Está en la página 1de 34

S10

Presupuesto
Presupu
esto

Cliente Costo al
Lugar

Item Descripción Und. Metrado Precio S/. Parcial S/.

01 ESTRUCTURAS 1,430,749.60
01.01 OBRAS PROVISIONALES 95,846.00
01.01.01 CARTEL DE OBRA GLB 1.00 1,270.90 1,270.90
01.01.02 ALMACEN PROVISIONAL m2 50.00 232.09 11,604.50
01.01.03 CERCO PROVISIONAL m 20.00 24.81 496.20
01.01.04 INSTALACION DE OFICINA EN OBRA und 1.00 1,928.24 1,928.24
01.01.05 SEÑALIZACION DURANTE LA EJECUCION GLB 1.00 546.16 546.16
01.01.06 PLAN DE CONTINGENCIA PARA EL DESARROLLO DEL GLB 1.00 80,000.00 80,000.00
AÑO ESCOLAR
01.02 TRABAJOS PRELIMINARES 76,633.94
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 2,953.30 4.16 12,285.73
01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 3,023.09 3.41 10,308.74
01.02.03 TRAZO Y REPLANTEO DURANTE LA EJECUCIÓN mes 2.00 3,048.89 6,097.78
01.02.04 DESMONTAJE DE TECHO DE CALAMINA m2 512.93 15.63 8,017.10
01.02.05 DESMONTAJE DE VENTANAS m2 26.00 12.92 335.92
01.02.06 DESMONTAJE DE PUERTAS m2 55.89 25.37 1,417.93
01.02.07 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 512.93 12.21 6,262.88
01.02.08 CORTE DE MATERIAL SUELTO CON MAQUINARIA m3 3,266.00 7.21 23,547.86
REND=360 M3/DIA
01.02.09 ELIMINACION CON MAQUINARIA REN.=150 M3/DIA m3 1,000.00 8.36 8,360.00
01.03 MOVIMIENTO DE TIERRAS 120,220.73
01.03.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 198.11 41.55 8,231.47
01.03.02 EXCAVACION MANUAL DE ZANJAS P/ZAPATAS m3 432.07 47.18 20,385.06
01.03.03 EXCAVACION DE ZANJA PARA CIMIENTO CORRIDO EN m3 169.16 47.18 7,980.97
TERRENO NORMAL
01.03.04 REFINE Y NIVELACION DE BASE DE FALSO PISO m2 926.43 6.24 5,780.92
01.03.05 RELLENO CON MATERIAL PROPIO m3 35.48 30.45 1,080.37
01.03.06 RELLENO Y COMPACTADO CON MATERIAL CLASIFICADO m3 214.35 13.13 2,814.42

01.03.07 NIVELACION Y COMPACTADO DE BASE m2 1,988.02 12.64 25,128.57


01.03.08 ACARREO INTERNO DE MAT. PROCEDENTE DE EXCAV. m3 1,040.33 31.16 32,416.68
01.03.09 ELIMINACION CON MAQUINARIA REN.=150 M3/DIA m3 1,035.02 8.36 8,652.77
01.03.10 CAMA DE ARENA H=5CM m2 203.00 8.14 1,652.42
01.03.11 EXCAVACION EN RED m3 171.17 35.62 6,097.08
01.04 CONCRETO SIMPLE 116,776.48
01.04.01 SOLADO PARA CIMIENTO CORRIDO (E=5CM ) MEZCLA m2 11.11 20.49 227.64
1:10
01.04.02 CONCRETO F'C=140 KG/CM2 +30% P.G. PARA FALSA m3 119.23 209.58 24,988.22
ZAPATAS
01.04.03 CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO m3 162.49 226.60 36,820.23
01.04.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 398.71 41.62 16,594.31
HASTA 0.30 MT
01.04.05 DADO DE CONCRETO 1:8+25% P.M. m3 1.54 291.91 449.54
01.04.06 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 33.95 315.38 10,707.15
01.04.07 ENCOFRADO Y DESENCOFRADO PARA ASTA DE m2 2.70 37.87 102.25
BANDERA
01.04.08 CONCRETO 1:8+25% P.M. PARA ASTA DE BANDERA m3 1.87 294.60 550.90
01.04.09 ENCOFRADO Y DESENCOFRADO PARA LOSA MULTIUSO m2 93.34 70.00 6,533.80

01.04.10 CONCRETO F'C=175 KG/CM2. PARA LOSA MULTIUSO m3 40.85 397.62 16,242.78
01.04.11 ENCOFRADO Y DESENCOFRADO DE RAMPA PEATONAL m2 6.07 41.87 254.15

01.04.12 CONCRETO F'C=175 KG/CM2. PARA RAMPA PEATONAL m3 7.08 367.76 2,603.74
01.04.13 DADO DE CONCRETO F'C=175 KG/CM2. m3 1.44 397.55 572.47
01.04.14 CAJA DE PASE 40X40X60 CM F'C= 140 KG/CM2 und 5.00 15.25 76.25
01.04.15 CONCRETO EN CAJA DE REBOSE F'C=210 KG/CM2 m3 0.07 482.65 33.79
01.04.16 ENCOFRADO Y DESENCOFRADO EN C.R.R. m2 0.46 41.87 19.26
01.05 CONCRETO ARMADO 867,451.27
01.05.01 ZAPATAS 73,020.91
01.05.01. ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 3,062.10 5.48 16,780.31
01.05.01. CONCRETO F'C= 210 KG/CM2. EN ZAPATAS m3 138.78 405.25 56,240.60
01.05.02 COLUMNAS 148,347.19
01.05.02. ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 14,332.42 5.48 78,541.66

01.05.02. ENCOFRADO Y DESENCOFRADO NORMAL EN m2 730.26 43.59 31,832.03


COLUMNAS
01.05.02. CONCRETO F'C=210 KG/CM2 PARA COLUMNAS m3 79.84 475.62 37,973.50
01.05.03 VIGAS 207,478.16
01.05.03. ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y kg 15,949.34 5.48 87,402.38
DINTELES
01.05.03. ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 806.15 63.59 51,263.08
01.05.03. CONCRETO F'C=210 KG/CM2 PARA VIGAS m3 144.68 475.62 68,812.70
01.05.04 LOSAS ALIGERADAS 212,520.23
01.05.04. ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS m2 1,366.84 56.34 77,007.77
ALIGERADAS
01.05.04. LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA und 13,668.44 3.64 49,753.12
LOSA ALIGERADA
01.05.04. ACERO ESTRUCTURAL TRABAJADO PARA LOSAS kg 9,344.44 5.48 51,207.53
ALIGERADAS
01.05.04. CONCRETO F'C=210 KG/CM2 PARA LOSAS ALIGERADAS m3 84.32 409.77 34,551.81

01.05.05 CANALETA DE CONCRETO 32,171.76


01.05.05. ACERO ESTRUCTURAL TRABAJADO PARA CANALETAS kg 1,219.93 5.48 6,685.22

01.05.05. ENCOFRADO Y DESENCOFRADO NORMAL EN m2 303.36 63.59 19,290.66


CANALETAS
01.05.05. CONCRETO F'C=175 KG/CM2. PARA CANALETAS m3 15.17 408.43 6,195.88
01.05.06 COLUMNETAS 19,035.08
01.05.06. ACERO ESTRUCTURAL TRABAJADO PARA kg 1,712.02 5.48 9,381.87
COLUMNETAS
01.05.06. ENCOFRADO Y DESENCOFRADO NORMAL EN m2 103.88 61.81 6,420.82
COLUMNETAS
01.05.06. CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS m3 7.00 461.77 3,232.39
01.05.07 VIGUETAS 6,083.57
01.05.07. ACERO ESTRUCTURAL TRABAJADO PARA VIGUETAS kg 379.14 5.48 2,077.69
01.05.07. ENCOFRADO Y DESENCOFRADO NORMAL EN m2 40.92 63.59 2,602.10
VIGUETAS
01.05.07. CONCRETO F'C=175 KG/CM2 PARA VIGUETAS m3 3.04 461.77 1,403.78
01.05.08 MURO DE CONTENCION 27,619.57
01.05.08. ACERO ESTRUCTURAL TRABAJADO PARA MURO DE kg 1,750.00 5.48 9,590.00
CONTENCION
01.05.08. ENCOFRADO Y DESENCOFRADO CARAVISTA EN m2 137.11 56.94 7,807.04
MUROS DE CONTENCION
01.05.08. CONCRETO FC=175 KG/CM2 PARA MUROS DE m3 22.22 460.06 10,222.53
CONTENCION CARAVISTA
01.05.09 PLACAS DE CONCRETO 7,558.99
01.05.09. ACERO ESTRUCTURAL TRABAJADO PARA PLACAS kg 600.73 5.48 3,292.00
01.05.09. ENCOFRADO Y DESENCOFRADO NORMAL EN PLACAS m2 54.38 43.59 2,370.42

