Está en la página 1de 7

(NTPC) / (TSTPP)

4X500 MW UNITS , Stage- II


OPERATION DEPARTMENT TS - II /OPN/R/P&I/TG/01
PROTECTION & INTERLOCKS CHECKING PROTOCOL
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006

CRT SOE Point


So Method of Channel BHEL LVS
Description Logic Set. Pt. Field Switches Trip in THL
No Checking acting
Status
CRT alarm
CRT

LUB OIL MAV 42 CP 016 By draining the Ch- 1    


1. PR.V.LOW Behind 2/3 <1.2Kg/Cm2 MAV 42 CP 017 pr. switches in
the Filter MAV 42 CP 018 combination Ch- 2    
Simulation
MAD 11 CY 011 Ch- 1    
AXIAL SHIFT DONE FROM
± 1.0 mm MAD 12 CY 011
3. VERY 2/3 THE Panel.
MAD 13 CY 011
HIGH 16% &84% Ch- 2    
(0-50%-100%)
Simulation
HP outer casing 500 0C MAA 50 CT 021 DONE FROM Ch- 1    
5. Exhaust Steam 2/3 MAA 50 CT 022 THE Panel.
temp HI . (0-600 0C) MAA 50 CT 023 (84% ) Ch- 2    
- MAC 11 CP 001
Speed signal &
COND. PR.
+ MAG 10 CP 002
LPT inlet pr.
Ch- 1    
As per the - MAC 11 CP 002
7. VACUUM TRIP 2/3 Simulation in
curve + MAG 10 CP 003
(VSP) Panel
- MAC 11 CP 003 Ch- 2    
+ MAG 10 CP 004

P&I Checked By Approved By P&I Checked By Approved By

Signature: Signature: Page 1 of 7


Name: R.N.Das D.Sarkar Name: A. Bhowmic A.N.Sar
Desig: Sr. Supdt (O) DGM (O) Desig: Supdt (C&I) DGM(C&I)
(Operation Dept.) ( C&I Dept.)
(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
OPERATION DEPARTMENT TS - II /OPN/R/P&I/TG/01
PROTECTION & INTERLOCKS CHECKING PROTOCOL
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006

CRT SOE Point


So Method of Channel BHEL LVS
Description Logic Set. Pt. Field Switches Trip in THL
No Checking acting
Status
CRT alarm
CRT
> - 0.70
KSC & Speed
Ch- 1    
COND. PR. MAG 10 CP 002
turbine speed simulation in
9. VACUUM TRIP 2/3 MAG 10 CP 003
> 6.67% of Panel. & Vac sim
(FSP) 3600 RPM MAG 10 CP 004 30 %
Ch- 2    

> 100 0 C
MAA 50 CT 051 A/B (Top)
HP CASING TOP- & MAA 50 CT 052 A/B (Bot) By simulation Ch- 1    
BOT Diff temp actual load MAA 50 CT 053 A/B (Top) from Panel
11. 2/3
Very high > 100 mw MAA 50 CT 054 A/B (Bot) both Load &
(16.67% of MAA 50 CT 055 A/B (Top) Temp points Ch- 2    
MAA 50 CT 056 A/B (Bot)
600MW )
> 45 0 C
IP CASING TOP- & MAB 50 CT 041 A/B (Top) Ch- 1    
BOTTOM Diff actual load MAB 50 CT 042 A/B (Bot) Simulation in
13. 2/3
temp Very high > 45 mw MAB 50 CT 043 A/B (Top) Panel
MAB 50 CT 044 A/B (Bot)
(FRONT) (7.5% of Ch- 2    
600MW )

P&I Checked By Approved By P&I Checked By Approved By

Signature: Signature: Page 2 of 7


Name: R.N.Das D.Sarkar Name: A. Bhowmic A.N.Sar
Desig: Sr. Supdt (O) DGM (O) Desig: Supdt (C&I) DGM(C&I)
(Operation Dept.) ( C&I Dept.)
(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
OPERATION DEPARTMENT TS - II /OPN/R/P&I/TG/01
PROTECTION & INTERLOCKS CHECKING PROTOCOL
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006

CRT SOE Point


So Method of Channel BHEL LVS
Description Logic Set. Pt. Field Switches Trip in THL
No Checking acting
Status
CRT alarm
CRT

