Está en la página 1de 40

PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
01 OBRAS PRELIMINARES Y PROVISIONALES
01.01 CARTEL DE IDENTIDAD DE LA OBRA DE 3.60X2.40 1.00 - - - 1.00 1.00 UND
01.02 OFICINA, ALMACEN Y GUARDIANIA 4.00 - - - 4.00 4.00 MES
01.03 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPOS 1.00 - - - 1.00 1.00 GLB
01.04 TRAZO, NIVELES Y REPLANTEO 1.00 25,659.12 - - 25,659.12 25,659.12 M2
01.05 MANTENIMIENTO DE TRANSITO Y DESVIACIONES 4.00 - - - 4.00 4.00 MES
01.06 DEMOLICION DE PAVIMENTO DE CONCRETO DE 15 CM 1.00 122.00 3.00 - 1.00 366.00 m2
01.07 ELIMINACION DE MATERIAL EXCEDENTE DEMOLICION DM=10 km 1.50 366.00 - 0.15 1.50 123.53 m3

02 MOVIMIENTO DE TIERRAS
02.01 CORTE DE MATERIAL SUELTO A NIVEL DE SUB RASANTE 1.00 ver (plan. Explan.) #REF! #REF! #REF! M3
02.02 CORTE ROCA FIJA 1.00 ver (plan. Explan.) 31.54 31.54 31.54 M3
02.03 CONFORMACION Y COMPACTACION SUBRASANTE 1.00 ver (plan. Explan.) #REF! #REF! #REF! M2
02.04 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km 1.00 ver (plan. Explan.) #REF! #REF! #REF! M3
01.05 BASE GRANULAR E=0.15M 1.00 ver (plan. Explan.) #REF! #REF! #REF! M2

03 PAVIMENTOS
03.01 OBRAS DE CONCRETO
03.01.01 ENCOFRADO Y DESENCOFRADO EN PISTAS 1.00 ver (plan. Explan.) 1,788.48 1,788.48 1,788.48 M2
03.01.02 CONCRETO EN PISTAS f'c=210 Kg/cm2 e=0.20 m 1.00 ver (plan. Explan.) 15,102.48 15,102.48 15,102.48 M2
03.01.03 ACERO EN JUNTAS DOWLES DE 35 cm D=3/4" 2,958.00 2,958.00 UND
VECES=LONG./16 X 17 VECES
AV. CRISTOBAL COLON 1,326.00 1,326.00
AV. JOSE VARA LLANOS 119.00 119.00
JR. CARHUACOCHA 119.00 119.00
JR. HEROES JESUCINOS 119.00 119.00
JR. HUAMALIES 119.00 119.00
JR. PROGRESO 119.00 119.00
JR. HUANUCO 136.00 136.00
JR. BOLIVAR 136.00 136.00
JR. SAN MARTIN 153.00 153.00
JR. SAN SEBASTIAN 170.00 170.00
CALLE 3 170.00 170.00
JR. CIRILO ALVARADO 153.00 153.00
JR. SILOS MORENO 119.00 119.00

03.01.04 ACERO EN JUNTAS DOWLES DE 35 cm D=1/2" 2,219.00 2,219.00 UND


VECES=LONG./1.2 X 1 VECES
AV. CRISTOBAL COLON 1,033.00 1,033.00
AV. JOSE VARA LLANOS 81.00 81.00
JR. CARHUACOCHA 81.00 81.00
JR. HEROES JESUCINOS 85.00 85.00
JR. HUAMALIES 87.00 87.00
JR. PROGRESO 92.00 92.00
JR. HUANUCO 97.00 97.00
JR. BOLIVAR 101.00 101.00
JR. SAN MARTIN 111.00 111.00
JR. SAN SEBASTIAN 124.00 124.00
CALLE 3 132.00 132.00
JR. CIRILO ALVARADO 114.00 114.00
JR. SILOS MORENO 81.00 81.00

03.02 VARIOS
03.02.01 JUNTA DE DILATACION e=1/2" 6,216.69 M
LONGITUDINALES
AV. CRISTOBAL COLON 2.00 1,239.43 2,478.86
AV. JOSE VARA LLANOS 2.00 97.08 194.16
JR. CARHUACOCHA 2.00 96.75 193.50
JR. HEROES JESUCINOS 2.00 101.70 203.40
JR. HUAMALIES 2.00 104.38 208.76
JR. PROGRESO 2.00 109.63 219.26
JR. HUANUCO 2.00 116.03 232.06
JR. BOLIVAR 2.00 120.17 240.34
JR. SAN MARTIN 2.00 132.98 265.96
JR. SAN SEBASTIAN 2.00 147.72 295.44
CALLE 3 2.00 157.84 315.67
JR. CIRILO ALVARADO 2.00 136.08 272.16
JR. SILOS MORENO 2.00 96.56 193.12
TRANSVERSALES -
AV. CRISTOBAL COLON 78.00 5.00 390.00
AV. JOSE VARA LLANOS 7.00 7.00 49.00
JR. CARHUACOCHA 7.00 3.50 24.50
JR. HEROES JESUCINOS 7.00 3.50 24.50
JR. HUAMALIES 7.00 5.50 38.50
JR. PROGRESO 7.00 7.00 49.00
JR. HUANUCO 8.00 6.00 48.00
JR. BOLIVAR 8.00 5.00 40.00
JR. SAN MARTIN 9.00 3.50 31.50
JR. SAN SEBASTIAN 10.00 4.50 45.00
CALLE 3 10.00 4.50 45.00
JR. CIRILO ALVARADO 9.00 7.00 63.00
JR. SILOS MORENO 7.00 8.00 56.00

03.02.02 CORTE JUNTA DE CONTRACCION 2,589.50 M

AV. CRISTOBAL COLON 232.00 5.00 1,160.00


AV. JOSE VARA LLANOS 18.00 7.00 126.00

Página 1
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
JR. CARHUACOCHA 18.00 3.50 63.00
JR. HEROES JESUCINOS 19.00 3.50 66.50
JR. HUAMALIES 20.00 5.50 110.00
JR. PROGRESO 21.00 7.00 147.00
JR. HUANUCO 22.00 6.00 132.00
JR. BOLIVAR 23.00 5.00 115.00
JR. SAN MARTIN 25.00 3.50 87.50
JR. SAN SEBASTIAN 27.00 4.50 121.50
CALLE 3 30.00 4.50 135.00
JR. CIRILO ALVARADO 26.00 7.00 182.00
JR. SILOS MORENO 18.00 8.00 144.00

03.02.03 CURADO CON AGUA INCL. ARROCERAS 15,102.48 M2

AV. CRISTOBAL COLON 1.00 6,279.79 6,279.79


AV. JOSE VARA LLANOS 1.00 716.92 716.92
JR. CARHUACOCHA 1.00 531.29 531.29
JR. HEROES JESUCINOS 1.00 453.05 453.05
JR. HUAMALIES 1.00 693.87 693.87
JR. PROGRESO 1.00 938.83 938.83
JR. HUANUCO 1.00 798.66 798.66
JR. BOLIVAR 1.00 699.25 699.25
JR. SAN MARTIN 1.00 622.97 622.97
JR. SAN SEBASTIAN 1.00 797.54 797.54
CALLE 3 1.00 804.71 804.71
JR. CIRILO ALVARADO 1.00 1,001.17 1,001.17
JR. SILOS MORENO 1.00 764.44 764.44

03.02.04 LIMPIEZA DE PISTAS 15,266.28 M2

AV. CRISTOBAL COLON 1.00 6,279.79 6,279.79


AV. JOSE VARA LLANOS 1.00 716.92 716.92
JR. CARHUACOCHA 1.00 531.29 531.29
JR. HEROES JESUCINOS 1.00 453.05 453.05
JR. HUAMALIES 1.00 693.87 693.87
JR. PROGRESO 1.00 938.83 938.83
JR. HUANUCO 1.00 798.66 798.66
JR. BOLIVAR 1.00 699.25 699.25
JR. SAN MARTIN 1.00 622.97 622.97
JR. SAN SEBASTIAN 1.00 797.54 797.54
CALLE 3 1.00 804.71 804.71
JR. CIRILO ALVARADO 1.00 1,001.17 1,001.17
JR. SILOS MORENO 1.00 764.44 764.44

04 VEREDAS Y RAMPAS DE CONCRETO


04.01 MOVIMIENTO DE TIERRAS
04.01.01 EXCAVACION MANUAL EN ZANJA 1,792.57 M3
AV. CRISTOBAL COLON
1.00 Area= 138.23 0.20 27.65
1.00 Area= 106.95 0.20 21.39
1.00 Area= 198.70 0.20 39.74
1.00 Area= 100.07 0.20 20.01
1.00 Area= 86.26 0.20 17.25
1.00 Area= 53.51 0.20 10.70
1.00 Area= 76.68 0.20 15.34
1.00 Area= 58.62 0.20 11.72
1.00 Area= 79.16 0.20 15.83
1.00 Area= 72.17 0.20 14.43
1.00 Area= 54.38 0.20 10.88
1.00 Area= 60.07 0.20 12.01
1.00 Area= 37.89 0.20 7.58
1.00 Area= 158.71 0.20 31.74
1.00 Area= 160.33 0.20 32.07
1.00 Area= 138.44 0.20 27.69
1.00 Area= 138.87 0.20 27.77
1.00 Area= 174.48 0.20 34.90
1.00 Area= 100.46 0.20 20.09
1.00 Area= 215.93 0.20 43.19
1.00 Area= 250.14 0.20 50.03
1.00 Area= 110.07 0.20 22.01
1.00 Area= 231.07 0.20 46.21
1.00 Area= 330.67 0.20 66.13
1.00 Area= 330.70 0.20 66.14
MARTILLO COLON 1.00 Area= 18.93 0.20 3.79
MARTILLO COLON 1.00 Area= 17.54 0.20 3.51
MARTILLO COLON 1.00 Area= 20.63 0.20 4.13
MARTILLO COLON 1.00 Area= 25.46 0.20 5.09
MARTILLO COLON 1.00 Area= 22.03 0.20 4.41
MARTILLO COLON 1.00 Area= 15.72 0.20 3.14
MARTILLO COLON 1.00 Area= 30.06 0.20 6.01
MARTILLO COLON 1.00 Area= 17.77 0.20 3.55
MARTILLO COLON 1.00 Area= 9.22 0.20 1.84
MARTILLO COLON 1.00 Area= 10.46 0.20 2.09
MARTILLO COLON 1.00 Area= 17.32 0.20 3.46
MARTILLO COLON 1.00 Area= 14.71 0.20 2.94
MARTILLO COLON 1.00 Area= 19.13 0.20 3.83
MARTILLO COLON 1.00 Area= 19.60 0.20 3.92

Página 2
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
MARTILLO COLON 1.00 Area= 16.89 0.20 3.38
MARTILLO COLON 1.00 Area= 21.19 0.20 4.24
MARTILLO COLON 1.00 Area= 18.02 0.20 3.60
MARTILLO COLON 1.00 Area= 17.61 0.20 3.52
MARTILLO COLON 1.00 Area= 29.05 0.20 5.81
MARTILLO COLON 1.00 Area= 32.41 0.20 6.48
MARTILLO COLON 1.00 Area= 24.32 0.20 4.86
MARTILLO COLON 1.00 Area= 18.28 0.20 3.66
MARTILLO COLON 1.00 Area= 16.26 0.20 3.25
MARTILLO COLON 1.00 Area= 19.93 0.20 3.99
MARTILLO COLON 1.00 Area= 21.41 0.20 4.28
MARTILLO COLON 1.00 Area= 16.46 0.20 3.29
MARTILLO COLON 1.00 Area= 17.44 0.20 3.49
MARTILLO COLON 1.00 Area= 16.30 0.20 3.26
MARTILLO COLON 1.00 Area= 15.28 0.20 3.06
MARTILLO COLON 1.00 Area= 11.99 0.20 2.40
MARTILLO COLON 1.00 Area= 11.36 0.20 2.27
MARTILLO COLON 1.00 Area= 12.01 0.20 2.40
MARTILLO COLON 1.00 Area= 11.03 0.20 2.21
MARTILLO COLON 1.00 Area= 11.85 0.20 2.37
MARTILLO COLON 1.00 Area= 14.40 0.20 2.88
MARTILLO COLON 1.00 Area= 10.30 0.20 2.06
MARTILLO COLON 1.00 Area= 10.00 0.20 2.00
MARTILLO COLON 1.00 Area= 25.01 0.20 5.00
MARTILLO COLON 1.00 Area= 15.50 0.20 3.10
MARTILLO COLON 1.00 Area= 13.68 0.20 2.74
MARTILLO COLON 1.00 Area= 27.65 0.20 5.53
MARTILLO COLON 1.00 Area= 32.14 0.20 6.43
MARTILLO COLON 1.00 Area= 27.66 0.20 5.53
MARTILLO COLON 1.00 Area= 22.59 0.20 4.52
MARTILLO COLON 1.00 Area= 35.22 0.20 7.04
MARTILLO COLON 1.00 Area= 24.35 0.20 4.87
MARTILLO COLON 1.00 Area= 17.58 0.20 3.52
MARTILLO COLON 1.00 Area= 27.30 0.20 5.46
MARTILLO COLON 1.00 Area= 28.04 0.20 5.61
MARTILLO COLON 1.00 Area= 9.22 0.20 1.84
AV. JOSE VARA LLANOS 1.00 Area= 231.55 0.20 46.31
1.00 Area= 197.82 0.20 39.56
JR. CARHUACOCHA 1.00 Area= 186.67 0.20 37.33
1.00 Area= 145.05 0.20 29.01
JR. HEROES JESUCINOS 1.00 Area= 176.99 0.20 35.40
1.00 Area= 186.43 0.20 37.29
JR. HUAMALIES 1.00 Area= 127.42 0.20 25.48
1.00 Area= 143.08 0.20 28.62
JR. PROGRESO 1.00 Area= 269.46 0.20 53.89
1.00 Area= 191.27 0.20 38.25
JR. HUANUCO 1.00 Area= 185.93 0.20 37.19
1.00 Area= 159.98 0.20 32.00
JR. BOLIVAR 1.00 Area= 173.85 0.20 34.77
1.00 Area= 178.76 0.20 35.75
JR. SAN MARTIN 1.00 Area= 139.49 0.20 27.90
1.00 Area= 136.86 0.20 27.37
JR. SAN SEBASTIAN 1.00 Area= 184.50 0.20 36.90
1.00 Area= 183.51 0.20 36.70
CALLE 3 1.00 Area= 300.92 0.20 60.18
1.00 Area= 370.95 0.20 74.19
JR. CIRILO ALVARADO 1.00 Area= 267.41 0.20 53.48
1.00 Area= 238.87 0.20 47.77
JR. SILOS MORENO 1.00 Area= 85.87 0.20 17.17
1.00 Area= 79.32 0.20 15.86

04.01.02 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km 1.25 1,792.57 - - 2,240.71 2,240.71 M3

04.01.03 AFIRMADO Y COMPACTADO C/EQUIPO LIVIANO E=10CM 8,962.83 M2


AV. CRISTOBAL COLON
1.00 Area= 138.23 138.23
1.00 Area= 106.95 106.95
1.00 Area= 198.70 198.70
1.00 Area= 100.07 100.07
1.00 Area= 86.26 86.26
1.00 Area= 53.51 53.51
1.00 Area= 76.68 76.68
1.00 Area= 58.62 58.62
1.00 Area= 79.16 79.16
1.00 Area= 72.17 72.17
1.00 Area= 54.38 54.38
1.00 Area= 60.07 60.07
1.00 Area= 37.89 37.89
1.00 Area= 158.71 158.71
1.00 Area= 160.33 160.33
1.00 Area= 138.44 138.44
1.00 Area= 138.87 138.87
1.00 Area= 174.48 174.48
1.00 Area= 100.46 100.46
1.00 Area= 215.93 215.93
1.00 Area= 250.14 250.14
1.00 Area= 110.07 110.07

Página 3
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
1.00 Area= 231.07 231.07
1.00 Area= 330.67 330.67
1.00 Area= 330.70 330.70
MARTILLO COLON 1.00 Area= 18.93 18.93
MARTILLO COLON 1.00 Area= 17.54 17.54
MARTILLO COLON 1.00 Area= 20.63 20.63
MARTILLO COLON 1.00 Area= 25.46 25.46
MARTILLO COLON 1.00 Area= 22.03 22.03
MARTILLO COLON 1.00 Area= 15.72 15.72
MARTILLO COLON 1.00 Area= 30.06 30.06
MARTILLO COLON 1.00 Area= 17.77 17.77
MARTILLO COLON 1.00 Area= 9.22 9.22
MARTILLO COLON 1.00 Area= 10.46 10.46
MARTILLO COLON 1.00 Area= 17.32 17.32
MARTILLO COLON 1.00 Area= 14.71 14.71
MARTILLO COLON 1.00 Area= 19.13 19.13
MARTILLO COLON 1.00 Area= 19.60 19.60
MARTILLO COLON 1.00 Area= 16.89 16.89
MARTILLO COLON 1.00 Area= 21.19 21.19
MARTILLO COLON 1.00 Area= 18.02 18.02
MARTILLO COLON 1.00 Area= 17.61 17.61
MARTILLO COLON 1.00 Area= 29.05 29.05
MARTILLO COLON 1.00 Area= 32.41 32.41
MARTILLO COLON 1.00 Area= 24.32 24.32
MARTILLO COLON 1.00 Area= 18.28 18.28
MARTILLO COLON 1.00 Area= 16.26 16.26
MARTILLO COLON 1.00 Area= 19.93 19.93
MARTILLO COLON 1.00 Area= 21.41 21.41
MARTILLO COLON 1.00 Area= 16.46 16.46
MARTILLO COLON 1.00 Area= 17.44 17.44
MARTILLO COLON 1.00 Area= 16.30 16.30
MARTILLO COLON 1.00 Area= 15.28 15.28
MARTILLO COLON 1.00 Area= 11.99 11.99
MARTILLO COLON 1.00 Area= 11.36 11.36
MARTILLO COLON 1.00 Area= 12.01 12.01
MARTILLO COLON 1.00 Area= 11.03 11.03
MARTILLO COLON 1.00 Area= 11.85 11.85
MARTILLO COLON 1.00 Area= 14.40 14.40
MARTILLO COLON 1.00 Area= 10.30 10.30
MARTILLO COLON 1.00 Area= 10.00 10.00
MARTILLO COLON 1.00 Area= 25.01 25.01
MARTILLO COLON 1.00 Area= 15.50 15.50
MARTILLO COLON 1.00 Area= 13.68 13.68
MARTILLO COLON 1.00 Area= 27.65 27.65
MARTILLO COLON 1.00 Area= 32.14 32.14
MARTILLO COLON 1.00 Area= 27.66 27.66
MARTILLO COLON 1.00 Area= 22.59 22.59
MARTILLO COLON 1.00 Area= 35.22 35.22
MARTILLO COLON 1.00 Area= 24.35 24.35
MARTILLO COLON 1.00 Area= 17.58 17.58
MARTILLO COLON 1.00 Area= 27.30 27.30
MARTILLO COLON 1.00 Area= 28.04 28.04
MARTILLO COLON 1.00 Area= 9.22 9.22
AV. JOSE VARA LLANOS 1.00 Area= 231.55 231.55
1.00 Area= 197.82 197.82
JR. CARHUACOCHA 1.00 Area= 186.67 186.67
1.00 Area= 145.05 145.05
JR. HEROES JESUCINOS 1.00 Area= 176.99 176.99
1.00 Area= 186.43 186.43
JR. HUAMALIES 1.00 Area= 127.42 127.42
1.00 Area= 143.08 143.08
JR. PROGRESO 1.00 Area= 269.46 269.46
1.00 Area= 191.27 191.27
JR. HUANUCO 1.00 Area= 185.93 185.93
1.00 Area= 159.98 159.98
JR. BOLIVAR 1.00 Area= 173.85 173.85
1.00 Area= 178.76 178.76
JR. SAN MARTIN 1.00 Area= 139.49 139.49
1.00 Area= 136.86 136.86
JR. SAN SEBASTIAN 1.00 Area= 184.50 184.50
1.00 Area= 183.51 183.51
CALLE 3 1.00 Area= 300.92 300.92
1.00 Area= 370.95 370.95
JR. CIRILO ALVARADO 1.00 Area= 267.41 267.41
1.00 Area= 238.87 238.87
JR. SILOS MORENO 1.00 Area= 85.87 85.87
1.00 Area= 79.32 79.32

04.02 OBRAS DE CONCRETO


04.02.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS 796.90 M2
AV. CRISTOBAL COLON 2.00 1,239.430 0.15 371.83
AV. JOSE VARA LLANOS 2.00 97.080 0.15 29.12
JR. CARHUACOCHA 2.00 96.750 0.15 29.03
JR. HEROES JESUCINOS 2.00 101.700 0.15 30.51
JR. HUAMALIES 2.00 104.380 0.15 31.31
JR. PROGRESO 2.00 109.630 0.15 32.89
JR. HUANUCO 2.00 116.030 0.15 34.81

Página 4
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
JR. BOLIVAR 2.00 120.170 0.15 36.05
JR. SAN MARTIN 2.00 132.980 0.15 39.89
JR. SAN SEBASTIAN 2.00 147.720 0.15 44.32
CALLE 3 2.00 157.835 0.15 47.35
JR. CIRILO ALVARADO 2.00 136.080 0.15 40.82
JR. SILOS MORENO 2.00 96.560 0.15 28.97

