Está en la página 1de 10

Savannah Business Opportunity

Program Annual Review


City Council Work Session
February 14, 2019
Agenda
• Key Dates
• SBO Overview
• 2018 Results
• 2019 Goal Setting
KEY PROGRAM DATES
M/WBE Program SBO Program
Disparity Study Conducted 2015 SBO Council Workshop April 2017

Disparity Study Workshop by March SBE Program Adopted June 2017


Griffin & Strong P.C. 2016
DBE Program Adopted September
M/WBE Program Report April
2017
Workshop 2016
Resolution to Suspend September
Final Disparity Study Report June M/WBE Formula 2017
Released 2016
SBO Program Launch January
2018
Resolution Adopting 18% February
DBE Goal 2018
SBO Program Amended September
2018
SBE PROGRAM OVERVIEW
DBE PROGRAM OVERVIEW
OUTREACH AND SUPPORT
LOCAL AND DISADVANTAGED PRIMES
Percent of Awarded Dollars (Prime)
35%
32%

30% 28%

25%
25% 24%

20%
$34,970,716

$9,940,285
$26,604,416

15%

$6,345,937
12%
10%
$10,811,629

4%
5%
$469,708
0%
% Awarded to Local (Prime) % of Local Awarded to
Disadvantaged (Prime)

2016 2017 2018


DISADVANTAGED SUBCONTRACTING
Percent of Awarded Dollars
(Subcontracting)
35%

30% 29% Race/Location Breakdown


$169,050
$311,906 1%
25% 1% $47,000
0%

$20,365,680
20% 18% $6,519,581
34%
15%
12%
$3,817,128

$7,293,401
10% 38%
$3,419,986

5%

$4,944,160
0% 26%
% Disadvatanged Participation
(Sub) A/Non-Local AA/Local AA/Non-Local
F/Local F/Non-Local H/Non-Local
2016 2017 2018
THE ARENA PROJECT
Award Local MBE WBE Total DBE

Project 30% 25% 5% 30%


Manager $819,358 $682,798 $136,560 $819,358

Design 4.13% 20.16% 1.86% 22.02%


Services $364,266 $1,778,112 $164,052 $1,942,164

Construction 25% 25% 12.5% 25%


Manager $1,829,004 $1,829,004 $914,502 $1,829,004
Goal Setting Recommendation
• Recommended Data Sources (DOT):
– GDOT Contractor Directory
– GDOT UCP Directory
– Previous M/WBE and DBE participation
– DOT national DBE goal of 10%
– City of Savannah 2016 Disparity Study
• Recommend 20% overall DBE goal with
10% local DBE (LDBE)

También podría gustarte