Introduction
This paper was prepared for presentation at the 1999 SPE European Formation Damage In all the world (and the Val D’Agri is not excluded) there
Conference held in The Hague, The Netherlands, 31 May–1 June 1999.
is considerable concern about the environmental effect of
This paper was selected for presentation by an SPE Program Committee following review of large scale development activity.
information contained in an abstract submitted by the author(s). Contents of the paper, as
presented, have not been reviewed by the Society of Petroleum Engineers and are subject to In Basilicata, in order to preserve the area’s environmental,
correction by the author(s). The material, as presented, does not necessarily reflect any
position of the Society of Petroleum Engineers, its officers, or members. Papers presented at archeological and rural worth, the area is going to be formally
SPE meetings are subject to publication review by Editorial Committees of the Society of
Petroleum Engineers. Electronic reproduction, distribution, or storage of any part of this paper
declared as a National Park; some of the wells already drilled
for commercial purposes without the written consent of the Society of Petroleum Engineers is and some to be drilled are inside its boundary.
prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300
words; illustrations may not be copied. The abstract must contain conspicuous To minimize the number of rig locations and in order to
acknowledgment of where and by whom the paper was presented. Write Librarian, SPE, P.O. reduce the environmental impact in the area, cluster
Box 833836, Richardson, TX 75083-3836, U.S.A., fax 01-972-952-9435.
development has been implemented in Val D’Agri field. The
carbonate reservoir has an average of 600 mt of undersaturated
Abstract oil column. Two different types of oil are present; light oil at
The Val D’Agri field is located 20 Km SE of Potenza API° 35 and heavy oil at API° 22. The bottom of the reservoir
(Basilicata) in Southern Italy. The aerial extension of the field is delimited by the acquifer at 2960 mt below s.l.
covers approx. 250 Km2 mostly (2/3) in the mountainous At present 4 wells are producing some 8,000 bbls/day
region (more than 1000 m. a.s.l.) of the field, while the treated in the Viggiano Oil Center; a further 13 wells have
remaining part is located in the river Agri valley at 600 m. been drilled and completed , but are not connected yet. The
a.s.l. Val D’Agri project involves the drilling of some 50 wells, the
The field is divided into five blocks: Grumento Nova, Corleto revamping of the Oil center to be able to treat more than
Perticara, Caldarosa, Volturino and Tempa Rossa, operated by 100,000 bbls/day and the construction of a 20” pipeline to the
ENI Agip Division on behalf of different Joint Ventures, Taranto refinery.
comprised by Enterprise Oil, FINA, and Mobil . Production test analysis suggest that most of the oil
From 1980 to present 24 wells have been drilled by ENI production comes from a few natural fractures and that the
Agip Division. The most significant discoveries have been formation damage can be effectively removed with a properly
Costa Molina 1(1980) and Monte Alpi 1 (1988), in the designed acid job.
southern part, Cerro Falcone 1 (1992), in the northern part, Acid jobs have been performed using different procedures.
and Monte Enoc 1 (1994), in the central part of the field which Initially, in the dual completion vertical wells, the acid
confirmed a unique reservoir. Val D’Agri is currently the most treatments consisted of bullhead pumping HCl acid at
interesting Italian region for hydrocarbon production, and maximum rate without any flow diversion.
probably the most demanding from the completion technology In the more recent horizontal wells the acid job procedure
point of view. included two main operations. Spotting the acid in front of the
The overall plan is to drill more than 50 wells and produce formation with coiled tubing, then bullheading acid at the
about 100,000 bopd when the oil treating center and the maximum rate intermixed with viscous pills.
pipeline network will be completed. Due to the length of the horizontal open hole section (more
than 1000 mt.) in the Monte Enoc 2 well (Figs 1 and 2 ) a new
acidizing technique was developed. A work string with
inflatable straddle packers was designed in order to treat
multiple intervals no longer than 100 m. To improve treating
2 S. Mascarà, A. D’Ambrosio, A. Zambelli, V. Gili, S. Loving, M. Dossena SPE 54738

