Formato N° 01 – Oferta Económica

PRESUPUESTO
ÍTEM DESCRIPCION DE PARTIDAS UNIDAD METRADO
1 MORTERO ASFÁLTICO (e = 12mm)
1.01 MOVILIZACION DE EQUIPOS glb 1.00
1.02 MORTERO ASFÁLTICO – TRAMO 1 km 1.22
1.03 MORTERO ASFÁLTICO – TRAMO 2 km 33.88
1.04 MORTERO ASFÁLTICO – TRAMO 3 km 8.18
1.05 MORTERO ASFÁLTICO – TRAMO 5 km 13.34
1.06 MORTERO ASFÁLTICO – TRAMO 8 km 7.20
1.07 MORTERO ASFÁLTICO – TRAMO 9 km 7.13
COSTO DIRECTO
GASTO GENERAL (**)
UTILIDAD
SUB-TOTAL
I.G.V.
PRESUPUESO TOTAL
P.U. (S/) PARCIAL (S/)

36,000.00 36,000.00
35,038.44 42,746.90
33,968.36 1,150,848.17
33,968.36 277,861.22
32,898.28 438,863.11
33,968.36 244,470.32
35,038.44 249,824.11
2,440,613.82
(5% CD) 122,030.69
(5% CD) 122,030.69
2,684,675.20
(18% S T) 483,241.54
3,167,916.74
PRESUPUESTO – MORTERO ASFÁLTICO TRAMO 1
N° DESCRIPCION DE PARTIDAS UNIDAD METRADO
100 TRABAJOS PRELIMINARES
102.A TRAZO Y REPLANTEO km 1.22
200.00 CONSERVACION DE PLATAFORMA Y TALUDES
201.A RIEGO DE LIGA m2 7,808.00
201.A MORTERO ASFÁLTICO (e= 12 mm) m2 7,808.00

COSTO DIRECTO
Longitud en Km.
COSTO POR Km

PRESUPUESTO – MORTERO ASFÁLTICO TRAMO 2


N° DESCRIPCION DE PARTIDAS UNIDAD METRADO
100.00 TRABAJOS PRELIMINARES
102.A TRAZO Y REPLANTEO km 33.88
200.00 CONSERVACION DE PLATAFORMA Y TALUDES
201.A RIEGO DE LIGA m2 210,056.00
201.A MORTERO ASFÁLTICO (e= 12 mm) m2 210,056.00

COSTO DIRECTO
Longitud en Km.
COSTO POR Km

PRESUPUESTO – MORTERO ASFÁLTICO TRAMO 3


N° DESCRIPCION DE PARTIDAS UNIDAD METRADO
100.00 TRABAJOS PRELIMINARES
102.A TRAZO Y REPLANTEO km 8.18
200.00 CONSERVACION DE PLATAFORMA Y TALUDES
201.A RIEGO DE LIGA m2 50,716.00
201.A MORTERO ASFÁLTICO (e= 12 mm) m2 50,716.00

COSTO DIRECTO
Longitud en Km.
COSTO POR Km

PRESUPUESTO – MORTERO ASFÁLTICO TRAMO 5


N° DESCRIPCION DE PARTIDAS UNIDAD METRADO
100.00 TRABAJOS PRELIMINARES
102.A TRAZO Y REPLANTEO km 13.34
200.00 CONSERVACION DE PLATAFORMA Y TALUDES
201.A RIEGO DE LIGA m2 80,040.00
201.A MORTERO ASFÁLTICO (e= 12 mm) m2 80,040.00

COSTO DIRECTO
Longitud en Km.
COSTO POR Km

PRESUPUESTO – MORTERO ASFÁLTICO TRAMO 8


N° DESCRIPCION DE PARTIDAS UNIDAD METRADO
100.00 TRABAJOS PRELIMINARES
102.A TRAZO Y REPLANTEO km 7.20
200.00 CONSERVACION DE PLATAFORMA Y TALUDES
201.A RIEGO DE LIGA m2 44,621.40
201.A MORTERO ASFÁLTICO (e= 12 mm) m2 44,621.40

COSTO DIRECTO
Longitud en Km.
COSTO POR Km

PRESUPUESTO – MORTERO ASFÁLTICO TRAMO 9


N° DESCRIPCION DE PARTIDAS UNIDAD METRADO
100.00 TRABAJOS PRELIMINARES
102.A TRAZO Y REPLANTEO km 7.13
200.00 CONSERVACION DE PLATAFORMA Y TALUDES
201.A RIEGO DE LIGA m2 45,632.00
201.A MORTERO ASFÁLTICO (e= 12 mm) m2 45,632.00

COSTO DIRECTO
Longitud en Km.
COSTO POR Km
MO 1
P.U. (S/) PARCIAL (S/)

