"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP

OBRA: PORO PORO - CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ


- CAJAMARCA"

DISTANCIA MEDIA PARA MATERIAL DE SUB-BASE


CANTERA INFLUENCIA DISTANCIA DISTANCIA DISTANCIA VOLUMEN VOL. x DIST.
MEDIA ACCESO TOTAL MATERIAL
KM. KM. KM. M3 M3.KM
N ° 01 00+000
04+367 2.18 9.97 12.15 6,192.10 75,255.38
6,192.10 75,255.38
d = 75,255.38 / 6,192.10 = 12.15
d = 12.2

DISTANCIA MEDIA PARA MATERIAL DE BASE

CANTERA INFLUENCIA DISTANCIA DISTANCIA DISTANCIA VOLUMEN VOL. x DIST.


MEDIA ACCESO TOTAL MATERIAL
KM. KM. KM. M3 M3.KM
N ° 01 00+000
04+367 2.18 9.97 12.15 4,819.14 58,569.18
4,819.14 58,569.18
d = 58,569.18 / 4,819.14 = 12.15
d = 12.2

DISTANCIA MEDIA PARA AGREGADOS DE CONCRETO

CANTERA INFLUENCIA DISTANCIA DISTANCIA DISTANCIA VOLUMEN VOL. x DIST.


MEDIA ACCESO TOTAL MATERIAL
KM. KM. KM. M3 M3.KM
N ° 01 00+000
04+367 2.18 0.47 2.65 1.00 2.65
1.00 2.65
d = 2.65 / 1.00 = 2.65
d = 2.7

DISTANCIA MEDIA PARA AGREGADOS DE T.S.B.

CANTERA INFLUENCIA DISTANCIA DISTANCIA DISTANCIA VOLUMEN VOL. x DIST.


MEDIA ACCESO TOTAL MATERIAL
KM. KM. KM. M3 M3.KM
N ° 01 00+000
04+367 2.18 0.47 2.65 786.04 2,085.73
786.04 2,085.73
d = 2,085.73 / 786.04 = 2.65
d = 2.7
EXPLANACIONES - TRAMO CP PORO PORO - CP LA LIBERTAD
UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO
KM 0.000 1000.000
- CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"
Nº 1

PROG. AREA (M2) VOLUMEN (M3) VOLUMEN DE CORTE (M3) VOLUMEN DE RELLENO (M3)

KM MATERIAL ROCA VOLUMEN PROPIO PRESTAMO


CORTE RELLENO CORTE RELLENO
SUELTO SUELTA ACUMULA ACUMULADO CANTERA
0+000.00 0.005 0.889 0.000 0.000 0.000 0.000
0+010.00 1.089 0.198 5.473 5.438 5.473 5.473 5.438
0+020.00 2.129 5.035 16.199 23.880 16.199 21.672 29.318
0+030.00 2.560 19.161 22.801 131.376 22.801 44.473 160.694
0+040.00 4.025 3.295 32.650 115.693 32.650 77.123 276.387
0+050.00 2.952 3.036 35.292 28.542 35.292 112.415 304.929
0+060.00 2.010 6.100 24.599 48.856 24.599 137.014 353.785
0+070.00 1.734 0.190 18.649 32.603 18.649 155.663 386.388
0+080.00 1.257 0.008 14.902 0.923 14.902 170.565 387.311
0+090.00 0.589 1.453 9.224 7.249 9.224 179.789 394.560
0+100.00 0.070 4.685 3.296 30.690 3.296 183.085 425.250
0+110.00 0.003 4.942 0.366 49.155 0.366 183.451 474.405
0+120.00 0.003 2.671 0.032 38.461 0.032 183.483 512.866
0+130.00 0.047 2.513 0.249 25.917 0.249 183.732 538.783
0+140.00 0.141 2.055 0.937 22.839 0.937 184.669 561.622
0+150.00 0.464 0.400 3.026 12.273 3.026 187.695 573.895
0+160.00 1.068 0.000 7.662 1.998 7.662 195.357 575.893
0+170.00 0.609 0.000 8.387 0.000 8.387 203.744 575.893
0+180.00 0.159 0.052 3.843 0.261 3.843 207.587 576.154
0+190.00 0.446 0.000 3.025 0.261 3.025 210.612 576.415
0+200.00 0.797 0.000 6.211 0.000 6.211 216.823 576.415
0+210.00 2.251 0.000 15.350 0.000 15.350 232.173 576.415
0+220.00 3.011 0.000 26.307 0.000 26.307 258.480 576.415
0+230.00 2.515 0.000 27.583 0.000 27.583 286.063 576.415
0+240.00 1.439 0.000 19.755 0.000 19.755 305.818 576.415
0+250.00 0.853 0.002 11.459 0.011 11.459 317.277 576.426
0+260.00 0.568 0.060 7.106 0.310 7.106 324.383 576.736
0+270.00 0.780 0.019 6.743 0.395 6.743 331.126 577.131
0+280.00 0.871 0.000 8.257 0.095 8.257 339.383 577.226
0+290.00 0.208 0.344 5.394 1.718 5.394 344.777 578.944
0+300.00 0.162 0.790 1.846 5.670 1.846 346.623 584.614
0+310.00 0.163 0.291 1.625 5.405 1.625 348.248 590.019
0+320.00 0.295 0.006 2.224 1.500 2.224 350.472 591.519
0+330.00 0.854 0.001 5.693 0.033 5.693 356.165 591.552
0+340.00 1.631 0.000 12.425 0.006 12.425 368.590 591.558
0+350.00 2.481 0.000 20.562 0.001 20.562 389.152 591.559
0+360.00 2.654 0.000 25.883 0.000 25.883 415.035 591.559
0+370.00 1.595 0.000 21.320 0.000 21.320 436.355 591.559
0+380.00 0.710 0.004 11.525 0.022 11.525 447.880 591.581
0+390.00 0.081 0.267 3.957 1.357 3.957 451.837 592.938
0+400.00 0.010 0.787 0.458 5.269 0.458 452.295 598.207
0+410.00 0.002 0.998 0.060 8.924 0.060 452.355 607.131
0+420.00 0.000 0.797 0.008 8.976 0.008 452.363 616.107
0+430.00 0.103 0.352 0.515 5.748 0.515 452.878 621.855
0+440.00 0.459 0.187 2.810 2.697 2.810 455.688 624.552
0+450.00 1.303 0.001 8.800 0.935 8.800 464.488 625.487
0+460.00 1.663 0.000 14.809 0.006 14.809 479.297 625.493
0+470.00 1.074 0.089 13.665 0.448 13.665 492.962 625.941
0+480.00 0.158 0.634 6.162 3.625 6.162 499.124 629.566
0+490.00 1.292 0.000 7.252 3.177 7.252 506.376 632.743
0+500.00 2.608 0.000 19.470 0.000 19.470 525.846 632.743
0+510.00 3.639 0.000 31.255 0.000 31.255 557.101 632.743
0+520.00 1.335 1.075 24.145 6.157 24.145 581.246 638.900
0+530.00 1.044 0.801 11.708 9.581 11.708 592.954 648.481
0+540.00 0.310 0.000 7.034 3.726 7.034 599.988 652.207
0+550.00 0.443 0.000 3.708 0.000 3.708 603.696 652.207
0+560.00 0.338 0.000 3.904 0.000 3.904 607.600 652.207
0+570.00 0.574 0.000 4.559 0.000 4.559 612.159 652.207
0+580.00 0.673 0.000 6.243 0.000 6.243 618.402 652.207
0+590.00 0.508 0.000 5.881 0.000 5.881 624.283 652.207
0+600.00 0.470 0.039 4.890 0.197 4.890 629.173 652.404
0+610.00 1.028 0.000 7.493 0.197 7.493 636.666 652.601
0+620.00 1.332 0.000 11.802 0.000 11.802 648.468 652.601
0+630.00 1.996 0.000 16.637 0.000 16.637 665.105 652.601
0+640.00 2.793 0.000 23.943 0.000 23.943 689.048 652.601
0+650.00 2.328 0.000 25.420 0.000 25.420 714.468 652.601
0+660.00 1.306 0.000 18.040 0.000 18.040 732.508 652.601
0+670.00 1.013 0.000 11.508 0.000 11.508 744.016 652.601
0+680.00 0.968 0.000 9.862 0.000 9.862 753.878 652.601
0+690.00 1.357 0.000 11.625 0.000 11.625 765.503 652.601
0+700.00 1.783 0.000 15.700 0.000 15.700 781.203 652.601
0+710.00 1.537 0.000 16.601 0.000 16.601 797.804 652.601
0+720.00 1.444 0.001 15.078 0.004 15.078 812.882 652.605
0+730.00 1.170 0.000 13.318 0.004 13.318 826.200 652.609
0+740.00 0.745 0.000 9.573 0.000 9.573 835.773 652.609
0+750.00 1.146 0.000 9.453 0.000 9.453 845.226 652.609
0+760.00 1.457 0.000 13.014 0.000 13.014 858.240 652.609
0+770.00 1.974 0.048 17.155 0.238 17.155 875.395 652.847
0+780.00 2.472 0.059 22.231 0.532 22.231 897.626 653.379
0+790.00 1.302 0.075 18.923 0.663 18.923 916.549 654.042
0+800.00 0.278 0.227 7.973 1.470 7.973 924.522 655.512
0+810.00 2.572 0.000 14.247 1.133 14.247 938.769 656.645
0+820.00 5.002 0.000 37.869 0.000 37.869 976.638 656.645
0+830.00 6.157 0.000 55.793 0.000 55.793 1032.431 656.645
0+840.00 7.391 0.000 67.739 0.000 67.739 1100.170 656.645
0+850.00 6.307 0.000 68.485 0.000 68.485 1168.655 656.645
0+860.00 5.905 0.000 61.174 0.000 61.174 1229.829 656.645
0+870.00 3.161 0.000 45.446 0.000 45.446 1275.275 656.645
0+880.00 0.529 0.160 18.396 0.813 18.396 1293.671 657.458
0+890.00 0.436 0.613 4.826 3.865 4.826 1298.497 661.323
0+900.00 0.000 1.155 2.317 8.648 2.317 1300.814 669.971
0+910.00 0.000 1.657 0.000 14.019 0.000 1300.814 683.990
0+920.00 0.000 2.024 0.000 18.363 0.000 1300.814 702.353
0+930.00 0.000 0.780 0.002 14.073 0.002 1300.816 716.426
0+940.00 0.552 0.000 2.761 3.898 2.761 1303.577 720.324
0+950.00 1.138 0.000 8.451 0.000 8.451 1312.028 720.324
0+960.00 1.088 0.000 11.103 0.000 11.103 1323.131 720.324
0+970.00 1.224 0.000 11.116 0.000 11.116 1334.247 720.324
0+980.00 1.716 0.000 14.577 0.000 14.577 1348.824 720.324
0+990.00 1.131 0.000 14.189 0.000 14.189 1363.013 720.324
1+000.00 0.650 0.000 8.836 0.000 8.836 1371.849 720.324
1371.849 720.324 1311.760 60.089

EXPLANACIONES - TRAMO CP PORO PORO - CP LA LIBERTAD


UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO
KM 1000.000 2000.000
- CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"
Nº 2
PROG. AREA (M2) VOLUMEN (M3) VOLUMEN DE CORTE (M3) VOLUMEN DE RELLENO (M3)
KM MATERIAL ROCA VOLUMEN PROPIO PRESTAMO
CORTE RELLENO CORTE RELLENO
SUELTO SUELTA ACUMULA ACUMULADO CANTERA

