URBANSA S.A.

OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO


CALLE 170
PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual 41 - 37

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 55.750 55.769 55.219 2.691


57.910

K0+006.00 55.77 55.784 55.234 2.636


57.870

K0+012.00 55.78 55.799 55.249 2.621


57.870

K0+018.00 55.80 55.814 55.264 2.606


57.870

K0+024.00 55.81 55.829 55.279 2.661


57.940

K0+030.00 55.83 55.844 55.294 2.646


57.940

K0+036.00 55.84 55.859 55.309 2.751


58.060

K0+042.00 55.86 55.874 55.324 2.806


58.130

K0+048.00 55.87 55.889 55.339 2.801


58.140

K0+054.00 55.89 55.904 55.354 2.776


58.130

K0+060.00 55.90 55.919 55.369 2.761


58.130

K0+066.00 55.92 55.934 55.384 2.816


58.200

K0+072.00 55.93 55.949 55.399 2.911


58.310

K0+078.00 55.95 55.964 55.414 2.896


58.310

K0+084.00 55.96 55.979 55.429 2.941


58.370

K0+087.00 55.97 55.987 55.437 2.924


58.360
PROMEDIO 2.765

PROMEDIO

LONGITUD
89.14 ml
INCLINADA

F 16" (400 mm) AREA TUBO (M2)


Fm int 0.362 AREA 0.6 (M2)
Espesor 0.019 DIST UTIL (ML)

F e externo 0.40 VOL EXC TRAMO (M3)

Bd (Teorico)
0.7 VOL TRIT Teorico(M3)

Cota rasante
pozo 37
55.75 VOL TRIT real(M3)
VOL TRIT Adicional(M3)
Cama 0.15 VOL B200 teorico (M3)
VOL B200 real (M3)
VOL B200 Adicional (M3)
Bd (real) 1.448 VOL EXC PZ P9 (M3)
B200 sobre
0.3
tuberia VOL RELL B200
ancho
4
vallado AREA ENTIBADO (M2)
h relleno 0.68 Relleno en Tierra
Longitud
36.00
Rajon Volumen Relleno Adicional en Tierra Confor

Cama Rajon 0.3


RAJON
Altura
3.084
Cilindro Relleno en Tierra Pozo
PLACA FONDO
TAPA Y CARGUE Y CONO
CONTRATISTA TOPÒGRAFO URBANSA
FECHA: 11/5/2017

Ancho Bd Ancho Bd Ancho Bd


PENDIENTE RAJON
(Real) (Real) (Real)

1.100 1.350 1.400 0.2500%

1.100 1.350 1.400

1.100 1.250 1.420

1.100 1.250 1.420 INICIO

1.150 1.340 1.400

1.100 1.400 1.400

1.550 1.700 1.800

1.550 1.675 1.800

1.100 1.400 1.630

1.100 1.550 1.680 TERMINACION

1.350 1.500 1.700

1.100 1.370 1.600

1.150 1.580 1.600

1.200 1.530 2.000

1.250 1.650 2.000

1.300 1.650 1.925


1.213 1.480 1.652

1.448

0.126
0.075
87.94
352.17

19.59

45.25

25.66
21.69
54.16
32.48
19.03

9.96

492.98

243.92

242.46
onal en Tierra Conformacion

13.10

11.49

1.00
1.00
RESIDENTE TECNICO
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual 10 B - 11 ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 58.680 58.699 58.149 5.561


63.710

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+066.00

K0+072.00

K0+078.00

K0+084.00

K0+093.95 58.640 58.659 58.109 5.791


63.900

PROMEDIO 5.676

PROMEDIO

Longitud
93.95 ml
Inclinada
CAN
F 14" (400 mm) Area de Tubo
Fm Interno 0.3620 AREA 0.5 (M2)
Espesor 0.0190 Distancia Util
Pendiente % 0.0004 Volumen Excavacion tramo
Fm Externo 0.4000 Volumen Excavacion Real (E
Bd (Teorico) 0.9500 Volumen Triturado Teorico
Cama Triturado 0.1500 Volumen Triturado Real
B - 200 sobre
0.2000
tuberia Volumen B200 Teorico
Rasante Pozo 10
63.710
B Volumen B200 Teorico