efficiency, the use of the SDATM ( self diverting acid ) to get actual phase is distensive and responsible for the
chemical diversion inside each interval was also planned. sedimentation of fluvial - lacustrine sequence of Val D’Agri.
Another technique used in the most recently wells is the This is confirmed, from the data gathered from the Val D’Agri
Coil Tubing Underbalance Acid Jetting Wash. The technique wells, by Pliocene Inferiore sediments laying on the carbonatic
involves in the circulation of acid through 1 1/2” (or bigger) apulo substratum.
Coil Tubing, the bottom hole assembly of the coil being
provided with a rotary jetting tool . The combined action of Horizontal Multilateral Drilling and Completion
the acid and the jetting force is able to remove the filter chake To limit the well locations, cluster multibranch horizontal
impairing the full production of the well wells have been planned in the Val D’Agri development.
The paper will illustrate the results achieved, problems Up today 7 wells have horizontal section:
encountered by these new techniques and indicate the already Cerro Falcone 1
planned modifications to the inflatable straddle system to Monte Alpi 5
allow an increase in the number of treated intervals without Monte enoc NW1
retrieving the working string in the case of the selective Monte Enoc 2
stimulation case and the experience gained in the coil tubing Monte Enoc 3
jetting system technique. Monte Enoc 9
Alli 1
Geological Prospective Moreover two bidrain horizontal well have been
Val D’Agri area is located in a sector of the South successfully completed:
Appenines campano-lucano arch with a tectonic style Cerro Falcone 2
characterized by a duplex type system: on the basis of this Volturino 1
model some stratighraphic-structural units geometrically Average length of the horizontal sections is same 1000
higher and more internal are in a position near to the mt.; with an average R.O.P of 2.5 mt/hour the reservoir is
alloctonus (Apennine chain) covering the more external units exposed to the drilling mud for more than 30 days.
(Inner Apula Platform) belonging to the foreland Apulo When a fracture is hit very often total fluid loss is
domain. experience; so to proceed with drilling L.C.M. is spotted.
From the analysis of the data it is agreed on the presence of All of this makes the restoring of the production
three principal lines: on the west side the Appenines Platform, capabilities of the wells a very challenging problem
on east side the Apula Platform and in between the
Lagonegrese basin. The lagonegresi sedimentary sequence of Stimulation Strategy
the South Appenines is considered a deformed part of a deep The advent of horizontal development of the fields puts the
sea basin, corresponding to the actual South Ionio sea (Finetti emphasis on production optimization; in particular on how to
and others 1996). restore productivity in the long open hole section.
The Apula Platform can be divided into two different Matrix acidizing is a well stimulation technique that
units: Inner and Outer Apula: latter represents the foreland and removes, partially or completely, near-wellbore damage with
is the substratum of the Fossa Bradanica, while the Inner acid.
Apula is the center of the Appenines Chain. An acidizing treatment is called a "matrix" treatment
The Val D’Agri field geological section (Fig. 3) shows because the acid is injected at pressure below formation
from SW to NE: fracture pressure. Injected fluids follow the path of least
1. the inner margin of the chain, characterized by distensive resistance corresponding to the higher permeability and/or
tectonic, gradually deepening to the tirrenic basin least damaged zones; consequently particular technique should
2. the apenninic chain s.s. in a carbonates thrust system be considered to increase acid placement.
(Apula Interna, Mostardini & Merlini 1986) and in a Generally, a matrix stimulation plan includes:
plastic alloctonus system covering the carbonates thrust proper design of the treating fluid, effective specific volume
3. the apulo-garganico foreland, immersed below the and rate and adequate treating technique in order to achieve
Appenines system complete damage removal from the entire productive interval.
The structural motif, at regional level, of the campano- Various stimulation techniques have been tested:
lucano Appenines arch is the result of two different 1. Selective stimulation
compressive tectonic phases: 2. Coil tubing washing
1. Top early Pliocene (confirmed by early Pliocene sequence 3. Bullheading from surface of cross linked acid,
laying on the carbonates apulo substratum)
2. Medium Pleistocene Selective Stimulation
With phase 1. the over thrust of the Irpine and A brief history. In order to selectively stimulate the horizontal
Lagonegrese Units, has been realized over the undeformed section, wells such as Monte Alpi 5, Monte Enoc NW 1 and
foreland. Cerro Falcone 2 were completed with slotted liner spaced with
Phase 2. is responsible for the structure of the inner Apula blank slotted sections isolated by ECIP (External Casing
in large anticlines which deform the alloctonus units. The
SPE 54738 Acidizing Deep Open-Hole Horizontal Wells: A case History on Selective Stimulation and Coil Tubing deployed Jetting System 3

