> 100 0 C
MAA 50 CT 051 A/B (Top)
HP CASING TOP- & MAA 50 CT 052 A/B (Bot) By simulation Ch- 1
BOT Diff temp actual load MAA 50 CT 053 A/B (Top) from Panel
11. 2/3
Very high > 100 mw MAA 50 CT 054 A/B (Bot) both Load &
(16.67% of MAA 50 CT 055 A/B (Top) Temp points Ch- 2
MAA 50 CT 056 A/B (Bot)
600MW )
> 45 0 C
IP CASING TOP- & MAB 50 CT 041 A/B (Top) Ch- 1
BOTTOM Diff actual load MAB 50 CT 042 A/B (Bot) Simulation in
13. 2/3
temp Very high > 45 mw MAB 50 CT 043 A/B (Top) Panel
MAB 50 CT 044 A/B (Bot)
(FRONT) (7.5% of Ch- 2
600MW )
> 45 0 C Ch- 1
Simulation in
IP CASING TOP- & MAB 50 CT 061 A/B (Top)
Panel
BOTTOM Diff actual load MAB 50 CT 062 A/B (Bot)
15. 2/3
temp Very high > 45 mw MAB 50 CT 063 A/B (Top) Ch- 2
MAB 50 CT 064 A/B (Bot)
(REAR) (7.5% of
600MW ) Ch- 2
1050 MM MAV10CL021 By Simulating
FIRE PROT'N MOT level MAV10CL022 the level & also
Ch- 1
18. 2/3
CHECK 1 & 2 (0-1600mm) MAV10CL023 by pressing the
From Top FP PB AT LOCAL push button. Ch- 2
By simulating
Level > MKA 24 CL 001 Ch- 1
the level
20. LIQUID MAIN 2/3 MAX MKA 24 CL 011
switches from
LEADS TOP MKA 24 CL 021 local. Ch- 2
MKA 75 CT 001
By Simulating Ch- 1
COLD GAS AFT the temp. RTDs
25. 2/3 > 60 0
C MKA 75 CT 002A
CLR A/B V. HIGH AT LOCAL
MKA 75 CT 003A Ch- 2
MKF 82 CF 001 A
STATOR WNDG. < 70 % by reducing the Ch- 1
MKF 82 CF 001 B
29. FLOW V. LOW 2/3 the actual flow
MKF 82 CF 001 C
<48 M3/hr Ch- 2
By Simulating
PRIM WATER MKF 80 CT 001 Ch- 1
the temp.
31. TEMP. AFT CLR 2/3 > 55 0
C MKF 80 CT 005
Switches AT
V. HIGH MKF 80 CT 006 LOCAL
Ch- 2
By draining the
FLOW MAIN < 73.88 % MKF 83 CF 001 A flow switches in Ch- 1
33. BUSH 'R' V. LOW 2/3 <1.33 MKF 83 CF 001 B combination &
M3/hr MKF 83 CF 001 C also by reducing
the flow.
Ch- 2
By draining the
FLOW MAIN flow switches in Ch- 1
< 73.88 % MKF 83 CF 011 A
BUSH 'S' V. combination &
35. 2/3 <1.33 MKF 83 CF 011 B
LOW also by reducing
M3/hr MKF 83 CF 011 C the flow. Ch- 2
By draining the
37. 2/3 < 73.88 % MKF 83 CF 021 A
flow switches in
Ch- 1
P&I Checked By Approved By P&I Checked By Approved By
Relay
MKY 01 EZ 000 A X 401 Ch- 1
GEN 186/286 By simulating the
39. 2/3 MKY 01 EZ 000 B X 401
PROTECTION GROUP MKY 01 EZ 000 C X 401 concant in GRP.
Operated
Ch- 2
Checked by Ch- 1
actually tripping
41. MFT MFT took
1/3 From FSSS the boiler.
place Ch- 2
Ch- 1
ELECTRICAL 3270 RPM Speed signal
43. 2/3 Speed transmitters
OVERSPEED (109%) simulation
Ch- 2
The interlocks are checked by observibg opeartion of TTR Ch- 1 Ch- 2 . Only once the actual