Está en la página 1de 16

METRADO DE ESTRUCTURAS - (BLOQUE - 1)

01. ESTRUCTURAS AULAS

Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
01 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 LIMPIEZA DE TERRENO MANUAL 1 1 390.50 390.50 M2
01.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA 1 1 390.50 390.50 M2

01.02 MOVIMIENTO DE TIERRAS


01.02.01 EXCAVACION PARA CIMIENTOS-ZAPATAS 142.84 M3
Zapatas
Z-1 20 1 1.30 1.30 2.00 67.60
Z-2 6 1 1.80 1.80 2.00 38.88
cimentacion
EJE A-A TRAMO 1,2,3,4 1 1 6.85 0.40 1.05 2.88
EJE A-B TRAMO 1,2 1 1 4.50 0.40 1.05 1.89
EJE B-B TRAMO 3,4 1 1 1.20 0.40 1.05 0.50
EJE B-C TRAMO 3,4 1 1 0.75 0.40 1.05 0.32
EJE C-C TRAMO 1'-1,2,3 1 1 7.95 0.40 1.05 3.34
EJE C-D TRAMO 1'1 1 1 4.50 0.40 1.05 1.89
EJE E-E TRAMO 1',1,2,3 1 1 7.95 0.40 1.05 3.34
EJE F-F TRAMO 3,4 1 1 1.95 0.40 1.05 0.82
EJE F-G TRAMO 1-2 1 1 4.50 0.40 1.05 1.89
EJE G-G TRAMO 1-2-3-4 1 1 6.85 0.40 1.05 2.88

EJE 1'-1' TRAMO C-E 1 1 5.50 0.40 1.05 2.31


EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 11.22 0.40 1.05 4.71
EJE 2-2 TRAMO C-D-E 1 1 5.26 0.40 1.05 2.21
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 11.72 0.40 1.05 4.92
EJE 4-4 TRAMO A-B-F-G 1 1 5.86 0.40 1.05 2.46

01.02.02 RELLENO Y COMPACTADO MANUAL 22.39 M3


ZAPATAS
Z1 20 1 Area= 1.14 0.60 13.68
Z2 6 1 Area= 2.42 0.60 8.71

01.02.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES Y OTROS 178.54 M3


TOTAL 142.84 178.54

01.02.04 ELIMINACION DE MATERIAL EXEDENTE CON MAQUINARIA A 5KM 178.54 178.54 M3

01.03 CONCRETO SIMPLE

01.03.01 SOLADO EN VIGAS DE CIMIENTOS 2.02 M3


EJE A-A TRAMO 1,2,3,4 1 1 10.20 0.40 0.05 0.20
EJE B-B TRAMO 3,4 1 1 2.15 0.40 0.05 0.04
EJE C-C TRAMO 1'-1,2,3 1 1 11.80 0.40 0.05 0.24
EJE E-E TRAMO 1,2,3 1 1 11.80 0.40 0.05 0.24
EJE F-F TRAMO 3,4 1 1 2.15 0.40 0.05 0.04
EJE G-G TRAMO 1-2-3-4 1 1 10.20 0.40 0.05 0.20

EJE 1'-1' TRAMO C-E 1 1 7.46 0.40 0.05 0.15


EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.12 0.40 0.05 0.30
EJE 2-2 TRAMO C-D-E 1 1 7.46 0.40 0.05 0.15
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.12 0.40 0.05 0.30
EJE 4-4 TRAMO A-B-F-G 1 1 7.76 0.40 0.05 0.16

01.03.02 CONCRETO EN SUB ZAPATAS C.H: 1:12+30% PM 26.62 M3


Z1 20 1 1.30 1.30 0.50 16.90
Z2 6 1 1.80 1.80 0.50 9.72

01.03.03 CONCRETO EN CIMIENTOS CORRIDOS 4.32 M3


EJE A-B TRAMO 1,2 1 1 4.50 0.40 0.65 1.17
EJE C-D TRAMO 1'1 1 1 4.50 0.40 0.65 1.17
EJE F-G TRAMO 1-2 1 1 4.50 0.40 0.65 1.17
EJE C-B TRAMO 3-4 2 1 1.55 0.40 0.65 0.81

01.03.04 CONCRETO EN SOBRE CIMIENTOS CORRIDOS 2.32 M3


EJE A-B TRAMO 1,2 1 1 4.50 0.40 0.35 0.63
EJE C-D TRAMO 1'1 1 1 4.50 0.40 0.35 0.63
EJE F-G TRAMO 1-2 1 1 4.50 0.40 0.35 0.63
EJE C-B TRAMO 3-4 2 1 1.55 0.40 0.35 0.43

01.03.05 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS HASTA 0.35M. 5.81 M2


EJE A-B TRAMO 1,2 1 1 4.50 0.35 1.58
EJE C-D TRAMO 1'1 1 1 4.50 0.35 1.58
EJE F-G TRAMO 1-2 1 1 4.50 0.35 1.58
EJE C-B TRAMO 3-4 2 1 1.55 0.35 1.09

1.04 CONCRETO ARMADO


01.04.01 ZAPATAS
01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 23.07 M3
Z -1 20 1 1.20 1.20 0.50 14.40
Z -2 6 1 1.70 1.70 0.50 8.67

01.04.01.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN ZAPATAS 739.20 KG


Ver planilla de metrados de acero 1 1 739.20 739.20
Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
01.04.02 VIGAS DE CIMENTACION
01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION 10.12 M3
EJE A-A TRAMO 1,2,3,4 1 1 10.20 0.25 0.40 1.02
EJE B-B TRAMO 3,4 1 1 2.15 0.25 0.40 0.22
EJE C-C TRAMO 1'-1,2,3 1 1 11.80 0.25 0.40 1.18
EJE E-E TRAMO 1,2,3 1 1 11.80 0.25 0.40 1.18
EJE F-F TRAMO 3,4 1 1 2.15 0.25 0.40 0.22
EJE G-G TRAMO 1-2-3-4 1 1 10.20 0.25 0.40 1.02

EJE 1'-1' TRAMO C-E 1 1 7.46 0.25 0.40 0.75


EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.12 0.25 0.40 1.51
EJE 2-2 TRAMO C-D-E 1 1 7.46 0.25 0.40 0.75
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.12 0.25 0.40 1.51
EJE 4-4 TRAMO A-B-F-G 1 1 7.76 0.25 0.40 0.78
101.22
01.04.02.02 ACERO F'Y=4200 KG/CM2 GRADO 60 VIGAS DE CIMENTACION 1539.31 KG
Ver planilla de metrados de acero 1 1 1539.31 1539.31

01.04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION 80.98 M2


EJE A-A TRAMO 1,2,3,4 2 1 10.20 0.40 8.16
EJE B-B TRAMO 3,4 2 1 2.15 0.40 1.72
EJE C-C TRAMO 1'-1,2,3 2 1 11.80 0.40 9.44
EJE E-E TRAMO 1,2,3 2 1 11.80 0.40 9.44
EJE F-F TRAMO 3,4 2 1 2.15 0.40 1.72
EJE G-G TRAMO 1-2-3-4 2 1 10.20 0.40 8.16

