CANTIDAD DE RECORTE PERFORADO POR POR HOYO PERFORADO

1) DETERMNAR EL # DE BBL DE RECORTE PERFORDO POR UNIDAD DE PIE DE


UN PIE DE UN HOYO 12 1/4, CON 20% DE POROSIDAD

DH = 12 1/4 IN
% POROSIDAD 20% 0.2
FACTOR = 1029.4

CR = ((DH^2)/1029,4)*(1-%POROSIDAD)
CR = ((12 1/4^2)/1029,4)*(1-0,20)
CR = 0.1166 BBL/FT

2) DETERMINAR LO FT^3 DE RECORTE PERFORADO POR PIE DE 12 1/4 IN,


%POROSIAD = 40%

DH = 12 1/4
% POROSIDAD = 40% 0.4
FACTOR = 144

CR = ((DH^2)/1029,4)*0,7854*(1-%POROSIDAD)
CR = ((12 1/4^2)/1029,4)*0,7854*(1-0,40)
CR = 0.4911 FT^3

CONTROL DE PERFORACION

1) DETERMINAR EL MDR EN (FT/HR) NECESARIO PARA MANTENER EL PESO DE


LODO SALIENDO 9,7 PPG EN LA LINEA DE FLUJO

MW in = 9 PPG
MW out = 9.7 PPG
Q= 530 GPM
DH = 17 1/2 IN

MDR = (67*(MW out - MW in)*Q)/DH^2


MDR = (67*(9,7 - 9)*530)/(17 1/2)^2
MDR = 81.166 FT/HR

FACTOR DE FLOTACION
DETERMINAR EL BF PARA UN MW DE 15 PPG

MW = 15 PPG

BF = 1 - (MW/65,5)
BF = 1 - (15/65,5)
BF = 0.7710

PERDIDA DE SOBRE BALANCE DEBIDO A LA CAIDA DEL MIVEL DEL LODO

DETERMINAR PIE DE TUBERIA SECA QUE DEBEN SER SACADO PARA PERDER EL
SOBRE BALANCE

DATOS:
CANT. SB = 150 PSI
CAP. TUB. 0.0773 BBL/FT
DES. TUB. = 0.0075 BBL/FT
MW = 11.5

FT = (S.B. * (CAP. TUB. - DES. TUB.))/(MW * 0,0052 * DES. TUB.)


FT = (150 * (0,0773 - 0,0075))/(11,5*0,052*0,0075)
FT = 2334.4

PIE DE TUBERIA MOJADA PARA PERDER EL SOBRE BALANCE

DETERMINAR EL FT FR TUBERIA MOJADA, QUE TIENE SER SACADA PARA PERDER EL


SOBREBALANCE USANDO LOS SIGUIENTES DATOS

DATOS:
CANT. S.B. = 150 PSI
CAP. TDR = 0.0773 BBL/FT
CAP. T = 0.1776 BBL/FT
DT = 0.0075 BBL/FT
MW = 11.5

FT = (SB * TDR -CAP. T - DT))/(MW * 0,052 * (CAP. T. + DT))


FT = (150 * (0,0773 -0,1776 - 0,0075))/(11,5 * 0,052 * (0,1776 + 0,0075))
-FT = 146.1

POTENCIA HIDRAULICA

DETERMINAR HHP:

DATOS:
P= 2950 PSI
Q= 520 GPM

HHP = (P * Q)/1714
HHP =(2950 * 520) /1714
HHP = 894.9825
DETERMINAR DE LA PRESION HIDROSTATICA CUANDO SE SACA TUBERIA
FUERA DEL POZO

DETERMINAR LA DISMINUCION DE LA PH CUANDO SE RETIRA TUBERIA SECA


FUERA DEL POZO, # DE TIRO SACADOS = 5; PROMEDIO DE LONGUITUD
POR TIRO = 92 FT; DESPLAZAMIENTO DE LA TUBERIA = 0,0075 BBL/FT;
CAPACIDAD DE LA TUBERIA DE REVESTIMIENTO = 0,00773BBL/FT; MW = 11,5

(CUANDO SE SACA TUBERIA SECA)

DATOS:
TIRO = 5
SACADO

PLPT = 92
DT = 0.0075 BBL/FT
CTR= 0.00773 BBL/FT
MW = 11.5

PASO 1 BD = #TS*PLPT*DT
BD = 5 * 92 * 0,0075
BD = 3.45 BBL

PASO 2 PH = (BD/(CTR-DT)*0,052*MW
PH = (3,45 / (0,00773 - 0,0075) * 0,052 * 11,5
PH = 8970 PSI

(CUANDO LA TUBERIA ESTA MOJADA)

DATOS:
#TS = 5
PLPT = 92
DT = 0.0075 BBL/FT
CTR = 0.001776 BBL/FT
CDC = 0.0773 BBL/FT

PASO 1 BD = #TS * PLPT * (DT +CTR)


BD = 5 * 92 * (0,0075 + 0,001776)
BD = 4.2670 BBL

PASO 2 PH = (BD/CDC - (DT + CTR))*0,0052 * MW


PH = (4,2670/0,0773 - (0,0075 + 0,001776))*0,0052 * 11,5
PH = 3.3004 PSI

CALCULO DE LA TUBERI DE PERFORACION Y COLLARES DE PERFORACION

CALCULAR LA CAPACIDAD, DESPLAZAMIENTO Y PESO CON LOS SIG. DATOS:

DATOS:

OD = 8 IN
ID = 2 5/7 IN

CAPACIDAD:

CAP = ID^2/1029,4
CAP = 8^2/1029,4
CAP = 0.0622 BBL/FT

DESPLAZAMIENTO:

DES = (OD^2-ID^2)/1029,4
DES = (8^2-2 5/^2)/1029,4
DES = 0.0550 BBL/FT

PESO:

PESO = DES * 27471


PESO = 0,O55O * 27471
PESO = 1510.1713 LB/FT