Está en la página 1de 91

|*|1269-CT02-177BQ|28/11/2002|15:48:59|.|5.7.2.

0|
|*|Clifton Golf Estate - BOQ|
COUNTER|ISC|SECTION|BILL|PAGE NO|ITEM NO|PAY REF|DESCRIPTION|UNIT|QUANTITY|RATE|
AMOUNT
|||||||RATES Rates 21/03/02||||
1|3418|1|1|1|||BILL NO 1 |H1|0.0|

2|3419|1|1|1|||PRELIMINARIES |H1|0.0|

3|3420|1|1|1|||--------------------------------------- ||0.0|
|||||||
|||||||

4|3421|1|1|1|||PRINCIPAL BUILDING AGREEMENT |H2|0.0|

5|3422|1|1|1|||The agreement shall be the JBCC Series 2000 Principal Building||0.0|


||||||| Agreement prepared by the Joint Building Contract Committee, May 1998
||||||| edition.
|||||||
|||||||

6|3423|1|1|1|||PRELIMINARIES |H2|0.0|

7|3424|1|1|1|||The preliminaries shall be the JBCC Series 2000 Preliminaries


prepared||0.0|
||||||| by the Joint Building Contracts Committee, May 1998 edition and shall be
||||||| deemed to be incorporated herein
|||||||
|||||||

8|3425|1|1|1|||FULL INTENT AND MEANING OF CLAUSES |H2|0.0|

9|3426|1|1|1|||Tenderers shall be deemed to have referred to the aforementioned||


0.0|
||||||| documents for the full intent and meaning of each clause. These clauses
||||||| are hereinafter referred to by the heading and clause number only.
|||||||
|||||||

10|3427|1|1|1|||Where standard clauses or alternatives are not entirely applicable


to this||0.0|
||||||| contract, such modifications, corrections or supplements as will apply are
||||||| given under each relevant clause heading
|||||||
|||||||

11|3428|1|1|1|||Where any item is not relevant to this specific contract such item
is||0.0|
||||||| marked N/A (signifying "not applicable")
|||||||
|||||||

12|3429|1|1|1|||PRICING OF CLAUSES |H2|0.0|

13|3430|1|1|1|||Tenderers shall allow opposite each clause for any cost involved
with||0.0|
||||||| complying with such clause. Any clauses left unpriced shall be deemed to
||||||| be covered by rates and prices elsewhere incorporated throughout these
||||||| Bills of Quantities.
|||||||
|||||||

14|3431|1|1|1|||PAYMENT CATEGORIES |H2|0.0|

15|3432|1|1|1|||Should 'Alternative A', as set out within clause 10.3 of the JBCC
2000||0.0|
||||||| Preliminaries, be used for the adjustment of preliminaries then each item
||||||| priced is to be allocated to one or more categories by the insertion of the
||||||| letter "F", "V" or "T", as the case may be, against the price in the rate
||||||| column. These letters shall indicate the relevant categories as follows :
|||||||
|||||||

16|3433|1|1|2|||"F" - A fixed amount, ie which shall not be varied ||0.0|


|||||||
|||||||
|||||||
|||||||"V" - An amount which shall be varied in proportion to the
||||||| contract value
|||||||
|||||||
|||||||
|||||||"T" - An amount which shall be varied in proportion to time
|||||||
|||||||

17|3434|1|1|2|||---------------------------------------- ||0.0|
|||||||
|||||||

18|3435|1|1|2|||SECTION A : JBCC PRINCIPAL BUILDING AGREEMENT |H2|0.0|

19|3436|1|1|2||| |H2|0.0|
|||||||
|||||||DEFINITIONS

20|3437|1|1|2|A||Clause 1.0: Definitions and interpretation|Item|1||143400.00


|||||||
|||||||

21|3438|1|1|2|||OBJECTIVE |H2|0.0|

22|3439|1|1|2|B||Clause 2.0: Offer, acceptance and performance|Item|1|


|||||||
|||||||

23|3440|1|1|2|||PREPARATION |H2|0.0|

24|3441|1|1|2|C||Clause 3.0: Documents|Item|1|


|||||||
|||||||
|||||||
|||||||A payment guarantee will not be provided
|||||||
|||||||

25|3442|1|1|2|D||Clause 4.0: Design responsibility|Item|1|


|||||||
|||||||

26|3443|1|1|2|E||Clause 5.0: Employer's agents|Item|1|


|||||||
|||||||

27|3444|1|1|2|F||Clause 6.0: Site representative|Item|1|


|||||||
|||||||

28|3445|1|1|2|G||Clause 7.0: Compliance with regulations |Item|1|


|||||||
|||||||

29|3446|1|1|2|H||Clause 8.0: Works risk|Item|1|


|||||||
|||||||

30|3447|1|1|2|J||Clause 9.0: Indemnities|Item|1|


|||||||
|||||||

31|3448|1|1|2|K||Clause 10.0: Works insurances |Item|1|


|||||||
|||||||

32|3449|1|1|2|L||Clause 11.0: Liability insurances |Item|1|


|||||||
|||||||

33|3450|1|1|2|M||Clause 12.0: Effecting insurance|Item|1|


|||||||
|||||||

34|3451|1|1|2|N||Clause 13.0: Insurance - Government contracts|N/A|0.0|


|||||||
|||||||

35|3452|1|1|2|P||Clause 14.0: Security |Item|1|


|||||||
|||||||

36|3453|1|1|3|||EXECUTION |H2|0.0|

37|3454|1|1|3|A||Clause 15.0: Preparation for and execution of the works|Item|1|


|||||||
|||||||

38|3455|1|1|3|B||Clause 16.0: Access to the works|Item|1|


|||||||
|||||||

39|3456|1|1|3|C||Clause 17.0: Contract instructions|Item|1|


|||||||
|||||||

40|3457|1|1|3|D||Clause 18.0: Setting out of the works |Item|


1|
|||||||
|||||||

41|3458|1|1|3|E||Clause 19.0: Assignment|Item|1|


|||||||
|||||||

42|3459|1|1|3|F||Clause 20.0: Nominated sub-contractors|Item|1|


|||||||
|||||||

43|3460|1|1|3|G||Clause 21.0: Selected sub-contractors|Item|1|


|||||||
|||||||

44|3461|1|1|3|H||Clause 22.0: Work by others|Item|1|


|||||||
|||||||

45|3462|1|1|3|||COMPLETION |H2|0.0|

46|3463|1|1|3|J||Clause 23.0: No clause|N/A|0.0|


|||||||
|||||||

47|3464|1|1|3|K||Clause 24.0: Practical completion|Item|1|


|||||||
|||||||

48|3465|1|1|3|L||Clause 25.0: Works completion|Item|1|


|||||||
|||||||

49|3466|1|1|3|M||Clause 26.0: Final completion|Item|1|


|||||||
|||||||
|||||||
|||||||The Contractor shall attend to defects during the defects liability period
||||||| on a progressive basis, to the satisfaction of the Principal Agent, and
will
||||||| not be permitted to wait until the end of the defects liability period or
until
||||||| the amount of defects accumulates in order to attend to a comprehensive
||||||| list of defects.
|||||||
|||||||

50|3467|1|1|3|N||Clause 27.0: Latent defects liability period|Item|1|


|||||||
|||||||

51|3468|1|1|3|P||Clause 28.0: Sectional completion|Item|1|


|||||||
|||||||

52|3469|1|1|4|A||Clause 29.0: Revision of date for practical completion|Item|1|


|||||||
|||||||
|||||||
|||||||Clause 29.1.1 is hereby deleted and substituted by the following:
|||||||
|||||||
|||||||
|||||||"Exceptionally inclement weather which shall only relate to weather with a
||||||| degree of inclemency which is materially greater than or is materially
||||||| beyond the average inclemency experienced in past years and/or
||||||| recorded, in terms of available records or otherwise, at or for the area in
||||||| which the site is situated, for the period(s) in question. Any revision of
||||||| date for practical completion which may, in terms of this clause be
||||||| allowed for exceptionally inclement weather, shall be related only to
||||||| those periods of exceptionally inclement weather by which the average
||||||| periods of time, during which exceptionally inclement weather, in terms of
||||||| available records, or on the evidence of past years, is experienced and/or
||||||| recorded in the area in which the site is situated, is exceeded. The
||||||| contractor is therefore to make allowance for normal vagaries of the
||||||| weather."
|||||||
|||||||
|||||||
|||||||Clause 29.4.3 is amended by the omission of "Within twenty (20)
||||||| working days" and replacing with "Within ten (10) working days".
|||||||
|||||||
|||||||
|||||||Clause 29.4.5 is hereby deleted and replaced with:
|||||||
|||||||
|||||||
|||||||"The contractor shall submit details of the claim within twenty (20
||||||| working days from receipt of the notification by the principal agent."
|||||||
|||||||
|||||||
|||||||Extension of time shall only be considered when work is on the critical
||||||| path of the programme, which the Contractor shall clearly identify, for the
||||||| works affected.
|||||||
|||||||
|||||||
|||||||Any delays to minor portions of the Works will only attract extensions of
||||||| time to those areas and not the entire project.
|||||||
|||||||

53|3470|1|1|4|B||Clause 30.0: Penalty for non completion|Item|1|


|||||||
|||||||

54|3471|1|1|4|||PAYMENT |H2|0.0|

55|3472|1|1|4|C||Clause 31.0: Interim payment to the contractor|Item|1|


|||||||
|||||||
|||||||
|||||||Clause 31.9 is amended by the deletion of "date of issue of the payment
||||||| certificate," in the first sentence and replacing with "date of issue of
the
||||||| VAT invoice,".
|||||||
|||||||
|||||||
|||||||Clause 31.10 is amended by the deletion of "date of practical
||||||| completion." at the end of the first sentence and replacing with "date of
||||||| final completion."
|||||||
|||||||

56|3473|1|1|5|A||Clause 32.0: Adjustment to the contract value|Item|1|


|||||||
|||||||
|||||||
|||||||Clause 32.6 is amended by the omission in the first sentence of "forty
||||||| (40) working days" and replacing with "ten (10) working days" and the
||||||| replacement of the second sentence with "The contractor shall submit
||||||| details of the expense or loss within twenty (20) working days from date
||||||| of receipt of the notification by the principal agent."
|||||||
|||||||
|||||||
|||||||It is recorded that only the Quantity Surveyor is empowered to rule
||||||| whether any instruction issued constitutes an additional cost and to
||||||| resolve cost aspects of any nature pertaining to this contract.
|||||||
|||||||
|||||||
|||||||Clause 32.10 is amended by the omission of "including a reasonable
||||||| allowance for waste,"
|||||||
|||||||

57|3474|1|1|5|B||Clause 33.0: Recovery of expense and loss|Item|1|


|||||||
|||||||

58|3475|1|1|5|C||Clause 34.0: Final account and final payment|Item|1|


|||||||
|||||||
|||||||
|||||||Clause 34.11 is amended by the omission of "practical completion" in
||||||| the second sentence and replacing with "final completion".
|||||||
|||||||

59|3476|1|1|5|D||Clause 35.0: Payment to third parties|Item|1|


|||||||
|||||||

60|3477|1|1|5|||CANCELLATION |H2|0.0|

61|3478|1|1|5|E||Clause 36.0: Cancellation by employer - contractor's default|


Item|1|
|||||||
|||||||

62|3479|1|1|5|F||Clause 37.0: Cancellation by employer - loss or damage|Item|1|


|||||||
|||||||
63|3480|1|1|5|G||Clause 38.0: Cancellation by contractor - employer's default|
Item|1|
|||||||
|||||||

64|3481|1|1|5|H||Clause 39.0: Cancellation - cessation of the works|Item|1|


|||||||
|||||||

65|3482|1|1|5|||DISPUTE |H2|0.0|

66|3483|1|1|5|J||Clause 40.0: Settlement of disagreements and disputes|Item|1|


|||||||
|||||||

67|4109|1|1|5||| ||0.0|
|||||||
|||||||

68|3484|1|1|5|||CONTRACT VARIABLES |H2|0.0|

69|3485|1|1|5||| |H2|0.0|
|||||||
|||||||THE SCHEDULE

70|3486|1|1|5|||Information necessary for completion of those clauses contained in


the||0.0|
||||||| schedule, as necessary for tender purposes, is given hereunder
|||||||
|||||||

71|3487|1|1|5|||---------------------------------------- ||0.0|
|||||||
|||||||

72|3488|1|1|5|K||Clause 41.0: Pre-tender information|Item|1|


|||||||
|||||||

73|3489|1|1|6|||Clause ||0.0|
|||||||
|||||||

74|3490|1|1|6|||41.1 CONTRACTING AND OTHER PARTIES ||0.0|


|||||||
|||||||
|||||||
|||||||

75|3491|1|1|6|||41.1.1: Employer: Big Bucks Trust(Pty) Ltd ||0.0|


|||||||
||||||| Postal Address: Big Bucks
|||||||
||||||| P.O. Box 12266
|||||||
||||||| Clifton
|||||||
||||||| Code: 56531
|||||||
|||||||
|||||||
||||||| Telephone: (0144) 604 0200
|||||||
||||||| Fax: (0144) 604 0360
|||||||
|||||||
|||||||
||||||| Domicilium: Big Bucks Trust
|||||||
||||||| Main Street
|||||||
||||||| Clifton
|||||||
|||||||

76|3492|1|1|6|||41.1.2: Principal Agent: Sharp Pencil Architects cc ||0.0|


|||||||
||||||| Postal Address: 88 Long Street
|||||||
||||||| Cape Town
|||||||
||||||| Code: 4001
|||||||
|||||||
|||||||
||||||| Telephone: (0121) 623 8320
|||||||
||||||| Fax: (0121) 623 3328
|||||||
|||||||