01.05.09. CONCRETO FC=210 KG/CM2 PARA PLACAS m3 4.68 405.25 1,896.57


01.05.10 LOSA MACIZA 1,693.83
01.05.10. ACERO ESTRUCTURAL TRABAJADO PARA LOSAS kg 181.37 5.48 993.91
MACIZAS
01.05.10. ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS m2 1.93 58.19 112.31
MACIZAS
01.05.10. CONCRETO F'C=210 KG/CM2 PARA LOSAS MACIZAS m3 1.45 405.25 587.61
01.05.11 CANALETA PARA EVACUACIÓN DE PRECIPITACIÓN 130,058.18
PLUVIAL
01.05.11. ENCOFRADO Y DESENCOFRADO EN CANAL DE m2 465.60 82.35 38,342.16
EVACUAC. PLUVIAL
01.05.11. CONCRETO F'C=175 KG/CM2. EN CANAL DE m3 21.73 447.40 9,722.00
EVACUACION PLUVIAL
01.05.11. REJILLA METALICA EN CUNETA DE EVACUACION m 776.00 67.44 52,333.44
PLUVIAL
01.05.11. JUNTAS ASFALTICAS m 1,870.15 15.86 29,660.58
01.05.12 BUZONETA 1,863.80
01.05.12. ACERO ESTRUCTURAL TRABAJADO PARA BUZONES kg 28.90 5.48 158.37
01.05.12. ENCOFRADO Y DESENCOFRADO NORMAL DE m2 13.29 58.19 773.35
BUZONES
01.05.12. CONCRETO F'C=210 KG/CM2 PARA BUZONES m3 2.30 405.25 932.08
01.06 TANQUE ELEVADO 4,259.34
01.06.01 ACERO ESTRUCTURAL TRABAJADO PARA TANQUE kg 182.48 5.48 999.99
ELEVADO
01.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE TANQUE m2 31.08 58.19 1,808.55
ELEVADO
01.06.03 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO m3 3.58 405.25 1,450.80
01.07 TANQUE CISTERNA 7,789.04
01.07.01 ACERO ESTRUCTURAL TRABAJADO PARA TANQUE kg 336.72 5.48 1,845.23
CISTERNA
01.07.02 ENCOFRADO Y DESENCOFRADO NORMAL DE TANQUE m2 46.57 58.19 2,709.91
CISTERNA
01.07.03 CONCRETO F'C=210 KG/CM2 PARA TANQUE CISTERNA m3 7.98 405.25 3,233.90
01.08 COBERTURA PARA PATIO 141,772.80
01.08.01 COBERTURA CON POLICARBONATO INCLUIDO m2 780.00 181.76 141,772.80
ESTRUCTURA METALICA
02 ARQUITECTURA 1,442,885.80
02.01 ALBAÑILERIA Y TABIQUERIA 180,599.68
02.01.01 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO- m2 743.19 64.09 47,631.05
ARENA
02.01.02 MUROS DE LADRILLO KK CARAVISTA DE SOGA C/M 1:4 X m2 818.27 91.72 75,051.72
1.5CM.
02.01.03 MURO DE CABEZA LADRILLO CORRIENTE CON m2 516.42 108.50 56,031.57
CEMENTO-ARENA
02.01.04 JUNTA DE CONSTRUCCION CON TEKNOPORT m2 32.76 57.55 1,885.34
02.02 REVOQUES ENLUCIDOS Y MOLDURAS 369,803.30
02.02.01 TARRAJEO EN CIELO RASO CON CEMENTO-ARENA 1:5 m2 1,356.33 103.50 140,380.16
02.02.02 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA 1:5 m2 891.05 46.63 41,549.66
E=1.5CM
02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON m2 557.96 44.71 24,946.39
CEMENTO-ARENA
02.02.04 TARRAJEO DE SUPERFICIE DE PLACAS CON CEMENTO- m2 49.68 44.71 2,221.19
ARENA
02.02.05 TARRAJEO CON CEMENTO PULIDO Y OCRE m2 8.70 22.11 192.36
02.02.06 TARRAJEO DE MUROS EXTERIORES E INTERIORES CON m2 3,458.52 36.10 124,852.57
CEMENTO-ARENA 1:5 E=1.5CM
02.02.07 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y m 936.81 24.64 23,083.00
VANOS.
02.02.08 BRUÑADO DE MUROS DE 1". m 1,508.15 8.34 12,577.97
02.03 COBERTURA 129,563.08
02.03.01 COBERTURA CON TEJA ANDINA DECORATIVA m2 1,839.31 63.69 117,145.65
02.03.02 COBERTURA CON TEJA ARTESANAL- CERCO m 233.79 27.13 6,342.72
PERIMETRICO
02.03.03 CUMBRERA CON TEJA ANDINA DECORATIVA m 172.97 35.12 6,074.71
02.04 PISOS Y PAVIMENTOS 197,174.78
02.04.01 FALSO PISO 35,217.60
02.04.01. CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO- m2 928.00 37.95 35,217.60
HORMIGON E=4"
02.04.02 CONTRA PISO 36,089.53
02.04.02. CONTRAPISO DE 48 MM. m2 927.99 38.89 36,089.53
02.04.03 PISOS 88,808.19
02.04.03. PISO CERAMICO DE 30X30 CM. m2 732.70 99.29 72,749.78
02.04.03. PISO CERAMICO DE 40X40 CM. m2 105.72 99.29 10,496.94
02.04.03. PISO DE CEMENTO PULIDO Y BRUÑ. 1.5 CM m2 35.20 40.78 1,435.46
COLOREADO
PISO DE CEMENTO PULIDO Y BRUÑ. 1.5 CM
COLOREADO
02.04.03. PISO VINILICO DE 4MM DE ALTA DENSIDAD m2 75.79 54.44 4,126.01
02.04.04 VEREDAS PERIMETRALES 37,059.46
02.04.04. ENCOFRADO Y DESENCOFRADO DE VEREDA m2 67.87 38.68 2,625.21
02.04.04. PISO DE CEMENTO PULIDO Y BRUÑ. 4" S/COLOREAR m2 462.00 58.96 27,239.52
(VEREDAS)
02.04.04. JUNTAS ASFALTICAS m 453.64 15.86 7,194.73
02.05 ZOCALOS Y CONTRAZOCALOS 120,268.41
02.05.01 ZOCALO DE CERAMICO 20 X 40 CM m2 223.80 201.72 45,144.94
02.05.02 CONTRAZOCALO DE CERAMICO DE H=10CM m 491.11 33.87 16,633.90
02.05.03 CONTRAZÓCALO BRUÑADO SEMI PULIDO S/COLOREAR m 408.81 13.98 5,715.16
H=0.20 M
02.05.04 CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 m 243.79 49.01 11,948.15
DE 1.5CM X 0.30M.
02.05.05 ZOCALO DE CERAMICO DE 30 X 30 CM m2 3.61 202.32 730.38
02.05.06 ZOCALO DE CERAMICO DE 20 X 30 CM m2 198.77 201.72 40,095.88
02.06 REVESTIMIENTOS 4,910.37
02.06.01 REVESTIMIENTO CON CERAMICO PEPELMA 30x30CM m2 45.61 107.66 4,910.37
02.07 CARPINTERIA METALICA Y DE MADERA 319,369.17
02.07.01 PUERTA DE MADERA APANELADA 1.20X3.38M APERTURA und 12.00 1,153.07 13,836.84
180°
02.07.02 PUERTA DE MADERA APANELADA 1.00X3.38M APERTURA und 10.00 4,522.67 45,226.70
180°
02.07.03 PUERTA DE MADERA APANELADA 0.80X3.38M APERTURA und 10.00 5,992.67 59,926.70
90°
02.07.04 PUERTA DE MADERA APANELADA 0.70X3.43M APERTURA und 10.00 3,802.87 38,028.70
90°
02.07.05 PUERTA DE MADERA APANELADA 0.80X2.10M APERTURA und 12.00 755.89 9,070.68
90°
02.07.06 PUERTA DE MADERA APANELADA 1.20X3.14M APERTURA und 1.00 1,153.07 1,153.07
90°
02.07.07 PUERTA METALICA 1.20X2.80 M (SEGÚN DISEÑO) und 1.00 1,415.14 1,415.14
02.07.08 PUERTA METALICA DOBLE HOJA 3.0M X 2.80M (SEGÚN und 1.00 4,423.95 4,423.95
DISEÑO)
02.07.09 DIVISIONES DE MELAMINE SEGUN DISEÑO SSHH m2 63.00 298.20 18,786.60
02.07.10 VENTANA DE MADERA CON SEGURO m2 416.17 212.02 88,236.36
02.07.11 ASTA DE BANDERA TIPICO CON CONCRETO Fc'=175 und 1.00 1,577.65 1,577.65
Kg/cm2
02.07.12 BARANDA DE TUBO FO. GDO. PASAMANOS Y m 27.76 121.79 3,380.89
PARANTES(SEGUN DETALLE) X0.90 ALT.
02.07.13 PASAMANO DE TUBO FºGº DE 2" EN RAMPAS (SEGUN m 21.05 103.43 2,177.20
DISEÑO)
02.07.14 PUERTA DE MADERA APANELADA 0.90X3.14M APERTURA und 1.00 1,141.17 1,141.17
90°
02.07.15 PUERTA DE MADERA APANELADA 1.00X3.17M APERTURA und 3.00 1,141.17 3,423.51
180°
02.07.16 PUERTA DE MADERA APANELADA 0.85X2.80M APERTURA und 3.00 3,702.87 11,108.61
180°
02.07.17 PUERTA DE MADERA APANELADA 0.60X1.8M APERTURA und 6.00 755.87 4,535.22
180°
02.07.18 PUERTA DE MADERA APANELADA 0.90X2.8M APERTURA und 2.50 3,372.87 8,432.18
180°
02.07.19 PUERTA DE MADERA APANELADA 0.70X1.8M APERTURA und 1.50 803.35 1,205.03
180°
02.07.20 ESCALERA DE GATO pza 1.00 1,471.17 1,471.17
02.07.21 TAPA METALICA EN CISTERNA Y TANQUE ELEVADO pza 2.00 272.01 544.02
02.07.22 REJILLA DE Fº 8"x12" (en caja receptora de rebose) pza 1.00 267.78 267.78
02.08 VIDRIOS, CRISTALES Y SIMILARES 27,562.09
02.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 4,548.20 6.06 27,562.09
02.09 PINTURA 93,634.92
02.09.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 1,356.33 14.55 19,734.60
02.09.02 PINTURA LATEX EN MUROS 2 MANOS m2 3,259.88 13.76 44,855.95
02.09.03 PINTURA LATEX EN COLUMNAS 2 MANOS m2 524.76 14.98 7,860.90
02.09.04 PINTURA LATEX EN VIGAS 2 MANOS m2 869.30 15.75 13,691.48
02.09.05 PINTURA LATEX EN PLACAS 2 MANOS m2 20.28 14.98 303.79
02.09.06 PINTURA ANTICORROSIVO EPOXI ZINCROMATO DOS m2 25.32 28.29 716.30
MANOS
02.09.07 PINTURA ESMALTE SINTETICO 2 MANOS EN PUERTA m2 26.72 14.52 387.97
METALICA
02.09.08 PINTURA DE CONTRAZOCALO C/ESMALTE m 642.60 6.46 4,151.20
02.09.09 PINTURA OLEO MATE MUROS INTERIORES Y m2 62.51 14.33 895.77
EXTERIORES
02.09.10 PINTURA OLEO MATE EN COLUMNA m2 34.80 16.75 582.90
02.09.11 PINTURA OLEO MATE EN VIGA m2 22.40 17.52 392.45
02.09.12 PINTURA CON IMPERMEABILIZANTE m2 31.92 1.93 61.61
03 INSTALACIONES ELECTRICAS 132,280.89
03.01 SALIDAS PARA INSTALACIONES ELECTRICAS 32,667.55
CANALIZACION DE TUBERIA ENTERRADA 20*30 m 368.00 4.16 1,530.88
03.01.02 SALIDA PARA CENTROS DE LUZ C/CABLE THW 2X2.5mm2 pto 165.00 110.54 18,239.10
+ TUBERIA PVC SAP 19MM(3/4")
03.01.03 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A pto 77.50 111.04 8,605.60
TIERRA + CABLE THW 3X4mm2 + TUBERIA PVC Ø3/4"
03.01.04 SALIDA PARA INTERRUPTOR SIMPLE pto 58.50 56.37 3,297.65
03.01.05 SALIDA PARA INTERRUPTOR DOBLE pto 14.00 58.06 812.84
03.01.06 SALIDA PARA ELECTROBOMBA pto 2.00 90.74 181.48
03.02 ALIMENTADORES Y CABLES 28,903.38
03.02.01 ALIMENTADOR CABLE NYY(4-1*16+1*16+1*16+1*16)MM2 + m 6.88 38.41 264.26
TUBERIA PVC SAP 50MM (2")
03.02.02 ALIMENTADOR CABLE NYY(3*35 +1*35)MM2 m 368.00 30.45 11,205.60
03.02.03 CABLE ELECTRICO NYY 1X16MM2 + TUBERIA PVC SAP m 541.75 32.18 17,433.52
25MM (1").
03.03 TABLEROS 11,573.12
03.03.01 TABLERO GENERAL METALICO PARA INTERRUPTORES pza 1.50 593.29 889.94
TERMOMAGNETICOS 28 POLOS
03.03.02 TABLERO DE DISTRIBUCION METALICO PARA und 8.50 452.07 3,842.60
INTERRUPTORES TERMOMAGNETICOS 10 POLOS
03.03.03 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X pza 1.50 142.24 213.36
100A
03.03.04 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X pza 10.50 90.44 949.62
40A
03.03.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X pza 8.50 81.97 696.75
30A
03.03.06 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X pza 34.00 74.44 2,530.96
20A
03.03.07 CONEXION AL SERVICIO PUBLICO GLB 1.00 419.86 419.86
03.03.08 TABLERO ELECTRICO GAB. METALICO P/DISTRIBUCIÓN 4 pza 1.00 1,354.00 1,354.00
CIRC.
03.03.09 TABLERO PARA MANDO DE CONTROL DE pza 1.00 676.03 676.03
ELECTROBOMBA
03.04 ARTEFACTOS 34,276.27
03.04.01 ARTEFACTO FLUORESCENTE 2 X 36 W INCLUYENDO und 148.00 142.76 21,128.48
EQUIPO Y PANTALL
03.04.02 ARTEFACTO FLUORESCENTE CIRCULAR 1 X 36 W und 23.50 49.54 1,164.19
INCLUYENDO EQUIPO Y PANTALL
03.04.03 FAROLA ORNAMENTAL SEGÚN DETALLE und 8.00 1,497.95 11,983.60
03.05 SISTEMA DE PROTECCION 16,585.27
03.05.01 BUZON ELECTRICO DE CONCRETO CON TAPA und 6.00 294.89 1,769.34
03.05.02 POZO PUESTA A TIERRA INC. CABLE und 8.50 1,743.05 14,815.93
03.06 INSTALACION REDES DE DATOS Y COMUNICACION 4,244.83
03.06.01 SALIDA PARA CONEXION DE DATOS Y COMUNICACION pto 10.00 85.50 855.00
03.06.02 SERVICIO DE CABLEADO DE DATOS Y COMUNICACION GLB 1.00 3,389.83 3,389.83
INSTALACION DE SWITCH DE INTERNET 4,030.47
PUNTOS DEFINIDOS EN AULAS-COORDINACION- pto 9.00 447.83 4,030.47
DIRECCION-PSICOMOTRIS
04 INSTALACIONES SANITARIAS 93,786.89
04.01 SISTEMA DE AGUA FRIA 29,481.96
04.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 61.00 72.58 4,427.38
04.01.02 TUBERIA PVC SAP C-10 ø 1/2" NTP 399.002 m 354.54 18.24 6,466.81
04.01.03 VALVULA COMPUERTA DE BRONCE DE ø 1/2" und 11.00 78.43 862.73
04.01.04 CAJA DE VALVULAS DE 10" X 20" TAPA FºFº pza 6.00 193.19 1,159.14
04.01.05 ACCESORIOS EN TUB ø 1/2" pto 9.00 48.29 434.61
04.01.06 CONEXION DE AGUA A RED PUBLICA GLB 1.00 331.22 331.22
04.01.07 ACCESORIOS EN TUB ø 3/4" pto 1.00 36.41 36.41
04.01.08 TENDIDO DE TUBERIA PVC 3/4" C-10 NTP 339.002 m 247.04 12.56 3,102.82
04.01.09 TUBERIA DE REBOSE EN SISTERNA FºGº Ø 3" m 1.25 74.61 93.26
04.01.10 TUBERIA DE REBOSE DE T. ELEV. FºGº Ø 2" m 7.86 71.20 559.63
04.01.11 TUBERIA DE ALIMENTACION FºGº Ø 1 1/2" m 13.15 234.68 3,086.04
04.01.12 TUBERIA DE IMPULSION FºGº Ø 3/4" m 10.40 227.88 2,369.95
04.01.13 TUBERIA RUPTOR DE AIRE FºGº Ø 1" m 15.76 229.43 3,615.82
04.01.14 TUBERIA DE VENTILACION FºGº Ø 2" INC. SOMBRERO m 2.00 227.00 454.00
04.01.15 CODO PVC-SAP 3/4" * 90º und 2.00 14.18 28.36
04.01.16 CODO PVC-SAP 1" * 90 und 3.00 28.26 84.78
04.01.17 CODO PVC-SAP 2" * 90 und 4.00 26.70 106.80
04.01.18 CODO PVC-SAP 3" * 90 und 1.00 44.49 44.49
04.01.19 TEE PVC-SAP 3/4" und 2.00 50.58 101.16
04.01.20 TEE PVC-SAP 1" und 2.00 28.26 56.52
04.01.21 TEE PVC-SAP 1 1/2" und 1.00 29.97 29.97
04.01.22 UNION UNIVERSAL DE PVC DE 3/4" und 3.00 38.27 114.81
04.01.23 UNION UNIVERSAL DE PVC DE 1" und 3.00 40.57 121.71
04.01.24 UNION UNIVERSAL DE PVC DE 1 1/2" und 3.00 53.62 160.86
04.01.25 LLAVE DE INTERRUPCION DE 1" pza 3.00 36.88 110.64
04.01.26 LLAVE DE INTERRUPCION DE 2" pza 1.00 116.93 116.93
04.01.27 LLAVE DE INTERRUPCION DE 1 1/2" pza 1.00 52.52 52.52
04.01.28 VALVULA FLOTADORA DE 1" und 2.00 87.83 175.66
04.01.29 VALVULA PVC SAP 1 1/2" (PIE DE SISTERNA) und 2.00 53.35 106.70
04.01.30 VALVULA COMPUERTA DE BRONCE ø 3/4" und 1.00 109.56 109.56
04.01.31 ELECTROBOMBA CENTRIFUGA DE 0.75 HP und 2.00 424.00 848.00
04.01.32 CONTROL DE NIVEL DE AGUA TIPO RADAR pza 2.00 25.42 50.84
04.01.33 VALVULA CHECK CON PILOTO DE 3/4" und 1.00 61.83 61.83
04.02 SISTEMA DE DESAGUE 20,894.51
04.02.01 SALIDA DE DESAGUE EN PVC ø 2" pto 31.00 77.19 2,392.89
04.02.02 SALIDA DE DESAGUE EN PVC ø 4" pto 30.00 77.39 2,321.70
04.02.03 SALIDA DE VENTILACION PVC ø 2" pto 11.00 87.40 961.40
04.02.04 TUBERIA PVC SAL ø 2" m 52.90 23.37 1,236.27
04.02.05 TUBERIA PVC SAL ø 4" m 131.50 24.26 3,190.19
04.02.06 REGISTRO DE BRONCE DE 2" pza 6.00 63.47 380.82
04.02.07 REGISTRO DE BRONCE DE 4" pza 10.00 77.03 770.30
04.02.08 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und 31.00 70.19 2,175.89
04.02.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" TAPA FºFº pza 6.00 260.93 1,565.58
04.02.10 CONEXION DE DESAGUE A VIA PUBLICA und 1.00 558.81 558.81
04.02.11 TENDIDO DE TUBERIA PVC UF Ø 110MM S-20 ISO NTP m 138.07 36.13 4,988.47
4435
04.02.12 TENDIDO DE TUBERIA PVC UF Ø 160MM S-20 ISO NTP m 6.64 53.04 352.19
4435
04.03 SISTEMA DE DRENAJE PLUVIAL 16,146.67
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN m2 33.35 61.81 2,061.36
COLUMNETAS
04.03.02 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS m3 3.07 461.77 1,417.63
04.03.03 TUBERIA DE PVC SAL 3" m 273.60 24.15 6,607.44
04.03.04 ACCESORIOS EN TUB BAJADA DE EVAC PLUVIAL pto 38.00 159.48 6,060.24
04.04 APARATOS Y ACCESORIOS SANITARIOS 22,081.35
04.04.01 INODORO TANQUE BAJO BLANCO pza 10.00 420.49 4,204.90
04.04.02 INODORO TANQUE BAJO BABY pza 20.00 325.24 6,504.80
04.04.05 LAVATORIO DE PARED BLANCO 1 LLAVE pza 30.00 161.98 4,859.40
04.04.06 LAVADERO DE COCINA DE ACERO INOXIDABLE pza 1.00 1,143.75 1,143.75
04.04.07 GRIFOS PARA LAVADEROS pza 30.00 105.45 3,163.50
04.04.08 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR und 30.00 48.79 1,463.70
BLANCO
04.04.11 ESPEJO CON MARCO METALICO PULIDO pza 10.00 74.13 741.30
04.05 ACCESORIOS VARIOS PVC 5,182.40
04.05.01 CODO PVC SAL 2"X90° pza 68.00 25.43 1,729.24
04.05.02 CODO PVC SAL 2"*2"X45° pza 16.00 32.00 512.00
04.05.03 CODO PVC SAL 4"4"X90° pza 35.00 36.58 1,280.30
04.05.04 TEE PVC-SAL 4"* 4" und 20.00 33.87 677.40
04.05.05 YEE PVC SAL 4"*4" pza 20.00 28.10 562.00
04.05.06 YEE PVC SAL 2"*2" pza 13.00 26.06 338.78
04.05.07 YEE PVC SAL 4"*2" pza 3.00 27.56 82.68
05 CAPACITACION 39,019.56
05.01 CAPACITACION A DOCENTES 19,509.78
05.01.01 CAPACITACION A DOCENTES PARA EL APOYO EN EL Eve 6.00 3,251.63 19,509.78
PROCESO DE APRENDIZAJE DE LOS ALUMNOS
05.02 CAPACITACION A PADRES DE FAMILIA 19,509.78
05.02.01 CAPACITACION A PADRES DE FAMILIA PARA EL APOYO Eve 6.00 3,251.63 19,509.78
EN EL PROCESO DE APRENDIZAJE DE SUS HIJOS
06 EQUIPAMIENTO CON MOBILIARIO, COMPUTADORAS Y 800,986.88
MATERIAL BIBLIOGRAFICO
06.01 EQUIPAMIENTO CON MOBILIARIO 383,219.94
06.01.01 ADQUISICION DE MESAS PARA NIÑOS(AS) und 105.00 211.86 22,245.30
06.01.02 ADQUISICION DE SILLAS PARA NIÑOS(AS) und 420.00 93.22 39,152.40
06.01.03 ADQUISICION DE PUPITRE PARA DOCENTES und 14.00 410.80 5,751.20
06.01.04 ADQUISICION DE SILLAS P/ PROFESORES, DIRECCION, und 20.00 110.17 2,203.40
SECRETARIA
06.01.05 ADQUISICION DE ESTANTES TIPO ARCHIVADOR und 20.00 710.20 14,204.00
06.01.06 ADQUISICION DE ESTANTES TIPO EMPOTRADO und 20.00 830.40 16,608.00
06.01.07 ADQUISICION DE ESCRITORIOS und 20.00 780.60 15,612.00
06.01.08 PIZARRA SMART 60" und 14.00 18,579.33 260,110.62
06.01.09 COCINA INC/TODOS SUS ACCESORIOS und 1.00 5,291.61 5,291.61
06.01.10 REFRIGERADORA und 1.00 2,041.41 2,041.41
06.02 MATERIAL DIDACTICO E INFORMATICO 393,126.59
06.02.01 EQUIPO INFORMATICO P/ PERSONAL DOCENTE Y ADM und 1.00 25,054.19 25,054.19
(INC. MUEBLE)
06.02.02 EQUIPOS DE SONIDO und 4.00 2,966.10 11,864.40
06.02.03 EQUIPOS AUDIO VISUAL und 4.00 4,510.90 18,043.60
06.02.04 KIT DE MATERIAL DIDACTICO - MODULO DE KIT 14.00 6,422.04 89,908.56
COMUNICACIÓN
06.02.05 KIT DE MATERIAL DIDACTICO - MODULO DE MATEMATICA KIT 14.00 5,821.68 81,503.52

