I. PEKERJAAN PRELIMINARY
1 Mobilisasi dan Demobilisasi Is 1.00 0.22% 50.00% 0.11% 50.00% 0.11% 100.00% 0.22%
2 Pembersihan lokasi Is 1.00 0.11% 50.00% 0.06% 30.00% 0.03% 80.00% 0.09%
3 Bangunan penunjang sementara (direksi keet) Is 1.00 0.11% 95.00% 0.11% 5.00% 0.01% 100.00% 0.11%
4 Uitzet & bouwplank Is 1.00 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
5 Gambar2 kerja (shop drawing) Is 1.00 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
6 Gambar2 kenyataan (as built drawing) Is 1.00 0.02% 90.00% 0.02% 10.00% 0.00% 100.00% 0.02%
7 Listrik, air kerja dan telpon Is 1.00 0.17% 35.00% 0.06% 35.00% 0.06% 70.00% 0.12%
8 Keamanan proyek Is 1.00 0.11% 0.03% 0.00% 0.03% 0.00% 0.05% 0.00%
9 Pengelolaan kebersihan lapangan Is 1.00 0.11% 0.02% 0.00% 0.02% 0.00% 0.04% 0.00%
10 Pengukuran (setting out) Is 1.00 0.02% 75.00% 0.02% 25.00% 0.01% 100.00% 0.02%
11 Masa pemeliharaan Is 1.00 0.11% 0.02% 0.00% 0.02% 0.00% 0.04% 0.00%
1 Pekerjaan Perhitungan Struktur ls 1.00 0.22% 90.00% 0.20% 10.00% 0.02% 100.00% 0.22%
2 Pekerjaan Galian
409984289.xls Page 1
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
1 . Galian pondasi batu kali m3 7.10 0.01% 0.00% 0.00% 0.00% 0.00%
2 . Galian pondasi setempat m3 205.70 0.30% 75.00% 0.22% 20.00% 0.06% 95.00% 0.28%
3 . Galian beam m3 112.50 0.16% 75.00% 0.12% 20.00% 0.03% 95.00% 0.16%
4 . Galian drainase m3 21.60 0.03% 0.00% 0.00% 10.00% 0.00% 10.00% 0.00%
5 . Galian septick tank & resapan m3 25.80 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Anti Rayap m2 707.00 0.48% 40.00% 0.19% 40.00% 0.19% 80.00% 0.38%
409984289.xls Page 2
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
c. Pekerjaan Pondasi
1 Pekerjaan pondasi batu kali
1 . Annstamping m3 2.35 0.02% 0.00% 0.00% 0.00% 0.00%
2 . Pondasi batu kali (1PC : 4PS) m3 4.60 0.06% 0.00% 0.00% 0.00% 0.00%
3 . Urugan pasir bawah pondasi t.5 cm m3 12.30 0.04% 50.00% 0.02% 50.00% 0.02% 100.00% 0.04%
2 Pekerjaan pondasi plat setempat m3 55.75 3.12% 50.00% 1.56% 35.00% 1.09% 85.00% 2.65%
3 Pekerjaan lantai kerja dibawah pondasi m3 11.70 0.24% 50.00% 0.12% 40.00% 0.09% 90.00% 0.21%
1 Pekerjaan Lantai m2 596.00 5.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plat bondeck)
(beton K-275 t=12cm)
(wiremesh M-7 double layer)
2 Pekerjaan atap deck beton m2 38.50 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plat bondeck)
(beton K-275 t=12cm + waterproofing)
(wiremesh M-7 double layer)
3 Pekerjaan screed pelindung waterproofing m2 48.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Include kawat ayam)
4 Pekerjaan kuda-kuda dan rangka atap baja m2 786.00 3.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Zyncromate finish)
5 Pekerjaan penutup atap galvalum m2 786.00 2.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area office
409984289.xls Page 3
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
. Area parkir motor & genset
6 Pekerjaan listplank beton m3 4.40 0.27% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Pekerjaan listplank kayu m' 61.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan talang baja m' 26.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Pekerjaan waterproofing m' 103.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Sika)
a. Pekerjaan Dinding
1 Pekerjaan pasangan dinding m2 1,467.00 3.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Bata ringan ex.Citicon)
2 Pekerjaan plester & aci dinding m2 2,572.00 2.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Pas.Granite tile dinding m2 74.00 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito 30x60cm)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Keramik dinding t.150 cm m2 109.00 0.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x25cm)
. Toilet 2
. Toliet 3
. Area Pantry LT 1
. Area Pantry LT 2
. Area wudhu
5 Pekerjaan Pas.Keramik dinding t.60 cm m2 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x20cm)
. Area janitor
6 Pekerjaan Tali Air m' 102.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan Plafond Kalsiboard bagian luar m2 244.00 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 4
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
(Plasterboard 4mm ex.Jaya Board)
(Steel hollow frame)
3 Pekerjaan Drop Ceilling m' 45.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plasterboard 9mm ex.Jaya Board)
(Steel hollow frame)
4 Pekerjaan Tali Air Plafond Gypsum m' 802.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Pertemuan Dengan Dinding)
409984289.xls Page 5
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
V. PEKERJAAN LANTAI
1 Pekerjaan Rabatan Lantai 1 m2 707.00 1.90% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(beton K-250 t=8cm)
(wiremesh M-5 single layer)
2 Pekerjaan Pas.Lantai Keramik 20x20cm m2 9.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Toilet 2
. Toliet 3
. Area wudhu
3 Pekerjaan Pas.Lantai Granite tile 30x30cm m2 29.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Lantai Granite tile 60x60cm m2 736.00 5.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Area coridoor
. Area tangga
. Area reception
. Area Meeting room
. Area Personalia
. Area Multifunction room
. Area Coridoor
. Area Manager
. Area Director
. Area Office
. Dll
5 Pekerjaan Pas.Lantai Keramik 40x40cm m2 326.00 1.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Area Storage
. Area File storage
. Area Dining room
. Area Pantry
. Area Musholla
. Area Coridoor
. Area Mechanic
. Area Janitor
. Area Security
. Dll
6 Pekerjaan Plint Lantai Keramik t. 8cm m1 246.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 6
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
7 Pekerjaan Plint Lantai Granite t. 8cm m1 310.00 0.32% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan Pas.Lantai Parquette (Stage) m2 60.00 0.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(solid wood ex.Merbau t.18mm)
(UPL Finish)
(under layer multiplex)
(wooden frame ex.Kamper)
. Waitting area Lt.1
. Waitting area Lt.2
409984289.xls Page 7
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
1 Pekerjaan Cat Dinding Exterior m2 1,276.00 1.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
2 Pekerjaan Cat Dinding Interior m2 1,302.00 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
4 Pekerjaan Cat Plafond Gypsum m2 1,150.00 0.72% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
5 Pekerjaan Cat Plafond Kalsiboard m2 244.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
6 Pekerjaan Cat Dinding Interior m2 108.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Epoxy paint Ex.Propan)
. Area Dining room
2 Pintu jendela DW.02 unit 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Pintu jendela DW.03 unit 1.00 0.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
4 Pintu jendela DW.04 unit 1.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
409984289.xls Page 8
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
5 Pintu jendela DW.05 unit 1.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu jendela DW.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Pintu jendela DW.07 unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Pintu jendela DW.08 unit 1.00 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
9 Pintu jendela DW.09 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
2 Pintu D.02 unit 11.00 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
409984289.xls Page 9
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
3 Pintu D.03 unit 6.00 0.55% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
4 Pintu D.04 unit 4.00 0.63% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
5 Pintu D.05 unit 1.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu D.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Steel hollow frame + wiremesh M-7)
(Duco finish ex.Nippe)
409984289.xls Page 10
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
8 Pintu D.08 unit 2.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(Duco finish ex.Nippe)
(Hardware ex.Kend)
2 Jendela W.02 unit 2.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Jendela W.03 unit 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
4 Jendela W.04 unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
5 Jendela W.05 unit 2.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
6 Jendela W.06 unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
409984289.xls Page 11
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Jendela W.07 unit 3.00 0.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
409984289.xls Page 12
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
8 Jendela W.08 unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
9 Jendela W.09 unit 1.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
10 Jendela W.10 unit 1.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
11 Jendela W.11 unit 1.00 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
12 Jendela W.12 unit 1.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
1 Down light 4" ex.Artolite unit 126.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Down light halogen unit 38.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Surface Mounted Balk TL 1x36 Watt ex.Artolite unit 53.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Surface Mounted Balk TL 2x36 Watt ex.Artolite unit 73.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Mercury unit 4.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 LED (hidden light drop ceilling area) m' 45.00 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Instalasi Exhaust Fan Ceilling unit 15.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Instalasi Wall Exhaust Fan unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Instalasi Wall Fan unit 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Instalasi Titik lampu titik 290.00 1.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
11 Instalasi Power outlet titik 139.00 0.59% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
12 Instalasi Outlet Data titik 67.00 0.56% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 13
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
13 Instalasi Outlet TLP. titik 45.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Instalasi Power AC titik 27.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Instalasi RCA titik 16.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Instalasi CCTV Cabel Quarsial RG. 6 titik 12.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Instalasi Pompa air titik 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
18 Instalasi TV Coaksial 5C titik 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Saklar single ex.Clipsal E 30 series unit 12.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Saklar double ex.Clipsal E 30 series unit 30.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 14
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
21 Saklar double hotel ex.Clipsal E 30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
22 Outlet power/stop kontak ex.Clipsal E30 series unit 139.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
23 Outlet data ex.Clipsal E30 series unit 67.00 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
24 Outlet Tlp. ex.Clipsal E30 series unit 45.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
25 Outlet TV. ex.Clipsal E30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
26 Exhaust Fan ex.KDK - 25TGQ1 unit 15.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
27 Exhaust Fan ex.KDK unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
28 Wall Fan ex. KDK unit 5.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
29 AC 0.5 PK unit 2.00 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
30 AC 1 PK unit 2.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
31 AC 1,5 PK unit 3.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32 AC 2 PK unit 18.00 3.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
33 AC 2.5 PK unit 2.00 0.49% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
34 Outdoor CCTV camera - infra red ex. Samsung unit 4.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
35 Indoor CCTV camera - infra red ex. Samsung unit 8.00 0.42% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
36 DVR ex. Samsung unit 1.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
37 Box panel MDP (metal) + MCB, MCCB, ex.MG ls 1.00 0.61% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
38 Box panel LT 2 (metal) + MCB, MCCB, ex.MG ls 1.00 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
39 Box panel Pompa (metal) + MCB, MCCB, ex.MG ls 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
40 COS unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
41 Box panel INF ls 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
42 PABX ex panasonic ls 1.00 0.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
43 Lan ex D-link ls 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
44 Genset 200 KVA Silent Type ex Perkins ls 1.00 7.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
45 Penangkal petir radius ±60m ex.Prevecton ls 1.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Instalasi air bersih ls 1.00 0.11% 0.00% 0.00% 10.00% 0.01% 10.00% 0.01%
2 Instalasi air kotor ls 1.00 0.25% 0.00% 0.00% 5.00% 0.01% 5.00% 0.01%
3 Instalasi drain AC ls 27.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Instalasi Air hujan ls 1.00 0.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Instalasi Exhaus fan ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Guter dengan penutup beton + buis beton ls 1.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Tower tank stainless steel 2500Lt. unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pompa air unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Valve unit 6.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Septictank ls 1.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
11 Resapan ls 1.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
12 Bak Control + Gril besi ls 6.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
13 Roof Drain unit 8.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Floor drain ex.Toto - TX 1 BN unit 9.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Closet ex.Toto - CW 660 PJ unit 7.00 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Jet spray ex.Toto - THX 20 NBPIV unit 7.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Wastafel ex.Toto - LW 526 J unit 5.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 15
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
18 Wastafel ex.Toto - LW 220 J unit 2.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Urinal ex.Toto - U 57 M unit 2.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Kran air ex.Toto - T 23 B13V7NB unit 3.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
21 Paper holder ex.Toto TX 703 AESV1 unit 7.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 16
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
X. PEKERJAAN LANDSCAPE
1 Pekerjaan kanstin ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan paving 20x20cm (include urugan pasir) m2 480.00 1.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Tanah subur (tanaman) m3 9.50 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Tanaman ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan kuda-kuda dan rangka atap baja m2 91.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Zyncromate finish) area parkir motor & Genset
6 Pekerjaan penutup atap galvalum m2 91.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area parkir motor & genset
1 Pas. Meja Kitchen ls 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Beton finishing keramik 20x20cm ex.Roman)
4 Peninggian Kenalpot Genset ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Pagar keliling bangunan t = 3m m' 29.00 1.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 17
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
c. Pekerjaan Pondasi
4 Pekerjaan Pondasi Tangga m3 0.55 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Beton Bor Pile dia. 40 cm m3 147.00 4.94% 65.00% 3.21% 35.00% 1.73% 100.00% 4.94%
V. PEKERJAAN LANTAI
7 Pekerjaan Waterproofing Coating (termasuk dinding T=30 m2 43.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
. Toilet 4
. Area Pantry LT 2
. Area janitor
7 Pekerjaan Tangga
1 . Struktur tangga beton m3 2.60 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 . Pekerjaan pasang keramik tangga granite tile 60x60 cm m2 22.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- ex Granito + step nozing
3 . Pekerjaan railling tangga m' 17.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Hollow stainless steel
- Tempered glass 12 mm
4 . Pekerjaan plester & aci bawah tangga m2 19.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
.