04.02.02 VEREDA DE CONCRETO F'C=175KG/CM2 E=15CM 8,962.83 M2


AV. CRISTOBAL COLON
1.00 Area= 138.23 138.23
1.00 Area= 106.95 106.95
1.00 Area= 198.70 198.70
1.00 Area= 100.07 100.07
1.00 Area= 86.26 86.26
1.00 Area= 53.51 53.51
1.00 Area= 76.68 76.68
1.00 Area= 58.62 58.62
1.00 Area= 79.16 79.16
1.00 Area= 72.17 72.17
1.00 Area= 54.38 54.38
1.00 Area= 60.07 60.07
1.00 Area= 37.89 37.89
1.00 Area= 158.71 158.71
1.00 Area= 160.33 160.33
1.00 Area= 138.44 138.44
1.00 Area= 138.87 138.87
1.00 Area= 174.48 174.48
1.00 Area= 100.46 100.46
1.00 Area= 215.93 215.93
1.00 Area= 250.14 250.14
1.00 Area= 110.07 110.07
1.00 Area= 231.07 231.07
1.00 Area= 330.67 330.67
1.00 Area= 330.70 330.70
MARTILLO COLON 1.00 Area= 18.93 18.93
MARTILLO COLON 1.00 Area= 17.54 17.54
MARTILLO COLON 1.00 Area= 20.63 20.63
MARTILLO COLON 1.00 Area= 25.46 25.46
MARTILLO COLON 1.00 Area= 22.03 22.03
MARTILLO COLON 1.00 Area= 15.72 15.72
MARTILLO COLON 1.00 Area= 30.06 30.06
MARTILLO COLON 1.00 Area= 17.77 17.77
MARTILLO COLON 1.00 Area= 9.22 9.22
MARTILLO COLON 1.00 Area= 10.46 10.46
MARTILLO COLON 1.00 Area= 17.32 17.32
MARTILLO COLON 1.00 Area= 14.71 14.71
MARTILLO COLON 1.00 Area= 19.13 19.13
MARTILLO COLON 1.00 Area= 19.60 19.60
MARTILLO COLON 1.00 Area= 16.89 16.89
MARTILLO COLON 1.00 Area= 21.19 21.19
MARTILLO COLON 1.00 Area= 18.02 18.02
MARTILLO COLON 1.00 Area= 17.61 17.61
MARTILLO COLON 1.00 Area= 29.05 29.05
MARTILLO COLON 1.00 Area= 32.41 32.41
MARTILLO COLON 1.00 Area= 24.32 24.32
MARTILLO COLON 1.00 Area= 18.28 18.28
MARTILLO COLON 1.00 Area= 16.26 16.26
MARTILLO COLON 1.00 Area= 19.93 19.93
MARTILLO COLON 1.00 Area= 21.41 21.41
MARTILLO COLON 1.00 Area= 16.46 16.46
MARTILLO COLON 1.00 Area= 17.44 17.44
MARTILLO COLON 1.00 Area= 16.30 16.30
MARTILLO COLON 1.00 Area= 15.28 15.28
MARTILLO COLON 1.00 Area= 11.99 11.99
MARTILLO COLON 1.00 Area= 11.36 11.36
MARTILLO COLON 1.00 Area= 12.01 12.01
MARTILLO COLON 1.00 Area= 11.03 11.03
MARTILLO COLON 1.00 Area= 11.85 11.85
MARTILLO COLON 1.00 Area= 14.40 14.40
MARTILLO COLON 1.00 Area= 10.30 10.30
MARTILLO COLON 1.00 Area= 10.00 10.00
MARTILLO COLON 1.00 Area= 25.01 25.01
MARTILLO COLON 1.00 Area= 15.50 15.50
MARTILLO COLON 1.00 Area= 13.68 13.68
MARTILLO COLON 1.00 Area= 27.65 27.65
MARTILLO COLON 1.00 Area= 32.14 32.14
MARTILLO COLON 1.00 Area= 27.66 27.66
MARTILLO COLON 1.00 Area= 22.59 22.59
MARTILLO COLON 1.00 Area= 35.22 35.22
MARTILLO COLON 1.00 Area= 24.35 24.35
MARTILLO COLON 1.00 Area= 17.58 17.58
MARTILLO COLON 1.00 Area= 27.30 27.30
MARTILLO COLON 1.00 Area= 28.04 28.04
MARTILLO COLON 1.00 Area= 9.22 9.22
AV. JOSE VARA LLANOS 1.00 Area= 231.55 231.55
1.00 Area= 197.82 197.82
JR. CARHUACOCHA 1.00 Area= 186.67 186.67

Página 5
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
1.00 Area= 145.05 145.05
JR. HEROES JESUCINOS 1.00 Area= 176.99 176.99
1.00 Area= 186.43 186.43
JR. HUAMALIES 1.00 Area= 127.42 127.42
1.00 Area= 143.08 143.08
JR. PROGRESO 1.00 Area= 269.46 269.46
1.00 Area= 191.27 191.27
JR. HUANUCO 1.00 Area= 185.93 185.93
1.00 Area= 159.98 159.98
JR. BOLIVAR 1.00 Area= 173.85 173.85
1.00 Area= 178.76 178.76
JR. SAN MARTIN 1.00 Area= 139.49 139.49
1.00 Area= 136.86 136.86
JR. SAN SEBASTIAN 1.00 Area= 184.50 184.50
1.00 Area= 183.51 183.51
CALLE 3 1.00 Area= 300.92 300.92
1.00 Area= 370.95 370.95
JR. CIRILO ALVARADO 1.00 Area= 267.41 267.41
1.00 Area= 238.87 238.87
JR. SILOS MORENO 1.00 Area= 85.87 85.87
1.00 Area= 79.32 79.32

04.02.01 RAMPA DE CONCRETO INCL. BRUÑADO 49.00 M2


RAMPAS INGRESO ESQUINAS
AV. CRISTOBAL COLON 49.00 Area= 1.00 49.00

04.02.01 JUNTAS DE DILATACION 2,143.20 M


AV. CRISTOBAL COLON 828.00 1.20 993.60
AV. JOSE VARA LLANOS 66.00 1.20 79.20
JR. CARHUACOCHA 66.00 1.20 79.20
JR. HEROES JESUCINOS 68.00 1.20 81.60
JR. HUAMALIES 70.00 1.20 84.00
JR. PROGRESO 74.00 1.20 88.80
JR. HUANUCO 78.00 1.20 93.60
JR. BOLIVAR 82.00 1.20 98.40
JR. SAN MARTIN 90.00 1.20 108.00
JR. SAN SEBASTIAN 100.00 1.20 120.00
CALLE 3 106.00 1.20 127.20
JR. CIRILO ALVARADO 92.00 1.20 110.40
JR. SILOS MORENO 66.00 1.20 79.20

04.02.02 CURADO DE VEREDAS INCL. TENDIDO DE ARROCERAS 8,962.83 M2


AV. CRISTOBAL COLON
1.00 Area= 138.23 138.23
1.00 Area= 106.95 106.95
1.00 Area= 198.70 198.70
1.00 Area= 100.07 100.07
1.00 Area= 86.26 86.26
1.00 Area= 53.51 53.51
1.00 Area= 76.68 76.68
1.00 Area= 58.62 58.62
1.00 Area= 79.16 79.16
1.00 Area= 72.17 72.17
1.00 Area= 54.38 54.38
1.00 Area= 60.07 60.07
1.00 Area= 37.89 37.89
1.00 Area= 158.71 158.71
1.00 Area= 160.33 160.33
1.00 Area= 138.44 138.44
1.00 Area= 138.87 138.87
1.00 Area= 174.48 174.48
1.00 Area= 100.46 100.46
1.00 Area= 215.93 215.93
1.00 Area= 250.14 250.14
1.00 Area= 110.07 110.07
1.00 Area= 231.07 231.07
1.00 Area= 330.67 330.67
1.00 Area= 330.70 330.70
MARTILLO COLON 1.00 Area= 18.93 18.93
MARTILLO COLON 1.00 Area= 17.54 17.54
MARTILLO COLON 1.00 Area= 20.63 20.63
MARTILLO COLON 1.00 Area= 25.46 25.46
MARTILLO COLON 1.00 Area= 22.03 22.03
MARTILLO COLON 1.00 Area= 15.72 15.72
MARTILLO COLON 1.00 Area= 30.06 30.06
MARTILLO COLON 1.00 Area= 17.77 17.77
MARTILLO COLON 1.00 Area= 9.22 9.22
MARTILLO COLON 1.00 Area= 10.46 10.46
MARTILLO COLON 1.00 Area= 17.32 17.32
MARTILLO COLON 1.00 Area= 14.71 14.71
MARTILLO COLON 1.00 Area= 19.13 19.13
MARTILLO COLON 1.00 Area= 19.60 19.60
MARTILLO COLON 1.00 Area= 16.89 16.89
MARTILLO COLON 1.00 Area= 21.19 21.19
MARTILLO COLON 1.00 Area= 18.02 18.02
MARTILLO COLON 1.00 Area= 17.61 17.61
MARTILLO COLON 1.00 Area= 29.05 29.05

Página 6
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
MARTILLO COLON 1.00 Area= 32.41 32.41
MARTILLO COLON 1.00 Area= 24.32 24.32
MARTILLO COLON 1.00 Area= 18.28 18.28
MARTILLO COLON 1.00 Area= 16.26 16.26
MARTILLO COLON 1.00 Area= 19.93 19.93
MARTILLO COLON 1.00 Area= 21.41 21.41
MARTILLO COLON 1.00 Area= 16.46 16.46
MARTILLO COLON 1.00 Area= 17.44 17.44
MARTILLO COLON 1.00 Area= 16.30 16.30
MARTILLO COLON 1.00 Area= 15.28 15.28
MARTILLO COLON 1.00 Area= 11.99 11.99
MARTILLO COLON 1.00 Area= 11.36 11.36
MARTILLO COLON 1.00 Area= 12.01 12.01
MARTILLO COLON 1.00 Area= 11.03 11.03
MARTILLO COLON 1.00 Area= 11.85 11.85
MARTILLO COLON 1.00 Area= 14.40 14.40
MARTILLO COLON 1.00 Area= 10.30 10.30
MARTILLO COLON 1.00 Area= 10.00 10.00
MARTILLO COLON 1.00 Area= 25.01 25.01
MARTILLO COLON 1.00 Area= 15.50 15.50
MARTILLO COLON 1.00 Area= 13.68 13.68
MARTILLO COLON 1.00 Area= 27.65 27.65
MARTILLO COLON 1.00 Area= 32.14 32.14
MARTILLO COLON 1.00 Area= 27.66 27.66
MARTILLO COLON 1.00 Area= 22.59 22.59
MARTILLO COLON 1.00 Area= 35.22 35.22
MARTILLO COLON 1.00 Area= 24.35 24.35
MARTILLO COLON 1.00 Area= 17.58 17.58
MARTILLO COLON 1.00 Area= 27.30 27.30
MARTILLO COLON 1.00 Area= 28.04 28.04
MARTILLO COLON 1.00 Area= 9.22 9.22
AV. JOSE VARA LLANOS 1.00 Area= 231.55 231.55
1.00 Area= 197.82 197.82
JR. CARHUACOCHA 1.00 Area= 186.67 186.67
1.00 Area= 145.05 145.05
JR. HEROES JESUCINOS 1.00 Area= 176.99 176.99
1.00 Area= 186.43 186.43
JR. HUAMALIES 1.00 Area= 127.42 127.42
1.00 Area= 143.08 143.08
JR. PROGRESO 1.00 Area= 269.46 269.46
1.00 Area= 191.27 191.27
JR. HUANUCO 1.00 Area= 185.93 185.93
1.00 Area= 159.98 159.98
JR. BOLIVAR 1.00 Area= 173.85 173.85
1.00 Area= 178.76 178.76
JR. SAN MARTIN 1.00 Area= 139.49 139.49
1.00 Area= 136.86 136.86
JR. SAN SEBASTIAN 1.00 Area= 184.50 184.50
1.00 Area= 183.51 183.51
CALLE 3 1.00 Area= 300.92 300.92
1.00 Area= 370.95 370.95
JR. CIRILO ALVARADO 1.00 Area= 267.41 267.41
1.00 Area= 238.87 238.87
JR. SILOS MORENO 1.00 Area= 85.87 85.87
1.00 Area= 79.32 79.32

04.02.03 LIMPIEZA GERENAL DE VEREDAS EN OBRA 8,962.83 M2


AV. CRISTOBAL COLON
1.00 Area= 138.23 138.23
1.00 Area= 106.95 106.95
1.00 Area= 198.70 198.70
1.00 Area= 100.07 100.07
1.00 Area= 86.26 86.26
1.00 Area= 53.51 53.51
1.00 Area= 76.68 76.68
1.00 Area= 58.62 58.62
1.00 Area= 79.16 79.16
1.00 Area= 72.17 72.17
1.00 Area= 54.38 54.38
1.00 Area= 60.07 60.07
1.00 Area= 37.89 37.89
1.00 Area= 158.71 158.71
1.00 Area= 160.33 160.33
1.00 Area= 138.44 138.44
1.00 Area= 138.87 138.87
1.00 Area= 174.48 174.48
1.00 Area= 100.46 100.46
1.00 Area= 215.93 215.93
1.00 Area= 250.14 250.14
1.00 Area= 110.07 110.07
1.00 Area= 231.07 231.07
1.00 Area= 330.67 330.67
1.00 Area= 330.70 330.70
MARTILLO COLON 1.00 Area= 18.93 18.93
MARTILLO COLON 1.00 Area= 17.54 17.54
MARTILLO COLON 1.00 Area= 20.63 20.63
MARTILLO COLON 1.00 Area= 25.46 25.46

Página 7
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
MARTILLO COLON 1.00 Area= 22.03 22.03
MARTILLO COLON 1.00 Area= 15.72 15.72
MARTILLO COLON 1.00 Area= 30.06 30.06
MARTILLO COLON 1.00 Area= 17.77 17.77
MARTILLO COLON 1.00 Area= 9.22 9.22
MARTILLO COLON 1.00 Area= 10.46 10.46
MARTILLO COLON 1.00 Area= 17.32 17.32
MARTILLO COLON 1.00 Area= 14.71 14.71
MARTILLO COLON 1.00 Area= 19.13 19.13
MARTILLO COLON 1.00 Area= 19.60 19.60
MARTILLO COLON 1.00 Area= 16.89 16.89
MARTILLO COLON 1.00 Area= 21.19 21.19
MARTILLO COLON 1.00 Area= 18.02 18.02
MARTILLO COLON 1.00 Area= 17.61 17.61
MARTILLO COLON 1.00 Area= 29.05 29.05
MARTILLO COLON 1.00 Area= 32.41 32.41
MARTILLO COLON 1.00 Area= 24.32 24.32
MARTILLO COLON 1.00 Area= 18.28 18.28
MARTILLO COLON 1.00 Area= 16.26 16.26
MARTILLO COLON 1.00 Area= 19.93 19.93
MARTILLO COLON 1.00 Area= 21.41 21.41
MARTILLO COLON 1.00 Area= 16.46 16.46
MARTILLO COLON 1.00 Area= 17.44 17.44
MARTILLO COLON 1.00 Area= 16.30 16.30
MARTILLO COLON 1.00 Area= 15.28 15.28
MARTILLO COLON 1.00 Area= 11.99 11.99
MARTILLO COLON 1.00 Area= 11.36 11.36
MARTILLO COLON 1.00 Area= 12.01 12.01
MARTILLO COLON 1.00 Area= 11.03 11.03
MARTILLO COLON 1.00 Area= 11.85 11.85
MARTILLO COLON 1.00 Area= 14.40 14.40
MARTILLO COLON 1.00 Area= 10.30 10.30
MARTILLO COLON 1.00 Area= 10.00 10.00
MARTILLO COLON 1.00 Area= 25.01 25.01
MARTILLO COLON 1.00 Area= 15.50 15.50
MARTILLO COLON 1.00 Area= 13.68 13.68
MARTILLO COLON 1.00 Area= 27.65 27.65
MARTILLO COLON 1.00 Area= 32.14 32.14
MARTILLO COLON 1.00 Area= 27.66 27.66
MARTILLO COLON 1.00 Area= 22.59 22.59
MARTILLO COLON 1.00 Area= 35.22 35.22
MARTILLO COLON 1.00 Area= 24.35 24.35
MARTILLO COLON 1.00 Area= 17.58 17.58
MARTILLO COLON 1.00 Area= 27.30 27.30
MARTILLO COLON 1.00 Area= 28.04 28.04
MARTILLO COLON 1.00 Area= 9.22 9.22
AV. JOSE VARA LLANOS 1.00 Area= 231.55 231.55
1.00 Area= 197.82 197.82
JR. CARHUACOCHA 1.00 Area= 186.67 186.67
1.00 Area= 145.05 145.05
JR. HEROES JESUCINOS 1.00 Area= 176.99 176.99
1.00 Area= 186.43 186.43
JR. HUAMALIES 1.00 Area= 127.42 127.42
1.00 Area= 143.08 143.08
JR. PROGRESO 1.00 Area= 269.46 269.46
1.00 Area= 191.27 191.27
JR. HUANUCO 1.00 Area= 185.93 185.93
1.00 Area= 159.98 159.98
JR. BOLIVAR 1.00 Area= 173.85 173.85
1.00 Area= 178.76 178.76
JR. SAN MARTIN 1.00 Area= 139.49 139.49
1.00 Area= 136.86 136.86
JR. SAN SEBASTIAN 1.00 Area= 184.50 184.50
1.00 Area= 183.51 183.51
CALLE 3 1.00 Area= 300.92 300.92
1.00 Area= 370.95 370.95
JR. CIRILO ALVARADO 1.00 Area= 267.41 267.41
1.00 Area= 238.87 238.87
JR. SILOS MORENO 1.00 Area= 85.87 85.87
1.00 Area= 79.32 79.32

05 SARDINEL DE CONCRETO
05.01 OBRAS PRELIMINARES
04.01.01 TRAZO NIVEL Y REPLANTEO PRELIMINAR 5,760.16 M
AV. CRISTOBAL COLON 2.00 1,239.430 2,478.86
AV. JOSE VARA LLANOS 2.00 97.080 194.16
JR. CARHUACOCHA 2.00 96.750 193.50
JR. HEROES JESUCINOS 2.00 101.700 203.40
JR. HUAMALIES 2.00 104.380 208.76
JR. PROGRESO 2.00 109.630 219.26
JR. HUANUCO 2.00 116.030 232.06
JR. BOLIVAR 2.00 120.170 240.34
JR. SAN MARTIN 2.00 132.980 265.96
JR. SAN SEBASTIAN 2.00 147.720 295.44
CALLE 3 2.00 157.835 315.67
JR. CIRILO ALVARADO 2.00 136.080 272.16
JR. SILOS MORENO 2.00 96.560 193.12

Página 8
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
JARDINERAS SILOS MORENO 1.00 15.000 15.00
JARDINERAS SILOS MORENO 1.00 23.000 23.00
JARDINERAS SILOS MORENO 1.00 22.030 22.03
JARDINERAS SILOS MORENO 1.00 23.210 23.21
JARDINERAS SILOS MORENO 1.00 23.320 23.32
JARDINERAS SILOS MORENO 1.00 23.430 23.43
JARDINERAS SILOS MORENO 1.00 18.040 18.04
JARDINERAS SILOS MORENO 1.00 21.430 21.43
JARDINERAS SILOS MORENO 1.00 25.370 25.37
JARDINERAS SILOS MORENO 1.00 25.240 25.24
JARDINERAS SILOS MORENO 1.00 25.110 25.11
JARDINERAS SILOS MORENO 1.00 25.000 25.00
JARDINERAS SILOS MORENO 1.00 14.290 14.29
JARDINERAS CRISTOBAL COLON 1.00 19.930 19.93
JARDINERAS CRISTOBAL COLON 1.00 23.880 23.88
JARDINERAS CRISTOBAL COLON 1.00 24.560 24.56
JARDINERAS CRISTOBAL COLON 1.00 24.780 24.78
JARDINERAS CRISTOBAL COLON 1.00 24.700 24.70
JARDINERAS CRISTOBAL COLON 1.00 24.620 24.62
JARDINERAS CRISTOBAL COLON 1.00 20.530 20.53