06.02.06 KIT DE MATERIAL DIDACTICO - MODULO DE CIENCIA Y KIT 14.00 4,970.07 69,580.98
AMBIENTE
06.02.07 KIT DE MATERIAL DIDACTICO - MODULO DE KIT 14.00 4,194.73 58,726.22
PSICOMOTRICIDAD
06.02.08 KIT DE MATERIAL DIDACTICO - BIBLIOTECA DE AULA KIT 14.00 2,746.08 38,445.12
06.03 JUEGOS MECANICOS VARIOS 22,371.92
06.03.01 SUMINSTRO E INSTALACION DE PASAMANOS und 2.00 3,974.36 7,948.72
06.03.02 SUMINISTRO E INSTALACION DE JUEGO MODULAR und 2.00 7,211.60 14,423.20
SEGÚN DETALLE
06.04 UTENCILIOS DE COCINA 2,268.43
06.04.01 JUEGO DE OLLAS GLB 1.00 423.73 423.73
06.04.02 JUEGO DE VAJILLAS GLB 1.00 593.20 593.20
06.04.03 UTENCILIOS DE COCINA GLB 1.00 1,251.50 1,251.50
07 MITIGACION AMBIENTAL 19,105.28
07.01 MEDIDAS DE PREVENCION DURANTE LA EJECUCION 4,997.78
07.01.01 RIEGO PERMANENTE DE AREAS DE TRABAJO m2 881.47 3.25 2,864.78
07.01.02 HABILITACION DE BOTADEROS m2 100.00 21.33 2,133.00
07.02 MEDIDAS DE MITIGACION POST EJECUCION 5,111.13
07.02.01 LIMPIEZA GENERAL m2 881.47 5.12 4,513.13
07.02.02 CLAUSURA Y RECUPERACION DE BOTADEROS m2 100.00 5.98 598.00
07.03 PROGRAMA DE MONITOREO Y SEGUIMIENTO 3,975.00
AMBIENTAL
07.03.01 MONITOREO AMBIENTAL mes 6.00 662.50 3,975.00
07.04 BASURERO 1,640.72
07.04.01 BASURERO und 8.00 205.09 1,640.72
07.05 JARDINERIA 3,380.65
07.05.01 PREPARADO DE TIERRA PARA INSTALACION DE PLANTAS m2 244.40 2.54 620.78