Rasante Pozo 11 63.900


Volumen Excavacion PZ 10
Altura relleno en
4.926
B - 200 adicional Volumen Relleno B200 Alred
Altura Cilindro
Muro Doble pozo 5.261
10 B Entibado Metalico

ver esquema Htotal


Volumen Relleno Adicional e

Bd 1 1.1000 3.0000 Volumen B200 sobre tuberia


rasante
Bd 2 2.7500 2.6760 Placa Fondo Pozo No 10 B
2,10)
Tapa, Cargue y Cono Pozo

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.950 0.950 0.950

0.950 0.950 0.950

0.950
CANTIDADES DE OBRA
e Tubo M2 0.126
0.5 (M2) M2 0.063
ia Util ML 92.75
n Excavacion tramo Teorica M3 500.13
n Excavacion Real (Esquema) M3 988.62
n Triturado Teorico M3 25.01
n Triturado Real M3 29.88

29.42
n B200 Teorico M3
34.98
n B200 Teorico M3

48.58
n Excavacion PZ 10 B M3
25.77
n Relleno B200 Alrededor Pozo M3

563.70
do Metalico M3

37.22
n Relleno Adicional en B- 200 M3

n B200 sobre tuberia hasta 901.90


M3
Fondo Pozo No 10 B (placa de 1.00
UN
Cargue y Cono Pozo No 10B UN 1.00

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual 10 C - 10 B ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 59.320 59.336 58.871 3.510


62.380

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+066.00

K0+072.00

K0+078.00

K0+084.00

K0+093.78 59.130 59.146 58.681 5.030


63.710

PROMEDIO 4.270

PROMEDIO

Longitud
93.78 ml
Inclinada
CAN
F 12" (325 mm) Area de Tubo
Fm Interno 0.2840 AREA 0.5 (M2)
Espesor 0.0155 Distancia Util
Pendiente % 0.0020 Volumen Excavacion tramo
Fm Externo 0.3150 Volumen Excavacion Real (E
Bd (Teorico) 0.9200 Volumen Triturado Teorico
Cama Triturado 0.1500 Volumen Triturado Real
B - 200 sobre
0.2000
tuberia Volumen B200 Teorico
Rasante
62.380
Pozo 10 C Volumen B200 Teorico
Rasante
63.710
Pozo 10 B Volumen Excavacion PZ 10
Altura relleno en
B - 200 adicional 3.605
hasta subrasante Volumen Relleno B200 Alred
Altura Cilindro
3.360
Muro 10 C Entibado Metalico

ver esquema Htotal


Volumen Relleno Adicional e

Bd 1 Volumen B200 sobre tuberia


Subrasante
Bd 2 Volumen relleno en tierra Su
tereno natural
Placa Fondo Pozo No 10 B
Estructura Via 0.650
2,10)
Tapa, Cargue y Cono Pozo
CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.950 0.950 0.950

0.950 0.950 0.950

0.950
CANTIDADES DE OBRA
e Tubo M2 0.078
0.5 (M2) M2 0.039
ia Util ML 92.58
n Excavacion tramo Teorica M3 363.65
n Excavacion Real (Esquema) M3 0.00
n Triturado Teorico M3 22.58
n Triturado Real M3 0.00

26.84
n B200 Teorico M3
0.00
n B200 Teorico M3

42.60
n Excavacion PZ 10 B M3

19.80
n Relleno B200 Alrededor Pozo M3
790.54
do Metalico M3

28.61
n Relleno Adicional en B- 200 M3

n B200 sobre tuberia hasta 251.65


ante M3
n relleno en tierra Subrasante a 112.00
natural M3
Fondo Pozo No 10 B (placa de
1.00
UN
Cargue y Cono Pozo No 10B UN 1.00

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual 10 C - 10 B ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 59.460 59.472 59.072 2.749


