Está en la página 1de 1

IN D IC A D O R E S U R Q U S A C - A B R IL 2 0 1 9

RESUMEN OPERATIVO DE EQUIPOS JUMBO

FRONTONERO 1056
FECHA 9/04/2019 EMPERNADOR 640
OBJETIVO SIMBA 541 7.0 197 85% 85% 60-80 3-6
Horas
TURNO EQUIPO Pies Perf. H. percucion H. Diesel PP / Hr Nª Fallas Disp. Mecánica % Utilización % MTBF MTTR
ZONA TIPO EQUIPO trabajadas
DIA CARIDAD FRONTONERO JB-06 10 0.3 1.3 1.5 7 44% 14%
COTURCAN FRONTONERO JB-08 1,118 4.7 3.3 8.0 139 97% 76%
JB-15 721 2.6 1.8 4.4 165 77% 42%
EMPERNADOR JB-20 175 1.4 3.0 4.4 40 97% 42%
SIMBA JB-18 83 0.2 0.2 0.4 193 82% 4%
HERCULES FRONTONERO JB-09 1,139 3.2 1.8 5.0 230 97% 47%
JB-19 1,076 3.5 0.8 4.3 250 97% 41%
JB-22 296 0.8 1.9 2.7 109 97% 26%
SANSON FRONTONERO JB-16 1,300 2.6 1.0 3.6 361 97% 34%
Total DIA 5,919 19.3 15.1 34.3 172 87% 36%
NOCHE CARIDAD FRONTONERO JB-06 418 2.8 1.7 4.4 94 97% 42%
EMPERNADOR JB-20 494 1.6 2.2 3.8 132 97% 36%
SIMBA JB-05 58 1.0 1.0 2.0 29 57% 19%
COTURCAN FRONTONERO JB-08 955 5.8 1.6 7.4 128 97% 71%
JB-15 585 2.0 0.9 3.0 197 97% 28%
SIMBA JB-18 195 3.6 5.4 9.0 22 97% 86%
HERCULES FRONTONERO JB-09 920 3.2 1.0 4.2 220 97% 40%
JB-19 773 2.9 1.0 3.9 198 97% 37%
JB-22 342 1.0 4.0 5.0 68 97% 48%
SANSON FRONTONERO JB-16 1,207 3.2 0.6 3.8 318 97% 36%
Total NOCHE 5,947 27.0 19.5 46.5 128 93% 44%
Total general 11,866 46.3 34.5 80.9 147 90% 41%

TURNO TIPO ACTIVIDAD JB-06 JB-08 JB-09 JB-15 JB-16 JB-18 JB-19 JB-20 JB-05 JB-22
DIA 202 EN ESPERA DE ORDEN 0.5
203 TRASLADO DE EQUIPO 1.0 0.7 0.4 0.3 1.8 0.7
208 ESPERA FRENTE DE TRABAJO 3.3 2.0 1.3 0.3
210 ESPERA LIMPIEZA DE FRENTE 0.7 3.0
212 OTRAS DEMORAS OPERATIVAS 3.3 1.2
301 FALLA MECÁNICA 5.3 2.0 1.6
303 MANTENIMIENTO PREVENTIVO 0.3
401 REPARTO DE GUARDIA 1.7 0.5 1.0
402 CHEQUEO DE MÁQUINA 0.5 0.2 0.7 0.2 1.2
403 REFRIGERIO 0.4 1.0 1.0 0.7 1.0 1.0
205 REGADO Y DESATADO 0.8
Total DIA 11.3 2.3 5.0 5.4 0.9 3.0 2.0 8.3 3.3
NOCHE 203 TRASLADO DE EQUIPO 0.7 0.8 0.2 0.3 0.7 1.8 3.3
206 INSTALAC. AGUA / ENERGÍA 0.7 0.5 0.5 0.3 1.0
208 ESPERA FRENTE DE TRABAJO 0.7 3.8 0.7 4.2 1.0 3.0
210 ESPERA LIMPIEZA DE FRENTE 2.7
211 FALTA DE AGUA 1.2
212 OTRAS DEMORAS OPERATIVAS 0.5 1.0 2.0 0.8
301 FALLA MECÁNICA 7.0 4.3
304 FALLA ELÉCTRICA 0.8
401 REPARTO DE GUARDIA 0.2 1.7
402 CHEQUEO DE MÁQUINA 0.5 0.2 0.5 0.3 0.3
403 REFRIGERIO 0.4
306 OTRAS DEMORAS NO OPERATIVAS 1.0
201 ABASTECIM. COMBUSTIBLE 0.5 0.5
205 REGADO Y DESATADO 0.5
Total NOCHE 7.0 4.0 4.0 4.8 2.5 1.7 6.3 5.3 10.4 4.9
Total general 18.3 6.3 9.0 10.3 3.4 4.7 8.3 13.6 10.4 8.3