77|3493|1|1|6|||41.1.3: Agent 1: Project Management Services (Pty) Ltd ||0.0|


|||||||
||||||| Agent's service: Project Manager
|||||||
||||||| Postal address: P.O.Box 4440
|||||||
||||||| Seapoint
|||||||
||||||| 6360
|||||||
|||||||
|||||||
||||||| Telephone: (0144) 879 8257
|||||||
||||||| Fax: (0144) 879 8556
|||||||
|||||||

78|3494|1|1|6|||41.1.4: Agent 2: Bean Counting (Pty) Ltd ||0.0|


|||||||
||||||| Agent's Service: Quantity Surveyor:
|||||||
||||||| Postal Address: P.O. Box 2668
|||||||
||||||| Knysna
|||||||
||||||| 9530
|||||||
|||||||
|||||||
||||||| Telephone: (0144) 473 5670
|||||||
||||||| Fax: (0144) 473 3531
|||||||
|||||||

79|3495|1|1|7|||41.1.5: Agent 3: Steel & Concrete cc ||0.0|


|||||||
||||||| Agent's servive: Structural & Civil Engineer
|||||||
||||||| Postal Address PO Box 4734
|||||||
||||||| Knysna
|||||||
||||||| 9530
|||||||
|||||||
|||||||
||||||| Telephone: (0144) 473 3745
|||||||
||||||| Fax: (0144) 473 9472
|||||||
|||||||

80|3496|1|1|7|||41.1.6 Agent 4: Plugs & Partners (Pty) Ltd ||0.0|


|||||||
||||||| Agent's service: Electrical Engineer
|||||||
||||||| Postal address: P.O.Box 44573
|||||||
||||||| Campsbay
|||||||
||||||| Code: 2445
|||||||
|||||||
|||||||
||||||| Telephone: (0421) 662 4649
|||||||
||||||| Facsimile: (0421) 662 5296
|||||||
|||||||

81|3497|1|1|7|||41.1.7: Agent 5: TS Black & Associates ||0.0|


|||||||
||||||| Agent's service: Land Surveyor
|||||||
||||||| Postal address: 23 Blue Street
|||||||
||||||| Knysna
|||||||
||||||| Code: 9530
|||||||
|||||||
|||||||
||||||| Telephone: (0144) 274 5414
|||||||
||||||| Fax: (0144) 274 6335
|||||||
|||||||

82|3498|1|1|7|||41.2 CONTRACT DETAILS ||0.0|


|||||||
|||||||

83|3499|1|1|7|||41.2.1 Works description:||0.0|


|||||||
|||||||
|||||||
||||||| As a rough guide only to Tenderers the work embodied in
|||||||
||||||| this contract comprises the construction of a new house
|||||||
||||||| with a gross construction area of approximately 556m� plus
|||||||
||||||| associated external works comprising paved areas, yard
|||||||
||||||| and boundary walls. The house is single storey with two
||||||| finished loft floors. The construction is of brick walls, thatched
||||||| roofs and screeded concrete floors to receive carpeting, tiles
|||||||
||||||| or timber. The walls are walls are generally plastered and
||||||| painted but with tiled areas. The ceilings are either skimmed
||||||| plasterboard, cement plastered concrete soffits or exposed
||||||| thatch.
|||||||
|||||||

84|3500|1|1|7|||41.2.2 Site description:||0.0|


|||||||
|||||||
|||||||
||||||| The site is located on Erf No. ............... at the
|||||||
||||||| Clifton Golf Estate, High Street, Clifton Flats
|||||||
|||||||

85|3501|1|1|8|||41.2.3 Works and installations by others: ||0.0|


|||||||
|||||||
|||||||
||||||| The Employer shall have the right to employ other Contractors
|||||||
||||||| (hereinafter referred to as "Direct Contractors") to execute
|||||||
||||||| any special works not contained in this contract, concurrently
|||||||
||||||| with the work being executed under this contract and the
|||||||
||||||| Contractor shall not be entitled to any percentage profit or
|||||||
||||||| discount on the value thereof. The Contractor shall allow
|||||||
||||||| these Direct Contractors to have access to the works and
|||||||
||||||| shall allocate reasonable space in the building for the storage
|||||||
||||||| of their materials, tools and equipment, all to the satisfaction
|||||||
||||||| of the Architect
|||||||
|||||||
|||||||
||||||| The Contractor shall also allow the Direct Contractors
|||||||
||||||| to use, free of charge, the latrine accommodation and water
|||||||
||||||| and power supply on site, and shall not in any way hinder
|||||||
||||||| or prevent the execution of their work
|||||||
|||||||
|||||||
||||||| The Contractor is to allow for any costs in connection
|||||||
||||||| with providing access for such concurrent contracts
|||||||
||||||| and for the use of the facilities stated above and no additional
|||||||
||||||| claim will be entertained due to the presence on the works of
|||||||
||||||| such Direct Contractors. Should the Contractor be required
|||||||
||||||| to make good after such Direct Contractors or to provide
|||||||
||||||| jobbing, etc., the Contractor will be recompensed for any
|||||||
||||||| costs incurred by him in terms of the Conditions of Contract
|||||||
|||||||
|||||||
|||||||

86|3502|1|1|8|||41.2.4 This agreement is for a government contract ||0.0|


|||||||
|||||||No
|||||||
|||||||

87|3503|1|1|8|||41.2.5 The date on which possession of the site is intended to


be||0.0|
|||||||
||||||| given
|||||||
|||||||
|||||||
||||||| ...................................... 200..
|||||||
|||||||

88|3504|1|1|8|||41.2.6 Period for the commencement of the works after the ||0.0|
|||||||
||||||| contractor takes possession of the site
|||||||
|||||||
|||||||
||||||| Working days : Five (5)
|||||||
|||||||

89|3505|1|1|8|||41.2.7 Completion in sections are required ||0.0|


|||||||
|||||||No
|||||||
|||||||

90|3506|1|1|9|||41.2.8 Intended date of practical completion and the penalty per||


0.0|
|||||||
||||||| calendar day for:
|||||||
|||||||
|||||||
||||||| (1) The works as a whole:
|||||||
|||||||
|||||||
||||||| Date Penalty
|||||||
||||||| 8 months after
|||||||
||||||| handover plus 5000,00
|||||||
||||||| including builders holiday
|||||||
||||||| if applicable
|||||||
|||||||

91|3507|1|1|9|||41.2.9 Where this agreement is for a government contract ||0.0|


|||||||
||||||| payment will made for materials and goods:
|||||||
|||||||Not applicable
|||||||
|||||||

92|3508|1|1|9|||41.2.10 Government contract dispute resolution: ||0.0|


|||||||
|||||||Not applicable
|||||||
|||||||

93|3509|1|1|9|||41.2.11 Arbitration rules as recommended by Association of||0.0|


||||||| Arbitrators (SA)
|||||||
|||||||Yes
|||||||
|||||||

94|3510|1|1|9||| ||0.0|
|||||||
|||||||41.3 INSURANCES
|||||||
|||||||

95|3511|1|1|9|||41.3.1 Where this agreement is for a government contract the


liability ||0.0|
|||||||
||||||| of the contractor shall be limited to
|||||||
|||||||Not applicable
|||||||
|||||||

96|3512|1|1|9|||41.3.2 Contract works insurance to be effected by ||0.0|


|||||||
|||||||Contractor
|||||||
|||||||
|||||||
||||||| For the amount of Contract Sum plus 20%
|||||||
||||||| with a deductible of: Not applicable
|||||||
|||||||
|||||||
||||||| SASRIA insurance for the amount of
|||||||
||||||| Contract Sum plus 20%
|||||||
||||||| with a deductible of: Not applicable
|||||||
|||||||
|||||||
|||||||

97|3513|1|1|9|||41.3.3 Public liability insurance to be effected by ||0.0|


|||||||
|||||||Contractor
|||||||
|||||||
|||||||
||||||| For the amount of 5 000 000,00
|||||||
||||||| with a deductible of: Not applicable
|||||||
|||||||
|||||||
|||||||

98|3514|1|1|9|||41.4 DOCUMENTS ||0.0|


|||||||
|||||||

99|3515|1|1|9|||41.4.1 Waiver of the contractor's lien is required ||0.0|


|||||||
|||||||No
|||||||
|||||||

100|3516|1|1|10|||41.4.2 Construction document copies to be supplied to the||


0.0|
||||||| contractor free of charge
|||||||
|||||||Number of : 3
|||||||
|||||||

101|3517|1|1|10|||41.4.3 Bills of quantities drawn up in accordance with a


system other ||0.0|
|||||||
||||||| than the Standard System of Measuring Building Work
|||||||
|||||||Not applicable
|||||||
|||||||

102|3518|1|1|10|||41.4.4 On acceptance of the tender the priced bills of


quantities is ||0.0|
|||||||
||||||| to be submitted within ten (10) working days
|||||||
|||||||

103|3519|1|1|10|||41.4.5 JBCC Engineering General Conditions are to be


included in the ||0.0|
|||||||
||||||| contract documents
|||||||
|||||||No
|||||||
|||||||

104|3520|1|1|10|||41.4.6 Where the contract value is not adjusted using CPAP


||0.0|
|||||||
|||||||
|||||||
||||||| Alternative: FIXED PRICE
|||||||
|||||||
|||||||
|||||||

105|3521|1|1|10|||41.4.7 Details of changes made to the provision of JBCC ||


0.0|
|||||||
||||||| Series 2000 standard documentation
|||||||
|||||||
|||||||
|||||||A. Principal Building Agreement
|||||||
|||||||
|||||||
||||||| Clause 3.0 Note added
|||||||
||||||| Clause 26.0 Note added
|||||||
||||||| Clause 29.0 Note added
|||||||
||||||| Clause 29.1.1 Replaced
|||||||
||||||| Clause 29.4.3 Amended
|||||||
||||||| Clause 29.4.5 Replaced
|||||||
||||||| Clause 31.9 Amended
|||||||
||||||| Clause 31.10 Amended
|||||||
||||||| Clause 32.0 Note added
|||||||
||||||| Clause 32.6 Amended
|||||||
||||||| Clause 32.10 Amended
|||||||
||||||| Clause 34.11 Amended
|||||||
|||||||
|||||||
|||||||B. JBCC Preliminaries
|||||||
|||||||
|||||||
||||||| Clause 8.1 Amended
|||||||
||||||| Clause 9.2 Amended
|||||||
||||||| Clause 11.3 Amended
|||||||
||||||| Clause 11.6 Amended
|||||||
|||||||

106|3522|1|1|10|||--------------------------------------- ||0.0|
|||||||
|||||||

107|3523|1|1|11|||SECTION B : JBCC PRELIMINARIES |H1|0.0|

108|3524|1|1|11||| |H2|0.0|
|||||||
|||||||1.0 DEFINITIONS AND INTERPRETATION

109|3525|1|1|11|A||Clause 1.0: Definitions and interpretation|Item|1|


|||||||
|||||||

110|3526|1|1|11|||2.0 DOCUMENTS |H2|0.0|

111|3527|1|1|11|B||Clause 2.1: Checking of documents|Item|1|


|||||||
|||||||

112|3528|1|1|11|C||Clause 2.2: Provisional bills of quantities|Item|1|


|||||||
|||||||
113|3529|1|1|11|D||Clause 2.3: Availability of construction documentation|Item|1|
|||||||
|||||||

114|3530|1|1|11|E||Clause 2.4: Interest of agents|Item|1|


|||||||
|||||||

115|3531|1|1|11|F||Clause 2.5: Priced documents |Item|1|


|||||||
|||||||

116|3532|1|1|11|G||Clause 2.6: Tender submission|Item|1|


|||||||
|||||||

117|3533|1|1|11|||3.0 THE SITE |H2|0.0|

118|3534|1|1|11|H||Clause 3.1: Defined works area |Item|1|


|||||||
|||||||

119|3535|1|1|11|J||Clause 3.2: Geotechnical investigation|Item|1|


|||||||
|||||||

120|3536|1|1|11|K||Clause 3.3: Inspection of the site|Item|1|


|||||||
|||||||

121|3537|1|1|11|L||Clause 3.4: Existing premises occupied |Item|


1|
|||||||
|||||||

122|3894|1|1|11|M||Clause 3.5: Previous work - dimensional accuracy|N/A|0.0|


|||||||
|||||||

123|3895|1|1|11|N||Clause 3.6: Previous work - defects|N/A|0.0|


|||||||
|||||||

124|3540|1|1|11|P||Clause 3.7: Services known|Item|1|


|||||||
|||||||

125|3541|1|1|11|Q||Clause 3.8: Services unknown|Item|1|


|||||||
|||||||

126|3542|1|1|11|R||Clause 3.9: Protection of trees|Item|1|


|||||||
|||||||

127|3543|1|1|11|S||Clause 3.10: Articles of value|Item|1|


|||||||
|||||||
128|3544|1|1|11|T||Clause 3.11: Inspection of adjoining properties|Item|1|
|||||||
|||||||

