Está en la página 1de 29

PROYECTO

TRAMO
CONTRATISTA
SUPERVISIÓN

c
Análisis Granulométrico por Tamizado (MTC E 204)
Material : Mezcla Teórica de Agregados para Asfalto
Muestra : Mezcla-01
Cantera : Crushing y La Gloria
Ubicación (Km.) : Planta de Asfalto

Malla Especificacio
Porcentajes pasantes (%)
Tamiz mm. nes
PIEDRAS ARENAS MAC - 2
Agregados piedra 3/4" piedra 1/2" Arena Arena MEZCLA
CRUSHING CRUSHING Sarandeada Chancada
filler MTC

3/4" 1/2" SARANDEADA CHANCADA CEMENTO


Proporciones 100.0%
18.0% 25.0% 31.0% 24.0% 2.0%
1" 25.400 100.000 100.00 100.0 100.0 100.0 100 - 100
3/4" 19.050 100.000 82.20 100.0 100.0 100.0 95.6 80 - 100
1/2" 12.700 67.700 56.00 100.0 100.0 100.0 83.2 67 - 85
3/8" 9.525 24.300 39.40 100.0 100.0 100.0 71.2 60 - 77
Nº 4 4.760 2.500 3.70 83.4 86.6 100.0 50.0 43 - 54
Nº 8 2.360 0.000 0.00 70.8 58.7 100.0 38.0
Nº 10 2.000 0.000 0.00 62.6 45.7 100.0 32.4 29 - 45
Nº 16 1.180 0.000 0.00 57.6 38.3 100.0 29.0
Nº 30 0.600 0.000 0.00 44.8 27.0 100.0 22.4
Nº 40 0.420 0.000 0.00 33.3 21.0 100.0 17.4 14 - 25
Nº 50 0.300 0.000 0.00 29.4 18.7 100.0 15.6
Nº 80 0.180 0.000 0.00 14.8 9.4 100.0 8.8 8 - 17
Nº 100 0.150 0.000 0.00 7.0 3.9 100.0 5.1
Nº 200 0.074 0.0 0.00 4.5 3.2 100.0 4.2 4 - 8
pasa 0.0 0.0 0.0 0.0
REPRESENTACIÓN GRÁFICA

CURVA GRANULOMÉTRICA

100

90

80

70

60

50

40

30

20

10

0
10.000
0.010

0.100

1.000

ABERTURA (mm)

OBSERVACIONES :
métrico por Tamizado (MTC E 204)
Certificado
Hecho por
Revisado por
Fecha : 01-May-16

Observaciones
Tamaño máximo 3/4"

Curva Ideal
100 difrencia
90 95.6
76 83.2
69 71.2
49 50.0
38.0
37 32.4

22.4
20 17.4
15.6
13 8.8
5.1
6 4.2

ESENTACIÓN GRÁFICA
% Q UE PASA EN PESO

CURVA GRANULOMÉTRICA
100.000
10.000
1.000

ABERTURA (mm)
|
PROYECTO
TRAMO
CONTRATISTA
SUPERVISIÓN

Análisis Granulométrico por Tamizado (MTC E 204)


Material Mezcla Teórica de Agregados para Asfalto
Muestra Mezcla-01
Cantera Crushing y La Gloria
Ubicación (Km.) Planta de Asfalto
Malla Especifi-
Porcentajes pasantes (%)
Tamiz mm. caciones
PIEDRA ARENAS Curva IV-B
Agregados piedra 3/4" piedra 1/2" Arena Arena MEZCLA
CRUSHING CRUSHING Sarandeada Chancada Instituto Asfalto