61.820

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+066.00

K0+072.00

K0+078.00

K0+084.00

K0+090.10 59.320 59.332 58.932 3.459


62.390

PROMEDIO 3.104

PROMEDIO

Longitud
90.10 ml
Inclinada
CAN
F 10" (250 mm) Area de Tubo
Fm Interno 0.2270 AREA 0.5 (M2)
Espesor 0.0115 Distancia Util
Pendiente % 0.0021 Volumen Excavacion tramo
Fm Externo 0.2500 Volumen Triturado Teorico
Bd (Teorico) 0.8500 Volumen B200 Teorico
Cama Triturado 0.1500 Volumen Excavacion PZ 6 B
B - 200 sobre
0.2000
tuberia Volumen Relleno B200 Alred
Rasante
61.820
Pozo 6B Entibado Metalico
Rasante
62.390
Pozo 10 C Volumen Relleno Adicional e
Altura relleno en Volumen B200 sobre tuberia
1.854
B - 200 adicional Subrasante
Altura Cilindro Volumen relleno en tierra Su
2.549
Muro 6B tereno natural

ver esquema Htotal


Placa Fondo Pozo No 6 B

Bd 1
Tapa, Cargue y Cono Pozo
Bd 2

Estructura Via 0.650

longitud tuberia
en via

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.850 0.850 0.850

0.000

0.425 0.850 0.850

0.708
CANTIDADES DE OBRA
e Tubo M2 0.049
0.5 (M2) M2 0.025
ia Util ML 88.90
n Excavacion tramo Teorica M3 234.52
n Triturado Teorico M3 18.60
n B200 Teorico M3 22.38
n Excavacion PZ 6 B M3 30.27

14.86
n Relleno B200 Alrededor Pozo M3
551.80
do Metalico M3

21.46
n Relleno Adicional en B- 200 M3
n B200 sobre tuberia hasta 90.94
ante M3
n relleno en tierra Subrasante a 0.00
natural M3

1.00
Fondo Pozo No 6 B UN

1.00
Cargue y Cono Pozo No 6B UN

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual 6 - 6B ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 59.670 59.682 59.282 3.219


62.500

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+065.34

K0+072.00

K0+078.00

K0+084.00

K0+065.34 59.460 59.472 59.072 2.749


61.820

PROMEDIO 2.984

PROMEDIO

Longitud
65.34 ml
Inclinada
CAN
F 10" (250 mm) Area de Tubo
Fm Interno 0.2270 AREA 0.5 (M2)
Espesor 0.0115 Distancia Util
Pendiente % 0.0031 Volumen Excavacion tramo
Fm Externo 0.2500 Volumen Triturado Teorico
Bd (Teorico) 0.8500 Volumen B200 Teorico
Cama Triturado 0.1500 Volumen Excavacion PZ 6
B - 200 sobre
0.2000
tuberia Volumen Relleno B200 Alred
Rasante
62.500
Pozo 6 Entibado Metalico
Rasante Volumen B200 sobre tuberia
61.820
Pozo 6B Subrasante (EN VIA)
Altura relleno en
2.384
B- 200 y tierra Volumen Relleno en tierra
Altura Cilindro
3.089
PZ 6 Placa Fondo Pozo No 6

ver esquema Htotal


Tapa, Cargue y Cono Pozo

Bd 1

Bd 2

Estructura Via 0.650


longitud tuberia
10.000
en via

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.850 0.850 0.850

0.850 0.850 0.850

0.850
CANTIDADES DE OBRA
e Tubo M2 0.049
0.5 (M2) M2 0.025
ia Util ML 64.14
n Excavacion tramo Teorica M3 162.66
n Triturado Teorico M3 13.42
n B200 Teorico M3 16.14
n Excavacion PZ 6 M3 24.70

14.35
n Relleno B200 Alrededor Pozo M3
382.72
do Metalico M3
n B200 sobre tuberia hasta 14.73
ante (EN VIA) M3
109.69
n Relleno en tierra M3
1.00
Fondo Pozo No 6 UN

