RATIO META
SP UA DESCRIPCION UND MO (HH/UND) EQ ($/UND) CODIGO
P0500072 4300110 Explotacion de Cantera 08 m³ 0.0274 0.6900 0
P0500075 4300120 Explotacion de Cauce de Quebrada m³ 0.0274 0.6700 01
P0500074 4300130 Cantera Cauce de Quebrada - Aguas Abajo m³ 0.0274 0.6700 02
SP053083 705301 Transporte de material 3B - 20m3 Dmt=2.6km m³xkm - 0.5539
SP053121 705302 Transporte de material 3C - 20m3 Dmt=1.87km m³xkm - 0.6200
SP053140 705303 Transporte de material 3D - 20m3 Dmt=1.81km m³xkm - 1.0200
SP020610 705401 Relleno compactado Material 3B m³ 0.0178 0.3297
SP020611 705402 Relleno compactado Material 3C m³ 0.0134 0.2900
SP020612 705403 Relleno compactado Material 3D m³ 0.0884 1.2800
SP053040 706301 Transporte de material 2A - 20m3 Dmt=1.86km m³xkm - 0.6900
SP053060 706302 Transporte de material 2B - 20m3 Dmt=1.86km m³xkm - 0.8900
SP053084 706303 Transporte de material 3B - 20m3 Dmt=2.45km m³xkm - 0.5700
SP053122 706304 Transporte de material 3C - 20m3 Dmt=1.88km m³xkm - 0.6200
SP020608 706401 Relleno compactado Material 2A m³ 0.2059 3.7500
SP020609 706402 Relleno compactado Material 2B m³ 0.0610 1.5000
SP020610 706403 Relleno compactado Material 3B m³ 0.0178 0.3800
SP020611 706404 Relleno compactado Material 3C m³ 0.0134 0.2900
RESUMEN DE FRENTES:
Rev. 1 Rev. 0
DESCRIPCION MO (HH/UND) EQ ($/UND) MO (HH/UND) EQ ($/UND) Delta (MO) Delta (EQ)
GENERAL 0.0274 0.6900 0.0274 0.6900 - -
PRESA - ETAPA I 0.0274 0.6700 0.0274 0.6900 - -0.0200
PRESA - ETAPA II 0.0274 0.6700 0.0274 0.6900 - -0.0200
- 0.6100 - 0.6600 - -0.1061
- 0.6200 - 0.6600 - -0.0400
- 1.0200 - 1.1000 - -0.0800
0.0178 0.3800 0.0178 0.3300 - -0.0003
0.0134 0.2900 0.0134 0.2600 - 0.0300
0.0884 1.2800 0.0884 1.2400 - 0.0400
- 0.6900 - 0.7400 - -0.0500
- 0.8900 - 0.9600 - -0.0700
- 0.5700 - 0.6200 - -0.0500
- 0.6200 - 0.6600 - -0.0400
0.2059 3.7500 0.2059 3.7900 - -0.0400
0.0610 1.5000 0.0610 1.5400 - -0.0400
0.0178 0.3800 0.0178 0.3300 - 0.0500
0.0134 0.2900 0.0134 0.2600 - 0.0300
Proyecto: Chavimochic - Etapa III / Fase 1
Semana: 42
Del: 10/12/2015
Al: 10/18/2015
CODIGO
CÓDIGO
PRODUCTI DESCRIPCIÓN DEL FRENTE CÓDIGO DESCRIPCIÓN DE LA PARTIDA
FRENTE
VIDAD
TOTAL
TOTAL REAL A ACUMULADO % ACUMULADO ACUMULADO
UND PREVISTO A VTR SALDO TOTAL
EJECUTAR REAL REAL REAL
CONSUMIR
PREVISTAS PROYECTADAS
TOTAL HH 389,165.17 406,419.67
ACUMULADO SEMANAL
% AVANCE 32.4% 0.72%
ACUM SEMANA ACTUAL
HH GANADAS Y PERDIDAS
