Documentos de Académico
Documentos de Profesional
Documentos de Cultura
X BUNGA PolybackONG
1 Amarilis (Amarylidaceae) 1 Tangkai 16,250.00 1,625.00
2 Anggrek macan (Arrachnis sp) 1 Tangkai 250,000.00 25,000.00
3 Anyelir 1 Tangkai 12,500.00 1,250.00
4 Apple blossom 1 Tangkai 10,000.00 1,000.00
5 Aster (Asteraceae sp) 1 Tangkai 13,750.00 1,375.00
6 Anggrek Dendrobium 1 Tangkai 62,500.00 6,250.00
7 Gladiol 1 Tangkai 12,500.00 1,250.00
8 Golden shower 1 Tangkai 50,000.00 5,000.00
9 Krisan (Chrysanthemum llini) 1 Tangkai 15,000.00 1,500.00
10 Mawar 1 Tangkai 5,000.00 500.00
XI TANAMAN TEDUH (INDOOR PLANT)
1 Anggrek bulan 40 -50 3 s/d 5 btg/rpn Polyback 100,000.00 10,000.00
2 Anggrek cathalea 40 -50 3 s/d 5 btg/rpn Polyback 75,000.00 7,500.00
3 Anggrek douglas kecil 40 -50 3 s/d 5 btg/rpn Polyback 23,500.00 2,350.00
4 Apple blossom 30 - 40 Polyback 50,000.00 5,000.00
5 Asparagus 30 - 40 dia. Tajuk 20 Polyback 20,000.00 2,000.00
6 Begonia daun besar 40 -50 dia. Tajuk 20 Polyback 22,500.00 2,250.00
7 Begonia daun Kecil 40 -50 dia. Tajuk 20 Polyback 22,500.00 2,250.00
8 Begonia Hijau 40-50 dia. Tajuk 20 Polyback 22,500.00 2,250.00
9 Begonia perak 40 -50 dia. Tajuk 20 Polyback 21,000.00 2,100.00
10 Belanceng bintik 40 -50 4 s/d 5 dn/Polyback Polyback 150,000.00 15,000.00
11 Belanceng putih 40 -50 4 s/d 5 dn/Polyback Polyback 20,000.00 2,000.00
12 Golden shower 50 dia. Tajuk 20 Polyback 40,000.00 4,000.00
13 Gandasari 30 - 40 dia. Tajuk 15 Polyback 20,000.00 2,000.00
14 Hortensia 30 - 40 dia. Tajuk 30 Polyback 30,000.00 3,000.00
15 Kembang kancing 30 - 40 dia. Tajuk 20 Polyback 10,000.00 1,000.00
16 Kencuran 30 - 40 dia. Tajuk 20 Polyback 10,000.00 1,000.00
17 Krisdoren 30 - 40 dia. Tajuk 15 Polyback 15,000.00 1,500.00
18 Kuping gajah 30 - 40 4 s/d 5 dn/Polyback Polyback 35,000.00 3,500.00
19 Kuping keledai 30 - 40 4 s/d 5 dn/Polyback Polyback 45,000.00 4,500.00
20 Maranta macan 30 - 40 dia. Tajuk 25 Polyback 22,500.00 2,250.00
21 Maranta batik 30 - 40 dia. Tajuk 25 Polyback 20,000.00 2,000.00
22 Maranta buntut ayam 30 - 40 dia. Tajuk 25 Polyback 25,000.00 2,500.00
23 Maranta keris 30 - 40 dia. Tajuk 25 Polyback 20,000.00 2,000.00
1 2 3 4 5 6 7
24 Maranta sepat 30 - 40 dia. Tajuk 25 Polyback 20,000.00 2,000.00
25 Meranti bintik 40 -50 dia. Tajuk 20 Polyback 20,000.00 2,000.00
26 Meranti kol 40 -50 dia. Tajuk 20 Polyback 20,000.00 2,000.00
27 Meranti mas koki 40 -50 dia. Tajuk 20 Polyback 20,000.00 2,000.00
28 Meranti pisang 40 -50 dia. Tajuk 20 Polyback 20,000.00 2,000.00
29 Monstera 50 - 75 4 s/d 5 dn/Polyback Polyback 10,000.00 1,000.00
30 Mutiara 40 -50 dia. Tajuk 20 Polyback 5,000.00 500.00
31 Pacing 40 -50 dia. Tajuk 20 Polyback 5,000.00 500.00
32 Dona Carmen 40-50 Polyback 37,500.00 3,750.00
33 Sisik Naga 30-40 Polyback 50,000.00 5,000.00
34 Palesota 20-30 Polyback 55,000.00 5,500.00
35 Diefenbachia 30-40 Polyback 75,000.00 7,500.00
36 Chiangmai 20-30 Polyback 40,000.00 4,000.00
37 Chiangmai balon 20-30 Polyback 87,500.00 8,750.00
38 Pilodendron dia. Tajuk 15 Polyback 7,500.00 750.00
39 Sabrina ungu 20 - 30 dia. Tajuk 15 Polyback 5,000.00 500.00
40 Bambu China 20-30 dia. Tajuk 20 Polyback 15,000.00 1,500.00
41 Sirih Gading 40 -50 dia. Tajuk 20 Polyback 15,000.00 1,500.00
42 Sri rejeki 30 - 40 4 s/d 5 dn/Polyback Polyback 20,000.00 2,000.00
43 Supelir foster kasar 30 - 40 dia. Tajuk 15 Polyback 25,000.00 2,500.00
44 Supelir halus 30 - 40 dia. Tajuk 15 Polyback 25,000.00 2,500.00
45 Tanduk rusa 40 -50 dia. Tajuk 20 Polyback 40,000.00 4,000.00
46 Walisongo biasa 50 - 100 dia. Btg 2 Polyback 40,000.00 4,000.00
47 Walisongo kuning 100 - 150 dia. Btg 3 Polyback 125,000.00 12,500.00
XIII BIJI
1 Bixa (Bixaceae sp) 1 Kg 40,000.00 4,000.00
2 Bunga kupu-kupu (Bauhunia pupurea) 1 Kg 30,000.00 3,000.00
3 Bungur (Largerstroemia loudonii) 1 Kg 20,000.00 2,000.00
4 Buni (Antidesma bunius) 1 Kg 40,000.00 4,000.00
5 Glodogan (Polyalthea longifolia) 1 Kg 40,000.00 4,000.00
6 Mahoni (Swietenia mahagoni) 1 Kg 10,000.00 1,000.00
7 Salam (Eugenia Polyanthum) 1 Kg 20,000.00 2,000.00
8 Tanjung (Mimusops elengi) 1 Kg 15,000.00 1,500.00
9 Trembesi (Samanea saman) 1 Kg 30,000.00 3,000.00
XV MATERI LENGKAP
1 Tanah Gambut (10 kg) 10 kg krg 3,000.00 300.00
2 Tanah Gambut (15 Kg) 15 kg krg 3,500.00 350.00
3 Tanah Gambut (20 kg) 20 kg krg 7,000.00 700.00
4 Tanah Merah Gembur m3 110,000.00 11,000.00
5 Tanah Subur m3 96,250.00 9,625.00
6 Tanah Bakar (10 kg) Krg 6,000.00 600.00
7 Tanah Bakar (20 kg) Krg 12,000.00 1,200.00
8 Pupuk Kandang (10 kg) Krg 6,000.00 600.00
9 Pupuk Kandang (15 kg) Krg 6,500.00 650.00
10 Pupuk Kandang (20 kg) Krg 12,000.00 1,200.00
11 Pupuk NPK 50 kg krg 580,000.00 58,000.00
12 Pupuk urea krg 3,000.00 300.00
13 Pupuk Kotoran Ayam krg 6,000.00 600.00
14 Polyback Plastik Hitam besar bh 13,000.00 1,300.00
15 Polyback plastik Hitam Sedang bh 10,000.00 1,000.00
16 Polyback Plastik Hitam Kecil bh 7,000.00 700.00
17 Polyback Keramik Besar 125,000.00 12,500.00
18 Polyback Keramik sedang 60,000.00 6,000.00
19 Batu api sedang 25 - 40 1 Bh 50,000.00 5,000.00
20 Batu brojol putih ambon dia. 3 - 5 Krg 90,000.00 9,000.00
,
1 2 3 4 5 6 7
21 Batu cadas besar/sedang 50 dia. 30 Bh 70,000.00 7,000.00
22 Batu kayu besar 75 1 Bh 150,000.00 15,000.00
23 Batu kayu kecil 40 1 Bh 90,000.00 9,000.00
24 Batu tempel cirebon alam berbagai jenis ukuran 8 x 20 M2 80,000.00 8,000.00
25 Batu tempel palimanan hijau dan putih 10 x 20 M2 80,000.00 8,000.00
26 Batu tulang besar 1 Bh 60,000.00 6,000.00
27 Batu tulang kecil 1 Bh 30,000.00 3,000.00
28 Gentong teratai besar 1 Bh 150,000.00 15,000.00
29 Gentong teratai kecil 1 Bh 60,000.00 6,000.00
30 Gentong teratai sedang 1 Bh 90,000.00 9,000.00
31 Kantong plastik dia. 20 Kg 15,000.00 1,500.00
32 Kromb dolken segitiga kawat duri (0,80 x 0,80 x 1,2 m) 1 Bh 20,000.00 2,000.00
33 Kromb dolken segitiga kawat duri (0,60 x 0,60 x 1,2 m) 1 Bh 25,000.00 2,500.00
34 Plastik bening tebal 8 mikron M2 3,500.00 350.00
35 Polyback dekoratif terra cotta clarris diameter Polyback 55 Bh 125,000.00 12,500.00
36 Polyback dekoratif terra cotta clarris diameter Polyback 60 Bh 150,000.00 15,000.00
37 Polyback plastik diameter terra cotta clarris diameter Polyback 30 Bh 67,000.00 6,700.00
38 Polyback plastik diameter terra cotta clarris diameter Polyback 40 Bh 95,000.00 9,500.00
39 Pupuk majemuk butir - prill 1 Kg 6,000.00 600.00
40 Pupuk majemuk kaplet uk 10 gr 1 Kg 8,000.00 800.00
41 Pupuk TSP 1 Kg 3,000.00 300.00
42 Pupuk Urea 1 Kg 2,000.00 200.00
43 Pupuk ZA 1 Kg 2,000.00 200.00
44 Serbuk gergaji 1 Krg 7,500.00 750.00
45 Steger bambu bulat 2 - 4 1 Btg 5,000.00 500.00
46 Steger dolken 2 m 1 Btg 5,000.00 500.00
47 Sekam, 50 gr/karung 1 Krg 4,500.00 450.00
48 Polybag Uk. Kecil Kg 25,000.00 2,500.00
49 Polybag Uk. Sedang Kg 25,000.00 2,500.00
50 Polybag Uk. Besar Kg 25,000.00 2,500.00
51 Sarung Tangan Psg 11,000.00 1,100.00
52 Cangkul Uk. Sedang Bh 35,000.00 3,500.00
53 Sendok Dempul Bh 7,000.00 700.00
54 Gembor Penyiram Bunga Bh 45,000.00 4,500.00
55 Ember Bh 11,000.00 1,100.00
56 Gunting Stick Bh 40,000.00 4,000.00
57 Gunting Besar Bh 45,000.00 4,500.00
58 Ayakan Bh 65,000.00 6,500.00
WALIKOTA PONTIANAK
9,900.00
34,100.00
11,275.00
9,900.00
5,500.00
8,800.00
2,200.00
3,300.00
3,300.00
4,950.00
14,600.00
5,500.00
12,100.00
11,000.00
19,250.00
3,850.00
6,600.00
6,600.00
6,600.00
7,700.00
3,575.00