1.00
Cargue y Cono Pozo No 6 UN

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual 5-Jun ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 59.790 59.802 59.402 3.399


62.800

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+065.34

K0+072.00

K0+078.00

K0+084.00

K0+027.19 59.670 59.682 59.282 3.219


62.500

PROMEDIO 3.309

PROMEDIO

Longitud
27.19 ml
Inclinada
CAN
F 10" (250 mm) Area de Tubo
Fm Interno 0.2270 AREA 0.5 (M2)
Espesor 0.0115 Distancia Util
Pendiente % 0.0040 Volumen Excavacion tramo
Fm Externo 0.2500 Volumen Triturado Teorico
Bd (Teorico) 0.8500 Volumen B200 Teorico
Cama Triturado 0.1500 Volumen Excavacion PZ 5
B - 200 sobre
0.2000
tuberia Volumen Relleno B200 Alred
Rasante
62.800
Pozo 5 Entibado Metalico
Rasante Volumen B200 sobre tuberia
62.500
Pozo 6 Subrasante (EN VIA)
Altura relleno en
2.709
tierra Volumen Relleno en tierra
Altura Cilindro
3.179
PZ 6 Placa Fondo Pozo No 5

ver esquema Htotal


Tapa, Cargue y Cono Pozo

Bd 1

Bd 2

Estructura Via 0.650


longitud tuberia
0.000
en via

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.850 0.850 0.850

0.850 0.850 0.850

0.850
CANTIDADES DE OBRA
e Tubo M2 0.049
0.5 (M2) M2 0.025
ia Util ML 25.99
n Excavacion tramo Teorica M3 73.09
n Triturado Teorico M3 5.44
n B200 Teorico M3 6.54
n Excavacion PZ 5 M3 28.39

15.73
n Relleno B200 Alrededor Pozo M3
171.98
do Metalico M3
n B200 sobre tuberia hasta 0.00
ante (EN VIA) M3
59.83
n Relleno en tierra M3
1.00
Fondo Pozo No 5 UN

1.00
Cargue y Cono Pozo No 5 UN

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual 4-May ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 59.830 59.842 59.442 3.559


63.000

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+065.34

K0+072.00

K0+078.00

K0+084.00

K0+011.46 59.790 59.802 59.402 3.399


62.800

PROMEDIO 3.479

PROMEDIO

Longitud
11.46 ml
Inclinada
CAN
F 10" (250 mm) Area de Tubo
Fm Interno 0.2270 AREA 0.5 (M2)
Espesor 0.0115 Distancia Util
Pendiente % 0.0035 Volumen Excavacion tramo
Fm Externo 0.2500 Volumen Triturado Teorico
Bd (Teorico) 0.8500 Volumen B200 Teorico
Cama Triturado 0.1500 Volumen Excavacion PZ 4
B - 200 sobre
0.2000
tuberia Volumen Relleno B200 Alred
Rasante
63.000
Pozo 4 Entibado Metalico
Rasante Volumen B200 sobre tuberia
62.800
Pozo 5 Subrasante (EN VIA)
Altura relleno en
2.879
tierra Volumen Relleno en tierra
Altura Cilindro
3.259
PZ 6 Placa Fondo Pozo No 4

ver esquema Htotal


Tapa, Cargue y Cono Pozo

Bd 1

Bd 2

Estructura Via 0.650


longitud tuberia
0.000
en via

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.850 0.850 0.850

0.850 0.850 0.850

0.850
CANTIDADES DE OBRA
e Tubo M2 0.049
0.5 (M2) M2 0.025
ia Util ML 10.26
n Excavacion tramo Teorica M3 30.34
n Triturado Teorico M3 2.15
n B200 Teorico M3 2.58
n Excavacion PZ 4 M3 29.80

16.45
n Relleno B200 Alrededor Pozo M3
71.38
do Metalico M3
n B200 sobre tuberia hasta 0.00
ante (EN VIA) M3
25.10
n Relleno en tierra M3
1.00
Fondo Pozo No 4 UN