PRODUCTIVIDAD (INDICE)
PROYECTADO PROYECTADO
ÚLTIMA ACUMULADO META PARA EL ACUMULADO
META PARA EL PARA EL
SEMANA REAL SALDO REAL
SALDO SALDO
0.0274 - - - 0.0274 0 0
0.0274 - 0.0071 0.0369 0.0369 57,995 122,691
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
0.0178 - 0.0011 0.0289 0.0289 44,740 66,995
- - - - - 0 0
0.0884 - - - 0.0735 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
0.2059 - - - 0.2059 0 0
0.0610 - - - 0.0607 0 0
- - - - - 0 0
- - - - - 0 0
102,736 189,686
Eficiencia
298.9% 72.3%
ACUM SEMANA ACTUAL BRECHA US$ PRODUCTIVIDAD
0 0 0 0 0
180,687 703 358,992 759,458 1,118,450
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
111,736 426 276,942 414,701 691,643
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Eficiencia
95.8%
Proyecto: Chavimochic - Etapa III / Fase 1
Semana: 42
Del: 10/12/2015
Al: 10/18/2015
CODIGO
CÓDIGO
PRODUCTI DESCRIPCIÓN DEL FRENTE CÓDIGO DESCRIPCIÓN DE LA PARTIDA
FRENTE
VIDAD
04300110 0 GENERAL 4300110 Explotacion de Cantera 08
04300120 0 GENERAL 4300120 Explotacion de Cauce de Quebrada
04300130 0 GENERAL 4300130 Cantera Cauce de Quebrada - Aguas Abajo
1705301 01 PRESA - ETAPA I 705301 Transporte de material 3B - 20m3 Dmt=2.6km
1705302 01 PRESA - ETAPA I 705302 Transporte de material 3C - 20m3 Dmt=1.87km
1705303 01 PRESA - ETAPA I 705303 Transporte de material 3D - 20m3 Dmt=1.81km
1705401 01 PRESA - ETAPA I 705401 Relleno compactado Material 3B
1705402 01 PRESA - ETAPA I 705402 Relleno compactado Material 3C
1705403 01 PRESA - ETAPA I 705403 Relleno compactado Material 3D
2706301 02 PRESA - ETAPA II 706301 Transporte de material 2A - 20m3 Dmt=1.86km
2706302 02 PRESA - ETAPA II 706302 Transporte de material 2B - 20m3 Dmt=1.86km
2706303 02 PRESA - ETAPA II 706303 Transporte de material 3B - 20m3 Dmt=2.45km
2706304 02 PRESA - ETAPA II 706304 Transporte de material 3C - 20m3 Dmt=1.88km
2706401 02 PRESA - ETAPA II 706401 Relleno compactado Material 2A
2706402 02 PRESA - ETAPA II 706402 Relleno compactado Material 2B
2706403 02 PRESA - ETAPA II 706403 Relleno compactado Material 3B
2706404 02 PRESA - ETAPA II 706404 Relleno compactado Material 3C
PREVISTAS PROYECTADAS
TOTAL HH 17,120,222.19 17,293,206.14
ACUMULADO SEMANAL
% AVANCE 35.5% 0.02%
ACUM SEMANA ACTUAL
$ GANADOS Y PERDIDOS
PRODUCTIVIDAD (INDICE)
PROYECTADO PROYECTADO
ACUMULADO ÚLTIMA META PARA EL ACUMULADO
META PARA EL PARA EL
REAL SEMANA SALDO REAL