409984289.xls Page 18
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SATUAN VOL. KET
MINGGU LALU MUNGGU INI TOTAL
SUB TOTAL XIII 100% 12.60% 9.33% 5.95% 0.07 18.55 0.17
409984289.xls Page 19
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
% VALUE % VALUE % VALUE
0% 0.00% 0.00%
I. PEKERJAAN PRELIMINARY
1 Mobilisasi dan Demobilisasi Is 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pembersihan lokasi Is 1.00 0.11% 80.00% 0.09% 3.00% 0.00% 83.00% 0.09%
3 Bangunan penunjang sementara (direksi keet) Is 1.00 0.11% 100.00% 0.11% 0.00% 0.00% 100.00% 0.11%
4 Uitzet & bouwplank Is 1.00 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
5 Gambar2 kerja (shop drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
6 Gambar2 kenyataan (as built drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
7 Listrik, air kerja dan telpon Is 1.00 0.17% 70.00% 0.12% 10.00% 0.02% 80.00% 0.13%
8 Keamanan proyek Is 1.00 0.11% 0.05% 0.00% 0.05% 0.00% 0.10% 0.00%
9 Pengelolaan kebersihan lapangan Is 1.00 0.11% 0.04% 0.00% 0.02% 0.00% 0.06% 0.00%
10 Pengukuran (setting out) Is 1.00 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
11 Masa pemeliharaan Is 1.00 0.11% 0.00% 0.00% 0.02% 0.00% 0.00% 0.00% Revisi
1 Pekerjaan Perhitungan Struktur ls 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pekerjaan Galian
409984289.xls Page 20
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
1 . Galian pondasi batu kali m3 7.10 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
2 . Galian pondasi setempat m3 205.70 0.30% 95.00% 0.28% 5.00% 0.01% 100.00% 0.30%
3 . Galian beam m3 112.50 0.16% 95.00% 0.16% 5.00% 0.01% 100.00% 0.16%
4 . Galian drainase m3 21.60 0.03% 10.00% 0.00% 5.00% 0.00% 15.00% 0.00%
5 . Galian septick tank & resapan m3 25.80 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
3 Pekerjaan Anti Rayap m2 707.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
409984289.xls Page 21
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
c. Pekerjaan Pondasi
1 Pekerjaan pondasi batu kali
1 . Annstamping m3 2.35 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
2 . Pondasi batu kali (1PC : 4PS) m3 4.60 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
3 . Urugan pasir bawah pondasi t.5 cm m3 12.30 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
2 Pekerjaan pondasi plat setempat m3 55.75 3.12% 85.00% 2.65% 10.00% 0.31% 95.00% 2.97%
3 Pekerjaan lantai kerja dibawah pondasi m3 11.70 0.24% 90.00% 0.21% 10.00% 0.02% 100.00% 0.24%
1 Pekerjaan Lantai m2 596.00 5.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plat bondeck)
(beton K-275 t=12cm)
(wiremesh M-7 double layer)
2 Pekerjaan atap deck beton m2 38.50 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plat bondeck)
(beton K-275 t=12cm + waterproofing)
(wiremesh M-7 double layer)
3 Pekerjaan screed pelindung waterproofing m2 48.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Include kawat ayam)
4 Pekerjaan kuda-kuda dan rangka atap baja m2 786.00 3.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Zyncromate finish)
5 Pekerjaan penutup atap galvalum m2 786.00 2.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area office
409984289.xls Page 22
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
. Area parkir motor & genset
6 Pekerjaan listplank beton m3 4.40 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Pekerjaan listplank kayu m' 61.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan talang baja m' 26.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Pekerjaan waterproofing m' 103.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Sika)
a. Pekerjaan Dinding
1 Pekerjaan pasangan dinding m2 1,467.00 3.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Bata ringan ex.Citicon)
2 Pekerjaan plester & aci dinding m2 2,572.00 2.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Pas.Granite tile dinding m2 74.00 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito 30x60cm)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Keramik dinding t.150 cm m2 109.00 0.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x25cm)
. Toilet 2
. Toliet 3
. Area Pantry LT 1
. Area Pantry LT 2
. Area wudhu
5 Pekerjaan Pas.Keramik dinding t.60 cm m2 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x20cm)
. Area janitor
6 Pekerjaan Tali Air m' 102.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan Plafond Kalsiboard bagian luar m2 244.00 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 23
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
(Plasterboard 4mm ex.Jaya Board)
(Steel hollow frame)
3 Pekerjaan Drop Ceilling m' 45.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plasterboard 9mm ex.Jaya Board)
(Steel hollow frame)
4 Pekerjaan Tali Air Plafond Gypsum m' 802.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Pertemuan Dengan Dinding)
409984289.xls Page 24
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
V. PEKERJAAN LANTAI
1 Pekerjaan Rabatan Lantai 1 m2 707.00 1.90% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(beton K-250 t=8cm)
(wiremesh M-5 single layer)
2 Pekerjaan Pas.Lantai Keramik 20x20cm m2 9.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Toilet 2
. Toliet 3
. Area wudhu
3 Pekerjaan Pas.Lantai Granite tile 30x30cm m2 29.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Lantai Granite tile 60x60cm m2 736.00 5.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Area coridoor
. Area tangga
. Area reception
. Area Meeting room
. Area Personalia
. Area Multifunction room
. Area Coridoor
. Area Manager
. Area Director
. Area Office
. Dll
5 Pekerjaan Pas.Lantai Keramik 40x40cm m2 326.00 1.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Area Storage
. Area File storage
. Area Dining room
. Area Pantry
. Area Musholla
. Area Coridoor
. Area Mechanic
. Area Janitor
. Area Security
. Dll
6 Pekerjaan Plint Lantai Keramik t. 8cm m1 246.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 25
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
7 Pekerjaan Plint Lantai Granite t. 8cm m1 310.00 0.32% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan Pas.Lantai Parquette (Stage) m2 60.00 0.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(solid wood ex.Merbau t.18mm)
(UPL Finish)
(under layer multiplex)
(wooden frame ex.Kamper)
. Waitting area Lt.1
. Waitting area Lt.2
409984289.xls Page 26
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
1 Pekerjaan Cat Dinding Exterior m2 1,276.00 1.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
2 Pekerjaan Cat Dinding Interior m2 1,302.00 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
4 Pekerjaan Cat Plafond Gypsum m2 1,150.00 0.72% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
5 Pekerjaan Cat Plafond Kalsiboard m2 244.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
6 Pekerjaan Cat Dinding Interior m2 108.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Epoxy paint Ex.Propan)
. Area Dining room
2 Pintu jendela DW.02 unit 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Pintu jendela DW.03 unit 1.00 0.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
4 Pintu jendela DW.04 unit 1.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
409984289.xls Page 27
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
5 Pintu jendela DW.05 unit 1.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu jendela DW.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Pintu jendela DW.07 unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Pintu jendela DW.08 unit 1.00 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
9 Pintu jendela DW.09 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
2 Pintu D.02 unit 11.00 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
409984289.xls Page 28
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
3 Pintu D.03 unit 6.00 0.55% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
4 Pintu D.04 unit 4.00 0.63% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
5 Pintu D.05 unit 1.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu D.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Steel hollow frame + wiremesh M-7)
(Duco finish ex.Nippe)
409984289.xls Page 29
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
8 Pintu D.08 unit 2.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(Duco finish ex.Nippe)
(Hardware ex.Kend)
2 Jendela W.02 unit 2.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Jendela W.03 unit 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
4 Jendela W.04 unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
5 Jendela W.05 unit 2.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
6 Jendela W.06 unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
409984289.xls Page 30
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Jendela W.07 unit 3.00 0.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
409984289.xls Page 31
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
8 Jendela W.08 unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
9 Jendela W.09 unit 1.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
10 Jendela W.10 unit 1.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
11 Jendela W.11 unit 1.00 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
12 Jendela W.12 unit 1.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
1 Down light 4" ex.Artolite unit 126.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Down light halogen unit 38.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Surface Mounted Balk TL 1x36 Watt ex.Artolite unit 53.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Surface Mounted Balk TL 2x36 Watt ex.Artolite unit 73.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Mercury unit 4.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 LED (hidden light drop ceilling area) m' 45.00 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Instalasi Exhaust Fan Ceilling unit 15.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Instalasi Wall Exhaust Fan unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Instalasi Wall Fan unit 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Instalasi Titik lampu titik 290.00 1.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
11 Instalasi Power outlet titik 139.00 0.59% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
12 Instalasi Outlet Data titik 67.00 0.56% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 32
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
13 Instalasi Outlet TLP. titik 45.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Instalasi Power AC titik 27.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Instalasi RCA titik 16.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Instalasi CCTV Cabel Quarsial RG. 6 titik 12.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Instalasi Pompa air titik 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
18 Instalasi TV Coaksial 5C titik 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Saklar single ex.Clipsal E 30 series unit 12.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Saklar double ex.Clipsal E 30 series unit 30.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 33
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
21 Saklar double hotel ex.Clipsal E 30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
22 Outlet power/stop kontak ex.Clipsal E30 series unit 139.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
23 Outlet data ex.Clipsal E30 series unit 67.00 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
24 Outlet Tlp. ex.Clipsal E30 series unit 45.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
25 Outlet TV. ex.Clipsal E30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
26 Exhaust Fan ex.KDK - 25TGQ1 unit 15.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
27 Exhaust Fan ex.KDK unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
28 Wall Fan ex. KDK unit 5.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
29 AC 0.5 PK unit 2.00 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
30 AC 1 PK unit 2.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
31 AC 1,5 PK unit 3.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32 AC 2 PK unit 18.00 3.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
33 AC 2.5 PK unit 2.00 0.49% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
34 Outdoor CCTV camera - infra red ex. Samsung unit 4.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
35 Indoor CCTV camera - infra red ex. Samsung unit 8.00 0.42% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
36 DVR ex. Samsung unit 1.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
37 Box panel MDP (metal) + MCB, MCCB, ex.MG ls 1.00 0.61% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
38 Box panel LT 2 (metal) + MCB, MCCB, ex.MG ls 1.00 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
39 Box panel Pompa (metal) + MCB, MCCB, ex.MG ls 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
40 COS unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
41 Box panel INF ls 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
42 PABX ex panasonic ls 1.00 0.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
43 Lan ex D-link ls 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
44 Genset 200 KVA Silent Type ex Perkins ls 1.00 7.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
45 Penangkal petir radius ±60m ex.Prevecton ls 1.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Instalasi air bersih ls 1.00 0.11% 10.00% 0.01% 0.00% 0.00% 10.00% 0.01%
2 Instalasi air kotor ls 1.00 0.25% 5.00% 0.01% 5.00% 0.01% 10.00% 0.02%
3 Instalasi drain AC ls 27.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Instalasi Air hujan ls 1.00 0.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Instalasi Exhaus fan ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Guter dengan penutup beton + buis beton ls 1.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Tower tank stainless steel 2500Lt. unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pompa air unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Valve unit 6.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Septictank ls 1.00 0.19% 0.00% 0.00% 30.00% 0.06% 30.00% 0.06%
11 Resapan ls 1.00 0.06% 0.00% 0.00% 30.00% 0.02% 30.00% 0.02%
12 Bak Control + Gril besi ls 6.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
13 Roof Drain unit 8.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Floor drain ex.Toto - TX 1 BN unit 9.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Closet ex.Toto - CW 660 PJ unit 7.00 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Jet spray ex.Toto - THX 20 NBPIV unit 7.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Wastafel ex.Toto - LW 526 J unit 5.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 34
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
18 Wastafel ex.Toto - LW 220 J unit 2.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Urinal ex.Toto - U 57 M unit 2.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Kran air ex.Toto - T 23 B13V7NB unit 3.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
21 Paper holder ex.Toto TX 703 AESV1 unit 7.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 35
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
X. PEKERJAAN LANDSCAPE
1 Pekerjaan kanstin ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan paving 20x20cm (include urugan pasir) m2 480.00 1.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Tanah subur (tanaman) m3 9.50 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Tanaman ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan kuda-kuda dan rangka atap baja m2 91.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Zyncromate finish) area parkir motor & Genset
6 Pekerjaan penutup atap galvalum m2 91.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area parkir motor & genset
1 Pas. Meja Kitchen ls 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Beton finishing keramik 20x20cm ex.Roman)
4 Peninggian Kenalpot Genset ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Pagar keliling bangunan t = 3m m' 29.00 1.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 36
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
c. Pekerjaan Pondasi
4 Pekerjaan Pondasi Tangga m3 0.55 0.03% 0.00% 0.00% 15.00% 0.00% 15.00% 0.00%
5 Pekerjaan Beton Bor Pile dia. 40 cm m3 147.00 4.94% 100.00% 4.94% 0.00% 0.00% 100.00% 4.94%
V. PEKERJAAN LANTAI
7 Pekerjaan Waterproofing Coating (termasuk dinding T=30 m2 43.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
. Toilet 4
. Area Pantry LT 2
. Area janitor
7 Pekerjaan Tangga
1 . Struktur tangga beton m3 2.60 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 . Pekerjaan pasang keramik tangga granite tile 60x60 cm m2 22.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- ex Granito + step nozing
3 . Pekerjaan railling tangga m' 17.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Hollow stainless steel
- Tempered glass 12 mm
4 . Pekerjaan plester & aci bawah tangga m2 19.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
.