129|3545|1|1|11|||4.0 MANAGEMENT OF CONTRACT |H2|0.0|

130|3546|1|1|11|U||Clause 4.1: Management of the works |Item|


1|
|||||||
|||||||

131|3547|1|1|11|V||Clause 4.2: Programme for the works|Item|1|


|||||||
|||||||

132|3548|1|1|12|A||Clause 4.3: Progress meetings |Item|1|


|||||||
|||||||

133|3549|1|1|12|B||Clause 4.4: Technical meetings|Item|1|


|||||||
|||||||

134|3550|1|1|12|||5.0 SAMPLES AND SHOP DRAWINGS |H2|0.0|

135|3551|1|1|12|C||Clause 5.1: Samples of materials|Item|1|


|||||||
|||||||

136|3552|1|1|12|D||Clause 5.2: Workmanship samples|Item|1|


|||||||
|||||||

137|3553|1|1|12|E||Clause 5.3: Shop drawings|Item|1|


|||||||
|||||||

138|3554|1|1|12|||6.0 TEMPORARY WORKS AND PLANT |H2|0.0|

139|3555|1|1|12|F||Clause 6.1: Deposits and fees|Item|1|


|||||||
|||||||

140|3556|1|1|12|G||Clause 6.2: Enclosure of the works |Item|1|


|||||||
|||||||

141|3557|1|1|12|H||Clause 6.3: Advertising|Item|1|


|||||||
|||||||

142|3558|1|1|12|J||Clause 6.4: Plant, equipment, sheds and offices |Item|1|


|||||||
|||||||

143|3559|1|1|12|K|| Clause 6.5: Main notice board|Item|1|


|||||||
|||||||
144|3560|1|1|12|L||Clause 6.6: Subcontractor's notice board|Item|1|
|||||||
|||||||

145|3561|1|1|12|||7.0 TEMPORARY SERVICES |H2|0.0|

146|3562|1|1|12|M||Clause 7.1: Location|Item|1|


|||||||
|||||||

147|3563|1|1|12|N||Clause 7.2: Water |Item|1|


|||||||
|||||||

148|3564|1|1|12|P||Clause 7.3: Electricity |Item|1|


|||||||
|||||||

149|3565|1|1|12|Q||Clause 7.4: Telecommunication equipment|Item|1|


|||||||
|||||||

150|3566|1|1|12|R||Clause 7.5: Ablution facilities |Item|


1|
|||||||
|||||||

151|3567|1|1|12|||8.0 PRIME COST AMOUNTS |H2|0.0|

152|3568|1|1|12|S||Clause 8.1: Responsibility for prime cost amounts|Item|1|


|||||||
|||||||
|||||||
|||||||Clause 8.1 is amended by the omission of "hoisting and fixing" in the
||||||| second sentence and replacing with "hoisting, wastage and fixing".
|||||||
|||||||

153|3569|1|1|12|||9.0 ATTENDANCE ON N/S SUBCONTRACTORS |H2|0.0|

154|3570|1|1|12|T||Clause 9.1: General attendance|Item|1|


|||||||
|||||||

155|3571|1|1|13|A||Clause 9.2: Special attendance|Item|1|


|||||||
|||||||
|||||||
|||||||The last three words contained within clause 9.2, ie "....... in the
||||||| schedule", shall be deleted and replace by "....... within the relevant
item
||||||| incorporated in these bills of quantities."
|||||||
|||||||

156|3572|1|1|13|B||Clause 9.3: Commissioning - fuel, water and power|Item|1|


|||||||
|||||||
157|3573|1|1|13|||10.0 FINANCIAL ASPECTS |H2|0.0|

158|3574|1|1|13|C||Clause 10.1: Statutory taxes, duties and levies


|Item|1|
|||||||
|||||||

159|3575|1|1|13|D||Clause 10.2: Payment of preliminaries|Item|1|


|||||||
|||||||

160|3576|1|1|13|E||Clause 10.3: Adjustment of preliminaries|Item|1|


|||||||
|||||||

161|3577|1|1|13|F||Clause 10.4: Payment certificate cash flow|Item|1|


|||||||
|||||||

162|3578|1|1|13|||11.0 GENERAL |H2|0.0|

163|3579|1|1|13|G||Clause 11.1: Protection of the works|Item|1|


|||||||
|||||||

164|3580|1|1|13|H||Clause 11.2: Protection/isolation of existing/sectionally


occupied works|Item|1|
|||||||
|||||||

165|3581|1|1|13|J||Clause 11.3: Site security |Item|1|


|||||||
|||||||
|||||||
|||||||Tenderers are to note that the contractor will be required to adhere to the
||||||| Cliftn Country Club security regulations, which include but are not limited
to the
||||||| following:
|||||||
|||||||
|||||||
|||||||* Random inspections of vehicles entering/leaving the site
|||||||
|||||||* All workmen are to be transported from the main entrance

||||||| gate after security clearance and transported back to


|||||||
||||||| the main gate at the end of each shift
|||||||
|||||||* Workmen are not permitted to wander around the golf course and
||||||| meals must be enjoyed at the workplace only
|||||||
|||||||* Permission to work overtime and weekends must be obtained
||||||| beforehand
|||||||
|||||||

166|3582|1|1|13|K||Clause 11.4: Notice before covering work|Item|1|


|||||||
|||||||

167|3583|1|1|13|L||Clause 11.5: Disturbance|Item|1|


|||||||
|||||||

168|3584|1|1|13|M||Clause 11.6: Works cleaning and clearing |Item|1|


|||||||
|||||||
|||||||
|||||||Great emphasis will be placed by the architect upon the orderliness and
||||||| cleanliness of the site during the construction and finishing of this
project
||||||| and the contractor shall ensure that this condition is met by himself and
||||||| all his sub-contractors at all times
|||||||
|||||||

169|3585|1|1|13|N||Clause 11.7: Vermin|Item|1|


|||||||
|||||||

170|3586|1|1|14|A||Clause 11.8: Overhand work|Item|1|


|||||||
|||||||

171|3587|1|1|14||| |H2|0.0|
|||||||
|||||||12.0 SCHEDULE OF VARIABLES

172|3588|1|1|14|||Information necessary for completion of those clauses contained


in the||0.0|
||||||| schedules, as necessary for tender purposes, is given hereunder
|||||||
|||||||

173|3589|1|1|14|B||Clause 12.1: Pre-tender information|Item|1|


|||||||
|||||||

174|3590|1|1|14|||Clause ||0.0|
|||||||
|||||||(and reference)
|||||||
|||||||

175|3591|1|1|14|||12.1.1 Provisional bills of quantities ||0.0|


|||||||
|||||||(2.2)
|||||||
|||||||Yes
|||||||
|||||||

176|3592|1|1|14|||12.1.2 Availability of construction documentation ||0.0|


|||||||
|||||||(2.3) Construction documentation is not complete
|||||||
|||||||Yes
|||||||
|||||||

177|3593|1|1|14|||12.1.3 Interests of agents ||0.0|


|||||||
|||||||(2.4)
|||||||
|||||||Not applicable
|||||||
|||||||

178|3594|1|1|14|||12.1.4 Defined works area||0.0|


|||||||
|||||||(3.1) The area of the works to be occupied by the contractor,
|||||||
||||||| any restrictions to the area and the limit of access or exit will
|||||||
||||||| be defined and pointed out by the architect on the handover
|||||||
||||||| of the site
|||||||
|||||||
|||||||
||||||| Building equipment and material must be neatly stacked and
|||||||
||||||| stored on the building site and not on neighbouring properties,
|||||||
||||||| roads, pavements, the golf course and public open spaces
|||||||
|||||||
|||||||
||||||| At no time will vehicular or pedestrian traffic be permitted
|||||||
||||||| across the golf course
|||||||
|||||||

179|3595|1|1|14|||12.1.5 Geotechnical investigation ||0.0|


|||||||
|||||||(3.2) There is no site soil investigation report available. The
||||||| contractor is to allow in his tender for the digging of all
||||||| necessary trial holes which will be inspected by the
||||||| Engineer prior to the commencement of any foundation
||||||| work
|||||||
|||||||

180|3596|1|1|14|||12.1.6 Existing premises occupied ||0.0|


|||||||
|||||||(3.4) Due to the occupancy of Clifton Country Club for the
|||||||
||||||| duration of the contract period, the contractor is to perform
|||||||
||||||| in such a manner so as to cause the minimum of
|||||||
||||||| inconvenience to the occupants and shall take all measures
|||||||
||||||| available to him in order to minimise noisy operations
|||||||
|||||||

181|3597|1|1|15|||12.1.7 Services known ||0.0|


|||||||
|||||||(3.7) The contractor is to liaise with the Architect, Civil and
||||||| Electrical Engineers with regard to existing services,
||||||| servitudes, etc. prior to signing the contract
|||||||
|||||||

182|3598|1|1|15|||12.1.8 Protection of trees ||0.0|


|||||||
|||||||(3.9) Specific trees and shrubs will require protection during the
|||||||
||||||| contract period. The contractor is required to liaise with the
|||||||
||||||| Architect for further information in this regard and allow for
|||||||
||||||| all costs related thereto in their tender amount
|||||||
|||||||
|||||||
||||||| The following penalties shall be applicable for all
||||||| damaged trees needing replacement:
|||||||
||||||| Yellow Wood trees: R5 000,00 per tree
|||||||
||||||| All other trees: R1 000,00 per tree
|||||||
|||||||

183|3599|1|1|15|||12.1.9 Inspection of adjoining properties ||0.0|


|||||||
|||||||(3.11)
|||||||
|||||||No specific requirements
|||||||
|||||||

184|3600|1|1|15|||12.1.10 Enclosure of the works||0.0|


|||||||
|||||||Yes
|||||||
|||||||(6.2) Hoarding 2,0m high overall comprising a double layer of 50%
|||||||
||||||| shade netting, securely fixed to four horizontal strands of
|||||||
||||||| 3,15mm diameter galvanised steel straining wire fixed to
|||||||
||||||| 100mm diameter creosote treated gumpoles at 3m centres set
|||||||
||||||| securely into the ground to a minimum depth of 600mm and
|||||||
||||||| including all necessary corner posts, strays, etc. and including
|||||||
||||||| access gates as required shall be erected prior to construction
|||||||
||||||| work commencing. The extent of the hoarding is approximately
|||||||
||||||| 145m
|||||||
|||||||

185|3601|1|1|15|||12.1.11 Offices ||0.0|


|||||||
|||||||(6.4.3)
|||||||
|||||||Yes
|||||||
|||||||

186|3602|1|1|15|||12.1.12 Main notice board ||0.0|


|||||||
|||||||(6.5)
|||||||
|||||||2 Number - Standard size
|||||||
|||||||

187|3603|1|1|15|||12.1.13 Subcontractors notice board ||0.0|


|||||||
|||||||(6.6)
|||||||
|||||||No
|||||||
|||||||

188|3604|1|1|15|||12.1.14 Water ||0.0|


|||||||
|||||||(7.2)
|||||||
|||||||Alternative B
|||||||
|||||||

189|3605|1|1|15|||12.1.15 Electricity ||0.0|


|||||||
|||||||(7.3)
|||||||
|||||||Alternative B
|||||||
|||||||

190|3606|1|1|16|||12.1.16 Telecommunications ||0.0|


|||||||
|||||||(7.4)
|||||||
|||||||Alternative A
|||||||
|||||||

191|3607|1|1|16|||12.1.17 Ablution facilities ||0.0|


|||||||
|||||||(7.5)
|||||||
|||||||Alternative A
|||||||
|||||||
192|3608|1|1|16|||12.1.18 Special attendance ||0.0|
|||||||
|||||||(9.2)
|||||||
||||||| Details of special attendances required shall be as
|||||||
||||||| detailed within the items relevant to each particular
|||||||
||||||| subcontract as incorporated hereinafter in these
|||||||
||||||| bills of quantities
|||||||
|||||||

193|3609|1|1|16|||12.1.19 Protection of the works ||0.0|


|||||||
|||||||(11.1) The contractor shall maintain the existing road within the
|||||||
||||||| hoarded area to a reasonable standard throughout the
|||||||
||||||| contract. A watercar must be used as necessary to maintain
|||||||
||||||| the minimum amount of dust
|||||||
|||||||

194|3610|1|1|16|||12.1.20 Protection of sectionally occupied works ||0.0|


|||||||
|||||||(11.2)
|||||||
|||||||Yes
|||||||
|||||||

195|3611|1|1|16|||12.1.21 Disturbance ||0.0|


|||||||
|||||||(11.5) Whilst the employer shall not impose restrictions upon
||||||| the contractor's working hours the contractor shall take all
||||||| measures available to him in order to minimise noisy
||||||| operations during business hours. Such measures will
||||||| include, inter alia, the use of "silent" compressors and strict
||||||| control of workmen
|||||||
|||||||

196|3612|1|1|16|||--------------------------------------- ||0.0|
|||||||
|||||||

197|3613|1|1|16|||SECTION C : SPECIFIC PRELIMINARIES |H1|0.0|

198|3614|1|1|16|||SUPPLEMENTARY DOCUMENTATION |H2|0.0|

199|3615|1|1|16|A||As built drawings |Item|1|


|||||||
|||||||
|||||||
|||||||The position of construction breaks and the extent of individual concrete
||||||| pours are to be recorded by the contractor on the structural engineer's
||||||| drawings and are to be submitted to the principal agent and the structural
||||||| engineer for their records.
|||||||
|||||||

200|3616|1|1|16|B||Site instructions |Item|1|


|||||||
|||||||
|||||||
|||||||Site instructions issued on site are to be recorded in triplicate in an
||||||| instruction book which is to be maintained on site by the contractor.
|||||||
|||||||

201|3617|1|1|17|A||Labour record |Item|1|


|||||||
|||||||
|||||||
|||||||At the end of each week the contractor shall provide the principal agent
||||||| with a written record, in schedule form, reflecting the number and
||||||| description of tradesmen and labourers employed by him and all
||||||| subcontractors on the works each day.
|||||||
|||||||

