Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Procedure: Person adding material to a mix must fill in ALL the information requested below. Any mistakes/overdose/uncertainty must be reported to Technical immediately.
Sheet(s) must be scanned and emailed to the Technical Supervisor daily.
Truck Trim Water Slump Stand Manual Admixture Manual Cement
Docket Number Mix Code Time Signed Batcher Comments
Number (L/m3) Water Added (L) Added (L) Added (kg)