Está en la página 1de 3
‘elcome pig ‘Renn Pataraat nse A Mal Open Fin at our Ears APPLICATION OF VOGEL METHOD uel pena om reams hning menene sana pene ats pg Asubined poston wage 22 TBD wer easy Seteeno seis Tsp. T tue potest 200 are eps netedexine 2 The peng re ut eal 5p 5 Thefoungeoreiesesare renee me pang 46ND, © PP? hee ae a wa BE ay Cao Be eels oma Be Pm wide Pat 2) Sete ef PEP oo cmc Ps rane 2sclgananp 0105. ne te * solution SO O1Giee -Leleel= but Fetkovich Method==-EXAMPLE + Avwellis producing fom an undersaturated ol reservoir that exist at ‘an average reservoir pressure of 3000 pel. Te bubble point pressure Is recorded as 1600 ps at 1805F. The folowing adtenal daa is valle: stabiized fow rate = 280 STBNGay, stabilized welloore pressure = 2200 psi 208, wW=0.3%, Bo at 2600 psi= 1.4 BbISTE Calculate the productivity index by using both the reservoir Properties and fow test data J eservit)= 0.42 STBIdaypsi; J (lon) = 0.35 STBVdaylps tical Application by BEGGS en = 02 An oil wells pricing from an understate reservoir thst is char acterized by 4 babble-point presse of 2130 peg. The Curent aver reservoir pressure is 3000 psig. Availabe flow test dat shows that the ‘wel produced 250 STI af a stabilized py of 2500 psig. Construct the TPR data,

También podría gustarte