202|3618|1|1|17|B||Plant record |Item|1|


|||||||
|||||||
|||||||
|||||||At the end of each week the contractor shall provide the principal agent
||||||| with a written record, in schedule form, reflecting the number, type and
||||||| capacity of all plant, excluding hand tools, currently used on the works.
|||||||
|||||||

203|3619|1|1|17|||FINANCIAL ASPECTS |H2|0.0|

204|3620|1|1|17|||Dayworks |H3|0.0|

205|3621|1|1|17|C||Where in the opinion of the quantity surveyor any extra work


cannot|%|0.00|
||||||| properly be measured or valued, the contractor will be allowed daywork
||||||| prices therefor calculated upon the costs defined hereunder together with
||||||| the stated percentages. The total thus arrived at shall be the total amount
||||||| recoverable by the contractor for performing such work.
|||||||
|||||||

206|3622|1|1|17|||The cost to the contractor or subcontractor of materials, being


the net||0.0|
||||||| cost (at current market prices) actually paid for such materials after the
||||||| deduction of cash discounts or if materials are supplied from the
||||||| contractor's or subcontractor's stock then the cost of such materials shall
||||||| be based upon the current market price plus the cost of delivery to site;
to
||||||| which net cost 10 per cent thereof shall be added.
|||||||
|||||||
207|3623|1|1|17|||The cost of labour to the contractor or subcontractor, being all
items of||0.0|
||||||| direct cost of labour actually remunerated to the workmen concerned
||||||| which shall include the cost of all allowances in terms of the Industrial
||||||| Conciliation Act (where applicable) or any other wage determination
||||||| applying in the area or any other charge or expense which is normally
||||||| binding as well as statutory levies to education and training funds as may
||||||| be applicable relating to the class of labour concerned at the time when
||||||| and in the area where the daywork is executed; to which labour costs 75
||||||| per cent in respect of shopfitting, wall and floor tiling, mosaic work and
||||||| electrical work, 60 per cent in respect of plumbing, plastering, joinery
and
||||||| stone masonry and 40 per cent in respect of painting and decorating,
||||||| general builders work and any other trade not specified herein, shall be
||||||| added.
|||||||
|||||||

208|3624|1|1|17|||Hourly based rates for labour shall be the current market rates
for labour||0.0|
||||||| based upon standard working hours and shall be applied in respect of the
||||||| time spent by workers directly engaged on the particular dayworks
||||||| including any operators operating mechanical plant and transport and
||||||| erecting and dismantling other plant.
|||||||
|||||||

209|3625|1|1|18|||If a claim is made that individual workmen have been paid wages
and||0.0|
||||||| allowances in excess of the minimum legalised rates, then proof must be
||||||| furnished that such workmen had been so paid prior to the
||||||| commencement of the extra work referred to.
|||||||
|||||||

210|3626|1|1|18|||Time lost due to inclement weather shall be excluded from the


time||0.0|
||||||| charged.
|||||||
|||||||

211|3627|1|1|18|||Other direct costs, being related direct costs such as mechanical


plant||0.0|
||||||| and transport, other than cost of material and labour and shall be the net
||||||| cost thereof without any percentage added.
|||||||
|||||||

212|3628|1|1|18|||The rates for mechanical plant shall be commercial hire rates


current at||0.0|
||||||| the time of executing the daywork and shall include fuel and insurance
||||||| costs.
|||||||
|||||||

213|3629|1|1|18|||The above percentages shall cover head office charges; site


staff||0.0|
||||||| including site supervision; third party and contractor's public liability
||||||| insurance; contractor's workmen's compensation and unemployment
||||||| insurance fund contributions; use, repair and sharpening of
||||||| non-mechanical hand tools; use of erected scaffolding, staging, trestles
||||||| and the like; use of tarpaulins, protective clothing, artificial lighting,
safety
||||||| and welfare facilities, storage and the like as may be available on the
||||||| site; and profit.
|||||||
|||||||

214|3630|1|1|18|||Supporting vouchers reflecting the time spent and materials used


each|Item|1|
||||||| week shall be delivered for verification to the quantity surveyor not later
||||||| than twenty one days after the end of the week concerned. Should the
||||||| contractor fail to submit the vouchers within this time, the quantity
||||||| surveyor shall determine a fair price for the work.
|||||||
|||||||

215|3631|1|1|18|||THE SITE |H2|0.0|

216|3632|1|1|18|||Access roads |H3|0.0|

217|3633|1|1|18|A||Only existing gravel access roads may be used. Vehicles with a


weight|Item|1|
||||||| exceeding 3 tons will only be allowed to cross the existing paved roads at
||||||| specified points. Access over or driving on the golf course is not
||||||| permitted.
|||||||
|||||||
|||||||
|||||||All vehicles are to adhere to the marked speed limits on site
|||||||
|||||||
|||||||
|||||||Golfers have right of way at all times (on and off the golf course)
|||||||
|||||||

218|3634|1|1|18|B||A refundable pavement and roads deposit of 5000,00 is payable


before|Item|1|
||||||| building work commences. This deposit will be refunded after completion
||||||| should the roads, pavement and surrounding landscaping be handed
||||||| back in the same condition as at commencement of the contract
|||||||
|||||||

219|3635|1|1|19|||MATERIALS AND WORKMANSHIP |H2|0.0|

220|3636|1|1|19|||Testing of windows to ensure watertightness |H3|0.0|

221|3637|1|1|19|A||As the windows are fixed they shall be glazed and prepared so
that each|Item|1|
||||||| window can be tested for watertightness with water sprayed on by means
||||||| of a 25mm hosepipe using adequate pressure. If the pressure proves to
||||||| be inadequate, in the opinion of the architect, then the pressure in the
||||||| hosepipe shall be boosted by means of compressed air or other
||||||| approved means. Each window section shall be tested under the
||||||| supervision of the clerk of works and approved before final acceptance.
|||||||
|||||||
|||||||

222|3638|1|1|19|||Guarantees |H3|0.0|

223|3639|1|1|19|||The contractor shall obtain written guarantees where called for,|


Item|1|
||||||| addressed to the employer, from the firms supplying the materials or
||||||| doing the work and deliver such guarantees to the principal agent.
|||||||
|||||||
|||||||
|||||||The guarantees shall state that workmanship, materials and installation
||||||| are guaranteed for a specified period reckoned from the date of practical
||||||| completion of the works and that any defects in the workmanship,
||||||| materials and installation that may arise during that period shall be made
||||||| good at the expense of the firm doing the work upon written notice from
||||||| the principal agent or the employer to do so.
|||||||
|||||||

224|3640|1|1|19|||FINANCIAL ASPECTS |H2|0.0|

225|3641|1|1|19|||Interim payments for unfixed materials |H3|0.0|

226|3642|1|1|19|B||Before including the value of any unfixed materials and goods in


his|Item|1|
||||||| valuation for each interim certificate the quantity surveyor will require a
||||||| certificate of ownership and a cession of rights in favour of the employer
||||||| from the contractor and/or each and every sub-contractor. Approved
||||||| forms of ownership and cession are attached at the end of these bills of
||||||| quantities

227|3643|1|1|19|||Overtime |H3|0.0|

228|3644|1|1|19|C||The additional costs of overtime work shall be for the


employer's account|Item|1|
||||||| only when prior written agreement thereto is given by the principal agent.

|||||||
|||||||

229|3645|1|1|19|||GENERAL |H2|0.0|

230|3646|1|1|19|||Copyright |H3|0.0|

231|3647|1|1|19|D||The ownership of the copyright in and to all drawings,


specifications,|Item|1|
||||||| models and documents of any nature delivered to the contractor or
||||||| produced by or on behalf of the contractor in connection with the works;
||||||| and, the artistic character and/or artistic design of the works, shall
remain
||||||| vested in and/or is hereby assigned to the employer by the contractor.
|||||||
|||||||

232|79|1|2|21|||BILL NO 2 |H1|0.0|
233|80|1|2|21|||EARTHWORKS |H1|0.0|

234|2340|1|2|21|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

235|81|1|2|21|||--------------------------------------- ||0.0|
|||||||
|||||||

236|2341|1|2|21|||SUPPLEMENTARY PREAMBLES |H2|0.0|

237|2342|1|2|21|||Nature of the ground |H3|0.0|

238|2343|1|2|21|||The nature of the ground ia assumed to be silty clay, therefore


"earth" ||0.0|
|||||||
|||||||

239|2344|1|2|21|||Carting away of excavated material |H3|0.0|

240|2345|1|2|21|||Descriptions of carting away of excavated material shall be


deemed to||0.0|
||||||| include loading excavated material onto trucks directly from the
||||||| excavations or, alternatively, from stock piles situated on the building
site
|||||||
|||||||

241|2346|1|2|21|||----------------------------------------- ||0.0|
|||||||
|||||||

242|82|1|2|21|||EXCAVATION, FILLING, ETC |H2|0.0|

243|83|1|2|21|||Excavation in earth not exceeding 2m deep |H3|0.0|

244|84|1|2|21|A||Trenches |m3|192|00.00|0000.00

245|2077|1|2|21|B||Holes |m3|2|00.00|00.00
|||||||
|||||||

246|85|1|2|21|C||Trenches and holes for thickening under surface bed etc |m3|4|
00.00|000.00

247|86|1|2|21|||Extra over all excavations for carting away |H3|0.0|

248|87|1|2|21|D||Surplus material from excavations and/or stock piles on site to a


dumping|m3|198|00.00|0000.00
||||||| site to be located by the contractor

249|88|1|2|21|||Risk of collapse of excavations |H3|0.0|

250|89|1|2|21|E||Sides of trench and hole excavations not exceeding 1,5m deep |m�|
485|0.00|0000.00
251|90|1|2|21|||Keeping excavations free of water |H3|0.0|

252|91|1|2|21|F||Keeping excavations free of water |Item|1||000.00

253|2505|1|2|22|||Earth filling obtained from the excavations and /or prescribed


stock|H3|0.0|
||||||| piles on site compacted to 93% Mod AASHTO density

254|2506|1|2|22|A||Backfilling to trenches, holes, etc |m3|10|00.00|000.00

255|94|1|2|22|||Earth filling supplied by the contractor compacted to 95% Mod|H3|


0.0|
||||||| AASHTO density

256|95|1|2|22|B||Under floors, steps, pavings, etc |m3|208|00.00|00000.00

257|96|1|2|22|C||Backfilling to trenches, holes, etc |m3|88|00.00|0000.00

258|97|1|2|22|||Prescribed density tests on filling |H3|0.0|

259|2347|1|2|22|D||"Modified AASHTO Density" test |No|1|000.00|000.00


|||||||
|||||||

260|98|1|2|22|E||Field density tests |No|10|00.00|000.00

261|99|1|3|24|||BILL NO 3 |H1|0.0|

262|100|1|3|24|||CONCRETE, FORMWORK AND REINFORCEMENT |H1|0.0|

263|2348|1|3|24|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

264|101|1|3|24|||---------------------------------------- ||0.0|
|||||||
|||||||

265|2349|1|3|24|||SUPPLEMENTARY PREAMBLES |H2|0.0|

266|2350|1|3|24|||Cost of tests |H3|0.0|

267|2351|1|3|24|||The costs of making, storing and testing of concrete test cubes


as||0.0|
||||||| required under Clause 7 "Tests" of SABS 1200 G shall include the cost of
||||||| providing cube moulds necessary for submitting reports on the tests to
||||||| the Architect. The testing shall be undertaken by an independent firm or
||||||| institution nominated by the contractor to the approval of the Architect.
||||||| (Test cubes are measured separately)
|||||||
|||||||

268|2352|1|3|24|||Formwork |H3|0.0|

269|2353|1|3|24|||Descriptions of formwork shall be deemed to include use and waste


only||0.0|
||||||| (except where described as "left in" or "permanent"), for fitting together
in
||||||| the required forms, wedging, plumbing and fixing to true angles and
||||||| surfaces as necessary to ensure easy release during stripping and for
||||||| re-conditioning as necessary before re-use
|||||||
|||||||

270|2354|1|3|24|||The vertical strutting shall be carried down to such


construction as is||0.0|
||||||| sufficiently strong to afford the required support without damage and shall
||||||| remain in position until the newly constructed work is able to support
itself
|||||||
|||||||

271|2355|1|3|24|||Concrete |H3|0.0|

272|2356|1|3|24|||Prices for concrete in strip footings and filling to cavity of


hollow walls are||0.0|
||||||| to include for working around steel reinforcing bars where applicable
|||||||
|||||||

273|2429|1|3|24|||---------------------------------------- ||0.0|
|||||||
|||||||

274|102|1|3|24|||UNREINFORCED CONCRETE CAST AGAINST EXCAVATED|H2|0.0|


||||||| SURFACES

275|103|1|3|24|||20MPa/19mm concrete |H3|0.0|

276|2663|1|3|24|A||Mass concrete |m3|0.2|000.00|00.00


|||||||
|||||||

277|2078|1|3|24|B||Bases |m3|1|000.00|000.00
|||||||
|||||||

278|104|1|3|24|C||Strip footings |m3|40|000.00|00000.00

279|108|1|3|25|A||Surface beds cast in panels on waterproofing |m3|37|000.00|


00000.00
|||||||
|||||||

280|109|1|3|25|B||Extra over surface beds for thickening 860mm wide sloping to


600mm|m|37|00.00|0000.00
||||||| wide x 130mm high under internal half brick wall
|||||||
|||||||

