GENERAL NOTES
All documents must be prepared and submitted in accordance with the following WGPSN Procedure: MALRC-ADM-PRC-001 - Supplier
Document Submission Procedure
The issue date specified as arranged at Bid stage is the latest that is considered acceptable. The Bidder/Supplier is to comply with the
agreed dates set out in the SDRL Matrix.
The Date Requirements section is to be completed and the dates set out in the SDRL Matrix are to be confirmed as agreed prior to issuing
the Purchase Order, and reflected in the SDRL.
PLEASE NOTE COLUMN 5a IS A REQUIRED COLUMN AND MUST BE FILLED IN PRIOR TO RELEASE
Columns 3 & 4
The documents required with the Bid, at first and final issues are indicated by a X within column 3 - With Bid, column 4 - First Issue.
Column 5
P = Date of purchase order P+= X weeks after purchase order or fax of intent
T = Date of test T- = X weeks after or prior test
D = Date of dispatch D = X weeks after or prior to dispatch
Q = Date of process Q = X weeks prior to manufacture/job process
U = Use of procedure U = X weeks prior to use of procedure
E = Final inspection E+= X weeks after final inspection
C = Date of Call Off C = X weeks after Call Off
Column 6
An 'X' in this column indicates that an Electronic Copy (Native Format of Drawing i.e. AutoCad) is required with Final Issue. SDRL codes J01
& K01, where 3 & 2 indicates Hard Copies are required after approval (amend as per Project Requirements)
Column 7
S = Review by WGPSN Representative at Suppliers Works - include in relevant Manual as instructed on column 9 and/or 10 of SDRL Matrix
I = Submit to Purchasers office for information Only - include in relevant Manual as instructed on column 9 and/or 10 of SDRL Matrix
Columns 8 & 9
An ‘X’ indicates documents (Certified Final issue) that are required to be included within the Certification and/or
Installation, Operating and Maintenance Manuals.
Note: Where a document is required to be included in either the Certification and/or Installation, Operating and Maintenance
Manuals, the approved version of the document should be coded 1 - Reviewed and No Comment. Submit final version of
Documents as required. If not, the approved version of the document should be coded 4 - No further review required.
If no Certification and/or Installation, Operating and Maintenance Manual has been requested, these columns should be left blank.
FormNo:MALRCͲSCMͲSDRͲ001 ©2016WoodGroupPSNLimited
Rev/Date:C3/27Sept2016 Thisdocumentisuncontrolledonceprinted.
SUPPLIER DOCUMENT REQUIREMENTS LISTING (SDRL)
DOCUMENT DATE REQD FINAL REVIEW WITHIN
CODE DOCUMENT DESCRIPTION REQUIREMENTS ISSUE CLASS MANUAL
WITH FIRST CODE ACTUAL J01 K01
BID ISSUE
1 2 3 4 5 5a 6 7 8 9
B- GENERAL ARRANGEMENT DRAWINGS
B01 General Arrangements X X P+4 29-Nov-17 X O X
COMMISSIONING, OPERATING, MAINTENANCE AND
J-
SPARES
J01 Operating and Maintenance Manual X E+1 12-Feb-18 3 O
L- TEST AND INSPECTION REPORTS
L01 Material Test Certificate X E 05-Feb-18 O X
Valve Seat Sealing and Valve Pressure Test Records -
X P+4 29-Nov-17 O X
L37 AS 6401 Section 4
FormNo:MALRCͲSCMͲSDRͲ001 ©2016WoodGroupPSNLimited
Rev/Date:C3/27Sept2016 Thisdocumentisuncontrolledonceprinted.
Document Number: 012280-ENG-LST-003
Document Revision: P1
SUPPLIER DOCUMENT REQUIREMENTS LISTING (SDRL) - LONG DESCRIPTION
CODE DOCUMENT FORMAT PURPOSE INFORMATION TO BE SHOWN ON DOCUMENT
L37 Valve Seat Sealing and Valve A4 document Design review and interface • Records to demonstrate that acceptable seat sealing and other pressure
pressure Test Records liaison tests have be preformed.
FormNo:MALRCͲSCMͲSDRͲ001 ©2016WoodGroupPSNLimited
Rev/Date:C3/27Sept2016 Thisdocumentisuncontrolledonceprinted.