1.00
Cargue y Cono Pozo No 4 UN

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual 3-Apr ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 60.130 60.142 59.742 2.709


62.450

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+065.34

K0+072.00

K0+078.00

K0+084.00

K0+065.99 59.830 59.842 59.442 3.559


63.000

PROMEDIO 3.134

PROMEDIO

Longitud
65.99 ml
Inclinada
CAN
F 10" (250 mm) Area de Tubo
Fm Interno 0.2270 AREA 0.5 (M2)
Espesor 0.0115 Distancia Util
Pendiente % 0.0039 Volumen Excavacion tramo
Fm Externo 0.2500 Volumen Triturado Teorico
Bd (Teorico) 0.8500 Volumen B200 Teorico
Cama Triturado 0.1500 Volumen Excavacion PZ 3
B - 200 sobre
0.2000
tuberia Volumen Relleno B200 Alred
Rasante
62.450
Pozo 3 Entibado Metalico
Rasante Volumen B200 sobre tuberia
63.000
Pozo 4 Subrasante (EN VIA)
Altura relleno en
2.534
tierra B - 200 Volumen Relleno en tierra
Altura Cilindro
2.669
PZ 6 Placa Fondo Pozo No 3

ver esquema Htotal


Tapa, Cargue y Cono Pozo

Bd 1

Bd 2

Estructura Via 0.650


longitud tuberia
15.000
en via

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.850 0.850 0.850

0.850 0.850 0.850

0.850
CANTIDADES DE OBRA
e Tubo M2 0.049
0.5 (M2) M2 0.025
ia Util ML 64.79
n Excavacion tramo Teorica M3 172.57
n Triturado Teorico M3 13.55
n B200 Teorico M3 16.31
n Excavacion PZ 3 M3 31.06

14.99
n Relleno B200 Alrededor Pozo M3
406.04
do Metalico M3
n B200 sobre tuberia hasta 24.01
ante (EN VIA) M3
107.22
n Relleno en tierra M3
1.00
Fondo Pozo No 3 UN

1.00
Cargue y Cono Pozo No 3 UN

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual P2-3 ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 60.460 60.472 60.072 2.609


62.680

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+065.34

K0+072.00

K0+078.00

K0+084.00

K0+066.00 60.130 60.142 59.742 2.709


62.450

PROMEDIO 2.659

PROMEDIO

Longitud
66.00 ml
Inclinada
CAN
F 10" (250 mm) Area de Tubo
Fm Interno 0.2270 AREA 0.5 (M2)
Espesor 0.0115 Distancia Util
Pendiente % 0.0050 Volumen Excavacion tramo
Fm Externo 0.2500 Volumen Triturado Teorico
Bd (Teorico) 0.8500 Volumen B200 Teorico
Cama Triturado 0.1500 Volumen Excavacion PZ 2
B - 200 sobre
0.2000
tuberia Volumen Relleno B200 Alred
Rasante
62.680
Pozo 2 Entibado Metalico
Rasante Volumen B200 sobre tuberia
62.450
Pozo 3 Subrasante (EN VIA)
Altura relleno en
2.059
tierra B - 200 Volumen Relleno en tierra
Altura Cilindro
2.599
PZ 6 Placa Fondo Pozo No 2

ver esquema Htotal


Tapa, Cargue y Cono Pozo

Bd 1

Bd 2

Estructura Via 0.650


longitud tuberia
15.000
en via

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.850 0.850 0.850

0.850 0.850 0.850

0.850
CANTIDADES DE OBRA
e Tubo M2 0.049
0.5 (M2) M2 0.025
ia Util ML 64.80
n Excavacion tramo Teorica M3 146.43
n Triturado Teorico M3 13.56
n B200 Teorico M3 16.31
n Excavacion PZ 2 M3 24.39

12.97
n Relleno B200 Alrededor Pozo M3
344.54
do Metalico M3
n B200 sobre tuberia hasta 77.58
ante (EN VIA) M3
0.00
n Relleno en tierra M3
1.00
Fondo Pozo No 2 UN

