COTA DE COTA DE COTA DE

DIAMETRO LONGITUD DIAMETRO PROFUNDIDAD DEMANDA


TRAMO MATERIAL n BUZON TERRENO TAPA FONDO BUZON
(mm) (m) (m) (m) (L/s)
(msnm) (msnm) (msnm)
TUBERIA-1 160 PVC 0.009 45 Bz-1 1.20 200.00 200.00 199.00 1.00 Bz-1 0.60
TUBERIA-2 160 PVC 0.009 45 Bz-2 1.20 199.00 199.00 197.80 1.20 Bz-2 0.80
TUBERIA-3 160 PVC 0.009 25 Bz-3 1.20 198.40 198.40 197.20 1.20 Bz-3 0.20
TUBERIA-4 160 PVC 0.009 25 Bz-4 1.20 197.00 197.00 195.80 1.20 Bz-4 0.40
TUBERIA-5 160 PVC 0.009 25 Bz-5 1.20 195.60 195.60 194.40 1.20 Bz-5 1.20
TUBERIA-6 160 PVC 0.009 25 Bz-6 1.20 194.20 194.20 193.00 1.20 Bz-6 0.60
TUBERIA-7 160 PVC 0.009 30 Bz-7 1.20 192.80 192.80 191.60 1.20 Bz-7 0.80
TUBERIA-8 160 PVC 0.009 30 Bz-8 1.20 198.60 198.60 197.60 1.00 Bz-8 0.20
TUBERIA-9 160 PVC 0.009 45 Bz-9 1.20 198.00 198.00 196.80 1.20 Bz-9 1.20
TUBERIA-10 160 PVC 0.009 30 Bz-10 1.20 197.20 197.20 196.20 1.00 Bz-10 0.60
TUBERIA-11 160 PVC 0.009 45 Bz-11 1.20 196.60 196.60 195.40 1.20 Bz-11 0.80
TUBERIA-12 160 PVC 0.009 45 Bz-12 1.20 195.20 195.20 194.00 1.20 Bz-12 0.20
TUBERIA-13 200 PVC 0.009 85 Bz-13 1.20 199.00 199.00 198.00 1.00 Bz-13 1.20
TUBERIA-14 200 PVC 0.009 85 Bz-14 1.20 197.60 197.60 196.60 1.00 Bz-14 0.60
TUBERIA-15 200 PVC 0.009 85 Bz-15 1.20 196.20 196.20 195.20 1.00 Bz-15 0.80

COTA COTA DE COTA DE


DESCARGA PROFUNDIDAD
TERRENO TAPA FONDO
PTAR 192.60 192.60 192.00 0.60