07.05.02 INSTALACION DE PLANTAS ORNAMENTALES und 30.00 67.80 2,034.00


07.05.03 INSTALACION DE GRAS AMERICANO m2 244.40 2.97 725.87
COSTO DIRECTO 3,958,814.90
GASTOS GENERALES (10.00 % CD) 395,881.49
UTILIDAD (8.00 %CD) 316,705.19
===================================== ===============
SUB TOTAL 4,671,401.58
IGV. (18% CD) 840,852.28
==================================== ===============
PRESUPUESTO DE OBRA (INC. IGV) 5,512,253.86
GASTOS DE SUPERVISION (INC. IGV) 275,612.69
==================================== ================
PRESUPUESTO TOTAL 5,787,866.55
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/.
01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.06 PLAN DE CONTINGENCIA PARA EL DESARROLLO DEL AÑO ESCOLAR GLB 0.20 80,000.00 16,000.00 16000
01.02 TRABAJOS PRELIMINARES - - - 0
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 1,063.47 4.16 4,424.04 4424
01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,037.56 3.41 3,538.08 3538.1
01.02.04 DESMONTAJE DE TECHO DE CALAMINA m2 109.39 15.63 1,709.77 1709.8
01.02.05 DESMONTAJE DE VENTANAS m2 5.28 12.92 68.22 68.218
01.02.06 DESMONTAJE DE PUERTAS m2 14.58 25.37 369.89 369.89
01.02.07 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 130.15 12.21 1,589.13 1589.1
01.02.08 CORTE DE MATERIAL SUELTO CON MAQUINARIA REND=360 M3/DIA m3 608.75 7.21 4,389.09 4389.1
01.02.09 ELIMINACION CON MAQUINARIA REN.=150 M3/DIA m3 186.39 8.36 1,558.22 1558.2
01.03 MOVIMIENTO DE TIERRAS - - - 0
01.03.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 127.79 41.55 5,309.67 5309.7
01.03.02 EXCAVACION MANUAL DE ZANJAS P/ZAPATAS m3 174.48 47.18 8,231.97 8232
01.03.03 EXCAVACION DE ZANJA PARA CIMIENTO CORRIDO EN TERRENO NORMAL m3 59.32 47.18 2,798.72 2798.7
01.03.04 REFINE Y NIVELACION DE BASE DE FALSO PISO m2 386.33 6.24 2,410.70 2410.7
01.03.05 RELLENO CON MATERIAL PROPIO m3 13.13 30.45 399.81 399.81
01.03.06 RELLENO Y COMPACTADO CON MATERIAL CLASIFICADO m3 42.60 13.13 559.34 559.34
01.03.07 NIVELACION Y COMPACTADO DE BASE m2 1,037.53 12.64 13,114.38 13114
01.03.08 ACARREO INTERNO DE MAT. PROCEDENTE DE EXCAV. m3 470.07 31.16 14,647.38 14647
01.03.09 ELIMINACION CON MAQUINARIA REN.=150 M3/DIA m3 456.94 8.36 3,820.02 3820
01.04 CONCRETO SIMPLE - - - 0
01.04.02 CONCRETO F'C=140 KG/CM2 +30% P.G. PARA FALSA ZAPATAS m3 44.50 209.58 9,326.31 9326.3
01.04.03 CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO m3 63.38 226.60 14,361.91 14362
01.04.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 MT m2 145.00 41.62 6,034.90 6034.9
01.04.06 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 12.78 315.38 4,030.56 4030.6
01.04.09 ENCOFRADO Y DESENCOFRADO PARA LOSA MULTIUSO m2 65.62 70.00 4,593.40 4593.4
01.04.10 CONCRETO F'C=175 KG/CM2. PARA LOSA MULTIUSO m3 22.85 397.62 9,085.62 9085.6
01.05 CONCRETO ARMADO - - - 0
01.05.01 ZAPATAS - - - 0
01.05.01.0 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 1,341.95 5.48 7,353.89 7353.9
01.05.01.0 CONCRETO F'C= 210 KG/CM2. EN ZAPATAS m3 58.16 405.25 23,569.34 23569
01.05.02 COLUMNAS - - - 0
01.05.02.0 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 6,119.74 5.48 33,536.18 33536
01.05.02.0 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 315.15 43.59 13,737.39 13737
01.05.02.0 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS m3 33.48 475.62 15,923.76 15924
01.05.03 VIGAS - - - 0
01.05.03.0 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES kg 6,087.32 5.48 33,358.51 33359
01.05.03.0 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 293.12 63.59 18,639.50 18640
01.05.03.0 CONCRETO F'C=210 KG/CM2 PARA VIGAS m3 53.55 475.62 25,469.45 25469
01.05.04 LOSAS ALIGERADAS - - - 0
01.05.04.0 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 562.36 56.34 31,683.36 31683
01.05.04.0 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA und 5,623.64 3.64 20,470.05 20470
01.05.04.0 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 3,853.38 5.48 21,116.52 21117
01.05.04.0 CONCRETO F'C=210 KG/CM2 PARA LOSAS ALIGERADAS m3 36.56 409.77 14,981.19 14981
01.05.05 CANALETA DE CONCRETO - - - 0
01.05.05.0 ACERO ESTRUCTURAL TRABAJADO PARA CANALETAS kg 471.58 5.48 2,584.26 2584.3
01.05.05.0 ENCOFRADO Y DESENCOFRADO NORMAL EN CANALETAS m2 117.84 63.59 7,493.45 7493.4
01.05.05.0 CONCRETO F'C=175 KG/CM2. PARA CANALETAS m3 5.89 408.43 2,405.65 2405.7
01.05.06 COLUMNETAS - - - 0
01.05.06.0 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETAS kg 484.41 5.48 2,654.57 2654.6
01.05.06.0 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS m2 25.49 61.81 1,575.54 1575.5
01.05.06.0 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS m3 1.75 461.77 808.10 808.1
01.05.07 VIGUETAS - - - 0
01.05.07.0 ACERO ESTRUCTURAL TRABAJADO PARA VIGUETAS kg 168.23 5.48 921.90 921.9
01.05.07.0 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 18.64 63.59 1,185.32 1185.3
01.05.07.0 CONCRETO F'C=175 KG/CM2 PARA VIGUETAS m3 1.38 461.77 637.24 637.24
01.05.11 CANALETA PARA EVACUACIÓN DE PRECIPITACIÓN PLUVIAL - - - 0
01.05.11.0 ENCOFRADO Y DESENCOFRADO EN CANAL DE EVACUAC. PLUVIAL m2 186.00 82.35 15,317.10 15317
01.05.11.0 CONCRETO F'C=175 KG/CM2. EN CANAL DE EVACUACION PLUVIAL m3 8.68 447.40 3,883.43 3883.4
01.05.11.0 REJILLA METALICA EN CUNETA DE EVACUACION PLUVIAL m 310.00 67.44 20,906.40 20906
01.05.11.0 JUNTAS ASFALTICAS m 620.00 15.86 9,833.20 9833.2
01.08 COBERTURA PARA PATIO - - - 0
01.08.01 COBERTURA CON POLICARBONATO INCLUIDO ESTRUCTURA METALICA m2 780.00 181.76 141,772.80 141773
02 ARQUITECTURA - - - 0
02.01 ALBAÑILERIA Y TABIQUERIA - - - 0
02.01.01 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO-ARENA m2 236.27 64.09 15,142.54 15143
02.01.03 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO-ARENA m2 198.78 108.50 21,567.63 21568
02.01.04 JUNTA DE CONSTRUCCION CON TEKNOPORT m2 12.78 57.55 735.49 735.49
02.02 REVOQUES ENLUCIDOS Y MOLDURAS - - - 0
02.02.01 TARRAJEO EN CIELO RASO CON CEMENTO-ARENA 1:5 m2 556.89 103.50 57,638.12 57638
02.02.02 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA 1:5 E=1.5CM m2 311.77 46.63 14,537.84 14538
02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 143.94 44.71 6,435.56 6435.6
02.02.06 TARRAJEO DE MUROS EXTERIORES E INTERIORES CON CEMENTO-ARENA 1:5 E=1.5CM m2 1,153.10 36.10 41,626.91 41627
- - - 0
02.02.07 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m 352.59 24.64 8,687.82 8687.8
02.02.08 BRUÑADO DE MUROS DE 1". m 684.20 8.34 5,706.23 5706.2
02.03 COBERTURA 0
02.03.01 COBERTURA CON TEJA ANDINA DECORATIVA m2 750.24 63.69 47,782.79 47783
02.03.03 CUMBRERA CON TEJA ANDINA DECORATIVA m 72.68 35.12 2,552.52 2552.5
02.04 PISOS Y PAVIMENTOS - - - 0
02.04.01 FALSO PISO - - - 0
02.04.01.0 CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4" m2 386.95 37.95 14,684.75 14685
02.04.02 CONTRA PISO - - - 0
02.04.02.0 CONTRAPISO DE 48 MM. m2 386.95 38.89 15,048.49 15048
02.04.03 PISOS - - - 0
02.04.03.0 PISO CERAMICO DE 30X30 CM. m2 269.06 99.29 26,714.97 26715
02.04.03.0 PISO CERAMICO DE 40X40 CM. m2 34.44 99.29 3,419.55 3419.5
02.04.03.0 PISO DE CEMENTO PULIDO Y BRUÑ. 1.5 CM COLOREADO m2 7.66 40.78 312.37 312.37
02.04.03.0 PISO VINILICO DE 4MM DE ALTA DENSIDAD m2 75.79 54.44 4,126.01 4126
02.04.04 VEREDAS PERIMETRALES - - - 0
02.04.04.0 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 26.48 38.68 1,024.25 1024.2
02.04.04.0 PISO DE CEMENTO PULIDO Y BRUÑ. 4" S/COLOREAR (VEREDAS) m2 183.91 58.96 10,843.33 10843
02.04.04.0 JUNTAS ASFALTICAS m 164.48 15.86 2,608.65 2608.7
02.05 ZOCALOS Y CONTRAZOCALOS - - - 0
02.05.01 ZOCALO DE CERAMICO 20 X 40 CM m2 89.52 201.72 18,057.97 18058
02.05.02 CONTRAZOCALO DE CERAMICO DE H=10CM m 205.47 33.87 6,959.27 6959.3
02.05.03 CONTRAZÓCALO BRUÑADO SEMI PULIDO S/COLOREAR H=0.20 M m 116.84 13.98 1,633.42 1633.4
02.05.05 ZOCALO DE CERAMICO DE 30 X 30 CM m2 3.61 202.32 730.38 730.38
02.07.01 PUERTA DE MADERA APANELADA 1.20X3.38M APERTURA 180° und 6.00 1,153.07 6,918.42 6918.4
02.07.02 PUERTA DE MADERA APANELADA 1.00X3.38M APERTURA 180° und 4.00 4,522.67 18,090.68 18091
02.07.03 PUERTA DE MADERA APANELADA 0.80X3.38M APERTURA 90° und 4.00 5,992.67 23,970.68 23971
02.07.04 PUERTA DE MADERA APANELADA 0.70X3.43M APERTURA 90° und 4.00 3,802.87 15,211.48 15211
02.07.05 PUERTA DE MADERA APANELADA 0.80X2.10M APERTURA 90° und 4.00 755.89 3,023.56 3023.6
02.07.06 PUERTA DE MADERA APANELADA 1.20X3.14M APERTURA 90° und 3.00 1,153.07 3,459.21 3459.2
02.07.09 DIVISIONES DE MELAMINE SEGUN DISEÑO SSHH m2 25.20 298.20 7,514.64 7514.6
02.07.10 VENTANA DE MADERA CON SEGURO m2 188.85 212.02 40,039.98 40040
02.08 VIDRIOS, CRISTALES Y SIMILARES - - - 0
02.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 2,077.42 6.06 12,589.17 12589
02.09 PINTURA - - - 0
02.09.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 556.89 14.55 8,102.75 8102.7
02.09.02 PINTURA LATEX EN MUROS 2 MANOS m2 890.18 13.76 12,248.88 12249
02.09.03 PINTURA LATEX EN COLUMNAS 2 MANOS m2 143.94 14.98 2,156.22 2156.2
02.09.04 PINTURA LATEX EN VIGAS 2 MANOS m2 293.77 15.75 4,626.88 4626.9
02.09.08 PINTURA DE CONTRAZOCALO C/ESMALTE m 44.89 6.46 289.99 289.99
03 INSTALACIONES ELECTRICAS - - - 0
03.01 SALIDAS PARA INSTALACIONES ELECTRICAS - - - 0
03.01.02 SALIDA PARA CENTROS DE LUZ C/CABLE THW 2X2.5mm2 + TUBERIA PVC SAP 19MM(3/4") pto 68.00 110.54 7,516.72 7516.7
03.01.03 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A TIERRA + CABLE THW 3X4mm2 + TUBERIA pto 31.00 111.04 3,442.24 3442.2
PVC Ø3/4"
03.01.04 SALIDA PARA INTERRUPTOR SIMPLE pto 20.00 56.37 1,127.40 1127.4
03.01.05 SALIDA PARA INTERRUPTOR DOBLE pto 6.00 58.06 348.36 348.36
03.02 ALIMENTADORES Y CABLES - - - 0
03.02.01 ALIMENTADOR CABLE NYY(4-1*16+1*16+1*16+1*16)MM2 + TUBERIA PVC SAP 50MM (2") m 216.50 38.41 8,315.77 8315.8
03.03 TABLEROS - - - 0
03.03.02 TABLERO DE DISTRIBUCION METALICO PARA INTERRUPTORES TERMOMAGNETICOS 10 POLOS und 3.00 452.07 1,356.21 1356.2
03.03.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza 3.00 81.97 245.91 245.91
03.03.06 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20A pza 12.00 74.44 893.28 893.28
03.04 ARTEFACTOS - - - 0
03.04.01 ARTEFACTO FLUORESCENTE 2 X 36 W INCLUYENDO EQUIPO Y PANTALL und 59.00 142.76 8,422.84 8422.8
03.04.02 ARTEFACTO FLUORESCENTE CIRCULAR 1 X 36 W INCLUYENDO EQUIPO Y PANTALL und 9.00 49.54 445.86 445.86
03.05.02 POZO PUESTA A TIERRA INC. CABLE und 3.00 1,743.05 5,229.15 5229.2
03.06 INSTALACION REDES DE DATOS Y COMUNICACION - - - 0
03.06.01 SALIDA PARA CONEXION DE DATOS Y COMUNICACION pto 4.00 85.50 342.00 342
03.06.02 SERVICIO DE CABLEADO DE DATOS Y COMUNICACION GLB 1.00 3,389.83 3,389.83 3389.8
04 INSTALACIONES SANITARIAS - - - 0
04.01 SISTEMA DE AGUA FRIA - - - 0
04.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 25.00 72.58 1,814.50 1814.5
04.01.02 TUBERIA PVC SAP C-10 ø 1/2" NTP 399.002 m 146.04 18.24 2,663.77 2663.8
04.01.03 VALVULA COMPUERTA DE BRONCE DE ø 1/2" und 5.00 78.43 392.15 392.15
04.01.04 CAJA DE VALVULAS DE 10" X 20" TAPA FºFº pza 3.00 193.19 579.57 579.57
04.01.05 ACCESORIOS EN TUB ø 1/2" pto 6.00 48.29 289.74 289.74
04.02 SISTEMA DE DESAGUE - - - 0
04.02.01 SALIDA DE DESAGUE EN PVC ø 2" pto 13.00 77.19 1,003.47 1003.5
04.02.02 SALIDA DE DESAGUE EN PVC ø 4" pto 12.00 77.39 928.68 928.68
04.02.03 SALIDA DE VENTILACION PVC ø 2" pto 5.00 87.40 437.00 437
04.02.04 TUBERIA PVC SAL ø 2" m 24.40 23.37 570.23 570.23
04.02.05 TUBERIA PVC SAL ø 4" m 52.60 24.26 1,276.08 1276.1
04.02.06 REGISTRO DE BRONCE DE 2" pza 3.00 63.47 190.41 190.41
04.02.07 REGISTRO DE BRONCE DE 4" pza 4.00 77.03 308.12 308.12
04.02.08 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und 13.00 70.19 912.47 912.47
04.02.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" TAPA FºFº pza 3.00 260.93 782.79 782.79
04.03 SISTEMA DE DRENAJE PLUVIAL - - - 0
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS m2 14.04 61.81 867.81 867.81
04.03.02 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS m3 1.63 461.77 752.69 752.69
04.03.03 TUBERIA DE PVC SAL 3" m 115.20 24.15 2,782.08 2782.1
04.03.04 ACCESORIOS EN TUB BAJADA DE EVAC PLUVIAL pto 16.00 159.48 2,551.68 2551.7
04.04 APARATOS Y ACCESORIOS SANITARIOS - - - 0
04.04.01 INODORO TANQUE BAJO BLANCO pza 4.00 420.49 1,681.96 1682
04.04.02 INODORO TANQUE BAJO BABY pza 8.00 325.24 2,601.92 2601.9
04.04.05 LAVATORIO DE PARED BLANCO 1 LLAVE pza 12.00 161.98 1,943.76 1943.8
04.04.06 LAVADERO DE COCINA DE ACERO INOXIDABLE pza 1.00 1,143.75 1,143.75 1143.8
04.04.07 GRIFOS PARA LAVADEROS pza 12.00 105.45 1,265.40 1265.4
04.04.08 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 12.00 48.79 585.48 585.48
04.04.11 ESPEJO CON MARCO METALICO PULIDO pza 4.00 74.13 296.52 296.52
04.05 ACCESORIOS VARIOS PVC - - - 0
04.05.01 CODO PVC SAL 2"X90° pza 32.00 25.43 813.76 813.76
04.05.02 CODO PVC SAL 2"*2"X45° pza 10.00 32.00 320.00 320
04.05.03 CODO PVC SAL 4"4"X90° pza 8.00 36.58 292.64 292.64
04.05.04 TEE PVC-SAL 4"* 4" und 8.00 33.87 270.96 270.96
04.05.05 YEE PVC SAL 4"*4" pza 8.00 28.10 224.80 224.8
04.05.06 YEE PVC SAL 2"*2" pza 11.00 26.06 286.66 286.66
04.05.07 YEE PVC SAL 4"*2" pza 7.00 27.56 192.92 192.92
COSTO DIRECTO 1,163,107.89
GASTOS GENERALES (10.00 % CD) 116,310.79
UTILIDAD (8.00 %CD) 93,048.63
=====================================
SUB TOTAL 1,372,467.31
IGV. (18% CD) 247,044.12
====================================
PRESUPUESTO DE OBRA (INC. IGV) 1,619,511.43
GASTOS DE SUPERVISION (INC. IGV) 64,397.57
====================================
PRESUPUESTO TOTAL 1,683,909.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
DIAGRA DE COSTOS ESTIMADOS

Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1

01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.06 PLAN DE CONTINGENCIA PARA EL DESARROLLO DEL AÑO ESCOLAR GLB 0.20 80,000.00 16,000.00 4,000.00
01.02 TRABAJOS PRELIMINARES - - - -
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 1,063.47 4.16 4,424.04 2,212.02
01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,037.56 3.41 3,538.08 3,538.08
01.02.04 DESMONTAJE DE TECHO DE CALAMINA m2 109.39 15.63 1,709.77 1,709.77
01.02.05 DESMONTAJE DE VENTANAS m2 5.28 12.92 68.22 68.22
01.02.06 DESMONTAJE DE PUERTAS m2 14.58 25.37 369.89 369.89
01.02.07 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 130.15 12.21 1,589.13 1,589.13
01.02.08 CORTE DE MATERIAL SUELTO CON MAQUINARIA REND=360 M3/DIA m3 608.75 7.21 4,389.09 4,389.09
01.02.09 ELIMINACION CON MAQUINARIA REN.=150 M3/DIA m3 186.39 8.36 1,558.22 1,558.22
01.03 MOVIMIENTO DE TIERRAS - - - -
01.03.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 127.79 41.55 5,309.67 5,309.67
01.03.02 EXCAVACION MANUAL DE ZANJAS P/ZAPATAS m3 174.48 47.18 8,231.97 8,231.97
01.03.03 EXCAVACION DE ZANJA PARA CIMIENTO CORRIDO EN TERRENO NORMAL m3 59.32 47.18 2,798.72 2,798.72
01.03.04 REFINE Y NIVELACION DE BASE DE FALSO PISO m2 386.33 6.24 2,410.70 2,410.70
01.03.05 RELLENO CON MATERIAL PROPIO m3 13.13 30.45 399.81 399.81
01.03.06 RELLENO Y COMPACTADO CON MATERIAL CLASIFICADO m3 42.60 13.13 559.34 559.34
01.03.07 NIVELACION Y COMPACTADO DE BASE m2 1,037.53 12.64 13,114.38 13,114.38
01.03.08 ACARREO INTERNO DE MAT. PROCEDENTE DE EXCAV. m3 470.07 31.16 14,647.38 14,647.38
01.03.09 ELIMINACION CON MAQUINARIA REN.=150 M3/DIA m3 456.94 8.36 3,820.02 3,820.02
01.04 CONCRETO SIMPLE - - - -
01.04.02 CONCRETO F'C=140 KG/CM2 +30% P.G. PARA FALSA ZAPATAS m3 44.50 209.58 9,326.31 9,326.31
01.04.03 CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO m3 63.38 226.60 14,361.91 14,361.91
01.04.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 MT m2 145.00 41.62 6,034.90 6,034.90
01.04.06 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 12.78 315.38 4,030.56 4,030.56
01.04.09 ENCOFRADO Y DESENCOFRADO PARA LOSA MULTIUSO m2 65.62 70.00 4,593.40 4,593.40
01.04.10 CONCRETO F'C=175 KG/CM2. PARA LOSA MULTIUSO m3 22.85 397.62 9,085.62 9,085.62
01.05 CONCRETO ARMADO - - - -
01.05.01 ZAPATAS - - - -
01.05.01.01 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 1,341.95 5.48 7,353.89 7,353.89
01.05.01.02 CONCRETO F'C= 210 KG/CM2. EN ZAPATAS m3 58.16 405.25 23,569.34 23,569.34
01.05.02 COLUMNAS - - - -
01.05.02.01 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 6,119.74 5.48 33,536.18 33,536.18
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 315.15 43.59 13,737.39 13,737.39
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS m3 33.48 475.62 15,923.76 15,923.76
01.05.03 VIGAS - - - -
01.05.03.01 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES kg 6,087.32 5.48 33,358.51 5,003.78
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 293.12 63.59 18,639.50 2,795.93
01.05.03.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS m3 53.55 475.62 25,469.45 -
01.05.04 LOSAS ALIGERADAS - - - -
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 562.36 56.34 31,683.36 -
01.05.04.02 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA und 5,623.64 3.64 20,470.05 -
01.05.04.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 3,853.38 5.48 21,116.52 -
01.05.04.04 CONCRETO F'C=210 KG/CM2 PARA LOSAS ALIGERADAS m3 36.56 409.77 14,981.19 -
01.05.05 CANALETA DE CONCRETO - - - -
01.05.05.01 ACERO ESTRUCTURAL TRABAJADO PARA CANALETAS kg 471.58 5.48 2,584.26 -
01.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CANALETAS m2 117.84 63.59 7,493.45 -
01.05.05.03 CONCRETO F'C=175 KG/CM2. PARA CANALETAS m3 5.89 408.43 2,405.65 -
01.05.06 COLUMNETAS - - - -
01.05.06.01 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETAS kg 484.41 5.48 2,654.57 -
01.05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS m2 25.49 61.81 1,575.54 -
01.05.06.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS m3 1.75 461.77 808.10 -
01.05.07 VIGUETAS - - - -
01.05.07.01 ACERO ESTRUCTURAL TRABAJADO PARA VIGUETAS kg 168.23 5.48 921.90 -
01.05.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 18.64 63.59 1,185.32 -
01.05.07.03 CONCRETO F'C=175 KG/CM2 PARA VIGUETAS m3 1.38 461.77 637.24 -
01.05.11 CANALETA PARA EVACUACIÓN DE PRECIPITACIÓN PLUVIAL - - - -
01.05.11.01 ENCOFRADO Y DESENCOFRADO EN CANAL DE EVACUAC. PLUVIAL m2 186.00 82.35 15,317.10 -
01.05.11.02 CONCRETO F'C=175 KG/CM2. EN CANAL DE EVACUACION PLUVIAL m3 8.68 447.40 3,883.43 -
01.05.11.03 REJILLA METALICA EN CUNETA DE EVACUACION PLUVIAL m 310.00 67.44 20,906.40 -
01.05.11.04 JUNTAS ASFALTICAS m 620.00 15.86 9,833.20 -
01.08 COBERTURA PARA PATIO - - - -
01.08.01 COBERTURA CON POLICARBONATO INCLUIDO ESTRUCTURA METALICA m2 780.00 181.76 141,772.80 70,886.40
02 ARQUITECTURA - - - -
02.01 ALBAÑILERIA Y TABIQUERIA - - - -
02.01.01 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO-ARENA m2 236.27 64.09 15,142.54 13,628.29
02.01.03 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO-ARENA m2 198.78 108.50 21,567.63 19,410.87
02.01.04 JUNTA DE CONSTRUCCION CON TEKNOPORT m2 12.78 57.55 735.49 661.94
02.02 REVOQUES ENLUCIDOS Y MOLDURAS - - - -
02.02.01 TARRAJEO EN CIELO RASO CON CEMENTO-ARENA 1:5 m2 556.89 103.50 57,638.12 -
02.02.02 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA 1:5 E=1.5CM m2 311.77 46.63 14,537.84 -
02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 143.94 44.71 6,435.56 -
02.02.06 TARRAJEO DE MUROS EXTERIORES E INTERIORES CON CEMENTO-ARENA 1:5 E=1.5CM m2 1,153.10 36.10 41,626.91 -
- - - -
02.02.07 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m 352.59 24.64 8,687.82 -
02.02.08 BRUÑADO DE MUROS DE 1". m 684.20 8.34 5,706.23 -
02.03 COBERTURA -
02.03.01 COBERTURA CON TEJA ANDINA DECORATIVA m2 750.24 63.69 47,782.79 -
02.03.03 CUMBRERA CON TEJA ANDINA DECORATIVA m 72.68 35.12 2,552.52 -
02.04 PISOS Y PAVIMENTOS - - - -
02.04.01 FALSO PISO - - - -
02.04.01.01 CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4" m2 386.95 37.95 14,684.75 -
02.04.02 CONTRA PISO - - - -
02.04.02.01 CONTRAPISO DE 48 MM. m2 386.95 38.89 15,048.49 -
02.04.03 PISOS - - - -
02.04.03.01 PISO CERAMICO DE 30X30 CM. m2 269.06 99.29 26,714.97 -
02.04.03.02 PISO CERAMICO DE 40X40 CM. m2 34.44 99.29 3,419.55 -
02.04.03.03 PISO DE CEMENTO PULIDO Y BRUÑ. 1.5 CM COLOREADO m2 7.66 40.78 312.37 -
02.04.03.04 PISO VINILICO DE 4MM DE ALTA DENSIDAD m2 75.79 54.44 4,126.01 -
02.04.04 VEREDAS PERIMETRALES - - - -
02.04.04.01 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 26.48 38.68 1,024.25 -
02.04.04.02 PISO DE CEMENTO PULIDO Y BRUÑ. 4" S/COLOREAR (VEREDAS) m2 183.91 58.96 10,843.33 -
02.04.04.03 JUNTAS ASFALTICAS m 164.48 15.86 2,608.65 -
02.05 ZOCALOS Y CONTRAZOCALOS - - - -
02.05.01 ZOCALO DE CERAMICO 20 X 40 CM m2 89.52 201.72 18,057.97 -
02.05.02 CONTRAZOCALO DE CERAMICO DE H=10CM m 205.47 33.87 6,959.27 -
02.05.03 CONTRAZÓCALO BRUÑADO SEMI PULIDO S/COLOREAR H=0.20 M m 116.84 13.98 1,633.42 -
02.05.05 ZOCALO DE CERAMICO DE 30 X 30 CM m2 3.61 202.32 730.38 -
02.07.01 PUERTA DE MADERA APANELADA 1.20X3.38M APERTURA 180° und 6.00 1,153.07 6,918.42 -
02.07.02 PUERTA DE MADERA APANELADA 1.00X3.38M APERTURA 180° und 4.00 4,522.67 18,090.68 -
02.07.03 PUERTA DE MADERA APANELADA 0.80X3.38M APERTURA 90° und 4.00 5,992.67 23,970.68 -
02.07.04 PUERTA DE MADERA APANELADA 0.70X3.43M APERTURA 90° und 4.00 3,802.87 15,211.48 -
02.07.05 PUERTA DE MADERA APANELADA 0.80X2.10M APERTURA 90° und 4.00 755.89 3,023.56 -
02.07.06 PUERTA DE MADERA APANELADA 1.20X3.14M APERTURA 90° und 3.00 1,153.07 3,459.21 -
02.07.09 DIVISIONES DE MELAMINE SEGUN DISEÑO SSHH m2 25.20 298.20 7,514.64 -
02.07.10 VENTANA DE MADERA CON SEGURO m2 188.85 212.02 40,039.98 -
02.08 VIDRIOS, CRISTALES Y SIMILARES - - - -
02.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 2,077.42 6.06 12,589.17 -
02.09 PINTURA - - - -
02.09.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 556.89 14.55 8,102.75 -
02.09.02 PINTURA LATEX EN MUROS 2 MANOS m2 890.18 13.76 12,248.88 -
02.09.03 PINTURA LATEX EN COLUMNAS 2 MANOS m2 143.94 14.98 2,156.22 -
02.09.04 PINTURA LATEX EN VIGAS 2 MANOS m2 293.77 15.75 4,626.88 -
02.09.08 PINTURA DE CONTRAZOCALO C/ESMALTE m 44.89 6.46 289.99 -
03 INSTALACIONES ELECTRICAS - - - -
03.01 SALIDAS PARA INSTALACIONES ELECTRICAS - - - -
03.01.02 SALIDA PARA CENTROS DE LUZ C/CABLE THW 2X2.5mm2 + TUBERIA PVC SAP 19MM(3/4") pto 68.00 110.54 7,516.72 -
03.01.03 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A TIERRA + CABLE THW 3X4mm2 + TUBERIA pto 31.00 111.04 3,442.24 -
PVC Ø3/4"
03.01.04 SALIDA PARA INTERRUPTOR SIMPLE pto 20.00 56.37 1,127.40 -
03.01.05 SALIDA PARA INTERRUPTOR DOBLE pto 6.00 58.06 348.36 -
03.02 ALIMENTADORES Y CABLES - - - -
03.02.01 ALIMENTADOR CABLE NYY(4-1*16+1*16+1*16+1*16)MM2 + TUBERIA PVC SAP 50MM (2") m 216.50 38.41 8,315.77 -
03.03 TABLEROS - - - -
03.03.02 TABLERO DE DISTRIBUCION METALICO PARA INTERRUPTORES TERMOMAGNETICOS 10 POLOS und 3.00 452.07 1,356.21 -
03.03.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza 3.00 81.97 245.91 -
03.03.06 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20A pza 12.00 74.44 893.28 -
03.04 ARTEFACTOS - - - -
03.04.01 ARTEFACTO FLUORESCENTE 2 X 36 W INCLUYENDO EQUIPO Y PANTALL und 59.00 142.76 8,422.84 -
03.04.02 ARTEFACTO FLUORESCENTE CIRCULAR 1 X 36 W INCLUYENDO EQUIPO Y PANTALL und 9.00 49.54 445.86 -
03.05.02 POZO PUESTA A TIERRA INC. CABLE und 3.00 1,743.05 5,229.15 -
03.06 INSTALACION REDES DE DATOS Y COMUNICACION - - - -
03.06.01 SALIDA PARA CONEXION DE DATOS Y COMUNICACION pto 4.00 85.50 342.00 -
03.06.02 SERVICIO DE CABLEADO DE DATOS Y COMUNICACION GLB 1.00 3,389.83 3,389.83 -
04 INSTALACIONES SANITARIAS - - - -
04.01 SISTEMA DE AGUA FRIA - - - -
04.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 25.00 72.58 1,814.50 -
04.01.02 TUBERIA PVC SAP C-10 ø 1/2" NTP 399.002 m 146.04 18.24 2,663.77 -
04.01.03 VALVULA COMPUERTA DE BRONCE DE ø 1/2" und 5.00 78.43 392.15 -
04.01.04 CAJA DE VALVULAS DE 10" X 20" TAPA FºFº pza 3.00 193.19 579.57 -
04.01.05 ACCESORIOS EN TUB ø 1/2" pto 6.00 48.29 289.74 -
04.02 SISTEMA DE DESAGUE - - - -
04.02.01 SALIDA DE DESAGUE EN PVC ø 2" pto 13.00 77.19 1,003.47 -
04.02.02 SALIDA DE DESAGUE EN PVC ø 4" pto 12.00 77.39 928.68 -
04.02.03 SALIDA DE VENTILACION PVC ø 2" pto 5.00 87.40 437.00 -
04.02.04 TUBERIA PVC SAL ø 2" m 24.40 23.37 570.23 -
04.02.05 TUBERIA PVC SAL ø 4" m 52.60 24.26 1,276.08 -
04.02.06 REGISTRO DE BRONCE DE 2" pza 3.00 63.47 190.41 -
04.02.07 REGISTRO DE BRONCE DE 4" pza 4.00 77.03 308.12 -
04.02.08 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und 13.00 70.19 912.47 -
04.02.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" TAPA FºFº pza 3.00 260.93 782.79 -
04.03 SISTEMA DE DRENAJE PLUVIAL - - - -
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS m2 14.04 61.81 867.81 -
04.03.02 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS m3 1.63 461.77 752.69 -
04.03.03 TUBERIA DE PVC SAL 3" m 115.20 24.15 2,782.08 -
04.03.04 ACCESORIOS EN TUB BAJADA DE EVAC PLUVIAL pto 16.00 159.48 2,551.68 -
04.04 APARATOS Y ACCESORIOS SANITARIOS - - - -
04.04.01 INODORO TANQUE BAJO BLANCO pza 4.00 420.49 1,681.96 -
04.04.02 INODORO TANQUE BAJO BABY pza 8.00 325.24 2,601.92 -
04.04.05 LAVATORIO DE PARED BLANCO 1 LLAVE pza 12.00 161.98 1,943.76 -
04.04.06 LAVADERO DE COCINA DE ACERO INOXIDABLE pza 1.00 1,143.75 1,143.75 -
04.04.07 GRIFOS PARA LAVADEROS pza 12.00 105.45 1,265.40 -
04.04.08 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 12.00 48.79 585.48 -
04.04.11 ESPEJO CON MARCO METALICO PULIDO pza 4.00 74.13 296.52 -
04.05 ACCESORIOS VARIOS PVC - - - -
04.05.01 CODO PVC SAL 2"X90° pza 32.00 25.43 813.76 -
04.05.02 CODO PVC SAL 2"*2"X45° pza 10.00 32.00 320.00 -
04.05.03 CODO PVC SAL 4"4"X90° pza 8.00 36.58 292.64 -
04.05.04 TEE PVC-SAL 4"* 4" und 8.00 33.87 270.96 -
04.05.05 YEE PVC SAL 4"*4" pza 8.00 28.10 224.80 -
04.05.06 YEE PVC SAL 2"*2" pza 11.00 26.06 286.66 -
04.05.07 YEE PVC SAL 4"*2" pza 7.00 27.56 192.92 -
COSTO DIRECTO 1,163,107.89 324,666.84
GASTOS GENERALES(10.00 % CD) 116,310.79 32,466.68
UTILIDAD(8.00 %CD) 93,048.63 25,973.35
SUB TOTAL 1,372,467.31 383,106.87
IGV.(18% CD) 247,044.12 68,959.24
PRESUPUESTO DE OBRA (INC. IGV) 1,619,511.43 452,066.10
GASTOS DE SUPERVISION(INC. IGV) 64,397.57 21,465.86
PRESUPUESTO TOTAL 1,683,909.00 473,531.96
AVANCE MENSUAL PROGRAMADO GLOBAL (%) 28.12%
AVANCE MENSUAL PROGRAMADO ACUMULADO (%) 28.12%
AVANCE PROGRAMADO
MES Monto S/. %
Chart Title Inicio - 0.00%
1,800,000.00 Mes 1 473,531.96 28.12%
Mes 2 649,563.77 38.57%
1,600,000.00
Mes 3 560,813.27 33.30%
1,400,000.00 1,683,909.00 100.00%
1,200,000.00 AVANCE
AVANCE PROMEDIO DESVIACION ESTA
1,000,000.00 33.33 5.227
800,000.00
INTERVALOS DISTRIBUCIONF(X)
600,000.00
25 0.02 0.05543396
400,000.00 26 0.03 0.08031026
27 0.04 0.11281914
200,000.00
28 0.05 0.15378015
- 29 0.05 0.20354141
1 2 3 4
30 0.06 0.26182744
31 0.07 0.32765230
32 0.07 0.39932731
33 0.08 0.47457582
34 0.08 0.55074521
35 0.07 0.62508398
36 0.07 0.69503638
37 0.06 0.75850256
38 0.05 0.81402062
39 0.04 0.86084571
40 0.03 0.89892381
41 0.03 0.92877930
42 0.02 0.95134897