409984289.xls Page 37
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
SUB TOTAL XIII 100% 14.50% 15.32% 1.83% 2% 16.33 17%
409984289.xls Page 38
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
% VALUE % VALUE % VALUE
0% 0.00% 0.00%
I. PEKERJAAN PRELIMINARY
1 Mobilisasi dan Demobilisasi Is 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pembersihan lokasi Is 1.00 0.11% 83.00% 0.09% 3.00% 0.00% 86.00% 0.10%
3 Bangunan penunjang sementara (direksi keet) Is 1.00 0.11% 100.00% 0.11% 0.00% 0.00% 100.00% 0.11%
4 Uitzet & bouwplank Is 1.00 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
5 Gambar2 kerja (shop drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
6 Gambar2 kenyataan (as built drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
7 Listrik, air kerja dan telpon Is 1.00 0.17% 80.00% 0.13% 2.50% 0.00% 82.50% 0.14%
8 Keamanan proyek Is 1.00 0.11% 0.10% 0.00% 0.02% 0.00% 0.12% 0.00%
9 Pengelolaan kebersihan lapangan Is 1.00 0.11% 0.06% 0.00% 0.15% 0.00% 0.21% 0.00%
10 Pengukuran (setting out) Is 1.00 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
11 Masa pemeliharaan Is 1.00 0.11% 0.00% 0.00% 0.02% 0.00% 0.00% 0.00% Revisi
1 Pekerjaan Perhitungan Struktur ls 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pekerjaan Galian
409984289.xls Page 39
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
1 . Galian pondasi batu kali m3 7.10 0.01% 0.00% 0.00% 100.00% 0.01% 100.00% 0.01%
2 . Galian pondasi setempat m3 205.70 0.30% 100.00% 0.30% 0.00% 0.00% 100.00% 0.30%
3 . Galian beam m3 112.50 0.16% 100.00% 0.16% 0.00% 0.00% 100.00% 0.16%
4 . Galian drainase m3 21.60 0.03% 15.00% 0.00% 0.00% 0.00% 15.00% 0.00%
5 . Galian septick tank & resapan m3 25.80 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Anti Rayap m2 707.00 0.48% 0.00% 0.00% 70.00% 0.33% 70.00% 0.33%
409984289.xls Page 40
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
c. Pekerjaan Pondasi
1 Pekerjaan pondasi batu kali
1 . Annstamping m3 2.35 0.02% 0.00% 0.00% 100.00% 0.02% 100.00% 0.02%
2 . Pondasi batu kali (1PC : 4PS) m3 4.60 0.06% 0.00% 0.00% 100.00% 0.06% 100.00% 0.06%
3 . Urugan pasir bawah pondasi t.5 cm m3 12.30 0.04% 0.00% 0.00% 100.00% 0.04% 100.00% 0.04%
2 Pekerjaan pondasi plat setempat m3 55.75 3.12% 95.00% 2.97% 5.00% 0.16% 100.00% 3.12%
3 Pekerjaan lantai kerja dibawah pondasi m3 11.70 0.24% 100.00% 0.24% 0.00% 0.00% 100.00% 0.24%
1 Pekerjaan Lantai m2 596.00 5.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plat bondeck)
(beton K-275 t=12cm)
(wiremesh M-7 double layer)
2 Pekerjaan atap deck beton m2 38.50 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plat bondeck)
(beton K-275 t=12cm + waterproofing)
(wiremesh M-7 double layer)
3 Pekerjaan screed pelindung waterproofing m2 48.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Include kawat ayam)
4 Pekerjaan kuda-kuda dan rangka atap baja m2 786.00 3.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Zyncromate finish)
5 Pekerjaan penutup atap galvalum m2 786.00 2.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area office
409984289.xls Page 41
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
. Area parkir motor & genset
6 Pekerjaan listplank beton m3 4.40 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Pekerjaan listplank kayu m' 61.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan talang baja m' 26.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Pekerjaan waterproofing m' 103.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Sika)
a. Pekerjaan Dinding
1 Pekerjaan pasangan dinding m2 1,467.00 3.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Bata ringan ex.Citicon)
2 Pekerjaan plester & aci dinding m2 2,572.00 2.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Pas.Granite tile dinding m2 74.00 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito 30x60cm)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Keramik dinding t.150 cm m2 109.00 0.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x25cm)
. Toilet 2
. Toliet 3
. Area Pantry LT 1
. Area Pantry LT 2
. Area wudhu
5 Pekerjaan Pas.Keramik dinding t.60 cm m2 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x20cm)
. Area janitor
6 Pekerjaan Tali Air m' 102.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan Plafond Kalsiboard bagian luar m2 244.00 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 42
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
(Plasterboard 4mm ex.Jaya Board)
(Steel hollow frame)
3 Pekerjaan Drop Ceilling m' 45.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plasterboard 9mm ex.Jaya Board)
(Steel hollow frame)
4 Pekerjaan Tali Air Plafond Gypsum m' 802.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Pertemuan Dengan Dinding)
409984289.xls Page 43
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
V. PEKERJAAN LANTAI
1 Pekerjaan Rabatan Lantai 1 m2 707.00 1.90% 0.00% 0.00% 80.00% 1.52% 80.00% 1.52%
(beton K-250 t=8cm)
(wiremesh M-5 single layer)
2 Pekerjaan Pas.Lantai Keramik 20x20cm m2 9.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Toilet 2
. Toliet 3
. Area wudhu
3 Pekerjaan Pas.Lantai Granite tile 30x30cm m2 29.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Lantai Granite tile 60x60cm m2 736.00 5.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Area coridoor
. Area tangga
. Area reception
. Area Meeting room
. Area Personalia
. Area Multifunction room
. Area Coridoor
. Area Manager
. Area Director
. Area Office
. Dll
5 Pekerjaan Pas.Lantai Keramik 40x40cm m2 326.00 1.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Area Storage
. Area File storage
. Area Dining room
. Area Pantry
. Area Musholla
. Area Coridoor
. Area Mechanic
. Area Janitor
. Area Security
. Dll
6 Pekerjaan Plint Lantai Keramik t. 8cm m1 246.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 44
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
7 Pekerjaan Plint Lantai Granite t. 8cm m1 310.00 0.32% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan Pas.Lantai Parquette (Stage) m2 60.00 0.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(solid wood ex.Merbau t.18mm)
(UPL Finish)
(under layer multiplex)
(wooden frame ex.Kamper)
. Waitting area Lt.1
. Waitting area Lt.2
409984289.xls Page 45
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
1 Pekerjaan Cat Dinding Exterior m2 1,276.00 1.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
2 Pekerjaan Cat Dinding Interior m2 1,302.00 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
4 Pekerjaan Cat Plafond Gypsum m2 1,150.00 0.72% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
5 Pekerjaan Cat Plafond Kalsiboard m2 244.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
6 Pekerjaan Cat Dinding Interior m2 108.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Epoxy paint Ex.Propan)
. Area Dining room
2 Pintu jendela DW.02 unit 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Pintu jendela DW.03 unit 1.00 0.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
4 Pintu jendela DW.04 unit 1.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
409984289.xls Page 46
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
5 Pintu jendela DW.05 unit 1.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu jendela DW.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Pintu jendela DW.07 unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Pintu jendela DW.08 unit 1.00 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
9 Pintu jendela DW.09 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
2 Pintu D.02 unit 11.00 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
409984289.xls Page 47
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
3 Pintu D.03 unit 6.00 0.55% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
4 Pintu D.04 unit 4.00 0.63% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
5 Pintu D.05 unit 1.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu D.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Steel hollow frame + wiremesh M-7)
(Duco finish ex.Nippe)
409984289.xls Page 48
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
8 Pintu D.08 unit 2.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(Duco finish ex.Nippe)
(Hardware ex.Kend)
2 Jendela W.02 unit 2.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Jendela W.03 unit 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
4 Jendela W.04 unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
5 Jendela W.05 unit 2.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
6 Jendela W.06 unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
409984289.xls Page 49
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Jendela W.07 unit 3.00 0.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
409984289.xls Page 50
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
8 Jendela W.08 unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
9 Jendela W.09 unit 1.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
10 Jendela W.10 unit 1.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
11 Jendela W.11 unit 1.00 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
12 Jendela W.12 unit 1.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
1 Down light 4" ex.Artolite unit 126.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Down light halogen unit 38.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Surface Mounted Balk TL 1x36 Watt ex.Artolite unit 53.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Surface Mounted Balk TL 2x36 Watt ex.Artolite unit 73.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Mercury unit 4.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 LED (hidden light drop ceilling area) m' 45.00 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Instalasi Exhaust Fan Ceilling unit 15.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Instalasi Wall Exhaust Fan unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Instalasi Wall Fan unit 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Instalasi Titik lampu titik 290.00 1.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
11 Instalasi Power outlet titik 139.00 0.59% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
12 Instalasi Outlet Data titik 67.00 0.56% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 51
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
13 Instalasi Outlet TLP. titik 45.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Instalasi Power AC titik 27.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Instalasi RCA titik 16.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Instalasi CCTV Cabel Quarsial RG. 6 titik 12.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Instalasi Pompa air titik 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
18 Instalasi TV Coaksial 5C titik 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Saklar single ex.Clipsal E 30 series unit 12.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Saklar double ex.Clipsal E 30 series unit 30.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 52
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
21 Saklar double hotel ex.Clipsal E 30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
22 Outlet power/stop kontak ex.Clipsal E30 series unit 139.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
23 Outlet data ex.Clipsal E30 series unit 67.00 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
24 Outlet Tlp. ex.Clipsal E30 series unit 45.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
25 Outlet TV. ex.Clipsal E30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
26 Exhaust Fan ex.KDK - 25TGQ1 unit 15.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
27 Exhaust Fan ex.KDK unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
28 Wall Fan ex. KDK unit 5.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
29 AC 0.5 PK unit 2.00 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
30 AC 1 PK unit 2.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
31 AC 1,5 PK unit 3.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32 AC 2 PK unit 18.00 3.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
33 AC 2.5 PK unit 2.00 0.49% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
34 Outdoor CCTV camera - infra red ex. Samsung unit 4.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
35 Indoor CCTV camera - infra red ex. Samsung unit 8.00 0.42% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
36 DVR ex. Samsung unit 1.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
37 Box panel MDP (metal) + MCB, MCCB, ex.MG ls 1.00 0.61% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
38 Box panel LT 2 (metal) + MCB, MCCB, ex.MG ls 1.00 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
39 Box panel Pompa (metal) + MCB, MCCB, ex.MG ls 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
40 COS unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
41 Box panel INF ls 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
42 PABX ex panasonic ls 1.00 0.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
43 Lan ex D-link ls 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
44 Genset 200 KVA Silent Type ex Perkins ls 1.00 7.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
45 Penangkal petir radius ±60m ex.Prevecton ls 1.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Instalasi air bersih ls 1.00 0.11% 10.00% 0.01% 0.00% 0.00% 10.00% 0.01%
2 Instalasi air kotor ls 1.00 0.25% 10.00% 0.02% 2.50% 0.01% 12.50% 0.03%
3 Instalasi drain AC ls 27.00 0.15% 0.00% 0.00% 5.00% 0.01% 5.00% 0.01%
4 Instalasi Air hujan ls 1.00 0.28% 0.00% 0.00% 5.00% 0.01% 5.00% 0.01%
5 Instalasi Exhaus fan ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Guter dengan penutup beton + buis beton ls 1.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Tower tank stainless steel 2500Lt. unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pompa air unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Valve unit 6.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Septictank ls 1.00 0.19% 30.00% 0.06% 0.00% 0.00% 30.00% 0.06%
11 Resapan ls 1.00 0.06% 30.00% 0.02% 0.00% 0.00% 30.00% 0.02%
12 Bak Control + Gril besi ls 6.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
13 Roof Drain unit 8.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Floor drain ex.Toto - TX 1 BN unit 9.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Closet ex.Toto - CW 660 PJ unit 7.00 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Jet spray ex.Toto - THX 20 NBPIV unit 7.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Wastafel ex.Toto - LW 526 J unit 5.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 53
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
18 Wastafel ex.Toto - LW 220 J unit 2.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Urinal ex.Toto - U 57 M unit 2.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Kran air ex.Toto - T 23 B13V7NB unit 3.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
21 Paper holder ex.Toto TX 703 AESV1 unit 7.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 54
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
X. PEKERJAAN LANDSCAPE
1 Pekerjaan kanstin ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan paving 20x20cm (include urugan pasir) m2 480.00 1.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Tanah subur (tanaman) m3 9.50 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Tanaman ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan kuda-kuda dan rangka atap baja m2 91.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Zyncromate finish) area parkir motor & Genset
6 Pekerjaan penutup atap galvalum m2 91.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area parkir motor & genset
1 Pas. Meja Kitchen ls 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Beton finishing keramik 20x20cm ex.Roman)
4 Peninggian Kenalpot Genset ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Pagar keliling bangunan t = 3m m' 29.00 1.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 55
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
c. Pekerjaan Pondasi
4 Pekerjaan Pondasi Tangga m3 0.55 0.03% 15.00% 0.00% 0.00% 0.00% 15.00% 0.00%
5 Pekerjaan Beton Bor Pile dia. 40 cm m3 147.00 4.94% 100.00% 4.94% 0.00% 0.00% 100.00% 4.94%
V. PEKERJAAN LANTAI
7 Pekerjaan Waterproofing Coating (termasuk dinding T=30 m2 43.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
. Toilet 4
. Area Pantry LT 2
. Area janitor
7 Pekerjaan Tangga
1 . Struktur tangga beton m3 2.60 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 . Pekerjaan pasang keramik tangga granite tile 60x60 cm m2 22.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- ex Granito + step nozing
3 . Pekerjaan railling tangga m' 17.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Hollow stainless steel
- Tempered glass 12 mm
4 . Pekerjaan plester & aci bawah tangga m2 19.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
.