1.00
Cargue y Cono Pozo No 2 UN

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual P 1-2 ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 60.560 60.572 60.172 2.559


62.730

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+065.34

K0+072.00

K0+078.00

K0+084.00

K0+011.55 60.460 60.472 60.072 2.609


62.680

PROMEDIO 2.584

PROMEDIO

Longitud
11.55 ml
Inclinada
CAN
F 10" (250 mm) Area de Tubo
Fm Interno 0.2270 AREA 0.5 (M2)
Espesor 0.0115 Distancia Util
Pendiente % 0.0052 Volumen Excavacion tramo
Fm Externo 0.2500 Volumen Triturado Teorico
Bd (Teorico) 0.8500 Volumen B200 Teorico
Cama Triturado 0.1500 Volumen Excavacion PZ 1
B - 200 sobre
0.2000
tuberia Volumen Relleno B200 Alred
Rasante
62.730
Pozo 1 Entibado Metalico
Rasante Volumen B200 sobre tuberia
62.680
Pozo 2 Subrasante (EN VIA)
Altura relleno en
1.984
tierra B - 200 Volumen Relleno en tierra
Altura Cilindro
2.319
PZ 6 Placa Fondo Pozo No 1

ver esquema Htotal


Tapa, Cargue y Cono Pozo

Bd 1

Bd 2

Estructura Via 0.650


longitud tuberia
0.000
en via

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.850 0.850 0.850

0.850 0.850 0.850

0.850
CANTIDADES DE OBRA
e Tubo M2 0.049
0.5 (M2) M2 0.025
ia Util ML 10.35
n Excavacion tramo Teorica M3 22.73
n Triturado Teorico M3 2.17
n B200 Teorico M3 2.61
n Excavacion PZ 1 M3 23.61

12.65
n Relleno B200 Alrededor Pozo M3
53.48
do Metalico M3
n B200 sobre tuberia hasta 11.73
ante (EN VIA) M3
0.00
n Relleno en tierra M3
1.00
Fondo Pozo No 1 UN

1.00
Cargue y Cono Pozo No 1 UN

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual DOM 2A - 2 ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 61.000 61.012 60.612 1.889


62.500

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+065.34

K0+072.00

K0+078.00

K0+084.00

K0+006.00 60.460 60.472 60.072 2.609


62.680

PROMEDIO 2.249

PROMEDIO

Longitud
6.00 ml
Inclinada
CAN
F 10" (250 mm) Area de Tubo
Fm Interno 0.2270 AREA 0.5 (M2)
Espesor 0.0115 Distancia Util
Pendiente % 0.0083 Volumen Excavacion tramo
Fm Externo 0.2500 Volumen Triturado Teorico
Bd (Teorico) 0.8500 Volumen B200 Teorico
Cama Triturado 0.1500 Volumen Excavacion PZ 2A
B - 200 sobre
0.2000
tuberia Volumen Relleno B200 Alred
Rasante
62.500
Pozo 2 Entibado Metalico
Rasante Volumen B200 sobre tuberia
62.680
Pozo 2A Subrasante (EN VIA)
Altura relleno en
1.649
tierra B - 200 Volumen Relleno en tierra
Altura Cilindro
2.089
PZ 6 Placa Fondo Pozo No 2A

ver esquema Htotal


Tapa, Cargue y Cono Pozo

Bd 1

Bd 2

Estructura Via 0.650


longitud tuberia
0.000
en via

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.850 0.850 0.850

0.850 0.850 0.850

0.850
CANTIDADES DE OBRA
e Tubo M2 0.049
0.5 (M2) M2 0.025
ia Util ML 4.80
n Excavacion tramo Teorica M3 9.17
n Triturado Teorico M3 1.00
n B200 Teorico M3 1.21
n Excavacion PZ 2A M3 23.61

11.23
n Relleno B200 Alrededor Pozo M3
21.59
do Metalico M3
n B200 sobre tuberia hasta 4.07
ante (EN VIA) M3
0.00
n Relleno en tierra M3
1.00
Fondo Pozo No 2A UN