EJE 1'-1' TRAMO C-E 2 1 7.46 0.40 5.97


EJE 1-1 TRAMO A-B-C-D-E-F-G 2 1 15.12 0.40 12.10
EJE 2-2 TRAMO C-D-E 2 1 7.46 0.40 5.97
EJE 3-3 TRAMO A-B-C-E-F-G 2 1 15.12 0.40 12.10
EJE 4-4 TRAMO A-B-F-G 2 1 7.76 0.40 6.21
01.04.03 CIMIENTOS REFORZADOS
01.04.03.01 CONCRETO EN CIMIENTOS Y SOBRE CIMIENTOS REFORZADOS 25.31
EJE A-A TRAMO 1,2,3,4 1 1 10.20 0.25 1.00 2.55
EJE B-B TRAMO 3,4 1 1 2.15 0.25 1.00 0.54
EJE C-C TRAMO 1'-1,2,3 1 1 11.80 0.25 1.00 2.95
EJE E-E TRAMO 1,2,3 1 1 11.80 0.25 1.00 2.95
EJE F-F TRAMO 3,4 1 1 2.15 0.25 1.00 0.54
EJE G-G TRAMO 1-2-3-4 1 1 10.20 0.25 1.00 2.55

EJE 1'-1' TRAMO C-E 1 1 7.46 0.25 1.00 1.87


EJE 1-1 TRAMO A-B-C-D-E-F-G 1 1 15.12 0.25 1.00 3.78
EJE 2-2 TRAMO C-D-E 1 1 7.46 0.25 1.00 1.87
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.12 0.25 1.00 3.78
EJE 4-4 TRAMO A-B-F-G 1 1 7.76 0.25 1.00 1.94

ACERO F'Y=4200
01.04.03.02
KG/CM2 GRADO 60 EN CIMIENTOS REFORZADOS 512.713 KG
Ver planilla de metrados de acero 1 1 512.71 512.71

01.03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS REFORZADOS 60.73


EJE A-A TRAMO 1,2,3,4 1 2 10.20 0.30 6.12
EJE B-B TRAMO 3,4 1 2 2.15 0.30 1.29
EJE C-C TRAMO 1'-1,2,3 1 2 11.80 0.30 7.08
EJE E-E TRAMO 1,2,3 1 2 11.80 0.30 7.08
EJE F-F TRAMO 3,4 1 2 2.15 0.30 1.29
EJE G-G TRAMO 1-2-3-4 1 2 10.20 0.30 6.12
2 0.30
EJE 1'-1' TRAMO C-E 1 2 7.46 0.30 4.48
EJE 1-1 TRAMO A-B-C-D-E-F-G 1 2 15.12 0.30 9.07
EJE 2-2 TRAMO C-D-E 1 2 7.46 0.30 4.48
EJE 3-3 TRAMO A-B-C-E-F-G 1 2 15.12 0.30 9.07
EJE 4-4 TRAMO A-B-F-G 1 2 7.76 0.30 4.66

01.04.04 COLUMNAS
01.04.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 9.29 M3
Columna C-1 20 1 0.35 0.25 4.55 7.96
Columna C-2 6 1 0.25 0.25 3.55 1.33

01.04.04.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNAS 1700.38 KG


Ver planilla de metrados de acero 1 1 1700.38 1700.38

01.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 139.50 M2


Columna C-1 20 1 1.20 4.65 111.60
Columna C-2 6 1 1.00 4.65 27.90

01.04.05 COLUMNETAS
01.04.05.01 CONCRETO EN COLUMNETAS F'C=210 KG/CM2 7.61 M3
Columna Ca-1 34 1 0.25 0.20 2.85 4.85
Columna Ca-2 11 1 0.25 0.20 1.00 0.55
Columna Ca-3 6 1 0.25 0.20 1.75 0.53
Columna Ca-4 15 1 0.25 0.15 3.00 1.69

01.04.05.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNETAS 2013.24 KG


Ver planilla de metrados de acero 1 1 2013.24 2013.24

01.04.05.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS 65.36 M2


Columna C-1 34 2 0.20 2.85 38.76
Columna C-2 11 2 0.20 1.00 4.40
Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
Columna C-3 6 2 0.20 1.75 4.20
Columna C-4 15 2 0.20 3.00 18.00

01.04.06 VIGAS
01.04.06.01 CONCRETO EN VIGAS F'C=210 KG/CM2 11.38 M3
EJE A-A TRAMO 1,2,3 1 1 8.05 0.25 0.40 0.81
EJE C-C TRAMO 1'-1,2,3 1 1 11.08 0.25 0.40 1.11
EJE E-E TRAMO 1,2,3 1 1 11.08 0.25 0.40 1.11
EJE G-G TRAMO 1-2-3-4 1 1 8.05 0.25 0.40 0.81
EJE A-A, B-B TRAMO 3-4 2 1 3.00 0.25 0.35 0.53
EJE G-G, F-F TRAMO 3-5 2 1 3.00 0.25 0.35 0.53
EJEA,B,C,D,E,F,G TRAMOS 1',1,2y3 14 1 0.60 0.25 0.20 0.42

EJE 1'-1' TRAMO C-E 1 1 7.76 0.25 0.40 0.78


EJE 1-1 TRAMO A-B-C-E-F-G 1 1 15.12 0.25 0.40 1.51
EJE 2-2 TRAMO A-B-C-E-F-G 1 1 7.46 0.25 0.40 0.75
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.12 0.25 0.40 1.51
EJE 4-4 TRAMO A-B-F-G 2 1 5.58 0.25 0.40 1.12
EJE 1',1,2,3 TRAMOS A,B,C,D,E,F,G 14 1 0.60 0.25 0.20 0.42

01.04.06.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS 1783.46 KG


Ver planilla de metrados de acero 1 1 1783.46 1783.46

01.04.06.03 ENCOFRADO Y DESNCOFRADO NORMAL EN VIGAS 114.11 M2


EJE A-A TRAMO 1,2,3 1 1 8.05 1.05 8.45
EJE C-C TRAMO 1'-1,2,3 1 1 11.08 1.05 11.63
EJE E-E TRAMO 1,2,3 1 1 11.08 1.05 11.63
EJE G-G TRAMO 1-2-3-4 1 1 8.05 1.05 8.45
EJE A-A, B-B TRAMO 3-4 2 1 3.00 0.95 5.70
EJE G-G, F-F TRAMO 3-5 2 1 3.00 0.95 5.70
EJEA,B,C,D,E,F,G TRAMOS 1',1,2y3 14 1 0.60 0.25 2.10

EJE 1'-1' TRAMO C-E 1 1 7.76 1.05 8.15


EJE 1-1 TRAMO A-B-C-E-F-G 1 1 15.12 1.05 15.88
EJE 2-2 TRAMO A-B-C-E-F-G 1 1 7.46 1.05 7.83
Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
EJE 3-3 TRAMO A-B-C-E-F-G 1 1 15.12 1.05 15.88
EJE 4-4 TRAMO A-B-F-G 2 1 5.58 0.95 10.60
EJE 1',1,2,3 TRAMOS A,B,C,D,E,F,G 14 1 0.60 0.25 2.10

01.04.07 LOSA ALIGERADA EN VOLADOS DE TECHO


01.04.07.01 CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2 8.32 M3
CONCRETO EN LOZA ALIGERADA F'C=210 KG/CM2 EN VOLADOS 4.69 M3
EJE A-A TRAMO 1,2,3,4 1 1 8.80 0.60 0.05 0.26
EJE C-C TRAMO 1'-1,2,3 1 1 12.80 0.65 0.05 0.42
EJE E-E TRAMO 1,2,3 1 1 12.80 0.65 0.05 0.42
EJE G-G TRAMO 1-2-3-4 1 1 8.80 0.60 0.05 0.26