Inflating Packer); the spacing according the results of the FMI calcite cemented natural fissures to very high conductivity
log locating the more fractured open hole sections (Fig. 4). fractures).
Following the running of the completion string and The spacing between the two packers ( about 95 m ) was
nippling up of the X-Mas tree, the acid job was performed chosen according to the interval selection proposed by
with coil tubing and TTBP(Through Tubing Bridge Plug) set reservoir department. To avoid acid-packer contact, a blank
in the blank slotted sections. zone of few meters for each part was added.
The results of this completion strategy were unsatisfactory The work string was designed to allow a high pump rate,
mainly due to the poor ECIP performance. according to the criteria suggested by Paccaloni’s MAPDIR
Moreover the pressure rating of the TTBP was the limiting technique (maintain the highest bottom hole treating pressure,
factor for an effective stimulation treatment. in matrix condition, to reach an uniform distribution of the
In Monte Enoc 2 a new selective stimulation methodology has treating fluid along the selected zone). In addition, to optimize
been used for the first time in ENI Agip Division. matrix treatment in high conductivity zones a new product for
chemical diversion was planned.
Reservoir target
The first wells drilled in Val D’Agri Limestone Formation Chemical Diverting Techniques
Field were vertical; now wildcat wells are single drain or The use of chemical diverting materials can be alternative
multidrain. Usually the horizontal main drain length is or/in conjunction with mechanical diversion. Diverting agents
between 800 and 1200 meters; the total length depends mainly temporarily block the more permeable sections of the interval,
from thief/fissured zones extension showed by logs analysis forcing the acid into the less permeable (or damaged) areas.
and eventually from mud losses monitored during the drilling A recently developed acid system (SDA TM -Self Diverting
phase. Matrix gives a poor contribution to the total oil Acid) containing no solids or particulate, shows very
production because of the low matrix permeability; high promising diversion effectiveness in carbonates formations.
productivity is possible only if a fault or an extensive fracture SDA can be used in either cased or open hole completion
network is encountered. since it actually diverts in the formation rather than on it (In-
Most natural fissures are distributed near to the main faults situ diversion).SDA consists on HCl acid mixed with a gelling
but actually it is very difficult to understand if they are agent and a pH sensitive crosslinker.
conductive or closed (e.s. cemented by calcite). SDA formulations have unique rheological properties:
The scope of work (completion and stimulation design) of initial spending of the acid during leak-off and wormholing,
Monte Enoc 2Or well was to select the best fractured zones will produce a rise in pH to value of 2-3, which initiates a
(high potential) and treat them with acid. Selective injection dramatic increase in viscosity. This highly viscous acid will
tests with brine were planned to verify the presence and then act to plug off the thief zone, forcing the following stage
conductivity of fractured zones predicted from log data. of plain acid to be diverted. Further reduction in pH to values
above 5 reduce the viscosity to about 15 cp.
Selective Stimulation: Monte Enoc 2 It has been seen that the retention of some viscosity after
spending assists to maintain the formation fines in suspension,
Well data and improves the clean-up of the formation.
The Monte Enoc 2or well has reached the total depth of @
4940 mt. T.M.D. (T.V.D. 3615m). The final completion Work String
consists of a 7” liner with shoe positioned at 3779 mt. T.M.D. The stimulation operation was designed to achieve the
and a horizontal 6” wellbore that cross the carbonatic reservoir following goals:
until the total measured depth (total horizontal open hole 1. High treating rate ( 20 - 30 bpm ) as it was experienced in
length 1161m). the previous jobs,
A Nacl brine (specific gravity 1.02 Kg/l) was used as 2. Selective treatment of intervals no longer than 100 meters,
completion fluid. A proper rock mechanic study was 3. Safe operations in presence of extremely high leak off,
performed from ENI Agip Division Lab on wellbore stability 4. Possible production test after stimulation,
during production phase before selecting an open hole 5. Killing of the well with presence of gas below the
completion. packer.
To achieve the first goal the available Coiled Tubing at the
Stimulation design time of the operation (1.5" OD ) was too small for high
Matrix acidizing of a horizontal well is very problematic treatment rate , so a 3 ½ " working string was selected. This
mainly due to the extent of the zone to be treated. The solution required additional tools in the work string to get
challenge is to obtain production optimization with a small annulus control during stimulation and leak off control in case
acid volume compared with a vertical well, this requires good of a successful job. Annulus control was necessary to activate
placement and pumping techniques. the circulation and the tester valve selected and this was made
The selected work string with straddle packers (Figs 5 and possible using a mechanical retrievable packer combined with
6) allows selective treatment of the horizontal section some slip joints. Because of the rig location, ( Monte Enoc 2
including zones with different conductivity (from zero as for well is located at about 1200 mt. asl ), it would have been very
4 S. Mascarà, A. D’Ambrosio, A. Zambelli, V. Gili, S. Loving, M. Dossena SPE 54738

