Reinforcement Checklist

Project:
Client: PMC: CBRE South Asia Pvt.Ltd.

Contractor: Structural
member:

Location: Date:

Grid: Level:

Drawing Reference No: Quantity:

Operations Yes No Remarks


Before Placing
1) Method of work agreed and all parties
involved/informed about specified tolerance.

2) Check for latest revision of drawing


3) BBS submitted
4) Steel used from approved lot
5) Check for grade of steel,test certificates

During Placing
1) Earlier comments attended.

2) Dia of bars as per certified BBS.

3) No of bars as per certified BBS.

4) Length of bars as per certified BBS.

5) Spacing of bars as per certified BBS.

6) Sufficient lap/development length provided.

7) Dimension of stirrups as per certified BBS.

8) Length of stirrup's hook as per certified BBS.

9) Check for stirrups at beam column junction.

10) Check for dimension and number of chairs.

11) Check for cover and cover block material.

12) Couplers/ Dowel Bars – position, No’s & size.

13) Check for spacer bars

14) Additional bars at openings if required.

15) Check gauge of binding wire & sufficient binding of


reinforcement

16) Check whether column location marked on slab top


mat and one complete stirrup set of column provided
over top mat
17) JMS submitted
Approved for next stage:
Contractor CBRE Client

Signature :

Name:
Note: The quantity mentioned above is approximate measure and can not be considered for any billing purpose.Only JMS to be
considered for billing else GFC drawings are to be refered for quantity.
INSPECTION REPORT
REINFORCEMENT CHECKLIST
CONTRACTOR CLIENT PMC

Project
Client
PMC Date
Contractor Structural Member
Package Civil Structure (Reinforcement) BBS.Ref.No.
Description of Work Reinforcement work Quantity
Wing Dwg.Ref.No Rev
Floor Level
Location Grid
Sl. No Description YES NO NA Remarks
Before placing
Method of work agreed and all parties
1
involved/informed about specified tolerance.
2 Check for latest revision of drawing
3 BBS submitted
4 Steel used from approved lot
5 Check for grade of steel/test certificate
During placing
1 Earlier comments attended
2 Dia of bars as per certified BBS
3 No of bars as per certified BBS
4 Length of bars as per certified BBS
5 Spacing of bars as per certified BBS
6 Sufficient laps/development length provided
7 Dimension of stirrups as per certified BBS
8 Check for stirrups at beam column junction
9 Check for dimension, number of chairs
10 Check for cover and cover block material
11 Check for position and fixing of couplers
12 Check for provision of dowel bars
13 Additional reinforcement at openings/cut-outs if
required

14 Check gauge of binding wire & sufficient binding of


reinforcement
Check whether column location marked on slab top
15 mat and one complete stirrup set of column provided
over top mat
16 JMS submitted
Observations if any :

Above Observations attended to and completed YES NO


Approved for next stage YES NO

Note: Bill of particular item will be certified only after signing checklist by respective representative.

The above works have been completed and accepted


Contractor Representative Contractor QA/QC Company Representative
Signature
Name
Date
Time