3,575.00
1,100.00
3,575.00
5,500.00
11,723.80
3,850.00
3,575.00
4,950.00
13,200.00
19,250.00
22,000.00
3,575.00
4,950.00
8,250.00
14,575.00
1,650.00
2,750.00
2,750.00
5,500.00
5,225.00
6,875.00
7,425.00
5,775.00
11,000.00
2,438.00
3,575.00
6,600.00
11,550.00
4,400.00
1,650.00
60,500.00
41,250.00
33,000.00
44,000.00
137,500.00
8
165,000.00
55,000.00
22,000.00
19,250.00
24,750.00
16,500.00
13,750.00
5,500.00
12,100.00
27,500.00
159,500.00
30,250.00
110,000.00
99,000.00
11,000.00
38,500.00
30,250.00
24,750.00
5,500.00
5,500.00
24,750.00
24,750.00
24,750.00
12,100.00
9,350.00
38,500.00
41,250.00
1,650.00
2,475.00
16,500.00
44,000.00
101,750.00
22,000.00
7,150.00
4,400.00
4,400.00
4,400.00
4,400.00
5,500.00
6,600.00
57,750.00
3,850.00
1,650.00
2,489.30
2,200.00
7,150.00
6,100.00
6,600.00
8,250.00
6,600.00
6,325.00
7,150.00
16,500.00
5,445.00
6,600.00
9,625.00
38,500.00
19,250.00
16,500.00
16,500.00
14,850.00
25,850.00
33,000.00
1,108.80
8
44,000.00
52,250.00
13,750.00
16,500.00
55,000.00
38,500.00
44,000.00
44,000.00
8,250.00
22,000.00
11,000.00
33,000.00
16,500.00
2,750.00
11,000.00
12,100.00
13,750.00
8,800.00
12,100.00
16,500.00
14,850.00
27,500.00
6,050.00
247,500.00
412,500.00
1,100,000.00
2,750,000.00
22,000.00
33,000.00
11,000.00
13,750.00
220,000.00
522,500.00
22,000.00
22,000.00
22,000.00
15,950.00
33,000.00
22,000.00
22,000.00
8,250.00
110,000.00
990,000.00
1,100,000.00
1,485,000.00
137,500.00
440,000.00
330,000.00
44,000.00
16,500.00
495,000.00
495,000.00
192,500.00
440,000.00
3,850,000.00
440,000.00
165,000.00
137,500.00
330,000.00
121,000.00
330,000.00
49,500.00
247,500.00
8
121,000.00
275,000.00
71,500.00
46,750.00
137,500.00
44,000.00
66,000.00
77,000.00
121,000.00
357,500.00
192,500.00
412,500.00
49,500.00
154,000.00
330,000.00
8,800,000.00
165,000.00
467,500.00
88,000.00
68,750.00
77,000.00
165,000.00
440,000.00
38,500.00
55,000.00
275,000.00
49,500.00
82,500.00
74,250.00
258,500.00
220,000.00
55,000.00
82,500.00
165,000.00
605,000.00
57,750.00
165,000.00
68,750.00
68,750.00
165,000.00
1,375,000.00
82,500.00
85,250.00
302,500.00
440,000.00
302,500.00
63,250.00
22,000.00
44,000.00
77,000.00
88,000.00
275,000.00
38,500.00
82,500.00
192,500.00
99,000.00
44,000.00
75,000.00
330,000.00
192,500.00
55,000.00
44,000.00
71,500.00
8
44,000.00
99,000.00
341,000.00
77,000.00
165,000.00
33,000.00
52,250.00
38,500.00
132,000.00
88,000.00
137,500.00
164,340.00
27,500.00
16,500.00
38,500.00
110,000.00
99,000.00
38,500.00
93,500.00
121,000.00
170,500.00
165,000.00
22,000.00
33,000.00
38,500.00
66,000.00
220,000.00
66,000.00
165,000.00
99,000.00
17,875.00
275,000.00
13,750.00
11,000.00
15,125.00
68,750.00
13,750.00
55,000.00
16,500.00
5,500.00
-
110,000.00
82,500.00
25,850.00
55,000.00
22,000.00
24,750.00
24,750.00
24,750.00
23,100.00
165,000.00
22,000.00
44,000.00
22,000.00
33,000.00
11,000.00
11,000.00
16,500.00
38,500.00
49,500.00
24,750.00
22,000.00
27,500.00
22,000.00
8
22,000.00
22,000.00
22,000.00
22,000.00
22,000.00
11,000.00
5,500.00
5,500.00
41,250.00
55,000.00
60,500.00
82,500.00
44,000.00
96,250.00
8,250.00
5,500.00
16,500.00
16,500.00
22,000.00
27,500.00
27,500.00
44,000.00
44,000.00
137,500.00
100,100.00
324,500.00
143,000.00
35,750.00
10,010.00
71,500.00
393,250.00
572,000.00
1,430,000.00
286,000.00
28,600.00
429,000.00
145,200.00
171,600.00
71,500.00
181,500.00
214,500.00
57,475.00
57,800.00
78,650.00
85,800.00
128,700.00
321,750.00
250,250.00
286,000.00
143,000.00
250,250.00
572,000.00
114,400.00
357,500.00
643,500.00
143,000.00
128,700.00
50,050.00
7,150.00
151,250.00
178,750.00
8
286,000.00
14,300.00
178,750.00
321,750.00
286,000.00
50,050.00
107,250.00
286,000.00
1,144,000.00
35,750.00
171,600.00
357,500.00
100,100.00
193,050.00
85,800.00
121,000.00
181,500.00
90,750.00
181,500.00
214,500.00
71,500.00
171,600.00
321,750.00
643,500.00
100,100.00
143,000.00
214,500.00
78,650.00
101,871.00
121,000.00
143,000.00
214,500.00
2,145,000.00
178,750.00
178,750.00
28,600.00
89,375.00
117,975.00
107,250.00
46,475.00
1,101,100.00
137,500.00
572,000.00
71,500.00
42,900.00
357,500.00
572,000.00
250,250.00
357,500.00
85,800.00
57,200.00
643,500.00
151,250.00
17,875.00
79,860.00
95,832.00
181,500.00
286,000.00
89,375.00
121,550.00
143,000.00
58,630.00
135,850.00
217,910.00
500,500.00
42,900.00
107,250.00
321,750.00
8
500,500.00
500,500.00
214,500.00
44,000.00
33,000.00
22,000.00
44,000.00
44,000.00
11,000.00
22,000.00
16,500.00
33,000.00
247,500.00
55,000.00
1,100,000.00
1,237,500.00
1,045,000.00
2,475,000.00
1,375,000.00
38,500.00
38,500.00
143,000.00
44,000.00
44,000.00
44,000.00
165,000.00
330,000.00
495,000.00
495,000.00
176,000.00
22,000.00
55,000.00
220,000.00
13,750.00
1,320,000.00
66,000.00
46,750.00
88,000.00
137,500.00
121,000.00
3,300.00
3,850.00
7,700.00
121,000.00
105,875.00
6,600.00
13,200.00
6,600.00
7,150.00
13,200.00
638,000.00
3,300.00
6,600.00
14,300.00
11,000.00
7,700.00
137,500.00
66,000.00
55,000.00
99,000.00
8
77,000.00
165,000.00
99,000.00
88,000.00
88,000.00
66,000.00
33,000.00
165,000.00
66,000.00
99,000.00
16,500.00
22,000.00
27,500.00
3,850.00
137,500.00
165,000.00
73,700.00
104,500.00
6,600.00
8,800.00
3,300.00
2,200.00
2,200.00
8,250.00
5,500.00
5,500.00
4,950.00
27,500.00
27,500.00
27,500.00
12,100.00
38,500.00
7,700.00
49,500.00
12,100.00
44,000.00
49,500.00
71,500.00
8,800.00
4,950.00
38,500.00
467,500.00
11,000.00
13,750.00
27.50
110.00
1,210.00
330.00
1,100.00
165.00
33,000.00
55.00
275.00
82.50
192.50
55.00
55.00
110.00
55.00
55.00
165.00
8
100.00
550.00
150.00
1,000.00
450.00
1,000.00
15,717.00
16,433.00
25,041.00
26,254.00
29,233.00
35,249.00
56,143.00
78,177.00
88,447.00
90,320.00
120,820.00
78,492.00
94,465.00
65,992.00
84,465.00
355,750.00
216,841.00
148,681.00
19,243.00
Januari 2009
PONTIANAK
I, SH, M.Hum
Uraian Analisa Harga Satuan Pekerjaan
I Asumsi
1 Dilaksanakan secara mekanis
2 Lokasi pekerjaan = Dermaga Sungai Pontianak
3 Jenis tanah = Lanau
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Tiang pancang disiapkan disekitar lokasi pemancangan
6 Panjang tiang pancang P 22.00 M / Btg
II Metode Pelaksanaan
1 Tiang pancang yang telah dicetak, diletakan pada posisinya
2 Pemancangan menggunakan drop-hummer, selama pemancangan kepala
3 tiang pancang dilindungi sehingga meminimalkan kerusakan akibat penum-
bukan. Unit alat pancang diletakan pada perancah
4 Pemancangan dihentikan setelah kedalaman yang disyaratkan secara teknis
1 Bahan
btg
2 Alat
2.b CRANE
Kapasitas v 22.00 M' 1 titik
Faktor efisiensi alat Fa 0.72 BAIK SEKALI - SEDANG
Waktu Siklus (menarik dan memposisikan tiang pancang) Ts 15.00 Menit
3 TENAGA
Kapasitas produksi/hari (PILE HUMMMER yang menentu= Tk x Q1 Qt 147.84 M1
bersambung
lanjutan
Rp. 218,000.00 / M1
Analisa Harga Satuan Pekerjaan Pemancangan (STRK.7.15)
Satuan Kerja : Stasiun Pengawasan Sumber Daya Kelautan dan Perikanan Pontianak
Lokasi : Pontianak
Sumber Dana : APBN Tahun Anggaran 2011
A Pekerja
B Bahan
C Peralatan
1 Pile Hammer Jam 0.0473 175,000.00 8,277.50
2 Crane Jam 0.0158 520,000.00 8,216.00
3 Ponton Ls 1.0000 194,475.00 194,475.00
4 Alat Bantu Ls 1.0000 5,000.00 5,000.00
CATATAN :
1 SATUAN bisa didasarkan jam kerja untuk Tenaga dan Alat dan ukuran volume dan/atau ukuran berat untuk Material.
PERKIRAAN KUANTITAS adalah kuantitas masing2 KOMPONEN untuk melengkapi satu satuan pengukuran dari Mata Pembayaran
