Está en la página 1de 7

CALCULO DE DEFLEXIONES ADMISIBLES POR CAPAS DEL PROYECTO

A NIVEL DE SUB RASANTE

ESPESOR DE CADA CAPA


E2 (Kg/cm2)=
SECTOR CBR EQ. Sub-Base Base C.A. 3000xCBR^0.65
S. R. (cm) (cm) (cm) 7.2<CBR<20
SECTOR 2 27.50 20.00 20.00 7.50 -

Donde : Wo=2(1-u²)xqxa/E (10¯²mm)

q a Wo CV
SECTOR u (Kg/cm2) (cm) (10^-2 mm) (10^-2 mm)

SECTOR 1 0.35 5.7 10.7 87.21 15.00

A NIVEL DE SUB-BASE

ESPESOR E2 (Kg/cm2)
DE CADA E1 (Kg/cm2)=
CAPA
SECTOR CBR Base S.R. 100xCBR 130xCBR^0.714
H1 (cm) (De sub-base)
SECTOR 1 40.00 20.00 1,385.56 4,000.00 1,810.57

Donde E1 =E2 (5.35 x log h1 + 0.62 log E2 -1.56 log h1 x log E2 - 1.13) =

q a E1/E2 H1/a F2
SECTOR (Kg/cm2) (cm) (cm) (cm)

SECTOR 1 5.7 10.7 1.31 1.87 0.73

Donde : Wo= 1.5*q*a*F2/E2 (10¯²mm)

E2
(Kg/cm2) F2 Wo CV D admisible
SECTOR S.R. (cm) (10^-2 mm) (10^-2 mm) (10^-2 mm)

SECTOR 1 1,385.56 0.73 48.20 48.20 86.42

A NIVEL DE BASE

ESPESOR E2 (Kg/cm2)
DE CADA E1 (Kg/cm2)=
CAPA
SECTOR CBR Base SB 100xCBR 130xCBR^0.714
H1 (cm) (De base)
SECTOR 1 100.00 20.00 1,942.63 10,000.00 3,482.92

Donde E1 =E2 (8.05 x log h1 + 0.84 log E2 -2.10 log h1 x log E2 - 2.2) =
q a E1/E2 H1/a F2
SECTOR (Kg/cm2) (cm) (cm) (cm)

SECTOR 1 5.7 10.7 1.57 1.87 0.73

Donde : Wo= 1.5*q*a*F2/E2 (10¯²mm)

E2
(Kg/cm2) F2 Wo CV D admisible
SECTOR S.R. (cm) (10^-2 mm) (10^-2 mm) (10^-2 mm)

SECTOR 1 1,942.63 0.73 34.38 74.00 76.23

A NIVEL DE CARPETA ASFALTICA

CALCULO ESPESOR EQUIV. E1 (Kg/cm2)=


SECTOR Base C.A. Esp. Base 100xCBR 130xCBR^0.714
(cm) (cm) Equiv. H1 (De base)
SECTOR 1 20.00 7.50 38.75 10,000.00 3,482.92

Donde E1 =E2 (8.05 x log h1 + 0.84 log E2 -2.10 log h1 x log E2 - 2.2) =

E2
(Kg/cm2) q a E1/E2 H1/a
SECTOR S.R. (Kg/cm2) (cm) (cm)
SECTOR 1 1,386 5.7 10.7 0.07 3.62

Donde : Wo= 1.5*q*a*F2/E2 (10¯²mm)

E2
(Kg/cm2) F2 Wo CV D admisible
SECTOR S.R. (cm) (10^-2 mm) (10^-2 mm) (10^-2 mm)

SECTOR 1 1,385.56 0.68 44.90 21.00 60.41

RESUMEN

DEFLEXIONES ADMISIBLES P/CAPA


SECTOR Sub. Sub-Base Base C. A.
Rasante Granular Granular (10^-2 mm)
SECTOR 1 108.73 86.42 76.23 60.41
PROYECTO

E2 (Kg/cm2)=
130xCBR^0.7 ASUMIDO
14
20<CBR
1,385.56 1,386

D admisible
(10^-2 mm)

108.73

g/cm2)=
E1

1,942.63

E2 - 1.13) =

g/cm2)=

E1

3,050.92

E2 - 2.2) =
g/cm2)=
E1

91.77

E2 - 2.2) =

F2
(cm)
0.68
DEFLEXIONES ADMISIBLES P/CAPA (10^-2 mm)
TRAMO PROGRESIVA Sub. Sub-Base Base C. A.
Rasante Granular Granular
Km. 00+140
III - Km. 108.73 86.41 76.23 60.41
03+660
Criterio del Instituto del Asfalto Deflexión Verticad Admisible, mm 25.64
Criterio Checoslovaco Deflexión Verticad Admisible, mm 8.035
Criterio de Yang H. Huang Deflexión Verticad Admisible, mm 26.32202
Criterio de la RTAC de Canadá Deflexión Verticad Admisible, mm 65.024
Criterio de Ivanov Deflexión Verticad Admisible, mm 5248
Criterio de Ruiz Deflexión Verticad Admisible, mm 24.763
Criterio de la AASHTO Road Test (Pt=2.5) Deflexión Verticad Admisible, mm 63.735
Criterio de la CGRA de Canadá Deflexión Verticad Admisible, mm 52.275
Criterio Belga Deflexión Verticad Admisible, mm 242
N = 5960000 0.2383 0.62284049
N = 5960000 0.16 0.6621349
N = 5960000 0.2438 0.58683253
N = 5960000 0.30103 0.59363746
N = 5960000 0.12 807.16863
N = 5960000 0.2523 0.48351352
N = 5960000 0.3077 0.52436623
N = 5960000 0.237 1.29586774
N = 5960000 0.334 1.32094007

También podría gustarte