Chart Title
100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
1 2 3 4
PRESUPUESTO
TOTAL
MES2 MES 3
PROGRMADO
(S/.)

8,000.00 4,000.00 16,000.00


- - -
2,212.02 - 4,424.04
- - 3,538.08
- - 1,709.77
- - 68.22
- - 369.89
- - 1,589.13
- - 4,389.09
- - 1,558.22
- - -
- - 5,309.67
- - 8,231.97
- - 2,798.72
- - 2,410.70
- - 399.81
- - 559.34
- - 13,114.38
- - 14,647.38
- - 3,820.02
- - -
- - 9,326.31
- - 14,361.91
- - 6,034.90
- - 4,030.56
- - 4,593.40
- - 9,085.62
- - -
- - -
- - 7,353.89
- - 23,569.34
- - -
- - 33,536.18
- - 13,737.39
- - 15,923.76
- - -
28,354.74 - 33,358.51
15,843.58 - 18,639.50
25,469.45 - 25,469.45
- - -
31,683.36 - 31,683.36
20,470.05 - 20,470.05
21,116.52 - 21,116.52
14,981.19 - 14,981.19
- - -
2,584.26 - 2,584.26
7,493.45 - 7,493.45
2,405.65 - 2,405.65
- - -
2,654.57 - 2,654.57
1,575.54 - 1,575.54
808.10 - 808.10
- - -
921.90 - 921.90
1,185.32 - 1,185.32
637.24 - 637.24
- - -
15,317.10 - 15,317.10
3,883.43 - 3,883.43
20,906.40 - 20,906.40
9,833.20 - 9,833.20
- - -
70,886.40 - 141,772.80
- - -
- - -
1,514.25 - 15,142.54
2,156.76 - 21,567.63
73.55 - 735.49
- - -
14,409.53 43,228.59 57,638.12
3,634.46 10,903.38 14,537.84
1,608.89 4,826.67 6,435.56
10,406.73 31,220.18 41,626.91
- - -
- 8,687.82 8,687.82
- 5,706.23 5,706.23
- - -
35,837.09 11,945.70 47,782.79
1,914.39 638.13 2,552.52
- - -
- - -
14,684.75 - 14,684.75
- - -
- 15,048.49 15,048.49
- - -
- 26,714.97 26,714.97
- 3,419.55 3,419.55
- 312.37 312.37
- 4,126.01 4,126.01
- - -
- 1,024.25 1,024.25
- 10,843.33 10,843.33
- 2,608.65 2,608.65
- - -
- 18,057.97 18,057.97
- 6,959.27 6,959.27
- 1,633.42 1,633.42
- 730.38 730.38
- 6,918.42 6,918.42
- 18,090.68 18,090.68
- 23,970.68 23,970.68
- 15,211.48 15,211.48
- 3,023.56 3,023.56
- 3,459.21 3,459.21
- 7,514.64 7,514.64
- 40,039.98 40,039.98
- - -
- 12,589.17 12,589.17
- - -
- 8,102.75 8,102.75
- 12,248.88 12,248.88
- 2,156.22 2,156.22
- 4,626.88 4,626.88
- 289.99 289.99
- - -
- - -
7,516.72 - 7,516.72
3,442.24 - 3,442.24
1,127.40 - 1,127.40
348.36 - 348.36
- - -
8,315.77 - 8,315.77
- - -
1,356.21 - 1,356.21
245.91 - 245.91
893.28 - 893.28
- - -
8,422.84 - 8,422.84
445.86 - 445.86
5,229.15 - 5,229.15
- - -
342.00 - 342.00
3,389.83 - 3,389.83
- - -
- - -
1,814.50 - 1,814.50
2,663.77 - 2,663.77
392.15 - 392.15
579.57 - 579.57
289.74 - 289.74
- - -
1,003.47 - 1,003.47
928.68 - 928.68
437.00 - 437.00
570.23 - 570.23
1,276.08 - 1,276.08
190.41 - 190.41
308.12 - 308.12
912.47 - 912.47
782.79 - 782.79
- - -
- 867.81 867.81
- 752.69 752.69
- 2,782.08 2,782.08
- 2,551.68 2,551.68
- - -
- 1,681.96 1,681.96
- 2,601.92 2,601.92
- 1,943.76 1,943.76
- 1,143.75 1,143.75
- 1,265.40 1,265.40
- 585.48 585.48
- 296.52 296.52
- - -
813.76 - 813.76
320.00 - 320.00
292.64 - 292.64
270.96 - 270.96
224.80 - 224.80
286.66 - 286.66
192.92 - 192.92
451,090.14 387,350.92 1,163,107.89 27.91% 0.28 0.33
45,109.01 38,735.09 116,310.79
36,087.21 30,988.07 93,048.63
532,286.36 457,074.08 1,372,467.31
95,811.55 82,273.33 247,044.12
628,097.91 539,347.42 1,619,511.43
21,465.86 21,465.86 64,397.57
649,563.77 560,813.27 1,683,909.00
38.57% 33.30%
66.70% 100.00%
GRAMADO ACUMULADO
% Acumulado
- 0.00%
473,531.96 28.12%
1,123,095.72 66.70%
1,683,909.00 100.00%

CION ESTANDAR MAX MIN


5.227 38.57 28.12

DISTRIBUCION
0.08

0.07

0.06

0.05

0.04

0.03 Pr(x<xmin) 4.64%


0.02 Pr(x>xmax) 4.62%
Pr(xmin<x<xmax) 90.74%
0.01

0.00
20 25 30 35 40 45
-0.01

Chart Title
1.00000000
0.90000000
0.80000000
0.70000000
0.60000000
0.50000000
0.40000000
0.30000000
0.20000000
0.10000000
-
20 25 30 35 40 45
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA
DISTRITO: JESUS NAZARENO ETAPA II 92 dias calendarios
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14. PRESUPUESTO 1,683,909.00
PRESUPUESTO
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1 MES2 MES 3 TOTAL
PROGRMADO (S/.)

01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.06 PLAN DE CONTINGENCIA PARA EL DESARROLLO DEL AÑO ESCOLAR GLB 0.20 80,000.00 16,000.00 4,000.00 8,000.00 4,000.00 16,000.00
01.02 TRABAJOS PRELIMINARES - - - - - - -
01.02.01 LIMPIEZA DE TERRENO MANUAL m2 1,063.47 4.16 4,424.04 2,212.02 2,212.02 - 4,424.04
01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,037.56 3.41 3,538.08 3,538.08 - - 3,538.08
01.02.04 DESMONTAJE DE TECHO DE CALAMINA m2 109.39 15.63 1,709.77 1,709.77 - - 1,709.77
01.02.05 DESMONTAJE DE VENTANAS m2 5.28 12.92 68.22 68.22 - - 68.22
01.02.06 DESMONTAJE DE PUERTAS m2 14.58 25.37 369.89 369.89 - - 369.89
01.02.07 DEMOLICION DE ESTRUCTURAS EXISTENTES m2 130.15 12.21 1,589.13 1,589.13 - - 1,589.13
01.02.08 CORTE DE MATERIAL SUELTO CON MAQUINARIA REND=360 M3/DIA m3 608.75 7.21 4,389.09 4,389.09 - - 4,389.09
01.02.09 ELIMINACION CON MAQUINARIA REN.=150 M3/DIA m3 186.39 8.36 1,558.22 1,558.22 - - 1,558.22
01.03 MOVIMIENTO DE TIERRAS - - - - - - -
01.03.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 127.79 41.55 5,309.67 5,309.67 - - 5,309.67
01.03.02 EXCAVACION MANUAL DE ZANJAS P/ZAPATAS m3 174.48 47.18 8,231.97 8,231.97 - - 8,231.97
01.03.03 EXCAVACION DE ZANJA PARA CIMIENTO CORRIDO EN TERRENO m3 59.32 47.18 2,798.72 2,798.72 - - 2,798.72
01.03.04 NORMAL
REFINE Y NIVELACION DE BASE DE FALSO PISO m2 386.33 6.24 2,410.70 2,410.70 - - 2,410.70
01.03.05 RELLENO CON MATERIAL PROPIO m3 13.13 30.45 399.81 399.81 - - 399.81
01.03.06 RELLENO Y COMPACTADO CON MATERIAL CLASIFICADO m3 42.60 13.13 559.34 559.34 - - 559.34
01.03.07 NIVELACION Y COMPACTADO DE BASE m2 1,037.53 12.64 13,114.38 13,114.38 - - 13,114.38
01.03.08 ACARREO INTERNO DE MAT. PROCEDENTE DE EXCAV. m3 470.07 31.16 14,647.38 14,647.38 - - 14,647.38
01.03.09 ELIMINACION CON MAQUINARIA REN.=150 M3/DIA m3 456.94 8.36 3,820.02 3,820.02 - - 3,820.02
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA
DISTRITO: JESUS NAZARENO ETAPA II 92 dias calendarios
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14. PRESUPUESTO 1,683,909.00
PRESUPUESTO
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1 MES2 MES 3 TOTAL
PROGRMADO (S/.)