1.00
Cargue y Cono Pozo No 2A UN

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CAL

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO:
Residual DOM 1A - 1 ACTA No PRESUPUESTO

ABSCISA COTA TERRENO COTA CLAVE COTA LOMO COTA FONDO CORTE A FONDO

K0+000.00 60.640 60.652 60.252 2.249


62.500

K0+006.00

K0+012.00

K0+018.00

K0+024.00

K0+030.00

K0+036.00

K0+042.00

K0+048.00

K0+054.00

K0+060.00

K0+065.34

K0+072.00

K0+078.00

K0+084.00

K0+006.00 60.560 60.572 60.172 2.559


62.730

PROMEDIO 2.404

PROMEDIO

Longitud
6.00 ml
Inclinada
CAN
F 10" (250 mm) Area de Tubo
Fm Interno 0.2270 AREA 0.5 (M2)
Espesor 0.0115 Distancia Util
Pendiente % 0.0133 Volumen Excavacion tramo
Fm Externo 0.2500 Volumen Triturado Teorico
Bd (Teorico) 0.8500 Volumen B200 Teorico
Cama Triturado 0.1500 Volumen Excavacion PZ 2A
B - 200 sobre
0.2000
tuberia Volumen Relleno B200 Alred
Rasante
62.500
Pozo 2 Entibado Metalico
Rasante Volumen B200 sobre tuberia
62.680
Pozo 2A Subrasante (EN VIA)
Altura relleno en
1.779
tierra B - 200 Volumen Relleno en tierra
Altura Cilindro
1.989
PZ 6 Placa Fondo Pozo No 2A

ver esquema Htotal


Tapa, Cargue y Cono Pozo

Bd 1

Bd 2

Estructura Via 0.650


longitud tuberia
0.000
en via

CONTRATISTA

TOPÒGRAFO URBANSA
MO EXTERNO CALLE 170

N DE TUBERIA

FECHA: 6/4/2018

Ancho Bd Ancho Bd Ancho Bd


RAJON
( Fondo Real) (Medio Real) (Superior Real)

0.850 0.850 0.850

0.850 0.850 0.850

0.850
CANTIDADES DE OBRA
e Tubo M2 0.049
0.5 (M2) M2 0.025
ia Util ML 4.80
n Excavacion tramo Teorica M3 9.81
n Triturado Teorico M3 1.00
n B200 Teorico M3 1.21
n Excavacion PZ 2A M3 23.21

11.89
n Relleno B200 Alrededor Pozo M3
23.07
do Metalico M3
n B200 sobre tuberia hasta 4.60
ante (EN VIA) M3
0.00
n Relleno en tierra M3
1.00
Fondo Pozo No 2A UN

1.00
Cargue y Cono Pozo No 2A UN

RESIDENTE TECNICO

Urbansa S.A
OBRA: 925 SAN JUAN BOSCO URBANISMO EXTERNO CALLE

PLANILLA PARA INSTALACION DE TUBERIA

Alcantarrillado
TRAMO: ACTA No PRESUPUESTO
Residual

14 12 10

92.75 92.58 338.83


Llongitud tuberia

Volumen Excavacion tramo Teorica

Volumen Triturado Teorico

Volumen B200 Teorico

Volumen Excavacion pozo

Volumen Relleno B200 Alrededor Pozo

Entibado Metalico tipo cajon

Entibado Metalico
Volumen B200 sobre tuberia hasta
Subrasante (EN VIA)

Volumen Relleno en tierra

Placa Fondo Pozo 2,10

Placa Fondo Pozo 1,70

Tapa, Cargue UN
CONTRATISTA

TOPÒGRAFO
URBANSA
NISMO EXTERNO CALLE 170

CION DE TUBERIA

FECHA: 6/4/2018

cantidades

524.16

1725.080

118.481

141.545

330.220

170.694

563.700

2817.139

1134.592

413.849

1.000

10.000

11.000
RESIDENTE TECNICO

Urbansa S.A