difficult and expensive to organize a continuous water supply than similar jobs in other fields. This was because of the high
to the rig site in case of high leak off. Therefore only a limited differential pressures recorded during the job (no fault or
volume of fluid and time was available to put the well in safe natural fracture network was encountered during the
conditions. stimulation). Every run only 2 or 3 intervals have been treated
The design called to treat 6 different zone of the well, by before a failure in the straddle packer occurred.
inflating, treating, deflating, and moving in next spot the An important consideration with such a work string is that
straddle packers. The most critical aspect in performing this during the day light, in this kind of wells, it is possible to treat
operation was the well control. no more than 4 intervals because the procedure required to
During the operation, in particular during the moving reposition the straddle packer across the new interval to treat
between one zone to another, with the straddle packers de- is time consuming. First it is necessary to completely deflate
flated, the fluid loss will increase due to the effects of the acid the straddle packer, then unseat the mechanical packer, then
stimulation. pull the work string up slowly trying to minimize swabbing in
The site logistic allowed to safely control the fluid loss, in the open hole section, then reset the mechanical packer and
the order of 4-5 bbl/min: this fluid loss value corresponds to finally inflate the straddle packers.
an equivalent Production Index PI of 50 m3/day/kg/cm2
considered satisfactory in terms of production; so the Treatment
operation was planned to be cease if such value could be The total treating volume had been designed according to
achieved. ENI Agip Division experience on previous jobs in similar
A Knock Out Isolation flapper Valve KOIV (Figs 7 and wells in Val D’Agri. Laboratory tests were performed to select
8) positioned at the top of the 7" liner, was installed before the best fluid type and volume.
running in the hole the stimulation string; it will be closed The choice was acid with 65 mc of 15% by weight regular
activated by a sleeve catcher placed at the bottom of the work HCl (the highest concentration compatible with a safe
string. corrosion level ) with corrosion inhibitor, iron control agent,
In case of high leak-off the work string could be pulled sulfur modifier, mutual solvent, antisludge agents, and friction
out of the hole above the KOIV and the protective sleeve reducer.
could be retrieved by the sleeve catcher, closing out For safety reasons, the acid treatments were planned only
automatically the flapper providing the separation between during the day light hours only. Two slugs of SDA for a total
formation and surface. The time required for this operation, volume of 15 mc were also pumped.
few hours, was compatible with the volume of fluid available The specific acid volume was about 800 lt/m of net pay (about
at the well site. 65 gal/ft) . The displacing fluid was fresh water with properly
The subsequent operation, i.e. the running of the selected additives.
completion string, was then conducted without any fluid loss
and consequently damage of the already acid stimulated open Stimulation results
hole section. After nippling up the X-Mas tree a wire line run During the job, 4 intervals have been stimulated :
was necessary to re-open the valve to the flow 1) 4885 - 4780 m
Because of the uncertainty on the bottom hole temperature 2) 4685 - 4580 m
during stimulation, to avoid possible deflating of the straddle 3) 4395 - 4290 m
packer, an “ad hoc” circulation sub at the top of the straddle 4) 3930 - 3897 m
packer was foreseen in the work string. With this tool it was After stimulation a PLT with coiled tubing was performed
possible to cool the wellbore before stimulation to minimize and showed the following producing intervals:
the cooling effect of the stimulation fluid pumped at high 1) 4620-4615 m
rates. 2) 4325-4315 m
The straddle packers size was compatible with the ID of 3) 4000-3980 m
the sleeve of the KOIV and the maximum differential pressure 4) 3885-3875 m
required for the stimulation. In order to verify the efficiency Most of the oil production (70-80%) was coming from the
and reliability of the system, some memory gauges were 4th interval. The interval 4885 - 4780 m where the FMI log
installed in the work string. At the end of the job it was highlighted considerable fissures was not productive.
possible to understand what really happened at downhole
conditions because from the surface pumping parameters only Stimulation-Considerations
it is not possible to know if the straddle packers worked as Real-time treatment monitoring showed, after straddle
expected. packer recovery, that the inflatable elements did not provide
The analysis of pressure and temperature data above the the zone isolation as planned because of difficulties in
top packer and between the straddle packers pointed out inflating the bottom packer probably due to the distance
problems during the inflation of the bottom packer not between the straddle packer assembly.
identifiable from surface parameters. This helped in designing Although the matrix stimulation was performed under non
the new work string for future selective stimulation in Val favorable conditions, an improvement of the injectivity index
D'Agri. The effective life of the straddle packer was shorter was obtained.
SPE 54738 Acidizing Deep Open-Hole Horizontal Wells: A case History on Selective Stimulation and Coil Tubing deployed Jetting System 5