2 Komponen Peralatan sudah termasuk bahan bakar, pelumas dan operator.
3 HARGA SATUAN sudah termasuk pajak-pajak (PPh dan bea lainnya) kecualai PPN, yang bisa dibayarkan di dalam Kontrak
Analisa Harga Satuan Pekerjaan
Satuan Kerja : Stasiun Pengawasan Sumber Daya Kelautan dan Perikanan Pontianak
Lokasi : Pontianak
Sumber Dana : APBN Tahun Anggaran 2011
A Pekerja
1 Pekerja Orang 2.0000 56,500.00 113,000.00
2 Mandor Orang 1.0000 76,000.00 76,000.00
B Bahan
1 BBM Solar Ltr 133.3000 6,000.00 799,800.00
2 Oli Engine Ltr 3.2000 35,000.00 112,000.00
C Peralatan
1 Ponton Besi 200 ton Unit 1.0000 450,000.00 450,000.00
3 Alat Bantu Ls 1.0000 5,000.00 5,000.00
KETERANGAN :
Sewa ponton : ### / hari
BBM Solar : 16.66 liter / jam
Oli Engine : 80.00 / 200 jam
Jam Kerja : 8 jam / hari, 25 hari / bulan
Alat bantu : pompa air, tali sling, cekak, baut, papan alas, dll
Rekapitulasi Rencana Anggaran Biaya
TOTAL HARGA
NO URAIAN PEKERJAAN
(Rp)
1 2 3
Total 2,264,055,932.74
PPN 10 % 226,405,593.27
Jumlah Total 2,490,461,526.01
Dibulatkan 2,490,461,000.00
Dua Miliar Empat Ratus Delapan Puluh Delapan Juta Tiga Ratus Sembilan Puluh Dua
Terbilang :
Juta
Rencana Anggaran Biaya (RAB)
1 2 3 4 5 6 7 8
I Pekerjaan Pendahuluan
1 Pengukuran dan pemasangan bouwplank 188.00 m' P.Ps. 02 39,534.00 7,432,392.00
2 Direksi keet dan bangsal kerja 9.00 m2 P.Ps. 04 863,032.10 7,767,288.90
3 Pekerjaan pembersihan lokasi 360.00 m2 P.Ps. 03 11,495.00 4,138,200.00
Sub Total I 19,337,880.90
II Pekerjaan Pondasi
A. Pondasi Setempat
1 Pekerjaan Pondasi Setempat 60 x 60 cm
a. Galian Tanah 57.60 m3 P.T. 02 65,587.50 3,777,840.00
b. Cerucuk dia. 8 - 4 m 40.00 btg - 22,000.00 880,000.00
c. Pemancangan Cerucuk dia. 812 - 4 m 40.00 btg - 14,000.00 560,000.00
d. Pekerjaan Urugan Pasir Alas, t = 20 cm 0.72 m3 P.T. 13 159,395.00 114,764.40
e. Pekerjaan Pemasangan Lantai Kerja Pondasi, t = 5 0.18 m3 P.BB. 01 940,290.36 169,252.26
f. Pekerjaan Plat Pondasi uk. 60 x 60 cm
- Beton K.225 0.90 m3 P.BB. 04 1,211,190.87 1,090,071.78
- Pembesian 184.54 kg P.BB. 07 18,589.85 3,430,570.92
- Bekisting 3.00 m2 P.BB. 09 160,658.00 481,974.00
g. Pekerjaan Kolom Pondasi
- Beton K.225 0.40 m3 P.BB. 04 1,211,190.87 484,476.35
- Pembesian 92.29 kg P.BB. 07 18,589.85 1,715,657.26
- Bekisting 4.00 m2 P.BB. 11.a 244,152.00 976,608.00
2 Pekerjaan Pondasi Setempat 120 x 1600 cm
a. Galian Tanah 55.68 m3 P.T. 02 65,587.50 3,651,912.00
b. Cerucuk dia. 15 - 12 m 240.00 btg - 69,500.00 16,680,000.00
c. Pemancangan Cerucuk dia. 15 - 12 m 240.00 btg - 42,000.00 10,080,000.00
d. Pekerjaan Urugan Pasir Alas, t = 20 cm 7.68 m3 P.T. 13 159,395.00 1,224,153.60
e. Pekerjaan Pemasangan Lantai Kerja Pondasi, t = 5 1.92 m3 P.BB. 01 940,290.36 1,805,357.48
f. Pekerjaan Plat Pondasi uk. 120 x 1600 cm
- Beton K.225 9.60 m3 P.BB. 04 1,211,190.87 11,627,432.37
- Pembesian 1,920.38 kg P.BB. 07 18,589.85 35,699,576.14
- Bekisting 17.20 m2 P.BB. 09 160,658.00 2,763,317.60
g. Pekerjaan Kolom Pondasi
- Beton K.225 1.08 m3 P.BB. 04 1,211,190.87 1,308,086.14
- Pembesian 249.18 kg P.BB. 07 18,589.85 4,632,218.82
- Bekisting 7.20 m2 P.BB. 11.a 244,152.00 1,757,894.40
3 Pekerjaan Pondasi Setempat 160 x 160 cm
a. Galian Tanah 63.36 m3 P.T. 02 65,587.50 4,155,624.00
b. Cerucuk dia. 15 - 12 m 240.00 btg - 69,500.00 16,680,000.00
c. Pemancangan Cerucuk dia. 15 - 12 m 240.00 btg - 42,000.00 10,080,000.00
d. Pekerjaan Urugan Pasir Alas, t = 20 cm 7.68 m3 P.T. 13 159,395.00 1,224,153.60
e. Pekerjaan Pemasangan Lantai Kerja Pondasi, t = 5 1.92 m3 P.BB. 01 940,290.36 1,805,357.48
f. Pekerjaan Plat Pondasi uk. 160 x 160 cm
- Beton K.225 9.60 m3 P.BB. 04 1,211,190.87 11,627,432.37
- Pembesian 1,826.02 kg P.BB. 07 18,589.85 33,945,437.90
- Bekisting 12.00 m2 P.BB. 09 160,658.00 1,927,896.00
g. Pekerjaan Kolom Pondasi
- Beton K.225 1.49 m3 P.BB. 04 1,211,190.87 1,804,674.40
- Pembesian 342.62 kg P.BB. 07 18,589.85 6,369,254.41
- Bekisting 9.90 m2 P.BB. 11.a 244,152.00 2,417,104.80
B. Balok Sloof
1 Pekerjaan Balok Sloof uk. 15/30 cm
- Beton K.225 1.55 m3 P.BB. 04 1,211,190.87 1,877,345.85
- Pembesian 373.72 kg P.BB. 07 18,589.85 6,947,398.74
- Bekisting Sloof 12.94 m2 P.BB. 10 171,988.50 2,225,531.19
2 Pekerjaan Balok Sloof uk. 25/50 cm
- Beton K.225 2.31 m3 P.BB. 04 1,211,190.87 2,797,850.91
- Pembesian 464.17 kg P.BB. 07 18,589.85 8,628,850.67
- Bekisting Sloof 11.56 m2 P.BB. 10 171,988.50 1,988,187.06
3 Pekerjaan Balok Sloof uk. 25/80 cm
- Beton K.225 1.20 m3 P.BB. 04 1,211,190.87 1,453,429.05
- Pembesian 288.86 kg P.BB. 07 18,589.85 5,369,864.07
- Bekisting Sloof 5.55 m2 P.BB. 10 171,988.50 954,536.18
4 Pekerjaan Balok Sloof uk. 25/100 cm
- Beton K.225 28.10 m3 P.BB. 04 1,211,190.87 34,034,463.50
- Pembesian 3,380.99 kg P.BB. 07 18,589.85 62,852,096.95
- Bekisting Sloof 221.29 m2 P.BB. 10 171,988.50 38,059,335.17
5 Pekerjaan Balok Sloof uk. 25/140 cm
- Beton K.225 11.20 m3 P.BB. 04 1,211,190.87 13,565,337.77
- Pembesian 1,347.58 kg P.BB. 07 18,589.85 25,051,310.06
- Bekisting Sloof 68.32 m2 P.BB. 10 171,988.50 11,750,254.32
Sub Total II 414,503,889.99
Kode Harga Satuan Jumlah Harga Total Harga
No. Uraian Pekerjaan Volume Satuan
Analisa (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
Struktur Lantai 2
8 Kolom uk. 30/30 cm
- Beton K 225 10.80 m3 P.BB. 04 1,211,190.87 13,080,861.42
- Tulangan 2,599.78 kg P.BB. 07 18,589.85 48,329,520.23
- Bekisting kolom 72.00 m2 P.BB. 11.a 244,152.00 17,578,944.00
9 Kolom Praktis
- Beton K 225 1.28 m3 P.BB. 04 1,211,190.87 1,550,324.32
- Tulangan 308.12 kg P.BB. 07 18,589.85 5,727,904.58
- Bekisting kolom 5.12 m2 P.BB. 11.a 244,152.00 1,250,058.24
10 Balok uk. 15/30 cm
- Beton K 225 1.35 m3 P.BB. 04 1,211,190.87 1,635,107.68
- Tulangan 326.06 kg P.BB. 07 18,589.85 6,061,406.49
- Bekisting Balok 11.29 m2 P.BB. 12.a 284,941.80 3,216,992.92
11 Balok uk. 15/50 cm
- Beton K 225 1.48 m3 P.BB. 04 1,211,190.87 1,792,562.49
- Tulangan 355.66 kg P.BB. 07 18,589.85 6,611,666.05
- Bekisting Balok 11.33 m2 P.BB. 12.a 284,941.80 3,228,390.59
12 Balok uk. 15/70 cm
- Beton K 225 1.94 m3 P.BB. 04 1,211,190.87 2,349,710.29
- Tulangan 409.32 kg P.BB. 07 18,589.85 7,609,197.40
- Bekisting Balok 9.25 m2 P.BB. 12.a 284,941.80 2,635,711.65
13 Balok uk. 20/30 cm
- Beton K 225 3.12 m3 P.BB. 04 1,211,190.87 3,778,915.52
- Tulangan 595.05 kg P.BB. 07 18,589.85 11,061,890.24
- Bekisting Balok 20.80 m2 P.BB. 12.a 284,941.80 5,926,789.44
14 Balok uk. 20/40 cm
- Beton K 225 17.13 m3 P.BB. 04 1,211,190.87 20,747,699.64
- Tulangan 2,838.45 kg P.BB. 07 18,589.85 52,766,359.73
- Bekisting Balok 42.82 m2 P.BB. 12.a 284,941.80 12,201,207.88
Struktur Lantai 3
15 Kolom uk. 30/30 cm
- Beton K 225 10.80 m3 P.BB. 04 1,211,190.87 13,080,861.42
- Tulangan 2,599.78 kg P.BB. 07 18,589.85 48,329,520.23
- Bekisting kolom 72.00 m2 P.BB. 11.a 244,152.00 17,578,944.00
16 Kolom Praktis
- Beton K 225 1.28 m3 P.BB. 04 1,211,190.87 1,550,324.32
- Tulangan 308.12 kg P.BB. 07 18,589.85 5,727,904.58
- Bekisting kolom 5.12 m2 P.BB. 11.a 244,152.00 1,250,058.24
17 Balok uk. 15/70 cm
- Beton K 225 1.94 m3 P.BB. 04 1,211,190.87 2,349,710.29
- Tulangan 409.32 kg P.BB. 07 18,589.85 7,609,197.40
- Bekisting Balok 9.25 m2 P.BB. 12.a 284,941.80 2,635,711.65
18 Balok uk. 20/30 cm
- Beton K 225 8.64 m3 P.BB. 04 1,211,190.87 10,464,689.13
- Tulangan 1,647.82 kg P.BB. 07 18,589.85 30,632,726.63
- Bekisting Balok 34.56 m2 P.BB. 12.a 284,941.80 9,847,588.61
19 Balok uk. 20/40 cm
- Beton K 225 7.40 m3 P.BB. 04 1,211,190.87 8,962,812.45
- Tulangan 1,226.33 kg P.BB. 07 18,589.85 22,797,290.75
- Bekisting Balok 18.50 m2 P.BB. 12.a 284,941.80 5,271,423.30
Sub Total III 643,173,189.90
Kode Harga Satuan Jumlah Harga Total Harga
No. Uraian Pekerjaan Volume Satuan
Analisa (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
IV Pekerjaan Tangga
1 Tangga Naik ke Lantai 2
- Beton K 225 2.85 m3 P.BB. 04 1,211,190.87 3,451,893.99
- Tulangan 1,136.83 kg P.BB. 07 18,589.85 21,133,499.18
- Bekisting kolom 19.06 m2 P.BB. 11.a 244,152.00 4,653,537.12
- Plesteran 13.88 m2 P.Pls. 02 49,503.00 687,101.64
- Keramik tangga uk. 40 x 40 cm (anti gores) 28.01 m2 P.LD. 04 210,940.50 5,908,443.41
- Relling tangga stainless 14.25 m' - 1,250,000.00 17,812,500.00
2 Tangga Naik ke Lantai 3
- Beton K 225 2.85 m3 P.BB. 04 1,211,190.87 3,451,893.99
- Tulangan 1,136.83 kg P.BB. 07 18,589.85 21,133,499.18
- Bekisting kolom 19.06 m2 P.BB. 11.a 244,152.00 4,653,537.12
- Plesteran 13.88 m2 P.Pls. 02 49,503.00 687,101.64
- Keramik tangga uk. 40 x 40 cm (anti gores) 28.01 m2 P.LD. 04 210,940.50 5,908,443.41
- Relling tangga stainless 14.25 m' - 1,250,000.00 17,812,500.00
3 Tangga naik sisi depan
- Beton K 225 1.17 m3 P.BB. 04 1,211,190.87 1,417,093.32
- Tulangan 234.00 kg P.BB. 07 18,589.85 4,350,024.90
- Bekisting kolom 4.80 m2 P.BB. 11.a 244,152.00 1,171,929.60
- Keramik tangga uk. 40 x 40 cm (anti gores) 6.60 m2 P.LD. 04 210,940.50 1,392,207.30
Sub Total IV 115,625,205.77
V Pekerjaan Lantai
Lantai 1
1 Plat lantai t = 10 cm
- Beton K 225 33.07 m3 P.BB. 04 1,211,190.87 40,054,082.14
- Wiremesh M8 683.92 kg P.BB. 08 19,698.10 13,471,924.55
- Bekisting lantai 7.28 m2 P.BB. 13.a 300,663.50 2,188,830.28
2 Keramik lantai uk. 40 x 40 cm (anti gores)
3 Cor dinding tutup kolong
- Beton K 225 9.24 m3 P.BB. 04 1,211,190.87 11,191,403.66
- Tulangan 961.29 kg P.BB. 07 18,589.85 17,870,236.91
- Bekisting lantai 33.60 m2 P.BB. 13.a 300,663.50 10,102,293.60
Lantai 2
3 Plat lantai t = 10 cm
- Beton K 225 31.75 m3 P.BB. 04 1,211,190.87 38,455,310.19
- Wiremesh M8 319.55 kg P.BB. 08 19,698.10 6,294,527.86
- Bekisting lantai 190.50 m2 P.BB. 13.a 300,663.50 57,276,396.75
4 Keramik lantai uk. 40 x 40 cm (anti gores)
Lantai 3