409984289.xls Page 56
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
SUB TOTAL XIII 100% 16.33% 16.89% 6.88% 5% 23.21 22%
409984289.xls Page 57
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
% VALUE % VALUE % VALUE
0% 0.00% 0.00%
I. PEKERJAAN PRELIMINARY
1 Mobilisasi dan Demobilisasi Is 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pembersihan lokasi Is 1.00 0.11% 86.00% 0.10% 0.00% 0.00% 86.00% 0.10%
3 Bangunan penunjang sementara (direksi keet) Is 1.00 0.11% 100.00% 0.11% 0.00% 0.00% 100.00% 0.11%
4 Uitzet & bouwplank Is 1.00 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
5 Gambar2 kerja (shop drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
6 Gambar2 kenyataan (as built drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
7 Listrik, air kerja dan telpon Is 1.00 0.17% 82.50% 0.14% 0.00% 0.00% 82.50% 0.14%
8 Keamanan proyek Is 1.00 0.11% 0.12% 0.00% 0.02% 0.00% 0.14% 0.00%
9 Pengelolaan kebersihan lapangan Is 1.00 0.11% 0.21% 0.00% 0.10% 0.00% 0.31% 0.00%
10 Pengukuran (setting out) Is 1.00 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
11 Masa pemeliharaan Is 1.00 0.11% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00% Revisi
1 Pekerjaan Perhitungan Struktur ls 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pekerjaan Galian
409984289.xls Page 58
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
1 . Galian pondasi batu kali m3 7.10 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
2 . Galian pondasi setempat m3 205.70 0.30% 100.00% 0.30% 0.00% 0.00% 100.00% 0.30%
3 . Galian beam m3 112.50 0.16% 100.00% 0.16% 0.00% 0.00% 100.00% 0.16%
4 . Galian drainase m3 21.60 0.03% 15.00% 0.00% 0.00% 0.00% 15.00% 0.00%
5 . Galian septick tank & resapan m3 25.80 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Anti Rayap m2 707.00 0.48% 70.00% 0.33% 15.00% 0.07% 85.00% 0.40%
409984289.xls Page 59
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
c. Pekerjaan Pondasi
1 Pekerjaan pondasi batu kali
1 . Annstamping m3 2.35 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
2 . Pondasi batu kali (1PC : 4PS) m3 4.60 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
3 . Urugan pasir bawah pondasi t.5 cm m3 12.30 0.04% 100.00% 0.04% 0.00% 0.00% 100.00% 0.04%
2 Pekerjaan pondasi plat setempat m3 55.75 3.12% 100.00% 3.12% 0.00% 0.00% 100.00% 3.12%
3 Pekerjaan lantai kerja dibawah pondasi m3 11.70 0.24% 100.00% 0.24% 0.00% 0.00% 100.00% 0.24%
1 Pekerjaan Lantai m2 596.00 5.02% 0.00% 0.00% 65.00% 3.26% 65.00% 3.26%
(Plat bondeck)
(beton K-275 t=12cm)
(wiremesh M-7 double layer)
2 Pekerjaan atap deck beton m2 38.50 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plat bondeck)
(beton K-275 t=12cm + waterproofing)
(wiremesh M-7 double layer)
3 Pekerjaan screed pelindung waterproofing m2 48.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Include kawat ayam)
4 Pekerjaan kuda-kuda dan rangka atap baja m2 786.00 3.82% 0.00% 0.00% 10.00% 0.38% 10.00% 0.38%
(Zyncromate finish)
5 Pekerjaan penutup atap galvalum m2 786.00 2.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area office
409984289.xls Page 60
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
. Area parkir motor & genset
6 Pekerjaan listplank beton m3 4.40 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Pekerjaan listplank kayu m' 61.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan talang baja m' 26.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Pekerjaan waterproofing m' 103.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Sika)
a. Pekerjaan Dinding
1 Pekerjaan pasangan dinding m2 1,467.00 3.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Bata ringan ex.Citicon)
2 Pekerjaan plester & aci dinding m2 2,572.00 2.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Pas.Granite tile dinding m2 74.00 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito 30x60cm)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Keramik dinding t.150 cm m2 109.00 0.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x25cm)
. Toilet 2
. Toliet 3
. Area Pantry LT 1
. Area Pantry LT 2
. Area wudhu
5 Pekerjaan Pas.Keramik dinding t.60 cm m2 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x20cm)
. Area janitor
6 Pekerjaan Tali Air m' 102.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan Plafond Kalsiboard bagian luar m2 244.00 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 61
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
(Plasterboard 4mm ex.Jaya Board)
(Steel hollow frame)
3 Pekerjaan Drop Ceilling m' 45.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plasterboard 9mm ex.Jaya Board)
(Steel hollow frame)
4 Pekerjaan Tali Air Plafond Gypsum m' 802.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Pertemuan Dengan Dinding)
409984289.xls Page 62
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
V. PEKERJAAN LANTAI
1 Pekerjaan Rabatan Lantai 1 m2 707.00 1.90% 80.00% 1.52% 10.00% 0.19% 90.00% 1.71%
(beton K-250 t=8cm)
(wiremesh M-5 single layer)
2 Pekerjaan Pas.Lantai Keramik 20x20cm m2 9.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Toilet 2
. Toliet 3
. Area wudhu
3 Pekerjaan Pas.Lantai Granite tile 30x30cm m2 29.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Lantai Granite tile 60x60cm m2 736.00 5.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Area coridoor
. Area tangga
. Area reception
. Area Meeting room
. Area Personalia
. Area Multifunction room
. Area Coridoor
. Area Manager
. Area Director
. Area Office
. Dll
5 Pekerjaan Pas.Lantai Keramik 40x40cm m2 326.00 1.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Area Storage
. Area File storage
. Area Dining room
. Area Pantry
. Area Musholla
. Area Coridoor
. Area Mechanic
. Area Janitor
. Area Security
. Dll
6 Pekerjaan Plint Lantai Keramik t. 8cm m1 246.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 63
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
7 Pekerjaan Plint Lantai Granite t. 8cm m1 310.00 0.32% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan Pas.Lantai Parquette (Stage) m2 60.00 0.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(solid wood ex.Merbau t.18mm)
(UPL Finish)
(under layer multiplex)
(wooden frame ex.Kamper)
. Waitting area Lt.1
. Waitting area Lt.2
409984289.xls Page 64
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
1 Pekerjaan Cat Dinding Exterior m2 1,276.00 1.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
2 Pekerjaan Cat Dinding Interior m2 1,302.00 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
4 Pekerjaan Cat Plafond Gypsum m2 1,150.00 0.72% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
5 Pekerjaan Cat Plafond Kalsiboard m2 244.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
6 Pekerjaan Cat Dinding Interior m2 108.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Epoxy paint Ex.Propan)
. Area Dining room
2 Pintu jendela DW.02 unit 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Pintu jendela DW.03 unit 1.00 0.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
4 Pintu jendela DW.04 unit 1.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
409984289.xls Page 65
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
5 Pintu jendela DW.05 unit 1.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu jendela DW.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Pintu jendela DW.07 unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Pintu jendela DW.08 unit 1.00 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
9 Pintu jendela DW.09 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
2 Pintu D.02 unit 11.00 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
409984289.xls Page 66
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
3 Pintu D.03 unit 6.00 0.55% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
4 Pintu D.04 unit 4.00 0.63% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
5 Pintu D.05 unit 1.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu D.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Steel hollow frame + wiremesh M-7)
(Duco finish ex.Nippe)
409984289.xls Page 67
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
8 Pintu D.08 unit 2.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(Duco finish ex.Nippe)
(Hardware ex.Kend)
2 Jendela W.02 unit 2.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Jendela W.03 unit 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
4 Jendela W.04 unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
5 Jendela W.05 unit 2.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
6 Jendela W.06 unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
409984289.xls Page 68
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Jendela W.07 unit 3.00 0.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
409984289.xls Page 69
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
8 Jendela W.08 unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
9 Jendela W.09 unit 1.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
10 Jendela W.10 unit 1.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
11 Jendela W.11 unit 1.00 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
12 Jendela W.12 unit 1.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
1 Down light 4" ex.Artolite unit 126.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Down light halogen unit 38.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Surface Mounted Balk TL 1x36 Watt ex.Artolite unit 53.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Surface Mounted Balk TL 2x36 Watt ex.Artolite unit 73.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Mercury unit 4.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 LED (hidden light drop ceilling area) m' 45.00 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Instalasi Exhaust Fan Ceilling unit 15.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Instalasi Wall Exhaust Fan unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Instalasi Wall Fan unit 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Instalasi Titik lampu titik 290.00 1.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
11 Instalasi Power outlet titik 139.00 0.59% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
12 Instalasi Outlet Data titik 67.00 0.56% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 70
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
13 Instalasi Outlet TLP. titik 45.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Instalasi Power AC titik 27.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Instalasi RCA titik 16.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Instalasi CCTV Cabel Quarsial RG. 6 titik 12.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Instalasi Pompa air titik 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
18 Instalasi TV Coaksial 5C titik 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Saklar single ex.Clipsal E 30 series unit 12.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Saklar double ex.Clipsal E 30 series unit 30.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 71
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
21 Saklar double hotel ex.Clipsal E 30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
22 Outlet power/stop kontak ex.Clipsal E30 series unit 139.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
23 Outlet data ex.Clipsal E30 series unit 67.00 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
24 Outlet Tlp. ex.Clipsal E30 series unit 45.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
25 Outlet TV. ex.Clipsal E30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
26 Exhaust Fan ex.KDK - 25TGQ1 unit 15.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
27 Exhaust Fan ex.KDK unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
28 Wall Fan ex. KDK unit 5.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
29 AC 0.5 PK unit 2.00 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
30 AC 1 PK unit 2.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
31 AC 1,5 PK unit 3.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32 AC 2 PK unit 18.00 3.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
33 AC 2.5 PK unit 2.00 0.49% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
34 Outdoor CCTV camera - infra red ex. Samsung unit 4.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
35 Indoor CCTV camera - infra red ex. Samsung unit 8.00 0.42% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
36 DVR ex. Samsung unit 1.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
37 Box panel MDP (metal) + MCB, MCCB, ex.MG ls 1.00 0.61% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
38 Box panel LT 2 (metal) + MCB, MCCB, ex.MG ls 1.00 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
39 Box panel Pompa (metal) + MCB, MCCB, ex.MG ls 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
40 COS unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
41 Box panel INF ls 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
42 PABX ex panasonic ls 1.00 0.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
43 Lan ex D-link ls 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
44 Genset 200 KVA Silent Type ex Perkins ls 1.00 7.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
45 Penangkal petir radius ±60m ex.Prevecton ls 1.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Instalasi air bersih ls 1.00 0.11% 10.00% 0.01% 0.00% 0.00% 10.00% 0.01%
2 Instalasi air kotor ls 1.00 0.25% 12.50% 0.03% 2.50% 0.01% 15.00% 0.04%
3 Instalasi drain AC ls 27.00 0.15% 0.00% 0.00% 5.00% 0.01% 5.00% 0.01%
4 Instalasi Air hujan ls 1.00 0.28% 5.00% 0.01% 5.00% 0.01% 10.00% 0.03%
5 Instalasi Exhaus fan ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Guter dengan penutup beton + buis beton ls 1.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Tower tank stainless steel 2500Lt. unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pompa air unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Valve unit 6.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Septictank ls 1.00 0.19% 30.00% 0.06% 0.00% 0.00% 30.00% 0.06%
11 Resapan ls 1.00 0.06% 30.00% 0.02% 0.00% 0.00% 30.00% 0.02%
12 Bak Control + Gril besi ls 6.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
13 Roof Drain unit 8.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Floor drain ex.Toto - TX 1 BN unit 9.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Closet ex.Toto - CW 660 PJ unit 7.00 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Jet spray ex.Toto - THX 20 NBPIV unit 7.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Wastafel ex.Toto - LW 526 J unit 5.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 72
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
18 Wastafel ex.Toto - LW 220 J unit 2.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Urinal ex.Toto - U 57 M unit 2.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Kran air ex.Toto - T 23 B13V7NB unit 3.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
21 Paper holder ex.Toto TX 703 AESV1 unit 7.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 73
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
X. PEKERJAAN LANDSCAPE
1 Pekerjaan kanstin ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan paving 20x20cm (include urugan pasir) m2 480.00 1.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Tanah subur (tanaman) m3 9.50 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Tanaman ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan kuda-kuda dan rangka atap baja m2 91.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Zyncromate finish) area parkir motor & Genset
6 Pekerjaan penutup atap galvalum m2 91.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area parkir motor & genset
1 Pas. Meja Kitchen ls 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Beton finishing keramik 20x20cm ex.Roman)
4 Peninggian Kenalpot Genset ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Pagar keliling bangunan t = 3m m' 29.00 1.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 74
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
c. Pekerjaan Pondasi
4 Pekerjaan Pondasi Tangga m3 0.55 0.03% 15.00% 0.00% 5.00% 0.00% 20.00% 0.01%
5 Pekerjaan Beton Bor Pile dia. 40 cm m3 147.00 4.94% 100.00% 4.94% 0.00% 0.00% 100.00% 4.94%
V. PEKERJAAN LANTAI
7 Pekerjaan Waterproofing Coating (termasuk dinding T=30 m2 43.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
. Toilet 4
. Area Pantry LT 2
. Area janitor
7 Pekerjaan Tangga
1 . Struktur tangga beton m3 2.60 0.16% 0.00% 0.00% 10.00% 0.02% 10.00% 0.02%
2 . Pekerjaan pasang keramik tangga granite tile 60x60 cm m2 22.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- ex Granito + step nozing
3 . Pekerjaan railling tangga m' 17.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Hollow stainless steel
- Tempered glass 12 mm
4 . Pekerjaan plester & aci bawah tangga m2 19.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
.