05.02 MOVIMIENTO DE TIERRAS


05.02.01 EXCAVACION MANUAL DE ZANJA 288.01 M3
AV. CRISTOBAL COLON 2.00 1,239.430 0.10 0.50 123.94
AV. JOSE VARA LLANOS 2.00 97.080 0.10 0.50 9.71
JR. CARHUACOCHA 2.00 96.750 0.10 0.50 9.68
JR. HEROES JESUCINOS 2.00 101.700 0.10 0.50 10.17
JR. HUAMALIES 2.00 104.380 0.10 0.50 10.44
JR. PROGRESO 2.00 109.630 0.10 0.50 10.96
JR. HUANUCO 2.00 116.030 0.10 0.50 11.60
JR. BOLIVAR 2.00 120.170 0.10 0.50 12.02
JR. SAN MARTIN 2.00 132.980 0.10 0.50 13.30
JR. SAN SEBASTIAN 2.00 147.720 0.10 0.50 14.77
CALLE 3 2.00 157.835 0.10 0.50 15.78
JR. CIRILO ALVARADO 2.00 136.080 0.10 0.50 13.61
JR. SILOS MORENO 2.00 96.560 0.10 0.50 9.66
JARDINERAS SILOS MORENO 1.00 15.000 0.10 0.50 0.75
JARDINERAS SILOS MORENO 1.00 23.000 0.10 0.50 1.15
JARDINERAS SILOS MORENO 1.00 22.030 0.10 0.50 1.10
JARDINERAS SILOS MORENO 1.00 23.210 0.10 0.50 1.16
JARDINERAS SILOS MORENO 1.00 23.320 0.10 0.50 1.17
JARDINERAS SILOS MORENO 1.00 23.430 0.10 0.50 1.17
JARDINERAS SILOS MORENO 1.00 18.040 0.10 0.50 0.90
JARDINERAS SILOS MORENO 1.00 21.430 0.10 0.50 1.07
JARDINERAS SILOS MORENO 1.00 25.370 0.10 0.50 1.27
JARDINERAS SILOS MORENO 1.00 25.240 0.10 0.50 1.26
JARDINERAS SILOS MORENO 1.00 25.110 0.10 0.50 1.26
JARDINERAS SILOS MORENO 1.00 25.000 0.10 0.50 1.25
JARDINERAS SILOS MORENO 1.00 14.290 0.10 0.50 0.71
JARDINERAS CRISTOBAL COLON 1.00 19.930 0.10 0.50 1.00
JARDINERAS CRISTOBAL COLON 1.00 23.880 0.10 0.50 1.19
JARDINERAS CRISTOBAL COLON 1.00 24.560 0.10 0.50 1.23
JARDINERAS CRISTOBAL COLON 1.00 24.780 0.10 0.50 1.24
JARDINERAS CRISTOBAL COLON 1.00 24.700 0.10 0.50 1.24
JARDINERAS CRISTOBAL COLON 1.00 24.620 0.10 0.50 1.23
JARDINERAS CRISTOBAL COLON 1.00 20.530 0.10 0.50 1.03

05.02.01 ELIMINACION DE MATERIAL EXCEDENTE DM=10KM 360.01 M3


%ESPONJ. 30% 1.00 1.250 288.01 360.01
05.03 OBRAS DE CONCRETO
05.02.01 ENCOFRADO Y DESENCOFRADO DE SARDINEL 11,520.32 M
AV. CRISTOBAL COLON 4.00 1,239.430 4,957.72
AV. JOSE VARA LLANOS 4.00 97.080 388.32
JR. CARHUACOCHA 4.00 96.750 387.00
JR. HEROES JESUCINOS 4.00 101.700 406.80
JR. HUAMALIES 4.00 104.380 417.52
JR. PROGRESO 4.00 109.630 438.52
JR. HUANUCO 4.00 116.030 464.12
JR. BOLIVAR 4.00 120.170 480.68
JR. SAN MARTIN 4.00 132.980 531.92
JR. SAN SEBASTIAN 4.00 147.720 590.88
CALLE 3 4.00 157.835 631.34
JR. CIRILO ALVARADO 4.00 136.080 544.32
JR. SILOS MORENO 4.00 96.560 386.24
JARDINERAS SILOS MORENO 2.00 15.000 30.00
JARDINERAS SILOS MORENO 2.00 23.000 46.00
JARDINERAS SILOS MORENO 2.00 22.030 44.06
JARDINERAS SILOS MORENO 2.00 23.210 46.42
JARDINERAS SILOS MORENO 2.00 23.320 46.64
JARDINERAS SILOS MORENO 2.00 23.430 46.86
JARDINERAS SILOS MORENO 2.00 18.040 36.08
JARDINERAS SILOS MORENO 2.00 21.430 42.86
JARDINERAS SILOS MORENO 2.00 25.370 50.74
JARDINERAS SILOS MORENO 2.00 25.240 50.48
JARDINERAS SILOS MORENO 2.00 25.110 50.22
JARDINERAS SILOS MORENO 2.00 25.000 50.00
JARDINERAS SILOS MORENO 2.00 14.290 28.58

Página 9
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
JARDINERAS CRISTOBAL COLON 2.00 19.930 39.86
JARDINERAS CRISTOBAL COLON 2.00 23.880 47.76
JARDINERAS CRISTOBAL COLON 2.00 24.560 49.12
JARDINERAS CRISTOBAL COLON 2.00 24.780 49.56
JARDINERAS CRISTOBAL COLON 2.00 24.700 49.40
JARDINERAS CRISTOBAL COLON 2.00 24.620 49.24
JARDINERAS CRISTOBAL COLON 2.00 20.530 41.06

05.02.02 CONCRETO EN SARDINEL f'c=175 KG/CM2 288.01 M3


AV. CRISTOBAL COLON 2.00 1,239.430 0.10 0.50 123.94
AV. JOSE VARA LLANOS 2.00 97.080 0.10 0.50 9.71
JR. CARHUACOCHA 2.00 96.750 0.10 0.50 9.68
JR. HEROES JESUCINOS 2.00 101.700 0.10 0.50 10.17
JR. HUAMALIES 2.00 104.380 0.10 0.50 10.44
JR. PROGRESO 2.00 109.630 0.10 0.50 10.96
JR. HUANUCO 2.00 116.030 0.10 0.50 11.60
JR. BOLIVAR 2.00 120.170 0.10 0.50 12.02
JR. SAN MARTIN 2.00 132.980 0.10 0.50 13.30
JR. SAN SEBASTIAN 2.00 147.720 0.10 0.50 14.77
CALLE 3 2.00 157.835 0.10 0.50 15.78
JR. CIRILO ALVARADO 2.00 136.080 0.10 0.50 13.61
JR. SILOS MORENO 2.00 96.560 0.10 0.50 9.66
JARDINERAS SILOS MORENO 1.00 15.000 0.10 0.50 0.75
JARDINERAS SILOS MORENO 1.00 23.000 0.10 0.50 1.15
JARDINERAS SILOS MORENO 1.00 22.030 0.10 0.50 1.10
JARDINERAS SILOS MORENO 1.00 23.210 0.10 0.50 1.16
JARDINERAS SILOS MORENO 1.00 23.320 0.10 0.50 1.17
JARDINERAS SILOS MORENO 1.00 23.430 0.10 0.50 1.17
JARDINERAS SILOS MORENO 1.00 18.040 0.10 0.50 0.90
JARDINERAS SILOS MORENO 1.00 21.430 0.10 0.50 1.07
JARDINERAS SILOS MORENO 1.00 25.370 0.10 0.50 1.27
JARDINERAS SILOS MORENO 1.00 25.240 0.10 0.50 1.26
JARDINERAS SILOS MORENO 1.00 25.110 0.10 0.50 1.26
JARDINERAS SILOS MORENO 1.00 25.000 0.10 0.50 1.25
JARDINERAS SILOS MORENO 1.00 14.290 0.10 0.50 0.71
JARDINERAS CRISTOBAL COLON 1.00 19.930 0.10 0.50 1.00
JARDINERAS CRISTOBAL COLON 1.00 23.880 0.10 0.50 1.19
JARDINERAS CRISTOBAL COLON 1.00 24.560 0.10 0.50 1.23
JARDINERAS CRISTOBAL COLON 1.00 24.780 0.10 0.50 1.24
JARDINERAS CRISTOBAL COLON 1.00 24.700 0.10 0.50 1.24
JARDINERAS CRISTOBAL COLON 1.00 24.620 0.10 0.50 1.23
JARDINERAS CRISTOBAL COLON 1.00 20.530 0.10 0.50 1.03

05.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 5,281.71 KG


ver metrado acero 1.00 5,281.705 5,281.71

05.02.04 JUNTA DE DILATACION CON ASFALTO 1/2" EN SARDINELES 1,920.05 M


JUNTA = LONGITUD TOTAL /3.0 X H=0.50 3,840.107 0.5 1,920.05

06 SISTEMA DE DRENAJE PLUVIAL


06.01 MOVIMIENTO DE TIERRAS
06.01.01 EXCAVACION MANUAL EN ZANJA 159.38 M3
AV. CRISTOBAL COLON 2.00 1,239.430 0.30 0.10 74.37
AV. JOSE VARA LLANOS 2.00 97.080 0.30 0.10 5.82
JR. CARHUACOCHA 2.00 96.750 0.30 0.10 5.81
JR. HEROES JESUCINOS 2.00 101.700 0.30 0.10 6.10
JR. HUAMALIES 2.00 104.380 0.30 0.10 6.26
JR. PROGRESO 2.00 109.630 0.30 0.10 6.58
JR. HUANUCO 2.00 116.030 0.30 0.10 6.96
JR. BOLIVAR 2.00 120.170 0.30 0.10 7.21
JR. SAN MARTIN 2.00 132.980 0.30 0.10 7.98
JR. SAN SEBASTIAN 2.00 147.720 0.30 0.10 8.86
CALLE 3 2.00 157.835 0.30 0.10 9.47
JR. CIRILO ALVARADO 2.00 136.080 0.30 0.10 8.16
JR. SILOS MORENO 2.00 96.560 0.30 0.10 5.79

06.01.02 CORTE ROCA FIJA (PERFORACION) 27.45 M3


AV. CRISTOBAL COLON 1.00 13.450 2.00 0.50 13.45
AV. JOSE VARA LLANOS 1.00 1.000 2.00 0.50 1.00
JR. CARHUACOCHA 1.00 1.000 2.00 0.50 1.00
JR. HEROES JESUCINOS 1.00 1.000 2.00 0.50 1.00
JR. HUAMALIES 1.00 1.000 2.00 0.50 1.00
JR. PROGRESO 1.00 1.000 2.00 0.50 1.00
JR. HUANUCO 1.00 1.000 2.00 0.50 1.00
JR. BOLIVAR 1.00 1.000 2.00 0.50 1.00
JR. SAN MARTIN 1.00 1.000 2.00 0.50 1.00
JR. SAN SEBASTIAN 1.00 1.000 2.00 0.50 1.00
CALLE 3 1.00 1.000 2.00 0.50 1.00
JR. CIRILO ALVARADO 1.00 1.000 2.00 0.50 1.00
JR. SILOS MORENO 1.00 3.000 2.00 0.50 3.00

06.01.03 ELIMINACION DE MATERIAL EXCEDENTE DM=10KM 233.54 M3


% ESPONJ. 25% 1.00 1.250 186.83 233.54

06.01.04 AFIRMADO Y COMPACTADO C/EQUIPO LIVIANO E=10CM 1,593.81 M2


AV. CRISTOBAL COLON 2.00 1,239.430 0.30 743.66
AV. JOSE VARA LLANOS 2.00 97.080 0.30 58.25

Página 10
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
JR. CARHUACOCHA 2.00 96.750 0.30 58.05
JR. HEROES JESUCINOS 2.00 101.700 0.30 61.02
JR. HUAMALIES 2.00 104.380 0.30 62.63
JR. PROGRESO 2.00 109.630 0.30 65.78
JR. HUANUCO 2.00 116.030 0.30 69.62
JR. BOLIVAR 2.00 120.170 0.30 72.10
JR. SAN MARTIN 2.00 132.980 0.30 79.79
JR. SAN SEBASTIAN 2.00 147.720 0.30 88.63
CALLE 3 2.00 157.835 0.30 94.70
JR. CIRILO ALVARADO 2.00 136.080 0.30 81.65
JR. SILOS MORENO 2.00 96.560 0.30 57.94

06.02 OBRAS DE CONCRETO


06.02.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS 1,062.54 M2
AV. CRISTOBAL COLON 4.00 1,239.430 0.10 495.77
AV. JOSE VARA LLANOS 4.00 97.080 0.10 38.83
JR. CARHUACOCHA 4.00 96.750 0.10 38.70
JR. HEROES JESUCINOS 4.00 101.700 0.10 40.68
JR. HUAMALIES 4.00 104.380 0.10 41.75
JR. PROGRESO 4.00 109.630 0.10 43.85
JR. HUANUCO 4.00 116.030 0.10 46.41
JR. BOLIVAR 4.00 120.170 0.10 48.07
JR. SAN MARTIN 4.00 132.980 0.10 53.19
JR. SAN SEBASTIAN 4.00 147.720 0.10 59.09
CALLE 3 4.00 157.835 0.10 63.13
JR. CIRILO ALVARADO 4.00 136.080 0.10 54.43
JR. SILOS MORENO 4.00 96.560 0.10 38.62

06.02.02 CONCRETO F'C=210 KG/CM2 159.38 M3


AV. CRISTOBAL COLON 2.00 1,239.430 0.30 0.10 74.37
AV. JOSE VARA LLANOS 2.00 97.080 0.30 0.10 5.82
JR. CARHUACOCHA 2.00 96.750 0.30 0.10 5.81
JR. HEROES JESUCINOS 2.00 101.700 0.30 0.10 6.10
JR. HUAMALIES 2.00 104.380 0.30 0.10 6.26
JR. PROGRESO 2.00 109.630 0.30 0.10 6.58
JR. HUANUCO 2.00 116.030 0.30 0.10 6.96
JR. BOLIVAR 2.00 120.170 0.30 0.10 7.21
JR. SAN MARTIN 2.00 132.980 0.30 0.10 7.98
JR. SAN SEBASTIAN 2.00 147.720 0.30 0.10 8.86
CALLE 3 2.00 157.835 0.30 0.10 9.47
JR. CIRILO ALVARADO 2.00 136.080 0.30 0.10 8.16
JR. SILOS MORENO 2.00 96.560 0.30 0.10 5.79

06.02.03 ACERO CORRUGADO fy=4200 KG/CM2 GRADO 60 1.00 3,985.35 3,985.35 3,985.35 KG

06.02.04 JUNTAS DE DILATACION e=1/2" 267.90 M


AV. CRISTOBAL COLON 414.00 0.30 124.20
AV. JOSE VARA LLANOS 33.00 0.30 9.90
JR. CARHUACOCHA 33.00 0.30 9.90
JR. HEROES JESUCINOS 34.00 0.30 10.20
JR. HUAMALIES 35.00 0.30 10.50
JR. PROGRESO 37.00 0.30 11.10
JR. HUANUCO 39.00 0.30 11.70
JR. BOLIVAR 41.00 0.30 12.30
JR. SAN MARTIN 45.00 0.30 13.50
JR. SAN SEBASTIAN 50.00 0.30 15.00
CALLE 3 53.00 0.30 15.90
JR. CIRILO ALVARADO 46.00 0.30 13.80
JR. SILOS MORENO 33.00 0.30 9.90

06.02.05 CURADO CON AGUA INCL. ARROCERAS 1,593.81 M2


AV. CRISTOBAL COLON 2.00 1,239.430 0.30 743.66
AV. JOSE VARA LLANOS 2.00 97.080 0.30 58.25
JR. CARHUACOCHA 2.00 96.750 0.30 58.05
JR. HEROES JESUCINOS 2.00 101.700 0.30 61.02
JR. HUAMALIES 2.00 104.380 0.30 62.63
JR. PROGRESO 2.00 109.630 0.30 65.78
JR. HUANUCO 2.00 116.030 0.30 69.62
JR. BOLIVAR 2.00 120.170 0.30 72.10
JR. SAN MARTIN 2.00 132.980 0.30 79.79
JR. SAN SEBASTIAN 2.00 147.720 0.30 88.63
CALLE 3 2.00 157.835 0.30 94.70
JR. CIRILO ALVARADO 2.00 136.080 0.30 81.65
JR. SILOS MORENO 2.00 96.560 0.30 57.94
06.02.06 LIMPIEZA DEL TERRENO MANUAL 1,593.81 M2
AV. CRISTOBAL COLON 2.00 1,239.430 0.30 743.66
AV. JOSE VARA LLANOS 2.00 97.080 0.30 58.25
JR. CARHUACOCHA 2.00 96.750 0.30 58.05
JR. HEROES JESUCINOS 2.00 101.700 0.30 61.02
JR. HUAMALIES 2.00 104.380 0.30 62.63
JR. PROGRESO 2.00 109.630 0.30 65.78
JR. HUANUCO 2.00 116.030 0.30 69.62
JR. BOLIVAR 2.00 120.170 0.30 72.10
JR. SAN MARTIN 2.00 132.980 0.30 79.79
JR. SAN SEBASTIAN 2.00 147.720 0.30 88.63
CALLE 3 2.00 157.835 0.30 94.70
JR. CIRILO ALVARADO 2.00 136.080 0.30 81.65

Página 11
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
JR. SILOS MORENO 2.00 96.560 0.30 57.94

07 JARDINERIA Y AREAS VERDES


07.01 PREPARACION DE TERRENO CON TIERRA ORGANICA 237.84 M2
AV. CRISTOBAL COLON 1.00 area= 13.64 13.64
AV. CRISTOBAL COLON 1.00 area= 18.92 18.92
AV. CRISTOBAL COLON 1.00 area= 19.33 19.33
AV. CRISTOBAL COLON 1.00 area= 19.73 19.73
AV. CRISTOBAL COLON 1.00 area= 18.75 18.75
AV. CRISTOBAL COLON 1.00 area= 15.20 15.20
AV. CRISTOBAL COLON 1.00 area= 8.90 8.90
JR SILOS MORENO 1.00 area= 4.57 4.57
JR SILOS MORENO 1.00 area= 9.18 9.18
JR SILOS MORENO 1.00 area= 9.74 9.74
JR SILOS MORENO 1.00 area= 10.16 10.16
JR SILOS MORENO 1.00 area= 10.86 10.86
JR SILOS MORENO 1.00 area= 11.42 11.42
JR SILOS MORENO 1.00 area= 7.74 7.74
JR SILOS MORENO 1.00 area= 9.56 9.56
JR SILOS MORENO 1.00 area= 12.37 12.37
JR SILOS MORENO 1.00 area= 11.65 11.65
JR SILOS MORENO 1.00 area= 10.93 10.93
JR SILOS MORENO 1.00 area= 10.21 10.21
JR SILOS MORENO 1.00 area= 4.98 4.98

07.02 SEMBRADO DE GRASS 237.84 M2


AV. CRISTOBAL COLON 1.00 area= 13.64 13.64
AV. CRISTOBAL COLON 1.00 area= 18.92 18.92
AV. CRISTOBAL COLON 1.00 area= 19.33 19.33
AV. CRISTOBAL COLON 1.00 area= 19.73 19.73
AV. CRISTOBAL COLON 1.00 area= 18.75 18.75
AV. CRISTOBAL COLON 1.00 area= 15.20 15.20
AV. CRISTOBAL COLON 1.00 area= 8.90 8.90
JR SILOS MORENO 1.00 area= 4.57 4.57
JR SILOS MORENO 1.00 area= 9.18 9.18
JR SILOS MORENO 1.00 area= 9.74 9.74
JR SILOS MORENO 1.00 area= 10.16 10.16
JR SILOS MORENO 1.00 area= 10.86 10.86
JR SILOS MORENO 1.00 area= 11.42 11.42
JR SILOS MORENO 1.00 area= 7.74 7.74
JR SILOS MORENO 1.00 area= 9.56 9.56
JR SILOS MORENO 1.00 area= 12.37 12.37
JR SILOS MORENO 1.00 area= 11.65 11.65
JR SILOS MORENO 1.00 area= 10.93 10.93
JR SILOS MORENO 1.00 area= 10.21 10.21
JR SILOS MORENO 1.00 area= 4.98 4.98

07.03 SEMBRIO DE PLANTONES INCL. EXCAVACION Y TAPADO 80.00 M2


AV. CRISTOBAL COLON 4.00 4.00
AV. CRISTOBAL COLON 4.00 4.00
AV. CRISTOBAL COLON 4.00 4.00
AV. CRISTOBAL COLON 4.00 4.00
AV. CRISTOBAL COLON 4.00 4.00
AV. CRISTOBAL COLON 4.00 4.00
AV. CRISTOBAL COLON 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00
JR SILOS MORENO 4.00 4.00

08 SEÑALIZACION
08.01 PINTURA DE PAVIMENTO (LINEA CONTINUA) 5,976.78 M
AV. CRISTOBAL COLON 3.00 1,239.430 0.75 2,788.72
AV. JOSE VARA LLANOS 3.00 97.080 0.75 218.43
JR. CARHUACOCHA 3.00 96.750 0.75 217.69
JR. HEROES JESUCINOS 3.00 101.700 0.75 228.83
JR. HUAMALIES 3.00 104.380 0.75 234.86
JR. PROGRESO 3.00 109.630 0.75 246.67
JR. HUANUCO 3.00 116.030 0.75 261.07
JR. BOLIVAR 3.00 120.170 0.75 270.38
JR. SAN MARTIN 3.00 132.980 0.75 299.21
JR. SAN SEBASTIAN 3.00 147.720 0.75 332.37
CALLE 3 3.00 157.835 0.75 355.13
JR. CIRILO ALVARADO 3.00 136.080 0.75 306.18
JR. SILOS MORENO 3.00 96.560 0.75 217.26
08.02 PINTURA DE SARDINELES (LINEA CONTINUA) 5,312.69 M
AV. CRISTOBAL COLON 2.00 1,239.430 2,478.86