5 Plat lantai t = 10 cm
- Beton K 225 31.75 m3 P.BB. 04 1,211,190.87 38,455,310.19
- Wiremesh M8 319.55 kg P.BB. 08 19,698.10 6,294,527.86
- Bekisting lantai 190.50 m2 P.BB. 13.a 300,663.50 57,276,396.75
6 Keramik lantai uk. 40 x 40 cm (anti gores)
Sub Total V 298,931,240.72
VI Pekerjaan Dinding
Lantai 1
1 Pekerjaan Dinding batako 212.00 m2 P.Dnd. 01 70,376.50 14,919,818.00
2 Plesteran dinding batako 424.00 m2 P.Pls. 02 49,503.00 20,989,272.00
3 Acian Dinding 424.00 m2 P.Pls. 07 29,615.00 12,556,760.00
Lantai 2
1 Dinding batako 249.80 m2 P.Dnd. 01 70,376.50 17,580,049.70
2 Plesteran dinding batako 499.60 m2 P.Pls. 02 49,503.00 24,731,698.80
3 Acian Dinding 499.60 m2 P.Pls. 07 29,615.00 14,795,654.00
Lantai 3
1 Dinding batako 249.80 m2 P.Dnd. 01 70,376.50 17,580,049.70
2 Plesteran dinding batako 499.60 m2 P.Pls. 02 49,503.00 24,731,698.80
3 Acian Dinding 499.60 m2 P.Pls. 07 29,615.00 14,795,654.00
Sub Total VI 162,680,655.00
Lantai 2
3 Rangka plafond GRC 317.50 m2 P.K. 35 79,300.13 25,177,789.69
4 Plafond GRC 317.50 m2 P.Pf. 05 38,844.30 12,333,065.25
Lantai 3
Kode Harga Satuan Jumlah Harga Total Harga
No. Uraian Pekerjaan Volume Satuan
Analisa (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Lantai 2
1 Pintu Type P1 (8 Unit)
- Kusen Kayu Kelas I 0.20 m3 P.K. 12 15,261,050.00 3,052,210.00
- Pintu Panel Kayu Kelas I uk. 80 x 210 cm 13.44 m2 P.K. 14 671,025.00 9,018,576.00
2 Pintu Type P2 (4 Unit)
- Kusen Kayu Kelas I 0.10 m3 P.K. 12 15,261,050.00 1,526,105.00
- Pintu Panel Kayu Kelas I uk. 70 x 210 cm 5.88 m2 P.K. 14 671,025.00 3,945,627.00
3 Jendela Type J1 (8 Unit)
- Kusen Rangka Alumunium 51.20 m' P.BA. 05 106,880.40 5,472,276.48
- Frame Jendela Alumunium uk. 42 x 110 cm (2) 16.00 unit - 750,000.00 12,000,000.00
- Kaca Ray Band t. 5 mm 11.52 m2 P.KK. 09 135,760.63 1,563,962.40
4 Jendela Type J2 (3 Unit)
- Kusen Rangka Alumunium 20.20 m' P.BA. 05 106,880.40 2,158,984.08
- Frame Jendela Alumunium uk. 75 x 140 cm (3) 6.00 unit - 750,000.00 4,500,000.00
- Kaca Ray Band t. 5 mm 4.32 m2 P.KK. 09 135,760.63 586,485.90
Lantai 3
1 Pintu Type P1 (8 Unit)
- Kusen Kayu Kelas I 0.20 m3 P.K. 12 15,261,050.00 3,052,210.00
- Pintu Panel Kayu Kelas I uk. 80 x 210 cm 13.44 m2 P.K. 14 671,025.00 9,018,576.00
2 Pintu Type P2 (4 Unit)
- Kusen Kayu Kelas I 0.10 m3 P.K. 12 15,261,050.00 1,526,105.00
- Pintu Panel Kayu Kelas I uk. 70 x 210 cm 5.88 m2 P.K. 14 671,025.00 3,945,627.00
3 Jendela Type J1 (8 Unit)
- Kusen Rangka Alumunium 51.20 m' P.BA. 05 106,880.40 5,472,276.48
- Frame Jendela Alumunium uk. 42 x 110 cm (2) 16.00 unit - 750,000.00 12,000,000.00
- Kaca Ray Band t. 5 mm 11.52 m2 P.KK. 09 135,760.63 1,563,962.40
4 Jendela Type J2 (2 Unit)
- Kusen Rangka Alumunium 20.20 m' P.BA. 05 106,880.40 2,158,984.08
- Frame Jendela Alumunium uk. 75 x 140 cm (3) 6.00 unit - 750,000.00 4,500,000.00
- Kaca Ray Band t. 5 mm 4.32 m2 P.KK. 09 135,760.63 586,485.90
Sub Total IX 140,398,698.16
Lantai 2
4 Kunci Pintu Tanam Biasa 12.00 Bh P.KK. 02 131,884.50 1,582,614.00
5 Engsel Pintu 36.00 Bh P.KK. 04 48,365.63 1,741,162.50
6 Slot pintu 12.00 Bh P.KK. 07 40,837.50 490,050.00
Lantai 3
7 Kunci Pintu Tanam Biasa 12.00 Bh P.KK. 02 131,884.50 1,582,614.00
8 Engsel Pintu 36.00 Bh P.KK. 04 48,365.63 1,741,162.50
9 Slot pintu 12.00 Bh P.KK. 07 40,837.50 490,050.00
Sub Total X 10,170,204.00
XI Pekerjaan Listrik
Lantai 1
1 Instalasi titik lampu 10.00 ttk - 245,000.00 2,450,000.00
2 Instalasi stop kontak 4.00 ttk - 245,000.00 980,000.00
3 Lampu SL 18 watt 10.00 bh - 65,000.00 650,000.00
4 Saklar tunggal 4.00 bh - 50,000.00 200,000.00
5 Saklar ganda 3.00 bh - 55,000.00 165,000.00
6 Instalasi box MCB 1.00 unit - 500,000.00 500,000.00
Lantai 2
7 Instalasi titik lampu 10.00 ttk - 245,000.00 2,450,000.00
8 Instalasi stop kontak 4.00 ttk - 245,000.00 980,000.00
9 Lampu SL 18 watt 10.00 bh - 65,000.00 650,000.00
10 Saklar tunggal 4.00 bh - 50,000.00 200,000.00
11 Saklar ganda 3.00 bh - 55,000.00 165,000.00
12 Instalasi box MCB 1.00 unit - 500,000.00 500,000.00
Lantai 3
13 Instalasi titik lampu 10.00 ttk - 245,000.00 2,450,000.00
14 Instalasi stop kontak 4.00 ttk - 245,000.00 980,000.00
15 Lampu SL 18 watt 10.00 bh - 65,000.00 650,000.00
16 Saklar tunggal 4.00 bh - 50,000.00 200,000.00
Kode Harga Satuan Jumlah Harga Total Harga
No. Uraian Pekerjaan Volume Satuan
Analisa (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Lantai 2
10 Keramik Lantai WC Uk. 20 x 20 cm 7.88 m2 P.LD. 01 169,340.04 1,334,399.52
11 Keramik Dinding WC uk. 25 x 20 cm 25.65 m2 P.LD. 07 170,476.50 4,372,722.23
12 Kloset duduk 3.00 bh P.Snt. 01 2,141,793.50 6,425,380.50
13 Kran Air 3.00 bh P.Snt. 15 44,352.00 133,056.00
14 Bak Air KM/WC 3.00 bh - 1,200,000.00 3,600,000.00
15 Floor Drain 3.00 bh - 200,000.00 600,000.00
Lantai 3
10 Keramik Lantai WC Uk. 20 x 20 cm 7.88 m2 P.LD. 01 169,340.04 1,334,399.52
11 Keramik Dinding WC uk. 25 x 20 cm 25.65 m2 P.LD. 07 170,476.50 4,372,722.23
12 Kloset duduk 3.00 bh P.Snt. 01 2,141,793.50 6,425,380.50
13 Kran Air 3.00 bh P.Snt. 15 44,352.00 133,056.00
14 Bak Air KM/WC 3.00 bh - 1,200,000.00 3,600,000.00
15 Floor Drain 3.00 bh - 200,000.00 600,000.00
Sub Total XII 68,396,674.72
XV Pekerjaan Lain-Lain
1 Pekerjaan arsiran dinding 31.25 m2 - 60,000.00 1,875,000.00
2 Pekerjaan Kunsul Beton 21.00 m' - 125,000.00 2,625,000.00
3 Pekerjaan balkon
- Dinding batako 68.34 m2 P.Dnd. 01 70,376.50 4,809,530.01
- Plesteran dinding batako 136.68 m2 P.Pls. 02 49,503.00 6,766,070.04
Sub Total XV 16,075,600.05
Total ###
PPN 10 % 227,962,880.77
Jumlah Total ###
Pembulatan ###
Terbilang : Dua Miliar Empat Puluh Empat Juta Delapan Ratus Tujuh Belas Ribu Rupiah
Lokasi :
Jumlah 5,350,000.00
Pengukuran Dermaga
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Surveyor OH #REF! 30.000 #REF!
2 Pembantu Surveyor OH #REF! 30.000 #REF!
3 Pekerja OH 68,200.00 60.000 4,092,000.00
Jumlah #REF!
B Alat
1 Theodolit Hari 100,000.00 30.000 3,000,000.00
2 Waterpass Hari 100,000.00 30.000 3,000,000.00
0.00
Jumlah 6,000,000.00
C Jumlah A + B #REF!
D Harga Satuan #REF!
Jumlah 148,500,000.00
1m1 Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 2 meter (P.Ps. 01)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Kayu OH 85,800.00 0.200 17,160.00
2 Pekerja OH 68,200.00 0.400 27,280.00
3 Kepala Tukang OH 93,500.00 0.020 1,870.00
4 Mandor OH 93,500.00 0.020 1,870.00
Jumlah 48,180.00
B Bahan
1 Kayu Pancang (Dolken) d = 10cm, p = 4m Btg 10,450.00 1.250 13,062.50
2 Seng Gelombang BJLS 0.20 Lbr 51,370.00 1.200 61,644.00
3 Kayu Kelas II uk. 4/6 M3 2,699,610.00 0.072 194,371.92
4 Paku Kg 21,900.00 0.060 1,314.00
Jumlah 270,392.42
C Jumlah A + B 318,572.42
D Harga Satuan 318,572.42
Acuan : ABK Bangunan Gedung dan Perumahan - 6.2
Jumlah 0.00
C Jumlah A + B 18,826.50
D Harga Satuan 18,826.50
Memasang 1m3 Pondasi Batu Belah, Campuran 1Pc : 3Ps (P.PB. 01)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 1.500 102,300.00
2 Tukang Batu OH 85,800.00 0.750 64,350.00
3 Kepala Tukang OH 93,500.00 0.075 7,012.50
4 Mandor OH 93,500.00 0.075 7,012.50
Jumlah 180,675.00
B Bahan
1 Batu Belah 15-20 cm M3 230,230.00 1.200 276,276.00
2 Semen Portland Kg 1,700.00 202.000 343,400.00
3 Pasir M3 115,000.00 0.485 55,775.00
Jumlah 675,451.00
C Jumlah A + B 856,126.00
D Harga Satuan 856,126.00
Acuan : SNI DT 91-0007-2007
Membuat 1m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB. 01)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 1.200 81,840.00
2 Tukang Batu OH 85,800.00 0.200 17,160.00
3 Kepala Tukang OH 93,500.00 0.020 1,870.00
4 Mandor OH 93,500.00 0.060 5,610.00
Jumlah 106,480.00
B Bahan
1 Semen Portland Kg 1,700.00 230.000 391,000.00
2 Pasir Kg 82.14 893.000 73,353.57
3 Batu pecah 1-2 cm (Kerikil) Kg 359.74 1,027.000 369,456.78
4 Air Liter 0.00 0.000 0.00
Jumlah 833,810.36
C Jumlah A + B 940,290.36
D Harga Satuan 940,290.36
Acuan : SNI DT 91-0008-2007
Membuat 1m3 Beton Mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87 (P.BB. 02)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
Membuat 1m3 Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 (P.BB. 03)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 1.650 112,530.00
2 Tukang Batu OH 85,800.00 0.275 23,595.00
3 Kepala Tukang OH 93,500.00 0.028 2,618.00
4 Mandor OH 93,500.00 0.083 7,760.50
Jumlah 146,503.50
B Bahan
1 Semen Portland Kg 1,700.00 326.000 554,200.00
2 Pasir Kg 82.14 760.000 62,428.57
3 Batu pecah 1-2 cm (Kerikil) Kg 359.74 1,029.000 370,176.27
4 Air Liter 0.00 0.000 0.00
Jumlah 986,804.84
C Jumlah A + B 1,133,308.34
D Harga Satuan 1,133,308.34
Acuan : SNI DT 91-0008-2007
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB. 04)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 1.650 112,530.00
2 Tukang Batu OH 85,800.00 0.275 23,595.00
3 Kepala Tukang OH 93,500.00 0.028 2,618.00
4 Mandor OH 93,500.00 0.083 7,760.50
Jumlah 146,503.50
B Bahan
1 Semen Portland Kg 1,700.00 371.000 630,700.00
2 Pasir Kg 82.14 698.000 57,335.71
3 Batu pecah 1-2 cm (Kerikil) Kg 359.74 1,047.000 376,651.66
4 Air Liter 0.00 0.000 0.00
Jumlah 1,064,687.37
C Jumlah A + B 1,211,190.87
D Harga Satuan 1,211,190.87
Acuan : SNI DT 91-0008-2007
Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225)Ready Mix, slump (12 ± 2) cm, w/c = 0,58 (P.BB. 04.a)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
1 Beton Ready Mix 225 M3 1.000 0.00
2 Sewa Pompa Ready Mix (Min. 100 M³) M3 1.000 0.00
Membuat 1m3 Beton Mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 (P.BB. 05)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 1.650 112,530.00
2 Tukang Batu OH 85,800.00 0.275 23,595.00
3 Kepala Tukang OH 93,500.00 0.028 2,618.00