Effectiveness of in-situ SDA diversion was deemed • By making a design modification to the straddle packer
evidenced (Fig. 9). assembly, it is possible to eliminate the problem of the
While the pressure remains flat at approximately 3200 psi, bottom packer not inflating.
during HCl acid injection into the formation, a notable
pressure increase was evident when SDA reached the Coil Tubing Wash
formation with almost constant rate (in reality the rate is An effective technique recently used in the horizontal
slightly decreasing). Well head pressure monitoring indicated wells of the Val D’Agri field is the Coil tubing underbalance
gradual increases, (total differential pressure about 600 psi) acid wash. Briefly the technique involves in the circulation of
suggesting that diversion stage was effective. a fluid, typically acid, through 1 3/4” (or bigger) Coil tubing;
The following regular acid stage resulted in a notable the bottom hole assembly of the coil is provided with a rotary
decrease of injection pressure. The pump rate was increased to jetting tool. The combined action of the acid and the jetting
10 bpm. When the second SDA stage reached the formation, tool is able to remove the filter cake.
the injection pressure surged by approximately 300-400 psi,
indicating possible in situ diversion. Underbalance wash: Monte Enoc 3
During both SDA diversion stages a slight premature In October 1997 , on well Monte Enoc 3or (open hole
decrease of injection pressure is notable before all acid volume completion ) this new techniques has been tested for the first
is pumped. This can be mainly attributed to a reduction of time in ENI Agip Division. The technique is based on the
injection rate, carried out not to exceed the maximum circulation of fluid through coiled tubing equipped with a
designed treating pressure during the SDA stages. The rotating circulating head with jets and a turbine that provides
injection pressure remained flat during the following regular the power necessary for the “stress cycling” exerted on the
HCl acid stage. No significant additional improvement of the undesired adhesive material (deposit/panel).
injectivity index was achieved. With the addition of appropriate additives to the base fluid or
the circulation of aggressive fluids (ex. acid) it is possible to
Discussion obtain the removal / disgregation of the deposits that obstruct
Generally when HCl acid is injected into carbonate the production.
formation, the measured well-head pressure is expected to fall, Adding nitrogen to the fluid from time to time , allows the
indicating the progress of the chemical reaction of the acid well to operate in underbalance conditions. The direction of
with the rock. the flow (formation-well-surface) makes the dragging of
During the last stimulation treatment (3930 - 3897 mt), removed deposits easier with evident benefits for the
two SDA stages were pumped, with HCl and SDA in productivity formation that see an effective reduction of skin.
sequence. Since both fluids have different rheologies and This technique has been applied firstly on Monte Enoc 3;
viscosity, the pressure response when entering into porous the stimulation program included an open hole cleanup with
media is affected. the rotary jetting tool ; an underbalance wash of the open hole
The use of SDA created a temporary desired skin, that with filtered brine, mutual solvent and a breaker to remove the
reduced the well injectivity, and then surely affected the polymeric filter cake, followed by an over balance wash of
pressure evolution. The discontinuity in pumping pressure is 15% HCl with mutual solvent, inhibitor etc. in order to
an indication of effective fluid diversion in the formation. remove any near well bore matrix damage caused by calcium
This temporary induced skin however masked any carbonate LCM and drilling cutting.
following pressure fall-off. For this reason any interpretation The stimulation operation was performed after the running
of pressure decline becomes very difficult. After well clean-up of the final completion (Fig. 10). The results were very
the P.I. was about 1.5 m3/d/bar (oil rate about 250 BOPD) and encouraging: Monte Enoc 3 well has been successfully tested
the most of the oil production is according to PLT data from at a production rate over 600 m3/day; estimated P.I.s are still
3885-3875 m interval. under evaluation. The technique of stimulation in open hole
completion with rotary jetting system , has been already
Conclusions on Selective Stimulation applied in other six horizzontal wells , with satisfactory and
The following conclusions can be drawn: encouraging results. The technique has brought to a
• The work string with straddle packer supplied with simplification of the completion hook up and a reduction in
continuous bottom hole monitoring system is an effective the surface equipment needed to stimulate the wells (Fig. 11)
tool for selective stimulation in horizontal wells. in an environmental sensitive area like Val D’Agri field.
• Analyzing data collected with memory gauge it is possible The Bottom assembly of the coil tubing is very simplified;
to understand what really happened during the job and at the moment ENI Agip Division has tested two different
improve the efficiency of the total system. B.H.A provided by different Service Company.
• Injection tests before stimulation can verify the presence of The reported one is provided by Baker Oil Tool (Fig. 12)
a conductive fractured zone. In Table 1 are summarized the wells data where the
• Chemical diversion with high pump rate are possible with technique as been applied and the relevant
a properly designed work string.
6 S. Mascarà, A. D’Ambrosio, A. Zambelli, V. Gili, S. Loving, M. Dossena SPE 54738