1+000.00 0.650 0.000 1371.849 720.324

1+010.00 1.496 0.000 10.640 0.000 10.640 1382.489 720.324


1+020.00 2.463 0.000 19.683 0.000 19.683 1402.172 720.324
1+030.00 2.024 0.000 22.314 0.000 22.314 1424.486 720.324
1+040.00 1.760 0.000 18.800 0.000 18.800 1443.286 720.324
1+050.00 1.421 0.000 15.799 0.000 15.799 1459.085 720.324
1+060.00 1.293 0.000 13.478 0.000 13.478 1472.563 720.324
1+070.00 1.288 0.000 12.858 0.000 12.858 1485.421 720.324
1+080.00 0.837 0.000 10.618 0.000 10.618 1496.039 720.324
1+090.00 0.572 0.000 7.043 0.000 7.043 1503.082 720.324
1+100.00 0.444 0.000 5.082 0.000 5.082 1508.164 720.324
1+110.00 0.681 0.185 5.828 0.886 5.828 1513.992 721.210
1+120.00 0.541 0.405 6.456 2.813 6.456 1520.448 724.023
1+130.00 1.197 0.000 8.909 1.965 8.909 1529.357 725.988
1+140.00 2.228 0.000 17.093 0.000 17.093 1546.450 725.988
1+150.00 0.852 0.000 15.272 0.000 15.272 1561.722 725.988
1+160.00 0.154 0.162 4.945 0.810 4.945 1566.667 726.798
1+170.00 0.163 0.263 1.565 2.124 1.565 1568.232 728.922
1+180.00 0.118 0.306 1.403 2.842 1.403 1569.635 731.764
1+190.00 0.767 0.000 4.424 1.529 4.424 1574.059 733.293
1+200.00 1.769 0.000 12.397 0.000 12.397 1586.456 733.293
1+210.00 1.095 0.000 13.744 0.001 13.744 1600.200 733.294
1+220.00 0.149 0.410 6.942 1.993 6.942 1607.142 735.287
1+230.00 0.001 0.433 0.670 4.189 0.670 1607.812 739.476
1+240.00 0.003 0.506 0.014 4.652 0.014 1607.826 744.128
1+250.00 0.110 0.466 0.562 4.859 0.562 1608.388 748.987
1+260.00 0.492 0.116 2.881 3.042 2.881 1611.269 752.029
1+270.00 0.493 0.418 4.710 2.823 4.710 1615.979 754.852
1+280.00 0.681 0.258 5.730 3.484 5.730 1621.709 758.336
1+290.00 1.607 0.000 11.553 1.252 11.553 1633.262 759.588
1+300.00 2.344 0.000 19.991 0.000 19.991 1653.253 759.588
1+310.00 1.875 0.000 21.375 0.000 21.375 1674.628 759.588
1+320.00 1.113 0.025 15.224 0.124 15.224 1689.852 759.712
1+330.00 0.610 0.002 8.616 0.135 8.616 1698.468 759.847
1+340.00 0.440 0.000 5.253 0.010 5.253 1703.721 759.857
1+350.00 0.275 0.122 3.870 0.613 3.870 1707.591 760.470
1+360.00 0.278 0.440 2.792 2.821 2.792 1710.383 763.291
1+370.00 0.238 0.133 2.582 2.870 2.582 1712.965 766.161
1+380.00 1.071 0.000 6.542 0.664 6.542 1719.507 766.825
1+390.00 0.491 0.000 7.810 0.000 7.810 1727.317 766.825
1+400.00 0.243 0.000 3.670 0.000 3.670 1730.987 766.825
1+410.00 1.082 0.000 6.623 0.000 6.623 1737.610 766.825
1+420.00 2.121 0.000 15.990 0.000 15.990 1753.600 766.825
1+430.00 2.406 0.000 22.609 0.000 22.609 1776.209 766.825
1+440.00 2.894 0.000 26.498 0.000 26.498 1802.707 766.825
1+450.00 3.540 0.000 32.170 0.000 32.170 1834.877 766.825
1+460.00 4.093 0.000 38.165 0.000 38.165 1873.042 766.825
1+470.00 3.533 0.000 38.050 0.000 38.050 1911.092 766.825
1+480.00 2.927 0.000 32.319 0.000 32.319 1943.411 766.825
1+490.00 1.389 0.000 21.648 0.000 21.648 1965.059 766.825
1+500.00 0.200 0.221 7.718 1.218 7.718 1972.777 768.043
1+510.00 0.972 0.174 6.365 1.798 6.365 1979.142 769.841
1+520.00 0.405 0.506 7.797 2.970 7.797 1986.939 772.811
1+530.00 0.655 0.105 6.027 2.689 6.027 1992.966 775.500
1+540.00 0.163 0.312 4.216 2.018 4.216 1997.182 777.518
1+550.00 0.576 0.038 3.824 1.693 3.824 2001.006 779.211
1+560.00 1.209 0.000 8.947 0.189 8.947 2009.953 779.400
1+570.00 2.368 0.000 17.883 0.000 17.883 2027.836 779.400
1+580.00 3.252 0.000 28.100 0.000 28.100 2055.936 779.400
1+590.00 2.183 0.000 27.178 0.000 27.178 2083.114 779.400
1+600.00 1.441 0.000 18.120 0.000 18.120 2101.234 779.400
1+610.00 0.057 1.168 7.485 5.838 7.485 2108.719 785.238
1+620.00 0.000 3.811 0.265 24.892 0.265 2108.984 810.130
1+630.00 0.009 2.405 0.043 31.370 0.043 2109.027 841.500
1+640.00 0.188 0.418 0.988 14.112 0.988 2110.015 855.612
1+650.00 1.057 0.030 6.452 2.141 6.452 2116.467 857.753
1+660.00 1.484 0.000 13.382 0.135 13.382 2129.849 857.888
1+670.00 1.400 0.000 14.629 0.000 14.629 2144.478 857.888
1+680.00 1.292 0.000 13.321 0.000 13.321 2157.799 857.888
1+690.00 0.835 0.041 10.308 0.226 10.308 2168.107 858.114
1+700.00 0.605 0.000 7.180 0.209 7.180 2175.287 858.323
1+710.00 0.168 0.045 3.865 0.225 3.865 2179.152 858.548
1+720.00 0.045 0.163 1.064 1.039 1.064 2180.216 859.587
1+730.00 0.336 0.000 1.914 0.821 1.914 2182.130 860.408
1+740.00 0.793 0.000 5.712 0.000 5.712 2187.842 860.408
1+750.00 0.691 0.000 7.479 0.000 7.479 2195.321 860.408
1+760.00 0.658 0.000 6.804 0.000 6.804 2202.125 860.408
1+770.00 1.047 0.000 8.625 0.000 8.625 2210.750 860.408
1+780.00 1.438 0.000 12.611 0.000 12.611 2223.361 860.408
1+790.00 0.741 0.000 10.943 0.000 10.943 2234.304 860.408
1+800.00 0.472 0.142 6.067 0.712 6.067 2240.371 861.120
1+810.00 0.273 0.203 3.728 1.724 3.728 2244.099 862.844
1+820.00 0.169 0.290 2.213 2.462 2.213 2246.312 865.306
1+830.00 0.337 0.088 2.563 1.862 2.563 2248.875 867.168
1+840.00 0.573 0.076 4.583 0.790 4.583 2253.458 867.958
1+850.00 0.264 0.161 4.193 1.161 4.193 2257.651 869.119
1+860.00 0.015 0.393 1.395 2.770 1.395 2259.046 871.889
1+870.00 1.556 0.000 7.855 1.965 7.855 2266.901 873.854
1+880.00 2.571 0.000 20.545 0.000 20.545 2287.446 873.854
1+890.00 1.178 0.000 18.316 0.000 18.316 2305.762 873.854
1+900.00 0.037 0.619 6.051 3.058 6.051 2311.813 876.912
1+910.00 0.102 0.778 0.589 7.447 0.589 2312.402 884.359
1+920.00 0.151 1.272 1.265 10.252 1.265 2313.667 894.611
1+930.00 0.122 0.439 1.361 8.559 1.361 2315.028 903.170
1+940.00 0.528 0.000 3.073 1.949 3.073 2318.101 905.119
1+950.00 0.418 0.000 4.495 0.000 4.495 2322.596 905.119
1+960.00 0.518 0.000 4.680 0.002 4.680 2327.276 905.121
1+970.00 1.252 0.000 8.850 0.002 8.850 2336.126 905.123
1+980.00 1.680 0.000 14.734 0.000 14.734 2350.860 905.123
1+990.00 0.694 0.033 11.884 0.173 11.884 2362.744 905.296
2+000.00 0.095 0.165 3.976 0.864 3.976 2366.720 906.160
2356.080 906.160 2156.381 210.339

EXPLANACIONES - TRAMO CP PORO PORO - CP LA LIBERTAD


UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO
KM 2000.000 3000.000
- CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"
Nº3
PROG. AREA (M2) VOLUMEN (M3) VOLUMEN DE CORTE (M3) VOLUMEN DE RELLENO (M3)
KM MATERIAL ROCA VOLUMEN PROPIO PRESTAMO
CORTE RELLENO CORTE RELLENO
SUELTO SUELTA ACUMULA ACUMULADO CANTERA

2+000.00 0.095 0.164 2366.720 906.160

2+010.00 1.601 0.013 8.539 0.871 8.539 2375.259 907.031


2+020.00 2.866 0.000 22.824 0.060 22.824 2398.083 907.091
2+030.00 1.777 0.000 23.656 0.000 23.656 2421.739 907.091
2+040.00 0.644 0.009 12.105 0.045 12.105 2433.844 907.136
2+050.00 1.490 0.000 10.668 0.040 10.668 2444.512 907.176
2+060.00 2.535 0.000 20.125 0.000 20.125 2464.637 907.176
2+070.00 2.243 0.000 23.891 0.000 23.891 2488.528 907.176
2+080.00 1.953 0.000 20.978 0.000 20.978 2509.506 907.176
2+090.00 1.344 0.000 16.524 0.000 16.524 2526.030 907.176
2+100.00 0.602 0.000 9.795 0.000 9.795 2535.825 907.176
2+110.00 0.000 1.164 3.031 5.788 3.031 2538.856 912.964
2+120.00 0.000 3.075 0.000 21.165 0.000 2538.856 934.129
2+130.00 0.000 1.467 0.000 22.715 0.000 2538.856 956.844
2+140.00 0.195 0.045 1.015 7.524 1.015 2539.871 964.368
2+150.00 0.068 0.240 1.318 1.426 1.318 2541.189 965.794
2+160.00 0.028 0.458 0.483 3.491 0.483 2541.672 969.285
2+170.00 0.108 0.173 0.682 3.156 0.682 2542.354 972.441
2+180.00 0.244 0.104 1.680 1.442 1.680 2544.034 973.883
2+190.00 0.178 0.040 1.946 0.777 1.946 2545.980 974.660
2+200.00 0.116 0.042 1.517 0.399 1.517 2547.497 975.059
2+210.00 0.269 0.078 2.165 0.526 2.165 2549.662 975.585
2+220.00 0.500 0.008 3.845 0.429 3.845 2553.507 976.014
2+230.00 3.854 0.000 24.206 0.047 24.206 2577.713 976.061
2+240.00 0.786 0.000 25.682 0.000 25.682 2603.395 976.061
2+250.00 0.542 0.000 6.686 0.000 6.686 2610.081 976.061
2+260.00 0.153 0.007 3.512 0.036 3.512 2613.593 976.097
2+270.00 0.991 0.000 5.737 0.037 5.737 2619.330 976.134
2+280.00 1.708 0.000 13.698 0.000 13.698 2633.028 976.134
2+290.00 1.320 0.000 15.139 0.000 15.139 2648.167 976.134
2+300.00 1.018 0.000 11.559 0.000 11.559 2659.726 976.134
2+310.00 0.741 0.000 8.728 0.000 8.728 2668.454 976.134
2+320.00 0.213 0.076 4.738 0.396 4.738 2673.192 976.530
2+330.00 0.000 1.465 1.021 7.764 1.021 2674.213 984.294
2+340.00 0.000 2.975 0.000 22.248 0.000 2674.213 1006.542
2+350.00 0.000 2.683 0.000 28.295 0.000 2674.213 1034.837
2+360.00 0.000 2.330 0.000 25.065 0.000 2674.213 1059.902
2+370.00 0.000 1.283 0.000 18.061 0.000 2674.213 1077.963
2+380.00 0.149 0.332 0.814 7.858 0.814 2675.027 1085.821
2+390.00 0.473 0.078 3.346 1.845 3.346 2678.373 1087.666
2+400.00 0.396 0.187 4.693 1.177 4.693 2683.066 1088.843
2+410.00 0.000 0.492 1.957 3.415 1.957 2685.023 1092.258
2+420.00 0.060 0.470 0.254 4.830 0.254 2685.277 1097.088
2+430.00 0.587 0.140 3.238 3.051 3.238 2688.515 1100.139
2+440.00 0.477 0.000 5.897 0.540 5.897 2694.412 1100.679
2+450.00 1.233 0.030 8.411 1.968 8.411 2702.823 1102.647
2+460.00 0.739 0.000 10.008 1.816 10.008 2712.831 1104.463
2+470.00 0.365 0.000 5.500 0.000 5.500 2718.331 1104.463
2+480.00 0.145 0.000 2.619 0.000 2.619 2720.950 1104.463
2+490.00 0.388 0.000 2.663 0.000 2.663 2723.613 1104.463
2+500.00 0.689 0.000 5.360 0.000 5.360 2728.973 1104.463
2+510.00 1.206 0.000 9.487 0.000 9.487 2738.460 1104.463
2+520.00 1.785 0.000 15.006 0.000 15.006 2753.466 1104.463
2+530.00 1.993 0.000 18.985 0.000 18.985 2772.451 1104.463
2+540.00 1.781 0.000 19.048 0.000 19.048 2791.499 1104.463
2+550.00 1.766 0.031 17.932 0.148 17.932 2809.431 1104.611
2+560.00 1.618 0.176 17.142 0.999 17.142 2826.573 1105.610
2+570.00 2.538 0.000 20.776 0.879 20.776 2847.349 1106.489
2+580.00 3.782 0.000 31.531 0.000 31.531 2878.880 1106.489
2+590.00 1.891 0.000 28.387 0.000 28.387 2907.267 1106.489
2+600.00 0.360 0.232 11.350 1.105 11.350 2918.617 1107.594
2+610.00 1.077 0.000 7.270 1.105 7.270 2925.887 1108.699
2+620.00 1.880 0.000 14.818 0.000 14.818 2940.705 1108.699
2+630.00 1.583 0.000 17.317 0.000 17.317 2958.022 1108.699
2+640.00 1.115 0.000 13.492 0.000 13.492 2971.514 1108.699
2+650.00 0.993 0.000 10.473 0.000 10.473 2981.987 1108.699
2+660.00 1.225 0.000 11.093 0.000 11.093 2993.080 1108.699
2+670.00 1.226 0.000 12.379 0.000 12.379 3005.459 1108.699
2+680.00 1.286 0.000 12.720 0.000 12.720 3018.179 1108.699
2+690.00 1.205 0.000 12.547 0.000 12.547 3030.726 1108.699
2+700.00 0.949 0.000 10.772 0.000 10.772 3041.498 1108.699
2+710.00 1.075 0.000 10.118 0.000 10.118 3051.616 1108.699
2+720.00 1.148 0.000 11.152 0.000 11.152 3062.768 1108.699
2+730.00 0.880 0.000 10.204 0.000 10.204 3072.972 1108.699
2+740.00 0.297 0.119 5.900 0.734 5.900 3078.872 1109.433
2+750.00 1.549 0.000 9.078 0.679 9.078 3087.950 1110.112
2+760.00 2.769 0.000 21.635 0.000 21.635 3109.585 1110.112
2+770.00 1.987 0.000 24.068 0.000 24.068 3133.653 1110.112
2+780.00 0.959 0.000 15.072 0.000 15.072 3148.725 1110.112
2+790.00 2.708 0.000 18.396 0.000 18.396 3167.121 1110.112
2+800.00 4.556 0.000 36.319 0.000 36.319 3203.440 1110.112
2+810.00 3.950 0.000 42.470 0.000 42.470 3245.910 1110.112
2+820.00 3.029 0.000 34.896 0.000 34.896 3280.806 1110.112
2+830.00 1.488 0.000 22.572 0.000 22.572 3303.378 1110.112
2+840.00 0.318 0.000 9.056 0.000 9.056 3312.434 1110.112
2+850.00 0.000 0.582 1.620 2.921 1.620 3314.054 1113.033
2+860.00 0.000 1.686 0.000 11.386 0.000 3314.054 1124.419
2+870.00 0.000 1.671 0.000 16.787 0.000 3314.054 1141.206
2+880.00 0.000 2.098 0.000 18.753 0.000 3314.054 1159.959
2+890.00 0.000 1.430 0.000 17.840 0.000 3314.054 1177.799
2+900.00 0.003 0.139 0.016 7.999 0.016 3314.070 1185.798
2+910.00 1.149 0.002 5.699 0.698 5.699 3319.769 1186.496
2+920.00 2.431 0.000 17.897 0.009 17.897 3337.666 1186.505
2+930.00 2.468 0.000 24.347 0.000 24.347 3362.013 1186.505
2+940.00 2.229 0.000 23.538 0.000 23.538 3385.551 1186.505
2+950.00 0.382 0.000 12.792 0.000 12.792 3398.343 1186.505
2+960.00 0.448 0.000 3.915 0.000 3.915 3402.258 1186.505
2+970.00 0.000 0.639 2.213 3.135 2.213 3404.471 1189.640
2+980.00 0.000 1.637 0.000 11.291 0.000 3404.471 1200.931
2+990.00 0.104 0.614 0.467 11.404 0.467 3404.938 1212.335
3+000.00 1.076 0.000 5.900 3.068 5.900 3410.838 1215.403
3400.198 1215.403 3164.572 246.266

