Qm = (Qa + Qb)/2
Qm = 7.4 l/s
T= 1.5 2.35 (minutos) 40 Partidas por hora
VR = Qm*T/4
VR = 166.5 lt
VE = VR(Pb+1)/(Pb-Pa)
VE = 563.7 Lt
Qm = (Qa + Qb)/2 0
Qm = 4
T= 4 1.41 (minutos) 15 Partidas por hora
VR = Qm*T/4
VR = 240
VE = VR(Pb+1)/(Pb-Pa)
VE = 1003.6 Lt
RESULTADOS
DATOS
406050078.xls
CENTRO ECOMAULE, PLANTA DE TRATAMIENTO DE LIXIVIADOS
Diámetro Boquilla
Qm 7.40 L/s
V 8 m/s
Ad neta 0.000925
Ad 0.004625 20%
d 19.18 mm Máx 3" (eventualmente 4")
0.76 pul 0,5 a 0,6 Dt
406050078.xls
PLANTA ELEVADORA
ALTURA GEOMETRICA
C eje bomba 194.1
CA MIN 199.00
P partida (bar) 2.40 24
Hg 19.10
PERDIDAS FRICCIONALES
Q MAT DN D int L C Hs V
Succión 1 CEM ASB 150.0 150.0 130.0 130.0 1,738.10 0.07
Succión 1 PVC 100.0 99.4 30.0 140.0 2,594.25 0.17
Succión 1 ACERO 100.0 100.0 5.0 100.0 782.96 0.17
Impulsión 1 Acero 50.0 50.0 3.0 100.0 13,740.96 0.66
18,856.26
PERDIDAS SINGULARES
161,673.48
Q (l/s) H (m)
0.00 19.1
2.78 20.7
5.56 25.4
8.33 33.0
11.11 43.6
13.89 57.2
16.67 73.7
19.44 93.1
22.22 115.4
25.00 140.6
27.78 168.8
30.56 199.8
33.33 233.6
PLANTA ELEVADORA
ALTURA GEOMETRICA
C eje bomba 194.1
CA MIN 199.00
P partida (bar) 3.60 36
Hg 31.10
PERDIDAS FRICCIONALES
Q MAT DN D int L C Hs V
Succión 1 CEM ASB 150.0 150.0 130.0 130.0 1,738.10 0.07
Succión 1 PVC 100.0 99.4 30.0 140.0 2,594.25 0.17
Succión 1 ACERO 100.0 100.0 5.0 100.0 782.96 0.17
Impulsión 1 Acero 50.0 50.0 3.0 100.0 13,740.96 0.66
18,856.26
PERDIDAS SINGULARES
161,673.48
Q (l/s) H (m)
0.00 31.1
2.78 32.7
5.56 37.4
8.33 45.0
11.11 55.6
13.89 69.2
16.67 85.7
19.44 105.1
22.22 127.4
25.00 152.6
27.78 180.8
30.56 211.8
33.33 245.6
36.11 282.4
38.89 322.0
41.67 364.5
44.44 409.9
Grafico Nº1
COCHRANE, SECTOR CHACRAS ESTRADA NORTE
Puntos de operación hidroneumático-bomba
140.0
120.0
100.0
Alturas (m)
80.0
60.0
40.0
20.0
0.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00
Alturas
60.0
40.0
20.0
0.0
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00
Caudal (l/seg)
Qm = (Qa + Qb)/2
Qm = 1
T= 4 5.477226 (minutos) 15 Partidas por hora
VR = Qm*T/4
VR = 60
VE = VR(Pb+1)/(Pb-Pa)
VE = 270 Lt
T Pvap
ºC bar
20 0.02337
40 0.07375
60 0.19920
80 0.47360
90 0.70110
100 1.00000
mca
10.19716