> 45 0 C Ch- 1    
Simulation in
IP CASING TOP- & MAB 50 CT 061 A/B (Top)
Panel
BOTTOM Diff actual load MAB 50 CT 062 A/B (Bot)
15. 2/3
temp Very high > 45 mw MAB 50 CT 063 A/B (Top) Ch- 2    
MAB 50 CT 064 A/B (Bot)
(REAR) (7.5% of
600MW ) Ch- 2    
1050 MM MAV10CL021 By Simulating
FIRE PROT'N MOT level MAV10CL022 the level & also
Ch- 1    
18. 2/3
CHECK 1 & 2 (0-1600mm) MAV10CL023 by pressing the
From Top FP PB AT LOCAL push button. Ch- 2    

GENERATOR MECHANICAL PROTECTIONS ( Sl no 10-19)

By simulating
Level > MKA 24 CL 001 Ch- 1    
the level
20. LIQUID MAIN 2/3 MAX MKA 24 CL 011
switches from
LEADS TOP MKA 24 CL 021 local. Ch- 2    

P&I Checked By Approved By P&I Checked By Approved By

Signature: Signature: Page 3 of 7


Name: R.N.Das D.Sarkar Name: A. Bhowmic A.N.Sar
Desig: Sr. Supdt (O) DGM (O) Desig: Supdt (C&I) DGM(C&I)
(Operation Dept.) ( C&I Dept.)
(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
OPERATION DEPARTMENT TS - II /OPN/R/P&I/TG/01
PROTECTION & INTERLOCKS CHECKING PROTOCOL
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006

CRT SOE Point


So Method of Channel BHEL LVS
Description Logic Set. Pt. Field Switches Trip in THL
No Checking acting
Status
CRT alarm
CRT
SO TEMP AFT By Simulating
MKW 71 CT 001 Ch- 1    
CLR AIR SIDE V. the temp.
22. 2/3 > 55 0
C MKW 71 CT 004
HIGH switches.
MKW 71 CT 005 Ch- 2    

HOT AIR MAIN


MKC 09 CT 001 By Simulating
24. EXCITER V. 2/3 > 80 0
C
MKC 09 CT 004 the temp.
Ch- 1    
HIGH Switches.
MKC 09 CT 005

MKA 75 CT 001
By Simulating Ch- 1    
COLD GAS AFT the temp. RTDs
25. 2/3 > 60 0
C MKA 75 CT 002A
CLR A/B V. HIGH AT LOCAL
MKA 75 CT 003A Ch- 2    

MKA 78 CT 001 By Simulating Ch- 1    


COLD GAS AFT
27. 2/3 > 60 0
C MKA 78 CT 002 A the temp. RTDs.
CLR C/D V. HIGH
MKA 78 CT 003 A Ch- 2    

P&I Checked By Approved By P&I Checked By Approved By

Signature: Signature: Page 4 of 7


Name: R.N.Das D.Sarkar Name: A. Bhowmic A.N.Sar
Desig: Sr. Supdt (O) DGM (O) Desig: Supdt (C&I) DGM(C&I)
(Operation Dept.) ( C&I Dept.)
(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
OPERATION DEPARTMENT TS - II /OPN/R/P&I/TG/01
PROTECTION & INTERLOCKS CHECKING PROTOCOL
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006

CRT SOE Point


So Method of Channel BHEL LVS
Description Logic Set. Pt. Field Switches Trip in THL
No Checking acting
Status
CRT alarm
CRT

MKF 82 CF 001 A
STATOR WNDG. < 70 % by reducing the Ch- 1    
MKF 82 CF 001 B
29. FLOW V. LOW 2/3 the actual flow
MKF 82 CF 001 C
<48 M3/hr Ch- 2    
By Simulating
PRIM WATER MKF 80 CT 001 Ch- 1    
the temp.
31. TEMP. AFT CLR 2/3 > 55 0
C MKF 80 CT 005
Switches AT
V. HIGH MKF 80 CT 006 LOCAL
Ch- 2    
By draining the
FLOW MAIN < 73.88 % MKF 83 CF 001 A flow switches in Ch- 1    
33. BUSH 'R' V. LOW 2/3 <1.33 MKF 83 CF 001 B combination &
M3/hr MKF 83 CF 001 C also by reducing
the flow.
Ch- 2    
By draining the
FLOW MAIN flow switches in Ch- 1    
< 73.88 % MKF 83 CF 011 A
BUSH 'S' V. combination &
35. 2/3 <1.33 MKF 83 CF 011 B
LOW also by reducing
M3/hr MKF 83 CF 011 C the flow. Ch- 2    
By draining the
37. 2/3 < 73.88 % MKF 83 CF 021 A
flow switches in
Ch- 1    
P&I Checked By Approved By P&I Checked By Approved By