SALDO SALDO
- - FALTAN $ - - 0 0
0.6796 1.2084 0.6591 0.4297 0.4297 -1,515,111 -3,205,261
- - FALTAN $ - - 0 0
0.5539 0.7052 0.5536 0.4477 0.4477 -887,615 -1,264,481
- - FALTAN $ - - 0 0
1.0200 - FALTA AVANCE - 0.5175 0 0
0.3297 0.7237 0.5104 0.0665 0.0665 -1,055,136 -1,579,994
- - FALTAN $ - - 0 0
1.2800 - FALTA AVANCE - - 0 0
- - FALTAN $ - - 0 0
0.9255 - FALTA AVANCE - 0.9199 0 0
- - FALTAN $ - - 0 0
- - FALTAN $ - - 0 0
- - FALTAN $ - - 0 0
1.6928 - Err:509 - 1.6890 0 0
- - FALTAN $ - - 0 0
- - FALTAN $ - - 0 0
-3,457,863 -6,049,735
Eficiencia
61.1% 150.3%
ACUM SEMANA ACTUAL
$ GANADOS Y PERDIDOS
SEMANA ACTUAL (USD$)
0 0 - - 0
-4,720,372 527 17,453 16,926 527
0 0 - - 0
-2,152,096 23 36,559 36,535 23
0 0 - - 0
0 0 - - 0
-2,635,130 -4,337 7,913 12,250 -4,337
0 0 - - 0
0 0 - - 0
0 0 - - 0
0 0 - - 0
0 0 - - 0
0 0 - - 0
0 0 - - 0
0 0 - - 0
0 0 - - 0
0 0 - - 0
- - 0
-9,507,598 -3,787
Eficiencia
99.0%
IPEQ
RATIOS SEMANALES
AVANCE SEMANAL
Código
Código frente Nombre de frente Nombre de partida de control
partida
04300120 00 GENERAL 4300120 Explotacion de Cauce de Quebrada
1705301 01 PRESA - ETAPA I 705301 Transporte de material 3B - 20m3 Dmt=2.6km
1705401 01 PRESA - ETAPA I 705401 Relleno compactado Material 3B
1705303 01 PRESA - ETAPA I 705303 Transporte de material 3D - 20m3 Dmt=1.81km
1705403 01 PRESA - ETAPA I 705403 Relleno compactado Material 3D
RATIOS ACUMULADOS
04300120
INDICE
Acumulado Auxiliar Sem. 14 Sem. 13 Sem. 12 Sem. 11 Sem. 10 0.9000
Real
1.2084 0.9686 1.1068 1.1516 1.1904 1.2128 0.8000
0.7052 0.4742 0.4017 0.3951 0.3811 0.3649
0.7237 0.5233 0.5347 0.5484 0.5570 0.5605 0.7000
Indices de Productvidad
- - - - - -
0.6000
- - - - - -
(USD$ / m3.km)
0.5000
0.4000
0.3000
0.2000
0.1000
1705301
1705401
ex p l o ta c i ó n de cante ra e n q u e b rad a
1.4000
1.2000
1.0000
Indices de Productvidad
(USD$ / m3)
0.8000
0.6000
0.4000
0.2000
-
Sem. 14 Sem. 13 Sem. 12 Sem. 11
Código UA / USD$
Sem. 14 Sem. 13 Sem. 12 Sem. 11
GANADOS
Semanal 280 -23,223 -18,447 -43,535
Acumulado -1,515,111 -1,515,391 -1,492,168 -1,473,721
t ra n s p o r te d e m ate r i al 3 b , 3 c - p re s a
0.9000
0.8000
0.7000
Indices de Productvidad
0.6000
(USD$ / m3.km)
0.5000
0.4000
0.3000
0.2000
0.1000
-
Sem. 14 Sem. 13 Sem. 12 Sem. 11
Código UA / USD$
Sem. 14 Sem. 13 Sem. 12 Sem. 11
GANADOS
Semanal 23 -27,328 3,509 -39,067
Acumulado -887,615 -887,639 -860,310 -863,819
Indices de Productv idad
