SITE INSPECTION FORM

TOOLS / PROJECT :
PERFORM BY :
ATTENDANCE :

ARCHITECTURE

1. Confirm layout of tools , Gridline :


2. Existing Tool No :
3. No of pole at site :
4. Type of pole :
5. Dimension of pole :

6. Ceiling required modification :


7. Walkable ceiling required modification :
8. Floor required modification / make good :
9. Existing Pole Sketch :
MECHANICAL SERVICES
OFA PCW N2 PV DI
Poc Tagging
Poc Size
Pipe Size
Pipe Material
Insulation Size
Insulation Type
Length to dropper

EXHAUST / VENTILATION

Size of POC :
Duct Size :
Duct Type : Round / Rectangular
Duct Material :
Duct Insulation :
Tool connection size :
Distance :
Remarks :