EJE 1'-1' TRAMO C-E 1 1 9.70 0.60 0.05 0.29


EJE 1-1 TRAMO A-B-C-D-E-F-G 2 1 9.10 0.60 0.05 0.55
EJE 2-2 TRAMO A-B-C-D-E-F-G 1 1 8.00 0.60 0.05 0.24
EJE 3-3 TRAMO A-B-C-E-F-G 2 1 9.70 0.60 0.05 0.58

01.04.07.02 CONCRETO EN LOZA ALIGERADA F'C=210 KG/CM2 EN SS.HH


EJE 4-4 TRAMO A-B,F-G 2 1 5.58 3.00 0.05 1.67

01.04.07.03 CONCRETO EN VIGUETAS DE LOZA ALIGERADA F'C=210 KG/CM2 3.62 M3


EJE A-A TRAMO 1,2,3,4 2 1 8.80 0.10 0.15 0.26
EJE C-C TRAMO 1'-1,2,3 2 1 12.80 0.10 0.15 0.38
EJE E-E TRAMO 1,2,3 2 1 12.80 0.10 0.15 0.38
EJE G-G TRAMO 1-2-3-4 2 1 8.80 0.10 0.15 0.26

EJE 1'-1' TRAMO C-E 2 1 9.70 0.10 0.15 0.29


EJE 1-1 TRAMO A-B-C-D-E-F-G 4 1 9.10 0.10 0.15 0.55
EJE 2-2 TRAMO A-B-C-D-E-F-G 2 1 8.00 0.10 0.15 0.24
EJE 3-3 TRAMO A-B-C-E-F-G 4 1 9.70 0.10 0.15 0.58

01.04.07.04 CONCRETO EN LOZA ALIGERADA F'C=210 KG/CM2 EN SS.HH


EJE 4-4 TRAMO A-B,F-G 8 1 5.58 0.10 0.15 0.67

01.04.07.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN LOZA ALIGERADA 602.21 KG


Ver planilla de metrados de acero 1 1 602.21 602.21

01.04.07.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOZA ALIGERADA 91.24 M2


EJE A-A TRAMO 1,2,3,4 1 1 8.80 0.80 7.04
EJE C-C TRAMO 1'-1,2,3 1 1 12.80 0.85 10.88
EJE E-E TRAMO 1,2,3 1 1 12.80 0.85 10.88
EJE G-G TRAMO 1-2-3-4 1 1 8.80 0.80 7.04

EJE 1'-1' TRAMO C-E 1 1 9.70 0.80 7.76


EJE 1-1 TRAMO A-B-C-D-E-F-G 2 1 9.10 0.80 14.56
EJE 2-2 TRAMO A-B-C-D-E-F-G 1 1 8.00 0.80 6.40
EJE 3-3 TRAMO A-B-C-E-F-G 2 1 9.70 0.80 15.52
EJE 4-4 TRAMO A-B,F-G 2 1 5.58 0.20 2.23
EJE 4-4 TRAMO A-B,F-G 8 1 5.58 0.20 8.93

01.04.07.04 LADRILLO DE ARCILLA HUECO 15X30X30 PARA TECHO 514.33 UND


EJE A-A TRAMO 1,2,3,4 1 1 8.80 0.30 29.33
EJE C-C TRAMO 1'-1,2,3 1 1 12.80 0.30 42.67
EJE E-E TRAMO 1,2,3 1 1 12.80 0.30 42.67
EJE G-G TRAMO 1-2-3-4 1 1 8.80 0.30 29.33

EJE 1'-1' TRAMO C-E 1 1 9.70 0.30 32.33


EJE 1-1 TRAMO A-B-C-D-E-F-G 2 1 9.10 0.30 60.67
EJE 2-2 TRAMO A-B-C-D-E-F-G 1 1 8.00 0.30 26.67
EJE 3-3 TRAMO A-B-C-E-F-G 2 1 9.70 0.30 64.67
EJE 4-4 TRAMO A-B,F-G 2 1 5.58 0.30 37.20
EJE 4-4 TRAMO A-B,F-G 8 1 5.58 0.30 148.80

01.05 JUNTAS DE CONSTRUCCION


01.05.01 JUNTAS DE TEKNOPOR DE 1" 50.19 M
EJE A-A TRAMO 1'-1,2,3,4 1 8 0.25 3.65 7.30
EJE B-B TRAMO 1-2-3-4 1 7 0.25 3.65 6.39
EJE C-C TRAMO 1'-1,2,3,4 1 11 0.25 3.65 10.04
EJE D-D TRAMO 1'-1-2-3-4 1 4 0.25 3.65 3.65
EJE E-E TRAMO 1'- 1,2,3,4 1 10 0.25 3.65 9.13
EJE F-F TRAMO 1'-1-2-3-4 1 6 0.25 3.65 5.48
EJE G-G TRAMO 1'-1-2-3-4 1 9 0.25 3.65 8.21

01.06 ESTRUCTURAS METALICAS


01.07.01 TIJERAL METALICO, TIPO - 01 1 3 3.00 3.00 UND
01.07.02 TIJERAL METALICO, TIPO - 02 1 6 6.00 6.00 UND
01.07.03 TIJERAL METALICO, TIPO - 03 1 20 20.00 20.00 UND
01.07.04 TIJERAL METALICO, TIPO - 04 1 20 20.00 20.00 UND
01.07.05 TIJERAL METALICO, TIPO - 05 1 2 2.00 2.00 UND
01.07.06 TIJERAL METALICO, TIPO - 06 1 2 2.00 2.00 UND
01.07.07 TIJERAL METALICO, TIPO - 07 1 2 2.00 2.00 UND
01.07.08 TIJERAL METALICO, TIPO - 08 1 10 10.00 10.00 UND
01.07.09 TIJERAL METALICO, TIPO - 09 1 2 2.00 2.00 UND
01.07.10 TIRANTES DE TUBO LAC 2''*3''X2.5MM EN EXTERIORES 1 1 55.50 55.50 55.50 ML
01.07.11 CORREAS DE TUBO LAC 2''X3''X2.5MM EN AULAS 1 1 315.88 315.88 315.88 ML
01.07.11 CORREAS DE TUBO LAC 2''X2''X2.5MM EN EXTERIORES 1 1 80.70 80.70 80.70 ML
01.07 COBERTURA
Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
01.07.01 COBERTURA DE POLICARBONATO
EN EXTERIOR 1 1 AREA=63.13 63.13 63.13 M2
01.07.02 COBERTURA DE TEJA ANDINA 275.56 M2
EN AULAS 1 1 area= 275.56 275.56

01.07.03 CUMBRERA DE TEJA ANDINA 73.00 M


EN AULAS 1 1 73.00 73.00

01.08 PRUEBAS
01.08.01 PRUEBAS DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) 10 1 10.00 10.00 UND
METRADO DE ESTRUCTURAS - (BLOQUE - 1)
FECHA: MARZO -2014 Revisado:

Clasificacion (m) Peso Peso


Nº Nº Piezas Longitud Longitud
Partida Descripción Ø Elemento por por Pieza Parcial 1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
Iguales Elemento (m) (m)
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