Signature: Signature: Page 5 of 7


Name: R.N.Das D.Sarkar Name: A. Bhowmic A.N.Sar
Desig: Sr. Supdt (O) DGM (O) Desig: Supdt (C&I) DGM(C&I)
(Operation Dept.) ( C&I Dept.)
(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
OPERATION DEPARTMENT TS - II /OPN/R/P&I/TG/01
PROTECTION & INTERLOCKS CHECKING PROTOCOL
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006

CRT SOE Point


So Method of Channel BHEL LVS
Description Logic Set. Pt. Field Switches Trip in THL
No Checking acting
Status
CRT alarm
CRT
FLOW MAIN MKF 83 CF 021 B combination &
<1.33
BUSH 'T' V. LOW
M3/hr
MKF 83 CF 021 C also by reducing Ch- 2    
the flow.

Relay
MKY 01 EZ 000 A X 401 Ch- 1    
GEN 186/286 By simulating the
39. 2/3 MKY 01 EZ 000 B X 401
PROTECTION GROUP MKY 01 EZ 000 C X 401 concant in GRP.
Operated
Ch- 2    
Checked by Ch- 1    
actually tripping
41. MFT MFT took
1/3 From FSSS the boiler.
place Ch- 2    
Ch- 1    
ELECTRICAL 3270 RPM Speed signal
43. 2/3 Speed transmitters
OVERSPEED (109%) simulation
Ch- 2    

45. EMERGENCY 2/3 Both PB PB from TG desk By pressing Ch- 1    


both push
TRIP FROM THE pressed

P&I Checked By Approved By P&I Checked By Approved By

Signature: Signature: Page 6 of 7


Name: R.N.Das D.Sarkar Name: A. Bhowmic A.N.Sar
Desig: Sr. Supdt (O) DGM (O) Desig: Supdt (C&I) DGM(C&I)
(Operation Dept.) ( C&I Dept.)
(NTPC) / (TSTPP)
4X500 MW UNITS , Stage- II
OPERATION DEPARTMENT TS - II /OPN/R/P&I/TG/01
PROTECTION & INTERLOCKS CHECKING PROTOCOL
AREA : Turbine Rev 0.0 (01/01/2006)
Unit - 3 EQUIPMENT NAME : MAIN TURBINE Date Of Checking : 03-01-2006

CRT SOE Point


So Method of Channel BHEL LVS
Description Logic Set. Pt. Field Switches Trip in THL
No Checking acting
Status
CRT alarm
CRT
PB PROVIDED IN simultaneou buttons
TG DESK (both) sly simultaneously
Ch- 2    
Trip from By pressing the Ch- 1    
EMERGENCY TRIP
Vertical push button in
47. from Vertical Panel 2/3 PB in Vertical Panel vertical panel.
Panel Ch- 2    
in CCR
Console
MANUAL TRIP By operating the
Mech
49. from Local 1/1 Pressed Local Trip PB trip lever in main
Trip
   
protection Rack trip device.

Emergency Trip Pressed By pressing from Both


50.
from VPC
1/1
from CRT
CRT VPC
CRT Channel
   

N:B :- After checking all the simulations are normalized by C&I .

The interlocks are checked by observibg opeartion of TTR Ch- 1 Ch- 2 . Only once the actual
operation of SV is checked in each channel .

P&I Checked By Approved By P&I Checked By Approved By

Signature: Signature: Page 7 of 7


Name: R.N.Das D.Sarkar Name: A. Bhowmic A.N.Sar
Desig: Sr. Supdt (O) DGM (O) Desig: Supdt (C&I) DGM(C&I)