3/4" 1/2" SARANDEADA CHANCADA


Proporciones 98%
18% 25% 31.0% 24.0%
1" 25.400 100.0 100.0 100.0 100.0
3/4" 19.050 100.0 82.2 100.0 100.0 95.6 100
1/2" 12.700 67.7 56.0 100.0 100.0 83.2 80 - 100
3/8" 9.525 24.3 39.4 100.0 100.0 71.2 70 - 90
Nº 4 4.760 2.5 3.7 83.4 86.6 50.0 50 - 70
Nº 8 2.360 0.0 0.0 70.8 58.7 38.0 35 50
Nº 10 2.000 0.0 0.0 62.6 45.7 32.4
Nº 16 1.180 57.6 38.3 29.0
Nº 30 0.600 44.8 27.0 22.4 18 29
Nº 40 0.420 33.3 21.0 17.4
Nº 50 0.300 29.4 18.7 15.6 13 23
Nº 80 0.180 14.8 9.4 8.8
Nº 100 0.150 7.0 3.9 5.1 8 16
Nº 200 0.074 4.5 3.2 4.2 4 - 10
pasa
REPRESENTACIÓN GRÁFICA
CURVA GRANULOMÉTRICA

100

90

80

70

60

50

40

30
5
20

10

0
10.000
0.010

1.000
0.100
21

20

19

18

17

16

15

14

13

12

10
11

ABERTURA (mm)

OBSERVACIONES :
métrico por Tamizado (MTC E 204)
Certificado
Hecho por
Revisado por
Fecha : 01-May-16

Observaciones
Tamaño máximo 3/4"

curva ideal difrencia


100 100 -4.5
90 90.0 -6.8
80 80.0 -8.8
60 60.0 -10.0
42 38.0

23

18

12
7 7.0 -2.8

SENTACIÓN GRÁFICA
% Q UE PASA EN PESO

ULOMÉTRICA
100.000
10.000
1.000
15

14

13

12

10
11

ERTURA (mm)
PROYECTO
TRAMO
CONTRATISTA
SUPERVISIÓN

Análisis Granulométrico por Tamizado (MTC E 204)


Material Mezcla Teórica de Agregados para Asfalto Certificado
Muestra Mezcla-01 Hecho por
Cantera Crushing y La Gloria Revisado por
Ubicación (Km.) Planta de Asfalto Fecha : 01-May-16
Malla Especifi-
Porcentajes pasantes (%) Observaciones
Tamiz mm. caciones
PIEDRA ARENAS ASTM Tamaño máximo 3/4"
Agregados piedra 3/4" piedra 1/2" Arena Arena MEZCLA
CRUSHING CRUSHING Sarandeada Chancada D 3515

3/4" 1/2" SARANDEADA CHANCADA


Proporciones 98% D-5
18.0% 25% 31.0% 24.0%
1" 25.400 100.0 100.0 100.0 100.0 98.0 curva ideal difrencia
3/4" 19.050 100.0 82.2 100.0 100.0 93.6 100 100 100 -6.5
1/2" 12.700 67.7 56.0 100.0 100.0 81.2 90 - 100 95 95.0 -13.8
3/8" 9.525 24.3 39.4 100.0 100.0 69.2
Nº 4 4.760 2.5 3.7 83.4 86.6 48.0 44 - 74 59 59.0 -11.0
Nº 8 2.360 0.0 0.0 70.8 58.7 36.0 28 - 58 43 43.0 -7.0
Nº 10 2.000 0.0 0.0 62.6 45.7 30.4
Nº 16 1.180 57.6 38.3 27.0
Nº 30 0.600 44.8 27.0 20.4
Nº 40 0.420 33.3 21.0 15.4
Nº 50 0.300 29.4 18.7 13.6 5 - 21 13 13.0 0.6
Nº 80 0.180 14.8 9.4 6.8
Nº 100 0.150 7.0 3.9 3.1
Nº 200 0.074 4.5 3.2 2.2 2 - 10 6 6.0 -3.8
pasa
REPRESENTACIÓN GRÁFICA

% QUE PASA EN PESO


CURVA GRANULOMÉTRICA

100

90

80

70

60

50

40

30

20

10

0
10.000

100.000
0.010

0.100

1.000
19

18

10
21

20

17

16

15

14

13

12

11

ABERTURA (mm)

OBSERVACIONES :

ELIMINAR FINOS
PROYECTO
TRAMO
CONTRATISTA
SUPERVISIÓN

Análisis Granulométrico por Tamizado (MTC E 204)


Material Mezcla Teórica de Agregados para Asfalto
Muestra Mezcla-01
Cantera Crushing y La Gloria
Ubicación (Km.) Planta de Asfalto

Graduación Superpave para Agregado de tamaño máximo nominal de 12.5 mm.

