Division: Civil

Sample ID Name of the Sample Specification followed


(IS/Other)

2018/92 Tile Adhesieve IS 15477

78497 Rcc Hume PCRS IS

79351 WPC IS 2645

79605 Mix design Wetting IS

79675 WPC IS

79841 Paver blocks IS

79850 AAC Block IS 2185

79850 Solid Blocks IS 2185

79850 Paving Blocks IS 15658

Page 1 of 8
75859 TMT for Pullout IS 2770

79928 Mix design Wetting IS

79927 Mix design Wetting IS

80015 Tile Adhesieve IS

80138 Mix design IS

80731 Shuttering ply IS

80732 Plywood MR Grade IS

81103 Mix Design M-45 IS

81127 Mix Design IS

81275 Marine Ply IS

81672 Cement IS 269

81769 V.Tiles IS 15622

81770 C.Tiles IS 15622

81787 WPC liquid IS

82134 Tile Adh. A grey & B grey IS

Page 2 of 8
82135 Block J. IS

82202 Blanket Material IS

82203 Track Ballast IS

82204 53 Gr.PC IS

82205 CC Brick IS

82294 WPC IS

82408 C.C Core IS

Inter Laboratory Samples

Interlab Issuing Sample ID & Sample Name IS Specification


Laboratory

Civil 79351 IS 2646

Civil 80734-A,B,C IS

Civil 81672 IS

Civil

Page 3 of 8
Regional Daily Pending Sample Status Report as on 17-01-2019

Region: NTH (WR), MUMBAI

Date of Receipt of Sample Date of Allotment Allotted To PDC Date

8/8/2018 8/8/2018 RNL 8/30/2018

9/7/2018 9/7/2018 RNL 10/5/2018

10/4/2018 10/4/2018 RNL 11/23/2018

10/11/2018 10/12/2018 RNL 11/30/2018

10/11/2018 10/12/2018 RNL 11/30/2018

10/17/2018 10/17/2018 AS 11/16/2018

10/17/2018 10/17/2018 AS 12/14/2018

10/17/2018 10/17/2018 AS 12/14/2018

10/17/2018 10/17/2018 AS 12/14/2018

Page 4 of 8
10/17/2018 10/17/2018 RNL 12/20/2018

10/23/2018 10/23/2018 RNL 12/20/2018

10/23/2018 10/23/2018 RNL 12/20/2018

10/24/2018 10/24/2018 RNL 12/20/2018

10/29/2018 10/29/2018 RNL 12/14/2018

11/20/2018 11/20/2018 AS 1/31/2019

11/20/2018 11/20/2018 AS 1/31/2019

11/30/2018 11/30/2018 RNL 1/21/2019

11/30/2018 11/30/2018 RNL 1/21/2019

06-12-20218 12/6/2018 AS 2/15/2019

12/19/2018 12/19/2018 AS 1/31/2019

12/19/2018 12/19/2018 AS 1/25/2019

12/19/2018 12/19/2018 AS 1/25/2019

12/24/2018 12/24/2018 AS 1/25/2019

1/2/2019 1/2/2019 RNL 2/20/2019

Page 5 of 8
1/2/2019 1/2/2019 RNL 2/20/2019

1/3/2019 1/3/2019 AS 2/22/2019

1/3/2019 1/3/2019 AS 2/22/2019

1/3/2019 1/3/2019 AS 2/22/2019

1/3/2019 1/3/2019 AS 2/22/2019

1/7/2019 1/7/2019 RNL 2/28/2019

1/10/2019 1/10/2019 AS 1/15/2019

Date of Raising Sample Name Raised To (Laboratory PDC


Name)

10/23/2018 WPC Chem

12/26/2018 Crushed sand Chem

12/26/2018 Cement Chem

Chem

Page 6 of 8
Reason for pending

Waiting for Test fee

Page 7 of 8
Remarks

Page 8 of 8