A material CYCLE is created as a configurable material with Gen. Item category group as 0004 and Item
category group as ERLA. Also material CYCLE is a BOM material, which has sub items.
Go to tab classification and select the class type Variants-300 as shown below.
Assign the class CYCLECLASS in the assignments area.
The class CYCLECLASS is created with the class type 300 (Variants) for the material cycle.
Transaction Code: CL01.
1) CYCLETYRES 2) SYSTEM
3) CYCLEMODEL 4) CYCLEPRIZE
Now the characteristic CYCLETYRES was created with character format.
Go to the values tab and maintain the characteristic values and description as per the requirement.
Go to the values tab and maintain the characteristic values and description as per the requirement.
Go to the values tab and maintain the characteristic values and description as per the requirement.
Now the characteristic CYCLEPRICE was created with character format. This characteristic is allowed for
multiple values.
Maintain the dependency editor for pricing the material CYCLE based on the required
combination.
Also we need to maintain the configuration profile for the material CYCLE.
A configuration profile CYCLE is created for the material CYCLE and set the status as released.
The necessary settings need to be maintained for the configurable material CYCLE to explore in a sales
order.
We have to create the variant conditions for the characteristics maintained in the class CYCLECLASS.
Then go to configuration or press F8 as shown below.
Finally maintain the condition records for the condition VA00 by using the transaction code: VK11.
The below specified conditions are active for the material CYCLE.
Now let us create a sales order. As the material is a BOM material it should explore with the sub-items
and also should give us the screen to select the required material.
As the material CYCLE is a configurable material, we can choose various options for the material as
shown below.
The material CYCLE is exploded with the sub-items and the net value is directly calculated based on the
variants maintained for condition type VA00.
The BOM components for material CYCLE are:
This is the complete overview of the variant configuration for a BOM material.