 NFPA 14 Standard for the Installation of Standpipe, Private H Hydrants and Hose Systems  NFPA 17

Standard for Dry Chemical Extinguishing system  NFPA 20 Standard for the Installation of Centrifugal
Fire Pumps  NFPA 22 Standard for Water Tanks for Private Fire Protection  NFPA 24 Standard for the
Installation of Private Fire Service Mains and their Appurtenances  NFPA 70 National Electrical Code 
NFPA 72 National Fire Alarm Code  NFPA 130 Standard for Fixed Guideway Transit and Passenger . Rail
Systems  UL Underwriter’s Laboratories, Inc.  UBC Uniform Building Code  ISO International
Standards Organization  (International Conference of Building Officials, Uniform Building Code (UBC) 
(U.S. Naval Facilities Engineering Command, Design Manual (DM-7)  (SEAOC, “Recommended Lateral
Force Requirements and Tentative Commentary”) Local Codes  DENR Department of Environment and
Natural Resources, Environmental Management Bureau DAO 2003–30  DOLE Department of Labor and
Employment DO 13  DPWH Standard Specifications for Public Works and Highways, Vol. II, Highways,
2012 Edition Contract for the Civil Works of LRT Line 2 VI - 44 BID DOCUMENTS East (Masinag) Extension
Project Section VI. Procuring Entity’s Requirements Package 2 – Design and Build of Stations Part 2:
Particular Design and Performance Specifications DO 098, 2014 Construction Safety and Health Program
 PEC Philippine Electrical Code 2009, Vol. I & II  RA 9485 Philippine Society of Mechanical Engineers
Code  NPCP National Plumbing Code of the Philippines, 2012  RA 9514 The Fire Code of the
Philippines, 2008  RA 6541 National Building Code of the Philippines  NSCP National Structural Code
of the Philippines, Volume I. (Buildings, Towers and other Vertical Structures, Fourth Edition, 2009)  BP
344 The Law to Enhance Mobility of Disabled Persons  PD 856 Code on Sanitation of the Philippines,
1976 1.4.2 Priority of Standards and Codes a) The edition of each standard used shall be current (i.e.,
Base Date of Tender). Later editions that become available during the course of the Contract may be
used upon receipt of a written statement of “No Objection” from the Engineer. b) The Philippine
National Standards (PNS), shall be used to the maximum extent possible for specifying materials and
testing methods as well as construction specifications and requirements. c) Design shall be made either
by service load (allowable stress) or strength design (load factor) methods. The Contractor shall select
one of these applicable methods and shall strictly adhere to said method for each element of the
structure. d) In the event of conflicting requirements between the provisions of this PDPS and other
standards and codes of practice, the provisions of PDPS shall have precedence. For other requirements
which have not been included in the Design Specification, the order of code adoption shall follow the
sequence of: Local Codes, and other International standards. 1.5 Materials Requirements This Section
relates to the properties of materials that are relevant to the design process. All materials shall conform
to the applicable specifications and codes pd 857