Puntos Zona
Tamices de
Æ de Restricción
ASTM mm Æ 0,45

Control Min.
1" 25.40 4.287
3/4" 19.00 3.762 100.0
1/2" 12.50 3.116 100.0 90.0
3/8" 9.500 2.754
no 4 4.750 2.016
no 8 2.360 1.472 58.0 28.0 39.1
no 10 2.00 1.366
no 16 1.180 1.077 25.6
n 30 o
0.600 0.795 19.1
no 40 0.420 0.677
no 50 0.300 0.582 15.5
n 80 o
0.177 0.459
n 100o
0.150 0.426
no 200 0.075 0.312 10.0 2.0

100

90
% que pasa

80

70

60

50

40

30

20

10

Tamaño de Tamiz a la potencia 0.45 (mm)


ométrico por Tamizado (MTC E 204)
Certificado
Hecho por
Revisado por
Fecha : 01-May-16

ra Agregado de tamaño máximo nominal de 12.5 mm.

Zona Fórmula
de

Tolerancia
Restricción de

Max. Mezcla
100.0
93.6
81.2
69.2
48.0 [6]
39.1 36.0 [6]
30.4
31.6 27.0
23.1 20.4 [4]
15.4
15.5 13.6 [3]
6.8
3.1
2.2 [2]
LA GLORIA (arena procesada),Cantera Crushing Lurin( piedra chancada,arena chancada). 01-05-2016

LABORATORIO DE SUELOS, CONCRETO Y ASFALTO

CALCULO DE PESOS POR MALLA - DISEÑO MARSHALL


OPTIM
% Asfalto 4.00 4.50 5.00 5.50 6.00 6.50 % Asfalto 4.00 4.50 5.00 5.50 6.00 6.50
Mat Mat
Malla Malla Peso Acumulado (gr)
1/2" 0.0 0.0 0.0 0.0 0.0 0.0 1/2" 0.0 0.0 0.0 0.0 0.0 0.0
3/8" 0.0 0.0 0.0 0.0 0.0 0.0 3/8" 0.0 0.0 0.0 0.0 0.0 0.0
#4 0.0 0.0 0.0 0.0 0.0 0.0 #4 0.0 0.0 0.0 0.0 0.0 0.0
0

0
# 10 0.0 0.0 0.0 0.0 0.0 0.0 # 10 0.0 0.0 0.0 0.0 0.0 0.0
< #10 24.0 23.9 23.8 23.6 23.5 23.4 < #10 24.0 23.9 23.8 23.6 23.5 23.4
SUB TOTAL 24.0 23.9 23.8 23.6 23.5 23.4 SUB TOTAL 24.0 23.9 23.8 23.6 23.5 23.4
1/2" 0.0 0.0 0.0 0.0 0.0 0.0 1/2" 0.0 0.0 0.0 0.0 0.0 0.0
3/8" 0.0 0.0 0.0 0.0 0.0 0.0 3/8" 0.0 0.0 0.0 0.0 0.0 0.0
Chancada

Chancada
#4 38.6 38.4 38.2 38.0 37.8 37.6 #4 38.6 38.4 38.2 38.0 37.8 37.6
Arena

Arena
# 10 117.8 117.2 116.6 116.0 115.3 114.7 # 10 156.4 155.6 154.8 153.9 153.1 152.3
< #10 131.6 130.9 130.2 129.6 128.9 128.2 < #10 288.0 286.5 285.0 283.5 282.0 280.5
SUB TOTAL 288.0 286.5 285.0 283.5 282.0 280.5 SUB TOTAL 288.0 286.5 285.0 283.5 282.0 280.5
3/4" 0.0 0.0 0.0 0.0 0.0 0.0 3/4" 0.0 0.0 0.0 0.0 0.0 0.0
1/2" 0.0 0.0 0.0 0.0 0.0 0.0 1/2" 0.0 0.0 0.0 0.0 0.0 0.0
Sarandeada