1.05 CONCRETO ARMADO


01.05.01 ZAPATAS
01.05.01.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN ZAPATAS 739.20

Zapata - 1
Longitudinal 5/8" 20 6 1.16 139.20 1.6 222.72

Transversal 5/8" 20 6 1.16 139.20 1.6 222.72

Zapata - 2
Longitudinal 5/8" 6 9 1.70 91.80 1.6 146.88

Transversal 5/8" 6 9 1.70 91.80 1.6 146.88

01.05.01.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN CIMIENTOS REFORZADOS 512.71

Longitudinal 3/8" 1 4 101.22 404.88 0.58 234.83

Transversal 3/8" 1 337.4 1.42 479.11 0.58 277.88

01.05.03 VIGAS DE CIMENTACION


01.05.03.02 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS DE CIMENTACION 1,539.31

1
EJE A-A TRAMO 1,2,3,4 5/8" 4 12.20 48.80 1.6 78.08

1
EJE B-B TRAMO 3,4 5/8" 4 2.90 11.60 1.6 18.56

1
EJE C-C TRAMO 1'-1,2,3 5/8" 4 13.72 54.88 1.6 87.81

1
EJE E-E TRAMO 1' 1,2,3 5/8" 4 13.72 54.88 1.6 87.81

1
EJE F-F TRAMO 3,4 5/8" 4 2.90 11.60 1.6 18.56

1
EJE G-G TRAMO 1-2-3-4 5/8" 4 12.20 48.80 1.6 78.08

1
EJE 1'-1' TRAMO C-D-E 5/8" 4 8.70 34.80 1.6 55.68

1
EJE 1-1 TRAMO A-B-C-D-E-F-G 5/8" 4 17.60 70.40 1.6 112.64

1
EJE 2-2 TRAMO C-D-E 5/8" 4 8.70 34.80 1.6 55.68

1
EJE 3-3 TRAMO A-B-C-E-F-G 5/8" 4 17.60 70.40 1.6 112.64

1
EJE 4-4 TRAMO A-B-F-G 5/8" 4 9.14 36.56 1.6 58.50

01.05.03.03 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS DE CIMENTACION

1
EJE A-A TRAMO 1,2,3,4 1/2" 2 12.20 24.40 1.02 24.89
Clasificacion (m) Peso Peso
Nº Nº Piezas Longitud Longitud
Partida Descripción Ø Elemento por por Pieza Parcial 1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
Iguales Elemento (m) (m)
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

1
EJE B-B TRAMO 3,4 1/2" 2 2.90 5.80 1.02 5.92

1
EJE C-C TRAMO 1'-1,2,3 1/2" 2 13.72 27.44 1.02 27.99

1
EJE E-E TRAMO 1' 1,2,3 1/2" 2 13.72 27.44 1.02 27.99

1
EJE F-F TRAMO 3,4 1/2" 2 2.90 5.80 1.02 5.92

1
EJE G-G TRAMO 1-2-3-4 1/2" 2 12.20 24.40 1.02 24.89

1
EJE 1'-1' TRAMO C-E 1/2" 2 8.70 17.40 1.02 17.75

1
EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 2 17.60 35.20 1.02 35.90

1
EJE 2-2 TRAMO C-D-E 1/2" 2 8.70 17.40 1.02 17.75

1
EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 2 17.60 35.20 1.02 35.90

1
EJE 4-4 TRAMO A-B-F-G 1/2" 2 9.14 18.28 1.02 18.65

01.05.03.04 ESTRIBOS EN VIGAS DE CIMENTACION


1
EJE A-A TRAMO 1,2,3,4 3/8" 59 1.20 70.80 0.58 41.06

1
EJE B-B TRAMO 3,4 3/8" 15 1.20 18.00 0.58 10.44

1
EJE C-C TRAMO 1'-1,2,3 3/8" 44 1.20 52.80 0.58 30.62

1
EJE E-E TRAMO 1' 1,2,3 3/8" 44 1.20 52.80 0.58 30.62

1
EJE F-F TRAMO 3,4 3/8" 15 1.20 18.00 0.58 10.44

1
EJE G-G TRAMO 1-2-3-4 3/8" 59 1.20 70.80 0.58 41.06

1
EJE 1'-1' TRAMO C-E 3/8" 80 1.20 96.00 0.58 55.68

1
EJE 1-1 TRAMO A-B-C-D-E-F-G 3/8" 160 1.20 192.00 0.58 111.36

1
EJE 2-2 TRAMO C-D-E 3/8" 80 1.20 96.00 0.58 55.68

1
EJE 3-3 TRAMO A-B-C-E-F-G 3/8" 160 1.20 192.00 0.58 111.36

1
EJE 4-4 TRAMO A-B-F-G 3/8" 48 1.20 57.60 0.58 33.41

01.05.04 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNAS 1,700.38

Columna C-1 5/8" 20 4.00 5.40 432.00 1.60 691.20

Columna C-1 1/2'' 20 2.00 5.40 216.00 1.02 220.32


Clasificacion (m) Peso Peso
Nº Nº Piezas Longitud Longitud
Partida Descripción Ø Elemento por por Pieza Parcial 1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
Iguales Elemento (m) (m)
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

Columna C-2 5/8" 6 4.00 4.50 108.00 1.60 172.80

Columna C-2 1/2'' 6 2.00 4.50 54.00 1.02 55.08

01.05.04.1 ESTRIBOS

ESTRIBO EN C 1 3/8" 20 34 1.20 816.00 0.58 473.28

ESTRIBO EN C 2 3/8" 6 28 0.90 151.20 0.58 87.70

01.05.05 ACERO F'Y=4200 KG/CM2 GRADO 60 EN COLUMNETAS 2,013.24

Columna Ca-1 3/8" 36.00 4.00 5.20 748.80 0.58 434.30

Columna Ca-2 3/8" 10.00 4.00 3.35 134.00 0.58 77.72

Columna Ca-3 3/8" 8.00 4.00 3.40 108.80 0.58 63.10

Columna Ca-4 3/8" 15.00 4.00 7.95 477.00 0.58 276.66

01.05.05.1 ESTRIBOS EN COLUMNETAS

Columna Ca-1 3/8" 34.00 46 0.75 1173.00 0.58 680.34

Columna Ca-2 3/8" 14.00 25 0.75 262.50 0.58 152.25

Columna Ca-3 3/8" 11.00 38 0.75 313.50 0.58 181.83

Columna Ca-4 3/8" 15.00 26 0.65 253.50 0.58 147.03

01.05.06 VIGAS

01.05.06.1 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS 1,783.46

1
EJE A-A TRAMO 1,2,3,4+volado 5/8" 1 53.70 53.70 1.6 85.92

1
EJE A-A TRAMO 3,4+volado 5/8" 1 18.44 18.44 1.6 29.50

1
EJE B-B TRAMO 3,4+volado 5/8" 1 31.44 31.44 1.6 50.30

1
EJE C-C TRAMO 1'-1,2,3+volado 5/8" 1 73.70 73.70 1.6 117.92

1
EJE D-D TRAMO 1'-2 volado 5/8" 1 12.60 12.60 1.6

1
EJE E-E TRAMO 1' 1,2,3+volado 5/8" 1 73.70 73.70 1.6 117.92

1
EJE F-F TRAMO 3,4+volado 5/8" 1 31.44 31.44 1.6 50.30

1
EJE G-G TRAMO 1-2-3-4+volado 5/8" 1 53.70 53.70 1.6 85.92
Clasificacion (m) Peso Peso
Nº Nº Piezas Longitud Longitud
Partida Descripción Ø Elemento por por Pieza Parcial 1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
Iguales Elemento (m) (m)
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