281|2889|1|3|25|||UNREINFORCED CONCRETE |H2|0.0|

282|2597|1|3|25|||25MPa/19mm concrete |H3|0.0|

283|2598|1|3|25|C||Steps, urinal steps, cupboard platforms, etc |m3|5|000.00|


0000.00
284|105|1|3|25|||REINFORCED CONCRETE |H2|0.0|

285|106|1|3|25|||20MPa/19mm concrete |H3|0.0|

286|107|1|3|25|D||Filling to cavity of hollow walls |m3|50|000.00|00000.00

287|1647|1|3|25|||25MPa/19mm concrete |H3|0.0|

288|110|1|3|25|E||Slabs, including beams and inverted beams |m3|36|000.00|00000.00


|||||||
|||||||

289|111|1|3|25|F||Stairs, including landings, beams and inverted beams |m3|2|


000.00|000.00
|||||||
|||||||

290|114|1|3|25|||TEST BLOCKS |H2|0.0|

291|115|1|3|25|G||Making and testing 150 x 150 x 150mm concrete strength test cube
|No|10|00.00|000.00

292|2890|1|3|25|||CONCRETE SUNDRIES |H2|0.0|

293|116|1|3|25|||Finishing top surfaces of concrete smooth with a power float |H3|


0.0|

294|117|1|3|25|H||Surface beds, slabs, etc |m2|44|0.00|000.00

295|2892|1|3|25|||FORMWORK |H1|0.0|

296|2891|1|3|25|||ROUGH FORMWORK (DEGREE OF ACCURACY III) |H2|0.0|

297|119|1|3|25|||Rough formwork to sides |H3|0.0|

298|2593|1|3|25|J||Beams |m2|16|00.00|0000.00

299|4073|1|3|25|K||Inverted beams |m2|6|00.00|000.00

300|4074|1|3|25|L||Inverted beams above concrete |m2|5|00.00|000.00

301|120|1|3|25|M||Edges, risers, ends and reveals not exceeding 300mm high or wide
|m|106|00.00|0000.00

302|2599|1|3|25|N||Sloping and stepped outer edges of stairs 320mm high extreme |


m|4|00.00|000.00
|||||||
|||||||

303|121|1|3|26|||Rough formwork to soffits |H3|0.0|

304|123|1|3|26|A||Slabs |m2|172|00.00|00000.000

305|122|1|3|26|B||Landings |m2|4|00.00|000.00

306|124|1|3|26|C||Stairs with sloping soffits |m2|6|000.00|000.00

307|4072|1|3|26|D||Beams |m2|3|00.00|000.00
308|125|1|3|26|||Permanent formwork to soffits |H3|0.0|

309|126|1|3|26|E||Galvanised cavity drip closer over 115mm cavity of hollow walls


|m|80|00.00|0000.00
|||||||
|||||||

310|2583|1|3|26|||MOVEMENT JOINTS ETC |H2|0.0|

311|2584|1|3|26|||Two layers of hardboard greased in between as slip joints


between|H3|0.0|
||||||| horizontal concrete and brick surfaces, including cement mortar
||||||| bed

312|3078|1|3|26|F||Exceeding 300mm wide |m2|5|00.00|000.00

313|2585|1|3|26|G||Not exceeding 300mm wide |m|84|00.00|0000.00

314|2588|1|3|26|||Expansion joints with softboard between vertical concrete and


brick|H3|0.0|
||||||| surfaces

315|2589|1|3|26|H||12mm Joints not exceeding 300mm high |m|29|00.00|000.00


|||||||
|||||||

316|2586|1|3|26|||Saw cut joints |H3|0.0|

317|2587|1|3|26|J||6 x 10mm Saw cut joints in top of concrete |m|78|0.00|000.00


|||||||
|||||||

318|127|1|3|26|||REINFORCEMENT |H1|0.0|

319|128|1|3|26|||Mild steel reinforcement to structural concrete work |H3|0.0|

320|129|1|3|26|K||10mm Diameter bars |t|0.700|0000.00|0000.00

321|130|1|3|26|L||8mm Diameter bars |t|0.70|0000.00|0000.00


|||||||
|||||||

322|131|1|3|26|||High tensile steel reinforcement to structural concrete work |H3|


0.0|

323|132|1|3|26|M||20mm Diameter bars |t|1.35|0000.00|0000.00

324|133|1|3|26|N||16mm Diameter bars |t|2.03|0000.00|0000.00

325|134|1|3|26|P||12mm Diameter bars |t|1.00|0000.00|0000.00

326|2076|1|3|26|Q||10mm Diameter bars |t|1.10|0000.00|0000.00


|||||||
|||||||

327|135|1|3|27|||Fabric reinforcement |H3|0.0|

328|136|1|3|27|A||Type 245 fabric reinforcement in concrete surface beds, slabs,


etc |m2|1|00.00|00.00

329|137|1|4|29|||BILL NO 4 |H1|0.0|

330|138|1|4|29|||PRECAST CONCRETE |H1|0.0|

331|2358|1|4|29|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

332|2430|1|4|29|||--------------------------------------- ||0.0|
|||||||
|||||||

333|140|1|4|29|||PRECAST CONCRETE |H2|0.0|

334|141|1|4|29|||Precast concrete finished smooth on exposed surfaces including|H3|


0.0|
||||||| bedding, jointing and pointing

335|142|1|4|29|A||Pyramid shaped capping size 470 x 470 x 140mm high extreme with|
No|4|000.00|000.00
||||||| 105mm thick base including bedding to top of brick pier in cement mortar

336|3361|1|4|29|B||Flat chimney cowl size 690 x 760mm with 85mm thick base,
including|No|1|000.00|000.00
||||||| bedding on top of chimney
|||||||
|||||||

337|3795|1|4|29|C||Flat chimney cowl size 860 x 690mm with 85mm thick base,
including|No|1|000.00|000.00
||||||| bedding on top of chimney
|||||||
|||||||

338|145|1|5|30|||BILL NO 5 |H1|0.0|

339|146|1|5|30|||MASONRY |H1|0.0|

340|2359|1|5|30|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

341|2431|1|5|30|||--------------------------------------- ||0.0|
|||||||
|||||||

342|2360|1|5|30|||SUPPLEMENTARY PREAMBLES |H2|0.0|

343|2361|1|5|30|||BRICKWORK |H2|0.0|

344|2362|1|5|30|||Sizes in descriptions |H3|0.0|

345|2363|1|5|30|||Where sizes in descriptions are given in brick units, "one brick"


shall||0.0|
||||||| represent the length and "half brick" the width of a brick
|||||||
|||||||

346|2364|1|5|30|||Hollow walls etc |H3|0.0|

347|2365|1|5|30|||Descriptions of hollow walls shall be deemed to include leaving


every fifth||0.0|
||||||| perpend of the bottom course of the external skin open as a weep hole
|||||||
|||||||

348|2366|1|5|30|||Wall ties for brickwork |H3|0.0|

349|2367|1|5|30|||Wall ties shall be polypropylene "S-ties" complying with BS


76877.||0.0|
||||||| Ties for hollow walls shall be of sufficient length to allow not less than
||||||| 75mm of each end to be built into the brickwork. Ties are to be spaced at
||||||| intervals of not more than 1m in the horizontal direction and not more
||||||| than 400mm staggered in the vertical direction except at openings,
||||||| vertical joints or ends of walls where they are to be placed vertically
||||||| above each other
|||||||
|||||||

350|2432|1|5|30|||--------------------------------------- ||0.0|
|||||||
|||||||

351|148|1|5|30|||BRICKWORK |H2|0.0|

352|3150|1|5|30|||Brickwork of NFX clay bricks (14Mpa nominal compressive|H3|0.0|


||||||| strength) in Class II mortar

353|153|1|5|30|A||Piers in foundations |m3|1|000.00|000.00


|||||||
|||||||

354|3280|1|5|30|B||Half brick walls in foundations |m2|2|00.00|000.00


|||||||
|||||||

355|159|1|5|30|C||One brick walls in foundations |m2|86|000.00|00000.00


|||||||
|||||||

356|162|1|5|30|D||280mm Cavity walls of two half brick skins, including


polypropylene ties in|m2|39|000.00|0000.00
||||||| foundations
|||||||
|||||||

357|3651|1|5|31|A||345mm Hollow wall of two half brick skins, including


polypropylene ties in|m2|109|000.00|00000.00
||||||| foundations
|||||||
|||||||
358|164|1|5|31|B||395mm Hollow wall of two half brick skins, including
polypropylene ties in|m2|145|000.00|00000.00
||||||| foundations
|||||||
|||||||

359|149|1|5|31|||Brickwork of NFX clay bricks (14Mpa nominal compressive|H3|0.0|


||||||| strength) in Class II mortar

360|150|1|5|31|C||Steps |m3|0.3|000.00|000.00

361|152|1|5|31|D||Piers |m3|5|000.00|0000.00

362|151|1|5|31|E||Chimneys |m3|6|000.00|0000.00

363|154|1|5|31|F||Half brick walls |m2|206|00.00|00000.00

364|155|1|5|31|G||Half brick dwarf walls |m2|16|00.00|0000.00

365|157|1|5|31|H||Half brick wall in beamfilling |m2|13|00.00|000.00

366|158|1|5|31|J||One brick walls |m2|82|000.00|00000.00

367|161|1|5|31|K||280mm Hollow walls of two half brick skins, including


polypropylene ties |m2|108|000.00|00000.00
|||||||
|||||||

368|163|1|5|31|L||345mm Hollow walls of two half brick skins, including


polypropylene ties |m2|270|000.00|00000.00
|||||||
|||||||

369|3689|1|5|31|M||345mm Hollow walls of two brick-on-edge skins including ties


and|m2|37|000.00|0000.00
||||||| 190mm wide cavity with and including 25MPa reinforced concrete infill
|||||||
|||||||

370|3156|1|5|31|N||345mm Solid walls |m2|12|000.00|0000.00


|||||||
|||||||

371|167|1|5|31|P||Half brick kerbs 200mm high |m|6|00.00|000.00


|||||||
|||||||

372|168|1|5|31|||BRICKWORK SUNDRIES |H3|0.0|

373|170|1|5|31|Q||Splayed mortar fillet one course high in 50mm cavity |m|28|0.00|


00.00

374|171|1|5|31|R||Splayed mortar fillet one course high in 115mm cavity |m|102|


0.00|000.00

375|173|1|5|31|S||Splayed mortar fillet two courses high in 115mm cavity between|m|


75|0.00|000.00
||||||| beamfilling and thatch
|||||||
|||||||

376|172|1|5|31|T||Splayed mortar fillet one course high in 165mm cavity |m|77|0.00|


000.00

377|174|1|5|31|U||Closing 50mm cavity of hollow wall vertically with brickwork half


brick|m|11|0.00|00.00
||||||| wide

378|175|1|5|31|V||Closing 115mm cavity of hollow wall vertically with brickwork


half brick|m|63|00.00|000.00
||||||| wide

379|177|1|5|32|A||Closing 50mm cavity of hollow wall horizontally with one course


of|m|28|00.00|000.00
||||||| brickwork

380|178|1|5|32|B||Closing 50mm cavity of hollow wall along gable with one course
of|m|38|00.00|0000.00
||||||| brickwork including shaping gable

381|179|1|5|32|C||Closing 115mm cavity of hollow wall horizontally with two courses


of|m|42|00.00|000.00
||||||| brickwork

382|180|1|5|32|D||200 x 300mm Fibre cement flue liners built into chimney brickwork
|m|10|000.00|0000.00
|||||||
|||||||

383|3890|1|5|32|E||Extra over 200 x 300mm fibre cement flue liners for bend |No|2|
000.00|000.00
|||||||
|||||||

384|181|1|5|32|||Brickwork reinforcement |H3|0.0|

385|182|1|5|32|F||75mm Wide brickwork reinforcement built in horizontally |m|2260|


0.00|0000.00
|||||||
|||||||

386|183|1|5|32|G||150mm Wide brickwork reinforcement built in horizontally |m|2477|


0.00|0000.00

387|2518|1|5|32|H||230mm Wide brickwork reinforcement built in horizontally |m|


283|0.00|000.00
|||||||
|||||||

388|185|1|5|32|||"Lin-con" pre-stressed fabricated lintels |H3|0.0|

389|186|1|5|32|J||100 x 70mm Lintels in lengths not exceeding 3m |m|114|00.00|


0000.00

390|187|1|5|32|K||150 x 70mm Lintels in lengths not exceeding 3m |m|89|00.00|


0000.00
|||||||
|||||||
391|188|1|5|32|L||100 x 70mm Lintels in lengths exceeding 3m and not exceeding 4,5m
|m|13|00.00|000.00
|||||||
|||||||

392|191|1|5|32|||Galvanised hoop iron cramps, ties, etc |H3|0.0|

393|2099|1|5|32|M||30 x 1,6mm Wall tie 400mm long with both ends built into
brickwork over|No|430|0.00|0000.00
||||||| control joints
|||||||
|||||||

394|192|1|5|32|N||30 x 1,6mm Cramp 500mm long with one end fixed to wood and other|
No|264|0.00|0000.00
||||||| end built into brickwork

395|194|1|5|32|||Joint forming material in movement joints |H3|0.0|

396|2522|1|5|32|P||10mm "Joincem" built in vertically through brick walls |m2|17|


00.00|000.00
|||||||
|||||||

397|198|1|6|34|||BILL NO 6 |H1|0.0|

398|199|1|6|34|||WATERPROOFING |H1|0.0|

399|2371|1|6|34|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

400|2433|1|6|34|||--------------------------------------- ||0.0|
|||||||
|||||||

401|2379|1|6|34|||SUPPLEMENTARY PREAMBLES |H2|0.0|

402|2380|1|6|34|||Waterproofing |H3|0.0|

403|2381|1|6|34|||Waterproofing of roofs, basements, etc shall be laid under a ten


year||0.0|
||||||| guarantee. Waterproofing to roofs shall be laid to even falls to outlets
etc
||||||| with necessary ridges, hips and valleys. Descriptions of sheet or
||||||| membrane waterproofing shall be deemed to include additional labour to
||||||| turn-ups and turn-downs
|||||||
|||||||

