Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Calculation of Weaving Warping PDF
Calculation of Weaving Warping PDF
html
A beam made of a high speed warping machine weight 369 lbs with the warp the weight of the empty beam
being 69 lbs the number of ends on the beam is 420 & the count of the yarn is 20s cotton. Find :
Solution
Weight of warp on the beam = 369-69 = 300 lbs
=(300×20×840) ÷ 420
=12000 yds.
= (300×20×420) ÷ 420
= 6000 hanks.
Problem 2
A super speed beam warper with a warping speed of 800 yds/min is preparing a standard warp of 525 ends. If
the count of the yarn is 30s & overall efficiency is 84%. Calculate the following.
The length of warp on each beam is required to be 44352 yds. Ignore waste.
Solution
I. Actual length of warp in yds/hr = Calculated production × 60 × Efficiency
= 880 × 60 × (84÷100)
= 44352 yds
= (Total length of warp produced per day of 8 hours in yds) ÷ ( Length of warp on a beam in yds)
= (354816÷44352)
= 8 beams
=(Total length of warp produced per day of 8 hours in yds×No. of ends in the warp) ÷ (840×Count of yarn)
=(354816×525) ÷ (840×20)
= 7392 lbs.
=(7392÷8)
= 924 lbs
Problem 3
A modern high speed beam warping machine produces 8 beams each containing 222720 yards of warp per day
of 8 hrs. If the calculated warping speed of the warper is 580 yds/min. calculate its efficiency.
Solution
=(222720÷8)
= 27840 yds
= 580 × 60 = 34800
Therefore, Efficiency
=(27840÷34800) × 100
=80%.