1
EJE 1'-1' TRAMO C-E 5/8" 1 48.30 48.30 1.6 77.28

1
EJE 1-1 TRAMO A-B-C-D-E-F-G 5/8" 1 93.20 93.20 1.6 149.12

1
EJE 2-2 TRAMO C-E-D 5/8" 1 48.30 48.30 1.6 77.28

1
EJE 3-3 TRAMO A-B-C-E-F-G 5/8" 1 93.20 93.20 1.6 149.12

1
EJE 4-4 TRAMO A-B-F-G 5/8" 1 25.80 25.80 1.6 41.28

01.05.06.2 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGAS

1
EJE A-A TRAMO 1,2,3,4 1/2" 1 8.90 8.90 1.02 9.08

1
EJE A-A TRAMO 3,4 1/2" 1 6.20 6.20 1.02

1
EJE B-B TRAMO 3,4 1/2" 1 6.20 6.20 1.02 6.32

1
EJE C-C TRAMO 1'-1,2,3 1/2" 1 28.30 28.30 1.02 28.87

1
EJE E-E TRAMO 1' 1,2,3 1/2" 1 28.30 28.30 1.02 28.87

1
EJE F-F TRAMO 3,4 1/2" 1 6.20 6.20 1.02 6.32

1
EJE G-G TRAMO 1-2-3-4 1/2" 1 8.90 8.90 1.02 9.08

1
EJE 1'-1' TRAMO C-E 1/2" 1 8.70 8.70 1.02 8.87

1
EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 1 17.60 17.60 1.02 17.95

1
EJE 2-2 TRAMO C-D-E 1/2" 1 8.72 8.72 1.02 8.89

1
EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 1 17.60 17.60 1.02 17.95

1
EJE 4-4 TRAMO A-B-F-G 1/2" 1 9.24 9.24 1.02 9.42

01.05.06.3 ESTRIBOS EN VIGAS


1
EJE A-A TRAMO 1,2,3,4 3/8" 62 1.20 74.40 0.58 43.15

1
EJE B-B TRAMO 3,4 3/8" 18 1.20 21.60 0.58 12.53

1
EJE C-C TRAMO 1'-1,2,3 3/8" 52 1.20 62.40 0.58 36.19

1
EJE E-E TRAMO 1' 1,2,3 3/8" 52 1.20 62.40 0.58 36.19

1
EJE F-F TRAMO 3,4 3/8" 18 1.20 21.60 0.58 12.53

1
EJE G-G TRAMO 1-2-3-4 3/8" 62 1.20 74.40 0.58 43.15

1
EJE 1'-1' TRAMO C-E 3/8" 84 1.20 100.80 0.58 58.46
Clasificacion (m) Peso Peso
Nº Nº Piezas Longitud Longitud
Partida Descripción Ø Elemento por por Pieza Parcial 1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total
Iguales Elemento (m) (m)
0.25 0.58 1.02 1.6 2.26 4.04 (kg) (kg)

1
EJE 1-1 TRAMO A-B-C-D-E-F-G 3/8" 168 1.20 201.60 0.58 116.93

1
EJE 2-2 TRAMO C-D-E 3/8" 168 1.20 201.60 0.58 116.93

1
EJE 3-3 TRAMO A-B-C-E-F-G 3/8" 130 1.20 156.00 0.58 90.48

1
EJE 4-4 TRAMO A-B-F-G 3/8" 48 1.20 57.60 0.58 33.41

01.05.07 LOZA ALIGERADA 602.21

01.05.07.1 ACERO F'Y=4200 KG/CM2 GRADO 60 EN VIGUETAS

1
EJE A-A TRAMO 1,2,3,4 1/2" 4 11 44 1.02 44.88

1
EJE C-C TRAMO 1'-1,2,3 1/2" 4 13 52 1.02 53.04

1
EJE E-E TRAMO 1,2,3 1/2" 4 13 52 1.02 53.04

1
EJE G-G TRAMO 1-2-3-4 1/2" 4 9.3 37.2 1.02 37.944

EJE 1'-1' TRAMO C-E 1/2" 1 4 7.01 28.04 1.02 28.6008

EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 1 4 15.11 60.44 1.02 61.6488

EJE 2-2 TRAMO A-B-C-D-E-F-G 1/2" 1 4 6.91 27.64 1.02 28.1928

EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 1 4 7.55 30.2 1.02 30.804

EJE 4-4 TRAMO A-B-F-G 1/2" 1 4 7.76 31.04 1.02 31.6608

01.05.07.2 ACERO DE TEMPERATURA

1
EJE A-A TRAMO 1,2,3,4 1/2" 2 11.00 22.00 1.02 22.44

1
EJE C-C TRAMO 1'-1,2,3 1/2" 2 13.00 26.00 1.02 26.52

1
EJE E-E TRAMO 1,2,3 1/2" 2 13.00 26.00 1.02 26.52

1
EJE G-G TRAMO 1-2-3-4 1/2" 2 9.30 18.60 1.02 18.97

1
EJE 1'-1' TRAMO C-E 1/2" 2 7.01 14.02 1.02 14.30

1
EJE 1-1 TRAMO A-B-C-D-E-F-G 1/2" 2 15.11 30.22 1.02 30.82

1
EJE 2-2 TRAMO A-B-C-D-E-F-G 1/2" 2 6.91 13.82 1.02 14.10

1
EJE 3-3 TRAMO A-B-C-E-F-G 1/2" 2 7.55 15.10 1.02 15.40

1
EJE 4-4 TRAMO A-B-F-G 1/2" 8 7.76 62.08 1.02 63.32
METRADO DE ESTRUCTURAS - (BLOQUE - 1)
02. ARQUITECTURA AULAS

Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
02 ARQUITECTURA
02.01 OBRAS DE CONCRETO SIMPLE
02.01.01 VEREDA
02.01.01.01 VEREDA DE CONCRETO DE 6" Y BRUÑADO 138.11 M2
Fachada principal 1 1 area= 67.70 67.70
Fachada posterior y laterales 1 1 area= 70.41 70.41

02.01.01.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS 12.48 M2


Fachada principal 1 1 perimet= 14.60 0.15 2.19
Fachada posterior y laterales 1 1 perimet= 68.60 0.15 10.29

02.01.01.03 JUNTAS ASFALTICAS EN VEREDAS 28.00 M


Fachada principal 5 1 1.00 5.00
Fachada posterior y laterales 23 1 1.00 23.00

02.01.02 CUNETA DE EVACUACION PLUVIAL


02.01.02.01 CONCRETO EN CUNETA F'C= 175KG/CM2 7.48 M3
Fachada principal 1 1 28.00 area= 0.09 2.38
Fachada posterior y laterales 1 1 60.00 area= 0.09 5.10

02.01.02.02 ENCOFRADO Y DESENCOFRADO DE CUNETA 35.20 M2


Fachada principal 2 1 28.00 0.20 11.20
Fachada posterior y laterales 2 1 60.00 0.20 24.00