Página 12
PLANILLA DE METRADOS

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
AV. JOSE VARA LLANOS 2.00 97.080 194.16
JR. CARHUACOCHA 2.00 96.750 193.50
JR. HEROES JESUCINOS 2.00 101.700 203.40
JR. HUAMALIES 2.00 104.380 208.76
JR. PROGRESO 2.00 109.630 219.26
JR. HUANUCO 2.00 116.030 232.06
JR. BOLIVAR 2.00 120.170 240.34
JR. SAN MARTIN 2.00 132.980 265.96
JR. SAN SEBASTIAN 2.00 147.720 295.44
CALLE 3 2.00 157.835 315.67
JR. CIRILO ALVARADO 2.00 136.080 272.16
JR. SILOS MORENO 2.00 96.560 193.12
09 VARIOS
09.01 FLETE TRANSPORTE TERRESTRE 1.00 GLB
1.00 1.00 1.00
09.02 DEMOLICION DE PAVIMENTO DE CONCRETO DE 15 CM 366.00 M2
AV. CRISTOBAL COLON 166.00 1,239.430 1.00 166.00
AV. JOSE VARA LLANOS 14.00 97.080 1.00 14.00
JR. CARHUACOCHA 14.00 96.750 1.00 14.00
JR. HEROES JESUCINOS 14.00 101.700 1.00 14.00
JR. HUAMALIES 14.00 104.380 1.00 14.00
JR. PROGRESO 16.00 109.630 1.00 16.00
JR. HUANUCO 16.00 116.030 1.00 16.00
JR. BOLIVAR 18.00 120.170 1.00 18.00
JR. SAN MARTIN 18.00 132.980 1.00 18.00
JR. SAN SEBASTIAN 20.00 147.720 1.00 20.00
CALLE 3 22.00 157.835 1.00 22.00
JR. CIRILO ALVARADO 20.00 136.080 1.00 20.00
JR. SILOS MORENO 14.00 96.560 1.00 14.00
09.03 ELIMINACION DE MATERIAL EXCEDENTE DEMOLICION DM=10KM 333.50 M2
1.00 54.900 1.50 1.50
09.04 REPOSICION DE CAJA DE CONCRETO Y COLOCACION DE TAPA/CAJA-CONEX 366.00 UND
AV. CRISTOBAL COLON 166.00 1,239.430 166.00
AV. JOSE VARA LLANOS 14.00 97.080 14.00
JR. CARHUACOCHA 14.00 96.750 14.00
JR. HEROES JESUCINOS 14.00 101.700 14.00
JR. HUAMALIES 14.00 104.380 14.00
JR. PROGRESO 16.00 109.630 16.00
JR. HUANUCO 16.00 116.030 16.00
JR. BOLIVAR 18.00 120.170 18.00
JR. SAN MARTIN 18.00 132.980 18.00
JR. SAN SEBASTIAN 20.00 147.720 20.00
CALLE 3 22.00 157.835 22.00
JR. CIRILO ALVARADO 20.00 136.080 20.00
JR. SILOS MORENO 14.00 96.560 14.00
09.05 REUBICACION DE POSTES DE LUZ 20.00 UND
AV. CRISTOBAL COLON 8.00 8.00
AV. JOSE VARA LLANOS 1.00 1.00
JR. CARHUACOCHA 1.00 1.00
JR. HEROES JESUCINOS 1.00 1.00
JR. HUAMALIES 1.00 1.00
JR. PROGRESO 1.00 1.00
JR. HUANUCO 1.00 1.00
JR. BOLIVAR 1.00 1.00
JR. SAN MARTIN 1.00 1.00
JR. SAN SEBASTIAN 1.00 1.00
CALLE 3 1.00 1.00
JR. CIRILO ALVARADO 1.00 1.00
JR. SILOS MORENO 1.00 1.00
09.06 NIVELACION DE TAPAS DE BUZON 12.00 UND
AV. CRISTOBAL COLON 1.00 1.00
AV. JOSE VARA LLANOS 1.00 1.00
JR. CARHUACOCHA 1.00 1.00
JR. HEROES JESUCINOS 1.00 1.00
JR. HUAMALIES 1.00 1.00
JR. PROGRESO 1.00 1.00
JR. HUANUCO 1.00 1.00
JR. BOLIVAR 1.00 1.00
JR. SAN MARTIN 1.00 1.00
JR. SAN SEBASTIAN 1.00 1.00
CALLE 3 1.00 1.00
JR. CIRILO ALVARADO 1.00 1.00
JR. SILOS MORENO - -
09.07 PLACA RECORDATORIA SIN PEDESTAL 1.00 UND
PLACA RECORDATORIA SIN PEDESTAL 1.00 1.00
09.08 PLAN DE MANEJO AMBIENTAL 1.00 GLB
PLAN DE MANEJO AMBIENTAL 1.00 1.00
09.09 PLAN DE SEGURIDAD Y SALUD EN OBRA 1.00 GLB
PLAN DE SEGURIDAD Y SALUD EN OBRA 1.00 1.00
09.10 LIMPIEZA DE OBRA FINAL 25,659.12 M2
PISTAS 1.00 15,102.484 15,102.48
VEREDAS 1.00 8,962.830 8,962.83
CUNETAS 1.00 1,593.807 1,593.81

Página 13
PLANILLA DE METRADOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO,
HUAMALIES, HUANUCO".

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES


###

LARGO LARGO
3.01.03 ACERO EN JUNTAS TRANSVERSALES DOWELS DE 30 CM CANT. PARCIAL TOTAL
3/4"
M M
AV. CRISTOBAL COLON 1,326.0 1,239.430 1,326.000
AV. JOSE VARA LLANOS 119.0 97.080 119.000
JR. CARHUACOCHA 119.0 96.750 119.000
JR. HEROES JESUCINOS 119.0 101.700 119.000
JR. HUAMALIES 119.0 104.380 119.000
JR. PROGRESO 119.0 109.630 119.000
JR. HUANUCO 136.0 116.030 136.000
JR. BOLIVAR 136.0 120.170 136.000
JR. SAN MARTIN 153.0 132.980 153.000
JR. SAN SEBASTIAN 170.0 147.720 170.000
CALLE 3 170.0 157.835 170.000
JR. CIRILO ALVARADO 153.0 136.080 153.000
JR. SILOS MORENO 119.0 96.560 119.000
TOTAL 2,958.00

3.01.04 ACERO EN JUNTAS TRANSVERSALES DOWELS DE 90 CM LARGO LARGO


1/2" CANT. PARCIAL TOTAL
M M
AV. CRISTOBAL COLON 1,033.0 1,239.430 1,033.0
AV. JOSE VARA LLANOS 81.0 97.080 81.0
JR. CARHUACOCHA 81.0 96.750 81.0
JR. HEROES JESUCINOS 85.0 101.700 85.0
JR. HUAMALIES 87.0 104.380 87.0
JR. PROGRESO 92.0 109.630 92.0
JR. HUANUCO 97.0 116.030 97.0
JR. BOLIVAR 101.0 120.170 101.0
JR. SAN MARTIN 111.0 132.980 111.0
JR. SAN SEBASTIAN 124.0 147.720 124.0
CALLE 3 132.0 157.835 132.0
JR. CIRILO ALVARADO 114.0 136.080 114.0
JR. SILOS MORENO 81.0 96.560 81.0

TOTAL 2,219.00
PLANILLA DE METRADOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO,
HUAMALIES, HUANUCO".

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES


###

LARGO LARGO
03.02.01 JUNTAS DE DILATACION E=1/2" CANT. PARCIAL TOTAL
M M
LONGITUDINALES
AV. CRISTOBAL COLON 2.0 1,239.430 2,478.860
AV. JOSE VARA LLANOS 2.0 97.080 194.160
JR. CARHUACOCHA 2.0 96.750 193.500
JR. HEROES JESUCINOS 2.0 101.700 203.400
JR. HUAMALIES 2.0 104.380 208.760
JR. PROGRESO 2.0 109.630 219.260
JR. HUANUCO 2.0 116.030 232.060
JR. BOLIVAR 2.0 120.170 240.340
JR. SAN MARTIN 2.0 132.980 265.960
JR. SAN SEBASTIAN 2.0 147.720 295.440
CALLE 3 2.0 157.835 315.670
JR. CIRILO ALVARADO 2.0 136.080 272.160
JR. SILOS MORENO 2.0 96.560 193.120
TRANSVERSALES
AV. CRISTOBAL COLON 390.0 1,239.430 390.000
AV. JOSE VARA LLANOS 35.0 97.080 35.000
JR. CARHUACOCHA 35.0 96.750 35.000
JR. HEROES JESUCINOS 35.0 101.700 35.000
JR. HUAMALIES 35.0 104.380 35.000
JR. PROGRESO 35.0 109.630 35.000
JR. HUANUCO 40.0 116.030 40.000
JR. BOLIVAR 40.0 120.170 40.000
JR. SAN MARTIN 45.0 132.980 45.000
JR. SAN SEBASTIAN 50.0 147.720 50.000
CALLE 3 50.0 157.835 50.000
JR. CIRILO ALVARADO 45.0 136.080 45.000
JR. SILOS MORENO 35.0 96.560 35.000

TOTAL 6,182.69

LARGO LARGO
03.02.02 CORTE JUNTA DE CONTRACCION CANT. PARCIAL TOTAL
M M
Total area= 1.0 6,759.085 6,759.1

TOTAL 6,759.09

LARGO
03.02.03 CURADO CON AGUA INCL. ARROCERAS CANT. Area= TOTAL
M M
Total area= 1.0 15,102.484 15,102.48

TOTAL 15,102.48

LARGO
03.02.04 LIMPIEZA DE PISTAS CANT. Area= TOTAL
M M
Total area= 1.0 15,102.484 15,102.48

TOTAL 15,102.48
METRADO DE MOVIMIENTO DE TIERRAS VEREDA

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES


#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
04 VEREDAS DE CONCRETO
04.01 MOVIMIENTO DE TIERRAS
04.01.01 EXCAVACION MANUAL EN ZANJA 1,792.57 M3
AV. CRISTOBAL COLON
1.00 Area= 138.23 0.20 27.65
1.00 Area= 106.95 0.20 21.39
1.00 Area= 198.70 0.20 39.74
1.00 Area= 100.07 0.20 20.01
1.00 Area= 86.26 0.20 17.25
1.00 Area= 53.51 0.20 10.70
1.00 Area= 76.68 0.20 15.34
1.00 Area= 58.62 0.20 11.72
1.00 Area= 79.16 0.20 15.83
1.00 Area= 72.17 0.20 14.43
1.00 Area= 54.38 0.20 10.88
1.00 Area= 60.07 0.20 12.01
1.00 Area= 37.89 0.20 7.58
1.00 Area= 158.71 0.20 31.74
1.00 Area= 160.33 0.20 32.07
1.00 Area= 138.44 0.20 27.69
1.00 Area= 138.87 0.20 27.77
1.00 Area= 174.48 0.20 34.90
1.00 Area= 100.46 0.20 20.09
1.00 Area= 215.93 0.20 43.19
1.00 Area= 250.14 0.20 50.03
1.00 Area= 110.07 0.20 22.01
1.00 Area= 231.07 0.20 46.21
1.00 Area= 330.67 0.20 66.13
1.00 Area= 330.70 0.20 66.14
MARTILLO COLON 1.00 Area= 18.93 0.20 3.79
MARTILLO COLON 1.00 Area= 17.54 0.20 3.51
MARTILLO COLON 1.00 Area= 20.63 0.20 4.13
MARTILLO COLON 1.00 Area= 25.46 0.20 5.09
MARTILLO COLON 1.00 Area= 22.03 0.20 4.41
MARTILLO COLON 1.00 Area= 15.72 0.20 3.14
MARTILLO COLON 1.00 Area= 30.06 0.20 6.01
MARTILLO COLON 1.00 Area= 17.77 0.20 3.55
MARTILLO COLON 1.00 Area= 9.22 0.20 1.84
MARTILLO COLON 1.00 Area= 10.46 0.20 2.09
MARTILLO COLON 1.00 Area= 17.32 0.20 3.46
MARTILLO COLON 1.00 Area= 14.71 0.20 2.94
MARTILLO COLON 1.00 Area= 19.13 0.20 3.83
MARTILLO COLON 1.00 Area= 19.60 0.20 3.92
MARTILLO COLON 1.00 Area= 16.89 0.20 3.38
MARTILLO COLON 1.00 Area= 21.19 0.20 4.24
MARTILLO COLON 1.00 Area= 18.02 0.20 3.60
MARTILLO COLON 1.00 Area= 17.61 0.20 3.52
MARTILLO COLON 1.00 Area= 29.05 0.20 5.81
MARTILLO COLON 1.00 Area= 32.41 0.20 6.48
MARTILLO COLON 1.00 Area= 24.32 0.20 4.86
MARTILLO COLON 1.00 Area= 18.28 0.20 3.66
MARTILLO COLON 1.00 Area= 16.26 0.20 3.25
MARTILLO COLON 1.00 Area= 19.93 0.20 3.99
MARTILLO COLON 1.00 Area= 21.41 0.20 4.28
MARTILLO COLON 1.00 Area= 16.46 0.20 3.29
MARTILLO COLON 1.00 Area= 17.44 0.20 3.49
MARTILLO COLON 1.00 Area= 16.30 0.20 3.26
MARTILLO COLON 1.00 Area= 15.28 0.20 3.06
MARTILLO COLON 1.00 Area= 11.99 0.20 2.40
MARTILLO COLON 1.00 Area= 11.36 0.20 2.27
MARTILLO COLON 1.00 Area= 12.01 0.20 2.40
MARTILLO COLON 1.00 Area= 11.03 0.20 2.21
MARTILLO COLON 1.00 Area= 11.85 0.20 2.37
MARTILLO COLON 1.00 Area= 14.40 0.20 2.88
MARTILLO COLON 1.00 Area= 10.30 0.20 2.06
MARTILLO COLON 1.00 Area= 10.00 0.20 2.00
MARTILLO COLON 1.00 Area= 25.01 0.20 5.00
MARTILLO COLON 1.00 Area= 15.50 0.20 3.10
MARTILLO COLON 1.00 Area= 13.68 0.20 2.74
MARTILLO COLON 1.00 Area= 27.65 0.20 5.53
MARTILLO COLON 1.00 Area= 32.14 0.20 6.43
MARTILLO COLON 1.00 Area= 27.66 0.20 5.53
MARTILLO COLON 1.00 Area= 22.59 0.20 4.52
MARTILLO COLON 1.00 Area= 35.22 0.20 7.04
MARTILLO COLON 1.00 Area= 24.35 0.20 4.87
MARTILLO COLON 1.00 Area= 17.58 0.20 3.52
MARTILLO COLON 1.00 Area= 27.30 0.20 5.46
MARTILLO COLON 1.00 Area= 28.04 0.20 5.61
MARTILLO COLON 1.00 Area= 9.22 0.20 1.84
AV. JOSE VARA LLANOS 1.00 Area= 231.55 0.20 46.31
1.00 Area= 197.82 0.20 39.56
JR. CARHUACOCHA 1.00 Area= 186.67 0.20 37.33
1.00 Area= 145.05 0.20 29.01
JR. HEROES JESUCINOS 1.00 Area= 176.99 0.20 35.40
1.00 Area= 186.43 0.20 37.29
JR. HUAMALIES 1.00 Area= 127.42 0.20 25.48
1.00 Area= 143.08 0.20 28.62
JR. PROGRESO 1.00 Area= 269.46 0.20 53.89
1.00 Area= 191.27 0.20 38.25
JR. HUANUCO 1.00 Area= 185.93 0.20 37.19
1.00 Area= 159.98 0.20 32.00
JR. BOLIVAR 1.00 Area= 173.85 0.20 34.77
1.00 Area= 178.76 0.20 35.75
JR. SAN MARTIN 1.00 Area= 139.49 0.20 27.90
1.00 Area= 136.86 0.20 27.37
JR. SAN SEBASTIAN 1.00 Area= 184.50 0.20 36.90
1.00 Area= 183.51 0.20 36.70
CALLE 3 1.00 Area= 300.92 0.20 60.18
1.00 Area= 370.95 0.20 74.19
JR. CIRILO ALVARADO 1.00 Area= 267.41 0.20 53.48
1.00 Area= 238.87 0.20 47.77
JR. SILOS MORENO 1.00 Area= 85.87 0.20 17.17
1.00 Area= 79.32 0.20 15.86

04.01.02 ELIMINACION DE MATERIAL EXCEDENTE DM= 1.25 1,792.57 - - 2,240.71 2,240.71 M3


04.01.03 AFIRMADO Y COMPACTADO C/EQUIPO LIVIANO E=10CM 8,962.83 M2
AV. CRISTOBAL COLON
1.00 Area= 138.23 138.23
1.00 Area= 106.95 106.95
1.00 Area= 198.70 198.70
1.00 Area= 100.07 100.07
1.00 Area= 86.26 86.26
1.00 Area= 53.51 53.51
1.00 Area= 76.68 76.68
1.00 Area= 58.62 58.62
1.00 Area= 79.16 79.16
1.00 Area= 72.17 72.17
1.00 Area= 54.38 54.38
1.00 Area= 60.07 60.07
1.00 Area= 37.89 37.89
1.00 Area= 158.71 158.71
1.00 Area= 160.33 160.33
1.00 Area= 138.44 138.44
1.00 Area= 138.87 138.87
1.00 Area= 174.48 174.48
1.00 Area= 100.46 100.46
1.00 Area= 215.93 215.93
1.00 Area= 250.14 250.14
1.00 Area= 110.07 110.07
1.00 Area= 231.07 231.07
1.00 Area= 330.67 330.67
1.00 Area= 330.70 330.70
MARTILLO COLON 1.00 Area= 18.93 18.93
MARTILLO COLON 1.00 Area= 17.54 17.54
MARTILLO COLON 1.00 Area= 20.63 20.63
MARTILLO COLON 1.00 Area= 25.46 25.46
MARTILLO COLON 1.00 Area= 22.03 22.03
MARTILLO COLON 1.00 Area= 15.72 15.72
MARTILLO COLON 1.00 Area= 30.06 30.06
MARTILLO COLON 1.00 Area= 17.77 17.77
MARTILLO COLON 1.00 Area= 9.22 9.22
MARTILLO COLON 1.00 Area= 10.46 10.46
MARTILLO COLON 1.00 Area= 17.32 17.32
MARTILLO COLON 1.00 Area= 14.71 14.71
MARTILLO COLON 1.00 Area= 19.13 19.13
MARTILLO COLON 1.00 Area= 19.60 19.60
MARTILLO COLON 1.00 Area= 16.89 16.89
MARTILLO COLON 1.00 Area= 21.19 21.19
MARTILLO COLON 1.00 Area= 18.02 18.02
MARTILLO COLON 1.00 Area= 17.61 17.61
MARTILLO COLON 1.00 Area= 29.05 29.05
MARTILLO COLON 1.00 Area= 32.41 32.41
MARTILLO COLON 1.00 Area= 24.32 24.32
MARTILLO COLON 1.00 Area= 18.28 18.28
MARTILLO COLON 1.00 Area= 16.26 16.26
MARTILLO COLON 1.00 Area= 19.93 19.93
MARTILLO COLON 1.00 Area= 21.41 21.41
MARTILLO COLON 1.00 Area= 16.46 16.46
MARTILLO COLON 1.00 Area= 17.44 17.44
MARTILLO COLON 1.00 Area= 16.30 16.30
MARTILLO COLON 1.00 Area= 15.28 15.28
MARTILLO COLON 1.00 Area= 11.99 11.99
MARTILLO COLON 1.00 Area= 11.36 11.36
MARTILLO COLON 1.00 Area= 12.01 12.01
MARTILLO COLON 1.00 Area= 11.03 11.03
MARTILLO COLON 1.00 Area= 11.85 11.85
MARTILLO COLON 1.00 Area= 14.40 14.40
MARTILLO COLON 1.00 Area= 10.30 10.30
MARTILLO COLON 1.00 Area= 10.00 10.00
MARTILLO COLON 1.00 Area= 25.01 25.01
MARTILLO COLON 1.00 Area= 15.50 15.50
MARTILLO COLON 1.00 Area= 13.68 13.68
MARTILLO COLON 1.00 Area= 27.65 27.65
MARTILLO COLON 1.00 Area= 32.14 32.14
MARTILLO COLON 1.00 Area= 27.66 27.66
MARTILLO COLON 1.00 Area= 22.59 22.59
MARTILLO COLON 1.00 Area= 35.22 35.22
MARTILLO COLON 1.00 Area= 24.35 24.35
MARTILLO COLON 1.00 Area= 17.58 17.58
MARTILLO COLON 1.00 Area= 27.30 27.30
MARTILLO COLON 1.00 Area= 28.04 28.04
MARTILLO COLON 1.00 Area= 9.22 9.22
AV. JOSE VARA LLANOS 1.00 Area= 231.55 231.55
1.00 Area= 197.82 197.82
JR. CARHUACOCHA 1.00 Area= 186.67 186.67
1.00 Area= 145.05 145.05
JR. HEROES JESUCINOS 1.00 Area= 176.99 176.99
1.00 Area= 186.43 186.43
JR. HUAMALIES 1.00 Area= 127.42 127.42
1.00 Area= 143.08 143.08
JR. PROGRESO 1.00 Area= 269.46 269.46
1.00 Area= 191.27 191.27
JR. HUANUCO 1.00 Area= 185.93 185.93
1.00 Area= 159.98 159.98
JR. BOLIVAR 1.00 Area= 173.85 173.85
1.00 Area= 178.76 178.76
JR. SAN MARTIN 1.00 Area= 139.49 139.49
1.00 Area= 136.86 136.86
JR. SAN SEBASTIAN 1.00 Area= 184.50 184.50
1.00 Area= 183.51 183.51
CALLE 3 1.00 Area= 300.92 300.92
1.00 Area= 370.95 370.95
JR. CIRILO ALVARADO 1.00 Area= 267.41 267.41
1.00 Area= 238.87 238.87
JR. SILOS MORENO 1.00 Area= 85.87 85.87
1.00 Area= 79.32 79.32