404|2434|1|6|34|||--------------------------------------- ||0.0|
|||||||
|||||||

405|201|1|6|34|||DAMPPROOFING OF WALLS AND FLOORS |H2|0.0|


406|202|1|6|34|||One layer of 375 micron "Brikgrip DPC" embossed|H3|0.0|
||||||| damp proof course

407|203|1|6|34|A||In walls |m2|162|0.00|0000.00

408|204|1|6|34|||One layer of 250 micron "USB Green"|H3|0.0|


||||||| waterproof sheeting sealed at laps with "Pressure
||||||| Sensitive Tape"

409|205|1|6|34|B||Under surface beds |m2|389|0.00|0000.00

410|208|1|6|34|||One primer coat and one slurry coat Gemflex |H3|0.0|

411|209|1|6|34|C||On shower floors and walls |m2|26|00.00|000.00


|||||||
|||||||

412|2457|1|6|34|D||On foundation walls, including bagging on brickwork |m2|13|


00.00|000.00
|||||||
|||||||

413|2404|1|6|34|||Five coat "Acrylastic" fibre reinforced heavy duty maintenance


free|H3|0.0|
||||||| acrylic waterproofing

414|2405|1|6|34|E||On gable and parapet walls |m2|40|000.00|0000.00


|||||||
|||||||

415|3147|1|6|34|F||Headwall flashing strip, including sealing top edge into groove


with|m|34|00.00|0000.00
||||||| mastic
|||||||
|||||||

416|3149|1|6|34|G||Side wall flashing strip, including sealing top edge into groove
with mastic |m|22|00.00|000.00
|||||||
|||||||

417|3116|1|6|35|||WATERPROOFING TO ROOFS, BASEMENTS, ETC |H2|0.0|

418|3119|1|6|35|||4mm "Derbigum SP" waterproofing |H3|0.0|

419|3120|1|6|35|A||On flat roofs |m2|7|00.00|000.00

420|3133|1|6|35|B||On tops and sides of inverted beams |m2|4|00.00|000.00

421|3122|1|6|35|C||Flashing strip at turn-ups including sealing top edge into


groove with|m|13|00.00|000.00
||||||| mastic
|||||||
|||||||

422|3134|1|6|35|||PROTECTIVE STONE DRESSING |H2|0.0|

423|3135|1|6|35|||River stone pebble dressing evenly spread with larger stones|H3|


0.0|
||||||| around outlets

424|3136|1|6|35|D||25mm Thick on waterproofing to flat roofs |m2|7|0.00|00.00


|||||||
|||||||

425|224|1|6|35|||JOINT SEALANTS, ETC |H2|0.0|

426|225|1|6|35|||Approved silicone pointing |H3|0.0|

427|226|1|6|35|E||Around vanity slabs, fireplace surrounds, etc |m|10|00.00|000.00

428|2715|1|6|35|F||Between timber frames and walls |m|32|00.00|000.00

429|230|1|6|35|G||Between timber thresholds and surface beds |m|5|00.00|00.00


|||||||
|||||||

430|227|1|6|35|||Becoflex joint sealant with backing cord, bond breaker, primer,


etc |H3|0.0|

431|2716|1|6|35|H||10 x 10mm In tiled joints in floors |m|78|00.00|0000.00


|||||||
|||||||

432|2524|1|6|35|J||10 x 10mm In vertical expansion joints, including raking out


expansion|m|134|00.00|0000.00
||||||| joint filler as necessary
|||||||
|||||||

433|231|1|7|37|||BILL NO 7 |H2|0.0|

434|232|1|7|37|||ROOF COVERINGS, ETC |H1|0.0|

435|2372|1|7|37|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

436|2435|1|7|37|||--------------------------------------- ||0.0|
|||||||
|||||||

437|234|1|7|37|||PROFILED METAL SHEETING AND ACCESSORIES |H2|0.0|

438|235|1|7|37|||0,6mm s-profile galvanised steel roofing and accessories with|H3|


0.0|
||||||| "Dromadek" silicon polyester finish on one side to roofs, secured
||||||| to timber purlins (elsewhere measured) in accordance with the
||||||| manufacturer's instructions

439|236|1|7|37|A||Roof covering with pitch not exceeding 50 degrees with side laps
sealed|m2|79|00.00|0000.00
|||||||
|||||||

440|237|1|7|37|B||Side wall flashing and stepped cover flashing |m|22|00.00|


0000.00
|||||||
|||||||

441|238|1|7|37|C||Head wall flashing and cover flashing |m|34|00.00|0000.00

442|239|1|7|37|D||Valley gutter 650mm girth |m|2|000.00|000.00

443|240|1|7|37|E||100 x 50mm Flashing piece riveted to sheeting |m|17|00.00|000.00

444|241|1|7|37|F||Poly closers |m|64|00.00|0000.00

445|242|1|7|37|||ROOF AND WALL INSULATION |H2|0.0|

446|243|1|7|37|||"Tisalation 40" housing grade glass fibre reinforced aluminium


foil|H3|0.0|
||||||| bonded insulation

447|244|1|7|37|G||Insulation laid taut over purlins (at approximately 1200mm


centres) and|m2|37|00.00|000.00
||||||| fixed concurrent with roof covering

448|245|1|7|37|||"Silver Insulcushion" on PVC coated straining wire |H3|0.0|

449|246|1|7|37|H||Insulation laid taut over purlins (at approximately 1200mm


centres) and|m2|42|00.00|000.00
||||||| fixed concurrent with roof covering

450|247|1|8|38|||BILL NO 8 |H1|0.0|

451|248|1|8|38|||CARPENTRY AND JOINERY |H1|0.0|

452|2373|1|8|38|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

453|2436|1|8|38|||--------------------------------------- ||0.0|
|||||||
|||||||

454|2383|1|8|38|||SUPPLEMENTARY PREAMBLES |H2|0.0|

455|2561|1|8|38|||Particle board |H3|0.0|

456|2559|1|8|38|||Particle board shall comply with the following specifications:


||0.0|
|||||||
|||||||
|||||||
|||||||a) SABS 1300 Particle board: exterior and flooring type
|||||||
|||||||
|||||||
|||||||b) SABS 1301 Particle board: interior type
|||||||
|||||||
457|3022|1|8|38|||Meranti |H3|0.0|

458|3023|1|8|38|||All meranti shall be selected meranti and shall be free of "sap"


wood ||0.0|
|||||||
|||||||

459|2384|1|8|38|||Joinery |H3|0.0|

460|2385|1|8|38|||Descriptions of frames shall be deemed to include frames,


transomes,||0.0|
||||||| mullions, rails, etc
|||||||
|||||||
|||||||
|||||||Descriptions of hardwood joinery shall be deemed to include pelleting of
||||||| bolt holes
|||||||
|||||||

461|2386|1|8|38|||Fixing |H3|0.0|

462|2387|1|8|38|||Items described as "nailed" shall be deemed to be fixed with


hardened||0.0|
||||||| steel nails or shot pins to brickwork or concrete
|||||||
|||||||

463|2562|1|8|38|||Decorative laminate finish |H3|0.0|

464|2560|1|8|38|||Laminate finish shall be glued under pressure. Edge strips shall


be butt||0.0|
||||||| jointed at junctions with adjacent similar finish
|||||||
|||||||

465|2437|1|8|38|||--------------------------------------- ||0.0|
|||||||
|||||||

466|250|1|8|38|||ROOFS, ETC |H2|0.0|

467|251|1|8|38|||Sawn softwood |H3|0.0|

468|3355|1|8|38|A||50 x 76mm Purlins |m|52|00.00|000.00

469|261|1|8|39|A||50 x 150mm Rafters exceeding 2,4m and not exceeding 3,9m |m|45|
00.00|0000.00

470|308|1|8|39|||Structural laminated timber |H3|0.0|

471|310|1|8|39|B||70 x 363mm "Capelam" beams |m|13|000.00|0000.00


|||||||
|||||||

472|291|1|8|39|||Wrought SA Pine grade S7 in galleries |H3|0.0|

473|255|1|8|39|C||50 x 76mm Purlins |m|9|00.00|000.00


474|256|1|8|39|D||50 x 76mm Splayed purlins fixed with and including stormclips |
m|47|00.00|0000.00
|||||||
|||||||

475|292|1|8|39|E||50 x 114mm Rafters in lengths not exceeding 2,4m |m|6|00.00|


000.00

476|1660|1|8|39|F||50 x 150mm Rafters in lengths not exceeding 2,4m long |m|36|


00.00|0000.00

477|294|1|8|39|G||50 x 150mm Trim piece |m|18|00.00|000.00

478|301|1|8|39|H||50 x 114mm Ledger bolted to brickwork |m|14|00.00|000.00

479|303|1|8|39|J||50 x 150mm Ledger bolted to brick wall |m|32|00.00|0000.00

480|297|1|8|39|K||75 x 150mm Closer|m|14|00.00|000.00


|||||||
|||||||

481|305|1|8|39|L||75 x 150mm Edge beam |m|16|00.00|000.00

482|258|1|8|39|M||50 x 220 x 60mm Blocking pieces cut to fit under purlins |No|26|
00.00|000.00

483|2802|1|8|39|N||50 x 275 x 125mm Blocking pieces cut to fit under purlins |No|
13|00.00|000.00
|||||||
|||||||

484|4046|1|8|39|||Wrought Meranti in pergolas |H3|0.0|

485|4047|1|8|39|P||32 x 44mm Tertiary members brass screwed to timber|m|167|00.00|


0000.00
|||||||
|||||||

486|4048|1|8|39|Q||50 x 150mm Secondary members fixed down with coach screws|m|66|


000.00|0000.00
||||||| countersunk and with one end fixed with brackets to brickwork (brackets
||||||| elsewhere measured) and the other end notched 30mm over edge beam
||||||| screwed to wood

487|4049|1|8|39|R||75 x 225mm Edge beams fixed to brickwork with brackets


(brackets|m|12|000.00|0000.00
||||||| elsewhere measured)

488|4050|1|8|39|S||Shaped ends to 50 x 150mm secondary beams in pergolas |No|17|


00.00|000.00

489|4051|1|8|39|T||Shaped ends to 75 x 225mm edge beams in pergolas |No|1|00.00|


00.00

490|313|1|8|39|||EAVES, VERGES, ETC |H2|0.0|

491|314|1|8|39|||Wrought laminated timber |H3|0.0|

492|315|1|8|39|U||32 x 228mm Fascias with bullnose edge |m|17|00.00|000.00


|||||||
|||||||

493|332|1|8|40|||SKIRTINGS |H2|0.0|

494|3723|1|8|40|||Supawood |H3|0.0|

495|3724|1|8|40|A||22 x 140mm "Bluegum WSK 6" |m|227|00.00|0000.00

496|335|1|8|40|B||22 x 140mm "Bluegum WSK 6" stepped over treads|m|25|00.00|0000.00


||||||| and risers
|||||||
|||||||

497|336|1|8|40|||DOORS |H2|0.0|

498|337|1|8|40|||Wrought meranti doors as per architect's drawing no. D163/253/


501|H3|0.0|
||||||| rev. A

499|338|1|8|40|C||Type A, size 1610 x 2032mm high consisting of 44mm glazed double|


No|2|0000.00|0000.00
||||||| door, including weatherboard, glazing beads, etc and 95 x 70mm once
||||||| rebated, once moulded and twice grooved frame
|||||||
|||||||

500|339|1|8|40|D||Type B, size 1610 x 2295mm high consisting of 44mm glazed double|


No|1|0000.00|0000.00
||||||| door, including glazing beads, etc and 95 x 70mm once rebated, once
||||||| moulded and twice grooved frame
|||||||
|||||||

501|341|1|8|40|E||Type F, size 813 x 2032mm high consisting of 44mm single panel


door|No|9|0000.00|00000.00
||||||| and 140 x 45mm twice rebated and twice grooved framed lining
|||||||
|||||||

502|2733|1|8|40|F||Type F, size 813 x 2032mm high consisting of 44mm single panel


door|No|1|0000.00|0000.00
||||||| with a half hour fire rating and 240 x 45mm twice rebated and twice
||||||| grooved framed lining
|||||||
|||||||

503|342|1|8|40|G||Type G, size 762 x 2032mm high consisting of 44mm single panel


door|No|8|0000.00|00000.00
||||||| and 140 x 45mm twice rebated and twice grooved framed lining
|||||||
|||||||

504|3177|1|8|40|H||Type GS, size 762 x 2032mm high consisting of 44mm solid single
panel|No|1|0000.00|0000.00
||||||| door with planted meranti panel and mouldings and 140 x 45mm twice
||||||| rebated and twice grooved framed lining
|||||||
|||||||
505|4035|1|8|40|J||Type KK, size 1200 x 1300mm high consisting of 44mm double
framed|No|1|0000.00|0000.00
||||||| and ledged doors and 95 x 70mm once rebated, once moulded and twice
||||||| grooved frame
|||||||
|||||||

506|351|1|8|40|||GARAGE DOORS |H2|0.0|

507|352|1|8|40|||Wrought meranti |H3|0.0|

508|3970|1|8|40|K||Boroma Morowood tip-up garage door to suit opening 2440mm wide


and|No|2|0000.00|00000.00
||||||| 2210mm high faced with 10mm tongued, grooved and recess jointed
||||||| meranti weather boarding to Chevron "C" pattern complete with framed
||||||| hardwood frames, hinges, springs, handle, centre lock and "Cobra Mark I
||||||| smooth drive" radio control operated automatic garage door opener with
||||||| one receiver and one transmitter unit and fixing in position complete as
||||||| per manufacturer's instructions