EXPLANACIONES - TRAMO CP PORO PORO - CP LA LIBERTAD


UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO
KM 3000.000 4000.000
- CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"
Nº4
PROG. AREA (M2) VOLUMEN (M3) VOLUMEN DE CORTE (M3) VOLUMEN DE RELLENO (M3)
KM MATERIAL ROCA VOLUMEN PROPIO PRESTAMO
CORTE RELLENO CORTE RELLENO
SUELTO SUELTA ACUMULA ACUMULADO CANTERA
3+000.00 1.076 0.000 3410.838 1215.403
3+010.00 2.592 0.000 18.395 0.000 18.395 3429.233 1215.403
3+020.00 3.797 0.000 32.184 0.000 32.184 3461.417 1215.403
3+030.00 4.179 0.000 40.139 0.000 40.139 3501.556 1215.403
3+040.00 3.828 0.000 40.322 0.000 40.322 3541.878 1215.403
3+050.00 2.093 0.000 29.640 0.000 29.640 3571.518 1215.403
3+060.00 0.304 0.064 11.985 0.320 11.985 3583.503 1215.723
3+070.00 0.407 0.091 3.684 0.742 3.684 3587.187 1216.465
3+080.00 0.330 0.210 3.869 1.452 3.869 3591.056 1217.917
3+090.00 0.256 0.022 2.963 1.144 2.963 3594.019 1219.061
3+100.00 0.438 0.000 3.476 0.109 3.476 3597.495 1219.170
3+110.00 0.512 0.017 4.756 0.094 4.756 3602.251 1219.264
3+120.00 0.725 0.000 6.184 0.085 6.184 3608.435 1219.349
3+130.00 1.575 0.000 11.512 0.000 11.512 3619.947 1219.349
3+140.00 2.491 0.000 20.365 0.000 20.365 3640.312 1219.349
3+150.00 3.164 0.000 28.277 0.000 28.277 3668.589 1219.349
3+160.00 3.837 0.000 35.004 0.000 35.004 3703.593 1219.349
3+170.00 4.088 0.000 39.958 0.000 39.958 3743.551 1219.349
3+180.00 3.124 0.000 36.948 0.000 36.948 3780.499 1219.349
3+190.00 1.456 0.000 22.888 0.000 22.888 3803.387 1219.349
3+200.00 0.034 0.182 7.436 0.939 7.436 3810.823 1220.288
3+210.00 0.156 0.143 0.924 1.659 0.924 3811.747 1221.947
3+220.00 0.322 0.085 2.375 1.141 2.375 3814.122 1223.088
3+230.00 0.152 0.341 2.446 2.077 2.446 3816.568 1225.165
3+240.00 0.005 0.917 0.802 6.259 0.802 3817.370 1231.424
3+250.00 0.117 0.303 0.612 6.103 0.612 3817.982 1237.527
3+260.00 0.790 0.000 4.672 1.489 4.672 3822.654 1239.016
3+270.00 0.339 0.109 5.733 0.547 5.733 3828.387 1239.563
3+280.00 0.197 0.459 2.690 2.836 2.690 3831.077 1242.399
3+290.00 0.463 0.005 3.444 2.255 3.444 3834.521 1244.654
3+300.00 1.203 0.005 8.350 0.052 8.350 3842.871 1244.706
3+310.00 1.145 0.000 11.635 0.022 11.635 3854.506 1244.728
3+320.00 0.887 0.005 10.163 0.024 10.163 3864.669 1244.752
3+330.00 0.013 0.344 4.501 1.743 4.501 3869.170 1246.495
3+340.00 0.000 1.505 0.064 9.243 0.064 3869.234 1255.738
3+350.00 0.003 0.861 0.014 11.830 0.014 3869.248 1267.568
3+360.00 0.030 0.290 0.164 5.756 0.164 3869.412 1273.324
3+370.00 0.088 0.167 0.589 2.284 0.589 3870.001 1275.608
3+380.00 0.283 0.067 1.852 1167.000 1.852 3871.853 2442.608
3+390.00 1.128 0.163 7.282 1.109 7.282 3879.135 2443.717
3+400.00 0.664 0.196 9.414 1.695 9.414 3888.549 2445.412
3+410.00 0.679 0.009 6.619 1.025 6.619 3895.168 2446.437
3+420.00 0.949 0.000 8.206 0.450 8.206 3903.374 2446.887
3+430.00 2.435 0.000 17.061 0.000 17.061 3920.435 2446.887
3+440.00 4.090 0.000 32.708 0.000 32.708 3953.143 2446.887
3+450.00 2.333 0.000 32.107 0.000 32.107 3985.250 2446.887
3+460.00 0.656 0.000 14.941 0.000 14.941 4000.191 2446.887
3+470.00 0.301 0.045 4.784 0.225 4.784 4004.975 2447.112
3+480.00 0.152 0.335 2.264 1.901 2.264 4007.239 2449.013
3+490.00 0.134 0.483 1.427 4.092 1.427 4008.666 2453.105
3+500.00 0.214 0.645 1.811 5.600 1.811 4010.477 2458.705
3+510.00 0.324 0.219 2.897 4.236 2.897 4013.374 2462.941
3+520.00 0.328 0.008 3.379 1.107 3.379 4016.753 2464.048
3+530.00 0.000 0.141 1.656 0.747 1.656 4018.409 2464.795
3+540.00 0.000 0.479 0.000 3.052 0.000 4018.409 2467.847
3+550.00 0.125 0.010 0.627 2.447 0.627 4019.036 2470.294
3+560.00 0.607 0.000 3.649 0.051 3.649 4022.685 2470.345
3+570.00 0.196 0.032 3.983 0.161 3.983 4026.668 2470.506
3+580.00 0.082 0.310 1.378 1.717 1.378 4028.046 2472.223
3+590.00 0.229 0.155 1.558 2.322 1.558 4029.604 2474.545
3+600.00 0.530 0.004 3.796 0.796 3.796 4033.400 2475.341
3+610.00 0.332 0.088 4.308 0.463 4.308 4037.708 2475.804
3+620.00 0.025 0.353 1.736 2.269 1.736 4039.444 2478.073
3+630.00 0.018 0.181 0.164 3.161 0.164 4039.608 2481.234
3+640.00 0.404 0.028 2.264 1.095 2.264 4041.872 2482.329
3+650.00 0.189 0.022 2.889 0.255 2.889 4044.761 2482.584
3+660.00 0.274 0.083 2.657 0.504 2.657 4047.418 2483.088
3+670.00 2.383 0.005 15.197 0.421 15.197 4062.615 2483.509
3+680.00 0.276 0.075 14.437 0.338 14.437 4077.052 2483.847
3+690.00 0.918 0.000 5.959 0.360 5.959 4083.011 2484.207
3+700.00 1.674 0.000 12.766 0.000 12.766 4095.777 2484.207
3+710.00 1.213 0.000 14.434 0.000 14.434 4110.211 2484.207
3+720.00 0.793 0.000 9.971 0.000 9.971 4120.182 2484.207
3+730.00 0.990 0.000 8.924 0.000 8.924 4129.106 2484.207
3+740.00 0.677 0.000 8.466 0.000 8.466 4137.572 2484.207
3+750.00 0.000 0.324 3.408 1.621 3.408 4140.980 2485.828
3+760.00 0.000 1.252 0.002 7.881 0.002 4140.982 2493.709
3+770.00 0.000 1.265 0.000 12.531 0.000 4140.982 2506.240
3+780.00 0.000 1.251 0.000 12.432 0.000 4140.982 2518.672
3+790.00 0.000 1.215 0.000 12.582 0.000 4140.982 2531.254
3+800.00 0.000 0.814 0.000 10.443 0.000 4140.982 2541.697
3+810.00 0.000 0.232 0.000 4.836 0.000 4140.982 2546.533
3+820.00 0.224 0.022 1.035 1.177 1.035 4142.017 2547.710
3+830.00 1.250 0.000 7.371 0.108 7.371 4149.388 2547.818
3+840.00 2.230 0.000 17.354 0.000 17.354 4166.742 2547.818
3+850.00 3.772 0.000 30.014 0.000 30.014 4196.756 2547.818
3+860.00 5.414 0.000 45.934 0.000 45.934 4242.690 2547.818
3+870.00 5.232 0.000 53.211 0.000 53.211 4295.901 2547.818
3+880.00 4.929 0.000 50.814 0.000 50.814 4346.715 2547.818
3+890.00 2.714 0.000 38.185 0.000 38.185 4384.900 2547.818
3+900.00 0.910 0.000 18.032 0.000 18.032 4402.932 2547.818
3+910.00 0.772 0.000 8.398 0.000 8.398 4411.330 2547.818
3+920.00 0.434 0.000 6.030 0.000 6.030 4417.360 2547.818
3+930.00 0.325 0.000 3.795 0.000 3.795 4421.155 2547.818
3+940.00 0.290 0.000 3.105 0.000 3.105 4424.260 2547.818
3+950.00 0.097 0.017 2.010 0.084 2.010 4426.270 2547.902
3+960.00 0.008 0.054 0.538 0.350 0.538 4426.808 2548.252
3+970.00 0.323 0.035 1.658 0.445 1.658 4428.466 2548.697
3+980.00 0.392 0.046 3.575 0.409 3.575 4432.041 2549.106
3+990.00 0.410 0.011 4.007 0.288 4.007 4436.048 2549.394
4+000.00 0.479 0.035 4.441 0.231 4.441 4440.489 2549.625
4429.849 2549.625 4143.644 296.845

EXPLANACIONES - TRAMO CP PORO PORO - CP LA LIBERTAD


UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO
KM 4000.00 4366.90
- CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"
Nº5
PROG. AREA (M2) VOLUMEN (M3) VOLUMEN DE CORTE (M3) VOLUMEN DE RELLENO (M3)
KM MATERIAL ROCA VOLUMEN PROPIO PRESTAMO
CORTE RELLENO CORTE RELLENO
SUELTO SUELTA ACUMULA ACUMULADO CANTERA