04.02 OBRAS DE CONCRETO


04.02.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS 796.90 M2
AV. CRISTOBAL COLON 2.00 1,239.430 0.15 371.83
AV. JOSE VARA LLANOS 2.00 97.080 0.15 29.12
JR. CARHUACOCHA 2.00 96.750 0.15 29.03
JR. HEROES JESUCINOS 2.00 101.700 0.15 30.51
JR. HUAMALIES 2.00 104.380 0.15 31.31
JR. PROGRESO 2.00 109.630 0.15 32.89
JR. HUANUCO 2.00 116.030 0.15 34.81
JR. BOLIVAR 2.00 120.170 0.15 36.05
JR. SAN MARTIN 2.00 132.980 0.15 39.89
JR. SAN SEBASTIAN 2.00 147.720 0.15 44.32
CALLE 3 2.00 157.835 0.15 47.35
JR. CIRILO ALVARADO 2.00 136.080 0.15 40.82
JR. SILOS MORENO 2.00 96.560 0.15 28.97

04.02.02 VEREDA DE CONCRETO F'C=175KG/CM2 E=15CM 8,962.83 M2


AV. CRISTOBAL COLON
1.00 Area= 138.23 138.23
1.00 Area= 106.95 106.95
1.00 Area= 198.70 198.70
1.00 Area= 100.07 100.07
1.00 Area= 86.26 86.26
1.00 Area= 53.51 53.51
1.00 Area= 76.68 76.68
1.00 Area= 58.62 58.62
1.00 Area= 79.16 79.16
1.00 Area= 72.17 72.17
1.00 Area= 54.38 54.38
1.00 Area= 60.07 60.07
1.00 Area= 37.89 37.89
1.00 Area= 158.71 158.71
1.00 Area= 160.33 160.33
1.00 Area= 138.44 138.44
1.00 Area= 138.87 138.87
1.00 Area= 174.48 174.48
1.00 Area= 100.46 100.46
1.00 Area= 215.93 215.93
1.00 Area= 250.14 250.14
1.00 Area= 110.07 110.07
1.00 Area= 231.07 231.07
1.00 Area= 330.67 330.67
1.00 Area= 330.70 330.70
MARTILLO COLON 1.00 Area= 18.93 18.93
MARTILLO COLON 1.00 Area= 17.54 17.54
MARTILLO COLON 1.00 Area= 20.63 20.63
MARTILLO COLON 1.00 Area= 25.46 25.46
MARTILLO COLON 1.00 Area= 22.03 22.03
MARTILLO COLON 1.00 Area= 15.72 15.72
MARTILLO COLON 1.00 Area= 30.06 30.06
MARTILLO COLON 1.00 Area= 17.77 17.77
MARTILLO COLON 1.00 Area= 9.22 9.22
MARTILLO COLON 1.00 Area= 10.46 10.46
MARTILLO COLON 1.00 Area= 17.32 17.32
MARTILLO COLON 1.00 Area= 14.71 14.71
MARTILLO COLON 1.00 Area= 19.13 19.13
MARTILLO COLON 1.00 Area= 19.60 19.60
MARTILLO COLON 1.00 Area= 16.89 16.89
MARTILLO COLON 1.00 Area= 21.19 21.19
MARTILLO COLON 1.00 Area= 18.02 18.02
MARTILLO COLON 1.00 Area= 17.61 17.61
MARTILLO COLON 1.00 Area= 29.05 29.05
MARTILLO COLON 1.00 Area= 32.41 32.41
MARTILLO COLON 1.00 Area= 24.32 24.32
MARTILLO COLON 1.00 Area= 18.28 18.28
MARTILLO COLON 1.00 Area= 16.26 16.26
MARTILLO COLON 1.00 Area= 19.93 19.93
MARTILLO COLON 1.00 Area= 21.41 21.41
MARTILLO COLON 1.00 Area= 16.46 16.46
MARTILLO COLON 1.00 Area= 17.44 17.44
MARTILLO COLON 1.00 Area= 16.30 16.30
MARTILLO COLON 1.00 Area= 15.28 15.28
MARTILLO COLON 1.00 Area= 11.99 11.99
MARTILLO COLON 1.00 Area= 11.36 11.36
MARTILLO COLON 1.00 Area= 12.01 12.01
MARTILLO COLON 1.00 Area= 11.03 11.03
MARTILLO COLON 1.00 Area= 11.85 11.85
MARTILLO COLON 1.00 Area= 14.40 14.40
MARTILLO COLON 1.00 Area= 10.30 10.30
MARTILLO COLON 1.00 Area= 10.00 10.00
MARTILLO COLON 1.00 Area= 25.01 25.01
MARTILLO COLON 1.00 Area= 15.50 15.50
MARTILLO COLON 1.00 Area= 13.68 13.68
MARTILLO COLON 1.00 Area= 27.65 27.65
MARTILLO COLON 1.00 Area= 32.14 32.14
MARTILLO COLON 1.00 Area= 27.66 27.66
MARTILLO COLON 1.00 Area= 22.59 22.59
MARTILLO COLON 1.00 Area= 35.22 35.22
MARTILLO COLON 1.00 Area= 24.35 24.35
MARTILLO COLON 1.00 Area= 17.58 17.58
MARTILLO COLON 1.00 Area= 27.30 27.30
MARTILLO COLON 1.00 Area= 28.04 28.04
MARTILLO COLON 1.00 Area= 9.22 9.22
AV. JOSE VARA LLANOS 1.00 Area= 231.55 231.55
1.00 Area= 197.82 197.82
JR. CARHUACOCHA 1.00 Area= 186.67 186.67
1.00 Area= 145.05 145.05
JR. HEROES JESUCINOS 1.00 Area= 176.99 176.99
1.00 Area= 186.43 186.43
JR. HUAMALIES 1.00 Area= 127.42 127.42
1.00 Area= 143.08 143.08
JR. PROGRESO 1.00 Area= 269.46 269.46
1.00 Area= 191.27 191.27
JR. HUANUCO 1.00 Area= 185.93 185.93
1.00 Area= 159.98 159.98
JR. BOLIVAR 1.00 Area= 173.85 173.85
1.00 Area= 178.76 178.76
JR. SAN MARTIN 1.00 Area= 139.49 139.49
1.00 Area= 136.86 136.86
JR. SAN SEBASTIAN 1.00 Area= 184.50 184.50
1.00 Area= 183.51 183.51
CALLE 3 1.00 Area= 300.92 300.92
1.00 Area= 370.95 370.95
JR. CIRILO ALVARADO 1.00 Area= 267.41 267.41
1.00 Area= 238.87 238.87
JR. SILOS MORENO 1.00 Area= 85.87 85.87
1.00 Area= 79.32 79.32
04.02.01 RAMPA DE CONCRETO INCL. BRUÑADO 49.00 M2
AV. CRISTOBAL COLON 49.00 Area= 1.00 49.00
04.02.01 JUNTAS DE DILATACION 2,143.20 M
AV. CRISTOBAL COLON 2.00 1,239.430 1.20 414.00 993.6
AV. JOSE VARA LLANOS 2.00 97.080 1.20 33.00 79.2
JR. CARHUACOCHA 2.00 96.750 1.20 33.00 79.2
JR. HEROES JESUCINOS 2.00 101.700 1.20 34.00 81.6
JR. HUAMALIES 2.00 104.380 1.20 35.00 84.0
JR. PROGRESO 2.00 109.630 1.20 37.00 88.8
JR. HUANUCO 2.00 116.030 1.20 39.00 93.6
JR. BOLIVAR 2.00 120.170 1.20 41.00 98.4
JR. SAN MARTIN 2.00 132.980 1.20 45.00 108.0
JR. SAN SEBASTIAN 2.00 147.720 1.20 50.00 120.0
CALLE 3 2.00 157.835 1.20 53.00 127.2
JR. CIRILO ALVARADO 2.00 136.080 1.20 46.00 110.4
JR. SILOS MORENO 2.00 96.560 1.20 33.00 79.2
04.02.02 CURADO DE VEREDAS INCL. TENDIDO DE ARROCERAS 8,962.83 M2
AV. CRISTOBAL COLON
1.00 Area= 138.23 138.23
1.00 Area= 106.95 106.95
1.00 Area= 198.70 198.70
1.00 Area= 100.07 100.07
1.00 Area= 86.26 86.26
1.00 Area= 53.51 53.51
1.00 Area= 76.68 76.68
1.00 Area= 58.62 58.62
1.00 Area= 79.16 79.16
1.00 Area= 72.17 72.17
1.00 Area= 54.38 54.38
1.00 Area= 60.07 60.07
1.00 Area= 37.89 37.89
1.00 Area= 158.71 158.71
1.00 Area= 160.33 160.33
1.00 Area= 138.44 138.44
1.00 Area= 138.87 138.87
1.00 Area= 174.48 174.48
1.00 Area= 100.46 100.46
1.00 Area= 215.93 215.93
1.00 Area= 250.14 250.14
1.00 Area= 110.07 110.07
1.00 Area= 231.07 231.07
1.00 Area= 330.67 330.67
1.00 Area= 330.70 330.70
MARTILLO COLON 1.00 Area= 18.93 18.93
MARTILLO COLON 1.00 Area= 17.54 17.54
MARTILLO COLON 1.00 Area= 20.63 20.63
MARTILLO COLON 1.00 Area= 25.46 25.46
MARTILLO COLON 1.00 Area= 22.03 22.03
MARTILLO COLON 1.00 Area= 15.72 15.72
MARTILLO COLON 1.00 Area= 30.06 30.06
MARTILLO COLON 1.00 Area= 17.77 17.77
MARTILLO COLON 1.00 Area= 9.22 9.22
MARTILLO COLON 1.00 Area= 10.46 10.46
MARTILLO COLON 1.00 Area= 17.32 17.32
MARTILLO COLON 1.00 Area= 14.71 14.71
MARTILLO COLON 1.00 Area= 19.13 19.13
MARTILLO COLON 1.00 Area= 19.60 19.60
MARTILLO COLON 1.00 Area= 16.89 16.89
MARTILLO COLON 1.00 Area= 21.19 21.19
MARTILLO COLON 1.00 Area= 18.02 18.02
MARTILLO COLON 1.00 Area= 17.61 17.61
MARTILLO COLON 1.00 Area= 29.05 29.05
MARTILLO COLON 1.00 Area= 32.41 32.41
MARTILLO COLON 1.00 Area= 24.32 24.32
MARTILLO COLON 1.00 Area= 18.28 18.28
MARTILLO COLON 1.00 Area= 16.26 16.26
MARTILLO COLON 1.00 Area= 19.93 19.93
MARTILLO COLON 1.00 Area= 21.41 21.41
MARTILLO COLON 1.00 Area= 16.46 16.46
MARTILLO COLON 1.00 Area= 17.44 17.44
MARTILLO COLON 1.00 Area= 16.30 16.30
MARTILLO COLON 1.00 Area= 15.28 15.28
MARTILLO COLON 1.00 Area= 11.99 11.99
MARTILLO COLON 1.00 Area= 11.36 11.36
MARTILLO COLON 1.00 Area= 12.01 12.01
MARTILLO COLON 1.00 Area= 11.03 11.03
MARTILLO COLON 1.00 Area= 11.85 11.85
MARTILLO COLON 1.00 Area= 14.40 14.40
MARTILLO COLON 1.00 Area= 10.30 10.30
MARTILLO COLON 1.00 Area= 10.00 10.00
MARTILLO COLON 1.00 Area= 25.01 25.01
MARTILLO COLON 1.00 Area= 15.50 15.50
MARTILLO COLON 1.00 Area= 13.68 13.68
MARTILLO COLON 1.00 Area= 27.65 27.65
MARTILLO COLON 1.00 Area= 32.14 32.14
MARTILLO COLON 1.00 Area= 27.66 27.66
MARTILLO COLON 1.00 Area= 22.59 22.59
MARTILLO COLON 1.00 Area= 35.22 35.22
MARTILLO COLON 1.00 Area= 24.35 24.35
MARTILLO COLON 1.00 Area= 17.58 17.58
MARTILLO COLON 1.00 Area= 27.30 27.30
MARTILLO COLON 1.00 Area= 28.04 28.04
MARTILLO COLON 1.00 Area= 9.22 9.22
AV. JOSE VARA LLANOS 1.00 Area= 231.55 231.55
1.00 Area= 197.82 197.82
JR. CARHUACOCHA 1.00 Area= 186.67 186.67
1.00 Area= 145.05 145.05
JR. HEROES JESUCINOS 1.00 Area= 176.99 176.99
1.00 Area= 186.43 186.43
JR. HUAMALIES 1.00 Area= 127.42 127.42
1.00 Area= 143.08 143.08
JR. PROGRESO 1.00 Area= 269.46 269.46
1.00 Area= 191.27 191.27
JR. HUANUCO 1.00 Area= 185.93 185.93
1.00 Area= 159.98 159.98
JR. BOLIVAR 1.00 Area= 173.85 173.85
1.00 Area= 178.76 178.76
JR. SAN MARTIN 1.00 Area= 139.49 139.49
1.00 Area= 136.86 136.86
JR. SAN SEBASTIAN 1.00 Area= 184.50 184.50
1.00 Area= 183.51 183.51
CALLE 3 1.00 Area= 300.92 300.92
1.00 Area= 370.95 370.95
JR. CIRILO ALVARADO 1.00 Area= 267.41 267.41
1.00 Area= 238.87 238.87
JR. SILOS MORENO 1.00 Area= 85.87 85.87
1.00 Area= 79.32 79.32
04.02.03 LIMPIEZA GERENAL DE VEREDAS EN OBRA 8,962.83 M2
AV. CRISTOBAL COLON
1.00 Area= 138.23 138.23
1.00 Area= 106.95 106.95
1.00 Area= 198.70 198.70
1.00 Area= 100.07 100.07
1.00 Area= 86.26 86.26
1.00 Area= 53.51 53.51
1.00 Area= 76.68 76.68
1.00 Area= 58.62 58.62
1.00 Area= 79.16 79.16
1.00 Area= 72.17 72.17
1.00 Area= 54.38 54.38
1.00 Area= 60.07 60.07
1.00 Area= 37.89 37.89
1.00 Area= 158.71 158.71
1.00 Area= 160.33 160.33
1.00 Area= 138.44 138.44
1.00 Area= 138.87 138.87
1.00 Area= 174.48 174.48
1.00 Area= 100.46 100.46
1.00 Area= 215.93 215.93
1.00 Area= 250.14 250.14
1.00 Area= 110.07 110.07
1.00 Area= 231.07 231.07
1.00 Area= 330.67 330.67
1.00 Area= 330.70 330.70
MARTILLO COLON 1.00 Area= 18.93 18.93
MARTILLO COLON 1.00 Area= 17.54 17.54
MARTILLO COLON 1.00 Area= 20.63 20.63
MARTILLO COLON 1.00 Area= 25.46 25.46
MARTILLO COLON 1.00 Area= 22.03 22.03
MARTILLO COLON 1.00 Area= 15.72 15.72
MARTILLO COLON 1.00 Area= 30.06 30.06
MARTILLO COLON 1.00 Area= 17.77 17.77
MARTILLO COLON 1.00 Area= 9.22 9.22
MARTILLO COLON 1.00 Area= 10.46 10.46
MARTILLO COLON 1.00 Area= 17.32 17.32
MARTILLO COLON 1.00 Area= 14.71 14.71
MARTILLO COLON 1.00 Area= 19.13 19.13
MARTILLO COLON 1.00 Area= 19.60 19.60
MARTILLO COLON 1.00 Area= 16.89 16.89
MARTILLO COLON 1.00 Area= 21.19 21.19
MARTILLO COLON 1.00 Area= 18.02 18.02
MARTILLO COLON 1.00 Area= 17.61 17.61
MARTILLO COLON 1.00 Area= 29.05 29.05
MARTILLO COLON 1.00 Area= 32.41 32.41
MARTILLO COLON 1.00 Area= 24.32 24.32
MARTILLO COLON 1.00 Area= 18.28 18.28
MARTILLO COLON 1.00 Area= 16.26 16.26
MARTILLO COLON 1.00 Area= 19.93 19.93
MARTILLO COLON 1.00 Area= 21.41 21.41
MARTILLO COLON 1.00 Area= 16.46 16.46
MARTILLO COLON 1.00 Area= 17.44 17.44
MARTILLO COLON 1.00 Area= 16.30 16.30
MARTILLO COLON 1.00 Area= 15.28 15.28
MARTILLO COLON 1.00 Area= 11.99 11.99
MARTILLO COLON 1.00 Area= 11.36 11.36
MARTILLO COLON 1.00 Area= 12.01 12.01
MARTILLO COLON 1.00 Area= 11.03 11.03
MARTILLO COLON 1.00 Area= 11.85 11.85
MARTILLO COLON 1.00 Area= 14.40 14.40
MARTILLO COLON 1.00 Area= 10.30 10.30
MARTILLO COLON 1.00 Area= 10.00 10.00
MARTILLO COLON 1.00 Area= 25.01 25.01
MARTILLO COLON 1.00 Area= 15.50 15.50
MARTILLO COLON 1.00 Area= 13.68 13.68
MARTILLO COLON 1.00 Area= 27.65 27.65
MARTILLO COLON 1.00 Area= 32.14 32.14
MARTILLO COLON 1.00 Area= 27.66 27.66
MARTILLO COLON 1.00 Area= 22.59 22.59
MARTILLO COLON 1.00 Area= 35.22 35.22
MARTILLO COLON 1.00 Area= 24.35 24.35
MARTILLO COLON 1.00 Area= 17.58 17.58
MARTILLO COLON 1.00 Area= 27.30 27.30
MARTILLO COLON 1.00 Area= 28.04 28.04
MARTILLO COLON 1.00 Area= 9.22 9.22
AV. JOSE VARA LLANOS 1.00 Area= 231.55 231.55
1.00 Area= 197.82 197.82
JR. CARHUACOCHA 1.00 Area= 186.67 186.67
1.00 Area= 145.05 145.05
JR. HEROES JESUCINOS 1.00 Area= 176.99 176.99
1.00 Area= 186.43 186.43
JR. HUAMALIES 1.00 Area= 127.42 127.42
1.00 Area= 143.08 143.08
JR. PROGRESO 1.00 Area= 269.46 269.46
1.00 Area= 191.27 191.27
JR. HUANUCO 1.00 Area= 185.93 185.93
1.00 Area= 159.98 159.98
JR. BOLIVAR 1.00 Area= 173.85 173.85
1.00 Area= 178.76 178.76
JR. SAN MARTIN 1.00 Area= 139.49 139.49
1.00 Area= 136.86 136.86
JR. SAN SEBASTIAN 1.00 Area= 184.50 184.50
1.00 Area= 183.51 183.51
CALLE 3 1.00 Area= 300.92 300.92
1.00 Area= 370.95 370.95
JR. CIRILO ALVARADO 1.00 Area= 267.41 267.41
1.00 Area= 238.87 238.87
JR. SILOS MORENO 1.00 Area= 85.87 85.87
1.00 Area= 79.32 79.32
METRADO DE MOVIMIENTO DE TIERRAS VEREDA

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES

###
05. SARDINEL DE CONCRETO
05.01 OBRAS PRELIMINARES
05.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR CANT. LARGO PARCIAL ANCHO ALTURA TOTAL
AV. CRISTOBAL COLON 2 1,239.430 2,478.860
AV. JOSE VARA LLANOS 2 97.080 194.160
JR. CARHUACOCHA 2 96.750 193.500
JR. HEROES JESUCINOS 2 101.700 203.400
JR. HUAMALIES 2 104.380 208.760
JR. PROGRESO 2 109.630 219.260
JR. HUANUCO 2 116.030 232.060
JR. BOLIVAR 2 120.170 240.340
JR. SAN MARTIN 2 132.980 265.960
JR. SAN SEBASTIAN 2 147.720 295.440
CALLE 3 2 157.835 315.670
JR. CIRILO ALVARADO 2 136.080 272.160
JR. SILOS MORENO 2 96.560 193.120
JARDINERAS SILOS MORENO 1 15.000 15.000
JARDINERAS SILOS MORENO 1 23.000 23.000
JARDINERAS SILOS MORENO 1 22.030 22.030
JARDINERAS SILOS MORENO 1 23.210 23.210
JARDINERAS SILOS MORENO 1 23.320 23.320
JARDINERAS SILOS MORENO 1 23.430 23.430
JARDINERAS SILOS MORENO 1 18.040 18.040
JARDINERAS SILOS MORENO 1 21.430 21.430
JARDINERAS SILOS MORENO 1 25.370 25.370
JARDINERAS SILOS MORENO 1 25.240 25.240
JARDINERAS SILOS MORENO 1 25.110 25.110
JARDINERAS SILOS MORENO 1 25.000 25.000
JARDINERAS SILOS MORENO 1 14.290 14.290
JARDINERAS CRISTOBAL COLON 1 19.930 19.930
JARDINERAS CRISTOBAL COLON 1 23.880 23.880
JARDINERAS CRISTOBAL COLON 1 24.560 24.560
JARDINERAS CRISTOBAL COLON 1 24.780 24.780
JARDINERAS CRISTOBAL COLON 1 24.700 24.700
JARDINERAS CRISTOBAL COLON 1 24.620 24.620
JARDINERAS CRISTOBAL COLON 1 20.530 20.530
TOTAL 5,760.16