4 Mandor OH 93,500.00 0.083 7,760.50
Jumlah 146,503.50
B Bahan
1 Semen Portland Kg 1,700.00 384.000 652,800.00
2 Pasir Kg 82.14 692.000 56,842.86
3 Batu pecah 1-2 cm (Kerikil) Kg 359.74 1,039.000 373,773.71
4 Air Liter 0.00 0.000 0.00
Jumlah 1,083,416.57
C Jumlah A + B 1,229,920.07
D Harga Satuan 1,229,920.07
Acuan : SNI DT 91-0008-2007
Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (P.BB. 06)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 1.650 112,530.00
2 Tukang Batu OH 85,800.00 0.275 23,595.00
3 Kepala Tukang OH 93,500.00 0.028 2,618.00
4 Mandor OH 93,500.00 0.083 7,760.50
Jumlah 146,503.50
B Bahan
1 Semen Portland Kg 1,700.00 413.000 702,100.00
2 Pasir Kg 82.14 681.000 55,939.29
3 Batu pecah 1-2 cm (Kerikil) Kg 359.74 1,021.000 367,298.32
4 Air Liter 0.00 0.000 0.00
Jumlah 1,125,337.61
C Jumlah A + B 1,271,841.11
D Harga Satuan 1,271,841.11
Acuan : SNI DT 91-0008-2007
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
Membuat 1m3 Sloof Beton Bertulang (200 kg besi + bekisting) (P.BB. 17)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 5.650 385,330.00
2 Tukang Batu OH 85,800.00 0.275 23,595.00
3 Tukang Kayu OH 85,800.00 1.560 133,848.00
4 Tukang Besi OH 85,800.00 1.400 120,120.00
5 Kepala Tukang OH 93,500.00 0.323 30,200.50
6 Mandor OH 93,500.00 0.283 26,460.50
Jumlah 719,554.00
B Bahan
1 Kayu Kelas III M3 2,266,100.00 0.270 611,847.00
2 Paku 2" - 5" Kg 21,900.00 2.000 43,800.00
3 Minyak Bekisting Lt 8,100.00 0.600 4,860.00
4 Besi Beton Polos Kg 16,300.00 210.000 3,423,000.00
5 Kawat Ikat Beton (bendrat) Kg 19,600.00 3.000 58,800.00
6 Semen Portland Kg 1,700.00 336.000 571,200.00
7 Pasir M3 115,000.00 0.540 62,100.00
8 Batu pecah 1-2 cm (Kerikil) M3 485,654.00 0.810 393,379.74
Jumlah 5,168,986.74
C Jumlah A + B 5,888,540.74
D Harga Satuan 5,888,540.74
Acuan : SNI DT 91-0008-2007
Membuat 1m3 Balok Beton Bertulang (200 kg besi + bekisting) (P.BB. 19)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 6.350 433,070.00
2 Tukang Batu OH 85,800.00 0.275 23,595.00
3 Tukang Kayu OH 85,800.00 1.650 141,570.00
4 Tukang Besi OH 85,800.00 1.400 120,120.00
5 Kepala Tukang OH 93,500.00 0.333 31,135.50
6 Mandor OH 93,500.00 0.318 29,733.00
Jumlah 779,223.50
B Bahan
1 Kayu Kelas III M3 2,266,100.00 0.320 725,152.00
2 Paku 2" - 5" Kg 21,900.00 3.200 70,080.00
3 Minyak Bekisting Lt 8,100.00 1.600 12,960.00
4 Besi Beton Polos Kg 16,300.00 210.000 3,423,000.00
5 Kawat Ikat Beton (bendrat) Kg 19,600.00 3.000 58,800.00
6 Semen Portland Kg 1,700.00 336.000 571,200.00
7 Pasir M3 115,000.00 0.540 62,100.00
8 Batu pecah 1-2 cm (Kerikil) M3 485,654.00 0.810 393,379.74
9 Ky.klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M3 2,699,610.00 0.140 377,945.40
10 Triplek t = 9mm Lbr 165,000.00 2.800 462,000.00
11 Cerucuk Ǿ 8 - 10cm / 4m Btg 10,450.00 16.000 167,200.00
Jumlah 6,323,817.14
C Jumlah A + B 7,103,040.64
D Harga Satuan 7,103,040.64
Acuan : SNI DT 91-0008-2007
Membuat 1m3 Dinding Beton Bertulang (150 kg besi + bekisting) (P.BB. 21)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 5.300 361,460.00
2 Tukang Batu OH 85,800.00 0.275 23,595.00
3 Tukang Kayu OH 85,800.00 1.300 111,540.00
4 Tukang Besi OH 85,800.00 1.050 90,090.00
5 Kepala Tukang OH 93,500.00 0.262 24,497.00
6 Mandor OH 93,500.00 0.265 24,777.50
Jumlah 635,959.50
B Bahan
1 Kayu Kelas III M3 2,266,100.00 0.240 543,864.00
2 Paku 2" - 5" Kg 21,900.00 3.200 70,080.00
3 Minyak Bekisting Lt 8,100.00 1.600 12,960.00
4 Besi Beton Polos Kg 16,300.00 157.500 2,567,250.00
5 Kawat Ikat Beton (bendrat) Kg 19,600.00 2.250 44,100.00
6 Semen Portland Kg 1,700.00 336.000 571,200.00
7 Pasir M3 115,000.00 0.540 62,100.00
8 Batu pecah 1-2 cm (Kerikil) M3 485,654.00 0.810 393,379.74
9 Ky.klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M3 2,699,610.00 0.160 431,937.60
10 Triplek t = 9mm Lbr 165,000.00 2.800 462,000.00
11 Cerucuk Ǿ 8 - 10cm / 4m Btg 10,450.00 24.000 250,800.00
Jumlah 5,409,671.34
C Jumlah A + B 6,045,630.84
D Harga Satuan 6,045,630.84
Acuan : SNI DT 91-0008-2007
Membuat 1m' Kolom Praktis Beton Bertulang (11 x 11) cm (P.BB. 23)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.180 12,276.00
2 Tukang Batu OH 85,800.00 0.020 1,716.00
3 Tukang Kayu OH 85,800.00 0.020 1,716.00
4 Tukang Besi OH 85,800.00 0.020 1,716.00
5 Kepala Tukang OH 93,500.00 0.006 561.00
6 Mandor OH 93,500.00 0.009 841.50
Jumlah 18,826.50
B Bahan
1 Kayu Kelas III M3 2,266,100.00 0.002 4,532.20
2 Paku 2" - 5" Kg 21,900.00 0.010 219.00
3 Minyak Bekisting Lt 8,100.00 0.000 0.00
4 Besi Beton Polos Kg 16,300.00 3.000 48,900.00
5 Kawat Ikat Beton (bendrat) Kg 19,600.00 0.450 8,820.00
6 Semen Portland Kg 1,700.00 4.000 6,800.00
7 Pasir M3 115,000.00 0.006 690.00
8 Batu pecah 1-2 cm (Kerikil) M3 485,654.00 0.009 4,370.89
Jumlah 74,332.09
C Jumlah A + B 93,158.59
D Harga Satuan 93,158.59
Acuan : SNI DT 91-0008-2007
Memasang 1m2 Dinding Bata Merah ukuran (5x11x22) cm tebal 1 Bata campuran 1Pc : 4Ps (P.Dnd. 04)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.600 40,920.00
2 Tukang Batu OH 85,800.00 0.200 17,160.00
3 Kepala Tukang OH 93,500.00 0.020 1,870.00
4 Mandor OH 93,500.00 0.030 2,805.00
Jumlah 62,755.00
B Bahan
1 Bata Merah 5 x 11 x 22cm Bh 2,530.00 140 354,200.00
2 Semen Portland Kg 1,700.00 26.550 45,135.00
3 Pasir Pasang M3 115,000.00 0.093 10,695.00
Jumlah 410,030.00
C Jumlah A + B 472,785.00
D Harga Satuan 472,785.00
Acuan : SNI DT 91-0009-2007
Memasang 1m2 Dinding Bata Merah ukuran (5x11x22) cm tebal 1/2 Bata campuran 1Pc : 4Ps (P.Dnd. 05)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.300 20,460.00
2 Tukang Batu OH 85,800.00 0.100 8,580.00
3 Kepala Tukang OH 93,500.00 0.010 935.00
4 Mandor OH 93,500.00 0.015 1,402.50
Jumlah 31,377.50
B Bahan
1 Bata Merah 5 x 11 x 22cm Bh 2,530.00 70 177,100.00
2 Semen Portland Kg 1,700.00 11.500 19,550.00
3 Pasir Pasang M3 115,000.00 0.043 4,945.00
Jumlah 201,595.00
C Jumlah A + B 232,972.50
D Harga Satuan 232,972.50
Acuan : SNI DT 91-0009-2007
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 9/9 (P.K. 01)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Kayu OH 85,800.00 24.000 2,059,200.00
2 Pekerja OH 68,200.00 8.000 545,600.00
3 Kepala Tukang OH 93,500.00 2.400 224,400.00
4 Mandor OH 93,500.00 0.400 37,400.00
Jumlah 2,866,600.00
B Bahan
1 Kayu Belian (Tidak Ketam uk. 9/9) M3 9,350,550.00 1.100 10,285,605.00
2 Paku beton Kg 27,500.00 3.000 82,500.00
Jumlah 10,368,105.00
C Jumlah A + B 13,234,705.00
D Harga Satuan 13,234,705.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian
Uk. 12/12 - 15/15 (P.K. 03)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Kayu OH 85,800.00 24.000 2,059,200.00
2 Pekerja OH 68,200.00 8.000 545,600.00
3 Kepala Tukang OH 93,500.00 2.400 224,400.00
4 Mandor OH 93,500.00 0.400 37,400.00
Jumlah 2,866,600.00
B Bahan
1 Kayu Belian (Tidak Ketam uk. 12/12 - 15/15) M3 8,116,350.00 1.100 8,927,985.00
2 Paku beton Kg 27,500.00 3.000 82,500.00
Jumlah 9,010,485.00
C Jumlah A + B 11,877,085.00
D Harga Satuan 11,877,085.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian
Uk. 18/18 - 20/20 (P.K. 04)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Kayu OH 85,800.00 24.000 2,059,200.00
2 Pekerja OH 68,200.00 8.000 545,600.00
3 Kepala Tukang OH 93,500.00 2.400 224,400.00
4 Mandor OH 93,500.00 0.400 37,400.00
Jumlah 2,866,600.00
B Bahan
1 Kayu Belian (Tidak Ketam uk. 18/18 - 20/20) M3 7,370,770.00 1.100 8,107,847.00
2 Paku beton Kg 27,500.00 3.000 82,500.00
Jumlah 8,190,347.00
C Jumlah A + B 11,056,947.00
D Harga Satuan 11,056,947.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3
1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 (P.K. 06)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Kayu OH 85,800.00 36.000 3,088,800.00
2 Pekerja OH 68,200.00 12.000 818,400.00
3 Kepala Tukang OH 93,500.00 3.600 336,600.00
4 Mandor OH 93,500.00 0.600 56,100.00
Jumlah 4,299,900.00
B Bahan
1 Kayu Belian (Ketam uk. 8/8) M3 10,771,200.00 1.100 11,848,320.00
2 Paku belian Kg 27,500.00 6.000 165,000.00
Jumlah 12,013,320.00
C Jumlah A + B 16,313,220.00
D Harga Satuan 16,313,220.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27
1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 7/7 (P.K. 07)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Kayu OH 85,800.00 24.000 2,059,200.00
2 Pekerja OH 68,200.00 8.000 545,600.00
3 Kepala Tukang OH 93,500.00 2.400 224,400.00
4 Mandor OH 93,500.00 0.400 37,400.00
Jumlah 2,866,600.00
B Bahan
1 Kayu Kelas I (Ketam Uk. 7/7) M3 6,033,170.00 1.100 6,636,487.00
2 Paku Kg 21,900.00 6.000 131,400.00
Jumlah 6,767,887.00
C Jumlah A + B 9,634,487.00
D Harga Satuan 9,634,487.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27.a
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela Kayu Belian (P.K. 12.a)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 7.000 477,400.00
2 Tukang Kayu OH 85,800.00 21.000 1,801,800.00
3 Kepala Tukang OH 93,500.00 2.100 196,350.00
4 Mandor OH 93,500.00 0.350 32,725.00
Jumlah 2,508,275.00
B Bahan
1 Kayu Belian (Ketam) M3 11,892,210.00 1.100 13,081,431.00
2 Paku 10 cm kg 21,900.00 1.250 27,375.00
3 Lem Kayu kg 20,400.00 1.000 20,400.00
Jumlah 13,129,206.00
C Jumlah A + B 15,637,481.00
D Harga Satuan 15,637,481.00
Acuan : SNI DT 91-0011-2007
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas II (P.K. 13)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 6.000 409,200.00
2 Tukang Kayu OH 85,800.00 18.000 1,544,400.00
3 Kepala Tukang OH 93,500.00 1.800 168,300.00
4 Mandor OH 93,500.00 0.300 28,050.00
Jumlah 2,149,950.00
B Bahan
1 Kayu Kelas II uk. 5/10 (Tidak Ketam) M3 3,053,270.00 1.200 3,663,924.00
2 Paku 10 cm kg 21,900.00 1.250 27,375.00