509|356|1|8|41|||WINDOWS |H2|0.0|

510|357|1|8|41|||Wrought meranti windows as per architect's drawing no.|H3|0.0|


||||||| F163/2453/50 rev. A formed of 95 x 70mm once rebated, once
||||||| moulded and four times grooved frame, 110 x 70mm once rebated,
||||||| once splayed, once rounded and twice grooved cill, 70 x 45mm
||||||| once rebated, once moulded and once grooved casement and 108 x
||||||| 45mm once rebated, once moulded and once grooved bottom rail,
||||||| fitted with and including one pair 76mm solid brass butts, one solid
||||||| brass hook plate casement fastener and one 300mm long solid
||||||| brass casement peg stay per leaf and including glazing beads, etc

511|358|1|8|41|A||Type A window frame, size 595 x 720mm high |No|1|000.00|000.00


|||||||
|||||||

512|359|1|8|41|B||Type B window frame, size 595 x 950mm high |No|4|000.00|0000.00


|||||||
|||||||

513|361|1|8|41|C||Type G window frame, size 1120 x 950mm high |No|4|0000.00|


0000.00
|||||||
|||||||

514|362|1|8|41|D||Type H window frame, size 1120 x 1180mm high |No|7|0000.00|


0000.00
|||||||
|||||||

515|3164|1|8|41|E||Type J window frame, size 1480 x 1180mm high |No|1|0000.00|


0000.00
|||||||
|||||||

516|364|1|8|41|F||Type K window frame, size 1480 x 1410mm high |No|2|0000.00|


0000.00
|||||||
|||||||

517|3032|1|8|41|||Wrought meranti windows as per architect's drawing no.|H3|0.0|


||||||| F163/2453/51 rev. A formed of 95 x 70mm once rebated, once
||||||| moulded and four times grooved frame, 110 x 70mm once rebated,
||||||| once splayed, once rounded and twice grooved cill, 70 x 45mm
||||||| once rebated, once moulded and once grooved casement, 145 x
||||||| 45mm once rebated, once moulded and once grooved fixture frame
||||||| and 32mm thick raised and fielded panel, including 19mm scotia,
||||||| etc, fitted with and including one pair 76mm solid brass butts, one
||||||| solid brass hook plate casement fastener and one 300mm long
||||||| solid brass casement peg stay per leaf and including glazing beads,
||||||| etc

518|4031|1|8|41|G||Type L window frame, size 2170 x 2125mm high overall |No|3|


0000.00|00000.00

519|371|1|8|41|H||Type T window frame, size 3370 x 2125mm high overall |No|2|


0000.00|00000.00
|||||||
|||||||

520|2948|1|8|42|||Wrought meranti windows as per architect's drawing no.|H3|0.0|


||||||| F163/2453/52 rev. A formed of 145 x 70mm frame, 145 x 45mm
||||||| toprail, 108 x 45mm fixture and slide and 145 x 45mm bottom rails,
||||||| all sections once rebated, once moulded and twice grooved, fitted
||||||| with and including Gillaldam Doburn Rollaway 98 bottom rolling
||||||| door gear with 19B brass head channel for 148 twin roller top
||||||| guides, one pair 100 x 50mm solid brass recessed flush handles,
||||||| one Lock Art 374/B190 brass narrow stile cylinder deadlock with
||||||| adjustable roller bolt and one Lock Art 812/thumb turn only/B190
||||||| brass single cylinder with knob one side and including glazing
||||||| beads, etc

521|367|1|8|42|A||Type M sliding window, size 2400 x 1600mm high |No|5|0000.00|


00000.00
|||||||
|||||||

522|375|1|8|42|||BEADS, ARCHITRAVES, ETC |H2|0.0|

523|3999|1|8|42|||Supawood |H3|0.0|

524|3166|1|8|42|B||22 x 44mm "Blue gum" WDR 3 dado rail |m|39|00.00|0000.00


|||||||
|||||||

525|378|1|8|42|||Wrought meranti |H3|0.0|

526|3203|1|8|42|C||16mm Scotia |m|5|00.00|00.00


|||||||
|||||||

527|3206|1|8|42|D||16mm Scotia stepped over treads and risers |m|3|00.00|00.00


|||||||
|||||||

528|381|1|8|42|E||32mm Scotia |m|33|00.00|000.00


529|377|1|8|42|F||22 x 94mm "Blue gum" WAR 4 architraves |m|184|00.00|0000.00
|||||||
|||||||

530|382|1|8|42|G||110 x 22mm Angle rounded door or window head lining |m|34|00.00|


0000.00
|||||||
|||||||

531|383|1|8|42|H||22 x 190mm Head lining |m|34|00.00|0000.00

532|385|1|8|42|J||32 x 290mm Window cill, once rounded and once rebated |m|33|
000.00|0000.00

533|387|1|8|42|K||22 x 105 x 155mm Moulded architrave boss piece |No|72|00.00|


0000.00
|||||||
|||||||

534|2544|1|8|42|||TIMBER HANDRAILS, BALUSTRADES, ETC |H2|0.0|

535|3020|1|8|42|||Wrought meranti handrails |H3|0.0|

536|2764|1|8|42|L||44mm Diameter continuous handrail with dowelled heading joints,|


m|8|00.00|000.00
||||||| including cranked brass brackets at 800mm centres
|||||||
|||||||

537|2554|1|8|42|||Wrought meranti balustrades |H3|0.0|

538|2553|1|8|42|M||75 x 75mm Posts with scalloped corners fixed with and including
10mm|m|8|000.00|0000.00
||||||| diameter x 200mm long galvanised mild steel threaded bar one end
||||||| drilled and epoxied into slab and the other end epoxied into post
|||||||
|||||||

539|2547|1|8|43|A||70 x 44mm Four times pencil rounded bottom rails |m|11|00.00|


000.00
|||||||
|||||||

540|2555|1|8|43|B||Extra over 70 x 44mm bottom rails for ramp or knee |No|2|


000.00|000.00
|||||||
|||||||

541|2548|1|8|43|C||100 x 44mm Continuous handrails with pencil rounds and with


dowelled|m|11|00.00|0000.00
||||||| heading joints
|||||||
|||||||

542|2549|1|8|43|D||Extra over 100 x 44mm handrail for ramp or knee |No|2|000.00|


000.00
|||||||
|||||||
543|2557|1|8|43|E||38 x 38mm Baluster 660mm long with pencil rounds set at 45
degrees|No|53|00.00|0000.00
||||||| and with bottom end framed into bottom rail and top end framed into
||||||| handrail
|||||||
|||||||

544|2552|1|8|43|F||38 x 38mm Baluster 660mm long with pencil rounds set at 45


degrees|No|13|00.00|0000.00
||||||| and with bottom end framed into raking bottom rail and top end framed
||||||| into raking handrail
|||||||
|||||||

545|3021|1|8|43|||Wrought meranti capping |H3|0.0|

546|3201|1|8|43|G||25 x 150mm Capping plugged to brickwork |m|5|00.00|000.00


|||||||
|||||||

547|3202|1|8|43|H||25 x 150mm Capping plugged to brickwork stepped over treads and|


m|3|00.00|000.00
||||||| risers
|||||||
|||||||

548|3949|1|8|43|J||25 x 150mm Capping with shadow line to bottom edges plugged to|
m|5|00.00|000.00
||||||| brickwork
|||||||
|||||||

549|4053|1|8|43|K||35 x 260mm Capping with shadow line to bottom edges plugged to|
m|1|000.00|000.00
||||||| brickwork
|||||||
|||||||

550|388|1|9|45|||BILL NO 9 |H1|0.0|

551|389|1|9|45|||CEILINGS, PARTITIONS AND ACCESS FLOORING |H1|0.0|

552|2374|1|9|45|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

553|2438|1|9|45|||--------------------------------------- ||0.0|
|||||||
|||||||

554|2389|1|9|45|||SUPPLEMENTARY PREAMBLES |H2|0.0|

555|2390|1|9|45|||Descriptions |H3|0.0|

556|2391|1|9|45|||Items described as "nailed" shall be deemed to be fixed with


hardened||0.0|
||||||| steel nails or pins or shot pinned to brickwork or concrete
|||||||
|||||||
|||||||
|||||||Items described as "plugged" shall be deemed to include screwing to
||||||| fibre, plastic or metal plugs at not exceeding 600mm centres, and where
||||||| described as "bolted" the bolts have been given elsewhere
|||||||
|||||||

557|2439|1|9|45|||--------------------------------------- ||0.0|
|||||||
|||||||

558|391|1|9|45|||CEILINGS, ETC |H2|0.0|

559|3097|1|9|45|||Sawn softwood |H3|0.0|

560|2942|1|9|45|A||38 x 38mm Bearers bolted |m|31|00.00|000.00


|||||||
|||||||

561|4095|1|9|45|||Wrought meranti |H3|0.0|

562|4096|1|9|45|B||19mm Scotia|m|21|00.00|000.00
|||||||
|||||||

563|392|1|9|45|||Supawood |H3|0.0|

564|3728|1|9|45|C||32 x 105mm "Blue gum WAR 2" cornices nailed,|m|164|00.00|0000.00


||||||| including sealing joints with painters' mate
|||||||
|||||||

565|395|1|9|45|||NAILED UP CEILINGS |H2|0.0|

566|3946|1|9|45|||6,4mm "Buffalo" gypsum plasterboard with 63mm wide strips of|H3|


0.0|
||||||| mesh scrim nailed over joints and the whole finished with gypsum
||||||| skim plaster trowelled to a smooth polished surface to the
||||||| thickness recommended by the manufacturer

567|3947|1|9|45|D||Ceilings, including 38 x 38mm sawn softwood brandering at 400mm|


m2|6|00.00|000.00
||||||| centres
|||||||
|||||||

568|3948|1|9|45|E||Extra over ceiling for opening for 150mm diameter downlighter |


No|8|00.00|000.00
|||||||
|||||||

569|404|1|9|46|||Wrought pine tongued & grooved ceilings |H3|0.0|

570|406|1|9|46|A||Ceilings of 12mm tongued-and-grooved boarding in 102mm widths |


m2|38|00.00|0000.00
|||||||
|||||||
571|3091|1|9|46|B||Extra over ceiling for opening for 150mm diameter downlighter |
No|12|00.00|000.00
|||||||
|||||||

572|2860|1|9|46|||Supawood V-jointed ceiling boards |H3|0.0|

573|2861|1|9|46|C||Ceilings of 12mm v-jointed ceiling boards grooved at 102mm


widths |m2|2|000.00|000.00
|||||||
|||||||

574|3092|1|9|46|D||Extra over ceiling for opening for 150mm diameter downlighter |


No|2|00.00|00.00
|||||||
|||||||

575|400|1|9|46|||SUSPENDED CEILINGS |H2|0.0|

576|401|1|9|46|||12,7mm "Buffalo" gypsum plasterboard with 63mm wide strips of|H3|


0.0|
||||||| mesh scrim nailed over joints and the whole finished with gypsum
||||||| skim plaster trowelled to a smooth polished surface to the
||||||| thickness recommended by the manufacturer on "Ronn" concealed
||||||| tee suspension system including main and cross tees, necessary
||||||| hangers, grids, etc

577|4045|1|9|46|E||Ceilings suspended not exceeding 1m below concrete soffits |m2|


4|000.00|000.00
|||||||
|||||||

578|4077|1|9|46|F||Sides and soffit of sloping arched bulkhead, suspended


exceeding|m2|3|000.00|000.00
||||||| 340mm and not exceeding 585mm below concrete soffits
|||||||
|||||||

579|3093|1|9|46|G||Extra over ceiling for opening for 150mm diameter downlighter |


No|2|00.00|00.00
|||||||
|||||||

580|2630|1|10|48|||BILL NO 10 |H1|0.0|

581|2633|1|10|48|||FLOOR COVERINGS, PLASTIC LININGS, ETC |H2|0.0|

582|2631|1|10|48|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

583|2632|1|10|48|||--------------------------------------- ||0.0|
|||||||
|||||||

584|2634|1|10|48|||FLOOR COVERINGS |H2|0.0|


585|2635|1|10|48|||Carpeting, including felt underlay (PC Sum R170,00/m2 supplied|
H3|0.0|
||||||| and laid, excluding VAT)

586|2636|1|10|48|A||On floors |m2|131|000.00|00000.00

587|3074|1|10|48|B||On treads and risers of stairs |m2|12|000.00|0000.00

588|408|1|11|49|||BILL NO 11 |H1|0.0|

589|409|1|11|49|||IRONMONGERY |H1|0.0|

590|1708|1|11|49|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

591|2440|1|11|49|||--------------------------------------- ||0.0|
|||||||
|||||||

592|1709|1|11|49|||SUPPLEMENTARY PREAMBLES |H2|0.0|

593|1710|1|11|49|||Finishes to ironmongery |H3|0.0|

594|1711|1|11|49|||Where applicable finishes to ironmongery are indicated by


suffixes in||0.0|
||||||| accordance with the following list:
|||||||
||||||| BS Satin bronze lacquered
|||||||
||||||| CH Chromium plated
|||||||
||||||| SC Satin chromium plated
|||||||
||||||| SE Silver enamelled
|||||||
||||||| GE Grey enamelled
|||||||
||||||| AS Anodised silver
|||||||
||||||| AB Anodised bronze
|||||||
||||||| AG Anodised gold
|||||||
||||||| ABL Anodised black
|||||||
||||||| PB Polished brass
|||||||
||||||| PL Polished and lacquered
|||||||
||||||| PT Epoxy coated
|||||||
||||||| SD Sanded
|||||||
|||||||
|||||||
|||||||