In particular are reported the total depth of the wells, the


open hole size and length, the completion tubing size and the
minimum restriction through it and finally the number of runs
performed on each well with the type of acid and treatment
volume.
This technique have a good impact in term of time/cost
reduction , and the system is reliable in term of equipment and
procedure

Acknowledgments
The authors would like to thank the Management of ENI
Agip Division for permission to publish this paper. Special
tanks to Mr Steven Scott from TAM International and Mr
Norbert Heitmann from Dowell Schlumberger for their
contribution. The authors wishes also to thank all the
personnel of ENI Agip Division Ortona District involved in
the operations.
Ortona District, cooperatated by San Donato Milanese
colleagues, is very much focused on the Val D’Agri field
Development.
Only the professionalism of the people involved can bring
the continued performance improvements that we continually
achieve and constantly strive for.

References:

1- G. Paccaloni M. Tambini “Advances in Matrix Stimulation


Technology” SPE N° 20623 SPE 65th Annual Technical
Conference and Exhibition held in New Orleans, LA, September
23-26, 1990.
2- M. Tambini “ An Effective Matrix Stimulation Technique for
Horizontal Wells” SPE N° 24993, SPE European Petroleum
Conference held in Cannes, France, 16-18 November 1992.
3- G. Paccaloni “ A New, Effective Matrix Stimulation Diversion
Technique” SPE N° 24781, SPE Formation Damage Control
Symposium held in Bakersfield, California, February 8-9, 1988.
4- Goode P.A. and Wilkinson, D.J. “Inflow Performance of a
Partially open Horizontal Wells” SPE N° 19341, SPE Eastern
Regional Meeting, Morgantown, October 24-27 1989.
5- M.J. Economides, K. Ben-Naceur, and R.C. Klem, ”Matrix
Stimulation Method for Horizontal Wells” Dowel Schlumberger
SPE N° 19719, SPE 64th Annual Technical Conference and
Exhibition, held in San Antonio,TX, October 8-11, 1989.
6- O. Lietard” Matrix Treatment in Horizontal Openhole wells:
Design of viscous diverter slugs and treatment fluid placement
optimization”, Dowell Schlumberger, SPE n° 38201, PE
European Formation Damage Conference held in The Hague,
The Netherlands, 2-3 June 1997.
SPE 54738 Acidizing Deep Open-Hole Horizontal Wells: A case History on Selective Stimulation and Coil Tubing deployed Jetting System 7