01.04 CONCRETO SIMPLE - - - - - - -


01.04.02 CONCRETO F'C=140 KG/CM2 +30% P.G. PARA FALSA ZAPATAS m3 44.50 209.58 9,326.31 9,326.31 - - 9,326.31
01.04.03 CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO m3 63.38 226.60 14,361.91 14,361.91 - - 14,361.91
01.04.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HASTA 0.30 MT m2 145.00 41.62 6,034.90 6,034.90 - - 6,034.90
01.04.06 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 12.78 315.38 4,030.56 4,030.56 - - 4,030.56
01.04.09 ENCOFRADO Y DESENCOFRADO PARA LOSA MULTIUSO m2 65.62 70.00 4,593.40 4,593.40 - - 4,593.40
01.04.10 CONCRETO F'C=175 KG/CM2. PARA LOSA MULTIUSO m3 22.85 397.62 9,085.62 9,085.62 - - 9,085.62
01.05 CONCRETO ARMADO - - - - - - -
01.05.01 ZAPATAS - - - - - - -
01.05.01.01 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 1,341.95 5.48 7,353.89 7,353.89 - - 7,353.89
01.05.01.02 CONCRETO F'C= 210 KG/CM2. EN ZAPATAS m3 58.16 405.25 23,569.34 23,569.34 - - 23,569.34
01.05.02 COLUMNAS - - - - - - -
01.05.02.01 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 6,119.74 5.48 33,536.18 33,536.18 - - 33,536.18
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 315.15 43.59 13,737.39 13,737.39 - - 13,737.39
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS m3 33.48 475.62 15,923.76 15,923.76 - - 15,923.76
01.05.03 VIGAS - - - - - - -
01.05.03.01 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES kg 6,087.32 5.48 33,358.51 5,003.78 28,354.74 - 33,358.51
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 293.12 63.59 18,639.50 2,795.93 15,843.58 - 18,639.50
01.05.03.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS m3 53.55 475.62 25,469.45 - 25,469.45 - 25,469.45
01.05.04 LOSAS ALIGERADAS - - - - - - -
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 562.36 56.34 31,683.36 - 31,683.36 - 31,683.36
01.05.04.02 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADA und 5,623.64 3.64 20,470.05 - 20,470.05 - 20,470.05
01.05.04.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 3,853.38 5.48 21,116.52 - 21,116.52 - 21,116.52
01.05.04.04 CONCRETO F'C=210 KG/CM2 PARA LOSAS ALIGERADAS m3 36.56 409.77 14,981.19 - 14,981.19 - 14,981.19
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA
DISTRITO: JESUS NAZARENO ETAPA II 92 dias calendarios
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14. PRESUPUESTO 1,683,909.00
PRESUPUESTO
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1 MES2 MES 3 TOTAL
PROGRMADO (S/.)

01.05.05 CANALETA DE CONCRETO - - - - - - -


01.05.05.01 ACERO ESTRUCTURAL TRABAJADO PARA CANALETAS kg 471.58 5.48 2,584.26 - 2,584.26 - 2,584.26
01.05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CANALETAS m2 117.84 63.59 7,493.45 - 7,493.45 - 7,493.45
01.05.05.03 CONCRETO F'C=175 KG/CM2. PARA CANALETAS m3 5.89 408.43 2,405.65 - 2,405.65 - 2,405.65
01.05.06 COLUMNETAS - - - - - - -
01.05.06.01 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETAS kg 484.41 5.48 2,654.57 - 2,654.57 - 2,654.57
01.05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS m2 25.49 61.81 1,575.54 - 1,575.54 - 1,575.54
01.05.06.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS m3 1.75 461.77 808.10 - 808.10 - 808.10
01.05.07 VIGUETAS - - - - - - -
01.05.07.01 ACERO ESTRUCTURAL TRABAJADO PARA VIGUETAS kg 168.23 5.48 921.90 - 921.90 - 921.90
01.05.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS m2 18.64 63.59 1,185.32 - 1,185.32 - 1,185.32
01.05.07.03 CONCRETO F'C=175 KG/CM2 PARA VIGUETAS m3 1.38 461.77 637.24 - 637.24 - 637.24
01.05.11 CANALETA PARA EVACUACIÓN DE PRECIPITACIÓN PLUVIAL - - - - - - -
01.05.11.01 ENCOFRADO Y DESENCOFRADO EN CANAL DE EVACUAC. PLUVIAL m2 186.00 82.35 15,317.10 - 15,317.10 - 15,317.10
01.05.11.02 CONCRETO F'C=175 KG/CM2. EN CANAL DE EVACUACION PLUVIAL m3 8.68 447.40 3,883.43 - 3,883.43 - 3,883.43
01.05.11.03 REJILLA METALICA EN CUNETA DE EVACUACION PLUVIAL m 310.00 67.44 20,906.40 - 20,906.40 - 20,906.40
01.05.11.04 JUNTAS ASFALTICAS m 620.00 15.86 9,833.20 - 9,833.20 - 9,833.20
01.08 COBERTURA PARA PATIO - - - - - - -
01.08.01 COBERTURA CON POLICARBONATO INCLUIDO ESTRUCTURA m2 780.00 181.76 141,772.80 70,886.40 70,886.40 - 141,772.80
METALICA - - - - - - -
02 ARQUITECTURA
02.01 ALBAÑILERIA Y TABIQUERIA - - - - - - -
02.01.01 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO-ARENA m2 236.27 64.09 15,142.54 13,628.29 1,514.25 - 15,142.54
02.01.03 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO-ARENA m2 198.78 108.50 21,567.63 19,410.87 2,156.76 - 21,567.63
02.01.04 JUNTA DE CONSTRUCCION CON TEKNOPORT m2 12.78 57.55 735.49 661.94 73.55 - 735.49
02.02 REVOQUES ENLUCIDOS Y MOLDURAS - - - - - - -
02.02.01 TARRAJEO EN CIELO RASO CON CEMENTO-ARENA 1:5 m2 556.89 103.50 57,638.12 - 14,409.53 43,228.59 57,638.12
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA
DISTRITO: JESUS NAZARENO ETAPA II 92 dias calendarios
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14. PRESUPUESTO 1,683,909.00
PRESUPUESTO
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1 MES2 MES 3 TOTAL
PROGRMADO (S/.)

02.02.02 TARRAJEO DE SUPERFICIE DE VIGAS MEZCLA 1:5 E=1.5CM m2 311.77 46.63 14,537.84 - 3,634.46 10,903.38 14,537.84
02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 143.94 44.71 6,435.56 - 1,608.89 4,826.67 6,435.56
02.02.06 TARRAJEO DE MUROS EXTERIORES E INTERIORES CON CEMENTO- m2 1,153.10 36.10 41,626.91 - 10,406.73 31,220.18 41,626.91
ARENA 1:5 E=1.5CM - - - - - - -
02.02.07 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m 352.59 24.64 8,687.82 - - 8,687.82 8,687.82
02.02.08 BRUÑADO DE MUROS DE 1". m 684.20 8.34 5,706.23 - - 5,706.23 5,706.23
02.03 COBERTURA - - - -
02.03.01 COBERTURA CON TEJA ANDINA DECORATIVA m2 750.24 63.69 47,782.79 - 35,837.09 11,945.70 47,782.79
02.03.03 CUMBRERA CON TEJA ANDINA DECORATIVA m 72.68 35.12 2,552.52 - 1,914.39 638.13 2,552.52
02.04 PISOS Y PAVIMENTOS - - - - - - -
02.04.01 FALSO PISO - - - - - - -
02.04.01.01 CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4" m2 386.95 37.95 14,684.75 - 14,684.75 - 14,684.75
02.04.02 CONTRA PISO - - - - - - -
02.04.02.01 CONTRAPISO DE 48 MM. m2 386.95 38.89 15,048.49 - - 15,048.49 15,048.49
02.04.03 PISOS - - - - - - -
02.04.03.01 PISO CERAMICO DE 30X30 CM. m2 269.06 99.29 26,714.97 - - 26,714.97 26,714.97
02.04.03.02 PISO CERAMICO DE 40X40 CM. m2 34.44 99.29 3,419.55 - - 3,419.55 3,419.55
02.04.03.03 PISO DE CEMENTO PULIDO Y BRUÑ. 1.5 CM COLOREADO m2 7.66 40.78 312.37 - - 312.37 312.37
02.04.03.04 PISO VINILICO DE 4MM DE ALTA DENSIDAD m2 75.79 54.44 4,126.01 - - 4,126.01 4,126.01
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA
DISTRITO: JESUS NAZARENO ETAPA II 92 dias calendarios
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14. PRESUPUESTO 1,683,909.00
PRESUPUESTO
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1 MES2 MES 3 TOTAL
PROGRMADO (S/.)

02.04.04 VEREDAS PERIMETRALES - - - - - - -


02.04.04.01 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 26.48 38.68 1,024.25 - - 1,024.25 1,024.25
02.04.04.02 PISO DE CEMENTO PULIDO Y BRUÑ. 4" S/COLOREAR (VEREDAS) m2 183.91 58.96 10,843.33 - - 10,843.33 10,843.33
02.04.04.03 JUNTAS ASFALTICAS m 164.48 15.86 2,608.65 - - 2,608.65 2,608.65
02.05 ZOCALOS Y CONTRAZOCALOS - - - - - - -
02.05.01 ZOCALO DE CERAMICO 20 X 40 CM m2 89.52 201.72 18,057.97 - - 18,057.97 18,057.97
02.05.02 CONTRAZOCALO DE CERAMICO DE H=10CM m 205.47 33.87 6,959.27 - - 6,959.27 6,959.27
02.05.03 CONTRAZÓCALO BRUÑADO SEMI PULIDO S/COLOREAR H=0.20 M m 116.84 13.98 1,633.42 - - 1,633.42 1,633.42
02.05.05 ZOCALO DE CERAMICO DE 30 X 30 CM m2 3.61 202.32 730.38 - - 730.38 730.38
02.07.01 PUERTA DE MADERA APANELADA 1.20X3.38M APERTURA 180° und 6.00 1,153.07 6,918.42 - - 6,918.42 6,918.42
02.07.02 PUERTA DE MADERA APANELADA 1.00X3.38M APERTURA 180° und 4.00 4,522.67 18,090.68 - - 18,090.68 18,090.68
02.07.03 PUERTA DE MADERA APANELADA 0.80X3.38M APERTURA 90° und 4.00 5,992.67 23,970.68 - - 23,970.68 23,970.68
02.07.04 PUERTA DE MADERA APANELADA 0.70X3.43M APERTURA 90° und 4.00 3,802.87 15,211.48 - - 15,211.48 15,211.48
02.07.05 PUERTA DE MADERA APANELADA 0.80X2.10M APERTURA 90° und 4.00 755.89 3,023.56 - - 3,023.56 3,023.56
02.07.06 PUERTA DE MADERA APANELADA 1.20X3.14M APERTURA 90° und 3.00 1,153.07 3,459.21 - - 3,459.21 3,459.21
02.07.09 DIVISIONES DE MELAMINE SEGUN DISEÑO SSHH m2 25.20 298.20 7,514.64 - - 7,514.64 7,514.64
02.07.10 VENTANA DE MADERA CON SEGURO m2 188.85 212.02 40,039.98 - - 40,039.98 40,039.98
02.08 VIDRIOS, CRISTALES Y SIMILARES - - - - - - -
02.08.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 2,077.42 6.06 12,589.17 - - 12,589.17 12,589.17
02.09 PINTURA - - - - - - -
02.09.01 PINTURA LATEX EN CIELO RASO 2 MANOS m2 556.89 14.55 8,102.75 - - 8,102.75 8,102.75
02.09.02 PINTURA LATEX EN MUROS 2 MANOS m2 890.18 13.76 12,248.88 - - 12,248.88 12,248.88
02.09.03 PINTURA LATEX EN COLUMNAS 2 MANOS m2 143.94 14.98 2,156.22 - - 2,156.22 2,156.22
02.09.04 PINTURA LATEX EN VIGAS 2 MANOS m2 293.77 15.75 4,626.88 - - 4,626.88 4,626.88
02.09.08 PINTURA DE CONTRAZOCALO C/ESMALTE m 44.89 6.46 289.99 - - 289.99 289.99
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA
DISTRITO: JESUS NAZARENO ETAPA II 92 dias calendarios
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14. PRESUPUESTO 1,683,909.00
PRESUPUESTO
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1 MES2 MES 3 TOTAL
PROGRMADO (S/.)

