Document Number
Número de Documento
PAN–PP–SOP–CHE–00001
1
Scope Alcance
This procedure is applicable for refilling the Este procedimiento es aplicable para
Hydrochloric Acid storage tank in the rellenar el tanque de almacenamiento de
Electrochlorination plant. Ácido Clorhídrico en la planta de
This procedure shall be performed by a Electroclorinación.
minimum of 2 operators. Este procedimiento será realizado por un
mínimo de 2 operadores.
2
Electrochlorination acid wash system Sistema de lavado ácido de
11217D-ME-DG-MJ420-P6018-00001 Electroclorinación 11217D-ME-DG-MJ420-
P6018-00001
Equipment
Step Number
Action Acción Completed
Paso Numero de
Equipo
PREPARATION
El supervisor de turno de la
Power plant shift supervisor central eléctrica en turno
on duty shall be informed by debe ser informado por los
1
the operators of the intend to operadores de la intención
perform this procedure de realizar este
procedimiento.
El EPP requerido debe ser
Required PPE shall be
inspeccionado y el EPP
inspected and damaged PPE
2 dañado debe ser
shall be replaced with the new
reemplazado por uno
ones by the operators
nuevo por los operadores
Los kits de derrame y
Spill kits and absorbents shall absorbentes deben
be placed within 10 meters of colocarse a menos de 10
3
the unloading area by the metros del área de
operators descarga por los
operadores
Los operadores
Operators shall ensure that garantizarán que las
4 safety showers adjacent to duchas de seguridad
the unloading area functional adyacentes al área de
descarga funcionen
Los operadores deben
Operators shall verify that the
verificar que los elementos
connection elements and
5 de conexión y los puntos
connection points are fit for
de conexión sean aptos
service
para el servicio
Un recipiente con agua de
A container with service water
servicio debe ser
6 shall be prepared for flushing
preparado para el lavado
purpose by the operators
por los operadores.
TRANSFER TRANFERENCIA
Operator 1 - Set one retention
tank next to the
7
Electrochlorination Acid
cleaning Skid.
Operator 2 – Place the
8 Hydrochloric acid using
Loading Drum Truck
Operator 1 - Close acid tank 0EC324
9
outlet valve /338
3
Operator 2 – Open Service
water inlet valve. Fill the
10 0WS379A
Cleaning acid tank up to 50%.
Close the valve.
Operator 1 – Place the Electric
11
transfer pump in Acid drum
Operator 1 – Insert the hose in
the valve installed in the top
12
of the acid tank (it’s a valve
with connected to a flange)
Operator 1 – Start the transfer
of Hydrochloric Acid to
13
Cleaning Acid tank. Empty the
acid drum.
Operator 2 – Open Service
14 water inlet valve to complete
1.5 cubic meter in the tank.
Operator 2 - Transfer the
Electric Acid pump to one
15
bucket with water in order to
wash and clean the pump
Operator 1 – Remove the hose
from the valve at the top of
16
the Acid tank and put back the
valve in close position
ACID RECYCLE STAGE
17 Close electrolyzer outlet valve 0EC302A
Close electrolyzer outlet drain
18 0EC300A
valve
Close electrolyzer inlet drain
19 0CW389A
valve
Close electrolyzer inlet by-
20 0CW387A
pass valve
21 Open acid tank outlet valve 0EC324
22 Open acid pump inlet valve 0EC309A
23 Open acid pump outlet valve 0EC328A
24 Open acid circulation valve 0EC330
25 Open acid return valve 0EC332
26 Start acid pump A 0EC304PA
Observe potential leaks during
27
the circulation stage
Circulate the acid for 5
28
minutes
29 Stop acid pump A 0EC304PA
Restore all the valves to
30
original position
31 TERMINATION