FECHA DE ENTREGA DE ESPECIFICACIONES : 15 DE FEBRERO

PROVEEDOR PRODUCTO FORMA DE PAGO

PAVIMENTACION
GEOTEXTIL NO TEJIDO EN COTA +4.00 m
CIDELSA GEOTEXTIL NW024 4mx140m AL CONTADO
GEOMALLA TRIAXIAL TX 140 N COTA +4.00 m
SISFRA GEOMALLA MULTIAXIAL 160 4mx75m AL CONTADO

SISFRA GEOMALLA MULTIAXIAL 160 3mx75m AL CONTADO


SISFRA GEOMALLA MULTIAXIAL 140 4mx75m AL CONTADO
TDM GEOMALLA TX T140 4X75 M AL CONTADO
GEOMALLA TRIAXIAL TX 160 EN COTA +4.49 m

SISFRA GEOMALLA MULTIAXIAL 160 4mx75m AL CONTADO

TDM GEOMALLA TX T160 4X75 M AL CONTADO


TOTAL A PAGAR
COSTO EN FECHA DE
COSTO
P.U IGV 18% COSTO SOLES TIPO DE ENTREGA
OC CANT. PARCIAL
US$. US$ TOTAL US$ CAMBIO 3.30 DE ORDEN
US$ S./ DE COMPRA

S/. 185,267.17
1081 80,640.00 0.59 47,577.60 8,563.97 56,141.57 185,267.17 2/25/2019
S/. 586,272.85
1080 9,000.00 2.20 19,800.00 3,564.00 23,364.00 77,101.20 2/18/2019

1080 6,075.00 2.20 13,365.00 2,405.70 15,770.70 52,043.31 2/18/2019


1083 32,700.00 1.79 58,533.00 10,535.94 69,068.94 227,927.50 2/25/2019
1082 32,700.00 1.80 58,860.00 10,594.80 69,454.80 229,200.84 2/25/2019
S/. 688,980.95

40,224.54 2.20 88,493.99 15,928.92 104,422.91 344,595.59 2/25/2019


1083
40,200.00 2.20 88,440.00 15,919.20 104,359.20 344,385.36 2/25/2019
1082
S/. 1,460,520.98
FECHA
TIEMPO DE TENTATIVA DE OBSERVACIONES
ENTREGA ENTREGA DE
MATERIALES

7 dias 3/4/2019 Se entrego al 100%

stock 3/4/2019 Se entrego al 80% el


resto llega el lunes
stock 3/4/2019 11/03/19
30 - 35 dias 3/25/2019
30 - 35 dias 3/25/2019

30 - 35 dias 3/25/2019 Llegan 30 000 m2 el


11/03/19
30 - 35 dias 3/25/2019
PROVEEDOR PRODUCTO OC CANT. (m2)
GEOTEXTIL NO TEJIDO EN COTA +4.00 m
CIDELSA GEOTEXTIL NW024 4mx140m 1081 80,640.00
GEOMALLA TRIAXIAL TX 140 N COTA +4.00 m
SISFRA GEOMALLA MULTIAXIAL 160 4mx75m 1080 9,000.00
SISFRA GEOMALLA MULTIAXIAL 160 3mx75m 1080 6,075.00
SISFRA GEOMALLA MULTIAXIAL 140 4mx75m 1083 32,700.00
TDM GEOMALLA TX T140 4X75 M 1082 32,700.00
GEOMALLA TRIAXIAL TX 160 EN COTA +4.49 m
SISFRA GEOMALLA MULTIAXIAL 160 4mx75m 1083 40,224.54
TDM GEOMALLA TX T160 4X75 M 1082 40,200.00
18-Feb 25-Feb 4-Mar 13-Mar 19-Mar 30-Mar 6-Apr 10-Apr 15-Apr TOTAL

OC 80640.00 80640.00

OC 6300.00 2700.00 9000.00


OC 5850.00 225.00 6075.00
OC 32700.00 32700.00
OC 32,700.00 32700.00

OC 23400.00 16824.54 40224.54


OC 40,200.00 40200.00
%

100%

100%
100%
0%
0%

58%
0%
MARZO 2019

L M M J

SISFRA LLEGADA
DE TX 160
12 150 m2
4 5 6 7

SISFRA LLEGADA DE
TX 160
2 925 m2
11 12 13 14

SISFRA LLEGADA
DE TX 160
23 400 m2
18 19 20 21

SISFRA
LLEGADA DE TX
140 3
25 300 m2 26 27 28
PROVEEDOR DESCRIPCION CANTIDAD (m2)

GEOMALLA
SISFRA MULTIAXIAL 160 9,000.00
4mx75m

GEOMALLA
SISFRA MULTIAXIAL 160 6,075.00
3mx75m

GEOMALLA
SISFRA MULTIAXIAL 160 23,400.00
4mx75m

SISFRA GEOMALLA 3,300.00


MULTIAXIAL TX 140
4mX75m

SISFRA GEOMALLA 20,100.00


MULTIAXIAL TX 140
4mX75m
GEOMALLA TX
TDM 18,525.00
T140 4X75 M

TOTAL 80,400.00
GEOMALLA TRIAXIAL COTA 4.00 m

RZO 2019

V S D L

1 2 3 1

8 9 10 8

15 16 17 15

22 23 24 22

29 30 31 29
P.U $ SUB TOTAL $ IGV $ TOTAL $ TOTAL S./

2.20 19,800.00 3,564.00 23,364.00 77,101.20

2.20 13,365.00 2,405.70 15,770.70 52,043.31

2.20 51,480.00 9,266.40 60,746.40 200,463.12

1.79 5,907.00 1,063.26 6,970.26 23,001.86

1.79 35,979.00 6,476.22 42,455.22 140,102.23


1.80 33,345.00 6,002.10 39,347.10 129,845.43

188,653.68 622,557.14
ABRIL 2019

M M J V S

SISFRA
LLEGADA DE
TX 140
2 3 4 20 100 m2 5 6

TDM
LLEGADA DE TX
140 18
525 m2
9 10 11 12 13

16 17 18 19 20

23 24 25 26 27

30 1 2 3 4
NUEVO ANTERIOR $
188,435.09 177,658.44 10,776.65
D

14

21

28

5
MARZO 2019

L M M J

4 5 6 7

11 12 13 14

18 19 20 21

25 26 27 28
PROVEEDOR DESCRIPCION CANTIDAD (m2) P.U $

GEOMALLA
SISFRA MULTIAXIAL 160 16,800.00 2.20
4mx75m

GEOMALLA TX T160
TDM 40,200.00 2.20
4X75 m

GEOMALLA
SISFRA MULTIAXIAL 160 23,400.00 2.20
4mx75m

TOTAL 80,400.00
GEOMALLA TRIAXIAL COTA 4.49 m

2019

V S D L

1 2 3 1

8 9 10 8

15 16 17 15

22 23 24 22

29 29 29 29
SUB TOTAL $ IGV $ TOTAL $ TOTAL S./

36,960.00 6,652.80 43,612.80 143,922.24

88,440.00 15,919.20 104,359.20 344,385.36

51,480.00 9,266.40 60,746.40 200,463.12

208,718.40 688,770.72
ABRIL 2019

M M J V S

SISFRA LLEGADA
DE TX 160
16 800
2 3 4 m2 5 6

TDM SISFRA
LLEGADA DE LLEGADA DE
TX 160 TX 160
40 200 m2 23 400 m2
9 10 11 12 13

16 17 18 19 20

23 24 25 26 27

30 1 2 3 4
D

14

21

28