(U S D $ / m 3)
re l l e n o co m p a c ta d o m at e r i a l 3 B, 3 c - P R ESA
0.8000
0.7000
0.6000
0.5000
0.4000
0.3000
0.2000
0.1000
-
Sem. 14 Sem. 13 Sem. 12 Sem. 11
Código UA / USD$
Sem. 14 Sem. 13 Sem. 12 Sem. 11
GANADOS
Semanal -4,337 -16,860 -14,918 -21,731
Acumulado -1,055,136 -1,050,799 -1,033,939 -1,019,021
INDICADORES DE
RELLENO COMPA
ID SERVICIO PRINCIPAL
CALCULO DEL PF
EXP
TRA
F A C T O R D E P E R F O R M A N C E (P F )
REL
I n d i cad o res d e
2.50
2.00
1.79
1.74
1.50
1.15 1.12
0.98
1.00
1.79
1.74
1.50
1.15 1.12
0.98
1.00
0.50
-
Explotacion de Cauce de Quebrada Transporte de m
INDICADORES DE PRODUCTIVIDAD - EQUIPOS
Semana Mes
PF META VTR
Sem.11 Sem.12 Sem.13 Sem.14
61,924
Ratos Previstos
0.670 1.199 1.168 1.214 0.659
0.552 0.739 0.515 0.803 0.554
0.330 0.612 0.761 0.752 0.510
n d i ca d o res d e P ro d u ct i vi d ad - P RE S A
1,60
2.31
1,40
1.86
1,20
1.55
1,00
1.42
1.31
800
1.12 1.10
1.00
600
1,20
1.55
1,00
1.42
1.31
800
1.12 1.10
1.00
600
400
200
-
Transporte de material 3B / 3C (DMT 2.6 km) Relleno compactado Material 3B / 3C
Fecha 3/28/2016
Evaluacion: 4/3/2016
3) 55,950
Costo Totales USD$ (última semana) Costo Totales USD$ (acumulado mes)
2,1 0.012833651
2,4 0.012391111
2,6 0.012152821
2.75 0.0119968485
2.85 0.0119019883
2.9 0.0118570115
2,1 105,165
2,4 74,522
USD$
46.54
1,600,000
2.31
1,400,000
0.597
0.577
6
1,200,000
5120 0.566
0.558
1.55
1,000,000 0.554
0.552
800,000
600,000
1,200,000
1.55
1,000,000
800,000
84 3755
600,000
400,000
200,000
-
ado Material 3B / 3C
1.2233662079
1.3379358764
SEMANA 1 SEMANA 2 SEMANA 3
AVANCE (UND)
sem1 sem2 sem3 sem4 M3.KM
EXP 132,389 115,261 163,943
TRA 263,224 229,170 325,964
1.0576923077
64400 40000 1.61 1.3893533333
55200 35000 1.5771428571 1.4695083333
1.1428571429
SEMANA 4 SEMANA 5 SEMANA 6
121,950
176,775
70,100
1.1588124931
1.0732452626
SEMANA 7 SEMANA 8 SEMANA 9
Acumulado
VTR Saldo Total Auxiliar Sem. 45 Sem. 44 Sem. 43 Sem. 42
real
- - 3,408
78,389 20,394 165,834
- 2,013 -
- - -
- 569 -
- 117 -
47,555 2,815 71,211
- 13,747 -
- 1,612 9,554
- - -
- - -
- - -
- - -
- - 1,954
- 55 11,260
- 809 -
- - -
5-Oct 28-Sep 21-Sep 14-Sep 7-Sep 31-Aug 24-Aug 17-Aug
11-Oct 4-Oct 27-Sep 20-Sep 13-Sep 6-Sep 30-Aug 23-Aug
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
809
10-Aug 3-Aug 27-Jul 20-Jul
16-Aug 9-Aug 2-Aug 26-Jul
55
Data a ingresar manualmente
17,120,222
* Insertar nueva semana.