4+000.00 0.479 0.035 4440.489 2549.625

4+010.00 2.371 1.550 14.565 7.977 14.565 4455.054 2557.602


4+020.00 0.000 3.172 12.328 23.757 12.328 4467.382 2581.359
4+030.00 1.382 2.249 7.190 27.227 7.190 4474.572 2608.586
4+040.00 0.000 1.406 7.190 18.341 7.190 4481.762 2626.927
4+050.00 0.087 0.542 0.440 9.736 0.440 4482.202 2636.663
4+060.00 0.319 0.223 1.987 3.865 1.987 4484.189 2640.528
4+070.00 0.200 0.273 2.493 2.525 2.493 4486.682 2643.053
4+080.00 0.353 0.187 2.641 2.355 2.641 4489.323 2645.408
4+090.00 0.755 0.012 5.424 1.024 5.424 4494.747 2646.432
4+100.00 0.879 0.071 8.238 0.434 8.238 4502.985 2646.866
4+110.00 0.785 0.208 8.405 1.381 8.405 4511.390 2648.247
4+120.00 0.420 0.552 5.836 4.017 5.836 4517.226 2652.264
4+130.00 1.233 0.080 8.228 3.197 8.228 4525.454 2655.461
4+140.00 2.343 0.000 18.022 0.433 18.022 4543.476 2655.894
4+150.00 2.561 0.000 24.779 0.000 24.779 4568.255 2655.894
4+160.00 2.742 0.000 26.512 0.000 26.512 4594.767 2655.894
4+170.00 2.807 0.000 27.743 0.000 27.743 4622.510 2655.894
4+180.00 2.497 0.210 26.519 1.050 26.519 4649.029 2656.944
4+190.00 1.219 0.251 18.163 2.444 18.163 4667.192 2659.388
4+200.00 0.806 0.000 9.293 1.357 9.293 4676.485 2660.745
4+210.00 1.148 0.009 8.998 0.050 8.998 4685.483 2660.795
4+220.00 1.009 0.000 11.027 0.040 11.027 4696.510 2660.835
4+230.00 0.589 0.037 7.880 0.205 7.880 4704.390 2661.040
4+240.00 0.087 0.121 3.509 0.715 3.509 4707.899 2661.755
4+250.00 0.000 0.250 0.454 1.626 0.454 4708.353 2663.381
4+260.00 0.000 1.317 0.001 7.358 0.001 4708.354 2670.739
4+270.00 0.170 0.045 0.834 6.470 0.834 4709.188 2677.209
4+280.00 0.685 0.000 4.273 0.207 4.273 4713.461 2677.416
4+290.00 0.585 0.000 6.348 0.000 6.348 4719.809 2677.416
4+300.00 0.574 0.000 5.792 0.000 5.792 4725.601 2677.416
4+310.00 0.117 0.339 3.454 1.695 3.454 4729.055 2679.111
4+320.00 0.038 1.050 0.775 6.944 0.775 4729.830 2686.055
4+330.00 0.390 0.000 2.137 5.249 2.137 4731.967 2691.304
4+340.00 1.482 0.000 0.357 0.000 0.357 4732.324 2691.304
4+350.00 0.856 0.000 11.690 0.000 11.690 4744.014 2691.304
4+360.00 0.451 0.000 6.537 0.000 6.537 4750.551 2691.304
4+366.90 0.000 0.000 1.550 0.000 1.550 4752.101 2691.304
4741.461 2691.304 4455.256 296.845
02.02 CORTE DE MATERIAL SUELTO CON MAQUINARIA 4455.26 m3
02.03 CORTE DE ROCA SUELTA (PERF. Y DISP.) 296.85 m3
02.04 CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO 2691.30 m3
05.07 TRANSPORTE DE MATERIAL PROPIO PARA RELLENO D<= 1KM 2691.30 M3K
TRANSPORTE A BOTADEROS - TRAMO CP PORO PORO - CP LA LIBERTAD
UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD, DISTRITO DE CATACHE -
KM 0+000.00 1+000.00
PROVINCIA DE SANTA CRUZ - CAJAMARCA"
Nº 1
Participacion Ubicación de Botaderos D.L.P. 100.00 m Distancia Momento D<=1km D>1km
INICIO (km) FIN (km) BOTADERO Participación % Acceso (km) Volumen (m 3)
% (km) (km) (km) (m 3 -km) (m 3 -km) (m 3 -km)

0+000.00 0+000.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.100 0.00 - - -
0+000.00 0+010.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.095 0.32 0.66 0.32 0.35
0+010.00 0+020.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.085 0.00 - - -
0+020.00 0+030.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.075 0.00 - - -
0+030.00 0+040.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.065 0.00 - - -
0+040.00 0+050.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.055 9.86 20.27 9.86 10.41
0+050.00 0+060.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.045 0.00 - - -
0+060.00 0+070.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.035 0.00 - - -
0+070.00 0+080.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.025 17.52 35.48 17.52 17.96
0+080.00 0+090.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.015 2.83 5.70 2.83 2.87
0+090.00 0+100.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 2.005 0.00 - - -
0+100.00 0+110.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.995 0.00 - - -
0+110.00 0+120.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.985 0.00 - - -
0+120.00 0+130.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.975 0.00 - - -
0+130.00 0+140.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.965 0.00 - - -
0+140.00 0+150.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.955 0.00 - - -
0+150.00 0+160.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.945 7.18 13.96 7.18 6.79
0+160.00 0+170.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.935 10.48 20.29 10.48 9.80
0+170.00 0+180.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.925 4.49 8.64 4.49 4.15
0+180.00 0+190.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.915 3.47 6.64 3.47 3.17
0+190.00 0+200.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.905 7.76 14.79 7.76 7.03
0+200.00 0+210.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.895 19.19 36.36 19.19 17.17
0+210.00 0+220.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.885 32.88 61.99 32.88 29.10
0+220.00 0+230.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.875 34.48 64.65 34.48 30.17
0+230.00 0+240.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.865 24.69 46.05 24.69 21.36
0+240.00 0+250.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.855 14.31 26.55 14.31 12.24
0+250.00 0+260.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.845 8.51 15.70 8.51 7.19
0+260.00 0+270.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.835 7.95 14.60 7.95 6.64
0+270.00 0+280.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.825 10.21 18.63 10.21 8.42
0+280.00 0+290.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.815 4.68 8.50 4.68 3.81
0+290.00 0+300.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.805 0.00 - - -
0+300.00 0+310.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.795 0.00 - - -
0+310.00 0+320.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.785 0.98 1.75 0.98 0.77
0+320.00 0+330.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.775 7.08 12.56 7.08 5.48
0+330.00 0+340.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.765 15.52 27.40 15.52 11.88
0+340.00 0+350.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.755 25.70 45.11 25.70 19.40
0+350.00 0+360.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.745 32.35 56.46 32.35 24.10
0+360.00 0+370.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.735 26.65 46.24 26.65 19.59
0+370.00 0+380.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.725 14.38 24.81 14.38 10.43
0+380.00 0+390.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.715 3.32 5.69 3.32 2.37
0+390.00 0+400.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.705 0.00 - - -
0+400.00 0+410.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.695 0.00 - - -
0+410.00 0+420.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.685 0.00 - - -
0+420.00 0+430.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.675 0.00 - - -
0+430.00 0+440.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.665 0.28 0.46 0.28 0.18
0+440.00 0+450.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.655 9.88 16.35 9.88 6.47
0+450.00 0+460.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.645 18.50 30.44 18.50 11.94
0+460.00 0+470.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.635 16.54 27.05 16.54 10.51
0+470.00 0+480.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.625 3.35 5.45 3.35 2.10
0+480.00 0+490.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.615 5.25 8.48 5.25 3.23
0+490.00 0+500.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.605 24.34 39.06 24.34 14.72
0+500.00 0+510.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.595 39.07 62.31 39.07 23.25
0+510.00 0+520.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.585 22.79 36.13 22.79 13.33
0+520.00 0+530.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.575 3.14 4.94 3.14 1.80
0+530.00 0+540.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.565 4.32 6.76 4.32 2.44
0+540.00 0+550.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.555 4.64 7.21 4.64 2.57
0+550.00 0+560.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.545 4.88 7.54 4.88 2.66
0+560.00 0+570.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.535 5.70 8.75 5.70 3.05
0+570.00 0+580.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.525 7.80 11.90 7.80 4.10
0+580.00 0+590.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.515 7.35 11.14 7.35 3.79
0+590.00 0+600.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.505 5.88 8.84 5.88 2.97
0+600.00 0+610.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.495 9.13 13.65 9.13 4.52
0+610.00 0+620.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.485 14.75 21.91 14.75 7.15
0+620.00 0+630.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.475 20.80 30.67 20.80 9.88
0+630.00 0+640.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.465 29.93 43.85 29.93 13.92
0+640.00 0+650.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.455 31.78 46.23 31.78 14.46
0+650.00 0+660.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.445 22.55 32.58 22.55 10.03
0+660.00 0+670.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.435 14.39 20.64 14.39 6.26
0+670.00 0+680.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.425 12.33 17.57 12.33 5.24
0+680.00 0+690.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.415 14.53 20.56 14.53 6.03
0+690.00 0+700.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.405 19.63 27.57 19.63 7.95
0+700.00 0+710.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.395 20.75 28.95 20.75 8.20
0+710.00 0+720.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.385 18.84 26.10 18.84 7.25
0+720.00 0+730.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.375 16.64 22.88 16.64 6.24
0+730.00 0+740.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.365 11.97 16.33 11.97 4.37
0+740.00 0+750.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.355 11.82 16.01 11.82 4.19
0+750.00 0+760.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.345 16.27 21.88 16.27 5.61
0+760.00 0+770.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.335 21.16 28.25 21.16 7.09
0+770.00 0+780.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.325 27.15 35.97 27.15 8.82
0+780.00 0+790.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.315 22.86 30.06 22.86 7.20
0+790.00 0+800.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.305 8.20 10.70 8.20 2.50
0+800.00 0+810.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.295 16.45 21.30 16.45 4.85
0+810.00 0+820.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.285 47.34 60.83 47.34 13.49
0+820.00 0+830.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.275 69.74 88.92 69.74 19.18
0+830.00 0+840.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.265 84.67 107.11 84.67 22.44
0+840.00 0+850.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.255 85.61 107.44 85.61 21.83
0+850.00 0+860.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.245 76.47 95.20 76.47 18.73
0+860.00 0+870.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.235 56.81 70.16 56.81 13.35
0+870.00 0+880.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.225 22.02 26.97 22.02 4.95
0+880.00 0+890.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.215 1.39 1.69 1.39 0.30
0+890.00 0+900.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.205 0.00 - - -
0+900.00 0+910.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.195 0.00 - - -
0+910.00 0+920.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.185 0.00 - - -
0+920.00 0+930.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.175 0.00 - - -
0+930.00 0+940.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.165 0.00 - - -
0+940.00 0+950.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.155 10.56 12.20 10.56 1.64
0+950.00 0+960.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.145 13.88 15.89 13.88 2.01
0+960.00 0+970.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.135 13.90 15.77 13.90 1.88
0+970.00 0+980.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.125 18.22 20.50 18.22 2.28
0+980.00 0+990.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.115 17.74 19.78 17.74 2.04
0+990.00 1+000.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.105 11.05 12.20 11.05 1.16
SUB TOTAL 2,120.61 1,441.83 678.80