05.02 MOVIMIENTO DE TIERRAS


05.02.01 EXCAVACION MANUAL EN ZANJA CANT. LARGO ANCHO ALTURA TOTAL
AV. CRISTOBAL COLON 2 1,239.430 0.100 0.500 123.943
AV. JOSE VARA LLANOS 2 97.080 0.100 0.500 9.708
JR. CARHUACOCHA 2 96.750 0.100 0.500 9.675
JR. HEROES JESUCINOS 2 101.700 0.100 0.500 10.170
JR. HUAMALIES 2 104.380 0.100 0.500 10.438
JR. PROGRESO 2 109.630 0.100 0.500 10.963
JR. HUANUCO 2 116.030 0.100 0.500 11.603
JR. BOLIVAR 2 120.170 0.100 0.500 12.017
JR. SAN MARTIN 2 132.980 0.100 0.500 13.298
JR. SAN SEBASTIAN 2 147.720 0.100 0.500 14.772
CALLE 3 2 157.835 0.100 0.500 15.784
JR. CIRILO ALVARADO 2 136.080 0.100 0.500 13.608
JR. SILOS MORENO 2 96.560 0.100 0.500 9.656
JARDINERAS SILOS MORENO 1 15.000 0.100 0.500 0.750
JARDINERAS SILOS MORENO 1 23.000 0.100 0.500 1.150
JARDINERAS SILOS MORENO 1 22.030 0.100 0.500 1.102
METRADO DE MOVIMIENTO DE TIERRAS VEREDA

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES

###
JARDINERAS SILOS MORENO 1 23.210 0.100 0.500 1.161
JARDINERAS SILOS MORENO 1 23.320 0.100 0.500 1.166
JARDINERAS SILOS MORENO 1 23.430 0.100 0.500 1.172
JARDINERAS SILOS MORENO 1 18.040 0.100 0.500 0.902
JARDINERAS SILOS MORENO 1 21.430 0.100 0.500 1.072
JARDINERAS SILOS MORENO 1 25.370 0.100 0.500 1.269
JARDINERAS SILOS MORENO 1 25.240 0.100 0.500 1.262
JARDINERAS SILOS MORENO 1 25.110 0.100 0.500 1.256
JARDINERAS SILOS MORENO 1 25.000 0.100 0.500 1.250
JARDINERAS SILOS MORENO 1 14.290 0.100 0.500 0.715
JARDINERAS CRISTOBAL COLON 1 19.930 0.100 0.500 0.997
JARDINERAS CRISTOBAL COLON 1 23.880 0.100 0.500 1.194
JARDINERAS CRISTOBAL COLON 1 24.560 0.100 0.500 1.228
JARDINERAS CRISTOBAL COLON 1 24.780 0.100 0.500 1.239
JARDINERAS CRISTOBAL COLON 1 24.700 0.100 0.500 1.235
JARDINERAS CRISTOBAL COLON 1 24.620 0.100 0.500 1.231
JARDINERAS CRISTOBAL COLON 1 20.530 0.100 0.500 1.027
TOTAL 288.01

05.02.02 ELIMINACION DE MATERIAL EXCEDENTE CANT. LARGO TOTAL


288.01 1.25 360.01

05.03. OBRAS DE CONCRETO


CANT. LARGO PARCIAL LARGO TOTAL
05.03.01 ENCOFRADO Y DESENCOFRADO EN SARDINEL
M M
AV. CRISTOBAL COLON 4 1,239.430 4,957.720
AV. JOSE VARA LLANOS 4 97.080 388.320
JR. CARHUACOCHA 4 96.750 387.000
JR. HEROES JESUCINOS 4 101.700 406.800
JR. HUAMALIES 4 104.380 417.520
JR. PROGRESO 4 109.630 438.520
JR. HUANUCO 4 116.030 464.120
JR. BOLIVAR 4 120.170 480.680
JR. SAN MARTIN 4 132.980 531.920
JR. SAN SEBASTIAN 4 147.720 590.880
CALLE 3 4 157.835 631.340
JR. CIRILO ALVARADO 4 136.080 544.320
JR. SILOS MORENO 4 96.560 386.240
JARDINERAS SILOS MORENO 2 15.000 30.000
JARDINERAS SILOS MORENO 2 23.000 46.000
JARDINERAS SILOS MORENO 2 22.030 44.060
JARDINERAS SILOS MORENO 2 23.210 46.420
JARDINERAS SILOS MORENO 2 23.320 46.640
JARDINERAS SILOS MORENO 2 23.430 46.860
JARDINERAS SILOS MORENO 2 18.040 36.080
JARDINERAS SILOS MORENO 2 21.430 42.860
JARDINERAS SILOS MORENO 2 25.370 50.740
JARDINERAS SILOS MORENO 2 25.240 50.480
JARDINERAS SILOS MORENO 2 25.110 50.220
JARDINERAS SILOS MORENO 2 25.000 50.000
JARDINERAS SILOS MORENO 2 14.290 28.580
JARDINERAS CRISTOBAL COLON 2 19.930 39.860
JARDINERAS CRISTOBAL COLON 2 23.880 47.760
JARDINERAS CRISTOBAL COLON 2 24.560 49.120
JARDINERAS CRISTOBAL COLON 2 24.780 49.560
JARDINERAS CRISTOBAL COLON 2 24.700 49.400
JARDINERAS CRISTOBAL COLON 2 24.620 49.240
JARDINERAS CRISTOBAL COLON 2 20.530 41.060
METRADO DE MOVIMIENTO DE TIERRAS VEREDA

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES

###
TOTAL 11,520.32

05.03.02 CONCRETO EN SARDINEL f'c=175 KG/CM2 CANT. LARGO PARCIAL LARGO TOTAL
M M

AV. CRISTOBAL COLON 2 1,239.430 0.100 0.500 123.943


AV. JOSE VARA LLANOS 2 97.080 0.100 0.500 9.708
JR. CARHUACOCHA 2 96.750 0.100 0.500 9.675
JR. HEROES JESUCINOS 2 101.700 0.100 0.500 10.170
JR. HUAMALIES 2 104.380 0.100 0.500 10.438
JR. PROGRESO 2 109.630 0.100 0.500 10.963
JR. HUANUCO 2 116.030 0.100 0.500 11.603
JR. BOLIVAR 2 120.170 0.100 0.500 12.017
JR. SAN MARTIN 2 132.980 0.100 0.500 13.298
JR. SAN SEBASTIAN 2 147.720 0.100 0.500 14.772
CALLE 3 2 157.835 0.100 0.500 15.784
JR. CIRILO ALVARADO 2 136.080 0.100 0.500 13.608
JR. SILOS MORENO 2 96.560 0.100 0.500 9.656
JARDINERAS SILOS MORENO 1 15.000 0.100 0.500 0.750
JARDINERAS SILOS MORENO 1 23.000 0.100 0.500 1.150
JARDINERAS SILOS MORENO 1 22.030 0.100 0.500 1.102
JARDINERAS SILOS MORENO 1 23.210 0.100 0.500 1.161
JARDINERAS SILOS MORENO 1 23.320 0.100 0.500 1.166
JARDINERAS SILOS MORENO 1 23.430 0.100 0.500 1.172
JARDINERAS SILOS MORENO 1 18.040 0.100 0.500 0.902
JARDINERAS SILOS MORENO 1 21.430 0.100 0.500 1.072
JARDINERAS SILOS MORENO 1 25.370 0.100 0.500 1.269
JARDINERAS SILOS MORENO 1 25.240 0.100 0.500 1.262
JARDINERAS SILOS MORENO 1 25.110 0.100 0.500 1.256
JARDINERAS SILOS MORENO 1 25.000 0.100 0.500 1.250
JARDINERAS SILOS MORENO 1 14.290 0.100 0.500 0.715
JARDINERAS CRISTOBAL COLON 1 19.930 0.100 0.500 0.997
JARDINERAS CRISTOBAL COLON 1 23.880 0.100 0.500 1.194
JARDINERAS CRISTOBAL COLON 1 24.560 0.100 0.500 1.228
JARDINERAS CRISTOBAL COLON 1 24.780 0.100 0.500 1.239
JARDINERAS CRISTOBAL COLON 1 24.700 0.100 0.500 1.235
JARDINERAS CRISTOBAL COLON 1 24.620 0.100 0.500 1.231
JARDINERAS CRISTOBAL COLON 1 20.530 0.100 0.500
5.00 1.027
TOTAL 288.01

05.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO CANT.


60
Total 1 5282 5281.71
TOTAL 5281.71

05.03.04 JUNTA DE DILATACION ASFALTO CANT. LONG. Nº JUNTAS LARGO (H=.50M)


ARENA 1:3 EN SARDINELES SUMERGIDOS SARDIN M
Total 1 5,760.16 1920 1920.05

TOTAL 1920.05
METRADO DE MOVIMIENTO DE TIERRAS VEREDA

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES


#REF!

METRADO
PARTIDA DESCRIPCION CANT. PARCIAL TOTAL UND
LARGO ANCHO ALTURA
06 SISTEMA DE EVACUACION DE AGUAS PLUVIALES
06.01 MOVIMIENTO DE TIERRAS
06.01.01 EXCAVACION MANUAL EN ZANJA 318.76 M3
AV. CRISTOBAL COLON 2.00 1,239.430 0.30 0.20 148.73
AV. JOSE VARA LLANOS 2.00 97.080 0.30 0.20 11.65
JR. CARHUACOCHA 2.00 96.750 0.30 0.20 11.61
JR. HEROES JESUCINOS 2.00 101.700 0.30 0.20 12.20
JR. HUAMALIES 2.00 104.380 0.30 0.20 12.53
JR. PROGRESO 2.00 109.630 0.30 0.20 13.16
JR. HUANUCO 2.00 116.030 0.30 0.20 13.92
JR. BOLIVAR 2.00 120.170 0.30 0.20 14.42
JR. SAN MARTIN 2.00 132.980 0.30 0.20 15.96
JR. SAN SEBASTIAN 2.00 147.720 0.30 0.20 17.73
CALLE 3 2.00 157.835 0.30 0.20 18.94
JR. CIRILO ALVARADO 2.00 136.080 0.30 0.20 16.33
JR. SILOS MORENO 2.00 96.560 0.30 0.20 11.59
06.01.02 CORTE ROCA FIJA (PERFORACION) 27.45 M3
AV. CRISTOBAL COLON 1.00 13.450 13.45
AV. JOSE VARA LLANOS 1.00 1.000 1.00
JR. CARHUACOCHA 1.00 1.000 1.00
JR. HEROES JESUCINOS 1.00 1.000 1.00
JR. HUAMALIES 1.00 1.000 1.00
JR. PROGRESO 1.00 1.000 1.00
JR. HUANUCO 1.00 1.000 1.00
JR. BOLIVAR 1.00 1.000 1.00
JR. SAN MARTIN 1.00 1.000 1.00
JR. SAN SEBASTIAN 1.00 1.000 1.00
CALLE 3 1.00 1.000 1.00
JR. CIRILO ALVARADO 1.00 1.000 1.00
JR. SILOS MORENO 1.00 3.000 3.00

06.01.03 ELIMINACION DE MATERIAL EXCEDENTE DM=10 km 1.25 318.76 - - 398.45 398.45 M3


06.01.04 AFIRMADO Y COMPACTADO C/EQUIPO LIVIANO E=10CM 1,593.81 M2
AV. CRISTOBAL COLON 2.00 1,239.430 0.30 743.66
AV. JOSE VARA LLANOS 2.00 97.080 0.30 58.25
JR. CARHUACOCHA 2.00 96.750 0.30 58.05
JR. HEROES JESUCINOS 2.00 101.700 0.30 61.02
JR. HUAMALIES 2.00 104.380 0.30 62.63
JR. PROGRESO 2.00 109.630 0.30 65.78
JR. HUANUCO 2.00 116.030 0.30 69.62
JR. BOLIVAR 2.00 120.170 0.30 72.10
JR. SAN MARTIN 2.00 132.980 0.30 79.79
JR. SAN SEBASTIAN 2.00 147.720 0.30 88.63
CALLE 3 2.00 157.835 0.30 94.70
JR. CIRILO ALVARADO 2.00 136.080 0.30 81.65
JR. SILOS MORENO 2.00 96.560 0.30 57.94
06.02 OBRAS DE CONCRETO
06.02.01 ENCOFRADO Y DESENCOFRADO DE CUNETAS 1,062.54 M2
AV. CRISTOBAL COLON 4.00 1,239.430 0.10 495.77
AV. JOSE VARA LLANOS 4.00 97.080 0.10 38.83
JR. CARHUACOCHA 4.00 96.750 0.10 38.70
JR. HEROES JESUCINOS 4.00 101.700 0.10 40.68
JR. HUAMALIES 4.00 104.380 0.10 41.75
JR. PROGRESO 4.00 109.630 0.10 43.85
JR. HUANUCO 4.00 116.030 0.10 46.41
JR. BOLIVAR 4.00 120.170 0.10 48.07
JR. SAN MARTIN 4.00 132.980 0.10 53.19
JR. SAN SEBASTIAN 4.00 147.720 0.10 59.09
CALLE 3 4.00 157.835 0.10 63.13
JR. CIRILO ALVARADO 4.00 136.080 0.10 54.43
JR. SILOS MORENO 4.00 96.560 0.10 38.62

06.02.02 CONCRETO F'C=210 KG/CM2 159.38 M3


AV. CRISTOBAL COLON 2.00 1,239.430 0.30 0.10 74.37
AV. JOSE VARA LLANOS 2.00 97.080 0.30 0.10 5.82
JR. CARHUACOCHA 2.00 96.750 0.30 0.10 5.81
JR. HEROES JESUCINOS 2.00 101.700 0.30 0.10 6.10
JR. HUAMALIES 2.00 104.380 0.30 0.10 6.26
JR. PROGRESO 2.00 109.630 0.30 0.10 6.58
JR. HUANUCO 2.00 116.030 0.30 0.10 6.96
JR. BOLIVAR 2.00 120.170 0.30 0.10 7.21
JR. SAN MARTIN 2.00 132.980 0.30 0.10 7.98
JR. SAN SEBASTIAN 2.00 147.720 0.30 0.10 8.86
CALLE 3 2.00 157.835 0.30 0.10 9.47
JR. CIRILO ALVARADO 2.00 136.080 0.30 0.10 8.16
JR. SILOS MORENO 2.00 96.560 0.30 0.10 5.79
06.02.03 ACERO CORRUGADO fy=4200 KG/CM2 GRADO 60 1.00 3,985.35 - 3,985.35 3,985.35 M2

06.02.04 JUNTAS DE DILATACION e=1/2" 267.90 M


AV. CRISTOBAL COLON 414.00 1,239.430 0.30 124.20
AV. JOSE VARA LLANOS 33.00 97.080 0.30 9.90
JR. CARHUACOCHA 33.00 96.750 0.30 9.90
JR. HEROES JESUCINOS 34.00 101.700 0.30 10.20
JR. HUAMALIES 35.00 104.380 0.30 10.50
JR. PROGRESO 37.00 109.630 0.30 11.10
JR. HUANUCO 39.00 116.030 0.30 11.70
JR. BOLIVAR 41.00 120.170 0.30 12.30
JR. SAN MARTIN 45.00 132.980 0.30 13.50
JR. SAN SEBASTIAN 50.00 147.720 0.30 15.00
CALLE 3 53.00 157.835 0.30 15.90
JR. CIRILO ALVARADO 46.00 136.080 0.30 13.80
JR. SILOS MORENO 33.00 96.560 0.30 9.90

06.02.05 CURADO CON AGUA INCL. ARROCERAS 1,593.81 M2


AV. CRISTOBAL COLON 2.00 1,239.430 0.30 743.66
AV. JOSE VARA LLANOS 2.00 97.080 0.30 58.25
JR. CARHUACOCHA 2.00 96.750 0.30 58.05
JR. HEROES JESUCINOS 2.00 101.700 0.30 61.02
JR. HUAMALIES 2.00 104.380 0.30 62.63
JR. PROGRESO 2.00 109.630 0.30 65.78
JR. HUANUCO 2.00 116.030 0.30 69.62
JR. BOLIVAR 2.00 120.170 0.30 72.10
JR. SAN MARTIN 2.00 132.980 0.30 79.79
JR. SAN SEBASTIAN 2.00 147.720 0.30 88.63
CALLE 3 2.00 157.835 0.30 94.70
JR. CIRILO ALVARADO 2.00 136.080 0.30 81.65
JR. SILOS MORENO 2.00 96.560 0.30 57.94
06.02.06 LIMPIEZA DEL TERRENO MANUAL 1,593.81 M2
AV. CRISTOBAL COLON 2.00 1,239.430 0.30 743.66
AV. JOSE VARA LLANOS 2.00 97.080 0.30 58.25
JR. CARHUACOCHA 2.00 96.750 0.30 58.05
JR. HEROES JESUCINOS 2.00 101.700 0.30 61.02
JR. HUAMALIES 2.00 104.380 0.30 62.63
JR. PROGRESO 2.00 109.630 0.30 65.78
JR. HUANUCO 2.00 116.030 0.30 69.62
JR. BOLIVAR 2.00 120.170 0.30 72.10
JR. SAN MARTIN 2.00 132.980 0.30 79.79
JR. SAN SEBASTIAN 2.00 147.720 0.30 88.63
CALLE 3 2.00 157.835 0.30 94.70
JR. CIRILO ALVARADO 2.00 136.080 0.30 81.65
JR. SILOS MORENO 2.00 96.560 0.30 57.94
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE
PUNCHAO, HUAMALIES, HUANUCO".

PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES


###

07 JARDINERIA Y AREAS VERDES

LARGO AREA
07.01 PREPARACION DE TERRENO CON TIERRA ORGANICA CANT. PARCIAL TOTAL
M2 M2
LONGITUDINALES
AV. CRISTOBAL COLON 1.0 13.640 13.640
AV. CRISTOBAL COLON 1.0 18.920 18.920
AV. CRISTOBAL COLON 1.0 19.330 19.330
AV. CRISTOBAL COLON 1.0 19.730 19.730
AV. CRISTOBAL COLON 1.0 18.750 18.750
AV. CRISTOBAL COLON 1.0 15.200 15.200
AV. CRISTOBAL COLON 1.0 8.900 8.900
JR SILOS MORENO 1.0 4.570 4.570
JR SILOS MORENO 1.0 9.180 9.180
JR SILOS MORENO 1.0 9.740 9.740
JR SILOS MORENO 1.0 10.160 10.160
JR SILOS MORENO 1.0 10.860 10.860
JR SILOS MORENO 1.0 11.420 11.420
JR SILOS MORENO 1.0 7.740 7.740
JR SILOS MORENO 1.0 9.560 9.560
JR SILOS MORENO 1.0 12.370 12.370
JR SILOS MORENO 1.0 11.650 11.650
JR SILOS MORENO 1.0 10.930 10.930
JR SILOS MORENO 1.0 10.210 10.210
JR SILOS MORENO 1.0 4.980 4.980

TOTAL 237.84

LARGO AREA
07.02 SEMBRIO DE GRASS CANT. PARCIAL TOTAL
M2 M2
LONGITUDINALES
AV. CRISTOBAL COLON 1.0 13.640 13.640
AV. CRISTOBAL COLON 1.0 18.920 18.920
AV. CRISTOBAL COLON 1.0 19.330 19.330
AV. CRISTOBAL COLON 1.0 19.730 19.730
AV. CRISTOBAL COLON 1.0 18.750 18.750
AV. CRISTOBAL COLON 1.0 15.200 15.200
AV. CRISTOBAL COLON 1.0 8.900 8.900
JR SILOS MORENO 1.0 4.570 4.570
JR SILOS MORENO 1.0 9.180 9.180
JR SILOS MORENO 1.0 9.740 9.740
JR SILOS MORENO 1.0 10.160 10.160
JR SILOS MORENO 1.0 10.860 10.860
JR SILOS MORENO 1.0 11.420 11.420
JR SILOS MORENO 1.0 7.740 7.740
JR SILOS MORENO 1.0 9.560 9.560
JR SILOS MORENO 1.0 12.370 12.370
JR SILOS MORENO 1.0 11.650 11.650
JR SILOS MORENO 1.0 10.930 10.930
JR SILOS MORENO 1.0 10.210 10.210
JR SILOS MORENO 1.0 4.980 4.980

TOTAL 237.84

LARGO PLANTA
07.03 Sembrio de plantones CANT. PARCIAL TOTAL
M2 UND
LONGITUDINALES
AV. CRISTOBAL COLON 1.0 4.000 4.000
AV. CRISTOBAL COLON 1.0 4.000 4.000
AV. CRISTOBAL COLON 1.0 4.000 4.000
AV. CRISTOBAL COLON 1.0 4.000 4.000
AV. CRISTOBAL COLON 1.0 4.000 4.000
AV. CRISTOBAL COLON 1.0 4.000 4.000
AV. CRISTOBAL COLON 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000
JR SILOS MORENO 1.0 4.000 4.000

TOTAL 80.00
METRADO DE MOVIMIENTO DE TIERRAS VEREDA

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES

03.02 ELIMINACION DE
03.01 CORTE A NIVEL DE SUBRASANTE CON EQUIPO EN 03.01 RELLENO A NIVEL DE SUBRASANTE CON EQUIPO
MATERIAL EXCEDENTE
TERRENO NORMAL M3 EN TERRENO NORMAL M3
CON EQ. HASTA 10KM M3
PROGRESIVA AREA 1 AREA 2 AREA 1 AREA 2
V1=Vol de
LARGO ANCHO VOLUMEN LARGO ANCHO VOLUMEN
CANT. excavc.*
M M M2 M2 M3 M M M2 M2 M3
K=1.25