409984289.xls Page 75
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MUNGGU INI TOTAL
SUB TOTAL XIII 100% 23.16% 22.15% 1.83% 6% 24.99 28%
409984289.xls Page 76
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
% VALUE % VALUE % VALUE
0% 0.00% 0.00%
I. PEKERJAAN PRELIMINARY
1 Mobilisasi dan Demobilisasi Is 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pembersihan lokasi Is 1.00 0.11% 86.00% 0.10% 0.00% 0.00% 86.00% 0.10%
3 Bangunan penunjang sementara (direksi keet) Is 1.00 0.11% 100.00% 0.11% 0.00% 0.00% 100.00% 0.11%
4 Uitzet & bouwplank Is 1.00 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
5 Gambar2 kerja (shop drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
6 Gambar2 kenyataan (as built drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
7 Listrik, air kerja dan telpon Is 1.00 0.17% 82.50% 0.14% 0.00% 0.00% 82.50% 0.14%
8 Keamanan proyek Is 1.00 0.11% 0.14% 0.00% 0.02% 0.00% 0.16% 0.00%
9 Pengelolaan kebersihan lapangan Is 1.00 0.11% 0.31% 0.00% 0.10% 0.00% 0.41% 0.00%
10 Pengukuran (setting out) Is 1.00 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
11 Masa pemeliharaan Is 1.00 0.11% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00% Revisi
1 Pekerjaan Perhitungan Struktur ls 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pekerjaan Galian
409984289.xls Page 77
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
1 . Galian pondasi batu kali m3 7.10 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
2 . Galian pondasi setempat m3 205.70 0.30% 100.00% 0.30% 0.00% 0.00% 100.00% 0.30%
3 . Galian beam m3 112.50 0.16% 100.00% 0.16% 0.00% 0.00% 100.00% 0.16%
4 . Galian drainase m3 21.60 0.03% 15.00% 0.00% 0.00% 0.00% 15.00% 0.00%
5 . Galian septick tank & resapan m3 25.80 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Anti Rayap m2 707.00 0.48% 85.00% 0.40% 15.00% 0.07% 100.00% 0.48%
409984289.xls Page 78
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
c. Pekerjaan Pondasi
1 Pekerjaan pondasi batu kali
1 . Annstamping m3 2.35 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
2 . Pondasi batu kali (1PC : 4PS) m3 4.60 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
3 . Urugan pasir bawah pondasi t.5 cm m3 12.30 0.04% 100.00% 0.04% 0.00% 0.00% 100.00% 0.04%
2 Pekerjaan pondasi plat setempat m3 55.75 3.12% 100.00% 3.12% 0.00% 0.00% 100.00% 3.12%
3 Pekerjaan lantai kerja dibawah pondasi m3 11.70 0.24% 100.00% 0.24% 0.00% 0.00% 100.00% 0.24%
1 Pekerjaan Lantai m2 596.00 5.02% 65.00% 3.26% 35.00% 1.76% 100.00% 5.02%
(Plat bondeck)
(beton K-275 t=12cm)
(wiremesh M-7 double layer)
2 Pekerjaan atap deck beton m2 38.50 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plat bondeck)
(beton K-275 t=12cm + waterproofing)
(wiremesh M-7 double layer)
3 Pekerjaan screed pelindung waterproofing m2 48.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Include kawat ayam)
4 Pekerjaan kuda-kuda dan rangka atap baja m2 786.00 3.82% 10.00% 0.38% 40.00% 1.53% 50.00% 1.91%
(Zyncromate finish)
5 Pekerjaan penutup atap galvalum m2 786.00 2.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area office
409984289.xls Page 79
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
. Area parkir motor & genset
6 Pekerjaan listplank beton m3 4.40 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Pekerjaan listplank kayu m' 61.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan talang baja m' 26.00 0.20% 0.00% 0.00% 10.00% 0.02% 10.00% 0.02%
9 Pekerjaan waterproofing m' 103.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Sika)
a. Pekerjaan Dinding
1 Pekerjaan pasangan dinding m2 1,467.00 3.62% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Bata ringan ex.Citicon)
2 Pekerjaan plester & aci dinding m2 2,572.00 2.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Pas.Granite tile dinding m2 74.00 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito 30x60cm)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Keramik dinding t.150 cm m2 109.00 0.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x25cm)
. Toilet 2
. Toliet 3
. Area Pantry LT 1
. Area Pantry LT 2
. Area wudhu
5 Pekerjaan Pas.Keramik dinding t.60 cm m2 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x20cm)
. Area janitor
6 Pekerjaan Tali Air m' 102.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan Plafond Kalsiboard bagian luar m2 244.00 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 80
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
(Plasterboard 4mm ex.Jaya Board)
(Steel hollow frame)
3 Pekerjaan Drop Ceilling m' 45.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plasterboard 9mm ex.Jaya Board)
(Steel hollow frame)
4 Pekerjaan Tali Air Plafond Gypsum m' 802.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Pertemuan Dengan Dinding)
409984289.xls Page 81
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
V. PEKERJAAN LANTAI
1 Pekerjaan Rabatan Lantai 1 m2 707.00 1.90% 90.00% 1.71% 0.00% 0.00% 90.00% 1.71%
(beton K-250 t=8cm)
(wiremesh M-5 single layer)
2 Pekerjaan Pas.Lantai Keramik 20x20cm m2 9.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Toilet 2
. Toliet 3
. Area wudhu
3 Pekerjaan Pas.Lantai Granite tile 30x30cm m2 29.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Lantai Granite tile 60x60cm m2 736.00 5.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Area coridoor
. Area tangga
. Area reception
. Area Meeting room
. Area Personalia
. Area Multifunction room
. Area Coridoor
. Area Manager
. Area Director
. Area Office
. Dll
5 Pekerjaan Pas.Lantai Keramik 40x40cm m2 326.00 1.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Area Storage
. Area File storage
. Area Dining room
. Area Pantry
. Area Musholla
. Area Coridoor
. Area Mechanic
. Area Janitor
. Area Security
. Dll
6 Pekerjaan Plint Lantai Keramik t. 8cm m1 246.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 82
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
7 Pekerjaan Plint Lantai Granite t. 8cm m1 310.00 0.32% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan Pas.Lantai Parquette (Stage) m2 60.00 0.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(solid wood ex.Merbau t.18mm)
(UPL Finish)
(under layer multiplex)
(wooden frame ex.Kamper)
. Waitting area Lt.1
. Waitting area Lt.2
409984289.xls Page 83
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
1 Pekerjaan Cat Dinding Exterior m2 1,276.00 1.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
2 Pekerjaan Cat Dinding Interior m2 1,302.00 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
4 Pekerjaan Cat Plafond Gypsum m2 1,150.00 0.72% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
5 Pekerjaan Cat Plafond Kalsiboard m2 244.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
6 Pekerjaan Cat Dinding Interior m2 108.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Epoxy paint Ex.Propan)
. Area Dining room
2 Pintu jendela DW.02 unit 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Pintu jendela DW.03 unit 1.00 0.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
4 Pintu jendela DW.04 unit 1.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
409984289.xls Page 84
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
5 Pintu jendela DW.05 unit 1.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu jendela DW.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Pintu jendela DW.07 unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Pintu jendela DW.08 unit 1.00 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
9 Pintu jendela DW.09 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
2 Pintu D.02 unit 11.00 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
409984289.xls Page 85
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
3 Pintu D.03 unit 6.00 0.55% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
4 Pintu D.04 unit 4.00 0.63% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
5 Pintu D.05 unit 1.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu D.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Steel hollow frame + wiremesh M-7)
(Duco finish ex.Nippe)
409984289.xls Page 86
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
8 Pintu D.08 unit 2.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(Duco finish ex.Nippe)
(Hardware ex.Kend)
2 Jendela W.02 unit 2.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Jendela W.03 unit 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
4 Jendela W.04 unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
5 Jendela W.05 unit 2.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
6 Jendela W.06 unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
409984289.xls Page 87
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Jendela W.07 unit 3.00 0.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
409984289.xls Page 88
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
8 Jendela W.08 unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
9 Jendela W.09 unit 1.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
10 Jendela W.10 unit 1.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
11 Jendela W.11 unit 1.00 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
12 Jendela W.12 unit 1.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
1 Down light 4" ex.Artolite unit 126.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Down light halogen unit 38.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Surface Mounted Balk TL 1x36 Watt ex.Artolite unit 53.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Surface Mounted Balk TL 2x36 Watt ex.Artolite unit 73.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Mercury unit 4.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 LED (hidden light drop ceilling area) m' 45.00 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Instalasi Exhaust Fan Ceilling unit 15.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Instalasi Wall Exhaust Fan unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Instalasi Wall Fan unit 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Instalasi Titik lampu titik 290.00 1.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
11 Instalasi Power outlet titik 139.00 0.59% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
12 Instalasi Outlet Data titik 67.00 0.56% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 89
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
13 Instalasi Outlet TLP. titik 45.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Instalasi Power AC titik 27.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Instalasi RCA titik 16.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Instalasi CCTV Cabel Quarsial RG. 6 titik 12.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Instalasi Pompa air titik 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
18 Instalasi TV Coaksial 5C titik 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Saklar single ex.Clipsal E 30 series unit 12.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Saklar double ex.Clipsal E 30 series unit 30.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 90
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
21 Saklar double hotel ex.Clipsal E 30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
22 Outlet power/stop kontak ex.Clipsal E30 series unit 139.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
23 Outlet data ex.Clipsal E30 series unit 67.00 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
24 Outlet Tlp. ex.Clipsal E30 series unit 45.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
25 Outlet TV. ex.Clipsal E30 series unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
26 Exhaust Fan ex.KDK - 25TGQ1 unit 15.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
27 Exhaust Fan ex.KDK unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
28 Wall Fan ex. KDK unit 5.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
29 AC 0.5 PK unit 2.00 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
30 AC 1 PK unit 2.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
31 AC 1,5 PK unit 3.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
32 AC 2 PK unit 18.00 3.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
33 AC 2.5 PK unit 2.00 0.49% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
34 Outdoor CCTV camera - infra red ex. Samsung unit 4.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
35 Indoor CCTV camera - infra red ex. Samsung unit 8.00 0.42% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
36 DVR ex. Samsung unit 1.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
37 Box panel MDP (metal) + MCB, MCCB, ex.MG ls 1.00 0.61% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
38 Box panel LT 2 (metal) + MCB, MCCB, ex.MG ls 1.00 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
39 Box panel Pompa (metal) + MCB, MCCB, ex.MG ls 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
40 COS unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
41 Box panel INF ls 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
42 PABX ex panasonic ls 1.00 0.25% 0.00% 0.00% 100.00% 0.25% 100.00% 0.25%
43 Lan ex D-link ls 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
44 Genset 200 KVA Silent Type ex Perkins ls 1.00 7.84% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
45 Penangkal petir radius ±60m ex.Prevecton ls 1.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Instalasi air bersih ls 1.00 0.11% 10.00% 0.01% 0.00% 0.00% 10.00% 0.01%
2 Instalasi air kotor ls 1.00 0.25% 15.00% 0.04% 0.00% 0.00% 15.00% 0.04%
3 Instalasi drain AC ls 27.00 0.15% 5.00% 0.01% 5.00% 0.01% 10.00% 0.02%
4 Instalasi Air hujan ls 1.00 0.28% 10.00% 0.03% 5.00% 0.01% 15.00% 0.04%
5 Instalasi Exhaus fan ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Guter dengan penutup beton + buis beton ls 1.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Tower tank stainless steel 2500Lt. unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pompa air unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Valve unit 6.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Septictank ls 1.00 0.19% 30.00% 0.06% 0.00% 0.00% 30.00% 0.06%
11 Resapan ls 1.00 0.06% 30.00% 0.02% 0.00% 0.00% 30.00% 0.02%
12 Bak Control + Gril besi ls 6.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