Sarandeada
3/8" 0.0 0.0 0.0 0.0 0.0 0.0 3/8" 0.0 0.0 0.0 0.0 0.0 0.0
Arena

Arena
#4 61.8 61.4 61.1 60.8 60.5 60.1 #4 61.8 61.4 61.1 60.8 60.5 60.1
# 10 77.4 77.0 76.6 76.2 75.8 75.4 # 10 139.1 138.4 137.7 137.0 136.2 135.5
< #10 232.9 231.7 230.4 229.2 228.0 226.8 < #10 372.0 370.1 368.1 366.2 364.3 362.3
SUB TOTAL 372.0 370.1 368.1 366.2 364.3 362.3 SUB TOTAL 372.0 370.1 368.1 366.2 364.3 362.3

3/4" 0.0 0.0 0.0 0.0 0.0 0.0 3/4" 0.0 0.0 0.0 0.0 0.0 0.0
132.0 131.3 130.6 129.9 129.3 128.6 132.0 131.3 130.6 129.9 129.3 128.6
CRUSHING

CRUSHING
1/2" 1/2"
piedra 1/2"

piedra 1/2"
3/8" 49.8 49.5 49.3 49.0 48.8 48.5 3/8" 181.8 180.9 179.9 179.0 178.0 177.1
#4 107.1 106.5 106.0 105.4 104.9 104.3 #4 288.9 287.4 285.9 284.4 282.9 281.4
# 10 11.1 11.0 11.0 10.9 10.9 10.8 # 10 300.0 298.4 296.9 295.3 293.8 292.2
< #10 0.0 0.0 0.0 0.0 0.0 0.0 < #10 300.0 298.4 296.9 295.3 293.8 292.2
SUB TOTAL 300.0 298.4 296.9 295.3 293.8 292.2 SUB TOTAL 300.0 298.4 296.9 295.3 293.8 292.2
3/4" 0.0 0.0 0.0 0.0 0.0 0.0 3/4" 0.0 0.0 0.0 0.0 0.0 0.0
1/2" 69.8 69.4 69.0 68.7 68.3 68.0 1/2" 69.8 69.4 69.0 68.7 68.3 68.0
CRUSHING

CRUSHING
piedra 3/4"

piedra 3/4"

3/8" 93.7 93.3 92.8 92.3 91.8 91.3 3/8" 163.5 162.7 161.8 161.0 160.1 159.3
#4 47.1 46.8 46.6 46.4 46.1 45.9 #4 210.6 209.5 208.4 207.3 206.2 205.1
# 10 5.4 5.4 5.3 5.3 5.3 5.3 # 10 216.0 214.9 213.8 212.6 211.5 210.4
< #10 0.0 0.0 0.0 0.0 0.0 0.0 < #10 216.0 214.9 213.8 212.6 211.5 210.4
CRUSHING

CRUSHING
piedra 3/4"

piedra 3/4"
SUB TOTAL 216.0 214.9 213.8 212.6 211.5 210.4 SUB TOTAL 216.0 214.9 213.8 212.6 211.5 210.4
1200.0 1193.8 1187.5 1181.3 1175.0 1168.8 TOTAL AGREGADOS 1200.0 1193.8 1187.5 1181.3 1175.0 1168.8
PEN 85-100 50.0 56.3 62.5 68.8 75.0 81.3 PEN 60 - 70 50.0 56.3 62.5 68.8 75.0 81.3
QUIMIBOND 0.0 0.0 0.0 0.0 0.0 0.0 CAL - FILLER 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL MUESTRA 1250.0 1250.0 1250.0 1250.0 1250.0 1250.0 TOTAL MUESTRA 1250.0 1250.0 1250.0 1250.0 1250.0 1250.0

Arena
as

Chancada 24.0
en

Arena
ar

Sarandeada natural 31.0


piedra piedra 3/4" CRUSHING 18.0
piedra piedra 1/2" CRUSHING 25.0
Total 100.0
LA GLORIA (arena procesada),Cantera Crushing Lurin( piedra chancada,arena chancada). 01-05-2016

LABORATORIO DE SUELOS, CONCRETO Y ASFALTO

CALCULO DE PESOS POR MALLA PARA BRIQUETAS - DISEÑO MARSHALL


OPTIMO
% Asfalto 4.00 4.50 5.00 5.50 6.00 6.50
Mat
Malla
1/2"
3/8"
#4
0 # 10
< #10
SUB TOTAL
1/2"
Chancada