TRANSPORTE A BOTADEROS - TRAMO CP PORO PORO - CP LA LIBERTAD


UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD, DISTRITO DE CATACHE -
KM 1+000.00 2+000.00
PROVINCIA DE SANTA CRUZ - CAJAMARCA"
FECHA Nº 2
Participacion Ubicación de Botaderos D.L.P. 100.00 m Distancia Momento D<=1km D>1km
INICIO (km) FIN (km) BOTADERO Participación % Acceso (km) Volumen (m )
3
% (km) (km) (km) (m 3 -km) (m 3 -km) (m 3 -km)
1+000.00 1+010.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.095 1.87 2.05 1.87 0.18
1+010.00 1+020.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.085 3.08 3.34 3.08 0.26
1+020.00 1+030.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.075 2.53 2.72 2.53 0.19
1+030.00 1+040.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.065 2.20 2.34 2.20 0.14
1+040.00 1+050.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.055 1.78 1.87 1.78 0.10
1+050.00 1+060.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.045 1.62 1.69 1.62 0.07
1+060.00 1+070.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.035 1.61 1.67 1.61 0.06
1+070.00 1+080.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.025 1.05 1.07 1.05 0.03
1+080.00 1+090.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.015 0.72 0.73 0.72 0.01
1+090.00 1+100.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 1.005 0.56 0.56 0.56 -
1+100.00 1+110.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.995 0.00 - - -
1+110.00 1+120.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.985 0.00 - - -
1+120.00 1+130.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.975 0.00 - - -
1+130.00 1+140.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.965 2.79 2.69 2.69 -
1+140.00 1+150.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.955 1.07 1.02 1.02 -
1+150.00 1+160.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.945 0.00 - - -
1+160.00 1+170.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.935 0.00 - - -
1+170.00 1+180.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.925 0.00 - - -
1+180.00 1+190.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.915 0.00 - - -
1+190.00 1+200.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.905 2.21 2.00 2.00 -
1+200.00 1+210.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.895 1.37 1.22 1.22 -
1+210.00 1+220.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.885 0.00 - - -
1+220.00 1+230.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.875 0.00 - - -
1+230.00 1+240.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.865 0.00 - - -
1+240.00 1+250.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.855 0.00 - - -
1+250.00 1+260.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.845 0.00 - - -
1+260.00 1+270.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.835 0.00 - - -
1+270.00 1+280.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.825 0.00 - - -
1+280.00 1+290.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.815 0.51 0.41 0.41 -
1+290.00 1+300.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.805 2.93 2.36 2.36 -
1+300.00 1+310.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.795 2.34 1.86 1.86 -
1+310.00 1+320.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.785 1.24 0.98 0.98 -
1+320.00 1+330.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.775 0.60 0.47 0.47 -
1+330.00 1+340.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.765 0.54 0.41 0.41 -
1+340.00 1+350.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.755 0.00 - - -
1+350.00 1+360.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.745 0.00 - - -
1+360.00 1+370.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.735 0.00 - - -
1+370.00 1+380.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.725 0.54 0.39 0.39 -
1+380.00 1+390.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.715 0.61 0.44 0.44 -
1+390.00 1+400.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.705 0.30 0.21 0.21 -
1+400.00 1+410.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.695 1.35 0.94 0.94 -
1+410.00 1+420.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.685 2.65 1.82 1.82 -
1+420.00 1+430.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.675 3.01 2.03 2.03 -
1+430.00 1+440.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.665 3.62 2.41 2.41 -
1+440.00 1+450.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.655 4.43 2.90 2.90 -
1+450.00 1+460.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.645 5.12 3.30 3.30 -
1+460.00 1+470.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.635 4.42 2.80 2.80 -
1+470.00 1+480.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.625 3.66 2.29 2.29 -
1+480.00 1+490.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.615 1.74 1.07 1.07 -
1+490.00 1+500.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.605 0.00 - - -
1+500.00 1+510.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.595 0.00 - - -
1+510.00 1+520.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.585 0.00 - - -
1+520.00 1+530.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.575 0.00 - - -
1+530.00 1+540.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.565 0.00 - - -
1+540.00 1+550.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.555 0.00 - - -
1+550.00 1+560.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.545 1.28 0.70 0.70 -
1+560.00 1+570.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.535 2.96 1.58 1.58 -
1+570.00 1+580.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.525 4.07 2.13 2.13 -
1+580.00 1+590.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.515 2.73 1.41 1.41 -
1+590.00 1+600.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.505 1.80 0.91 0.91 -
1+600.00 1+610.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.495 0.00 - - -
1+610.00 1+620.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.485 0.00 - - -
1+620.00 1+630.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.475 0.00 - - -
1+630.00 1+640.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.465 0.00 - - -
1+640.00 1+650.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.455 0.00 - - -
1+650.00 1+660.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.445 1.69 0.75 0.75 -
1+660.00 1+670.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.435 1.75 0.76 0.76 -
1+670.00 1+680.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.425 1.62 0.69 0.69 -
1+680.00 1+690.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.415 0.77 0.32 0.32 -
1+690.00 1+700.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.405 0.51 0.20 0.20 -
1+700.00 1+710.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.395 0.00 - - -
1+710.00 1+720.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.385 0.00 - - -
1+720.00 1+730.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.375 0.00 - - -
1+730.00 1+740.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.365 0.99 0.36 0.36 -
1+740.00 1+750.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.355 0.86 0.31 0.31 -
1+750.00 1+760.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.345 0.82 0.28 0.28 -
1+760.00 1+770.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.335 1.31 0.44 0.44 -
1+770.00 1+780.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.325 1.80 0.58 0.58 -
1+780.00 1+790.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.315 0.93 0.29 0.29 -
1+790.00 1+800.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.305 0.00 - - -
1+800.00 1+810.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.295 0.00 - - -
1+810.00 1+820.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.285 0.00 - - -
1+820.00 1+830.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.275 0.00 - - -
1+830.00 1+840.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.265 0.00 - - -
1+840.00 1+850.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.255 0.00 - - -
1+850.00 1+860.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.245 0.00 - - -
1+860.00 1+870.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.235 0.00 - - -
1+870.00 1+880.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.225 3.21 0.72 0.72 -
1+880.00 1+890.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.215 1.47 0.32 0.32 -
1+890.00 1+900.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.205 0.00 - - -
1+900.00 1+910.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.195 0.00 - - -
1+910.00 1+920.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.185 0.00 - - -
1+920.00 1+930.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.175 0.00 - - -
1+930.00 1+940.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.165 0.00 - - -
1+940.00 1+950.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.155 0.52 0.08 0.08 -
1+950.00 1+960.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.145 0.65 0.09 0.09 -
1+960.00 1+970.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.135 1.56 0.21 0.21 -
1+970.00 1+980.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.125 2.10 0.26 0.26 -
1+980.00 1+990.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.115 0.66 0.08 0.08 -
1+990.00 2+000.00 B-1 100.00 2+000.00 100.00% 0.20 0.10 0.105 0.00 - - -
SUB TOTAL 65.53 64.51 1.04

TRANSPORTE A BOTADEROS - TRAMO CP PORO PORO - CP LA LIBERTAD


UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD, DISTRITO DE CATACHE -
KM 2+000.00 3+000.00
PROVINCIA DE SANTA CRUZ - CAJAMARCA"
Nº3
Participacion Ubicación de Botaderos D.L.P. 100.00 m Distancia Momento D<=1km D>1km
INICIO (km) FIN (km) BOTADERO Participación % Acceso (km) Volumen (m 3)
% (km) (km) (km) (m 3 -km) (m 3 -km) (m 3 -km)
2+000.00 2+010.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.095 9.63 20.17 9.63 10.54
2+010.00 2+020.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.085 28.46 59.33 28.46 30.88
2+020.00 2+030.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.075 29.57 61.36 29.57 31.79
2+030.00 2+040.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.065 15.08 31.13 15.08 16.06
2+040.00 2+050.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.055 13.29 27.30 13.29 14.02
2+050.00 2+060.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.045 25.16 51.44 25.16 26.29
2+060.00 2+070.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.035 29.86 60.77 29.86 30.91
2+070.00 2+080.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.025 26.22 53.10 26.22 26.88
2+080.00 2+090.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.015 20.66 41.62 20.66 20.96
2+090.00 2+100.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 2.005 12.24 24.55 12.24 12.30
2+100.00 2+110.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.995 0.00 - - -
2+110.00 2+120.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.985 0.00 - - -
2+120.00 2+130.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.975 0.00 - - -
2+130.00 2+140.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.965 0.00 - - -
2+140.00 2+150.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.955 0.00 - - -
2+150.00 2+160.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.945 0.00 - - -
2+160.00 2+170.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.935 0.00 - - -
2+170.00 2+180.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.925 0.37 0.71 0.37 0.34
2+180.00 2+190.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.915 1.50 2.87 1.50 1.37
2+190.00 2+200.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.905 1.42 2.70 1.42 1.28
2+200.00 2+210.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.895 2.08 3.93 2.08 1.86
2+210.00 2+220.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.885 4.29 8.09 4.29 3.80
2+220.00 2+230.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.875 30.20 56.63 30.20 26.43
2+230.00 2+240.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.865 32.10 59.87 32.10 27.77
2+240.00 2+250.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.855 8.36 15.50 8.36 7.15
2+250.00 2+260.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.845 4.35 8.02 4.35 3.67
2+260.00 2+270.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.835 7.13 13.08 7.13 5.95
2+270.00 2+280.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.825 17.12 31.25 17.12 14.13
2+280.00 2+290.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.815 18.92 34.35 18.92 15.42
2+290.00 2+300.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.805 14.45 26.08 14.45 11.63
2+300.00 2+310.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.795 10.91 19.58 10.91 8.67
2+310.00 2+320.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.785 5.45 9.72 5.45 4.28
2+320.00 2+330.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.775 0.00 - - -
2+330.00 2+340.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.765 0.00 - - -
2+340.00 2+350.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.755 0.00 - - -
2+350.00 2+360.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.745 0.00 - - -
2+360.00 2+370.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.735 0.00 - - -
2+370.00 2+380.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.725 0.00 - - -
2+380.00 2+390.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.715 1.97 3.38 1.97 1.41
2+390.00 2+400.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.705 4.45 7.59 4.45 3.14
2+400.00 2+410.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.695 0.00 - - -
2+410.00 2+420.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.685 0.00 - - -
2+420.00 2+430.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.675 0.39 0.65 0.39 0.26
2+430.00 2+440.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.665 6.72 11.19 6.72 4.47
2+440.00 2+450.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.655 8.15 13.49 8.15 5.34
2+450.00 2+460.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.645 10.33 16.99 10.33 6.66
2+460.00 2+470.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.635 6.88 11.24 6.88 4.37
2+470.00 2+480.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.625 3.27 5.32 3.27 2.05
2+480.00 2+490.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.615 3.33 5.38 3.33 2.05
2+490.00 2+500.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.605 6.70 10.75 6.70 4.05
2+500.00 2+510.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.595 11.86 18.91 11.86 7.06
2+510.00 2+520.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.585 18.76 29.73 18.76 10.97
2+520.00 2+530.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.575 23.73 37.38 23.73 13.65
2+530.00 2+540.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.565 23.81 37.26 23.81 13.45
2+540.00 2+550.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.555 22.24 34.58 22.24 12.34
2+550.00 2+560.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.545 20.23 31.25 20.23 11.02
2+560.00 2+570.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.535 24.92 38.24 24.92 13.33
2+570.00 2+580.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.525 39.41 60.11 39.41 20.69
2+580.00 2+590.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.515 35.48 53.76 35.48 18.27
2+590.00 2+600.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.505 12.86 19.36 12.86 6.50
2+600.00 2+610.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.495 7.76 11.60 7.76 3.84
2+610.00 2+620.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.485 18.52 27.51 18.52 8.98
2+620.00 2+630.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.475 21.65 31.93 21.65 10.28
2+630.00 2+640.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.465 16.87 24.71 16.87 7.84
2+640.00 2+650.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.455 13.09 19.05 13.09 5.96
2+650.00 2+660.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.445 13.87 20.04 13.87 6.17
2+660.00 2+670.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.435 15.47 22.20 15.47 6.73
2+670.00 2+680.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.425 15.90 22.66 15.90 6.76
2+680.00 2+690.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.415 15.68 22.19 15.68 6.51
2+690.00 2+700.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.405 13.47 18.92 13.47 5.45
2+700.00 2+710.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.395 12.65 17.64 12.65 5.00
2+710.00 2+720.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.385 13.94 19.31 13.94 5.37
2+720.00 2+730.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.375 12.76 17.54 12.76 4.78
2+730.00 2+740.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.365 6.49 8.86 6.49 2.37
2+740.00 2+750.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.355 10.53 14.27 10.53 3.74
2+750.00 2+760.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.345 27.04 36.37 27.04 9.33
2+760.00 2+770.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.335 30.09 40.16 30.09 10.08
2+770.00 2+780.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.325 18.84 24.96 18.84 6.12
2+780.00 2+790.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.315 23.00 30.24 23.00 7.24
2+790.00 2+800.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.305 45.40 59.25 45.40 13.85
2+800.00 2+810.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.295 53.09 68.75 53.09 15.66
2+810.00 2+820.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.285 43.62 56.05 43.62 12.43
2+820.00 2+830.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.275 28.22 35.97 28.22 7.76
2+830.00 2+840.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.265 11.32 14.32 11.32 3.00
2+840.00 2+850.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.255 0.00 - - -
2+850.00 2+860.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.245 0.00 - - -
2+860.00 2+870.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.235 0.00 - - -
2+870.00 2+880.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.225 0.00 - - -
2+880.00 2+890.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.215 0.00 - - -
2+890.00 2+900.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.205 0.00 - - -
2+900.00 2+910.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.195 6.29 7.51 6.29 1.23
2+910.00 2+920.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.185 22.36 26.50 22.36 4.14
2+920.00 2+930.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.175 30.43 35.76 30.43 5.33
2+930.00 2+940.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.165 29.42 34.28 29.42 4.85
2+940.00 2+950.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.155 15.99 18.47 15.99 2.48
2+950.00 2+960.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.145 4.89 5.60 4.89 0.71
2+960.00 2+970.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.135 0.00 - - -
2+970.00 2+980.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.125 0.00 - - -
2+980.00 2+990.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.115 0.00 - - -
2+990.00 3+000.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.105 3.69 4.08 3.69 0.39
SUB TOTAL 1,966.41 1,256.65 709.84