13 Roof Drain unit 8.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Floor drain ex.Toto - TX 1 BN unit 9.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Closet ex.Toto - CW 660 PJ unit 7.00 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Jet spray ex.Toto - THX 20 NBPIV unit 7.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Wastafel ex.Toto - LW 526 J unit 5.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 91
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
18 Wastafel ex.Toto - LW 220 J unit 2.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19 Urinal ex.Toto - U 57 M unit 2.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20 Kran air ex.Toto - T 23 B13V7NB unit 3.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
21 Paper holder ex.Toto TX 703 AESV1 unit 7.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 92
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
X. PEKERJAAN LANDSCAPE
1 Pekerjaan kanstin ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan paving 20x20cm (include urugan pasir) m2 480.00 1.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Tanah subur (tanaman) m3 9.50 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Tanaman ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan kuda-kuda dan rangka atap baja m2 91.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Zyncromate finish) area parkir motor & Genset
6 Pekerjaan penutup atap galvalum m2 91.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area parkir motor & genset
1 Pas. Meja Kitchen ls 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Beton finishing keramik 20x20cm ex.Roman)
4 Peninggian Kenalpot Genset ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Pagar keliling bangunan t = 3m m' 29.00 1.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 93
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
c. Pekerjaan Pondasi
4 Pekerjaan Pondasi Tangga m3 0.55 0.03% 20.00% 0.01% 0.00% 0.00% 20.00% 0.01%
5 Pekerjaan Beton Bor Pile dia. 40 cm m3 147.00 4.94% 100.00% 4.94% 0.00% 0.00% 100.00% 4.94%
V. PEKERJAAN LANTAI
7 Pekerjaan Waterproofing Coating (termasuk dinding T=30 m2 43.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
. Toilet 4
. Area Pantry LT 2
. Area janitor
7 Pekerjaan Tangga
1 . Struktur tangga beton m3 2.60 0.16% 10.00% 0.02% 0.00% 0.00% 10.00% 0.02%
2 . Pekerjaan pasang keramik tangga granite tile 60x60 cm m2 22.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- ex Granito + step nozing
3 . Pekerjaan railling tangga m' 17.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Hollow stainless steel
- Tempered glass 12 mm
4 . Pekerjaan plester & aci bawah tangga m2 19.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
.
409984289.xls Page 94
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
SUB TOTAL XIII 100% 24.99% 28.14% 2.90% 5% 27.89 34%
409984289.xls Page 95
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
% VALUE % VALUE % VALUE
0% 0.00% 0.00%
I. PEKERJAAN PRELIMINARY
1 Mobilisasi dan Demobilisasi Is 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pembersihan lokasi Is 1.00 0.11% 86.00% 0.10% 0.00% 0.00% 86.00% 0.10%
3 Bangunan penunjang sementara (direksi keet) Is 1.00 0.11% 100.00% 0.11% 0.00% 0.00% 100.00% 0.11%
4 Uitzet & bouwplank Is 1.00 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
5 Gambar2 kerja (shop drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
6 Gambar2 kenyataan (as built drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
7 Listrik, air kerja dan telpon Is 1.00 0.17% 82.50% 0.14% 0.00% 0.00% 82.50% 0.14%
8 Keamanan proyek Is 1.00 0.11% 0.14% 0.00% 0.02% 0.00% 0.16% 0.00%
9 Pengelolaan kebersihan lapangan Is 1.00 0.11% 0.31% 0.00% 0.10% 0.00% 0.41% 0.00%
10 Pengukuran (setting out) Is 1.00 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
11 Masa pemeliharaan Is 1.00 0.11% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00% Revisi
1 Pekerjaan Perhitungan Struktur ls 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pekerjaan Galian
409984289.xls Page 96
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
1 . Galian pondasi batu kali m3 7.10 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
2 . Galian pondasi setempat m3 205.70 0.30% 100.00% 0.30% 0.00% 0.00% 100.00% 0.30%
3 . Galian beam m3 112.50 0.16% 100.00% 0.16% 0.00% 0.00% 100.00% 0.16%
4 . Galian drainase m3 21.60 0.03% 15.00% 0.00% 0.00% 0.00% 15.00% 0.00%
5 . Galian septick tank & resapan m3 25.80 0.04% 0.00% 0.00% 10.00% 0.00% 10.00% 0.00%
3 Pekerjaan Anti Rayap m2 707.00 0.48% 100.00% 0.48% 0.00% 0.00% 100.00% 0.48%
409984289.xls Page 97
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
c. Pekerjaan Pondasi
1 Pekerjaan pondasi batu kali
1 . Annstamping m3 2.35 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
2 . Pondasi batu kali (1PC : 4PS) m3 4.60 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
3 . Urugan pasir bawah pondasi t.5 cm m3 12.30 0.04% 100.00% 0.04% 0.00% 0.00% 100.00% 0.04%
2 Pekerjaan pondasi plat setempat m3 55.75 3.12% 100.00% 3.12% 0.00% 0.00% 100.00% 3.12%
3 Pekerjaan lantai kerja dibawah pondasi m3 11.70 0.24% 100.00% 0.24% 0.00% 0.00% 100.00% 0.24%
1 Pekerjaan Lantai m2 596.00 5.02% 100.00% 5.02% 0.00% 0.00% 100.00% 5.02%
(Plat bondeck)
(beton K-275 t=12cm)
(wiremesh M-7 double layer)
2 Pekerjaan atap deck beton m2 38.50 0.44% 0.00% 0.00% 25.00% 0.11% 25.00% 0.11%
(Plat bondeck)
(beton K-275 t=12cm + waterproofing)
(wiremesh M-7 double layer)
3 Pekerjaan screed pelindung waterproofing m2 48.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Include kawat ayam)
4 Pekerjaan kuda-kuda dan rangka atap baja m2 786.00 3.82% 50.00% 1.91% 50.00% 1.91% 100.00% 3.82%
(Zyncromate finish)
5 Pekerjaan penutup atap galvalum m2 786.00 2.13% 0.00% 0.00% 75.00% 0.00% 75.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area office
409984289.xls Page 98
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
. Area parkir motor & genset
6 Pekerjaan listplank beton m3 4.40 0.27% 0.00% 0.00% 20.00% 0.05% 20.00% 0.05%
7 Pekerjaan listplank kayu m' 61.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan talang baja m' 26.00 0.20% 10.00% 0.02% 55.00% 0.11% 65.00% 0.13%
9 Pekerjaan waterproofing m' 103.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Sika)
a. Pekerjaan Dinding
1 Pekerjaan pasangan dinding m2 1,467.00 3.62% 0.00% 0.00% 60.00% 2.17% 60.00% 2.17%
(Bata ringan ex.Citicon)
2 Pekerjaan plester & aci dinding m2 2,572.00 2.88% 0.00% 0.00% 30.00% 0.86% 30.00% 0.86%
3 Pekerjaan Pas.Granite tile dinding m2 74.00 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito 30x60cm)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Keramik dinding t.150 cm m2 109.00 0.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x25cm)
. Toilet 2
. Toliet 3
. Area Pantry LT 1
. Area Pantry LT 2
. Area wudhu
5 Pekerjaan Pas.Keramik dinding t.60 cm m2 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman 20x20cm)
. Area janitor
6 Pekerjaan Tali Air m' 102.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan Plafond Kalsiboard bagian luar m2 244.00 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
409984289.xls Page 99
PROGRES PEKERJAAN MINGGUAN
PROYEK PEMBANGUNAN GUDANG PRODUKSI & KANTOR
SEDURI,TUMAPEL DLANGGU Periode ; .............. 2016
MOJOKERTO
Bobot PROGRESS REPORT
No. PEKERJAAN SAT. VOL. KET
MINGGU LALU MINGGU INI TOTAL
(Plasterboard 4mm ex.Jaya Board)
(Steel hollow frame)
3 Pekerjaan Drop Ceilling m' 45.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plasterboard 9mm ex.Jaya Board)
(Steel hollow frame)
4 Pekerjaan Tali Air Plafond Gypsum m' 802.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Pertemuan Dengan Dinding)
V. PEKERJAAN LANTAI
1 Pekerjaan Rabatan Lantai 1 m2 707.00 1.90% 90.00% 1.71% 0.00% 0.00% 90.00% 1.71%
(beton K-250 t=8cm)
(wiremesh M-5 single layer)
2 Pekerjaan Pas.Lantai Keramik 20x20cm m2 9.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Toilet 2
. Toliet 3
. Area wudhu
3 Pekerjaan Pas.Lantai Granite tile 30x30cm m2 29.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Lantai Granite tile 60x60cm m2 736.00 5.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito)
. Area coridoor
. Area tangga
. Area reception
. Area Meeting room
. Area Personalia
. Area Multifunction room
. Area Coridoor
. Area Manager
. Area Director
. Area Office
. Dll
5 Pekerjaan Pas.Lantai Keramik 40x40cm m2 326.00 1.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Roman)
. Area Storage
. Area File storage
. Area Dining room
. Area Pantry
. Area Musholla
. Area Coridoor
. Area Mechanic
. Area Janitor
. Area Security
. Dll
6 Pekerjaan Plint Lantai Keramik t. 8cm m1 246.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Pekerjaan Plint Lantai Granite t. 8cm m1 310.00 0.32% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan Pas.Lantai Parquette (Stage) m2 60.00 0.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(solid wood ex.Merbau t.18mm)
(UPL Finish)
(under layer multiplex)
(wooden frame ex.Kamper)
. Waitting area Lt.1
. Waitting area Lt.2
1 Pekerjaan Cat Dinding Exterior m2 1,276.00 1.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
2 Pekerjaan Cat Dinding Interior m2 1,302.00 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
4 Pekerjaan Cat Plafond Gypsum m2 1,150.00 0.72% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
5 Pekerjaan Cat Plafond Kalsiboard m2 244.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
6 Pekerjaan Cat Dinding Interior m2 108.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Epoxy paint Ex.Propan)
. Area Dining room
2 Pintu jendela DW.02 unit 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Pintu jendela DW.03 unit 1.00 0.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
4 Pintu jendela DW.04 unit 1.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
5 Pintu jendela DW.05 unit 1.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu jendela DW.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Pintu jendela DW.07 unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Pintu jendela DW.08 unit 1.00 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
9 Pintu jendela DW.09 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
2 Pintu D.02 unit 11.00 1.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
4 Pintu D.04 unit 4.00 0.63% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
5 Pintu D.05 unit 1.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu D.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Steel hollow frame + wiremesh M-7)
(Duco finish ex.Nippe)
8 Pintu D.08 unit 2.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(Duco finish ex.Nippe)
(Hardware ex.Kend)
2 Jendela W.02 unit 2.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Jendela W.03 unit 1.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
4 Jendela W.04 unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
5 Jendela W.05 unit 2.00 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
6 Jendela W.06 unit 1.00 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
7 Jendela W.07 unit 3.00 0.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Jendela W.08 unit 1.00 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
9 Jendela W.09 unit 1.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
10 Jendela W.10 unit 1.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
11 Jendela W.11 unit 1.00 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
12 Jendela W.12 unit 1.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
1 Down light 4" ex.Artolite unit 126.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Down light halogen unit 38.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Surface Mounted Balk TL 1x36 Watt ex.Artolite unit 53.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Surface Mounted Balk TL 2x36 Watt ex.Artolite unit 73.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Mercury unit 4.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 LED (hidden light drop ceilling area) m' 45.00 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Instalasi Exhaust Fan Ceilling unit 15.00 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Instalasi Wall Exhaust Fan unit 1.00 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Instalasi Wall Fan unit 5.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Instalasi Titik lampu titik 290.00 1.16% 0.00% 0.00% 10.00% 0.12% 10.00% 0.12%
11 Instalasi Power outlet titik 139.00 0.59% 0.00% 0.00% 10.00% 0.06% 10.00% 0.06%
12 Instalasi Outlet Data titik 67.00 0.56% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Instalasi air bersih ls 1.00 0.11% 10.00% 0.01% 10.00% 0.01% 20.00% 0.02%
2 Instalasi air kotor ls 1.00 0.25% 15.00% 0.04% 2.50% 0.01% 17.50% 0.04%
3 Instalasi drain AC ls 27.00 0.15% 10.00% 0.02% 2.50% 0.00% 12.50% 0.02%
4 Instalasi Air hujan ls 1.00 0.28% 15.00% 0.04% 10.00% 0.03% 25.00% 0.07%
5 Instalasi Exhaus fan ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Guter dengan penutup beton + buis beton ls 1.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Tower tank stainless steel 2500Lt. unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pompa air unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Valve unit 6.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
10 Septictank ls 1.00 0.19% 30.00% 0.06% 0.00% 0.00% 30.00% 0.06%
11 Resapan ls 1.00 0.06% 30.00% 0.02% 0.00% 0.00% 30.00% 0.02%
12 Bak Control + Gril besi ls 6.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
13 Roof Drain unit 8.00 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
14 Floor drain ex.Toto - TX 1 BN unit 9.00 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
15 Closet ex.Toto - CW 660 PJ unit 7.00 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Jet spray ex.Toto - THX 20 NBPIV unit 7.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Wastafel ex.Toto - LW 526 J unit 5.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN LANDSCAPE
1 Pekerjaan kanstin ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan paving 20x20cm (include urugan pasir) m2 480.00 1.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Tanah subur (tanaman) m3 9.50 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Tanaman ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan kuda-kuda dan rangka atap baja m2 91.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Zyncromate finish) area parkir motor & Genset
6 Pekerjaan penutup atap galvalum m2 91.00 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area parkir motor & genset
1 Pas. Meja Kitchen ls 1.00 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Beton finishing keramik 20x20cm ex.Roman)