02.02 MUROS Y TABIQUES


02.02.01 MURO DE CABEZA LADRILLO KIN-KONG DE ARCILLA area 255.65 M2
Eje 1'-1' entre A-B-C-D-E-F-G Menos Vanos 3 1 17.16 51.48
Eje 1-1 entre C-E Menos Vanos 1 1 13.83 13.83
Eje 2-2 entre A-C-E-G Menos Vanos 2 1 20.77 41.54
Eje 3-3 entre A-C-E-G Menos Vanos 2 1 11.92 23.84
Eje 4-4 entre A-B-F-G Menos Vanos 2 1 10.34 20.68
Eje A-A y G-G entre 1-3 Menos Vanos 2 1 23.23 46.46
Eje C-C Y E-E entre 1-2-3 Menos Vanos 2 1 28.91 57.82

02.02.02 MURO DE SOGA LADRILLO KIN-KONG DE ARCILLA 33.66 M2


Deposito de aulas 1-2-3 Menos Vanos 3 1 11.22 33.66

02.03 REVOQUES ENLUCIDOS Y MOLDURAS


02.03.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA 1:5 31.44 M2
Aula - 1 (SS.HH Niñas) 1 1 13.10 1.20 15.72
Aula - 3 (SS.HH Niños) 1 1 13.10 1.20 15.72

02.03.02 TARRAJEO EN MUROS EXTERIORES MEZCLA 1:5 CEMENTO:ARENA 145.49 M2


Eje 1-1 entre A-B-C-D-E-F-G Menos Vanos 3 1 17.16 1.00 51.48
Eje A-A y G-G entre 1-3' Menos Vanos 2 1 23.23 1.00 46.46
Eje C-E entre 1-3 2 1 5.62 3.00 33.72
Eje 2-2 entre C-E Menos Vanos 1 1 13.83 1.00 13.83

02.03.03 TARRAJEO EN MUROS INTERIORES MEZCLA 1:5 CEMENTO:ARENA 302.29 M2


Eje 1-1 entre A-B-C-D-E-F-G Menos Vanos 3 1 17.16 1.00 51.48
Eje 2-2 entre C-E Menos Vanos 1 1 13.83 1.00 13.83
Eje 3-3 entre A-C-E-G Menos Vanos 2 1 20.77 1.00 41.54
Eje 3'-3' entre A-C-E-G Menos Vanos 2 1 11.92 1.00 23.84
Eje A-A, G-G entre 1-3' Menos Vanos 2 1 23.23 1.00 46.46
Eje C-C, E-E entre 1-2-3 Menos Vanos 2 1 28.91 1.00 57.82
Deposito de aulas 1-2-3 Menos Vanos 3 2 11.22 1.00 67.32

02.03.04 TARRAJEO DE SUPERFICIE COLUMNAS INCL. ARISTAS MEZCLA 1:5 CEMENTO:ARENA 84.90 M2
Columna C-1 20 1 1.20 3.00 72.00
Columna C-2 6 1 1.00 2.15 12.90

02.03.05 TARRAJEO DE SUPERF.VIGAS INCL.ARISTAS, MEZCLA 1:5 CEMENTO:ARENA 120.76 M2


Eje 1-2-3 entre A-B-C-D-E-F-G 3 1 25.00 0.70 52.50
Eje 1-1 entre C-E 1 1 8.50 0.65 5.53
Eje 3'-3' entre A-G 1 1 25.00 0.65 16.25
Eje A-B, F-G entre 1-3' 2 1 11.20 0.65 14.56
Eje C-D-E entre 1-3' 3 1 15.20 0.70 31.92

02.03.06 VESTIDURA DE DERRAMES 229.80 M


V-1 6 1 8.60 51.60
V-2 7 1 3.00 21.00
V-3 5 1 6.00 30.00
Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
V-4 2 1 6.00 12.00
V-5 6 1 4.00 24.00
V-6 6 1 4.00 24.00
V-7 2 1 4.00 8.00
V-8 2 1 6.60 13.20
P-1 3 1 6.10 18.30
P-2 3 1 5.50 16.50
P-3 2 1 5.60 11.20

02.03.08 BRUÑA DE 1CM ENTRE MUROS Y ESTRUCTURAS 558.80 M


VIGAS
Eje 1-2-3 entre A-B-C-D-E-F-G 6 1 25.00 150.00
Eje 1-1 entre C-E 2 1 8.50 17.00
Eje 3'-3' entre A-G 2 1 25.00 50.00
Eje A-B, F-G entre 1-3' 4 1 11.20 44.80
Eje C-D-E entre 1-3' 6 1 15.20 91.20
COLUMNAS
Columna C-1 20 3 3.00 180.00
Columna C-2 6 2 2.15 25.80

02.04 CIELORRASOS
02.04.01 CIELORRASOS CON ENLUCIDO DE YESO 221.10 M2
Aulas 1-2-3 1 1 area= 199.20 199.20
SS.HH. 1 1 area= 21.90 21.90

02.04.02 CIELORASO DE CEMENTO Y ARENA 54.00 M2


1 1 80.40 0.60 48.24
1 1 9.60 0.60 5.76
02.05 PISOS Y PAVIMENTOS
02.05.01 FALSO PISO F'c=175 kg/cm2 328.08 M2
Aulas 1-2-3 3 1 area= 59.51 178.53
Deposito aulas 1-2-3 3 1 area= 6.63 19.89
Hall (Alero, SS.HH) 1 1 area= 129.66 129.66

02.05.02 DURMIENTES DEMADERA AGUANO 2.5''X3''X3.5M 311.18 ML


Aulas 1-2-3 3 1 13.83 7.5 311.18

02.05.03 CONTRAPISO DE 48 MM. 328.08 M2


Aulas 1-2-3 3 1 area= 59.51 178.53
Deposito aulas 1-2-3 3 1 area= 6.63 19.89
Hall (Alero, SS.HH) 1 1 area= 129.66 129.66

02.05.04 PISO DE CERAMICO ANTIDESLIZANTE AT. 0.60x0.60 M 108.35 M2


SS.HH. (niños y niñas) 2 1 area= 9.99 19.98
Deposito aulas 1-2-3 3 1 area= 6.63 19.89
Fachada principal 1 1 area= 68.48 68.48

02.05.05 PISO DE MADERA MACHIMBREADA AGUANO 178.50 M2


Aulas 1-2-3 3 1 area= 59.50 178.50

02.06 ZOCALOS Y CONTRAZOCALOS


02.06.01 ZOCALO DE CEMENTO PULIDO C/MORTERO 1:5 DE 2CM. DE H=0.30CM. 83.88 M
Fachada principal, posterior y lateral 1 1 perimet= 83.88 83.88

02.06.02 CONTRAZOCALO DE MAYOLICA DE 20x20CM. 29.04 M2


SS.HH (niños y niñas) 2 1 12.10 1.20 29.04

02.06.03 CONTRAZOCALO DE CERAMICO DE 40 x 40 CM. H=10CM. 28.80 M


Deposito (aulas 1-2-3) 3 1 perimet= 9.60 28.80

02.06.04 CONTRAZOCALO DE MADERA AGUANO H=10CM. 91.32 M


Aulas 1-2-3 3 1 perimet= 30.44 91.32

02.07 CARPINTERIA DE MADERA


02.07.01 PUERTA DE MADERA CEDRO NACIONAL C/ SOBRELUZ 14.95 M2
P-1 3 1 1.50 2.30 10.35
P-3 2 1 1.00 2.30 4.60

02.07.02 PUERTA CONTRAPLACADA CON PLANCHA DE TRIPLAY DE 6mm. C/SOBRELUZ 6.21 M2


P-2 3 1 0.90 2.30 6.21

02.08 CARPINTERIA METALICA


02.08.01 DIVISION CON PLANCHA METALICA 16.27 M2
SS.HH (niños y niñas) 2 1 4.52 1.80 16.27
Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
02.08.02 PUERTA MELAMINE CON MARCO DE ALUMINIO 2.52 M2
SS.HH (niños y niñas) 2 1 0.70 1.80 2.52