3/8"
Arena

#4
# 10
< #10
SUB TOTAL
3/4"
Sarandeada

1/2"
3/8"
Arena

#4
# 10
< #10
SUB TOTAL

3/4"
piedra 1/2"
CRUSHING

1/2"
3/8"
#4
# 10
< #10
SUB TOTAL
3/4"
1/2"
edra 3/4"
USHING

3/8"
#4
# 10
piedra 3/4"
CRUSHING < #10

SUB TOTAL

PEN 60 - 70
QUIMIBOND
TOTAL MUESTRA 1250.0 1250.0 1250.0 1250.0 1250.0 1250.0 1250.0

Arena
as

Chancada 24.0
en

Arena
ar

Sarandeada natural 31.0


piedra piedra 3/4" CRUSHING 18.0
piedra piedra 1/2" CRUSHING 25.0
Total 100.0
DISEÑO : MAC-AC-001
REFERENCIA : MEZCLA ASFALTICA EN CALIENTE
FECHA : 24-11-2015

VACIOS
PESO UNITARIO
Peso Unitario Kg.

2.54 9

Vacíos %
8
2.53

7
2.52
6
2.51
5
2.5
4

2.49 3

2.48 2

2.47
1

0
2.46
4 4.5 5
4 4.5 5 5.5 6 6.5 7 % de
% de C.A.

FLUJO ESTABILID
Estabilidad Kg.

5 1700
Flujo mm

1600
4

1500

3
1400

2
1300

1 1200

0 1100
4 4.5 5
4 4.5 5 5.5 6 6.5 7
% de C.A. % de
1400

2
1300

1 1200

1100
0
4 4.5 5
4 4.5 5 5.5 6 6.5 7
% de C.A. % de
DETERMINACION DEL OPTIMO CONTENIDO DE ASFALT

VACIOS
V.M.A.

22
V.M.A. %

20

18

16

14

12

10
4.5 5 5.5 6 6.5 7
% de C.A. 4 0 4.5 5 5.5 6 6.5 7
% de C.A.

RESUMEN
ESTABILIDAD
GOLPES POR LADO
CEMENTO ASFALTICO
PESO UNITARIO
VACIOS
V.M.A.
VACIOS LLENOS CON C.A.
FLUJO
ESTABILIDAD
Finos / Ligante
INDICE DE COMPACTIBILIDAD
ESTABILIDAD RETENIDA

4.5 5 5.5 6 6.5 7


% de C.A.
DOSIFICACION
Grava Chancada - Cantera Dorita
Arena Chancada - Cantera Dorita
4.5 5 5.5 6 6.5 7
Arena Procesada - Cantera La Gloria
% de C.A.
Asfalto Convencional Pen 60/70
Mejorador de Adherencia Quimibond 3000
IDO DE ASFALTO
Vacíos LLenos C.A. %

VACIOS LLENOS C.A.

100

90

80

70

60

50

40

30
6 6.5 7 4 4.5 5 5.5 6 6.5 7
% de C.A.

RESUMEN DE RESULTADOS
-0.20% OPTIMO % C.A. 0.20% ESPECIFICACION
75 75 75 75
5.30 5.60 5.90 (+/- 0.2%)
2.340 2.519 2.341
4.6 4.4 3.7 3 - 5
14.6 17.3 15.1 Mìn 14
69.0 74.6 74.9
3.4 3.05 3.9 2 - 4
1082 1504 1068 Mïn. 815
1.11 0.6 - 1.3 8
81.1 Mïn. 5 2.0
6.5 Mín. 75
42.0 %
43.0 %
15.0 %
5.60 %
0.5 %