TRANSPORTE A BOTADEROS - TRAMO CP PORO PORO - CP LA LIBERTAD


UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD, DISTRITO DE CATACHE -
KM 3+000.00 4+000.00
PROVINCIA DE SANTA CRUZ - CAJAMARCA"
Nº4
Participacion Ubicación de Botaderos D.L.P. 100.00 m Distancia Momento D<=1km D>1km
INICIO (km) FIN (km) BOTADERO Participación % Acceso (km) Volumen (m 3)
% (km) (km) (km) (m 3 -km) (m 3 -km) (m 3 -km)
3+000.00 3+010.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.095 22.99 25.18 22.99 2.18
3+010.00 3+020.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.085 40.23 43.65 40.23 3.42
3+020.00 3+030.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.075 50.17 53.94 50.17 3.76
3+030.00 3+040.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.065 50.40 53.68 50.40 3.28
3+040.00 3+050.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.055 37.05 39.09 37.05 2.04
3+050.00 3+060.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.045 14.60 15.25 14.60 0.66
3+060.00 3+070.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.035 3.71 3.84 3.71 0.13
3+070.00 3+080.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.025 3.09 3.17 3.09 0.08
3+080.00 3+090.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.015 2.33 2.37 2.33 0.03
3+090.00 3+100.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 1.005 4.21 4.24 4.21 0.02
3+100.00 3+110.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.995 5.83 5.80 5.80 -
3+110.00 3+120.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.985 7.63 7.51 7.51 -
3+120.00 3+130.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.975 14.39 14.03 14.03 -
3+130.00 3+140.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.965 25.46 24.57 24.57 -
3+140.00 3+150.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.955 35.35 33.76 33.76 -
3+150.00 3+160.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.945 43.76 41.35 41.35 -
3+160.00 3+170.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.935 49.95 46.70 46.70 -
3+170.00 3+180.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.925 46.19 42.72 42.72 -
3+180.00 3+190.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.915 28.61 26.18 26.18 -
3+190.00 3+200.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.905 8.17 7.39 7.39 -
3+200.00 3+210.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.895 0.00 - - -
3+210.00 3+220.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.885 1.60 1.42 1.42 -
3+220.00 3+230.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.875 0.57 0.49 0.49 -
3+230.00 3+240.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.865 0.00 - - -
3+240.00 3+250.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.855 0.00 - - -
3+250.00 3+260.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.845 4.05 3.42 3.42 -
3+260.00 3+270.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.835 6.51 5.44 5.44 -
3+270.00 3+280.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.825 0.00 - - -
3+280.00 3+290.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.815 1.60 1.30 1.30 -
3+290.00 3+300.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.805 10.38 8.35 8.35 -
3+300.00 3+310.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.795 14.52 11.54 11.54 -
3+310.00 3+320.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.785 12.67 9.95 9.95 -
3+320.00 3+330.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.775 3.53 2.74 2.74 -
3+330.00 3+340.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.765 0.00 - - -
3+340.00 3+350.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.755 0.00 - - -
3+350.00 3+360.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.745 0.00 - - -
3+360.00 3+370.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.735 0.00 - - -
3+370.00 3+380.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.725 0.00 - - -
3+380.00 3+390.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.715 7.77 5.56 5.56 -
3+390.00 3+400.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.705 9.73 6.86 6.86 -
3+400.00 3+410.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.695 7.04 4.90 4.90 -
3+410.00 3+420.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.685 9.72 6.66 6.66 -
3+420.00 3+430.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.675 21.33 14.40 14.40 -
3+430.00 3+440.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.665 40.89 27.19 27.19 -
3+440.00 3+450.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.655 40.13 26.29 26.29 -
3+450.00 3+460.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.645 18.68 12.05 12.05 -
3+460.00 3+470.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.635 5.71 3.63 3.63 -
3+470.00 3+480.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.625 0.55 0.34 0.34 -
3+480.00 3+490.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.615 0.00 - - -
3+490.00 3+500.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.605 0.00 - - -
3+500.00 3+510.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.595 0.00 - - -
3+510.00 3+520.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.585 2.90 1.69 1.69 -
3+520.00 3+530.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.575 1.17 0.67 0.67 -
3+530.00 3+540.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.565 0.00 - - -
3+540.00 3+550.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.555 0.00 - - -
3+550.00 3+560.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.545 4.50 2.45 2.45 -
3+560.00 3+570.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.535 4.79 2.56 2.56 -
3+570.00 3+580.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.525 0.00 - - -
3+580.00 3+590.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.515 0.00 - - -
3+590.00 3+600.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.505 3.79 1.91 1.91 -
3+600.00 3+610.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.495 4.83 2.39 2.39 -
3+610.00 3+620.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.485 0.00 - - -
3+620.00 3+630.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.475 0.00 - - -
3+630.00 3+640.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.465 1.52 0.70 0.70 -
3+640.00 3+650.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.455 3.31 1.50 1.50 -
3+650.00 3+660.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.445 2.72 1.21 1.21 -
3+660.00 3+670.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.435 18.49 8.04 8.04 -
3+670.00 3+680.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.425 17.64 7.50 7.50 -
3+680.00 3+690.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.415 7.02 2.91 2.91 -
3+690.00 3+700.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.405 15.96 6.46 6.46 -
3+700.00 3+710.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.395 18.04 7.13 7.13 -
3+710.00 3+720.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.385 12.46 4.80 4.80 -
3+720.00 3+730.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.375 11.16 4.18 4.18 -
3+730.00 3+740.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.365 10.58 3.86 3.86 -
3+740.00 3+750.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.355 2.31 0.82 0.82 -
3+750.00 3+760.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.345 0.00 - - -
3+760.00 3+770.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.335 0.00 - - -
3+770.00 3+780.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.325 0.00 - - -
3+780.00 3+790.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.315 0.00 - - -
3+790.00 3+800.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.305 0.00 - - -
3+800.00 3+810.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.295 0.00 - - -
3+810.00 3+820.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.285 0.00 - - -
3+820.00 3+830.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.275 9.08 2.50 2.50 -
3+830.00 3+840.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.265 21.69 5.75 5.75 -
3+840.00 3+850.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.255 37.52 9.57 9.57 -
3+850.00 3+860.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.245 57.42 14.07 14.07 -
3+860.00 3+870.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.235 66.51 15.63 15.63 -
3+870.00 3+880.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.225 63.52 14.29 14.29 -
3+880.00 3+890.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.215 47.73 10.26 10.26 -
3+890.00 3+900.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.205 22.54 4.62 4.62 -
3+900.00 3+910.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.195 10.50 2.05 2.05 -
3+910.00 3+920.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.185 7.54 1.39 1.39 -
3+920.00 3+930.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.175 4.74 0.83 0.83 -
3+930.00 3+940.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.165 3.88 0.64 0.64 -
3+940.00 3+950.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.155 2.41 0.37 0.37 -
3+950.00 3+960.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.145 0.25 0.04 0.04 -
3+960.00 3+970.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.135 1.54 0.21 0.21 -
3+970.00 3+980.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.125 3.98 0.50 0.50 -
3+980.00 3+990.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.115 4.66 0.54 0.54 -
3+990.00 4+000.00 B-2 100.00 4+000.00 100.00% 0.20 0.10 0.105 5.27 0.55 0.55 -
SUB TOTAL 791.54 775.91 15.60

TRANSPORTE A BOTADEROS - TRAMO CP PORO PORO - CP LA LIBERTAD


UNIDAD : M3
PROYECTO: "MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD, DISTRITO DE CATACHE -
KM 4+000.00 4+366.90
PROVINCIA DE SANTA CRUZ - CAJAMARCA"
Nº5
Participacion Ubicación de Botaderos D.L.P. 100.00 m Distancia Momento D<=1km D>1km
INICIO (km) FIN (km) BOTADERO Participación % Acceso (km) Volumen (m 3)
% (km) (km) (km) (m 3 -km) (m 3 -km) (m 3 -km)
4+000.00 4+010.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.095 8.63 0.82 0.82 -
4+010.00 4+020.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.085 0.00 - - -
4+020.00 4+030.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.075 0.00 - - -
4+030.00 4+040.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.065 0.00 - - -
4+040.00 4+050.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.055 0.00 - - -
4+050.00 4+060.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.045 0.00 - - -
4+060.00 4+070.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.035 0.00 - - -
4+070.00 4+080.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.025 0.48 0.01 0.01 -
4+080.00 4+090.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.015 5.55 0.08 0.08 -
4+090.00 4+100.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.005 9.78 0.05 0.05 -
4+100.00 4+110.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.005 8.85 0.04 0.04 -
4+110.00 4+120.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.015 2.47 0.04 0.04 -
4+120.00 4+130.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.025 6.45 0.16 0.16 -
4+130.00 4+140.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.035 22.01 0.77 0.77 -
4+140.00 4+150.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.045 30.97 1.39 1.39 -
4+150.00 4+160.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.055 33.14 1.82 1.82 -
4+160.00 4+170.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.065 34.68 2.25 2.25 -
4+170.00 4+180.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.075 31.89 2.39 2.39 -
4+180.00 4+190.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.085 19.77 1.68 1.68 -
4+190.00 4+200.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.095 9.99 0.95 0.95 -
4+200.00 4+210.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.105 11.19 1.17 1.17 -
4+210.00 4+220.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.115 13.74 1.58 1.58 -
4+220.00 4+230.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.125 9.60 1.20 1.20 -
4+230.00 4+240.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.135 3.53 0.48 0.48 -
4+240.00 4+250.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.145 0.00 - - -
4+250.00 4+260.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.155 0.00 - - -
4+260.00 4+270.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.165 0.00 - - -
4+270.00 4+280.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.175 5.09 0.89 0.89 -
4+280.00 4+290.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.185 7.94 1.47 1.47 -
4+290.00 4+300.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.195 7.24 1.41 1.41 -
4+300.00 4+310.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.205 2.28 0.47 0.47 -
4+310.00 4+320.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.215 0.00 - - -
4+320.00 4+330.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.225 0.00 - - -
4+330.00 4+340.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.235 0.45 0.10 0.10 -
4+340.00 4+350.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.245 14.61 3.58 3.58 -
4+350.00 4+360.00 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.255 8.17 2.08 2.08 -
4+360.00 4+366.90 B-3 100.00 4+000.00 100.00% 0.20 0.10 0.263 1.94 0.51 0.51 -
SUB TOTAL 27.39 27.39 0.00
05.01 TRANSPORTE DE MATERIAL DE ELIMINACION HASTA 1 KM 3,566.29 m 3-km
05.02 TRANPORTE DE MATERIAL DE ELIMINACION > 1 KM 1,405.28 m 3-km
MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DE LA
PROYECTO: CARRETERA CRUCE SAUCEPAMPA - CRUCE LA CONGA - DISTRITO DE
YAUYUCAN - CAJAMARCA
METRADO DE SOBREANCHO Nº 1
UNIDAD : M2 KM 10+370.00 11+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-1 13.8 37.6 0.6 22.56
C-2 30 8.04 0.6 4.82
C-3 20 15.14 0.6 9.08
C-4 38 34.55 0.6 20.73
C-5 11 17.67 0.6 10.60
C-6 10 16.64 0.6 9.98
C-7 10 14.78 0.6 8.87
C-8 24 34.36 0.6 20.62
C-9 30 36.08 0.6 21.65
C-10 90 41.09 0.5 20.55
C-11 15 20.97 0.6 12.58 162.04

METRADO DE SOBREANCHO Nº 2
UNIDAD : M2 KM 11+000.00 12+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-12 22 15.53 0.6 9.32
C-13 80 17.56 0.5 8.78
C-14 78 86.72 0.5 43.36
C-15 30 26.76 0.6 16.06
C-16 50 15.44 0.5 7.72
C-17 15 12.68 0.6 7.61
C-18 20 14 0.6 8.40
C-19 50 10.75 0.5 5.38
C-20 50 22.52 0.5 11.26
C-21 150 21.4 0.4 8.56
C-22 15 12.01 0.6 7.21
C-23 25 20.81 0.6 12.49
C-24 40 21.96 0.6 13.18
C-25 50 35.74 0.5 17.87 177.18

METRADO DE SOBREANCHO Nº 3
UNIDAD : M2 KM 12+000.00 13+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-26 50 24.92 0.5 12.46
C-27 300 27.77 0.4 11.11
C-28 14 22.02 0.6 13.21
C-29 15 17.77 0.6 10.66
C-30 10 3.12 0.6 1.87
C-31 66 84.37 0.5 42.19
C-32 21 39.71 0.6 23.83
C-33 50 26.4 0.5 13.20
C-34 35 31.78 0.6 19.07
C-35 30 53.65 0.6 32.19
C-36 20 21.06 0.6 12.64
C-37 70 26.89 0.5 13.45
C-38 110 64.33 0.4 25.73 231.60

METRADO DE SOBREANCHO Nº 4
UNIDAD : M2 KM 13+000.00 14+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-39 30 21.95 0.6 13.17
C-40 50 15.41 0.5 7.71
C-41 20 14.93 0.6 8.96
C-42 10 25.76 0.6 15.46
C-43 30 11.17 0.6 6.70
C-44 55 30.22 0.5 15.11
C-45 16 26.53 0.6 15.92
C-46 40 32.72 0.6 19.63
C-47 20 17.13 0.6 10.28
C-48 10 26.42 0.6 15.85
C-49 30 16.4 0.6 9.84
C-50 13 14.77 0.6 8.86
C-51 30 13.75 0.6 8.25
C-52 60 15.36 0.5 7.68
C-53 55 26.65 0.5 13.33
C-54 50 21.9 0.5 10.95
C-55 25 25 0.6 15.00
C-56 50 19.97 0.5 9.99
C-57 16 27.86 0.6 16.72 229.39
METRADO DE SOBREANCHO Nº 5
UNIDAD : M2 KM 14+000.00 15+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-58 50 10.32 0.5 5.16
C-59 100 18.05 0.4 7.22
C-60 80 43.75 0.5 21.88
C-61 25 37.85 0.6 22.71
C-62 55 19.82 0.6 11.89
C-63 55 23.66 0.5 11.83
C-64 28 56.41 0.6 33.85
C-65 35 50.44 0.6 30.26
C-66 60 18.51 0.5 9.26
C-67 50 25.08 0.5 12.54
C-68 30 23.35 0.6 14.01
C-69 12 13.89 0.6 8.33
C-70 10 16.68 0.6 10.01
C-71 40 24.34 0.6 14.60
C-72 50 32.57 0.5 16.29
C-73 30 16.39 0.6 9.83
C-74 40 24.15 0.6 14.49
C-75 40 12.73 0.6 7.64
C-76 30 14.47 0.6 8.68
C-77 30 20.3 0.6 12.18 282.66

METRADO DE SOBREANCHO Nº 6
UNIDAD : M2 KM 15+000.00 16+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-78 20 23.23 0.6 13.94
C-79 20 7.96 0.6 4.78
C-80 15 24.13 0.6 14.48
C-81 50 10.05 0.5 5.03
C-82 50 8.88 0.5 4.44
C-83 50 10.57 0.5 5.29
C-84 200 14.21 0.4 5.68
C-85 16 36.23 0.6 21.74
C-86 40 13.07 0.6 7.84
C-87 30 25.92 0.6 15.55
C-88 50 16.25 0.5 8.13
C-89 50 19.32 0.5 9.66
C-90 100 15.55 0.4 6.22
C-91 60 42.54 0.5 21.27
C-92 35 33.88 0.6 20.33
C-93 30 13.1 0.6 7.86
C-94 30 10.53 0.6 6.32
C-95 50 15.84 0.5 7.92
C-96 12 19.69 0.6 11.81
C-97 12 21.09 0.6 12.65
C-98 50 21.36 0.5 10.68
C-99 30 16.62 0.6 9.97
C-100 38 31.55 0.6 18.93
C-101 13 18.33 0.6 11.00
C-102 22 21.59 0.6 12.95 274.46