3 Lem Kayu kg 20,400.00 1.000 20,400.00
Jumlah 3,711,699.00
C Jumlah A + B 5,861,649.00
D Harga Satuan 5,861,649.00
Acuan : SNI DT 91-0011-2007
Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas II (P.K. 15)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 1.000 68,200.00
2 Tukang Kayu OH 85,800.00 3.000 257,400.00
3 Kepala Tukang OH 93,500.00 0.300 28,050.00
4 Mandor OH 93,500.00 0.050 4,675.00
Jumlah 358,325.00
B Bahan
1 Papan Kayu Kelas II (Ketam) M3 6,331,160.00 0.040 253,246.40
2 Lem Kayu kg 20,400.00 0.500 10,200.00
Jumlah 263,446.40
C Jumlah A + B 621,771.40
D Harga Satuan 621,771.40
Acuan : SNI DT 91-0011-2007
Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I (P.K. 19)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.800 54,560.00
2 Tukang Kayu OH 85,800.00 2.400 205,920.00
3 Kepala Tukang OH 93,500.00 0.240 22,440.00
4 Mandor OH 93,500.00 0.040 3,740.00
Jumlah 286,660.00
B Bahan
1 Papan Kayu Kelas I (Ketam) M3 7,562,500.00 0.0256 193,600.00
2 Paku 1/2" -1" Kg 21,900.00 0.030 657.00
3 Lem Kayu Lt 20,400.00 0.500 10,200.00
4 Plywood 4' x 8' x 4mm Lbr 109,340.00 1.000 109,340.00
Jumlah 313,797.00
C Jumlah A + B 600,457.00
D Harga Satuan 600,457.00
Acuan : SNI DT 91-0011-2007
Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas I Bentang 6 m (P.K. 24)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 4.000 272,800.00
2 Tukang Kayu OH 85,800.00 12.000 1,029,600.00
3 Kepala Tukang OH 93,500.00 1.200 112,200.00
4 Mandor OH 93,500.00 0.200 18,700.00
Jumlah 1,433,300.00
B Bahan
1 Balok Kayu Kelas I (Tidak Ketam) M3 4,630,120.00 1.100 5,093,132.00
2 Besi Strip Kg 38,500.00 15.000 577,500.00
3 Paku 12 cm Kg 21,900.00 5.600 122,640.00
Jumlah 5,793,272.00
C Jumlah A + B 7,226,572.00
D Harga Satuan 7,226,572.00
Acuan : SNI DT 91-0011-2007
Memasang 1m2 Rangka Atap Genteng Beton, Kayu Kelas II (P.K. 29)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.100 6,820.00
2 Tukang Kayu OH 85,800.00 0.100 8,580.00
3 Kepala Tukang OH 93,500.00 0.010 935.00
4 Mandor OH 93,500.00 0.005 467.50
Jumlah 16,802.50
B Bahan
1 Kaso-kaso (5x7) cm M3 1,883,750.00 0.014 26,372.50
2 Reng M3 962,500.00 0.057 54,862.50
3 Paku 7 cm - 10 cm Kg 21,900.00 0.250 5,475.00
Jumlah 86,710.00
C Jumlah A + B 103,512.50
D Harga Satuan 103,512.50
Acuan : SNI DT 91-0011-2007
Memasang 1m2 Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau III (P.K. 34)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.150 10,230.00
2 Tukang Kayu OH 85,800.00 0.300 25,740.00
3 Kepala Tukang OH 93,500.00 0.030 2,805.00
4 Mandor OH 93,500.00 0.075 7,012.50
Jumlah 45,787.50
B Bahan
1 Kaso-kaso (5x7) cm M3 1,883,750.00 0.0154 29,009.75
2 Paku 7 cm - 10 cm Kg 21,900.00 0.200 4,380.00
Jumlah 33,389.75
C Jumlah A + B 79,177.25
D Harga Satuan 79,177.25
Acuan : SNI DT 91-0011-2007
Memasang 1m2 Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III (P.K. 35)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.200 13,640.00
2 Tukang Kayu OH 85,800.00 0.300 25,740.00
3 Kepala Tukang OH 93,500.00 0.030 2,805.00
4 Mandor OH 93,500.00 0.010 935.00
Jumlah 43,120.00
B Bahan
1 Kaso-kaso (5x7) cm M3 1,883,750.00 0.0163 30,705.13
2 Paku 7 cm - 10 cm Kg 21,900.00 0.250 5,475.00
Jumlah 36,180.13
C Jumlah A + B 79,300.13
D Harga Satuan 79,300.13
Acuan : SNI DT 91-0011-2007
1m2 Pasang Rangka Langit-langit (30 x 30)cm Kayu Kelas II (P.K. 37)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.250 17,050.00
2 Tukang Kayu OH 85,800.00 0.350 30,030.00
3 Kepala Tukang OH 93,500.00 0.035 3,272.50
4 Mandor OH 93,500.00 0.0125 1,168.75
Jumlah 51,521.25
B Bahan
1 Kayu Kelas II (Tidak Ketam) M3 3,724,160.00 0.027 100,552.32
2 Paku Kg 21,900.00 0.200 4,380.00
Jumlah 104,932.32
C Jumlah A + B 156,453.57
D Harga Satuan 156,453.57
Acuan : ABK Bangunan Gedung dan Perumahan - 6.44
Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas I (P.K. 38)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.100 6,820.00
2 Tukang Kayu OH 85,800.00 0.200 17,160.00
3 Kepala Tukang OH 93,500.00 0.020 1,870.00
4 Mandor OH 93,500.00 0.005 467.50
Jumlah 26,317.50
B Bahan
1 Papan Kayu Kelas I (Ketam) M3 7,562,500.00 0.0108 81,675.00
2 Paku Kg 21,900.00 0.100 2,190.00
Jumlah 83,865.00
C Jumlah A + B 110,182.50
D Harga Satuan 110,182.50
Acuan : SNI DT 91-0011-2007
Memasang 1m2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II (P.K. 46)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.200 13,640.00
2 Tukang Kayu OH 85,800.00 0.600 51,480.00
3 Kepala Tukang OH 93,500.00 0.060 5,610.00
4 Mandor OH 93,500.00 0.010 935.00
Jumlah 71,665.00
B Bahan
1 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam M3 3,724,160.00 0.0280 104,276.48
2 Paku Kg 21,900.00 0.150 3,285.00
3 Plywood 4' x 8' x 4mm Kg 109,340.00 0.860 94,032.40
4 Lem Kayu Ltr 20,400.00 0.560 11,424.00
Jumlah 213,017.88
C Jumlah A + B 284,682.88
D Harga Satuan 284,682.88
Acuan : SNI DT 91-0011-2007
Memasang 1m2 Dinding Lambriziring dari Papan Kayu Kelas I (P.K. 47)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.600 40,920.00
2 Tukang Kayu OH 85,800.00 1.800 154,440.00
3 Kepala Tukang OH 93,500.00 0.180 16,830.00
4 Mandor OH 93,500.00 0.030 2,805.00
Jumlah 214,995.00
B Bahan
1 Papan Kayu Kelas I (Ketam) M3 7,562,500.00 0.007 52,937.50
2 Paku Kg 21,900.00 0.100 2,190.00
3 Sekrup Kg 66,000.00 0.150 9,900.00
Jumlah 65,027.50
C Jumlah A + B 280,022.50
D Harga Satuan 280,022.50
Acuan : SNI DT 91-0011-2007
Memasang 1m2 Dinding Lambriziring dari Plywood ukuran (120 x 240) cm (P.K. 48)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.025 1,705.00
2 Tukang Kayu OH 85,800.00 0.075 6,435.00
3 Kepala Tukang OH 93,500.00 0.008 748.00
4 Mandor OH 93,500.00 0.001 93.50
Jumlah 8,981.50
B Bahan
1 Plywood 4' x 8' x 4mm Lbr 109,340.00 0.400 43,736.00
2 Paku 1/2 " - 1" Kg 21,900.00 0.050 1,095.00
Jumlah 44,831.00
C Jumlah A + B 53,812.50
D Harga Satuan 53,812.50
Acuan : SNI DT 91-0011-2007
1m2 Pasang Atap Genteng Metal Type PRIMA 0.35 (P.PA. 01)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.200 13,640.00
2 Tukang kayu OH 85,800.00 0.100 8,580.00
3 Kepala Tukang OH 93,500.00 0.010 935.00
4 Mandor OH 93,500.00 0.001 93.50
Jumlah 23,248.50
B Bahan
1 Genteng Metal Type PRIMA 0.35 Lbr 69,630.00 1.840 128,119.20
2 Paku Kg 21,900.00 0.200 4,380.00
Jumlah 132,499.20
C Jumlah A + B 155,747.70
D Harga Satuan 155,747.70
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32
1m2 Pasang Atap Genteng Metal Type CLASSIC 0.35 (P.PA. 03)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.200 13,640.00
2 Tukang kayu OH 85,800.00 0.100 8,580.00
3 Kepala Tukang OH 93,500.00 0.010 935.00
4 Mandor OH 93,500.00 0.001 93.50
Jumlah 23,248.50
B Bahan
1 Genteng Metal Type CLASSIC 0.35 Lbr 67,320.00 1.620 109,058.40
2 Paku Kg 21,900.00 0.200 4,380.00
Jumlah 113,438.40
C Jumlah A + B 136,686.90
D Harga Satuan 136,686.90
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32
1m2 Pasang Atap Genteng Metal Stone Type CLASSIC 0.35 (P.PA. 04)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.200 13,640.00
2 Tukang kayu OH 85,800.00 0.100 8,580.00
3 Kepala Tukang OH 93,500.00 0.010 935.00
4 Mandor OH 93,500.00 0.001 93.50
Jumlah 23,248.50
B Bahan
1 Genteng Metal Stone Type CLASSIC 0.35 Lbr 88,880.00 1.620 143,985.60
2 Paku Kg 21,900.00 0.200 4,380.00
Jumlah 148,365.60
C Jumlah A + B 171,614.10
D Harga Satuan 171,614.10
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32
1m1 Pekerjaan Bubungan dengan Seng Datar Color 0.35 / 10 m1 (P.PA. 07)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.250 17,050.00
2 Tukang kayu OH 85,800.00 0.250 21,450.00
3 Kepala Tukang OH 93,500.00 0.025 2,337.50
Jumlah 40,837.50
B Bahan
1 Paku Kg 21,900.00 0.100 2,190.00
2 Seng Datar Color 0.35 Lbr 60,500.00 6.000 363,000.00
3 Papan Kayu Kelas II (tdk ketam) M3 4,541,790.00 0.072 327,008.88
Jumlah 692,198.88
C Jumlah A + B 733,036.38
D Harga Satuan 733,036.38
Jadi 1 M1 73,303.64
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10
1m1 Pasang Nok / Bumbungan Genteng Metal Kotak 0.35 (P.PA. 09)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.250 17,050.00
2 Tukang kayu OH 85,800.00 0.150 12,870.00
3 Kepala Tukang OH 93,500.00 0.015 1,402.50
4 Mandor OH 93,500.00 0.013 1,215.50
Jumlah 32,538.00
B Bahan
1 Nok / Bubungan Genteng Metal Kotak 0.35 Meter 85,360.00 1.000 85,360.00
2 Paku 1/2" - 1" Kg 21,900.00 0.050 1,095.00
Jumlah 86,455.00
C Jumlah A + B 118,993.00
D Harga Satuan 118,993.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.36
1m1 Pasang Nok / Bumbungan Genteng Metal Stone Kotak 0.35 (P.PA. 10)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.250 17,050.00
2 Tukang kayu OH 85,800.00 0.150 12,870.00
3 Kepala Tukang OH 93,500.00 0.015 1,402.50
4 Mandor OH 93,500.00 0.013 1,215.50
Jumlah 32,538.00
B Bahan
1 Nok / Bubungan Genteng Metal Stone Kotak Meter 101,200.00 1.000 101,200.00
2 Paku 1/2" - 1" Kg 21,900.00 0.050 1,095.00
Jumlah 102,295.00
C Jumlah A + B 134,833.00
D Harga Satuan 134,833.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.36
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm (P.Pf. 01)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.100 6,820.00
2 Tukang Kayu OH 85,800.00 0.100 8,580.00
3 Kepala Tukang OH 93,500.00 0.010 935.00
4 Mandor OH 93,500.00 0.0050 467.50
Jumlah 16,802.50
B Bahan
1 Tripleks t = 3 mm Lbr 60,500.00 0.375 22,687.50
2 Paku tripleks Kg 28,870.00 0.030 866.10
Jumlah 23,553.60
C Jumlah A + B 40,356.10
D Harga Satuan 40,356.10
Sumber : SNI DT 91-0013-2007
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm (P.Pf. 02)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.100 6,820.00