TABLE 1-WELL SUMMARY DATA


WELL TBG SIZE/ MEAS. O.H. SIZE & C.T. RUN ACID
No MIN REST. DEPTH (mt) LENGTH (mt) SIZE (inches) No SPEC.
A 4.5” / 3.125” 5250 6” / 1100 1.75 2 (1 Dummy) 50 m3 SDA 28X
B 4.5” / 3.125” 5475 6” / 900 1.75 5 (4 Dummy) 60 m3 SDA 28X
C 4.5” / 3.125” 4933 6” /1150 1.75 1 60 m3 SDA 28X
D 4.5” / 3.125” 4552 6” / 950 1.75 2 (Dummy) 40m3 28% HCL
E 3.5” / 2.56” 3994 8.5” / 1100 1.75 2 60 m3 SDA 28X

Val d’Agri
Val d’Agri Caldarosa Lease
Caldarosa Lease
0ïWHý(QRFýëý:HOOýðý*HRORJLFDOý6HFWLRQ ýý0ïý(12&ýëý:HOO
6WUXFWXUDOý0DS
1: 0ïWHý(QRFýë 6(

0ý(ïë

Fig. 2- Monte Enoc 2 Well: Structural Map

Fig. 1- Monte Enoc 2 Well: Geological section


8 S. Mascarà, A. D’Ambrosio, A. Zambelli, V. Gili, S. Loving, M. Dossena SPE 54738

GEOLOGIC SKEMATIC OF VAL D'AGRI Val D'Agri Area - size 4"1/2 Completion string
w/slotted completion

CFALC1
TBG HGR 9"-mod. DP4H5(MONEL K)
4"1/2 EU top*4"1/2 Vam Ace -w/triple metal
CFALC2X B.P.V. mod. TSB-1
NIPPLES pin*pin 4"1/2 Vam Ace 12,6# Duplex 25%

N° 5 TBG 4"1/2 Vam Ace 12,6# Duplex 25%

VOLT1 CALD1 PERT1

TMAN1 CUP ROCK


Safety Valve size 3,812" fil. 4"1/2 Vam Ace

MENW1

ME1
SICILIDI S.L. TBG 4"1/2 PJD-C.B. 12,75#
CMOL3X

MALPIN1
CMOLW1
Landing Nipple R size
MALPIW1
CMOL1
MALPI1

MALPI3D LIGURIDI S.L. TBG 4"1/2 PJD-C.B. 12,75#


MALPI4X TVENTO1
MALPI5OR
CMOLW1
MALPIE1
Side Pocket Mdl 4"1/2

TBG 4"1/2 PJD-C.B. 12,75#


PIATT. APPENNINICA
Mod. K22 Anchor fil.4"1/2 PJD-

Pkr SC2PAH 9"5/8

Mill Out Extension


FLYSCH GORGOGLIO
TBG 4"1/2 PJD-C.B. 12,75#

Landing Nipple AR size 3,688" (NO-GO

LAGONEGRESI S.L.
CAST1

CSARAC1

SOUTH -WEST NORTH-EST

APPENNINIC
LIGURIDI
PLATFORM LIG. SICILIDI IRPINE Fig. 4- Typical horizontal selective completion
F. GORGOGLIONE

INNER APULA PLATFORM OUTER APULA PLATFORM

Fig. 3- Val D’agri field: Geological Section

Fig. 5- Schematic work string for selective stimulation


SPE 54738 Acidizing Deep Open-Hole Horizontal Wells: A case History on Selective Stimulation and Coil Tubing deployed Jetting System 9

cp 32" a 48 mt

csg 24"1/2 162#


@ mt 397

Setting sleeve
size 7"3/4 * 20 feet

csg 18"5/8 96,5# K.O.I.V. 7"5/8 w/flapp


@ mt 1197 I.D. 5,6" valve in lock open pos

top - cemento teorico


a mt 1300

BSP Packer 7" 29/32

csg 13"3/8 68#L80


Tie-back stem
@ mt 1971
for 7" liner

csg 9"7/8 ams 62,8# T95


@ mt 3341

Fig. 6.- Detailed work string for selective stimulation of Monte PORT COLLAR A MT 3424.12
Enoc 2 horizontal well TOP LINER 7" 23-32# L80 A MT 3105
2° E.CP. A MT W/BSP PKR W/15' SETTING- SLEEVE
ID 159,4 MM SIZE 7" 23-32 #