METRADO DE SOBREANCHO Nº 7
UNIDAD : M2 KM 16+000.00 17+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-103 16 10.73 0.6 6.44
C-104 15 19.89 0.6 11.93
C-105 20 11.32 0.6 6.79
C-106 13 22.55 0.6 13.53
C-107 28 30.39 0.6 18.23
C-108 18 18.71 0.6 11.23
C-109 20 6.43 0.6 3.86
C-110 14 16.83 0.6 10.10
C-111 10 16.12 0.6 9.67
C-112 36 32.32 0.6 19.39
C-113 30 18.73 0.6 11.24
C-114 15 10.26 0.6 6.16
C-115 20 9.25 0.6 5.55
C-116 25 18.59 0.6 11.15
C-117 13 16.18 0.6 9.71
C-118 70 35.18 0.6 21.11
C-119 80 29.88 0.5 14.94
C-120 40 35.23 0.6 21.14
C-121 16 17.7 0.6 10.62
C-122 20 11.49 0.6 6.89 229.68
METRADO DE SOBREANCHO Nº 8
UNIDAD : M2 KM 17+000.00 18+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-123 30 13.75 0.6 8.25
C-124 20 11.26 0.6 6.76
C-125 10 20.67 0.6 12.40
C-126 30 14.97 0.6 8.98
C-127 35 15.06 0.6 9.04
C-128 35 17.71 0.6 10.63
C-129 60 5.41 0.6 3.25
C-130 30 17.67 0.6 10.60
C-131 60 89.74 0.5 44.87
C-132 20 29.01 0.6 17.41
C-133 140 59.28 0.4 23.71
C-134 22 31.92 0.6 19.15
C-135 60 52.01 0.5 26.01
C-136 25 19.81 0.6 11.89 212.93

METRADO DE SOBREANCHO Nº 9
UNIDAD : M2 KM 18+000.00 19+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-137 30 18.07 0.6 10.84
C-138 50 23.29 0.5 11.65
C-139 10 12.89 0.6 7.73
C-140 18 28.02 0.6 16.81
C-141 50 19.61 0.5 9.81
C-142 30 18.34 0.6 11.00
C-143 22 24.7 0.6 14.82
C-144 18 18.19 0.6 10.91
C-145 50 16.33 0.5 8.17
C-146 40 13.08 0.6 7.85
C-147 80 63.34 0.5 31.67
C-148 14 22.11 0.6 13.27
C-149 17 31.25 0.6 18.75
C-150 30 12.94 0.6 7.76
C-151 30 9.94 0.6 5.96
C-152 31 52.39 0.6 31.43
C-153 20 26.3 0.6 15.78
C-154 15 12.59 0.6 7.55
C-155 25 31.25 0.6 18.75 260.52

METRADO DE SOBREANCHO Nº 10
UNIDAD : M2 KM 19+000.00 20+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-156 18 10.68 0.6 6.41
C-157 18 16.96 0.6 10.18
C-158 20 11.62 0.6 6.97
C-159 25 13.81 0.6 8.29
C-160 50 47.61 0.5 23.81
C-161 30 23.29 0.6 13.97
C-162 20 7.69 0.6 4.61
C-163 30 18.49 0.6 11.09
C-164 20 10.59 0.6 6.35
C-165 12 23.54 0.6 14.12
C-166 50 18.04 0.5 9.02
C-167 50 20.38 0.5 10.19
C-168 40 22 0.6 13.20
C-169 30 22.27 0.6 13.36
C-170 30 12.03 0.6 7.22
C-171 25 33.87 0.6 20.32
C-172 20 8.76 0.6 5.26
C-173 20 13.98 0.6 8.39
C-174 30 16.2 0.6 9.72
C-175 30 10.41 0.6 6.25
C-176 30 11.61 0.6 6.97
C-177 100 9.56 0.4 3.82
C-178 100 10.66 0.4 4.26 223.78
METRADO DE SOBREANCHO Nº 11
UNIDAD : M2 KM 20+000.00 21+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-179 60 22.55 0.5 11.28
C-180 80 3.91 0.5 1.96
C-181 50 21.28 0.5 10.64
C-182 12 14.02 0.6 8.41
C-183 15 24.61 0.6 14.77
C-184 100 12.52 0.4 5.01
C-185 40 15.82 0.6 9.49
C-186 70 45.76 0.5 22.88
C-187 20 18.52 0.6 11.11
C-188 20 8.39 0.6 5.03
C-189 35 46.07 0.6 27.64
C-190 30 14.1 0.6 8.46
C-191 20 14.21 0.6 8.53
C-192 24 39.95 0.6 23.97
C-193 22 21.88 0.6 13.13
C-194 20 18.02 0.6 10.81
C-195 30 36.81 0.6 22.09 215.20

METRADO DE SOBREANCHO Nº 12
UNIDAD : M2 KM 21+000.00 22+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-196 30 10.39 0.6 6.23
C-197 30 11.57 0.6 6.94
C-198 30 6.41 0.6 3.85
C-199 50 38.4 0.5 19.20
C-200 50 23.39 0.5 11.70
C-201 20 22.54 0.6 13.52
C-202 30 9.21 0.6 5.53
C-203 50 32.84 0.5 16.42
C-204 200 24.22 0.4 9.69
C-205 70 32.62 0.5 16.31
C-206 20 9.83 0.6 5.90
C-207 10 15.34 0.6 9.20
C-208 10 6.82 0.6 4.09
C-209 20 8.13 0.6 4.88
C-210 20 9.93 0.6 5.96
C-211 30 12.53 0.6 7.52
C-212 60 54.49 0.5 27.25
C-213 100 11.8 0.4 4.72
C-214 70 83.64 0.5 41.82 220.72

METRADO DE SOBREANCHO Nº 13
UNIDAD : M2 KM 22+000.00 23+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-215 18.6 53.59 0.6 32.15
C-216 30 40.84 0.6 24.50
C-217 100 19.38 0.4 7.75
C-218 100 8.76 0.4 3.50
C-219 50 20.59 0.5 10.30
C-220 50 15.54 0.6 9.32
C-221 10 15.98 0.6 9.59
C-222 10 14.96 0.6 8.98
C-223 32 37.55 0.6 22.53
C-224 30 16.33 0.6 9.80
C-225 50 17.32 0.5 8.66
C-226 50 46.05 0.5 23.03
C-227 100 13.32 0.4 5.33
C-228 100 10.68 0.4 4.27
C-229 130 53.2 0.4 21.28
C-230 15 8.24 0.6 4.94
C-231 15 9.91 0.6 5.95
C-232 20 13.85 0.6 8.31 220.19
METRADO DE SOBREANCHO Nº 14
UNIDAD : M2 KM 23+000.00 24+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-233 100 42.82 0.4 17.13
C-234 25 17.06 0.6 10.24
C-235 30 6.43 0.6 3.86
C-236 18 24.71 0.6 14.83
C-237 20 15.25 0.6 9.15
C-238 36 68.03 0.6 40.82
C-239 25 24.66 0.6 14.80
C-240 10 6.36 0.6 3.82
C-241 14 18.78 0.6 11.27
C-242 18 16.67 0.6 10.00
C-243 26 16.74 0.6 10.04
C-244 60 54.04 0.5 27.02
C-245 40 17.67 0.6 10.60
C-246 11 18.87 0.6 11.32
C-247 20 15.29 0.6 9.17
C-248 40 23.61 0.6 14.17
C-249 17 20.93 0.6 12.56
C-250 20 12.26 0.6 7.36
C-251 30 28.67 0.6 17.20 255.34

METRADO DE SOBREANCHO Nº 15
UNIDAD : M2 KM 24+000.00 25+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-252 40 25.4 0.6 15.24
C-253 10 8.3 0.6 4.98
C-254 10 8.48 0.6 5.09
C-255 20 9.19 0.6 5.51
C-256 50 11.12 0.5 5.56
C-257 15 26.16 0.6 15.70
C-258 30 10.96 0.6 6.58
C-259 60 34.8 0.5 17.40
C-260 14 21.73 0.6 13.04
C-261 24 34.74 0.6 20.84
C-262 70 51.09 0.5 25.55
C-263 60 56.7 0.5 28.35
C-264 32 33.12 0.6 19.87
C-265 150 32.68 0.4 13.07
C-266 30 12.59 0.6 7.55
C-267 300 16.02 0.4 6.41
C-268 60 23.24 0.5 11.62
C-269 11 21.71 0.6 13.03 235.38

METRADO DE SOBREANCHO Nº 16
UNIDAD : M2 KM 25+000.00 26+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-270 30 41.29 0.6 24.77
C-271 15 31.89 0.6 19.13
C-272 18 35.21 0.6 21.13
C-273 100 19.64 0.4 7.86
C-274 10 13.36 0.6 8.02
C-275 30 6.56 0.6 3.94
C-276 26 26.4 0.6 15.84
C-277 40 20.25 0.6 12.15
C-278 30 22.1 0.6 13.26
C-279 20 12.13 0.6 7.28
C-280 100 15.02 0.4 6.01
C-281 10 15.84 0.6 9.50
C-282 22 26.81 0.6 16.09
C-283 26 62.23 0.6 37.34
C-284 16 34.74 0.6 20.84
C-285 100 46.86 0.4 18.74 241.89
METRADO DE SOBREANCHO Nº 17
UNIDAD : M2 KM 26+000.00 27+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-286 60 52.56 0.5 26.28
C-287 22 38.03 0.6 22.82
C-288 50 29.35 0.5 14.68
C-289 50 39.98 0.5 19.99
C-290 20 21.67 0.6 13.00
C-291 50 30.7 0.5 15.35
C-292 80 18.97 0.5 9.49
C-293 25 13.29 0.6 7.97
C-294 10 10.84 0.6 6.50
C-295 30 15.8 0.6 9.48
C-296 120 36.99 0.4 14.80
C-297 50 21.29 0.5 10.65
C-298 40 16.41 0.6 9.85
C-299 16.5 40.69 0.6 24.41
C-300 60 10.63 0.5 5.32
C-301 60 14.99 0.5 7.50 218.07

METRADO DE SOBREANCHO Nº 18
UNIDAD : M2 KM 27+000.00 28+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-302 15 8.44 0.6 5.06
C-303 80 48.2 0.5 24.10
C-304 30 17.77 0.6 10.66
C-305 200 10.46 0.4 4.18
C-306 12 16.57 0.6 9.94
C-307 10 12.43 0.6 7.46
C-308 50 24.86 0.5 12.43
C-309 80 14.45 0.5 7.23
C-310 35 25.77 0.6 15.46
C-311 22 18.34 0.6 11.00
C-312 30 20.53 0.6 12.32
C-313 18 27.46 0.6 16.48
C-314 20 25.6 0.6 15.36
C-315 50 31.69 0.5 15.85
C-316 50 15.96 0.5 7.98
C-317 45 28.96 0.6 17.38
C-318 18 31.21 0.6 18.73 211.61

METRADO DE SOBREANCHO Nº 19
UNIDAD : M2 KM 28+000.00 29+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-319 100 26.6 0.4 10.64
C-320 10 14.82 0.6 8.89
C-321 28 24.17 0.6 14.50
C-322 50 7.49 0.5 3.75
C-323 40 10.44 0.6 6.26
C-324 30 29.31 0.6 17.59
C-325 18 16.49 0.6 9.89
C-326 15 6.92 0.6 4.15
C-327 15 8.27 0.6 4.96
C-328 60 36.19 0.5 18.10
C-329 100 70.16 0.4 28.06
C-330 12 21.87 0.6 13.12
C-331 25 25.59 0.6 15.35
C-332 30 20.05 0.6 12.03
C-333 100 41.8 0.4 16.72
C-334 33 60.12 0.6 36.07 220.09
METRADO DE SOBREANCHO Nº 20
UNIDAD : M2 KM 29+000.00 29+396.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-335 35 22.69 0.6 13.61
C-336 30 10.69 0.6 6.41
C-337 30 3.79 0.6 2.27
C-338 30 10.34 0.6 6.20
C-339 40 28.57 0.6 17.14
C-340 30 10.71 0.6 6.43
C-341 28 28.78 0.6 17.27
C-342 16 26.93 0.6 16.16
C-343 50 13.16 0.5 6.58
C-344 10 7.24 0.6 4.34 96.42

RESUMEN METRADO DE SOBREANCHOS

AREA
KM KM PARCIAL
10+370 11+000 162.04
11+000 12+000 177.18
12+000 13+000 231.60
13+000 14+000 229.39
14+000 15+000 282.66
15+000 16+000 274.46
16+000 17+000 229.68
17+000 18+000 212.93
18+000 19+000 260.52
19+000 20+000 223.78
20+000 21+000 215.20
21+000 22+000 220.72
22+000 23+000 220.19
23+000 24+000 255.34
24+000 25+000 235.38
25+000 26+000 241.89
26+000 27+000 218.07
27+000 28+000 211.61
28+000 29+000 220.09
29+000 29+396 96.42

TOTAL: 4419.16 m2
METRADO DE SOBREANCHO

"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO


PROYECTO:
- CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

METRADO DE SOBREANCHO Nº 1
UNIDAD : M2 KM 0+000.00 1+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-99 35.00 8.757 0.70 3.68
C-100 30.00 14.240 0.90 7.69
C-102 25.00 9.664 1.00 5.80
C-1 32.00 9.685 0.80 4.65
C-101 56.00 12.171 0.50 3.65
C-2 90.00 8.645 0.30 1.56
C-3 28.00 14.428 0.90 7.79
C-4 68.00 14.269 0.40 3.42
C-5 60.00 12.959 0.50 3.89
C-6 106.00 18.326 0.30 3.30
C-7 245.00 58.113 0.10 3.49
C-8 20.00 13.251 1.20 9.54
C-9 42.00 20.116 0.60 7.24
C-10 56.00 17.839 0.50 5.35
C-11 102.00 34.179 0.30 6.15
C-12 62.00 17.727 0.40 4.25
C-13 135.00 13.617 0.20 1.63
C-14 46.00 25.396 0.60 9.14
C-15 45.00 14.905 0.60 5.37
C-16 24.00 11.317 1.00 6.79
C-17 34.00 22.752 0.80 10.92 115.31