RESUMEN OPERATIVO DE EQUIPOS SCOOP

MES ABR_19
FECHA 9-Abr
OBJETIVOS 7.0 85% 85% 60-80 3-6 7.0
Horas GUARDIAS Parada Parada Disp. Mecanica Utilizacion
TURNO ZONA EQUIPO CAPACIDAD N° FALLAS MTBF MTBR HRS/ GUARDIA
Trabajadas TRABAJADAS Correctiva Preventiva (%) (%)
SC 49 2.2 6.7 1 0.0 0.5 0.0 94.7% 67.0% 6.7
CARIDAD
SC 50 4.2 6.2 1 0.0 0.5 0.0 94.7% 62.0% 6.2
SC 43 4.2 6.1 1 0.0 0.5 0.0 94.7% 61.0% 6.1
SC 51 4.2 6.9 1 0.0 0.5 0.0 94.7% 69.0% 6.9
COTURCAN
DIA SC 25 6.0 7.6 1 0.0 0.5 0.0 94.7% 76.0% 7.6
SC 44 6.0 3.7 1 1.0 0.5 1.0 94.7% 37.0% 3.7 1.0 3.7
SC 52 4.2 8.6 1 0.0 0.5 0.0 94.7% 86.0% 8.6
HERCULES
SC 24 6.0 8.0 1 0.0 0.5 0.0 94.7% 80.0% 8.0
SANSON SC 03 4.2 6.7 1 0.0 0.5 0.0 94.7% 67.0% 6.7
Total DIA 60.5 9 1.0 4.8 1.0 94.7% 67.2% 60.5 1.0 6.7
SC 49 2.2 6.7 1 0.0 0.5 0.0 94.7% 67.0% 6.7
CARIDAD
SC 50 4.2 9.3 1 0.0 0.5 0.0 94.7% 93.0% 9.3
SC 43 4.2 6.8 1 0.0 0.5 0.0 94.7% 68.0% 6.8
SC 51 4.2 7.4 1 0.0 0.5 0.0 94.7% 74.0% 7.4
NOCHE COTURCAN
SC 25 6.0 2.6 1 0.0 0.5 0.0 94.7% 26.0% 2.6
SC 44 6.0 8.5 1 0.0 0.5 0.0 94.7% 85.0% 8.5
HERCULES SC 52 4.2 9.7 1 0.0 0.5 0.0 94.7% 97.0% 9.7
SANSON SC 03 4.2 8.2 1 0.8 0.5 1.0 86.7% 82.0% 8.2 0.8 8.2
Total NOCHE 59.2 8 0.8 4.3 1.0 93.7% 74.0% 59.2 0.8 7.4
Total general 119.7 17 1.8 9.1 2.0 94.2% 70.4% 59.9 0.9 7.0

H O R A S A C U M U LA D A S D E E Q U IPO S D E L 2 6 /0 3 A L 0 9 /0 4

H O R A S A CU M U LA D A S D E S CO O P H O R A S A C U M U L A D A S D E JU M B O

SCOOP CAPACIDAD TOTAL HORAS JUMBO H. percusion H. Diesel


14 2.2 47 JB-05 26 15
49 2.2 165 JB-06 61 48
3 4.2 175 JB-08 129 96
50 4.2 246 JB-09 65 40
51 4.2 225 JB-15 69 45
52 4.2 242 JB-16 70 19 52

43 4.2 198 JB-18 24 15 43

24 6.0 215 JB-19 72 36 24

25 6.0 172 JB-20 45 82 25

44 6.0 214 JB-21 15 56 44

TOTAL 1,899 TOTAL 576 450 TO TAL

También podría gustarte