2 Tukang Kayu OH 85,800.00 0.100 8,580.00
3 Kepala Tukang OH 93,500.00 0.010 935.00
4 Mandor OH 93,500.00 0.0050 467.50
Jumlah 16,802.50
B Bahan
1 Tripleks t = 6 mm Lbr 244,800.00 0.375 91,800.00
2 Paku tripleks Kg 28,870.00 0.030 866.10
Jumlah 92,666.10
C Jumlah A + B 109,468.60
D Harga Satuan 109,468.60
Sumber : SNI DT 91-0013-2007
1m2 Pasang Talang Datar Seng BJLS 30 / Talang Sembunyi (P.BA. 10)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.150 10,230.00
2 Tukang Kayu OH 85,800.00 0.400 34,320.00
3 Kepala Tukang OH 93,500.00 0.025 2,337.50
4 Mandor OH 93,500.00 0.00125 116.88
Jumlah 47,004.38
B Bahan
1 Seng Plat 3' x 6' BJLS 30 Lbr 71,500.00 0.500 35,750.00
2 Paku 1/2" - 1" Kg 21,900.00 0.015 328.50
3 Papan Kayu Kelas 2 Tidak Ketam M3 4,541,790.00 0.0096 43,601.18
4 Meni Kg 44,220.00 0.250 11,055.00
Jumlah 90,734.68
C Jumlah A + B 137,739.06
D Harga Satuan 137,739.06
Acuan : ABK Bangunan Gedung dan Perumahan - 6.18
1m2 Pasang Talang Miring Seng BJLS 30 / Jurai Dalam (P.BA. 11)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.040 2,728.00
2 Tukang Kayu OH 85,800.00 0.400 34,320.00
3 Kepala Tukang OH 93,500.00 0.025 2,337.50
4 Mandor OH 93,500.00 0.00125 116.88
Jumlah 39,502.38
B Bahan
1 Seng Plat 3' x 6' BJLS 30 Lbr 71,500.00 0.50 35,750.00
2 Paku 1/2" - 1" Kg 21,900.00 0.015 328.50
3 Papan Kayu Kelas 2 Tidak Ketam M3 4,541,790.00 0.019 86,294.01
4 Meni Kg 44,220.00 0.300 13,266.00
Jumlah 135,638.51
C Jumlah A + B 175,140.89
D Harga Satuan 175,140.89
Acuan : ABK Bangunan Gedung dan Perumahan - 6.19
10m1 Pemasangan Pipa Pembuangan dari Talang Atap Ø 8cm BJLS 30 (P.BA. 13)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Kayu OH 85,800.00 3.750 321,750.00
2 Kepala Tukang Kayu OH 93,500.00 0.375 35,062.50
3 Pekerja OH 68,200.00 2.250 153,450.00
4 Mandor OH 93,500.00 0.110 10,285.00
Jumlah 520,547.50
B Bahan
1 Seng Plat BJLS 30 Lbr 71,500.00 2.500 178,750.00
Jumlah 178,750.00
C Jumlah A + B 699,297.50
D Harga Satuan 699,297.50
Jadi 1m1 69,929.75
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.18
1m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual (P.Ct. 02)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.150 10,230.00
2 Mandor OH 93,500.00 0.0025 233.75
Jumlah 10,463.75
B Bahan
1 Sabun Kg 20,350.00 0.050 1,017.50
1,017.50
C Jumlah A + B 11,481.25
D Harga Satuan 11,481.25
Acuan : ABK Bangunan Gedung dan Perumahan - 6.3
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.070 4,774.00
2 Tukang Cat OH 85,800.00 0.009 772.20
3 Kepala Tukang OH 93,500.00 0.006 561.00
4 Mandor OH 93,500.00 0.0025 233.75
Jumlah 6,340.95
B Bahan
1 Cat Meni Kg 44,220.00 0.200 8,844.00
2 Dempul Kg 27,940.00 0.150 4,191.00
3 Cat Dasar Kg 33,000.00 0.170 5,610.00
4 Cat Kilat Penutup 2 Kali Kg 42,130.00 0.260 10,953.80
29,598.80
C Jumlah A + B 35,939.75
D Harga Satuan 35,939.75
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 3Lapis Cat Penutup) (P.Ct. 05)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.070 4,774.00
2 Tukang Cat OH 85,800.00 0.105 9,009.00
3 Kepala Tukang OH 93,500.00 0.004 374.00
4 Mandor OH 93,500.00 0.0025 233.75
Jumlah 14,390.75
B Bahan
1 Cat Meni Kg 44,220.00 0.200 8,844.00
2 Dempul Kg 27,940.00 0.150 4,191.00
3 Cat Dasar Kg 33,000.00 0.170 5,610.00
4 Cat Kilat Penutup 3 Kali Kg 42,130.00 0.350 14,745.50
33,390.50
C Jumlah A + B 47,781.25
D Harga Satuan 47,781.25
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9
1m2 Pelaburan Bidang Kayu Dengan Cat Residu dan Ter (P.Ct. 09)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Cat OH 85,800.00 0.100 8,580.00
2 Kepala Tukang OH 93,500.00 0.006 561.00
Jumlah 9,141.00
B Bahan
1 Residu dan Ter Ltr 25,300.00 0.350 8,855.00
8,855.00
C Jumlah A + B 17,996.00
D Harga Satuan 17,996.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.12
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.020 1,364.00
2 Tukang Cat OH 85,800.00 0.063 5,405.40
3 Kepala Tukang OH 93,500.00 0.0063 589.05
4 Mandor OH 93,500.00 0.0025 233.75
Jumlah 7,592.20
B Bahan
1 Plamur (dempul tembok) Kg 27,940.00 0.100 2,794.00
2 Cat Dasar tembok Kg 33,000.00 0.120 3,960.00
3 Cat Tembok Penutup 2 x Kg 36,520.00 0.260 9,495.20
16,249.20
C Jumlah A + B 23,841.40
D Harga Satuan 23,841.40
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11a)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.020 1,364.00
2 Tukang Cat OH 85,800.00 0.063 5,405.40
3 Kepala Tukang OH 93,500.00 0.0063 589.05
4 Mandor OH 93,500.00 0.0025 233.75
Jumlah 7,592.20
B Bahan
1 Plamur (dempul tembok) Kg 27,940.00 0.100 2,794.00
2 Cat Dasar tembok Kg 33,000.00 0.120 3,960.00
3 Cat Tembok Penutup Type Weather Shield 2 Kg 80,080.00 0.260 20,820.80
27,574.80
C Jumlah A + B 35,167.00
D Harga Satuan 35,167.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14
1m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 12)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 0.028 1,909.60
2 Tukang Cat OH 85,800.00 0.042 3,603.60
1m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah (P.Ct. 14)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Cat OH 85,800.00 0.250 21,450.00
2 Kepala Tukang OH 93,500.00 0.225 21,037.50
3 Pekerja OH 68,200.00 0.0225 1,534.50
4 Mandor OH 93,500.00 0.0075 701.25
Jumlah 44,723.25
B Bahan
1 Meni Besi Kg 44,220.00 0.100 4,422.00
2 Kuas Bh 17,710.00 0.010 177.10
3 Perancah Kayu Kelas II M3 3,724,160.00 0.002 7,448.32
12,047.42
C Jumlah A + B 56,770.67
D Harga Satuan 56,770.67
Acuan : ABK Bangunan Gedung dan Perumahan - 6.21
1m2 Pekerjaan Bongkaran Dinding Tembok Plesteran Simpai (P. Bkr. 02)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 68,200.00 1.000 68,200.00
2 Mandor OH 93,500.00 0.050 4,675.00
Jumlah 72,875.00
B Jumlah A 72,875.00
C Harga Satuan 72,875.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - L.4
Harga Termasuk
Keuntungan
No. Tenaga Kerja Satuan Kode
(Overhead)
(Rp)
A. UPAH
1 Mandor Lapangan Org/hari L.061 93,500.00
2 Mekanik Org/hari L.071 93,500.00
3 Kepala Tukang Org/hari L.073 93,500.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 85,800.00
5 Operator terlatih Org/hari L.081 77,000.00
6 Operator semi terlatih Org/hari L.082 68,200.00
7 Sopir Org/hari L.091 77,000.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 68,200.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 77,000.00
Harga Termasuk
Keuntungan
No. Material Satuan Kode
(Overhead)
(Rp)
B. BAHAN PENGISI
1 Batu Kong M³ M.101 192,500.00
2 Batu Sap Pinang M³ - 215,050.00
3 Batu pecah 15/20 cm M³ - 230,230.00
4 Batu pecah 10/15 cm M³ M.020 246,070.00
5 Batu pecah 5/7 cm M³ M.022 271,060.00
6 Batu pecah 3/5 cm M³ M.023 290,700.00
7 Batu pecah 2/3 cm M³ M.024 327,030.00
8 Batu pecah 1/2 cm M³ M.025 485,654.00
9 Batu pecah 0,5 - 1 cm / Agregat Kasar M³ M.026 394,900.00
10 Filler Kg - 600.00
11 Chipping M³ - 336,600.00
12 Chipping Kg - 180.00
13 Stone Dust / Agregat Halus M³ - 371,360.00
14 Aspal Kg - 9,900.00
15 Pasir M³ M.040 115,000.00
16 Semen PC Zak M.080 73,600.00
17 Semen PC Kg - 1,700.00
18 Tanah Ex. Peniraman M³ M.050.a 115,060.00
19 Tanah EX. Peladis M³ M.050 220,000.00
20 Paving Block Bh - 2,200.00
21 Paving Stone Bh - 3,630.00
22 Batu Bata 5 x 11 x 22cm Bh - 2,530.00
23 Bataco 15 x 30 x 7 cm Bh - 990.00
24 Bataco 20 x 40 x 9 cm ( cetak mesin ) Bh - 2,530.00
25 Bataco 20 x 40 x 7 cm ( cetak mesin ) Bh - 2,310.00
26 Terawang ( roster ) 18 x 18 cm Bh - 3,300.00
27 Keramik 20 x 20 cm Kotak - 50,120.00
28 Keramik 30 x 30 cm Kotak - 40,030.00
29 Keramik 30 x 30 cm Unpolished Kotak - 54,450.00
30 Keramik 30 x 30 cm Artistik Kotak - 64,130.00
31 Keramik 40 x 40 cm (biasa) Kotak - 71,390.00
32 Keramik 40 x 40 cm (anti gores) Kotak - 96,250.00
33 Keramik 40 x 40 cm Unpolished Kotak - 98,450.00
34 Granito 40 x 40 cm Kotak - 189,420.00
35 Marmer M² - 453,750.00
36 Wood Flooring M² - 275,000.00
37 List Keramik WC. 8 x 20 cm Bh - 242,000.00
38 Plint Kayu uk. 2 x 10 cm M1 - 46,750.00
39 Keramik dinding 20 x 20 cm M² - 50,380.00
40 Keramik dinding 20 x 25 cm M² - 54,890.00
41 Floor Hardener Kg - 8,250.00
42 Beton Ready Mix B 0 M³ - 726,000.00
43 Beton Ready Mix 125 M³ - 759,000.00
44 Beton Ready Mix 175 M³ - 814,000.00
45 Beton Ready Mix 225 M³ - 907,500.00
46 Beton Ready Mix 300 M³ - 990,000.00
47 Additive Ready Mix M³ - 44,000.00
48 Karung Goni Curing Beton ( 0.7m² ) Gulung - 11,550.00
49 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg - 1,155,000.00
50 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg - 1,485,000.00
51 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg - 990,000.00
52 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg - 1,105,500.00
53 Pemancangan Mini Pile - 6m Btg - 132,000.00
54 Sewa Pompa Ready Mix (Min. 100 M³) M³ - 55,000.00
55 Bahan Plastik Cor Beton M² - 3,850.00
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³ - 9,736,320.00
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³ - 11,463,540.00
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³ - 9,063,230.00
4 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³ M.181.a 9,350,550.00
5 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ M.181.b 7,903,940.00
6 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ - 8,116,350.00
7 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³ - 7,370,770.00
8 Ky. Belian ketam Uk. 6/6 - 4 M M³ - 8,934,750.00
9 Ky. Belian ketam Uk. 7/7 - 4 M M³ - 11,892,210.00
10 Ky. Belian ketam Uk. 8/8 - 4 M M³ - 10,771,200.00
11 Ky. Belian ketam Uk. 5/10 - 4 M M³ - 10,771,200.00
12 Ky. Belian ketam Uk. 4/8 - 4 M M³ - 9,453,120.00
13 Papan belian ketam (4m) M³ M.181.e 16,958,370.00
14 Papan belian tdk ketam (4m) M³ M.181.d 15,074,070.00
15 Kayu Papan M³ - 1,650,000.00
