Projects

For our detailed literature on these other Cordek Solutions,


M74 Interchange please call our technical sales on: 01403 799601
Some 4000m2 of Corform panels were supplied to the
M74 Joint Venture within a six week period.
Formwork Solutions

CORFORM
For a range of construction applications

Trough & Waffle Moulds


For forming ribbed concrete floors

Piling Accessories
A range of product solutions and systems

Cellcore
For protecting foundations against ground movement

Claymaster
Low density polystyrene for accommodating lateral ground movement

Cellform
Like Groundform but with built-in protection against ground movement

Groundform
A formwork system for in-situ ground beams and pile caps

Correx® & Seekure


For temporary protection If the contents of this brochure do not point to a solution for a
M80 Motorway particular application, we urge contractors and specifiers to call our
Cordek supplied 5 structures on the M80 contract in Tipform Technical Sales line on 01403 799601.
Our reputation is built on innovation and we have a wealth of
Scotland to Highway Management Construction JV. A system for constructing steep sided landfill sites
problem solving experience for you to call on.

Filcor EPS
For voidforming, fill and a range of other applications

The total quantity was some 2700m2 with lengths


Creative Solutions
For a range of design led applications
varying from 2600mm to 3100mm. Delivery was
generally required within a matter of weeks from
order placement.
Gas Protection
For venting hazardous gases from under buildings

Cordek Limited
Spring Copse Business Park
THE ULTIMATE PERMANENT FORMWORK SYSTEM
Slinfold
West Sussex
RH13 0SZ England FOR CONSTRUCTING BRIDGE DECKS
Telephone 01403 799600
Facsimile 01403 791718 The contents of this brochure are the copyright of Cordek Limited
e-mail info@cordek.com and may not be reproduced without permission. June 2010

w w w. c o rd e k . c o m CONSTRUCTION • FORMWORK • ACCESSORIES


The Cordek Corform System Design

Corform Corform panels are designed to ensure that they meet Independent tests are then carried out by Stanger
the rigorous requirements of each project, in terms of Testing Services Ltd (UKAS accredited) to confirm the
A new permanent formwork system, for use on both steel and initial and creep deflection. suitability of the design.
concrete beams, from a company with a proven reputation for
supplying quality products to the construction industry.

Cordek have been involved with the


construction of motorway bridges throughout
the UK for more than 30 years. They have
now combined with the UK’s largest
manufacturer of fibreglass products to supply
the Corform range of permanent formwork.

A typical Corform panel


Typical 50mm minimum
panel bearing
Non-standard profiles, skewed ends and tapered units can
be supplied on short lead times. A Corform panel under test at Stangers
PVC Foam Tape

A curved viaduct on the M74 requiring 546 non-standard Corform panels varying in length from 2740mm to 4400mm. Butyl Tape
Butyl Bead

Cross section of
panel butt joints

Accessories
● 8mm Butyl Bead (6m rolls)
- for sealing between Corform panel and bridge steel
● Butyl Tape (50mm x 28m long)
- for sealing joints between butt joints of panels
● PVC Foam Tape (19mm wide x 12m long) Benefits
Butyl Bead
- to prevent grout loss between Corform panel and bridge steel ● A rapid and reliable delivery service

● A high quality product

● Where necessary lifting holes in the stiffeners to facilitate cranage

● Very flexible panel construction

● Independent testing by Stanger Testing Services Ltd (UKAS accredited)

PVC Foam Tape Butyl Tape ● Detailed layouts supplied by Cordek Technical Team
The Cordek Corform System Design

Corform Corform panels are designed to ensure that they meet Independent tests are then carried out by Stanger
the rigorous requirements of each project, in terms of Testing Services Ltd (UKAS accredited) to confirm the
A new permanent formwork system, for use on both steel and initial and creep deflection. suitability of the design.
concrete beams, from a company with a proven reputation for
supplying quality products to the construction industry.

Cordek have been involved with the


construction of motorway bridges throughout
the UK for more than 30 years. They have
now combined with the UK’s largest
manufacturer of fibreglass products to supply
the Corform range of permanent formwork.

A typical Corform panel


Typical 50mm minimum
panel bearing
Non-standard profiles, skewed ends and tapered units can
be supplied on short lead times. A Corform panel under test at Stangers
PVC Foam Tape

A curved viaduct on the M74 requiring 546 non-standard Corform panels varying in length from 2740mm to 4400mm. Butyl Tape
Butyl Bead

Cross section of
panel butt joints

Accessories
● 8mm Butyl Bead (6m rolls)
- for sealing between Corform panel and bridge steel
● Butyl Tape (50mm x 28m long)
- for sealing joints between butt joints of panels
● PVC Foam Tape (19mm wide x 12m long) Benefits
Butyl Bead
- to prevent grout loss between Corform panel and bridge steel ● A rapid and reliable delivery service

● A high quality product

● Where necessary lifting holes in the stiffeners to facilitate cranage

● Very flexible panel construction

● Independent testing by Stanger Testing Services Ltd (UKAS accredited)

PVC Foam Tape Butyl Tape ● Detailed layouts supplied by Cordek Technical Team
The Cordek Corform System Design

Corform Corform panels are designed to ensure that they meet Independent tests are then carried out by Stanger
the rigorous requirements of each project, in terms of Testing Services Ltd (UKAS accredited) to confirm the
A new permanent formwork system, for use on both steel and initial and creep deflection. suitability of the design.
concrete beams, from a company with a proven reputation for
supplying quality products to the construction industry.