METRADO DE SOBREANCHO Nº 2
UNIDAD : M2 KM 1+000.00 2+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-18 140.00 88.989 0.20 10.68
C-19 48.00 24.419 0.60 8.79
C-20 82.00 24.553 0.30 4.42
C-21 42.00 14.272 0.60 5.14
C-103 24.00 10.007 1.00 6.00
C-22 28.00 14.111 0.90 7.62
C-23 56.00 25.816 0.50 7.74
C-24 57.00 34.053 0.50 10.22
C-25 188.00 23.337 0.20 2.80
C-26 110.00 22.604 0.30 4.07
C-27 38.00 24.432 0.70 10.26
C-28 18.00 15.461 1.40 12.99
C-29 18.00 28.592 1.40 24.02
C-30 64.00 13.851 0.40 3.32
C-31 46.00 17.355 0.60 6.25
C-32 26.00 21.130 1.00 12.68
C-33 42.00 16.703 0.60 6.01
C-34 80.00 24.003 0.40 5.76
C-35 32.00 29.493 0.80 14.16
C-36 122.00 21.958 0.20 2.63
C-37 26.00 22.673 1.00 13.60
C-38 16.00 7.944 1.50 7.15
C-39 22.00 17.414 1.10 11.49
C-40 26.00 6.848 1.00 4.11
C-41 22.00 8.249 1.10 5.44 207.36
METRADO DE SOBREANCHO

"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO


PROYECTO:
- CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

METRADO DE SOBREANCHO Nº 3
UNIDAD : M2 KM 2+000.00 3+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-42 44.00 17.659 0.60 6.36
C-43 74.00 31.282 0.40 7.51
C-44 72.00 15.370 0.40 3.69
C-45 28.00 16.552 0.90 8.94
C-46 20.00 12.465 1.20 8.97
C-47 16.00 21.534 1.50 19.38
C-48 28.00 26.062 0.90 14.07
C-49 44.00 15.872 0.60 5.71
C-50 50.00 28.475 0.50 8.54
C-51 28.00 33.154 0.90 17.90
C-52 24.00 15.136 1.00 9.08
C-53 12.00 27.237 2.00 32.68
C-54 32.00 12.507 0.80 6.00
C-55 92.00 70.875 0.30 12.76
C-56 66.00 43.928 0.40 10.54
C-57 50.00 49.603 0.50 14.88
C-58 16.00 27.708 1.50 24.94
C-59 36.00 26.364 0.70 11.07
C-60 68.00 22.656 0.40 5.44
C-61 52.00 33.730 0.50 10.12
C-62 45.00 39.915 0.60 14.37
C-63 36.00 10.351 0.70 4.35
C-64 16.00 11.881 1.50 10.69
C-65 30.00 22.032 0.90 11.90 279.90

METRADO DE SOBREANCHO Nº 4
UNIDAD : M2 KM 3+000.00 4+000.00

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-66 64.00 34.067 0.40 8.18
C-67 60.00 22.718 0.50 6.82
C-68 38.00 18.942 0.70 7.96
C-69 168.00 16.050 0.20 1.93
C-70 20.00 15.530 1.20 11.18
C-71 78.00 17.210 0.40 4.13
C-72 44.00 9.156 0.60 3.30
C-73 27.00 15.466 0.90 8.35
C-74 36.00 17.274 0.70 7.26
C-75 38.00 13.426 0.70 5.64
C-76 46.00 14.382 0.60 5.18
C-77 60.00 26.739 0.50 8.02
C-78 38.00 43.228 0.70 18.16
C-79 155.00 23.409 0.20 2.81
C-80 12.00 16.487 2.00 19.78
C-81 14.00 29.488 1.70 30.08
C-82 50.00 15.339 0.50 4.60
C-83 48.00 28.364 0.60 10.21
C-84 62.00 17.096 0.40 4.10
C-85 41.00 17.564 0.60 6.32
C-86 16.00 14.157 1.50 12.74
C-87 76.00 10.859 0.40 2.61
C-88 25.00 14.296 1.00 8.58
C-89 76.00 18.440 0.40 4.43
C-90 52.00 21.436 0.50 6.43 208.77
METRADO DE SOBREANCHO

"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO


PROYECTO:
- CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

METRADO DE SOBREANCHO Nº 5
UNIDAD : M2 KM 4+000.00 4+366.90

CURVA # RADIO L. DE CURVA S. A. AREA P. AREA TOTAL


C-91 101.00 40.786 0.30 7.34
C-92 76.00 34.397 0.40 8.26
C-93 32.00 12.627 0.80 6.06
C-94 26.00 9.571 1.00 5.74
C-95 26.00 15.558 1.00 9.33
C-96 26.00 26.783 1.00 16.07
C-97 20.00 11.708 1.20 8.43
C-98 24.07 46.696 1.00 28.02 89.25

RESUMEN METRADO DE SOBREANCHOS

KM KM AREA PARCIAL

00+000 01+000 115.31


01+000 02+000 207.36
02+000 03+000 279.90
03+000 04+000 208.77
04+000 4+366.90 89.25

TOTAL: 900.60 m2
METRADO DE SUB BASE

"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO -


PROYECTO:
CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

INICIO KM 0+000 FIN KM 4+366.90


ANCHO LONG. SOBREANCHO SUB-BASE ESPESOR SUB-BASE
KM KM GRANULAR GRANULAR
ML ML M2 M2 M M3
00+000 01+000 4.950 1,000.00 115.31 5,065.31 0.250 1392.96
01+000 02+000 4.950 1,000.00 207.36 5,157.36 0.250 1418.27
02+000 03+000 4.950 1,000.00 279.90 5,229.90 0.250 1438.22
03+000 04+000 4.950 1,000.00 208.77 5,158.77 0.250 1418.66
04+000 04+367 4.950 366.90 89.25 1,905.41 0.250 523.99
TOTAL 22,516.75 6,192.10

03.04 PERFILADO DE SUBRASANTE EN ZONAS DE CORTE CON EQUIPO 22,516.75 m2


04.01 SUB BASE GRANULAR E=0.20M 6,192.10 m3
METRADO DE BASE

"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA


PROYECTO:
LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

KM INCIO 0+000 KM FIN 4+366.90


ANCHO LONG. SOBREANCHO BASE ESPESOR BASE
KM KM GRANULAR GRANULAR
ML ML M2 M2 M M3
00+000 01+000 4.380 1,000.00 115.31 4,495.31 0.219 1081.68
01+000 02+000 4.380 1,000.00 207.36 4,587.36 0.219 1103.83
02+000 03+000 4.380 1,000.00 279.90 4,659.90 0.219 1121.29
03+000 04+000 4.380 1,000.00 208.77 4,588.77 0.219 1104.17
04+000 04+367 4.380 366.90 89.25 1,696.27 0.219 408.17
TOTAL 20,027.62 4,819.14

05.02 BASE GRANULAR E=0.175 M 4,819.14 m3


METRADO DE IMPRIMACION

"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO


PROYECTO:
- CP LA LIBERTAD, DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

INICIO KM 0+000 FIN KM 4+366.90


ANCHO LONG. SOBREANCHO IMPRIMACION
KM KM ASFALTICA
ML ML M2 M2
00+000 01+000 4.100 1,000.00 115.31 4,215.31
01+000 02+000 4.100 1,000.00 207.36 4,307.36
02+000 03+000 4.100 1,000.00 279.90 4,379.90
03+000 04+000 4.100 1,000.00 208.77 4,308.77
04+000 04+367 4.100 366.90 89.25 1,593.54
TOTAL 18,804.89

04.03 IMPRIMACION ASFALTICA MC-30 (SIN ASFALTO 18,804.89 m2


METRADO DE TRATAMIENTO SUPERFICIAL BICAPA

"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD,
PROYECTO:
DISTRITO DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

INICIO KM 0+000 FIN KM 4+366.90


ANCHO LONG. SOBREANCHO
KM KM T.S.B. Espesor Volumen
ML ML M2 M2 m m3
00+000 01+000 4.100 1,000.00 115.31 4,215.31 0.038 176.20
01+000 02+000 4.100 1,000.00 207.36 4,307.36 0.038 180.05
02+000 03+000 4.100 1,000.00 279.90 4,379.90 0.038 183.08
03+000 04+000 4.100 1,000.00 208.77 4,308.77 0.038 180.11
04+000 04+367 4.100 366.90 89.25 1,593.54 0.038 66.61
TOTAL 18,804.89 786.04

04.04 TRATAMIENTO SUPERFICIAL BICAPA, e=1" 18,804.89 m2


"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD, DISTRITO
DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

Sustento de metrados de transporte de Material Granular para Sub Base

Ubicación
D.L.P. Distanci Volumen D>1km
INICIO FIN Código Particip de Acceso Momento D<=1km
30.00 a Sub Base (m 3-
(km) (km) Cantera acion % Canteras (km) (m 3 -km) (m 3-km)
m (km) (km) (m3) km)
(km)

00+000 01+000 C-1 100.00 9+500.00 0.50 0.03 10.470 1,392.96 14,584.29 1,392.96 13,191.33
01+000 02+000 C-1 100.00 9+500.00 0.50 0.03 11.470 1,418.27 16,267.56 1,418.27 14,849.29
02+000 03+000 C-1 100.00 9+500.00 0.50 0.03 12.470 1,438.22 17,934.60 1,438.22 16,496.38
03+000 04+000 C-1 100.00 9+500.00 0.50 0.03 13.470 1,418.66 19,109.35 1,418.66 17,690.69
04+000 04+337 C-1 100.00 9+500.00 0.50 0.03 14.138 523.99 7,408.41 523.99 6,884.42
6,192.10 75,304.21 6,192.10 69,112.11

05.03 TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM 6,192.10 M3K


05.04 TRANSPORTE DE MATERIAL GRANULAR > 1 KM 69,112.11 M3K
"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD, DISTRITO
DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

Sustento de metrados de transporte de Material Granular para Base

Ubicación D.L.P. Distanci Volumen D<=1km D>1km


INICIO FIN Código Particip Acceso Momento
de Canteras 30.00 a Sub Base (m 3- (m 3-
(km) (km) Cantera acion % (km) (m 3-km)
(km) m (km) (km) (m3) km) km)
00+000 01+000 C-1 100.00 9+500.00 0.50 0.03 10.470 1,081.68 11,325.19 1,081.68 10,243.51
01+000 02+000 C-1 100.00 9+500.00 0.50 0.03 11.470 1,103.83 12,660.93 1,103.83 11,557.10
02+000 03+000 C-1 100.00 9+500.00 0.50 0.03 12.470 1,121.29 13,982.49 1,121.29 12,861.20
03+000 04+000 C-1 100.00 9+500.00 0.50 0.03 13.470 1,104.17 14,873.17 1,104.17 13,769.00
04+000 04+367 C-1 100.00 9+500.00 0.50 0.03 14.153 408.17 5,777.01 408.17 5,368.84
4,819.14 58,618.79 4,819.14 53,799.65

05.03 TRANSPORTE DE MATERIAL GRANULAR HASTA 1 KM 4,819.14 M3K


05.04 TRANSPORTE DE MATERIAL GRANULAR > 1 KM 53,799.65 M3K
"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD, DISTRITO
DE CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

Sustento de metrados de transporte de Material Granular


Ubicación D.L.P. Distanci D<=1km D>1km
INICIO FIN Código Particip Acceso Volumen Momento
de Canteras 30.00 a (m 3- (m 3-
(km) (km) Cantera acion % (km) (m3) (m 3 -km)
(km) m (km) (km) km) km)
00+000 01+000 C-1 100.00 46+141.00 0.50 0.03 46.111 176.20 8,124.75 176.20 7,948.55
01+000 02+000 C-1 100.00 46+141.00 0.50 0.03 45.111 180.05 8,122.13 180.05 7,942.09
02+000 03+000 C-1 100.00 46+141.00 0.50 0.03 44.111 183.08 8,075.84 183.08 7,892.76
03+000 04+000 C-1 100.00 46+141.00 0.50 0.03 43.111 180.11 7,764.58 180.11 7,584.47
04+000 04+367 C-1 100.00 46+141.00 0.50 0.03 42.428 66.61 2,826.10 66.61 2,759.49
786.04 34,913.40 786.06 34,127.36

05.05 TRANSPORTE DE AGREGADOS PARA TSB HASTA 1 KM 786.06 M3K


05.06 TRANSPORTE DE AGREGADOS PARA TSB > 1 KM 34,127.36 M3K
METRADO DE CUNETAS (REVESTIDAS)

"MEJORAMIENTO A NIVEL DE TRATAMIENTO SUPERFICIAL BICAPA DEL TRAMO CP PORO PORO - CP LA LIBERTAD, DISTRITO DE
CATACHE - PROVINCIA DE SANTA CRUZ - CAJAMARCA"

PORO PORO - LA LIBERTAD


LADO IZQUIERDO LADO DERECHO
KM KM KM KM
INICIO FINAL LONG. INICIO FINAL LONG.
00+000 04+367 4,366.90
LONG. A DESCONTAR= 36.00 -36.00
SUB TOTAL 0.00 - 4,330.90

06.03.01 CUNETA TRIANGULAR REVESTIDA f'c=175 kg/cm2 1.00x0.50 m 4,330.90