= xdx
03 1 45
dx xf(x)dx , 2 terms added M1, M1
5 2
1 2 8x
1
1 x0 8 x3
F(x0 )
3 1 45
dx for 1 x 2 their fraction + v.u.l on f(x)dx &2 terms M1
x0
1 8x4 8x4
3 180 1
A1
180
1
45
2 x04 13 A1
0 x0
1
F(x) x 0 x 1
3 summary B1
1
45
2 x4 13 1 x 2
1 x2
[6]
[3]
b
Scale and label &
Pantai Sepat Box [D1]
Camp Site Q1, Q2, Q3 & 10, 64
[D1 ](at least 3)
38, 45, 52, & 31, 72
[D1] (at least 3) [4]
[D1](all correct)
Balok Beach
Camp Site
B1
3) IQR of no. of camping tents on Balok Beach Camp Site is 52-38 = 14
IQR of no. of camping tents on Pantai Sepat Camp Site is 52-33=19
Hence, IQR of no. of camping tents on Pantai Sepat Camp Site > IQR of
no. of camping tents on Pantai Sepat Camp Site
any 3
acceptable
4) Q3 – Q2 = 52 - 45 = 7 , Q2 - Q1 = 45- 38 = 7 comments
5) Range of no. camping tents on Balok Beach less than range of no.
camping tents on Pantai Sepat Camp Site
72-31 < 64-10 ie 41 < 54
[3]