1° E.CP. A MT3444.48

TOP/CMT A MT 3626
O.H. 6" A MT 4880

liner 7" ams 29# L80


@ mt 3779
Fig. 7- Monte Enoc 2 Well: casing profile with the Knock Out
Isolation Valve (KIOV) installed
10 S. Mascarà, A. D’Ambrosio, A. Zambelli, V. Gili, S. Loving, M. Dossena SPE 54738

Injection line size 1/4" Control line size 1/4"

TBG HGR "METAL SEAL" SIZE 11" 10000 PSI - 3"1/2


BPV 3" TSB

NIPPLES 3"1/2

N° 4 TBG 3"1/2 AMS-28 10,2# 28%

TBG/RET. SAF. VALVE OTIS


50 M Inconel 718 Material

TBG 3"1/2 PJD 9,3# T95

LANDING NIPPLE SIZE


1500 M

TBG 3"1/2 PJD 9.3# T95

TIE/BACK 9"7/8
@ 1798,5 M
N° 2 TBG 3"1/2 AMS 28 10.2# 28%

S.POCKET MANDREL

7" LINER HGR FLEX LOCK-


W/ZXP Top-Pkr N° 1 TBG 3"1/2 AMS 28 10.2# 28%
@ m 3250

Fig. 8- Details on the KOIV valve used in the Monte Enoc 2 well
LANDING NIPPLE SIZE
CSG 9"7/8 @
3330 M
N° 1 TBG 3"1/2 AMS 28 10.2 # 28%
Fig 8 - Acid Job (3897 m, Circ.Valve; T.V.D. 3450 m)
8000
24
TOP/CMT @ 3400-3450 M LATCH SEAL NIPPLE FOR 4" BORE
7000 22
Bottom
Hole Pressure
20
Data
First
6000 Start Second 3570-72 M
SDA 18
Acid SDA
Plug
Squeeze Plug PACKER RSB 7"
16
5000
Positrieve
pressure (psi)

rate (bpm)

Packer 14
Set End of
4000 Acid Squeeze
12
Start
Pumping 10
3000 Acid Surface
Data Landing Nipple AFH size 2,56"
8

2000 6

4
1000 W/LINE ENTRY GUIDE 3"1/2 PJD 9,3#
2
CSG 7" 29#
@ M 3580-85
0 0
13.26 13.40 13.55 14.09 14.24 14.38 14.52 15.07 15.21 15.36
time (hours)

OPEN HOLE SIZE

Fig. 9- Pressure Log of acid job performed on Monte Enoc 2 well

Fig. 10- Typical completion schematic


SPE 54738 Acidizing Deep Open-Hole Horizontal Wells: A case History on Selective Stimulation and Coil Tubing deployed Jetting System 11

50 m3
round
tank 50 m3 50 m3 50 m3
54 m3 54 m3
round round round
Tank Tank
tank tank tank

Recirculating Manifold Suction Manifold


Pump Truck

N2 Pump CAT
Turbine Turbine
Frac
Pumper pumper
Pumper

H 2O P u m p
B

CT Unit WH

Fig.11-Surface Lay-out for stimulation job: A ) Equipment needed


for CT operation only; B) Equipment needed for bull-heading
operation

2.25” O.D. Coiled Tubing Connector

2.13” O.D. Dual Back Pressure

2.13” O.D. Model “FA” Hydraulic


Disconnect

• 2 MT.

2.13” O.D. Dual Circulating Sub

2.13” O.D. Pump Thru Weight Bar

Fig.12- Coiled Tubing Spinning Washing Tool Bottom Hole


Assembly
2.50” O.D. Fixed Blade

2.25” O.D. Spinning Wash Tool

También podría gustarte