Del: 3/28/2016 3/21/2016 3/14/2016 3/7/2016
Al: 3-Apr 27-Mar 20-Mar 13-Mar
Acumulado
VTR Saldo Total Auxiliar Sem. 14 Sem. 13 Sem. 12 Sem. 11
real
- 144,521 85,941
1,947,198 2,965,594 4,033,411 28,512.92 25,430.90 32,173.62 29,868.35
- 352,194 - 10,945.38 5,748.69 17,671.92 14,551.24
3,250,247 2,729,744 4,630,244 89,818.01 53,002.54 56,477.69 66,425.61
- 626,264 -
- 98,292 199,528 6,913.05 4,819.68 5,079.38 5,111.02
882,818 1,006,926 1,321,959 28,556.77 18,057.98 30,335.70 21,197.89
- 597,303 -
- 311,320 138,336 7,144.02 10,062.00 12,016.35 9,230.00
- - 12,183
- 1,917 305,729
- 781,835 -
- 20 -
- - 35,599
- 700 277,029
- 333,726 -
- - -
Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016
Año 2016 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
1,493 47 377
114,823 100,349 83,348 85,219 172,137 131,003 94,918 39
20
700
38,992 36,908 33,845 34,658 77,810 65,508 46,005
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
3,962 2,496
165,697 13,612 2,409
13,569
Data a ingresar manualmente
17,120,222
* Insertar nueva semana.
Del: 3/28/2016 3/21/2016 3/14/2016 3/7/2016
Al: 3-Apr 27-Mar 20-Mar 13-Mar
Acumulado
VTR Saldo Total Auxiliar Sem. 14 Sem. 13 Sem. 12 Sem. 11
real
- 1,917 317,913 - - - -
1.12
6,080,263 9,950,354 11,039,959
2/29/2016 2/22/2016 2/15/2016 2/8/2016 2/1/2016 1/25/2016 1/18/2016 11-Jan
6-Mar 28-Feb 21-Feb 14-Feb 7-Feb 31-Jan 24-Jan 17-Jan
Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016
- - - - - - - -
Año 2016 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
- - - - - - - -
699.88 312,628.10 - - - - - -
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
1,493 47 - 377 - - - -
699.88 - - - - - - -
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
- - - - - -
- - - - - -
3,962 2,496
165,697 13,612 2,409
13,569
Data a ingresar manualmente
PONDERACIÓN DE LA DMT:
V (m3)
705401 3B - ETAPA I 14,752
705402 3C - ETAPA I 2,552,716
706403 3B - ETAPA II 2,934,901
706404 3C - ETAPA II 1,184,899
6,687,268
* Insertar nueva semana.
Del: 28-Mar 21-Mar 14-Mar
Al: 3-Apr 27-Mar 20-Mar
Metrados no
Adic/Deduc Acumulado
previstos y no Metrado total Auxiliar Sem. 14 Sem. 13 Sem. 12
aprobados real
aprobados
124,552 -
8,926,282 2,865,095 59,866 25,680 42,678
- -
14,226,805 5,867,735 162,254.19 66,000.00 109,685.90
- -
195,616 -
6,687,268 2,677,658 55,950 24,000 39,886
- -
108,075 -
17,657 -
343,516 -
- -
- -
9,493 -
184,686 -
- -
- -
Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016
1,006
11-Jan 4-Jan 7-Dec 30-Nov 23-Nov 16-Nov 9-Nov 2-Nov
17-Jan 10-Jan 13-Dec 6-Dec 29-Nov 22-Nov 15-Nov 8-Nov
Año 2016 Año 2016 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
0 0
0 0
31-Aug 24-Aug 17-Aug 10-Aug 3-Aug 27-Jul 20-Jul
6-Sep 30-Aug 23-Aug 16-Aug 9-Aug 2-Aug 26-Jul
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
INDICE
Código Nombre de Código INDICE Meta
Nombre de partida de control Acumulado
frente frente partida (HH / UND)
Real
04300110 00 GENERAL 4300110 Explotacion de Cantera 08 0.0274 -
04300120 00 GENERAL 4300120 Explotacion de Cauce de Quebrada 0.0274 0.0071
04300130 00 GENERAL 4300130 Cantera Cauce de Quebrada - Aguas Ab 0.0274 -
1705301 01 PRESA - ETAP 705301 Transporte de material 3B - 20m3 Dmt=2 - -
1705302 01 PRESA - ETAP 705302 Transporte de material 3C - 20m3 Dmt= - -