02.09 CERRAJERIA
02.09.01 BISAGRA CAPUCHINA DE 4" 12.00 PAR
P-1 3 1.5 4.50
P-2 3 1.5 4.50
P-3 2 1.5 3.00

02.09.02 CERRADURA PARA PUERTA DE TRES GOLPES 3.00 PZA


P-1 3 1 3.00

02.09.03 CERRADURA DE PERILLA CON SEGURIDAD INTERIOR 5.00 PZA


P-2 3 1 3.00
P-3 2 1 2.00

02.09.04 PICAPORTE DE 4" 8.00 UND


P-1 3 1 3.00
P-2 3 1 3.00
P-3 2 1 2.00

02.10 VIDRIOS, CRISTALES Y SIMILARES


02.10.01 VIDRIO TEMPLADO DE 8MM. INCLUYE PROTECTOR 611.77 M2
V-1 6 1 2.20 2.10 298.38
V-2 7 1 0.75 0.75 42.38
V-3 5 1 0.75 2.25 90.82
V-4 2 1 0.90 2.10 40.69
V-5 6 1 0.50 1.50 48.44
V-6 6 1 0.50 1.50 48.44
V-7 2 1 1.55 0.45 15.02
V-8 2 1 2.85 0.45 27.61

02.10.02 VIDRIO CRUDO INCOLORO DE 6MM. 46.50 M2


P-1 3 1 1.50 0.60 29.06
P-2 3 1 0.90 0.60 17.44

02.10.03 ESPEJO BISELADO DE 6MM S/PLANOS 10.55 M2


SS.HH (niños y niñas) 2 1 0.70 0.70 10.55

02.11 PINTURA
02.11.01 PINTURA EN CIELORRASO 275.00 M2
Aulas 1-2-3 1 1 area= 221.00 221.00
en voladizo 1 1 area= 54.00 54.00

02.11.02 PINTURA EN EXTERIORES 145.49 M2


Eje 1-1 entre A-B-C-D-E-F-G Menos Vanos 3 1 17.16 1.00 51.48
Eje A-A y G-G entre 1-3' Menos Vanos 2 1 23.23 1.00 46.46
Eje C-E entre 1-3 2 1 5.62 3.00 33.72
Eje 2-2 entre C-E Menos Vanos 1 1 13.83 1.00 13.83

02.11.03 PINTURA EN INTERIORES 302.29 M2


Eje 1-1 entre A-B-C-D-E-F-G Menos Vanos 3 1 17.16 1.00 51.48
Eje 2-2 entre C-E Menos Vanos 1 1 13.83 1.00 13.83
Eje 3-3 entre A-C-E-G Menos Vanos 2 1 20.77 1.00 41.54
Eje 3'-3' entre A-C-E-G Menos Vanos 2 1 11.92 1.00 23.84
Eje A-A, G-G entre 1-3' Menos Vanos 2 1 23.23 1.00 46.46
Eje C-C, E-E entre 1-2-3 Menos Vanos 2 1 28.91 1.00 57.82
Deposito de aulas 1-2-3 Menos Vanos 3 2 11.22 1.00 67.32

02.11.04 PINTURA EN COLUMNAS 84.90 M2


Columna C-1 20 1 1.20 3.00 72.00
Columna C-2 6 1 1.00 2.15 12.90

02.11.05 PINTURA EN VIGAS 120.76 M2


Eje 1-2-3 entre A-B-C-D-E-F-G 3 1 25.00 0.70 52.50
Eje 1-1 entre C-E 1 1 8.50 0.65 5.53
Eje 3'-3' entre A-G 1 1 25.00 0.65 16.25
Eje A-B, F-G entre 1-3' 2 1 11.20 0.65 14.56
Eje C-D-E entre 1-3' 3 1 15.20 0.70 31.92

02.11.06 PINTURA EN VESTIDURA DE DERRAMES 229.80 M


V-1 6 1 8.60 51.60
V-2 7 1 3.00 21.00
V-3 5 1 6.00 30.00
V-4 2 1 6.00 12.00
Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
V-5 6 1 4.00 24.00
V-6 6 1 4.00 24.00
V-7 2 1 4.00 8.00
V-8 2 1 6.60 13.20
P-1 3 1 6.10 18.30
P-2 3 1 5.50 16.50
P-3 2 1 5.60 11.20

02.11.07 PINTURA EN CONTRAZOCALOS Y ZOCALOS H= 0.30M C/ESMALTE 83.88 M


Fachada principal, posterior y lateral 1 1 perimet= 83.88 83.88

02.11.08 PINTURA EN PUERTAS C/BARNIZ 2 MANOS 21.16 M2


P-1 3 1 1.50 2.30 10.35
P-2 3 1 0.90 2.30 6.21
P-3 2 1 1.00 2.30 4.60

02.12 APARATOS Y ACCESORIOS SANITARIOS


02.12.01 INODORO SIFON JETT BLANCO COLOCADO, PARA NIÑOS 4.00 PZA
SS.HH (niños y niñas) 2 2 4.00

02.12.02 LAVATORIO OVALIN SOBREPONER BLANCO COLOCADO 4.00 PZA


SS.HH (niños y niñas) 2 2 4.00

02.12.03 PAPELERA DE LOZA BLANCA DE 13x15 4.00 UND


SS.HH (niños y niñas) 2 2 4.00

02.12.04 JABONERA DE LOSA COLOR BLANCO 4.00 UND


SS.HH (niños y niñas) 2 2 4.00

02.13 SISTEMA DE SEGURIDAD, MANTENIMIENTO Y SEÑALIZACION


02.13.01 SISTEMA DE SEGURIDAD Y SEÑALIZACION 1.00 GLB
Bloque 1 Aulas 1 1 1.00

02.14 OBRAS COMPLEMENTARIAS

02.14.01 Tapa junta vanos y columnas 1 24 2.60 62.40 62.40 m


METRADO DE ESTRUCTURAS - (BLOQUE - 1)

INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº:

OBRA : “MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN Plano:
APURIMAC”

PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:


FECHA: MARZO -2014 Revisado:

03. INSTALACIONES ELECTRICAS

Nº de Nº de Medidas
Nº de Partida Descripción Parcial Total Und.
Elem. Cant. Largo Ancho Altura
03 INSTALACIONES ELECTRICAS Y SISTEMAS ESPECIALES
03.01 INSTALACIONES ELECTRICAS
03.01.01 TABLEROS
03.01.01.01 TABLERO DE DISTRIBUCION T.D. - 1 1 1 1.00 1.00 Eqp

03.01.02 INSTALACION DE SISTEMA DE PARARRAYO


03.01.02.01 SUMINSTRO E INSTALACION DE PARARAYO 1 1 1.00 1.00 JGO

03.01.03 INSTALACION DE PUESTA A TIERRA


03.01.03.01 SUMINSTRO E INSTALACION DE PUESTA ATIERRA 1 1 1.00 1.00 JGO

03.01.04 SALIDA PARA CENTRO DE LUZ


03.01.04.01 SALIDA PARA CENTRO DE LUZ 22.00 PTO
Aula - 03 años 5 1 5.00
Aula - 04 años 5 1 5.00
Aula - 05 años 5 1 5.00
Deposito 3 1 3.00

