Documentos de Académico
Documentos de Profesional
Documentos de Cultura
(http://w
ww.sap.c
Products
om/) (https://www.sap.com/products.html)
Industries (https://www.sap.com/industries.html)
upport
Services and Support (https://www.sap.com/support.html)
Community (https://www.sap.com/community.html)
Developer (https://developers.sap.com/index.html)
Partner (https://www.sap.com/partner.html)
About (https://www.sap.com/corporate/en.html)
Ask a Question (https://answers.sap.com/questions/ask.html) Write a Blog Post (https://blogs.sap.com/wp-admin/post-new.p
Can any body help me in configuring milestone billing plan with out project systems. The problem I am
facing is that I am not able to copy the billing value from billing plan date to invoice document.
(https://people.sap.com/former.member)
https://archive.sap.com/discussions/thread/379160 1/6
3/30/2019 Billing Plan configuation
Former Member
June 18, 2007 at 18:24 PM
0 Likes
://answers.sap.com/questions/ask.html?primaryTagId=209057551571413566377230676804921)
4 replies
(https://people.sap.com/former.member)
Former Member replied April 18, 2007 at 05:04 AM
Milestone billing means distributing the total amount to be billed over multiple billing
During sales order processing, the system determines from the item category whether
a
The type of billing plan that is determined at this point is set up in Customizing and
Billing plans for periodic billing and milestone billing plans for project-related milestone
billing have different overview screens so that you can enter data relevant to your
processing.
For example, for milestone billing, you must be able to enter data to identify the
individual milestones.
Milestone billing is typically used for billing projects, such as plant engineering and
construction projects. Such projects often include a series of milestones that mark the
completion of different stages of the work. In the SAP R/3 System, milestones are
defined
in a network along with planned and actual dates for the completion of work. The
milestones
Each milestone-related billing date is blocked for processing until the Project System
Delivery-relevant order items for which a milestone billing plan applies are billed on the
basis of the requested delivery quantity and not on the total of the confirmed
quantities.
The connection between the project and the sales document item is made in the
individual
schedule lines of the item. Each schedule item can be assigned to a network in a
project.
The following figure shows an example of milestone billing where only the Contract
have
been billed :
Billing Plan
Network/Activities
Maintenance 01-04-95
Acceptance 01-05-95
For each billing date in a milestone billing plan, you can specify whether the billing
date is:
1. fixed
3. updated with the actual date of the milestone, if the date is earlier than the
regards
Biju
hi,
I have defined billing plan with three different dates and billing amount is split into
three values using percentage basis billing rule, My problem is while billing the system
is able to copy the billing plan item based on the selection of date with total value (net
value) of the item.instead of copying the respecting billing plan item value.
regards
AVS
(https://people.sap.com/former.member)
Former Member replied May 07, 2007 at 17:19 PM
Hi Biju-
Thanks for the information on Milestone Billing I am looking for additional information
https://archive.sap.com/discussions/thread/379160 4/6
3/30/2019 Billing Plan configuation
Thanks for the information on Milestone Billing. I am looking for additional information
on Periodic Billing. Specifically, I do not see how to configure the system to do a "One
Time Billing" no matter how long the contract duration.
I see to create a Billing Plan Type for this, but there are only 4 time units (DAY, WEEK,
MONTH, YEAR). I see my only options is to create 100's of billing plant types for each
time unit to accomodate this. Do you know how I can create one Billing Plan Type, that
will accommodate a request for one time billing, no matter how long the duration of the
contract? Thanks for your help
-Melody
If I understand you right, Melody, you may try in the IMG for Billing Plans Maintain
Date Category for Billing Plan Type -> Billing Rule = 5.
This is under Milestone Billing, and I beleive this will allow you to have manual control
over the billing dates, including just entering in whatever date you want.
Bill
(https://www.facebook.com/sapcommunity) (https://twitter.com/SAPCommunity)
(https://www.youtube.com/c/SAPCommunities) (https://www.linkedin.com/company/sap)
(http://www.slideshare.net/SAP) (https://instagram.com/sap/) ()
use.html)
https://archive.sap.com/discussions/thread/379160 5/6
3/30/2019 Billing Plan configuation
https://archive.sap.com/discussions/thread/379160 6/6