Cordek have been involved with the


construction of motorway bridges throughout
the UK for more than 30 years. They have
now combined with the UK’s largest
manufacturer of fibreglass products to supply
the Corform range of permanent formwork.

A typical Corform panel


Typical 50mm minimum
panel bearing
Non-standard profiles, skewed ends and tapered units can
be supplied on short lead times. A Corform panel under test at Stangers
PVC Foam Tape

A curved viaduct on the M74 requiring 546 non-standard Corform panels varying in length from 2740mm to 4400mm. Butyl Tape
Butyl Bead

Cross section of
panel butt joints

Accessories
● 8mm Butyl Bead (6m rolls)
- for sealing between Corform panel and bridge steel
● Butyl Tape (50mm x 28m long)
- for sealing joints between butt joints of panels
● PVC Foam Tape (19mm wide x 12m long) Benefits
Butyl Bead
- to prevent grout loss between Corform panel and bridge steel ● A rapid and reliable delivery service

● A high quality product

● Where necessary lifting holes in the stiffeners to facilitate cranage

● Very flexible panel construction

● Independent testing by Stanger Testing Services Ltd (UKAS accredited)

PVC Foam Tape Butyl Tape ● Detailed layouts supplied by Cordek Technical Team
Projects

For our detailed literature on these other Cordek Solutions,


M74 Interchange please call our technical sales on: 01403 799601
Some 4000m2 of Corform panels were supplied to the
M74 Joint Venture within a six week period.
Formwork Solutions

CORFORM
For a range of construction applications

Trough & Waffle Moulds


For forming ribbed concrete floors

Piling Accessories
A range of product solutions and systems

Cellcore
For protecting foundations against ground movement

Claymaster
Low density polystyrene for accommodating lateral ground movement

Cellform
Like Groundform but with built-in protection against ground movement

Groundform
A formwork system for in-situ ground beams and pile caps

Correx® & Seekure


For temporary protection If the contents of this brochure do not point to a solution for a
M80 Motorway particular application, we urge contractors and specifiers to call our
Cordek supplied 5 structures on the M80 contract in Tipform Technical Sales line on 01403 799601.
Our reputation is built on innovation and we have a wealth of
Scotland to Highway Management Construction JV. A system for constructing steep sided landfill sites
problem solving experience for you to call on.

Filcor EPS
For voidforming, fill and a range of other applications

The total quantity was some 2700m2 with lengths


Creative Solutions
For a range of design led applications
varying from 2600mm to 3100mm. Delivery was
generally required within a matter of weeks from
order placement.
Gas Protection
For venting hazardous gases from under buildings

Cordek Limited
Spring Copse Business Park
THE ULTIMATE PERMANENT FORMWORK SYSTEM
Slinfold
West Sussex
RH13 0SZ England FOR CONSTRUCTING BRIDGE DECKS
Telephone 01403 799600
Facsimile 01403 791718 The contents of this brochure are the copyright of Cordek Limited
e-mail info@cordek.com and may not be reproduced without permission. June 2010

w w w. c o rd e k . c o m CONSTRUCTION • FORMWORK • ACCESSORIES


Projects

For our detailed literature on these other Cordek Solutions,


M74 Interchange please call our technical sales on: 01403 799601
Some 4000m2 of Corform panels were supplied to the
M74 Joint Venture within a six week period.
Formwork Solutions

CORFORM
For a range of construction applications

Trough & Waffle Moulds


For forming ribbed concrete floors

Piling Accessories
A range of product solutions and systems

Cellcore
For protecting foundations against ground movement

Claymaster
Low density polystyrene for accommodating lateral ground movement

Cellform
Like Groundform but with built-in protection against ground movement

Groundform
A formwork system for in-situ ground beams and pile caps

Correx® & Seekure


For temporary protection If the contents of this brochure do not point to a solution for a
M80 Motorway particular application, we urge contractors and specifiers to call our
Cordek supplied 5 structures on the M80 contract in Tipform Technical Sales line on 01403 799601.
Our reputation is built on innovation and we have a wealth of
Scotland to Highway Management Construction JV. A system for constructing steep sided landfill sites
problem solving experience for you to call on.

Filcor EPS
For voidforming, fill and a range of other applications

The total quantity was some 2700m2 with lengths


Creative Solutions
For a range of design led applications
varying from 2600mm to 3100mm. Delivery was
generally required within a matter of weeks from
order placement.
Gas Protection
For venting hazardous gases from under buildings

Cordek Limited
Spring Copse Business Park
THE ULTIMATE PERMANENT FORMWORK SYSTEM
Slinfold
West Sussex
RH13 0SZ England FOR CONSTRUCTING BRIDGE DECKS
Telephone 01403 799600
Facsimile 01403 791718 The contents of this brochure are the copyright of Cordek Limited
e-mail info@cordek.com and may not be reproduced without permission. June 2010

w w w. c o rd e k . c o m CONSTRUCTION • FORMWORK • ACCESSORIES