1705303 01 PRESA - ETAP 705303 Transporte de material 3D - 20m3 Dmt= - -
1705401 01 PRESA - ETAP 705401 Relleno compactado Material 3B 0.0178 0.0011
1705402 01 PRESA - ETAP 705402 Relleno compactado Material 3C 0.0134 -
1705403 01 PRESA - ETAP 705403 Relleno compactado Material 3D 0.0884 -
2706301 02 PRESA - ETAPA 706301 Transporte de material 2A - 20m3 Dmt=1 - -
2706302 02 PRESA - ETAPA 706302 Transporte de material 2B - 20m3 Dmt= - -
2706303 02 PRESA - ETAPA 706303 Transporte de material 3B - 20m3 Dmt= - -
2706304 02 PRESA - ETAPA 706304 Transporte de material 3C - 20m3 Dmt= - -
2706401 02 PRESA - ETAPA 706401 Relleno compactado Material 2A 0.2059 -
2706402 02 PRESA - ETAPA 706402 Relleno compactado Material 2B 0.0610 -
2706403 02 PRESA - ETAPA 706403 Relleno compactado Material 3B 0.0178 -
2706404 02 PRESA - ETAPA 706404 Relleno compactado Material 3C 0.0134 -
* Insertar nueva semana.
Del: 9-Nov 9-Nov 2-Nov 26-Oct 19-Oct 12-Oct
Al: 15-Nov 15-Nov 8-Nov 1-Nov 25-Oct 18-Oct
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
INDICE
Código Código INDICE Meta ($
Nombre de frente Nombre de partida de control Acumulado
frente partida / UND)
Real
04300110 00 GENERAL 4300110 Explotacion de Cantera 08 0.690 -
04300120 00 GENERAL 4300120 Explotacion de Cauce de Quebrada 0.670 1.208
Cantera Cauce de Quebrada - Aguas
00 GENERAL 4300130 0.670 -
04300130 Abajo
Transporte de material 3B - 20m3
01 PRESA - ETAPA I 705301 0.554 0.705
1705301 Dmt=2.6km
Transporte de material 3C - 20m3
01 PRESA - ETAPA I 705302 0.620 -
1705302 Dmt=1.87km
Transporte de material 3D - 20m3
01 PRESA - ETAPA I 705303 1.020 -
1705303 Dmt=1.81km
1705401 01 PRESA - ETAPA I 705401 Relleno compactado Material 3B 0.330 0.724
1705402 01 PRESA - ETAPA I 705402 Relleno compactado Material 3C 0.290 -
1705403 01 PRESA - ETAPA I 705403 Relleno compactado Material 3D 1.280 -
Transporte de material 2A - 20m3
02 PRESA - ETAPA II 706301 0.690 -
2706301 Dmt=1.86km
Transporte de material 2B - 20m3
02 PRESA - ETAPA II 706302 0.890 -
2706302 Dmt=1.86km
Transporte de material 3B - 20m3
02 PRESA - ETAPA II 706303 0.570 -
2706303 Dmt=2.45km
Transporte de material 3C - 20m3
02 PRESA - ETAPA II 706304 0.620 -
2706304 Dmt=1.88km
2706401 02 PRESA - ETAPA II 706401 Relleno compactado Material 2A 3.750 -
2706402 02 PRESA - ETAPA II 706402 Relleno compactado Material 2B 1.500 -
2706403 02 PRESA - ETAPA II 706403 Relleno compactado Material 3B 0.380 -
2706404 02 PRESA - ETAPA II 706404 Relleno compactado Material 3C 0.290 -
* Insertar nueva semana.
Del: 28-Mar 21-Mar 14-Mar 7-Mar 29-Feb 22-Feb 15-Feb
Al: 3-Apr 27-Mar 20-Mar 13-Mar 6-Mar 28-Feb 21-Feb
Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016
FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE
FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE
Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2016 Año 2015 Año 2015
FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE
FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE
FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE
Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015 Año 2015
FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE
FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE FALTA AVANCE