%
1.05 0.09 0.12 0.12 0.10 0.07 0.01
2.432
4.0 4.5 5 5.5 6.0 0.0
C.A. 2.498 2.481 2.462 2.442 2.423
ASFALTO ABSORBIDO 0.09 0.12 0.12 0.10 0.07
C.A. 4.0 4.5 5 5.5 6.0
PESO UNITARIO 2.488 2.509 2.519 2.516 2.500
VACIOS 7.2 5.7 4.6 3.8 3.1
V.M.A. 17.4 17.1 17.2 17.8 18.7
V.LL.C.A. 58.6 66.8 73.3 78.5 83.4
FLUJO 2.40 2.60 3.00 3.30 3.60
ESTABILIDAD 1478 1525 1515 1425 1315
P. UNIT. V.LL.C.C.A.
5.60 2.519 5.60 74.6 f(x) =
5.60 2.15 5.60 0 RICE ASTM D-2041 VS % C.A. MAC-01
5.60 2.519 5.60 74.63
0 2.519 0 74.63
2.550
peso espicifico

VACIOS FLUJO
5.60 4.4 5.60 3.05
2.530
5.60 0.0 5.60 0
5.60 4.4 5.60 3.05
2.510
0 4.4 0 3.05
V.M.A. ESTABILIDAD 2.490
5.60 17.3 5.60 1504
5.60 0 5.60 0 2.470
5.60 17.3 5.60 1504
0 17.3 0 1504 2.450

2.430
5.60
5.60 2.410
5.60 4.5 4.7 4.9 5.1 5.3 5.5 5.7 5.9 6.1 6.3 6.5 6

5.60 % asfalto

14 f(x) =
3.6 RICE RICE ASTM D-2041 VS % C.A. MAC-01
2.563
1.7
11
ASFALTO

10

9
f(x) =
RICE ASTM D-2041 VS % C.A. MAC-01

11
1.05

% ASFALTO
10

4
2.410 2.430 2.450 2.470 2.490 2.510

Pu
C.A. MAC-01

.9 6.1 6.3 6.5 6.7 6.9 7.1 7.3 7.5

% asfalto

.A. MAC-01
.A. MAC-01

0.0

0.0

0.0

0.0

-23.2090 0.0

5.60 -66.799

63.1710

2.490 2.510 2.530 2.550

Pu
v

ASFALTO ABSORBIDO 0.09 0.12 0.12 0.10 0.07


C.A. 4.0 4.5 5 5.5 6.0
PESO UNITARIO 2.488 2.509 2.519 2.516 2.500
VACIOS 7.2 5.7 4.6 3.8 3.1
VMA 17.4 17.1 17.2 17.8 18.7
VFA 58.6 66.8 73.3 78.5 83.4
FLUJO 9.45 10.24 11.81 12.99 14.17
ESTABILIDAD 7.43 10.15 11.50 12.13 11.04
0.1 0.1 0.1 0.1 0.1

VACIOS PE

PESO UNITARIO
8.0 2.530
% VACIOS

7.0 2.520
6.0
2.510
5.0
2.500
4.0
2.490
3.0
2.480
2.0

1.0 2.470

0.0 2.460
3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 3.5 4.0 4.5
% ASFALTO

VMA
23.0 90.0
22.0
21.0 85.0
VMA

VFA

20.0 80.0
19.0
18.0 75.0
17.0
70.0
16.0
15.0 65.0
14.0
13.0 60.0
12.0
55.0
11.0
10.0 50.0
3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 3.5 4.0 4.5

% ASFALTO

FLUJO E
ESTABILIDAD (KN)

16.00 15.00
FLUJO (0.01")

15.00 14.00
13.00
14.00
12.00
13.00
FLUJO E

ESTABILIDAD (KN)
16.00 15.00

FLUJO (0.01")
15.00 14.00
13.00
14.00
12.00
13.00
11.00
12.00 10.00

11.00 9.00
8.00
10.00
7.00
9.00
6.00
8.00 5.00
3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 3.5 4.0 4.5

% ASFALTO
6.5
2.485
2.8
19.1
87.5
15.72
9.11
0.1

PESO UNITARIO
PESO UNITARIO

2.530

2.520

2.510

2.500

2.490

2.480

2.470

2.460
3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0
% ASFALTO

VFA
90.0

85.0
VFA

80.0

75.0

70.0

65.0

60.0

55.0

50.0
3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0

% ASFALTO

ESTABILIDAD
ESTABILIDAD (KN)

15.00
14.00
13.00
12.00
ESTABILIDAD
ESTABILIDAD (KN)

15.00
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0

% ASFALTO

También podría gustarte