SS.HH 4 1 4.00

03.01.05 ARTEFACTOS DE ILUMINACION


03.01.05.01 Artefacto para enpotrar, con 02 fluorecente lineales de 36W, con rejilla y sistema optico parabolico 15.00 UND
Aula - 03 años 5 1 5.00
Aula - 04 años 5 1 5.00
Aula - 05 años 5 1 5.00

03.01.05.02 Artefacto para enpotrar Incandescentes 11-15W 7.00 UND


Deposito 3 1 3.00
SS.HH 4 1 4.00

03.01.06 INTERRUPTORES
03.01.06.01 SALIDA PARA INTERRUPTOR SIMPLE, INCLUYE INSTALACION DE INTERRUPTOR 7.00 PTO
Deposito 3 1 3.00
SS.HH 4 1 4.00

03.01.06.02 SALIDA PARA INTERRUPTOR DOBLE, INCLUYE INSTALACION DE INTERRUPTOR 3.00 PTO
Aula - 03 años 1 1 1.00
Aula - 04 años 1 1 1.00

Aula - 05 años 1 1 1.00

03.01.07 TOMACORRIENTES

03.01.07.01 SALIDA PARA TOMACORRIENTES DOBLE CON PUESTA TIERRA, INCLUYE INSTALACION DE TOMACORRIENTE PTO
25.00
Aula - 03 años 7 1 7.00
Aula - 04 años 7 1 7.00
Aula - 05 años 8 1 8.00
Deposito 3 1 3.00

03.01.08 SISTEMAS ESPECIALES


3 1 3.00 3.00 PTO
03.01.08.01 SALIDA PARA RED DE DATOS

03.01.08.02 Salida para proyector Multimedia, para empotrar, con 01 puerto 3 1 3.00 3.00 PTO

03.01.08.03 Salida para TV por cable con tapa ciega 3 1 3.00 3.00 PTO

03.01.08.04 SALIDA PARA EQUIPO PARLANTE 2 1 2.00 2.00 PTO

03.01.09 CAJAS METALICAS CON TAPA 1 1 1.00 2.00 PTO

03.01.09.01 inatalacion de cajas metalicas de cajas de 20x20x10 9 1 1.00 9.00 pto


METRADO DE ESTRUCTURAS - (BLOQUE - 1)

INSTITUCION : INSTITUCION EDUCATIVA INICIAL Hoja Nº:


OBRA : “MEJORAMIENTO DE LA CAPACIDAD DE PRESTACIÓN DE SERVICIO DE LA INSTITUCIÓN EDUCATIVA INICIAL Nº 58 Plano:
DEL DISTRITO DE PROGRESO, PROVINCIA DE GRAU, REGIÓN APURIMAC”

PROPIETARIO: MUNICIPALIDAD DISTRITAL DE PROGRESO Hecho por:


FECHA: MARZO -2014 Revisado:

04. INSTALACIONES SANITARIAS

Nº de Nº de Nº de Medidas
Descripción Parcial Total Und.
Partida Elem. Cant. Largo Ancho Altura
04 INSTALACIONES SANITARIAS
04.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
04.01.01 INSTALACIONES INTERIORES
04.01.01.01 TRAZO Y REPLANTEO 33.33 M
SS.HH Niños y Niñas en aulas 1 1 33.33 33.33

04.01.01.02 EXCAVACION DE ZANJAS REFINE Y CAMA DE APOYO 33.33 M


SS.HH Niños y Niñas en aulas 1 1 33.33 33.33

04.01.01.03 INSTALACION DE TUB. PVC SAP C-10 Ø 1/2" 17.63 M


SS.HH Niños y Niñas en aulas 1 1 17.63 17.63

04.01.01.05 RELLENO CON MATERIAL PROPIO 33.33 M


SS.HH Niños y Niñas en aulas 1 1 33.33 33.33

04.01.01.06 VALVULA COMPUERTA DE BRONCE Ø 1/2" 2.00 UND


SS.HH Niños y Niñas en aulas 2 1 2.00

04.01.01.07 ACCESORIOS VARIOS 26.00 UND


Codo pvc sap Ø 1/2"x90° 16 1 16.00
Tee pvc sap Ø 1/2"x90° 10 1 10.00

04.01.01.08 PRUEBA HIDRAULICA 1 1 1.00 1.00 M

04.02 SISTEMA DE AGUA CALIENTE


04.02.01 INSTALACIONES INTERIORES
04.02.01.01 INSTALACION DE TUB. CPVC C-10 Ø 1/2" 19.77 M
SS.HH Niños y Niñas en aulas 1 1 19.77 19.77

04.02.01.02 INSTALACION DE TUB. CPVC C-10 Ø 3/4" 3.50 UND


SS.HH Niños y Niñas en aulas 1 1 3.50 3.50

04.02.01.03 CALENTADOR ELECTRICO DE AGUA 1.00 UND


SS.HH Niños y Niñas en aulas 1 1 1.00

04.02.01.04 ACCESORIOS VARIOS 9.00 UND


Codo cpvc Ø 1/2"x90° 7 1 7.00
Tee cpvc Ø 1/2" 2 1 2.00

04.02.01.05 PRUEBA HIDRAULICA 1 1 1.00 1.00 GLB

04.03 SISTEMA DE DESAGUE Y VENTILACION


04.03.01 INSTALACIONES INTERIORES
04.03.01.01 INSTALACION DE TUB. PVC Ø 2" 1 1 14.67 14.67 14.67 M

04.03.01.02 INSTALACION DE TUB. PVC Ø 4" 1 1 23.89 23.89 23.89 M

04.03.01.03 SALIDA DE DESAGUE EN TUB.PVC Ø 2" 6 1 6.00 6.00 PTO

04.03.01.04 SALIDA DE DESAGUE EN TUB.PVC Ø 4" 4 1 4.00 4.00 PTO

04.03.01.05 REGISTRO ROSCADO Ø 4" 2 1 2.00 2.00 PQT

04.03.01.06 SUMIDERO DE 4'' 4 1 4.00 4.00 PQT

04.03.01.07 SALIDA DE VENTILACION TUB.PVC Ø 2" 3 1 3.00 3.00 PTO

04.03.01.08 SOMBRERO DE VENTILACION Ø 2" 3 1 3.00 3.00 PTO

04.03.01.09 ACCESORIOS VARIOS 8.00 UND


Codo pvc Ø 4"x90° 2 1 2.00
Codo pvc Ø 4"x45° 1 1 1.00
Yee pvc Ø 4" 3 1 3.00
Yee pvc Ø 2" 2 1 2.00

04.04 PRUEBA HIDRAHULICA EN SISTEMA DE DESAGUE


04.04.01 PRUEBA HIDRAHULICA 1 1 1.00 1.00 GLB
04.05 EVACUACION DE AGUAS FLUVIALES
04.05.01 TUBERIA DE 4'' 10 1 10.00 10.00 M

04.05.02 DADO DE CONCRETO 0.20 *0.20 10 1 0.2 0.2 1.2 0.48 0.48 M3

También podría gustarte