Manual MNL‐1400‐0000‐001 Health and Safety in the Office
Manual CML‐1400‐0000‐001 HSE Manual Manual CML‐1400‐0000‐002 Corporate Environmental and Social Management System Manual Policy POL‐1400‐0000‐001 HSES Policy Policy POL‐1400‐0000‐002 Security Policy Procedure PRO‐1400‐0000‐001 Hazard Identification Risk Assessment and Risk Management Procedure PRO‐1400‐0000‐002 Incident Investigation Reporting and Classification Procedure PRO‐1400‐0000‐003 Audit and Inspection Procedure PRO‐1400‐0000‐004 HSSE&S Communications and Consultation Procedure PRO‐1400‐0000‐005 HSSE&S Performance Management Procedure PRO‐1400‐0000‐006 HSES Legal and Other Requirements Procedure PRO‐1400‐0000‐007 HSSE&S Training Procedure PRO‐1400‐0000‐008 HSE Requirements for Duqm Refinery Contractors Procedure PRO‐1400‐0000‐009 Barricading of Hazards Procedure PRO‐1400‐0000‐010 Compressed Gases and Air Procedure PRO‐1400‐0000‐011 Confined Spaces Procedure PRO‐1400‐0000‐012 Electrical Safety Procedure PRO‐1400‐0000‐013 Emergency Management Program Procedure PRO‐1400‐0000‐014 Fire Prevention Planning and Control Procedure PRO‐1400‐0000‐015 First Aid and Medical Treatment Procedure PRO‐1400‐0000‐016 General Workplace Amenities Procedure PRO‐1400‐0000‐017 Hazardous Materials Procedure PRO‐1400‐0000‐018 Hydrogen Sulphide Procedure PRO‐1400‐0000‐019 Hot Work Operations Procedure PRO‐1400‐0000‐020 Machine Guarding Procedure PRO‐1400‐0000‐021 Manual Handling Procedure PRO‐1400‐0000‐022 Occupational Health Procedure PRO‐1400‐0000‐023 Permit to Work Procedure PRO‐1400‐0000‐024 Personal Protective Equipment Procedure PRO‐1400‐0000‐025 Plant and Equipment Procedure PRO‐1400‐0000‐026 Portable Power Tools Procedure PRO‐1400‐0000‐027 Powered Lift Trucks Procedure PRO‐1400‐0000‐028 Heavy Lift, Transport and Rigging Procedure PRO‐1400‐0000‐029 Safety Signage and Signs Procedure PRO‐1400‐0000‐030 Scaffolding Procedure PRO‐1400‐0000‐031 Tag‐Out Lock‐Out Isolation Procedure PRO‐1400‐0000‐032 Traffic Management and Logistics Procedure PRO‐1400‐0000‐033 Working at Height Procedure PRO‐1400‐0000‐034 Ergonomics and Display Screen Equipment Procedure PRO‐1400‐0000‐035 Environmental Aspect Impact Assessment Procedure PRO‐1400‐0000‐036 Golden Rules of Safety Procedure PRO‐1400‐0000‐037 Health, Hygiene and Welfare Procedure for Accommodation Procedure PRO‐1400‐0000‐038 Journey Management Procedure Procedure PRO‐1400‐0000‐039 Driving Safety Standard for Contractors Procedure PRO‐1400‐0000‐040 Contractor Mobilization Procedure Procedure PRO‐1400‐0000‐041 HSSES Management of Change Procedure (HOLD) Procedure PRO‐1400‐0000‐042 Grievance Management Procedure Procedure PRO‐1400‐0000‐043 Fitness for Task and Health Surveillance Procedure PRO‐1400‐0000‐044 HSE for Temporary Buildings (HOLD) Procedure PRO‐1400‐0000‐045 Excavation and Trenching Procedure (ISSUED) Plan PLN‐1400‐0000‐001 Project HSSE&S Plan (HOLD) Plan PLN‐1400‐0000‐002 Emergency Response Plan Plan PLN‐1400‐0000‐003 Stakeholder Engagement Plan Plan PLN‐1400‐0000‐004 Waste Management Plan Plan PLN‐1400‐0000‐005 Erosion Control and Reinstatement Plan (HOLD) Plan PLN‐1400‐0000‐006 Test Water Management Plan Plan PLN‐1400‐0000‐007 Pollution Prevention Management Plan Plan PLN‐1400‐0000‐008 Ecological Management Plan (HOLD) Plan PLN‐1400‐0000‐011 HSSE&S Assurance Plan Plan PLN‐1400‐0000‐012 Environment Monitoring Plan Plan PLN‐1400‐0000‐013 Community Health and Safety Plan Plan PLN‐1400‐0000‐014 Cultural Heritage Management Plan (including Chance Finds) Plan PLN‐1400‐0000‐015 Worker Influx Management Plan Plan PLN‐1400‐0000‐016 Environmental and Social Management Plan Framework (ISSUED) Specification SPC‐1400‐0000‐001 Project Environmental Standards