795.88 970.98

1.20 9,369.60
4.15 32,406.32

42,746.90
1.22
35,038.44

MO 2
P.U. (S/) PARCIAL (S/)

795.88 26,964.55

1.20 252,067.20
4.15 871,816.42

1,150,848.17
33.88
33,968.36

MO 3
P.U. (S/) PARCIAL (S/)

795.88 6,510.33

1.20 60,859.20
4.15 210,491.69

277,861.22
8.18
33,968.36

MO 5
P.U. (S/) PARCIAL (S/)

795.88 10,617.09
1.20 96,048.00
4.15 332,198.02

438,863.11
13.34
32,898.28

MO 8
P.U. (S/) PARCIAL (S/)

795.88 5,727.98

1.20 53,545.68
4.15 185,196.66

244,470.32
7.20
33,968.36

MO 9
P.U. (S/) PARCIAL (S/)

795.88 5,674.65

1.20 54,758.40
4.15 189,391.05

249,824.11
7.13
35,038.44
ANALISIS DE PRECIO

Partida 102.A TRAZO Y REPLANTEO

Rendimiento KM/DIA EQ.

Código Descripción Recurso


MANO DE OBRA
TOPOGRAFO
PEON

MATERAILES
MADERA TORNILLO
PINTURA

EQUIPOS
HERRAMIENTAS MANUALES
JALON
WINCHA DE 30M
MIRA DE 4M
NIVEL TOPOGRAFICO
TEODOLITO

Partida 201.A RIEGO DE LIGA

Rendimiento m2/DIA EQ.

Código Descripción Recurso


MANO DE OBRA
CAPATAZ
OFICIAL
PEON

MATERAILES
EMULSION ASFALTICA

EQUIPOS
HERRAMIENTAS MANUALES
CAMION IMPRIMADOR
CAMION CISTERNA
COMPRESORA NEUMATICA 250-330 PCM, 87HP

Partida 201.A MORTERO ASFÁLTICO (e= 12 mm)

Rendimiento m2/DIA EQ.

Código Descripción Recurso


MANO DE OBRA
CAPATAZ
OPERARIO
PEON
MATERAILES
EMULSION ASFALTICA DE ROTIRA LENTA
FILER
AGUA PARA RIEGO
ARENA GRUESA DE CANTERA INC. TRANSPORTE Y
SARANDEO

EQUIPOS
HERRAMIENTAS MANUALES
MAQYUINA EXTENDEDORA DE MORTERO
CAMION PLATAFORMA 4X2 122HP 8TN
VOLQUETE 6X4 330HP 15M3
CARGADOR S/LLANTAS 125-155 HP 3Y3
COMPRESORA NEUMATICA 250-330 PCM, 87HP
E PRECIOS UNITARIOS

1.00 Costo unitario directo por : m2 795.88

Unidad Cuadrilla Cantidad Precio S/. Parcial S/.

HH 1.0000 8.0000 23.44 187.52


HH 3.0000 24.0000 14.44 346.56
534.08

P2 3.0000 5.64 16.92


GLN 0.3000 33.08 9.92
26.84

%MO 3.0000 534.08 16.02


HM 2.0000 16.0000 1.88 30.08
UND 0.0250 60.00 1.50
HM 2.0000 16.0000 0.41 6.56
HM 2.0000 16.0000 6.90 110.40
HM 1.0000 8.0000 8.80 70.40
234.96

3000.00 Costo unitario directo por : m2 1.20

Unidad Cuadrilla Cantidad Precio S/. Parcial S/.

HH 1.0000 0.0027 23.44 0.06


HH 1.0000 0.0027 16.05 0.04
HH 6.0000 0.0160 14.44 0.23
0.33

L 1.2000 0.00
0.00

%MO 3.0000 0.33 0.01


HM 1.0000 0.0027 122.00 0.33
HM 1.0000 0.0027 120.00 0.32
HM 1.0000 0.0027 77.00 0.21
0.87

2 mm)

4000.00 Costo unitario directo por : m2 4.15

Unidad Cuadrilla Cantidad Precio S/. Parcial S/.

HH 1.0000 0.0020 23.44 0.05


HH 2.0000 0.0040 19.53 0.08
HH 8.0000 0.0160 14.44 0.23
0.36

GAL 0.7100 0.00 0.00


KG 0.2500 0.00 0.00
M3 0.0051 4.00 0.02
M3 0.0180 80.00 1.44
1.46

%MO 3.0000 0.36 0.01


HM 1.0000 0.0020 320.00 0.64
HM 1.0000 0.0020 120.00 0.24
HM 2.0000 0.0040 240.00 0.96
HM 1.0000 0.0020 180.00 0.36
HM 1.0000 0.0020 60.00 0.12
2.33

0.018