4 Peninggian Kenalpot Genset ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Pagar keliling bangunan t = 3m m' 29.00 1.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
c. Pekerjaan Pondasi
4 Pekerjaan Pondasi Tangga m3 0.55 0.03% 20.00% 0.01% 0.00% 0.00% 20.00% 0.01%
5 Pekerjaan Beton Bor Pile dia. 40 cm m3 147.00 4.94% 100.00% 4.94% 0.00% 0.00% 100.00% 4.94%
V. PEKERJAAN LANTAI
7 Pekerjaan Waterproofing Coating (termasuk dinding T=30 m2 43.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
. Toilet 4
. Area Pantry LT 2
. Area janitor
7 Pekerjaan Tangga
1 . Struktur tangga beton m3 2.60 0.16% 10.00% 0.02% 0.00% 0.00% 10.00% 0.02%
2 . Pekerjaan pasang keramik tangga granite tile 60x60 cm m2 22.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- ex Granito + step nozing
3 . Pekerjaan railling tangga m' 17.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Hollow stainless steel
- Tempered glass 12 mm
4 . Pekerjaan plester & aci bawah tangga m2 19.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
.
I. PEKERJAAN PRELIMINARY
1 Mobilisasi dan Demobilisasi Is 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pembersihan lokasi Is 1.00 0.11% 90.00% 0.10% 2.00% 0.00% 92.00% 0.10%
3 Bangunan penunjang sementara (direksi keet) Is 1.00 0.11% 100.00% 0.11% 0.00% 0.00% 100.00% 0.11%
4 Uitzet & bouwplank Is 1.00 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
5 Gambar2 kerja (shop drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
6 Gambar2 kenyataan (as built drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
7 Listrik, air kerja dan telpon Is 1.00 0.17% 82.50% 0.14% 0.00% 0.00% 82.50% 0.14%
8 Keamanan proyek Is 1.00 0.11% 0.16% 0.00% 39.84% 0.04% 40.00% 0.04%
9 Pengelolaan kebersihan lapangan Is 1.00 0.11% 0.41% 0.00% 39.59% 0.04% 40.00% 0.04%
10 Pengukuran (setting out) Is 1.00 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
11 Masa pemeliharaan Is 1.00 0.11% 0.02% 0.00% 0.02% 0.00% 0.00% 0.00% Revisi
Harga satuan termasuk pengujian, proteksi, coring dan semua hal yang
diperlukan untuk mendapat hasil yang baik dari beton jadi
1 Pekerjaan Perhitungan Struktur ls 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 . Urugan kembali bekas galian m3 124.50 0.09% 100.00% 0.09% 0.00% 0.00% 100.00% 0.09%
2 Pekerjaan Galian
3 Pekerjaan Anti Rayap m2 707.00 0.48% 100.00% 0.48% 0.00% 0.00% 100.00% 0.48%
2 Pekerjaan pondasi plat setempat m3 55.75 3.12% 100.00% 3.12% 0.00% 0.00% 100.00% 3.12%
3 Pekerjaan lantai kerja dibawah pondasi m3 11.70 0.24% 100.00% 0.24% 0.00% 0.00% 100.00% 0.24%
1 Pekerjaan Lantai m2 596.00 5.02% 100.00% 5.02% 0.00% 0.00% 100.00% 5.02%
(Plat bondeck)
(beton K-275 t=12cm)
(wiremesh M-7 double layer)
2 Pekerjaan atap deck beton m2 38.50 0.44% 25.00% 0.11% 75.00% 0.33% 100.00% 0.44%
(Plat bondeck)
(beton K-275 t=12cm + waterproofing)
(wiremesh M-7 double layer)
3 Pekerjaan screed pelindung waterproofing m2 48.00 0.06% 0.00% 0.00% 70.00% 0.04% 70.00% 0.04%
(Include kawat ayam)
4 Pekerjaan kuda-kuda dan rangka atap baja m2 786.00 3.82% 100.00% 3.82% 0.00% 0.00% 100.00% 3.82%
(Zyncromate finish)
5 Pekerjaan penutup atap galvalum m2 786.00 2.13% 75.00% 0.00% 15.00% 0.00% 90.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area office
6 Pekerjaan listplank beton m3 4.40 0.27% 20.00% 0.05% 65.00% 0.18% 85.00% 0.23%
7 Pekerjaan listplank kayu m' 61.00 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pekerjaan talang baja m' 26.00 0.20% 55.00% 0.11% 45.00% 0.09% 100.00% 0.20%
9 Pekerjaan waterproofing m' 103.00 0.06% 0.00% 0.00% 80.00% 0.05% 80.00% 0.05%
(ex.Sika)
a. Pekerjaan Dinding
1 Pekerjaan pasangan dinding m2 1,467.00 3.62% 60.00% 2.17% 25.00% 0.90% 85.00% 3.07%
(Bata ringan ex.Citicon)
2 Pekerjaan plester & aci dinding m2 2,572.00 2.88% 30.00% 0.86% 50.00% 1.44% 80.00% 2.31%
3 Pekerjaan Pas.Granite tile dinding m2 74.00 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(ex.Granito 30x60cm)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Keramik dinding t.150 cm m2 109.00 0.35% 0.00% 0.00% 45.00% 0.16% 45.00% 0.16%
(ex.Roman 20x25cm)
. Toilet 2
. Toliet 3
. Area Pantry LT 1
. Area Pantry LT 2
. Area wudhu
5 Pekerjaan Pas.Keramik dinding t.60 cm m2 5.00 0.02% 0.00% 0.00% 60.00% 0.01% 60.00% 0.01%
(ex.Roman 20x20cm)
. Area janitor
6 Pekerjaan Tali Air m' 102.00 0.03% 0.00% 0.00% 50.00% 0.01% 50.00% 0.01%
2 Pekerjaan Plafond Kalsiboard bagian luar m2 244.00 0.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Drop Ceilling m' 45.00 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Plasterboard 9mm ex.Jaya Board)
(Steel hollow frame)
4 Pekerjaan Tali Air Plafond Gypsum m' 802.00 0.27% 0.00% 0.00% 40.00% 0.11% 40.00% 0.11%
(Pertemuan Dengan Dinding)
V. PEKERJAAN LANTAI
1 Pekerjaan Rabatan Lantai 1 m2 707.00 1.90% 90.00% 1.71% 10.00% 0.19% 100.00% 1.90%
(beton K-250 t=8cm)
(wiremesh M-5 single layer)
2 Pekerjaan Pas.Lantai Keramik 20x20cm m2 9.00 0.02% 0.00% 0.00% 70.00% 0.02% 70.00% 0.02%
(ex.Roman)
. Toilet 2
. Toliet 3
. Area wudhu
3 Pekerjaan Pas.Lantai Granite tile 30x30cm m2 29.00 0.14% 0.00% 0.00% 50.00% 0.07% 50.00% 0.07%
(ex.Granito)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Lantai Granite tile 60x60cm m2 736.00 5.94% 0.00% 0.00% 65.00% 3.86% 65.00% 3.86%
(ex.Granito)
. Area coridoor
. Area tangga
. Area reception
. Area Meeting room
. Area Personalia
. Area Multifunction room
. Area Coridoor
. Area Manager
. Area Director
. Area Office
. Dll
5 Pekerjaan Pas.Lantai Keramik 40x40cm m2 326.00 1.28% 0.00% 0.00% 75.00% 0.96% 75.00% 0.96%
(ex.Roman)
. Area Storage
. Area File storage
. Area Dining room
. Area Pantry
. Area Musholla
. Area Coridoor
. Area Mechanic
. Area Janitor
. Area Security
. Dll
6 Pekerjaan Plint Lantai Keramik t. 8cm m1 246.00 0.15% 0.00% 0.00% 50.00% 0.08% 50.00% 0.08%
7 Pekerjaan Plint Lantai Granite t. 8cm m1 310.00 0.32% 0.00% 0.00% 45.00% 0.14% 45.00% 0.14%
8 Pekerjaan Pas.Lantai Parquette (Stage) m2 60.00 0.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(solid wood ex.Merbau t.18mm)
(UPL Finish)
(under layer multiplex)
(wooden frame ex.Kamper)
. Waitting area Lt.1
. Waitting area Lt.2
1 Pekerjaan Cat Dinding Exterior m2 1,276.00 1.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
2 Pekerjaan Cat Dinding Interior m2 1,302.00 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
4 Pekerjaan Cat Plafond Gypsum m2 1,150.00 0.72% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
5 Pekerjaan Cat Plafond Kalsiboard m2 244.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
6 Pekerjaan Cat Dinding Interior m2 108.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Epoxy paint Ex.Propan)
. Area Dining room
2 Pintu jendela DW.02 unit 1.00 0.14% 0.00% 0.00% 70.00% 0.10% 70.00% 0.10%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Pintu jendela DW.03 unit 1.00 0.26% 0.00% 0.00% 20.00% 0.05% 20.00% 0.05%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
4 Pintu jendela DW.04 unit 1.00 0.48% 0.00% 0.00% 20.00% 0.10% 20.00% 0.10%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
5 Pintu jendela DW.05 unit 1.00 0.20% 0.00% 0.00% 20.00% 0.04% 20.00% 0.04%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu jendela DW.06 unit 1.00 0.15% 0.00% 0.00% 70.00% 0.11% 70.00% 0.11%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Pintu jendela DW.07 unit 2.00 0.27% 0.00% 0.00% 70.00% 0.19% 70.00% 0.19%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Pintu jendela DW.08 unit 1.00 0.12% 0.00% 0.00% 70.00% 0.08% 70.00% 0.08%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
9 Pintu jendela DW.09 unit 1.00 0.15% 0.00% 0.00% 70.00% 0.11% 70.00% 0.11%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
2 Pintu D.02 unit 11.00 1.04% 0.00% 0.00% 70.00% 0.73% 70.00% 0.73%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
4 Pintu D.04 unit 4.00 0.63% 0.00% 0.00% 70.00% 0.44% 70.00% 0.44%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
5 Pintu D.05 unit 1.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Framless Door - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu D.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Steel hollow frame + wiremesh M-7)
(Duco finish ex.Nippe)
7 Pintu D.07 unit 1.00 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Steel hollow frame + plat besi)
(Duco finish ex.Nippe)
8 Pintu D.08 unit 2.00 0.11% 0.00% 0.00% 70.00% 0.08% 70.00% 0.08%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(Duco finish ex.Nippe)
(Hardware ex.Kend)
2 Jendela W.02 unit 2.00 0.15% 0.00% 0.00% 70.00% 0.10% 70.00% 0.10%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Jendela W.03 unit 1.00 0.04% 0.00% 0.00% 70.00% 0.03% 70.00% 0.03%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
4 Jendela W.04 unit 1.00 0.09% 0.00% 0.00% 70.00% 0.07% 70.00% 0.07%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
5 Jendela W.05 unit 2.00 0.20% 0.00% 0.00% 70.00% 0.14% 70.00% 0.14%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
6 Jendela W.06 unit 1.00 0.08% 0.00% 0.00% 70.00% 0.06% 70.00% 0.06%
(Kusen solid wood ex.Merbau)
7 Jendela W.07 unit 3.00 0.45% 0.00% 0.00% 70.00% 0.32% 70.00% 0.32%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Jendela W.08 unit 1.00 0.01% 0.00% 0.00% 70.00% 0.01% 70.00% 0.01%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
9 Jendela W.09 unit 1.00 0.19% 0.00% 0.00% 70.00% 0.14% 70.00% 0.14%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
10 Jendela W.10 unit 1.00 0.05% 0.00% 0.00% 70.00% 0.03% 70.00% 0.03%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
11 Jendela W.11 unit 1.00 0.13% 0.00% 0.00% 70.00% 0.09% 70.00% 0.09%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
12 Jendela W.12 unit 1.00 0.11% 0.00% 0.00% 70.00% 0.08% 70.00% 0.08%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
1 Down light 4" ex.Artolite unit 126.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Down light halogen unit 38.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Surface Mounted Balk TL 1x36 Watt ex.Artolite unit 53.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Surface Mounted Balk TL 2x36 Watt ex.Artolite unit 73.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Mercury unit 4.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 LED (hidden light drop ceilling area) m' 45.00 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Instalasi Exhaust Fan Ceilling unit 15.00 0.06% 0.00% 0.00% 60.00% 0.04% 60.00% 0.04%
8 Instalasi Wall Exhaust Fan unit 1.00 0.00% 0.00% 0.00% 60.00% 0.00% 60.00% 0.00%
9 Instalasi Wall Fan unit 5.00 0.02% 0.00% 0.00% 60.00% 0.01% 60.00% 0.01%
10 Instalasi Titik lampu titik 290.00 1.16% 0.00% 0.00% 60.00% 0.69% 60.00% 0.69%
11 Instalasi Power outlet titik 139.00 0.59% 0.00% 0.00% 60.00% 0.36% 60.00% 0.36%
12 Instalasi Outlet Data titik 67.00 0.56% 0.00% 0.00% 60.00% 0.34% 60.00% 0.34%
1 Instalasi air bersih ls 1.00 0.11% 10.00% 0.01% 40.00% 0.04% 50.00% 0.06%
2 Instalasi air kotor ls 1.00 0.25% 15.00% 0.04% 55.00% 0.14% 70.00% 0.17%
3 Instalasi drain AC ls 27.00 0.15% 10.00% 0.02% 40.00% 0.06% 50.00% 0.08%
4 Instalasi Air hujan ls 1.00 0.28% 15.00% 0.04% 55.00% 0.15% 70.00% 0.20%
5 Instalasi Exhaus fan ls 1.00 0.15% 0.00% 0.00% 60.00% 0.09% 60.00% 0.09%
6 Guter dengan penutup beton + buis beton ls 1.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Tower tank stainless steel 2500Lt. unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pompa air unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Valve unit 6.00 0.03% 0.00% 0.00% 50.00% 0.01% 50.00% 0.01%
10 Septictank ls 1.00 0.19% 30.00% 0.06% 0.00% 0.00% 30.00% 0.06%
11 Resapan ls 1.00 0.06% 30.00% 0.02% 0.00% 0.00% 30.00% 0.02%
12 Bak Control + Gril besi ls 6.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
13 Roof Drain unit 8.00 0.03% 0.00% 0.00% 80.00% 0.03% 80.00% 0.03%
14 Floor drain ex.Toto - TX 1 BN unit 9.00 0.07% 0.00% 0.00% 20.00% 0.01% 20.00% 0.01%
15 Closet ex.Toto - CW 660 PJ unit 7.00 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
16 Jet spray ex.Toto - THX 20 NBPIV unit 7.00 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17 Wastafel ex.Toto - LW 526 J unit 5.00 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
X. PEKERJAAN LANDSCAPE
1 Pekerjaan kanstin ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan paving 20x20cm (include urugan pasir) m2 480.00 1.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Tanah subur (tanaman) m3 9.50 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Tanaman ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan kuda-kuda dan rangka atap baja m2 91.00 0.44% 0.00% 0.00% 90.00% 0.40% 90.00% 0.40%
(Zyncromate finish) area parkir motor & Genset
6 Pekerjaan penutup atap galvalum m2 91.00 0.23% 0.00% 0.00% 90.00% 0.21% 90.00% 0.21%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area parkir motor & genset
1 Pas. Meja Kitchen ls 1.00 0.14% 0.00% 0.00% 100.00% 0.14% 100.00% 0.14%
(Beton finishing keramik 20x20cm ex.Roman)
4 Peninggian Kenalpot Genset ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Pagar keliling bangunan t = 3m m' 29.00 1.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
c. Pekerjaan Pondasi
4 Pekerjaan Pondasi Tangga m3 0.55 0.03% 20.00% 0.01% 80.00% 0.02% 100.00% 0.03%
5 Pekerjaan Beton Bor Pile dia. 40 cm m3 147.00 4.94% 100.00% 4.94% 0.00% 0.00% 100.00% 4.94%
V. PEKERJAAN LANTAI
7 Pekerjaan Waterproofing Coating (termasuk dinding T=30 cm) m2 43.00 0.09% 0.00% 0.00% 80.00% 0.07% 80.00% 0.07%
. Toilet 4
. Area Pantry LT 2
. Area janitor
7 Pekerjaan Tangga
1 . Struktur tangga beton m3 2.60 0.16% 10.00% 0.02% 90.00% 0.14% 100.00% 0.16%
2 . Pekerjaan pasang keramik tangga granite tile 60x60 cm m2 22.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- ex Granito + step nozing
3 . Pekerjaan railling tangga m' 17.00 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Hollow stainless steel
- Tempered glass 12 mm
4 . Pekerjaan plester & aci bawah tangga m2 19.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
.
SUB TOTAL XIII 100% 31.53% 39.54% 48.06% 20% 79.60 60%
I. PEKERJAAN PRELIMINARY
1 Mobilisasi dan Demobilisasi Is 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pembersihan lokasi Is 1.00 0.11% 92.00% 0.10% 0.00% 0.00% 92.00% 0.10%
3 Bangunan penunjang sementara (direksi keet) Is 1.00 0.11% 100.00% 0.11% 0.00% 0.00% 100.00% 0.11%
4 Uitzet & bouwplank Is 1.00 0.06% 100.00% 0.06% 0.00% 0.00% 100.00% 0.06%
5 Gambar2 kerja (shop drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