CALLE. SINGA 2,319.375 7.290 2,899.219


0 + 000.00 - 0 + 010.00 10.00 6.53 4.363 5.756 50.595 10.00 - - - - 1.00 63.244
0 + 010.00 - 0 + 020.00 10.00 6.62 5.756 5.592 56.740 10.00 - - - - 1.00 70.925
0 + 020.00 - 0 + 030.00 10.00 5.94 5.592 2.768 41.800 10.00 - - - - 1.00 52.250
0 + 030.00 - 0 + 040.00 10.00 5.80 2.768 2.835 28.015 10.00 - - - - 1.00 35.019
0 + 040.00 - 0 + 050.00 10.00 5.35 2.835 4.596 37.155 10.00 - - - - 1.00 46.444
0 + 050.00 - 0 + 060.00 10.00 5.34 4.596 5.603 50.995 10.00 - - - - 1.00 63.744
0 + 060.00 - 0 + 070.00 10.00 5.32 5.603 8.882 72.425 10.00 - - - - 1.00 90.531
0 + 070.00 - 0 + 080.00 10.00 6.47 8.882 9.848 93.650 10.00 - - - - 1.00 117.063
0 + 080.00 - 0 + 090.00 10.00 6.69 9.848 13.992 119.200 10.00 - - - - 1.00 149.000
0 + 090.00 - 0 + 100.00 10.00 6.83 13.992 16.721 153.565 10.00 - - - - 1.00 191.956
0 + 100.00 - 0 + 110.00 10.00 7.10 16.721 13.179 149.500 10.00 - - - - 1.00 186.875
0 + 110.00 - 0 + 120.00 10.00 6.57 13.179 14.427 138.030 10.00 - - - - 1.00 172.538
0 + 120.00 - 0 + 130.00 10.00 6.85 14.427 15.654 150.405 10.00 - - - - 1.00 188.006
0 + 130.00 - 0 + 140.00 10.00 7.36 15.654 13.897 147.755 10.00 - - - - 1.00 184.694
0 + 140.00 - 0 + 150.00 10.00 8.10 13.897 13.187 135.420 10.00 - - - - 1.00 169.275
0 + 150.00 - 0 + 160.00 10.00 8.25 13.187 15.880 145.335 10.00 - - - - 1.00 181.669
0 + 160.00 - 0 + 170.00 10.00 8.31 15.880 13.479 146.795 10.00 - - - - 1.00 183.494
0 + 170.00 - 0 + 180.00 10.00 7.12 13.479 6.934 102.065 10.00 - - - - 1.00 127.581
0 + 180.00 - 0 + 190.00 10.00 6.66 6.934 4.331 56.325 10.00 - - 0.729 3.645 1.00 70.406
0 + 190.00 - 0 + 200.00 10.00 4.98 4.331 4.997 46.640 10.00 1.90 0.729 - 3.645 1.00 58.300
0 + 200.00 - 0 + 210.00 10.00 7.09 4.997 8.429 67.130 10.00 - - - - 1.00 83.913
0 + 210.00 - 0 + 220.00 10.00 7.47 8.429 9.183 88.060 10.00 - - - - 1.00 110.075
0 + 220.00 - 0 + 230.00 10.00 6.76 9.183 13.393 112.880 10.00 - - - - 1.00 141.100
0 + 230.00 - 0 + 240.00 10.00 9.38 13.393 12.386 128.895 10.00 - - - - 1.00 161.119

CALLE. HUAMALIES 2,080.102 - 2,600.128


0 + 240.00 - 0 + 250.00 10.00 7.06 12.386 18.018 152.020 10.00 - - - - 1.00 190.025
0 + 250.00 - 0 + 260.00 10.00 7.99 18.018 20.240 191.290 10.00 - - - - 1.00 239.113
0 + 260.00 - 0 + 270.00 10.00 8.53 20.240 22.287 212.635 10.00 - - - - 1.00 265.794
0 + 270.00 - 0 + 280.00 10.00 8.67 22.287 23.142 227.145 10.00 - - - - 1.00 283.931

Página 30
METRADO DE MOVIMIENTO DE TIERRAS VEREDA

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES

03.02 ELIMINACION DE
03.01 CORTE A NIVEL DE SUBRASANTE CON EQUIPO EN 03.01 RELLENO A NIVEL DE SUBRASANTE CON EQUIPO
MATERIAL EXCEDENTE
TERRENO NORMAL M3 EN TERRENO NORMAL M3
CON EQ. HASTA 10KM M3
PROGRESIVA AREA 1 AREA 2 AREA 1 AREA 2
V1=Vol de
LARGO ANCHO VOLUMEN LARGO ANCHO VOLUMEN
CANT. excavc.*
M M M2 M2 M3 M M M2 M2 M3
K=1.25
0 + 280.00 - 0 + 290.00 10.00 8.78 23.142 23.816 234.790 10.00 - - - - 1.00 293.488
0 + 290.00 - 0 + 300.00 10.00 8.88 23.816 22.414 231.150 10.00 - - - - 1.00 288.938
0 + 300.00 - 0 + 310.00 10.00 9.00 22.414 7.477 149.455 10.00 - - - - 1.00 186.819
0 + 310.00 - 0 + 320.00 10.00 3.92 7.477 7.192 73.345 10.00 - - - - 1.00 91.681
0 + 320.00 - 0 + 330.00 10.00 4.38 7.192 7.353 72.725 10.00 - - - - 1.00 90.906
0 + 330.00 - 0 + 340.00 10.00 4.88 7.353 7.979 76.660 10.00 - - - - 1.00 95.825
0 + 340.00 - 0 + 350.00 10.00 5.38 7.979 8.677 83.280 10.00 - - - - 1.00 104.100
0 + 350.00 - 0 + 360.00 10.00 5.88 8.677 8.123 84.000 10.00 - - - - 1.00 105.000
0 + 360.00 - 0 + 370.00 10.00 6.38 8.123 6.007 70.650 10.00 - - - - 1.00 88.313
0 + 370.00 - 0 + 380.00 10.00 6.68 6.007 5.228 56.175 10.00 - - - - 1.00 70.219
0 + 380.00 - 0 + 390.00 10.00 6.42 5.228 3.291 42.595 10.00 - - - - 1.00 53.244
0 + 390.00 - 0 + 400.00 10.00 6.14 3.291 3.751 35.210 10.00 - - - - 1.00 44.013
0 + 400.00 - 0 + 410.00 10.00 5.94 3.751 2.363 30.570 10.00 - - - - 1.00 38.213
0 + 410.00 - 0 + 420.00 10.00 5.93 2.363 1.245 18.040 10.00 - - - - 1.00 22.550
0 + 420.00 - 0 + 430.00 10.00 5.97 1.245 1.448 13.465 10.00 - - - - 1.00 16.831
0 + 430.00 - 0 + 440.00 10.00 5.97 1.448 2.396 19.220 10.00 - - - - 1.00 24.025
0 + 440.00 - 0 + 442.59 2.59 6.18 2.396 1.992 5.682 2.59 - - - - 1.00 7.103

Página 31
PLANILLA DE METRADOS PAVIMENTOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
###

03.00 PAVIMENTO
03.02.02 CURADO CON AGUA INC.
02.0 BASE GRANULAR E=0.15M 03.01.01 ENCOFRADO Y DESENCOFRADO 03.01.02 CONCRETO EN PISTAS f'c=210
PROGRESIVA ARROCERAS, 03.02.03 LIMPIEZA DE PISTAS
M2 EN PISTAS ML kg/cm2 M2
Y CUNETAS EN OBRA M2
LARGO ANCHO LARGO ANCHO LARGO ANCHO LARGO ANCHO
CANT. AREA M2 CANT. AREA M2 CANT. AREA M2 CANT. AREA M2
mts ml mts mts mts mts mts mts
AV. CRISTOBAL COLON
0 + 000 - 0 + 020.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 020 - 0 + 040.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 040 - 0 + 060.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 060 - 0 + 074.47 1.00 14.47 5.00 72.35 1.00 14.47 5.00 48.41 1.00 14.47 5.00 72.35 1.00 14.47 5.00 72.35
0 + 074 - 0 + 080.00 1.00 5.53 5.00 27.65 1.00 5.53 5.00 21.59 1.00 5.53 5.00 27.65 1.00 5.53 5.00 27.65
0 + 080 - 0 + 100.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 100 - 0 + 120.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 120 - 0 + 140.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 140 - 0 + 160.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 160 - 0 + 180.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 180 - 0 + 183.48 1.00 3.48 5.00 17.40 1.00 3.48 5.00 15.44 1.00 3.48 5.00 17.40 1.00 3.48 5.00 17.40
0 + 183 - 0 + 190.00 1.00 6.52 5.00 32.60 1.00 6.52 5.00 24.56 1.00 6.52 5.00 32.60 1.00 6.52 5.00 32.60
0 + 190 - 0 + 200.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 35.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 50.00
0 + 200 - 0 + 220.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 220 - 0 + 240.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 240 - 0 + 260.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 260 - 0 + 265.90 1.00 5.90 5.00 29.50 1.00 5.90 5.00 22.70 1.00 5.90 5.00 29.50 1.00 5.90 5.00 29.50
0 + 266 - 0 + 270.00 1.00 4.10 5.00 20.50 1.00 4.10 5.00 17.30 1.00 4.10 5.00 20.50 1.00 4.10 5.00 20.50
0 + 270 - 0 + 280.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 35.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 50.00
PLANILLA DE METRADOS PAVIMENTOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
###

03.00 PAVIMENTO
03.02.02 CURADO CON AGUA INC.
02.0 BASE GRANULAR E=0.15M 03.01.01 ENCOFRADO Y DESENCOFRADO 03.01.02 CONCRETO EN PISTAS f'c=210
PROGRESIVA ARROCERAS, 03.02.03 LIMPIEZA DE PISTAS
M2 EN PISTAS ML kg/cm2 M2
Y CUNETAS EN OBRA M2
LARGO ANCHO LARGO ANCHO LARGO ANCHO LARGO ANCHO
CANT. AREA M2 CANT. AREA M2 CANT. AREA M2 CANT. AREA M2
mts ml mts mts mts mts mts mts
0 + 280 - 0 + 300.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 300 - 0 + 320.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 320 - 0 + 330.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 35.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 50.00
0 + 330 - 0 + 340.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 35.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 50.00
0 + 340 - 0 + 360.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 360 - 0 + 380.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 380 - 0 + 387.44 1.00 7.44 5.00 37.20 1.00 7.44 5.00 27.32 1.00 7.44 5.00 37.20 1.00 7.44 5.00 37.20
0 + 387 - 0 + 390.00 1.00 2.56 5.00 12.80 1.00 2.56 5.00 12.68 1.00 2.56 5.00 12.80 1.00 2.56 5.00 12.80
0 + 390 - 0 + 400.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 35.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 50.00
0 + 400 - 0 + 420.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 420 - 0 + 439.51 1.00 19.51 5.00 97.55 1.00 19.51 5.00 63.53 1.00 19.51 5.00 97.55 1.00 19.51 5.00 97.55
0 + 440 - 0 + 440.00 1.00 0.49 5.00 2.45 1.00 0.49 5.00 6.47 1.00 0.49 5.00 2.45 1.00 0.49 5.00 2.45
0 + 440 - 0 + 460.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 460 - 0 + 480.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 480 - 0 + 496.96 1.00 16.96 5.00 84.80 1.00 16.96 5.00 55.88 1.00 16.96 5.00 84.80 1.00 16.96 5.00 84.80
0 + 497 - 0 + 500.00 1.00 3.04 5.00 15.20 1.00 3.04 5.00 14.12 1.00 3.04 5.00 15.20 1.00 3.04 5.00 15.20
0 + 500 - 0 + 520.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 520 - 0 + 540.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 540 - 0 + 560.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 560 - 0 + 580.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 580 - 0 + 600.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 600 - 0 + 606.20 1.00 6.20 5.00 31.00 1.00 6.20 5.00 23.60 1.00 6.20 5.00 31.00 1.00 6.20 5.00 31.00
0 + 606 - 0 + 610.00 1.00 3.80 5.00 19.00 1.00 3.80 5.00 16.40 1.00 3.80 5.00 19.00 1.00 3.80 5.00 19.00
0 + 610 - 0 + 620.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 35.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 50.00
0 + 620 - 0 + 640.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 640 - 0 + 660.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 660 - 0 + 680.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 680 - 0 + 700.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 700 - 0 + 717.45 1.00 17.45 5.00 87.25 1.00 17.45 5.00 57.35 1.00 17.45 5.00 87.25 1.00 17.45 5.00 87.25
0 + 717 - 0 + 720.00 1.00 2.55 5.00 12.75 1.00 2.55 5.00 12.65 1.00 2.55 5.00 12.75 1.00 2.55 5.00 12.75
0 + 720 - 0 + 740.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 740 - 0 + 760.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 760 - 0 + 780.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 780 - 0 + 800.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
PLANILLA DE METRADOS PAVIMENTOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
###

03.00 PAVIMENTO
03.02.02 CURADO CON AGUA INC.
02.0 BASE GRANULAR E=0.15M 03.01.01 ENCOFRADO Y DESENCOFRADO 03.01.02 CONCRETO EN PISTAS f'c=210
PROGRESIVA ARROCERAS, 03.02.03 LIMPIEZA DE PISTAS
M2 EN PISTAS ML kg/cm2 M2
Y CUNETAS EN OBRA M2
LARGO ANCHO LARGO ANCHO LARGO ANCHO LARGO ANCHO
CANT. AREA M2 CANT. AREA M2 CANT. AREA M2 CANT. AREA M2
mts ml mts mts mts mts mts mts
0 + 800 - 0 + 816.10 1.00 16.10 5.00 80.50 1.00 16.10 5.00 53.30 1.00 16.10 5.00 80.50 1.00 16.10 5.00 80.50
0 + 816 - 0 + 820.00 1.00 3.90 5.00 19.50 1.00 3.90 5.00 16.70 1.00 3.90 5.00 19.50 1.00 3.90 5.00 19.50
0 + 820 - 0 + 840.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 840 - 0 + 860.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 860 - 0 + 880.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 880 - 0 + 900.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 900 - 0 + 920.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 920 - 0 + 940.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 940 - 0 + 960.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 960 - 0 + 980.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 980 - 0 + 1000.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1000 - 0 + 1020.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1020 - 0 + 1040.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1040 - 0 + 1060.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1060 - 0 + 1066.33 1.00 6.33 5.00 31.65 1.00 6.33 5.00 23.99 1.00 6.33 5.00 31.65 1.00 6.33 5.00 31.65
0 + 1066 - 0 + 1070.00 1.00 3.67 5.00 18.35 1.00 3.67 5.00 16.01 1.00 3.67 5.00 18.35 1.00 3.67 5.00 18.35
0 + 1070 - 0 + 1080.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 35.00 1.00 10.00 5.00 50.00 1.00 10.00 5.00 50.00
0 + 1080 - 0 + 1100.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1100 - 0 + 1120.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1120 - 0 + 1140.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1140 - 0 + 1160.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1160 - 0 + 1180.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1180 - 0 + 1200.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1200 - 0 + 1220.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 1220 - 0 + 1239.50 1.00 19.50 5.00 97.50 1.00 19.50 5.00 63.50 1.00 19.50 5.00 97.50 1.00 19.50 5.00 97.50

0 + 000 - 0 + 020 1.00 20.00 8.98 179.60 1.00 20.00 8.98 68.98 1.00 20.00 8.98 179.60 1.00 20.00 8.98 179.60
0 + 020 - 0 + 040 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 040 - 0 + 060 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 060 - 0 + 080 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 080 - 0 + 096.76 1.00 16.76 7.00 117.32 1.00 16.76 7.00 57.28 1.00 16.76 7.00 117.32 1.00 16.76 7.00 117.32
PLANILLA DE METRADOS PAVIMENTOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
###

03.00 PAVIMENTO
03.02.02 CURADO CON AGUA INC.
02.0 BASE GRANULAR E=0.15M 03.01.01 ENCOFRADO Y DESENCOFRADO 03.01.02 CONCRETO EN PISTAS f'c=210
PROGRESIVA ARROCERAS, 03.02.03 LIMPIEZA DE PISTAS
M2 EN PISTAS ML kg/cm2 M2
Y CUNETAS EN OBRA M2
LARGO ANCHO LARGO ANCHO LARGO ANCHO LARGO ANCHO
CANT. AREA M2 CANT. AREA M2 CANT. AREA M2 CANT. AREA M2
mts ml mts mts mts mts mts mts
0 + 000 - 0 + 020 1.00 20.00 9.76 195.20 1.00 20.00 9.76 69.76 1.00 20.00 9.76 195.20 1.00 20.00 9.76 195.20
0 + 020 - 0 + 040 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 040 - 0 + 060 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 060 - 0 + 080 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 080 - 0 + 096.70 1.00 16.70 7.55 126.09 1.00 16.70 7.55 57.65 1.00 16.70 7.55 126.09 1.00 16.70 7.55 126.09

0 + 000 - 0 + 020 1.00 20.00 6.67 133.40 1.00 20.00 6.67 66.67 1.00 20.00 6.67 133.40 1.00 20.00 6.67 133.40
0 + 020 - 0 + 040 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 040 - 0 + 060 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 060 - 0 + 080 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 080 - 0 + 100.00 1.00 20.00 4.75 95.00 1.00 20.00 4.75 64.75 1.00 20.00 4.75 95.00 1.00 20.00 4.75 95.00
0 + 100 - 0 + 101.94 1.00 1.94 7.55 14.65 1.00 1.94 7.55 13.37 1.00 1.94 7.55 14.65 1.00 1.94 7.55 14.65

0 + 000 - 0 + 020 1.00 20.00 10.95 219.00 1.00 20.00 10.95 70.95 1.00 20.00 10.95 219.00 1.00 20.00 10.95 219.00
0 + 020 - 0 + 040 1.00 20.00 5.50 110.00 1.00 20.00 5.50 65.50 1.00 20.00 5.50 110.00 1.00 20.00 5.50 110.00
0 + 040 - 0 + 060 1.00 20.00 5.50 110.00 1.00 20.00 5.50 65.50 1.00 20.00 5.50 110.00 1.00 20.00 5.50 110.00
0 + 060 - 0 + 080 1.00 20.00 5.50 110.00 1.00 20.00 5.50 65.50 1.00 20.00 5.50 110.00 1.00 20.00 5.50 110.00
0 + 080 - 0 + 100.00 1.00 20.00 5.50 110.00 1.00 20.00 5.50 65.50 1.00 20.00 5.50 110.00 1.00 20.00 5.50 110.00
0 + 100 - 0 + 104.54 1.00 4.54 7.68 34.87 1.00 4.54 7.68 21.30 1.00 4.54 7.68 34.87 1.00 4.54 7.68 34.87

0 + 000 - 0 + 020 1.00 20.00 13.12 262.40 1.00 20.00 13.12 73.12 1.00 20.00 13.12 262.40 1.00 20.00 13.12 262.40
0 + 020 - 0 + 040 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 040 - 0 + 060 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 060 - 0 + 080 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 080 - 0 + 100.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 100 - 0 + 109.96 1.00 9.96 11.69 116.43 1.00 9.96 11.69 41.57 1.00 9.96 11.69 116.43 1.00 9.96 11.69 116.43
1.00 - 1.00 - - - 1.00 - - - 1.00 - - -

0 + 000 - 0 + 020 1.00 20.00 7.15 143.00 1.00 20.00 7.15 67.15 1.00 20.00 7.15 143.00 1.00 20.00 7.15 143.00
0 + 020 - 0 + 040 1.00 20.00 6.00 120.00 1.00 20.00 6.00 66.00 1.00 20.00 6.00 120.00 1.00 20.00 6.00 120.00
0 + 040 - 0 + 060 1.00 20.00 6.00 120.00 1.00 20.00 6.00 66.00 1.00 20.00 6.00 120.00 1.00 20.00 6.00 120.00
0 + 060 - 0 + 080 1.00 20.00 6.00 120.00 1.00 20.00 6.00 66.00 1.00 20.00 6.00 120.00 1.00 20.00 6.00 120.00
PLANILLA DE METRADOS PAVIMENTOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
###

03.00 PAVIMENTO
03.02.02 CURADO CON AGUA INC.
02.0 BASE GRANULAR E=0.15M 03.01.01 ENCOFRADO Y DESENCOFRADO 03.01.02 CONCRETO EN PISTAS f'c=210
PROGRESIVA ARROCERAS, 03.02.03 LIMPIEZA DE PISTAS
M2 EN PISTAS ML kg/cm2 M2
Y CUNETAS EN OBRA M2
LARGO ANCHO LARGO ANCHO LARGO ANCHO LARGO ANCHO
CANT. AREA M2 CANT. AREA M2 CANT. AREA M2 CANT. AREA M2
mts ml mts mts mts mts mts mts
0 + 080 - 0 + 100.00 1.00 20.00 6.00 120.00 1.00 20.00 6.00 66.00 1.00 20.00 6.00 120.00 1.00 20.00 6.00 120.00
0 + 100 - 0 + 116.31 1.00 16.31 10.77 175.66 1.00 16.31 10.77 59.70 1.00 16.31 10.77 175.66 1.00 16.31 10.77 175.66
0 + 1.00 - 1.00 - - - 1.00 - - - 1.00 - - -

0 + 000 - 0 + 020 1.00 20.00 9.87 197.40 1.00 20.00 9.87 69.87 1.00 20.00 9.87 197.40 1.00 20.00 9.87 197.40
0 + 020 - 0 + 040 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 040 - 0 + 060 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 060 - 0 + 080 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 080 - 0 + 100 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 100 - 0 + 120 1.00 20.00 5.00 100.00 1.00 20.00 5.00 65.00 1.00 20.00 5.00 100.00 1.00 20.00 5.00 100.00
0 + 120 - 0 + 120.37 1.00 0.37 5.00 1.85 1.00 0.37 5.00 1.85 1.00 0.37 5.00 1.85 1.00 0.37 5.00 1.85
0 + 1.00 - 1.00 - - - 1.00 - - - 1.00 - - -

