Está en la página 1de 9
Fros (9 “Par un sistema on toberas y des reservortes, la arva de la bomba se calwiS en bese 2 prebas con una veloddol angdlar de “oo rpm . El métr, el€cttco a usar Tene we peterca para trebajar 2 4600 rpm . DéTenminer Nox Tem, = (£62 SS bg= 12053 LI Gn 50 kts 2, (4gz)so 5 Og= 42.53 Lk Ny= 4400 rpm y= (400% = 5, fy (eg ye? He: 24 7 N= 41600 rp. Hem) G34F | 59.24 | 55.01 | 48/66) 42.34 | 34.44) 13.95 Olé) © | v2 | 445.45 | ate46 | 290.94 | 363,64) 400.00 Core de la bombe N= 1690 rem 40 30 20 ‘ 40 ee ee ae 7 400 Ao oo 00 acters) Bb) Curie de sistema (Lomi, meter , Tuberla, reservories) Eeendy pe eveecta antes (1) y (2): Bit Be WE + Hea, Ine elit FB tee EY é 2 Hecway = B~ Bat Cheat Kot byt Kot ei tS. 2 b= 585.0- SIS + (H6+0Nt1O+OAS 444 £ 489.8° z a 4542 a = 24.54 (06+ 9914104 OS +14 fx 19-6) _a* i “ ‘aaa seat Fonte Selalarde £% 4 os = ) Rew UO = Gx ONStS = 2761863.42 ae OAs 115 - 2-52 = EEC aoe i te ( ee By 0. ‘oe a7e1663-4 OV ) pe Ws --- @) Ham 2hest ( 73.26 + 4ovda fxCsen4 6) Ae wales (b n404 4 pnigig« 3) w2 2 C) t ve Adlemas, ger Cortravided f Gr) acstis) °) Grepreands Is awa del sistema HVS @+* Hem) 30 Curia. del sssteme. Rvs @. fo litt) of doo 260 Boo 420 buego per hallr el cout , entercepiames fa curve. de te bemba ce. la curva cel sistema H ve G, Hem) 60 pel oe fecot Gm B64 nif | ey 50 4o

También podría gustarte