6 Gambar2 kenyataan (as built drawing) Is 1.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
7 Listrik, air kerja dan telpon Is 1.00 0.17% 82.50% 0.14% 7.50% 0.01% 90.00% 0.15%
8 Keamanan proyek Is 1.00 0.11% 40.00% 0.04% 40.00% 0.04% 80.00% 0.09%
9 Pengelolaan kebersihan lapangan Is 1.00 0.11% 40.00% 0.04% 40.00% 0.04% 80.00% 0.09%
10 Pengukuran (setting out) Is 1.00 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
11 Masa pemeliharaan Is 1.00 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Revisi
Harga satuan termasuk pengujian, proteksi, coring dan semua hal yang
diperlukan untuk mendapat hasil yang baik dari beton jadi
1 Pekerjaan Perhitungan Struktur ls 1.00 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 . Urugan kembali bekas galian m3 124.50 0.09% 100.00% 0.09% 0.00% 0.00% 100.00% 0.09%
2 Pekerjaan Galian
3 Pekerjaan Anti Rayap m2 707.00 0.48% 100.00% 0.48% 0.00% 0.00% 100.00% 0.48%
2 Pekerjaan pondasi plat setempat m3 55.75 3.12% 100.00% 3.12% 0.00% 0.00% 100.00% 3.12%
3 Pekerjaan lantai kerja dibawah pondasi m3 11.70 0.24% 100.00% 0.24% 0.00% 0.00% 100.00% 0.24%
1 Pekerjaan Lantai m2 596.00 5.02% 100.00% 5.02% 0.00% 0.00% 100.00% 5.02%
(Plat bondeck)
(beton K-275 t=12cm)
(wiremesh M-7 double layer)
2 Pekerjaan atap deck beton m2 38.50 0.44% 100.00% 0.44% 0.00% 0.00% 100.00% 0.44%
(Plat bondeck)
(beton K-275 t=12cm + waterproofing)
(wiremesh M-7 double layer)
3 Pekerjaan screed pelindung waterproofing m2 48.00 0.06% 70.00% 0.04% 30.00% 0.02% 100.00% 0.06%
(Include kawat ayam)
4 Pekerjaan kuda-kuda dan rangka atap baja m2 786.00 3.82% 100.00% 3.82% 0.00% 0.00% 100.00% 3.82%
(Zyncromate finish)
5 Pekerjaan penutup atap galvalum m2 786.00 2.13% 90.00% 0.00% 10.00% 0.00% 100.00% 0.00%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area office
6 Pekerjaan listplank beton m3 4.40 0.27% 85.00% 0.23% 15.00% 0.04% 100.00% 0.27%
7 Pekerjaan listplank kayu m' 61.00 0.24% 0.00% 0.00% 100.00% 0.24% 100.00% 0.24%
8 Pekerjaan talang baja m' 26.00 0.20% 100.00% 0.20% 0.00% 0.00% 100.00% 0.20%
9 Pekerjaan waterproofing m' 103.00 0.06% 80.00% 0.05% 20.00% 0.01% 100.00% 0.06%
(ex.Sika)
a. Pekerjaan Dinding
1 Pekerjaan pasangan dinding m2 1,467.00 3.62% 85.00% 3.07% 15.00% 0.54% 100.00% 3.62%
(Bata ringan ex.Citicon)
2 Pekerjaan plester & aci dinding m2 2,572.00 2.88% 80.00% 2.31% 20.00% 0.58% 100.00% 2.88%
3 Pekerjaan Pas.Granite tile dinding m2 74.00 0.53% 0.00% 0.00% 98.00% 0.52% 98.00% 0.52%
(ex.Granito 30x60cm)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Keramik dinding t.150 cm m2 109.00 0.35% 45.00% 0.16% 55.00% 0.19% 100.00% 0.35%
(ex.Roman 20x25cm)
. Toilet 2
. Toliet 3
. Area Pantry LT 1
. Area Pantry LT 2
. Area wudhu
5 Pekerjaan Pas.Keramik dinding t.60 cm m2 5.00 0.02% 60.00% 0.01% 40.00% 0.01% 100.00% 0.02%
(ex.Roman 20x20cm)
. Area janitor
6 Pekerjaan Tali Air m' 102.00 0.03% 50.00% 0.01% 50.00% 0.01% 100.00% 0.03%
2 Pekerjaan Plafond Kalsiboard bagian luar m2 244.00 0.50% 0.00% 0.00% 100.00% 0.50% 100.00% 0.50%
3 Pekerjaan Drop Ceilling m' 45.00 0.10% 0.00% 0.00% 70.00% 0.07% 70.00% 0.07%
(Plasterboard 9mm ex.Jaya Board)
(Steel hollow frame)
4 Pekerjaan Tali Air Plafond Gypsum m' 802.00 0.27% 40.00% 0.11% 55.00% 0.15% 95.00% 0.26%
(Pertemuan Dengan Dinding)
V. PEKERJAAN LANTAI
1 Pekerjaan Rabatan Lantai 1 m2 707.00 1.90% 100.00% 1.90% 0.00% 0.00% 100.00% 1.90%
(beton K-250 t=8cm)
(wiremesh M-5 single layer)
2 Pekerjaan Pas.Lantai Keramik 20x20cm m2 9.00 0.02% 70.00% 0.02% 30.00% 0.01% 100.00% 0.02%
(ex.Roman)
. Toilet 2
. Toliet 3
. Area wudhu
3 Pekerjaan Pas.Lantai Granite tile 30x30cm m2 29.00 0.14% 50.00% 0.07% 50.00% 0.07% 100.00% 0.14%
(ex.Granito)
. Toilet 1
. Toilet 4
4 Pekerjaan Pas.Lantai Granite tile 60x60cm m2 736.00 5.94% 65.00% 3.86% 33.00% 1.96% 98.00% 5.82%
(ex.Granito)
. Area coridoor
. Area tangga
. Area reception
. Area Meeting room
. Area Personalia
. Area Multifunction room
. Area Coridoor
. Area Manager
. Area Director
. Area Office
. Dll
5 Pekerjaan Pas.Lantai Keramik 40x40cm m2 326.00 1.28% 75.00% 0.96% 25.00% 0.32% 100.00% 1.28%
(ex.Roman)
. Area Storage
. Area File storage
. Area Dining room
. Area Pantry
. Area Musholla
. Area Coridoor
. Area Mechanic
. Area Janitor
. Area Security
. Dll
6 Pekerjaan Plint Lantai Keramik t. 8cm m1 246.00 0.15% 50.00% 0.08% 50.00% 0.08% 100.00% 0.15%
7 Pekerjaan Plint Lantai Granite t. 8cm m1 310.00 0.32% 45.00% 0.14% 55.00% 0.18% 100.00% 0.32%
8 Pekerjaan Pas.Lantai Parquette (Stage) m2 60.00 0.94% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(solid wood ex.Merbau t.18mm)
(UPL Finish)
(under layer multiplex)
(wooden frame ex.Kamper)
. Waitting area Lt.1
. Waitting area Lt.2
1 Pekerjaan Cat Dinding Exterior m2 1,276.00 1.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
2 Pekerjaan Cat Dinding Interior m2 1,302.00 0.82% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
4 Pekerjaan Cat Plafond Gypsum m2 1,150.00 0.72% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Pentalite)
5 Pekerjaan Cat Plafond Kalsiboard m2 244.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Ex.ICI - Dulux Wheathershield)
6 Pekerjaan Cat Dinding Interior m2 108.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Epoxy paint Ex.Propan)
. Area Dining room
2 Pintu jendela DW.02 unit 1.00 0.14% 70.00% 0.10% 20.00% 0.03% 90.00% 0.13%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Pintu jendela DW.03 unit 1.00 0.26% 20.00% 0.05% 0.00% 0.00% 20.00% 0.05%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
4 Pintu jendela DW.04 unit 1.00 0.48% 20.00% 0.10% 0.00% 0.00% 20.00% 0.10%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
5 Pintu jendela DW.05 unit 1.00 0.20% 20.00% 0.04% 0.00% 0.00% 20.00% 0.04%
(Framless Door - Tempered glass 12mm)
(Framless Windoow - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu jendela DW.06 unit 1.00 0.15% 70.00% 0.11% 20.00% 0.03% 90.00% 0.14%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
7 Pintu jendela DW.07 unit 2.00 0.27% 70.00% 0.19% 20.00% 0.05% 90.00% 0.25%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Pintu jendela DW.08 unit 1.00 0.12% 70.00% 0.08% 20.00% 0.02% 90.00% 0.11%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
9 Pintu jendela DW.09 unit 1.00 0.15% 70.00% 0.11% 20.00% 0.03% 90.00% 0.14%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
2 Pintu D.02 unit 11.00 1.04% 70.00% 0.73% 20.00% 0.21% 90.00% 0.94%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
4 Pintu D.04 unit 4.00 0.63% 70.00% 0.44% 20.00% 0.13% 90.00% 0.56%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(PU natural finish ex.Propan)
(Hardware ex.Kend)
5 Pintu D.05 unit 1.00 0.29% 0.00% 0.00% 20.00% 0.06% 20.00% 0.06%
(Framless Door - Tempered glass 12mm)
(Hardware ex.Kend)
6 Pintu D.06 unit 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
(Steel hollow frame + wiremesh M-7)
(Duco finish ex.Nippe)
7 Pintu D.07 unit 1.00 0.18% 0.00% 0.00% 90.00% 0.16% 90.00% 0.16%
(Steel hollow frame + plat besi)
(Duco finish ex.Nippe)
8 Pintu D.08 unit 2.00 0.11% 70.00% 0.08% 20.00% 0.02% 90.00% 0.10%
(Kusen solid wood ex.Merbau)
(Solid panel door ex.Merbau)
(Duco finish ex.Nippe)
(Hardware ex.Kend)
2 Jendela W.02 unit 2.00 0.15% 70.00% 0.10% 20.00% 0.03% 90.00% 0.13%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
3 Jendela W.03 unit 1.00 0.04% 70.00% 0.03% 20.00% 0.01% 90.00% 0.04%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
4 Jendela W.04 unit 1.00 0.09% 70.00% 0.07% 20.00% 0.02% 90.00% 0.08%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
5 Jendela W.05 unit 2.00 0.20% 70.00% 0.14% 20.00% 0.04% 90.00% 0.18%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
6 Jendela W.06 unit 1.00 0.08% 70.00% 0.06% 20.00% 0.02% 90.00% 0.07%
(Kusen solid wood ex.Merbau)
7 Jendela W.07 unit 3.00 0.45% 70.00% 0.32% 20.00% 0.09% 90.00% 0.41%
(Kusen solid wood ex.Merbau)
(Solid windoow frame ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
8 Jendela W.08 unit 1.00 0.01% 70.00% 0.01% 20.00% 0.00% 90.00% 0.01%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
9 Jendela W.09 unit 1.00 0.19% 70.00% 0.14% 20.00% 0.04% 90.00% 0.18%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 10mm)
(Hardware ex.Kend)
10 Jendela W.10 unit 1.00 0.05% 70.00% 0.03% 20.00% 0.01% 90.00% 0.04%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
11 Jendela W.11 unit 1.00 0.13% 70.00% 0.09% 20.00% 0.03% 90.00% 0.12%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
12 Jendela W.12 unit 1.00 0.11% 70.00% 0.08% 20.00% 0.02% 90.00% 0.10%
(Kusen solid wood ex.Merbau)
(PU natural finish ex.Propan)
(Clear glass 8mm)
(Hardware ex.Kend)
1 Down light 4" ex.Artolite unit 126.00 0.48% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Down light halogen unit 38.00 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Surface Mounted Balk TL 1x36 Watt ex.Artolite unit 53.00 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Surface Mounted Balk TL 2x36 Watt ex.Artolite unit 73.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Mercury unit 4.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 LED (hidden light drop ceilling area) m' 45.00 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Instalasi Exhaust Fan Ceilling unit 15.00 0.06% 60.00% 0.04% 40.00% 0.02% 100.00% 0.06%
8 Instalasi Wall Exhaust Fan unit 1.00 0.00% 60.00% 0.00% 40.00% 0.00% 100.00% 0.00%
9 Instalasi Wall Fan unit 5.00 0.02% 60.00% 0.01% 40.00% 0.01% 100.00% 0.02%
10 Instalasi Titik lampu titik 290.00 1.16% 60.00% 0.69% 30.00% 0.35% 90.00% 1.04%
11 Instalasi Power outlet titik 139.00 0.59% 60.00% 0.36% 40.00% 0.24% 100.00% 0.59%
12 Instalasi Outlet Data titik 67.00 0.56% 60.00% 0.34% 40.00% 0.23% 100.00% 0.56%
1 Instalasi air bersih ls 1.00 0.11% 50.00% 0.06% 50.00% 0.06% 100.00% 0.11%
2 Instalasi air kotor ls 1.00 0.25% 70.00% 0.17% 20.00% 0.05% 90.00% 0.22%
3 Instalasi drain AC ls 27.00 0.15% 50.00% 0.08% 50.00% 0.08% 100.00% 0.15%
4 Instalasi Air hujan ls 1.00 0.28% 70.00% 0.20% 30.00% 0.08% 100.00% 0.28%
5 Instalasi Exhaus fan ls 1.00 0.15% 60.00% 0.09% 40.00% 0.06% 100.00% 0.15%
6 Guter dengan penutup beton + buis beton ls 1.00 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Tower tank stainless steel 2500Lt. unit 2.00 0.27% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
8 Pompa air unit 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
9 Valve unit 6.00 0.03% 50.00% 0.01% 50.00% 0.01% 100.00% 0.03%
10 Septictank ls 1.00 0.19% 30.00% 0.06% 0.00% 0.00% 30.00% 0.06%
11 Resapan ls 1.00 0.06% 30.00% 0.02% 0.00% 0.00% 30.00% 0.02%
12 Bak Control + Gril besi ls 6.00 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
13 Roof Drain unit 8.00 0.03% 80.00% 0.03% 20.00% 0.01% 100.00% 0.03%
14 Floor drain ex.Toto - TX 1 BN unit 9.00 0.07% 20.00% 0.01% 0.00% 0.00% 20.00% 0.01%
15 Closet ex.Toto - CW 660 PJ unit 7.00 0.31% 0.00% 0.00% 20.00% 0.06% 20.00% 0.06%
16 Jet spray ex.Toto - THX 20 NBPIV unit 7.00 0.05% 0.00% 0.00% 20.00% 0.01% 20.00% 0.01%
17 Wastafel ex.Toto - LW 526 J unit 5.00 0.29% 0.00% 0.00% 20.00% 0.06% 20.00% 0.06%
X. PEKERJAAN LANDSCAPE
1 Pekerjaan kanstin ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan paving 20x20cm (include urugan pasir) m2 480.00 1.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Tanah subur (tanaman) m3 9.50 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Tanaman ls 1.00 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan kuda-kuda dan rangka atap baja m2 91.00 0.44% 90.00% 0.40% 10.00% 0.04% 100.00% 0.44%
(Zyncromate finish) area parkir motor & Genset
6 Pekerjaan penutup atap galvalum m2 91.00 0.23% 90.00% 0.21% 10.00% 0.02% 100.00% 0.23%
(Galvalum ex.Jaindo)
(Aluminium foil 5mm)
. Area parkir motor & genset
1 Pas. Meja Kitchen ls 1.00 0.14% 100.00% 0.14% 0.00% 0.00% 100.00% 0.14%
(Beton finishing keramik 20x20cm ex.Roman)
4 Peninggian Kenalpot Genset ls 1.00 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Pekerjaan Pagar keliling bangunan t = 3m m' 29.00 1.11% 0.00% 0.00% 60.00% 0.67% 60.00% 0.67%
c. Pekerjaan Pondasi
4 Pekerjaan Pondasi Tangga m3 0.55 0.03% 100.00% 0.03% 0.00% 0.00% 100.00% 0.03%
5 Pekerjaan Beton Bor Pile dia. 40 cm m3 147.00 4.94% 100.00% 4.94% 0.00% 0.00% 100.00% 4.94%
V. PEKERJAAN LANTAI
7 Pekerjaan Waterproofing Coating (termasuk dinding T=30 cm) m2 43.00 0.09% 80.00% 0.07% 20.00% 0.02% 100.00% 0.09%
. Toilet 4
. Area Pantry LT 2
. Area janitor
7 Pekerjaan Tangga
1 . Struktur tangga beton m3 2.60 0.16% 100.00% 0.16% 0.00% 0.00% 100.00% 0.16%
2 . Pekerjaan pasang keramik tangga granite tile 60x60 cm m2 22.00 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- ex Granito + step nozing
3 . Pekerjaan railling tangga m' 17.00 0.44% 0.00% 0.00% 50.00% 0.22% 50.00% 0.22%
- Hollow stainless steel
- Tempered glass 12 mm
4 . Pekerjaan plester & aci bawah tangga m2 19.00 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
.
SUB TOTAL XIII 100% 79.60% 59.51% 29.09% 15% 108.68 75%
JULI ' 14 AGUSTUS ' 14 SEPTEMBER ' 14 OKTOBER ' 14 NOPEMBER ' 14 DESEMBER ' 14
NO. URAIAN PEKERJAAN BOBOT
27-04 05-10 11-17 18-24 25-31 1-4 05-10 11-17 18-24 25-31 1-6 7-13 14-20 21-27 28-30 1-7 8-14 15-21 22-28 29-4 5-11 12-18 19-25 26-4 5-11 12-18 19-25
I PEKERJAAN PRELIMINARY
Mobilisasi dan Demobilisasi 0.22% 0.11% 0.11%
Pengelolaan kebersihan lapangan 0.11% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
Pengukuran (setting out) 0.02% L L 0.02%
Masa pemeliharaan 0.11% I I 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
II PEKERJAAN BONGKARAN B B
III PEKERJAAN STRUKTUR U U
Pekerjaan Perhitungan Struktur 0.22% 0.07% 0.07% 0.07% R R
Pekerjaan Urugan 1.02% 0.51% 0.51%
Pekerjaan Galian 0.54% 0.14% 0.14% 0.14% 0.14%
Pekerjaan Anti Rayap 0.48% 0.24% 0.24%
Outdoor CCTV camera - infra red ex. Samsung 0.34% 0.17% 0.17%
Indoor CCTV camera - infra red ex. Samsung 0.42% 0.21% 0.21%
DVR ex. Samsung 0.24% 0.12% 0.12%
Box panel MDP (metal) + MCB, MCCB, ex.MG 0.61% 0.30% 0.30%
Box panel LT 2 (metal) + MCB, MCCB, ex.MG 0.40% 0.20% 0.20%
Box panel Pompa (metal) + MCB, MCCB, ex.MG 0.04% 0.02% 0.02%
XI PEKERJAAN PLUMBING
Instalasi air bersih 0.11% 0.06% 0.06%
Instalasi air kotor 0.25% 0.08% 0.08% 0.08%
TOTAL ### 0.00% 0.07% 0.07% 0.07% 0.00% 1.63% 1.56% 1.55% 2.35% 2.65% 5.09% 4.60% 3.58% 3.43% 8.44% 8.34% 9.71% 8.87% 7.33% 9.57% 8.65% 6.19% 3.61% 2.32% 0.33%
TOTAL KOMULATIF 0.00% 0.07% 0.15% 0.22% 0.22% 1.86% 3.42% 4.96% 7.31% 9.96% 15.05% 19.65% 23.23% 26.65% 35.09% 43.43% 53.14% 62.01% 69.34% 78.91% 87.56% 93.75% 97.35% 99.67% 100.00%