0 + 000 - 0 + 020 1.00 20.00 8.38 167.60 1.00 20.00 8.38 68.38 1.00 20.00 8.38 167.60 1.00 20.00 8.38 167.60
0 + 020 - 0 + 040 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 040 - 0 + 060 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 060 - 0 + 080 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 080 - 0 + 100 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 100 - 0 + 120 1.00 20.00 3.50 70.00 1.00 20.00 3.50 63.50 1.00 20.00 3.50 70.00 1.00 20.00 3.50 70.00
0 + 120 - 0 + 133.09 1.00 13.09 8.05 105.37 1.00 13.09 8.05 47.32 1.00 13.09 8.05 105.37 1.00 13.09 8.05 105.37

0 + 000 - 0 + 020 1.00 20.00 6.30 126.00 1.00 20.00 6.30 66.30 1.00 20.00 6.30 126.00 1.00 20.00 6.30 126.00
0 + 020 - 0 + 040 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 040 - 0 + 060 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 060 - 0 + 080 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 080 - 0 + 100 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 100 - 0 + 120 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 120 - 0 + 140 1.00 20.00 8.05 161.00 1.00 20.00 8.05 68.05 1.00 20.00 8.05 161.00 1.00 20.00 8.05 161.00
0 + 140 - 0 + 147.52 1.00 7.52 8.05 60.54 1.00 7.52 8.05 30.61 1.00 7.52 8.05 60.54 1.00 7.52 8.05 60.54

0 + 000 - 0 + 020 1.00 20.00 6.30 126.00 1.00 20.00 6.30 66.30 1.00 20.00 6.30 126.00 1.00 20.00 6.30 126.00
0 + 020 - 0 + 040 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 040 - 0 + 060 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
PLANILLA DE METRADOS PAVIMENTOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
###

03.00 PAVIMENTO
03.02.02 CURADO CON AGUA INC.
02.0 BASE GRANULAR E=0.15M 03.01.01 ENCOFRADO Y DESENCOFRADO 03.01.02 CONCRETO EN PISTAS f'c=210
PROGRESIVA ARROCERAS, 03.02.03 LIMPIEZA DE PISTAS
M2 EN PISTAS ML kg/cm2 M2
Y CUNETAS EN OBRA M2
LARGO ANCHO LARGO ANCHO LARGO ANCHO LARGO ANCHO
CANT. AREA M2 CANT. AREA M2 CANT. AREA M2 CANT. AREA M2
mts ml mts mts mts mts mts mts
0 + 060 - 0 + 080 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 080 - 0 + 100 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 100 - 0 + 120 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 120 - 0 + 140 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 140 - 0 + 160 1.00 20.00 4.50 90.00 1.00 20.00 4.50 64.50 1.00 20.00 4.50 90.00 1.00 20.00 4.50 90.00
0 + 160 - 0 + 167.27 1.00 7.27 6.70 48.71 1.00 7.27 6.70 28.51 1.00 7.27 6.70 48.71 1.00 7.27 6.70 48.71

0 + 000 - 0 + 020 1.00 20.00 9.84 196.80 1.00 20.00 9.84 69.84 1.00 20.00 9.84 196.80 1.00 20.00 9.84 196.80
0 + 020 - 0 + 040 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 040 - 0 + 060 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 060 - 0 + 080 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 080 - 0 + 100 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 100 - 0 + 120 1.00 20.00 7.00 140.00 1.00 20.00 7.00 67.00 1.00 20.00 7.00 140.00 1.00 20.00 7.00 140.00
0 + 120 - 0 + 134.91 1.00 14.91 7.00 104.37 1.00 14.91 7.00 51.73 1.00 14.91 7.00 104.37 1.00 14.91 7.00 104.37

0 + 000 - 0 + 020 1.00 20.00 8.55 171.00 1.00 20.00 8.55 68.55 1.00 20.00 8.55 171.00 1.00 20.00 8.55 171.00
0 + 020 - 0 + 040 1.00 20.00 8.00 160.00 1.00 20.00 8.00 68.00 1.00 20.00 8.00 160.00 1.00 20.00 8.00 160.00
0 + 040 - 0 + 060 1.00 20.00 8.00 160.00 1.00 20.00 8.00 68.00 1.00 20.00 8.00 160.00 1.00 20.00 8.00 160.00
0 + 060 - 0 + 080 1.00 20.00 8.00 160.00 1.00 20.00 8.00 68.00 1.00 20.00 8.00 160.00 1.00 20.00 8.00 160.00
0 + 080 - 0 + 094.18 1.00 14.18 8.00 113.44 1.00 14.18 8.00 50.54 1.00 14.18 8.00 113.44 1.00 14.18 8.00 113.44

SUB TOTAL 1 15,020.19 8,860.10 15,020.19 15,020.19

ZONA DE MARTILLOS Cant. Largo Ancho LARGO ANCHO LARGO ANCHO LARGO ANCHO
Area(m2) CANT. AREA ML CANT. AREA M2 CANT. AREA M2
mts mts mts mts mts mts

Intersc. Av. Cristobal Colon con Jose V 1.00 Variable Variable 1.84 1.00 Variable Variable 1.84 1.00 Variable Variable 1.84 1.00 Variable Variable 1.84
1.00 Variable Variable 2.12 1.00 Variable Variable 2.12 1.00 Variable Variable 2.12 1.00 Variable Variable 2.12
1.00 Variable Variable 1.96 1.00 Variable Variable 1.96 2.00 Variable Variable 1.96 2.00 Variable Variable 1.96
1.00 Variable Variable 2.97 1.00 Variable Variable 2.97 3.00 Variable Variable 2.97 3.00 Variable Variable 2.97
Intersc. Av. Cristobal Colon con Carhu 1.00 Variable Variable 2.15 1.00 Variable Variable 2.15 1.00 Variable Variable 2.15 1.00 Variable Variable 2.15
1.00 Variable Variable 1.78 1.00 Variable Variable 1.78 1.00 Variable Variable 1.78 1.00 Variable Variable 1.78
PLANILLA DE METRADOS PAVIMENTOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
###

03.00 PAVIMENTO
03.02.02 CURADO CON AGUA INC.
02.0 BASE GRANULAR E=0.15M 03.01.01 ENCOFRADO Y DESENCOFRADO 03.01.02 CONCRETO EN PISTAS f'c=210
PROGRESIVA ARROCERAS, 03.02.03 LIMPIEZA DE PISTAS
M2 EN PISTAS ML kg/cm2 M2
Y CUNETAS EN OBRA M2
LARGO ANCHO LARGO ANCHO LARGO ANCHO LARGO ANCHO
CANT. AREA M2 CANT. AREA M2 CANT. AREA M2 CANT. AREA M2
mts ml mts mts mts mts mts mts
1.00 Variable Variable 1.74 1.00 Variable Variable 1.74 2.00 Variable Variable 1.74 2.00 Variable Variable 1.74
1.00 Variable Variable 1.82 1.00 Variable Variable 1.82 3.00 Variable Variable 1.82 3.00 Variable Variable 1.82
Intersc. Av. Cristobal Colon con Heroes 1.00 Variable Variable 1.74 1.00 Variable Variable 1.74 1.00 Variable Variable 1.74 1.00 Variable Variable 1.74
1.00 Variable Variable 3.26 1.00 Variable Variable 3.26 1.00 Variable Variable 3.26 1.00 Variable Variable 3.26
1.00 Variable Variable 0.52 1.00 Variable Variable 0.52 2.00 Variable Variable 0.52 2.00 Variable Variable 0.52
1.00 Variable Variable 3.86 1.00 Variable Variable 3.86 3.00 Variable Variable 3.86 3.00 Variable Variable 3.86
Intersc. Av. Cristobal Colon con Huamal 1.00 Variable Variable 2.27 1.00 Variable Variable 2.27 1.00 Variable Variable 2.27 1.00 Variable Variable 2.27
1.00 Variable Variable 1.52 1.00 Variable Variable 1.52 1.00 Variable Variable 1.52 1.00 Variable Variable 1.52
1.00 Variable Variable 2.64 1.00 Variable Variable 2.64 2.00 Variable Variable 2.64 2.00 Variable Variable 2.64
1.00 Variable Variable 1.51 1.00 Variable Variable 1.51 3.00 Variable Variable 1.51 3.00 Variable Variable 1.51
Intersc. Av. Cristobal Colon con Progre 1.00 Variable Variable 1.45 1.00 Variable Variable 1.45 1.00 Variable Variable 1.45 1.00 Variable Variable 1.45
1.00 Variable Variable 1.75 1.00 Variable Variable 1.75 1.00 Variable Variable 1.75 1.00 Variable Variable 1.75
1.00 Variable Variable 1.64 1.00 Variable Variable 1.64 2.00 Variable Variable 1.64 2.00 Variable Variable 1.64
Intersc. Av. Cristobal Colon con Huanuc 1.00 Variable Variable 1.77 1.00 Variable Variable 1.77 1.00 Variable Variable 1.77 1.00 Variable Variable 1.77
1.00 Variable Variable 2.16 1.00 Variable Variable 2.16 1.00 Variable Variable 2.16 1.00 Variable Variable 2.16
1.00 Variable Variable 2.22 1.00 Variable Variable 2.22 2.00 Variable Variable 2.22 2.00 Variable Variable 2.22
Intersc. Av. Cristobal Colon con Bolivar 1.00 Variable Variable 1.97 1.00 Variable Variable 1.97 1.00 Variable Variable 1.97 1.00 Variable Variable 1.97
1.00 Variable Variable 1.68 1.00 Variable Variable 1.68 1.00 Variable Variable 1.68 1.00 Variable Variable 1.68
1.00 Variable Variable 1.64 1.00 Variable Variable 1.64 2.00 Variable Variable 1.64 2.00 Variable Variable 1.64
1.00 Variable Variable 1.76 1.00 Variable Variable 1.76 3.00 Variable Variable 1.76 3.00 Variable Variable 1.76
Intersc. Av. Cristobal Colon San Martin 1.00 Variable Variable 1.96 1.00 Variable Variable 1.96 1.00 Variable Variable 1.96 1.00 Variable Variable 1.96
1.00 Variable Variable 1.27 1.00 Variable Variable 1.27 1.00 Variable Variable 1.27 1.00 Variable Variable 1.27
1.00 Variable Variable 1.86 1.00 Variable Variable 1.86 2.00 Variable Variable 1.86 2.00 Variable Variable 1.86
1.00 Variable Variable 2.09 1.00 Variable Variable 2.09 3.00 Variable Variable 2.09 3.00 Variable Variable 2.09
Intersc. Av. Cristobal Colon San Sebast 1.00 Variable Variable 2.16 1.00 Variable Variable 2.16 1.00 Variable Variable 2.16 1.00 Variable Variable 2.16
1.00 Variable Variable 1.65 1.00 Variable Variable 1.65 1.00 Variable Variable 1.65 1.00 Variable Variable 1.65
1.00 Variable Variable 1.30 1.00 Variable Variable 1.30 2.00 Variable Variable 1.30 2.00 Variable Variable 1.30
1.00 Variable Variable 2.07 1.00 Variable Variable 2.07 3.00 Variable Variable 2.07 3.00 Variable Variable 2.07
Intersc. Av. Cristobal Colon con Calle 0 1.00 Variable Variable 1.03 1.00 Variable Variable 1.03 1.00 Variable Variable 1.03 1.00 Variable Variable 1.03
PLANILLA DE METRADOS PAVIMENTOS
OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
###

03.00 PAVIMENTO
03.02.02 CURADO CON AGUA INC.
02.0 BASE GRANULAR E=0.15M 03.01.01 ENCOFRADO Y DESENCOFRADO 03.01.02 CONCRETO EN PISTAS f'c=210
PROGRESIVA ARROCERAS, 03.02.03 LIMPIEZA DE PISTAS
M2 EN PISTAS ML kg/cm2 M2
Y CUNETAS EN OBRA M2
LARGO ANCHO LARGO ANCHO LARGO ANCHO LARGO ANCHO
CANT. AREA M2 CANT. AREA M2 CANT. AREA M2 CANT. AREA M2
mts ml mts mts mts mts mts mts
1.00 Variable Variable 3.42 1.00 Variable Variable 3.42 1.00 Variable Variable 3.42 1.00 Variable Variable 3.42
1.00 Variable Variable 2.02 1.00 Variable Variable 2.02 2.00 Variable Variable 2.02 2.00 Variable Variable 2.02
1.00 Variable Variable 0.96 1.00 Variable Variable 0.96 3.00 Variable Variable 0.96 3.00 Variable Variable 0.96
Intersc. Av. Cristobal Colon con Cirilo 1.00 Variable Variable 0.80 1.00 Variable Variable 0.80 1.00 Variable Variable 0.80 1.00 Variable Variable 0.80
1.00 Variable Variable 3.41 1.00 Variable Variable 3.41 1.00 Variable Variable 3.41 1.00 Variable Variable 3.41
Intersc. Av. Cristobal Colon con Silos 1.00 Variable Variable 3.61 1.00 Variable Variable 3.61 1.00 Variable Variable 3.61 1.00 Variable Variable 3.61
1.00 Variable Variable 0.95 1.00 Variable Variable 0.95 1.00 Variable Variable 0.95 1.00 Variable Variable 0.95

SUB TOTAL 2 82.29 82.29 82.29 82.29

TOTAL 15,102.48 8,942.39 15,102.48 15,102.48


METRADO DE FIERRO

OBRA: “CONSTRUCCION DE PISTAS Y VEREDAS DE LA LOCALIDAD DE PUNCHAO, DISTRITO DE PUNCHAO, HUAMALIES, HUANUCO".
PROPIETARIO: MUNICIPALIDAD PROVINCIAL DE HUAMALIES
#REF!

NUMERO NUMERO LONG. LONGITUD (METROS LINEALES DE VARILLAS)


ITEM ELEMENTO Ø ELEMENTOS PIEZAS POR POR PZA 1/4" 3/8" 1/2" 5/8" 3/4" 1"
IGUALES ELEMENTO (M) M M M M M M
05.03.03 SARDINELES
ACERO LONGITUDINAL 0.00 0.00 0.00 0.00 0.00
AV. CRISTOBAL COLON 1/4" 2 2 1,239.430 4957.72 0.00 0.00 0.00 0.00 0.00
AV. JOSE VARA LLANOS 1/4" 2 2 97.080 388.32 0.00 0.00 0.00 0.00 0.00
JR. CARHUACOCHA 1/4" 2 2 96.750 387.00 0.00 0.00 0.00 0.00 0.00
JR. HEROES JESUCINOS 1/4" 2 2 101.700 406.80 0.00 0.00 0.00 0.00 0.00
JR. HUAMALIES 1/4" 2 2 104.380 417.52 0.00 0.00 0.00 0.00 0.00
JR. PROGRESO 1/4" 2 2 109.630 438.52 0.00 0.00 0.00 0.00 0.00
JR. HUANUCO 1/4" 2 2 116.030 464.12 0.00 0.00 0.00 0.00 0.00
JR. BOLIVAR 1/4" 2 2 120.170 480.68 0.00 0.00 0.00 0.00 0.00
JR. SAN MARTIN 1/4" 2 2 132.980 531.92 0.00 0.00 0.00 0.00 0.00
JR. SAN SEBASTIAN 1/4" 2 2 147.720 590.88 0.00 0.00 0.00 0.00 0.00
CALLE 3 1/4" 2 2 157.835 631.34 0.00 0.00 0.00 0.00 0.00
JR. CIRILO ALVARADO 1/4" 2 2 136.080 544.32 0.00 0.00 0.00 0.00 0.00
JR. SILOS MORENO 1/4" 2 2 96.560 386.24 0.00 0.00 0.00 0.00 0.00
JARDINERAS SILOS MORENO 1/4" 1 2 284.470 568.94 0.00 0.00 0.00 0.00 0.00
JARDINERAS CRISTOBAL COLON 1/4" 1 2 163.000 326.00 0.00 0.00 0.00 0.00 0.00
ACERO VERTICAL 0.00 0.00 0.00 0.00 0.00 0.00
AV. CRISTOBAL COLON 1/4" 4132 2 0.500 4132.00 0.00 0.00 0.00 0.00 0.00
AV. JOSE VARA LLANOS 1/4" 324 2 0.500 324.00 0.00 0.00 0.00 0.00 0.00
JR. CARHUACOCHA 1/4" 323 2 0.500 323.00 0.00 0.00 0.00 0.00 0.00
JR. HEROES JESUCINOS 1/4" 339 2 0.500 339.00 0.00 0.00 0.00 0.00 0.00
JR. HUAMALIES 1/4" 348 2 0.500 348.00 0.00 0.00 0.00 0.00 0.00
JR. PROGRESO 1/4" 366 2 0.500 366.00 0.00 0.00 0.00 0.00 0.00
JR. HUANUCO 1/4" 387 2 0.500 387.00 0.00 0.00 0.00 0.00 0.00
JR. BOLIVAR 1/4" 401 2 0.500 401.00 0.00 0.00 0.00 0.00 0.00
JR. SAN MARTIN 1/4" 444 2 0.500 444.00 0.00 0.00 0.00 0.00 0.00
JR. SAN SEBASTIAN 1/4" 493 2 0.500 493.00 0.00 0.00 0.00 0.00 0.00
CALLE 3 1/4" 527 2 0.500 527.00 0.00 0.00 0.00 0.00 0.00
JR. CIRILO ALVARADO 1/4" 454 2 0.500 454.00 0.00 0.00 0.00 0.00 0.00
JR. SILOS MORENO 1/4" 322 2 0.500 322.00 0.00 0.00 0.00 0.00 0.00
JARDINERAS SILOS MORENO 1/4" 949 1 0.500 474.50 0.00 0.00 0.00 0.00 0.00
JARDINERAS CRISTOBAL COLON 1/4" 544 1 0.500 272.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
21126.82 0.00 0.00 0.00 0.00 0.00
04.01.03 CUNETAS
ACERO LONGITUDINAL
AV. CRISTOBAL COLON 1/4" 2 2 1,239.430 4957.72 0.00 0.00 0.00 0.00 0.00
AV. JOSE VARA LLANOS 1/4" 2 2 97.080 388.32 0.00 0.00 0.00 0.00 0.00
JR. CARHUACOCHA 1/4" 2 2 96.750 387.00 0.00 0.00 0.00 0.00 0.00
JR. HEROES JESUCINOS 1/4" 2 2 101.700 406.80 0.00 0.00 0.00 0.00 0.00
JR. HUAMALIES 1/4" 2 2 104.380 417.52 0.00 0.00 0.00 0.00 0.00
JR. PROGRESO 1/4" 2 2 109.630 438.52 0.00 0.00 0.00 0.00 0.00
JR. HUANUCO 1/4" 2 2 116.030 464.12 0.00 0.00 0.00 0.00 0.00
JR. BOLIVAR 1/4" 2 2 120.170 480.68 0.00 0.00 0.00 0.00 0.00
JR. SAN MARTIN 1/4" 2 2 132.980 531.92 0.00 0.00 0.00 0.00 0.00
JR. SAN SEBASTIAN 1/4" 2 2 147.720 590.88 0.00 0.00 0.00 0.00 0.00
CALLE 3 1/4" 2 2 157.835 631.34 0.00 0.00 0.00 0.00 0.00
JR. CIRILO ALVARADO 1/4" 2 2 136.080 544.32 0.00 0.00 0.00 0.00 0.00
JR. SILOS MORENO 1/4" 2 2 96.560 386.24 0.00 0.00 0.00 0.00 0.00
ACERO VERTICAL 0.00 0.00 0.00 0.00 0.00 0.00
AV. CRISTOBAL COLON 1/4" 4132 2 0.300 2479.20 0.00 0.00 0.00 0.00 0.00
AV. JOSE VARA LLANOS 1/4" 324 2 0.300 194.40 0.00 0.00 0.00 0.00 0.00
JR. CARHUACOCHA 1/4" 323 2 0.300 193.80 0.00 0.00 0.00 0.00 0.00
JR. HEROES JESUCINOS 1/4" 339 2 0.300 203.40 0.00 0.00 0.00 0.00 0.00
JR. HUAMALIES 1/4" 348 2 0.300 208.80 0.00 0.00 0.00 0.00 0.00
JR. PROGRESO 1/4" 366 2 0.300 219.60 0.00 0.00 0.00 0.00 0.00
JR. HUANUCO 1/4" 387 2 0.300 232.20 0.00 0.00 0.00 0.00 0.00
JR. BOLIVAR 1/4" 401 2 0.300 240.60 0.00 0.00 0.00 0.00 0.00
JR. SAN MARTIN 1/4" 444 2 0.300 266.40 0.00 0.00 0.00 0.00 0.00
JR. SAN SEBASTIAN 1/4" 493 2 0.300 295.80 0.00 0.00 0.00 0.00 0.00
CALLE 3 1/4" 527 2 0.300 316.20 0.00 0.00 0.00 0.00 0.00
JR. CIRILO ALVARADO 1/4" 454 2 0.300 272.40 0.00 0.00 0.00 0.00 0.00
JR. SILOS MORENO 1/4" 322 2 0.300 193.20 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
15941.38 0.00 0.00 0.00 0.00 0.00
RESUMEN DE ACERO
ITEM DESCRIPCION 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL (KG)
05.03.03 SARDINELES 21126.82 0.00 0.00 0.00 0.00 0.00 5281.71
06.02.03 CUNETAS 15941.38 0.00 0.00 0.00 0.00 0.00 3985.35
-

TOTAL VARILLAS (m) 37068.20 0.00 0.00 0.00 0.00 0.00 9267.05

Peso (Kg/m) 0.25 0.58 1.00 1.55 2.24 3.99

TOTAL VARILLAS (kg) 9,267.05 - - - - - 9,267.05