16 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³ M.181.f 6,660,170.00
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.g 11,297,220.00
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³ - 4,630,120.00
19 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³ - 6,033,170.00
20 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³ - 11,550,000.00
21 Kusen Ky Kelas I Bangkirai uk. 5/10 M³ - 82,500.00
22 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.h 2,194,720.00
23 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³ M.181.i 3,293,620.00
24 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³ - 3,724,160.00
25 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³ - 3,168,550.00
26 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³ - 2,699,610.00
27 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³ - 1,883,750.00
28 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³ - 3,053,270.00
29 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³ - 3,244,010.00
30 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³ - 3,949,990.00
31 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³ - 4,109,820.00
32 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³ - 2,520,870.00
33 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³ - 4,947,360.00
34 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³ - 962,500.00
35 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³ - 2,266,100.00
36 Papan kayu klas II (mabang) tdk ketam M³ M.181.j 4,541,790.00
37 Papan kayu klas II (mabang) ketam M³ M.181.k 6,331,160.00
38 Papan kayu klas I tdk ketam M³ - 9,052,120.00
39 Papan kayu klas I ketam M³ - 7,562,500.00
40 Papan mal klas III M³ M.181.l 2,380,500.00
41 Papan Simpiran M³ - 604,780.00
42 Renglat kayu klas I uk 1/8 cm Btg - 19,360.00
43 Kayu profil 10cm Btg - 20,680.00
D. BAHAN CAT
1 Amplas Lbr - 2,310.00
2 Minyak cat Kg - 27,940.00
3 Cat kilat Kg - 42,130.00
4 Plamur Kg - 29,480.00
5 Cat dasar Kg - 33,000.00
6 Cat tembok Kg - 36,520.00
7 Cat tembok type weather shield Kg - 80,080.00
8 Cat seng Kg - 42,900.00
9 Dempul Kg - 27,940.00
10 Plitur Kg - 39,160.00
11 Thiner Ltr M.090.f 22,990.00
12 Thiner ND Ltr - 32,450.00
13 Melamic Ltr - 56,540.00
14 Vernis Ltr - 30,910.00
15 Meni Kg - 44,220.00
16 Oker Kg - 55,820.00
17 Lem Kayu Kg - 20,400.00
18 Sealent Tube - 137,500.00
19 Soda Api Kg - 11,660.00
20 Sabun / cream pembersih kotoran Kg - 20,350.00
21 Teak Oil Ltr - 44,000.00
22 Ter / Residu Ltr - 25,300.00
23 Kuas 4" Bh - 17,710.00
24 Road Line Paint ( Cat Marka ) Ltr M.090.e 49,500.00
25 Glass Bit Kg M.090.g 36,520.00
26 Weatherbond Emulsion ( cat kerb ) Kg M.090.h 79,200.00
27 Termoplast Kg - 34,100.00
F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh - 302,500.00
2 Kait angin Bh - 14,850.00
3 Handle Bh - 110,000.00
4 Engsel jendela Bh - 24,750.00
5 Engsel pintu Bh - 33,000.00
6 Slot pintu Bh - 20,350.00
7 Slot jendela Bh - 11,550.00
8 Kunci tanam 2 slag (setaraf Belluci) Bh - 184,250.00
9 Kunci tanam 1 slag Bh - 118,250.00
10 Kunci tanam antik Bh - 179,020.00
11 Kunci tanam biasa Bh - 86,900.00
12 Kunci silinder Bh - 107,250.00
13 Door Closer Bh - 123,750.00
14 Door Stoper Bh - 22,000.00
15 Paku Seng Kg M.166.a 24,530.00
16 Paku campuran 1" - 5 " Kg M.166.b 21,900.00
17 Paku beton Kg - 27,500.00
18 Paku Atap Seng Kg M.166.c 27,500.00
19 Paku triplek Kg - 28,870.00
20 Paku GRC Kg - 28,870.00
21 Paku Zincallume Kg - 38,500.00
22 Sekrup Gypsum Kg - 66,000.00
23 Sekrup Fixer Bh - 330.00
24 Engsel Angin Bh - 11,000.00
G. BAHAN ATAP
1 Sirap belian Lbr - 5,500.00
2 Asbes Lbr - 55,000.00
3 Eternit M² - 71,500.00
4 Genteng Metal Sakura Roof 0.35 Lbr - 44,000.00
5 Genteng Metal Type Prima 0.35 Lbr - 69,630.00
6 Genteng Metal Type Royal 0.35 Lbr - 69,630.00
7 Genteng Metal Type Classic 0.35 Lbr - 67,320.00
8 Genteng Metal Stone ( Type Classic 0.35 ) Lbr - 88,880.00
9 Genteng Metal Stone ( Type Prima 0.35 ) Lbr - 88,880.00
10 Atap Metal Supersheet 0.35 (polos) M' - 93,500.00
11 Atap Metal Supersheet 0.35 (polos) M² - 116,930.00
12 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh - 71,500.00
13 Nok bubungan genteng metal kotak 0.35 Meter - 85,360.00
14 Nok bubungan genteng metal stone kotak 0.35 Meter - 101,200.00
15 Seng Gelombang Bjls 30 Lbr - 71,390.00
16 Seng Gelombang Bjls 20 Lbr - 51,370.00
17 Seng Plat Bjls 20 Lbr - 52,800.00
18 Seng Plat Bjls 30 Lbr - 71,500.00
19 Seng Plat Bjls 30 (lebar 45 cm) M' - 20,900.00
20 Plat Datar Color 0.35 Lbr - 60,500.00
21 Zincalume Gelombang Persegi 0.35 (polos) M² - 114,120.00
22 Zincalume Gelombang Persegi 0.30 (polos) M² - 100,370.00
23 Zincalume Gelombang Persegi 0.35 (color) M² - 127,870.00
24 Zincalume Gelombang Persegi 0.30 (color) M² - 114,120.00
25 Zincalume Plat 0.2 Lbr - 130,900.00
26 Aluminium Foil M² - 55,000.00
H. BAHAN KACA
1 Kaca Polos, t = 5 mm M² - 109,450.00
2 Kaca Polos, t = 12mm M² - 422,400.00
3 Kaca Rayben, t = 5 mm M² - 146,300.00
4 Kaca Cermin t = 3mm M² - 156,750.00
5 Kaca Patri M² - 1,045,000.00
6 Sealent Kg - 111,650.00
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh - 214,500.00
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh - 225,500.00
9 Kaca Es M² - 167,200.00
I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr - 60,500.00
2 Triplek t = 6 mm Lbr - 244,800.00
3 Triplek t =9 mm Lbr - 165,000.00
4 Multiplek t = 10 mm Lbr - 187,000.00
5 Multiplek t = 12 mm Lbr - 222,200.00
6 Plywood 4' x 8' x 4mm Lbr - 109,340.00
7 Panel GRC 120 x 240 x 40 Lbr - 64,900.00
8 GypsumBoard t = 9mm Lbr - 67,100.00
J. BAHAN SANITASI
1 Kloset duduk monoblok Bh - 1,705,000.00
2 Kloset duduk putih (setaraf TOTO) Bh - 2,145,000.00
3 Kloset duduk warna (setaraf TOTO) Bh - 2,343,000.00
4 Kloset jongkok (setaraf TOTO) Bh - 204,600.00
5 Kloset jongkok (setaraf INA) Bh - 137,500.00
6 Kran air uk 1/2" Bh - 33,550.00
7 Pipa paralon dia 1/2" Btg - 17,820.00
8 Pipa paralon dia 3/4" Btg - 27,670.00
9 Pipa paralon dia 1" Btg - 40,700.00
10 Pipa paralon dia 2" Btg - 61,820.00
11 Pipa paralon dia 3" Btg - 117,150.00
12 Pipa paralon dia 4" Btg - 154,000.00
13 Seal Tape Set - 5,500.00
Harga Termasuk
Harga Termasuk
Keuntungan
Keuntungan
No. ALAT Satuan (Unit /
(Unit / Jam)
Hari)
Rp.
Rp.
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 25.00 M
Panjang 1 buah beugel = 0.7 M
Jumlah beugel dalam 1 M3 beton = 166.67 Buah = 167.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 8.16 M
Panjang 1 buah beugel = 1.3 M
Jumlah beugel dalam 1 M3 beton = 54.42 Buah = 54.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 100.00 M
Panjang 1 buah beugel = 0.34 M
Jumlah beugel dalam 1 M3 beton = 666.67 Buah = 667.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 10.00 M
Panjang 1 buah beugel = 1.3 M
Jumlah beugel dalam 1 M3 beton = 66.67 Buah = 67.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 9.52 M
Panjang 1 buah beugel = 1.6 M
Jumlah beugel dalam 1 M3 beton = 63.49 Buah = 63.00 Buah
Panjang (Arah y)
Lebar (Arah x)
Analisa :
Panjang (Arah y)
Lebar (Arah x)
Analisa :
Panjang (Arah y)
Lebar (Arah x)
Analisa :
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 16.00 M
Panjang 1 buah beugel = 0.9 M
Jumlah beugel dalam 1 M3 beton = 106.67 Buah = 107.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 100.00 M
Panjang 1 buah beugel = 0.34 M
Jumlah beugel dalam 1 M3 beton = 666.67 Buah = 667.00 Buah
Panjang (Arah y)
Lebar (Arah x)
Analisa :
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 19.61 M
Panjang 1 buah beugel = 0.84 M
Jumlah beugel dalam 1 M3 beton = 130.72 Buah = 131.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 23.53 M
Panjang 1 buah beugel = 0.74 M
Jumlah beugel dalam 1 M3 beton = 156.86 Buah = 157.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 8.33 M
Panjang 1 buah beugel = 1.5 M
Jumlah beugel dalam 1 M3 beton = 55.56 Buah = 56.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 12.50 M
Panjang 1 buah beugel = 1.1 M
Jumlah beugel dalam 1 M3 beton = 83.33 Buah = 83.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 22.22 M
Panjang 1 buah beugel = 0.8 M
Jumlah beugel dalam 1 M3 beton = 148.15 Buah = 148.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 33.33 M
Panjang 1 buah beugel = 0.6 M
Jumlah beugel dalam 1 M3 beton = 222.22 Buah = 222.00 Buah
Panjang (Arah y)
Lebar (Arah x)
Analisa :
Panjang (Arah y)
Lebar (Arah x)
Analisa :
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 16.00 M
Panjang 1 buah beugel = 0.9 M
Jumlah beugel dalam 1 M3 beton = 106.67 Buah = 107.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 8.33 M
Panjang 1 buah beugel = 1.5 M
Jumlah beugel dalam 1 M3 beton = 55.56 Buah = 56.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 12.50 M
Panjang 1 buah beugel = 1.1 M
Jumlah beugel dalam 1 M3 beton = 83.33 Buah = 83.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 19.05 M
Panjang 1 buah beugel = 0.9 M
Jumlah beugel dalam 1 M3 beton = 126.98 Buah = 127.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 22.22 M
Panjang 1 buah beugel = 0.8 M
Jumlah beugel dalam 1 M3 beton = 148.15 Buah = 148.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 44.44 M
Panjang 1 buah beugel = 0.5 M
Jumlah beugel dalam 1 M3 beton = 296.30 Buah = 296.00 Buah
Tulangan Utama
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 100.00 M
Panjang 1 buah beugel = 0.32 M
Jumlah beugel dalam 1 M3 beton = 500.00 Buah = 500.00 Buah
B C
Analisa :
Panjang balok/kolom dalam 1 M3 beton = 29.46 M
Panjang 1 buah beugel = 0.79 M
Jumlah beugel dalam 1 M3 beton = 196.38 Buah = 196.00 Buah
Panjang (Arah y)
Lebar (Arah x)
Analisa :
B C
Analisa :
Panjang Tulangan per Pondasi = 30.39 M