03 INSTALACIONES ELECTRICAS - - - - - - -
03.01 SALIDAS PARA INSTALACIONES ELECTRICAS - - - - - - -
03.01.02 SALIDA PARA CENTROS DE LUZ C/CABLE THW 2X2.5mm2 + TUBERIA
pto 68.00 110.54 7,516.72 - 7,516.72 - 7,516.72
PVC SAP 19MM(3/4")
03.01.03 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA A TIERRA +
CABLE THW 3X4mm2 + TUBERIA PVC Ø3/4" pto 31.00 111.04 3,442.24 - 3,442.24 - 3,442.24

03.01.04 SALIDA PARA INTERRUPTOR SIMPLE pto 20.00 56.37 1,127.40 - 1,127.40 - 1,127.40
03.01.05 SALIDA PARA INTERRUPTOR DOBLE pto 6.00 58.06 348.36 - 348.36 - 348.36
03.02 ALIMENTADORES Y CABLES - - - - - - -
03.02.01 ALIMENTADOR CABLE NYY(4-1*16+1*16+1*16+1*16)MM2 + TUBERIA m 216.50 38.41 8,315.77 - 8,315.77 - 8,315.77
PVC SAP 50MM (2") - - - - - - -
03.03 TABLEROS
03.03.02 TABLERO DE DISTRIBUCION METALICO PARA INTERRUPTORES
und 3.00 452.07 1,356.21 - 1,356.21 - 1,356.21
TERMOMAGNETICOS 10 POLOS
03.03.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza 3.00 81.97 245.91 - 245.91 - 245.91
03.03.06 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20A pza 12.00 74.44 893.28 - 893.28 - 893.28
03.04 ARTEFACTOS - - - - - - -
03.04.01 ARTEFACTO FLUORESCENTE 2 X 36 W INCLUYENDO EQUIPO Y und 59.00 142.76 8,422.84 - 8,422.84 - 8,422.84
PANTALL
03.04.02 ARTEFACTO FLUORESCENTE CIRCULAR 1 X 36 W INCLUYENDO und 9.00 49.54 445.86 - 445.86 - 445.86
EQUIPO Y PANTALL
03.05.02 POZO PUESTA A TIERRA INC. CABLE und 3.00 1,743.05 5,229.15 - 5,229.15 - 5,229.15
03.06 INSTALACION REDES DE DATOS Y COMUNICACION - - - - - - -
03.06.01 SALIDA PARA CONEXION DE DATOS Y COMUNICACION pto 4.00 85.50 342.00 - 342.00 - 342.00
03.06.02 SERVICIO DE CABLEADO DE DATOS Y COMUNICACION GLB 1.00 3,389.83 3,389.83 - 3,389.83 - 3,389.83
04 INSTALACIONES SANITARIAS - - - - - - -
04.01 SISTEMA DE AGUA FRIA - - - - - - -
04.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 25.00 72.58 1,814.50 - 1,814.50 - 1,814.50
04.01.02 TUBERIA PVC SAP C-10 ø 1/2" NTP 399.002 m 146.04 18.24 2,663.77 - 2,663.77 - 2,663.77
04.01.03 VALVULA COMPUERTA DE BRONCE DE ø 1/2" und 5.00 78.43 392.15 - 392.15 - 392.15
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA
DISTRITO: JESUS NAZARENO ETAPA II 92 dias calendarios
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14. PRESUPUESTO 1,683,909.00
PRESUPUESTO
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1 MES2 MES 3 TOTAL
PROGRMADO (S/.)

04.01.04 CAJA DE VALVULAS DE 10" X 20" TAPA FºFº pza 3.00 193.19 579.57 - 579.57 - 579.57
04.01.05 ACCESORIOS EN TUB ø 1/2" pto 6.00 48.29 289.74 - 289.74 - 289.74
04.02 SISTEMA DE DESAGUE - - - - - - -
04.02.01 SALIDA DE DESAGUE EN PVC ø 2" pto 13.00 77.19 1,003.47 - 1,003.47 - 1,003.47
04.02.02 SALIDA DE DESAGUE EN PVC ø 4" pto 12.00 77.39 928.68 - 928.68 - 928.68
04.02.03 SALIDA DE VENTILACION PVC ø 2" pto 5.00 87.40 437.00 - 437.00 - 437.00
04.02.04 TUBERIA PVC SAL ø 2" m 24.40 23.37 570.23 - 570.23 - 570.23
04.02.05 TUBERIA PVC SAL ø 4" m 52.60 24.26 1,276.08 - 1,276.08 - 1,276.08
04.02.06 REGISTRO DE BRONCE DE 2" pza 3.00 63.47 190.41 - 190.41 - 190.41
04.02.07 REGISTRO DE BRONCE DE 4" pza 4.00 77.03 308.12 - 308.12 - 308.12
04.02.08 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und 13.00 70.19 912.47 - 912.47 - 912.47
04.02.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" TAPA FºFº pza 3.00 260.93 782.79 - 782.79 - 782.79
04.03 SISTEMA DE DRENAJE PLUVIAL - - - - - - -
04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS m2 14.04 61.81 867.81 - - 867.81 867.81
04.03.02 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS m3 1.63 461.77 752.69 - - 752.69 752.69
04.03.03 TUBERIA DE PVC SAL 3" m 115.20 24.15 2,782.08 - - 2,782.08 2,782.08
04.03.04 ACCESORIOS EN TUB BAJADA DE EVAC PLUVIAL pto 16.00 159.48 2,551.68 - - 2,551.68 2,551.68
04.04 APARATOS Y ACCESORIOS SANITARIOS - - - - - - -
04.04.01 INODORO TANQUE BAJO BLANCO pza 4.00 420.49 1,681.96 - - 1,681.96 1,681.96
04.04.02 INODORO TANQUE BAJO BABY pza 8.00 325.24 2,601.92 - - 2,601.92 2,601.92
04.04.05 LAVATORIO DE PARED BLANCO 1 LLAVE pza 12.00 161.98 1,943.76 - - 1,943.76 1,943.76
04.04.06 LAVADERO DE COCINA DE ACERO INOXIDABLE pza 1.00 1,143.75 1,143.75 - - 1,143.75 1,143.75
04.04.07 GRIFOS PARA LAVADEROS pza 12.00 105.45 1,265.40 - - 1,265.40 1,265.40
04.04.08 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 12.00 48.79 585.48 - - 585.48 585.48
04.04.11 ESPEJO CON MARCO METALICO PULIDO pza 4.00 74.13 296.52 - - 296.52 296.52
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA
DISTRITO: JESUS NAZARENO ETAPA II 92 dias calendarios
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14. PRESUPUESTO 1,683,909.00
PRESUPUESTO
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1 MES2 MES 3 TOTAL
PROGRMADO (S/.)

04.05 ACCESORIOS VARIOS PVC - - - - - - -


04.05.01 CODO PVC SAL 2"X90° pza 32.00 25.43 813.76 - 813.76 - 813.76
04.05.02 CODO PVC SAL 2"*2"X45° pza 10.00 32.00 320.00 - 320.00 - 320.00
04.05.03 CODO PVC SAL 4"4"X90° pza 8.00 36.58 292.64 - 292.64 - 292.64
04.05.04 TEE PVC-SAL 4"* 4" und 8.00 33.87 270.96 - 270.96 - 270.96
04.05.05 YEE PVC SAL 4"*4" pza 8.00 28.10 224.80 - 224.80 - 224.80
04.05.06 YEE PVC SAL 2"*2" pza 11.00 26.06 286.66 - 286.66 - 286.66
04.05.07 YEE PVC SAL 4"*2" pza 7.00 27.56 192.92 - 192.92 - 192.92
COSTO DIRECTO 1,163,107.89 324,666.84 451,090.14 387,350.92 1,163,107.89
GASTOS GENERALES(10.00 % CD) 116,310.79 32,466.68 45,109.01 38,735.09 116,310.79
UTILIDAD(8.00 %CD) 93,048.63 25,973.35 36,087.21 30,988.07 93,048.63
SUB TOTAL 1,372,467.31 383,106.87 532,286.36 457,074.08 1,372,467.31
IGV.(18% CD) 247,044.12 68,959.24 95,811.55 82,273.33 247,044.12
PRESUPUESTO DE OBRA (INC. IGV) 1,619,511.43 452,066.10 628,097.91 539,347.42 1,619,511.43
GASTOS DE SUPERVISION(INC. IGV) 64,397.57 21,465.86 21,465.86 21,465.86 64,397.57
PRESUPUESTO TOTAL 1,683,909.00 473,531.96 649,563.77 560,813.27 1,683,909.00
AVANCE MENSUAL PROGRAMADO GLOBAL (%) 28.12% 38.57% 33.30%
AVANCE MENSUAL PROGRAMADO ACUMULADO (%) 28.12% 66.70% 100.00%
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA
DISTRITO: JESUS NAZARENO ETAPA II 92 dias calendarios
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14. PRESUPUESTO 1,683,909.00
PRESUPUESTO
Item Descripción Und. METRADO PRECIO S/. PARCIAL S/. MES 1 MES2 MES 3 TOTAL
PROGRMADO (S/.)

AVANCE PROGRAMADO ACUMULADO


DIST RIBUCION NORMAL MES Monto S/. % Monto A. S/. % Acumulado
0.08 Inicio - 0.00% - 0.00%
Mes 1 473,531.96 28.12% 473,531.96 28.12%
0.07
Mes 2 649,563.77 38.57% 1,123,095.72 66.70%
0.06
Mes 3 560,813.27 33.30% 1,683,909.00 100.00%
0.05 1,683,909.00 100.00%
0.04
AVANCE PROMEDIO DESVIACION ESTANDAR MAX MIN
0.03 33.33 5.227 38.57 28.1
PERIODO DE MEDICION 01 Mes
0.02 INTERVALOS DISTRIBUCION F(X)
25 0.02 0.05543396
0.01 26 0.03 0.08031026
27 0.04 0.11281914
0.00
20 25 30 35 40 45 28 0.05 0.15378015
-0.01 29 0.05 0.20354141
30 0.06 0.26182744
GRAFICO PROBABILIDAD ACUMULADA 31 0.07 0.32765230
1.00000000 32 0.07 0.39932731
0.90000000 33 0.08 0.47457582
34 0.08 0.55074521
0.80000000 35 0.07 0.62508398
0.70000000 36 0.07 0.69503638
0.60000000 37 0.06 0.75850256
38 0.05 0.81402062
0.50000000 39 0.04 0.86084571
0.40000000 40 0.03 0.89892381
0.30000000 41 0.03 0.92877930
42 0.02 0.95134897
0.20000000
0.10000000 Pr(x<xmin) 4.64%
Pr(x>xmax) 4.62%
- Pr(xmin<x<xmax)
20 25 30 35 40 45 90.74%
ANEXO N° 02
PLAN DE EJECUCIÓN FÍSICA Y FINANCIERA DE PROYECTO
B. CRONOGRAMA DE EJECUCIÓN FÍNANCIERA
NOMBRE DEL PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL INCIAL PARA LA INSTITUCION EDUCATIVA Nº104 SIMON BOLIVAR DEL
DISTRITO DE JESUS NAZARENO, PROVINCIA DE HUAMANGA-AYACUCHO"
CODIGO SNIP: 237746 DIRECTA INDIRECTA
DEPARTAMENTO: AYACUCHO X
PROVINCIA: HUAMANGA ETAPA II 92 dias calendarios
DISTRITO: JESUS NAZARENO PRESUPUESTO 1,683,909.00
LOCALIDAD: ASOC. PAMPA DEL ARCO MZ "G" LT 14.
ITEM AVANCE PROGRAMADO ACUMULADO
DISTRIBUCION NORMAL MES Monto S/. % Monto A. S/. % Acumulado
0.08 Inicio - 0.00% - 0.00%
Mes 1 473,531.96 28.12% 473,531.96 28.12%
0.07
Mes 2 649,563.77 38.57% 1,123,095.72 66.70%
0.06 Mes 3 560,813.27 33.30% 1,683,909.00 100.00%
0.05 1,683,909.00 100.00%
0.04 AVANCE PROMEDIO DESVIACION ESTANDAR MAX MIN
33.33 5.227 38.57 28.1
0.03
PERIODO DE MEDICION 01 Mes
0.02 INTERVALOS DISTRIBUCION F(X)
25 0.02 0.05543396
0.01
26 0.03 0.08031026
27 0.04 0.11281914
0.00
20 25 30 35 40 45 28 0.05 0.15378015
-0.01 29 0.05 0.20354141
30 0.06 0.26182744
GRAFICO PROBABILIDAD ACUMULADA 31 0.07 0.32765230
1.00000000 32 0.07 0.39932731
0.90000000 33 0.08 0.47457582
34 0.08 0.55074521
0.80000000 35 0.07 0.62508398
0.70000000 36 0.07 0.69503638
0.60000000 37 0.06 0.75850256
38 0.05 0.81402062
0.50000000 39 0.04 0.86084571
0.40000000 40 0.03 0.89892381
41 0.03 0.92877930
0.30000000
42 0.02 0.95134897
0.20000000
0.10000000 Pr(x<xmin) 4.64%
Pr(x>xmax) 4.62%
- Pr(xmin<x<xmax)
20 25 30 35 40 45 90.74%

También podría gustarte