Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Método Indirecto
½*L2*(1.95)=5.625
L=1.96
A=L/2=1.96/2=0.98
Vte: Volumen de tanque elevado
Vte=1/3*7500=2500=2.5m3
2.5=a2*(a-0.45)
a=1.52
Hutil=1.52-0.45=1.07
QB=Vte/3600=2.5/3600=6.94*10-4=0.694
P=QB*Hdt/75(n)
P=0.694*17.51/75*0.5
P=0.32 hp
Tramo A-B
0.00047 = 0.2788 (140) (0.0254)2.63 (G)0.54
G = 0.0456
L = 1.7
Le = 2.04
HT = 1.7
Hf = 0.0456 (1.7+2.04) = 0.17
V = 0.93
PB = 1.7 - 0.0456 = 1.65 m
Tramo B-C
0.00047 = 0.2788 (140) (0.0254)2.63 (G)0.54
G = 0.0456
L = 4.15
Le = 4.98
HT = 0
Hf = 0.0456 (4.15+4.98) = 0.42
V = 0.93
PB = 1.65+ 0 - 0.0456 = 1.61 m
Tramo C-D
0.00012 = 0.2788 (140) (0.0254)2.63 (G)0.54
G = 0.036
L = 3.2
Le = 3.84
HT = 3.2
Hf = 0.036 (3.2+3.84) = 0.026
V = 0.23
PB = 1.61+3.2 - 0.036 = 4.8 m
Tramo D-E
0.000235 = 0.2788 (140) (0.0254)2.63 (G)0.54
G = 0.012
L = 1.2
Le = 1.44
HT = 0
Hf = 0.012 (1.2+1.44) = 0.033
V = 0.46
PB = 4.8+0 - 0.012 = 4.79 m
TRAMO P HT Q D C G Hf V L Le
PM 0 0 0
A-B 1.65437601 1.7 0.00047 0.0254 140 0.04562399 0.17063373 0.92755469 1.7 2.04
B-C 1.60875201 0 0.00047 0.0254 140 0.04562399 0.41654706 0.92755469 4.15 4.98
C-D 4.80511119 3.2 0.00012 0.0254 140 0.00364082 0.02563139 0.23682248 3.2 3.84
D-E 4.79247168 0 0.000235 0.0254 140 0.01263951 0.03336831 0.46377735 1.2 1.44
Le PS HT Hd Gmax
10.26 3.5 4.9 1.4 0.13645224