595|3815|1|11|49|||Treatment of all brass ironmongery |H3|0.0|

596|3816|1|11|49|||Prices for all brass ironmongery is to include for removing


lauer coat||0.0|
||||||| before installation and epoxy coating to Architects specification
|||||||
|||||||

597|3903|1|11|49|||--------------------------------------- ||0.0|
|||||||
|||||||

598|1712|1|11|49|||HINGES, BOLTS, ETC |H2|0.0|

599|1713|1|11|49|||"Key Lock" |H3|0.0|

600|1714|1|11|49|A||100 x 75mm Brass butt hinges |No|49|00.00|0000.00


|||||||
|||||||

601|1715|1|11|49|B||100 x 125mm AH H083 brass projection hinge |No|12|00.00|000.00


|||||||
|||||||

602|4061|1|11|49|C||150mm Brass necked barrel bolt |No|2|00.00|00.00


|||||||
|||||||

603|4062|1|11|49|D||100 x 38mm Brass hasp and staple (W&B product code B1469) |No|
1|00.00|00.00
|||||||
|||||||

604|3169|1|11|50|||"Bolt Tom" |H3|0.0|

605|1717|1|11|50|A||100mm Art M99A brass flush bolts, face mounted |No|2|000.00|


000.00
|||||||
|||||||

606|3170|1|11|50|B||200mm Art M99A brass flush bolts, face mounted |No|6|000.00|


0000.00
|||||||
|||||||

607|1718|1|11|50|||CATCHES, CABIN HOOKS, ETC |H2|0.0|

608|4066|1|11|50|||"Key Lock" |H3|0.0|

609|4063|1|11|50|C||Art 164 Double roller catch|No|2|00.00|00.00


|||||||
|||||||

610|1719|1|11|50|||"Hallmark" |H3|0.0|

611|1720|1|11|50|D||100mm Brass cabin hook, including 70 x 70 x 20mm chamfered


Meranti|No|6|00.00|000.00
||||||| block painted
|||||||
|||||||

612|1721|1|11|50|||LOCKS |H2|0.0|

613|4064|1|11|50|E||51mm Solid brass case five pin tumbler padlock|No|1|000.00|


000.00
|||||||
|||||||

614|1722|1|11|50|||"Key Lock" |H3|0.0|

615|1723|1|11|50|F||311/B190 2-lever mortice lock (brass) |No|18|00.00|0000.00


|||||||
|||||||

616|3185|1|11|50|G||315/B190 Cylinder lock case with Bisa Art 52310/50 deadlock


(polished|No|1|000.00|000.00
||||||| chrome) with round escutcheon plates and Bisa 08545/05 cylinder plates
||||||| (brass)
|||||||
|||||||

617|1725|1|11|50|H||315/810/799/B190 Cylinder mortice with double cylinder lock and


rebate|No|3|000.00|000.00
||||||| conversion set (brass)
|||||||
|||||||

618|1726|1|11|50|||HANDLES |H2|0.0|

619|1727|1|11|50|||"Grab and Pull" |H3|0.0|

620|3701|1|11|50|J||Set of MV117 Solid brass lever handles for lever locks|No|18|


000.00|0000.00
|||||||
|||||||

621|1728|1|11|50|K||Set of MV117Y Solid brass lever handles for cylinder locks|No|


2|000.00|000.00
|||||||
|||||||

622|3877|1|11|50|L||Set of MG106Y Solid brass lever handles for cylinder locks|No|


2|000.00|000.00
|||||||
|||||||

623|4065|1|11|50|M||150mm 753 Brass pull handle|No|2|000.00|000.00


|||||||
|||||||

624|1730|1|11|50|N||250mm 753 Brass pull handle |No|2|000.00|000.00


|||||||
|||||||

625|2728|1|11|50|||DOOR CLOSERS |H2|0.0|


626|2946|1|11|50|||"Corma" |H3|0.0|

627|2945|1|11|50|P||TS72 Size 2-4 Overhead door closer |No|1|000.00|000.00

628|2719|1|11|51|||BATHROOM FITTINGS |H2|0.0|

629|4002|1|11|51|A||Robe hook (PC Sum R100,00 each excluding VAT, delivered to


site)|No|10|000.00|0000.00
|||||||
|||||||

630|4003|1|11|51|B||Towel ring (PC Sum R175,00 each excluding VAT, delivered to


site)|No|7|000.00|0000.00
|||||||
|||||||

631|4004|1|11|51|C||Toilet roll holder (PC Sum R180,00 each excluding VAT,


delivered to site)|No|5|000.00|0000.00
|||||||
|||||||

632|4005|1|11|51|D||Soap dish (PC Sum R260,00 each excluding VAT, delivered to


site)|No|11|000.00|0000.00
|||||||
|||||||

633|2066|1|11|51|||WASHING LINES ETC |H2|0.0|

634|2067|1|11|51|E||"Extrecta" or equal approved 3m long epoxy powder coated


folding down|No|1|000.00|000.00
||||||| washing lines
|||||||
|||||||

635|1737|1|11|51|||SUNDRIES |H2|0.0|

636|1743|1|11|51|F||10mm Diameter steel dowel 75mm long in and including mortice in


timber|No|46|00.00|000.00
||||||| and brickwork or concrete
|||||||
|||||||

637|1738|1|11|51|||"Key Lock" |H3|0.0|

638|1739|1|11|51|G||Art 255 Brass door stop |No|21|00.00|000.00


|||||||
|||||||

639|490|1|12|53|||BILL NO 12 |H1|0.0|

640|491|1|12|53|||METALWORK |H1|0.0|

641|2375|1|12|53|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

642|2441|1|12|53|||--------------------------------------- ||0.0|
|||||||
|||||||

643|2393|1|12|53|||SUPPLEMENTARY PREAMBLES |H2|0.0|

644|2394|1|12|53|||Descriptions |H3|0.0|

645|2395|1|12|53|||Descriptions of bolts shall be deemed to include nuts and


washers ||0.0|
|||||||
|||||||
|||||||
|||||||Descriptions of expansion and chemical expansion bolts shall be deemed
||||||| to include nuts, washers and mortices in brickwork or concrete
|||||||
|||||||
|||||||
|||||||The effective fixing length of expansion and chemical expansion bolts is
||||||| the thickness of material being fixed to the masonry surface
|||||||
|||||||
|||||||
|||||||Metalwork described as "holed for bolt(s)" shall be deemed to exclude
||||||| the bolts unless otherwise described
|||||||
|||||||

646|2442|1|12|53|||--------------------------------------- ||0.0|
|||||||
|||||||

647|499|1|12|53|||SUNDRY GALVANISED STEELWORK |H2|0.0|

648|500|1|12|53|||Bolts, brackets, etc |H3|0.0|

649|501|1|12|53|A||Bolts |kg|3|00.00|000.00

650|521|1|12|53|B||8mm Threaded rod 150mm long one end epoxied into brickwork and
the|No|2|00.00|00.00
||||||| other end epoxied into timber
|||||||
|||||||

651|523|1|12|53|C||10mm Diameter threaded bar 450mm long one end epoxied into|No|2|
00.00|00.00
||||||| brickwork and the other end epoxied into timber
|||||||
|||||||

652|2714|1|12|53|D||10mm Diameter treaded bar 850mm long with one end flanged and
cast|No|4|00.00|00.00
||||||| 600mm deep into column and the other end fixed through timber,
||||||| including nut and 40mm diameter spacer washer
|||||||
|||||||

653|2089|1|12|53|E||Galvanised mild steel truss hanger to support 50 x 150mm rafter


|No|14|00.00|000.00
|||||||
|||||||

654|506|1|12|54|||SHOWER CUBICLE DOORS |H2|0.0|

655|4057|1|12|54|||"Showertec" white powder coated aluminium shower cubicle doors|


H3|0.0|
||||||| with sliding gear, cleats, stops, etc and toughened clear safety
||||||| glass plugged to tiled walls

656|4058|1|12|54|A||Panel pivot door 1000 x 1800mm high with fixed side panel 1000
x|No|4|0000.00|00000.00
||||||| 1800mm high with 700 x 1000mm cut-out

657|509|1|12|54|||FIREPLACES |H2|0.0|

658|510|1|12|54|||"FireJack" |H3|0.0|

659|511|1|12|54|B||850 Universal De Luxe gas convector, including gas grate, flat


lintel, etc |No|1|0000.00|0000.00
|||||||
|||||||

660|512|1|12|54|C||1 000 De Luxe "FireJack" barbeque, including gas grill, etc |


No|1|0000.00|0000.00
|||||||
|||||||

661|517|1|12|54|||Sundries |H3|0.0|

662|520|1|12|54|D||10 x 10 x 1,5mm Stainless steel spark arrester size 530 x 460mm


overall|No|2|000.00|000.00
||||||| built into chimney brickwork
|||||||
|||||||

663|525|1|13|56|||BILL NO 13 |H1|0.0|

664|526|1|13|56|||PLASTERING |H1|0.0|

665|2376|1|13|56|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

666|2443|1|13|56|||--------------------------------------- ||0.0|
|||||||
|||||||

667|529|1|13|56|||SCREEDS |H2|0.0|

668|530|1|13|56|||Screeds on concrete |H3|0.0|

669|531|1|13|56|A||26mm Thick screeds |m2|271|00.00|0000.00


|||||||
|||||||

670|532|1|13|56|B||30mm Thick screeds |m2|134|00.00|0000.00


|||||||
|||||||

671|533|1|13|56|C||Average 35mm thick screeds to floors to falls |m2|50|00.00|


0000.00

672|3131|1|13|56|D||Average 35mm thick on floors to falls and currents |m2|11|


00.00|000.00
|||||||
|||||||

673|536|1|13|56|E||30mm Thick on treads and risers of stairs |m2|17|00.00|000.00


|||||||
|||||||

674|537|1|13|56|||INTERNAL PLASTER |H2|0.0|

675|538|1|13|56|||One coat cement plaster on brickwork |H3|0.0|

676|539|1|13|56|F||On walls |m2|339|00.00|0000.00

677|540|1|13|56|G||On narrow widths |m2|21|00.00|000.00

678|541|1|13|56|||Two coat plaster with gypsum finish on brickwork |H3|0.0|

679|542|1|13|56|H||On walls |m2|576|00.00|00000.00

680|543|1|13|56|J||On narrow widths |m2|44|00.00|0000.00

681|544|1|13|56|||Gypsum skim plaster on concrete |H3|0.0|

682|1624|1|13|56|K||On ceilings |m2|157|00.00|0000.00


|||||||
|||||||

683|2605|1|13|56|L||On raking soffits of stairs |m2|6|00.00|000.00

684|2606|1|13|56|M||On projecting and isolated beams |m2|17|00.00|000.00

685|548|1|13|57|||EXTERNAL PLASTER |H2|0.0|

686|549|1|13|57|||Cement plaster on brickwork |H3|0.0|

687|550|1|13|57|A||On walls |m2|404|00.00|00000.00

688|551|1|13|57|B||On walls in foundations |m2|156|00.00|0000.00


|||||||
|||||||

689|553|1|13|57|C||On narrow widths |m2|31|00.00|0000.00

690|554|1|13|57|D||Set sloping on narrow widths of gable walls average 30mm thick|


m2|18|00.00|000.00
|||||||
|||||||

691|555|1|13|57|E||On sloping top of cills 50mm girth |m|39|00.00|000.00

692|556|1|13|57|F||Splay on top of plinth 15mm girth |m|77|00.00|000.00


693|4028|1|13|57|G||Plaster moulding type "A" as detail No 1 of Annexure "A" of
these bills of|m|3|00.00|00.00
||||||| quantities

694|559|1|13|57|H||Plaster moulding type "B" as detail No 2 of Annexure "A" of


these bills of|m|58|00.00|0000.00
||||||| quantities

695|560|1|13|57|J||Plaster moulding type "B" as detail No 2 of Annexure "A" of


these bills of|m|28|00.00|0000.00
||||||| quantities circular on elevation

696|561|1|13|57|K||Plaster band at pergola piers 15mm thick x 100mm high |m|8|


00.00|000.00
|||||||
|||||||

697|562|1|13|57|L||Plaster drip mould type "C" above window as detail No 3 of


Annexure "A"|m|37|00.00|0000.00
||||||| of these bills of quantities

698|3140|1|13|57|||Cement plaster on concrete |H3|0.0|

699|3139|1|13|57|M||On projecting and isolated beams |m2|25|00.00|000.00

700|3142|1|13|57|N||Set sloping on narrow widths of upstand beams average 30mm


thick |m2|4|00.00|000.00
|||||||
|||||||

701|563|1|13|57|||CORNER PROTECTORS, DIVIDING STRIPS, ETC |H2|0.0|

702|564|1|13|57|P||3 x 25mm Flat section brass dividing strips between different


floor|m|18|00.00|0000.00
||||||| finishes

703|565|1|13|57|Q||3 x 32mm Flat section galvanised mild steel water bar embedded
in floor|m|5|00.00|000.00
||||||| finish

704|567|1|13|57|||SUNDRIES |H2|0.0|

705|568|1|13|57|R||"Mental" galvanised metal lathing fixed along edges to brickwork


or|m2|10|00.00|000.00
||||||| concrete
|||||||
|||||||

706|566|1|13|57|S||"Mentos" galvanised plaster angle bead |m|344|00.00|00000.00


|||||||
|||||||

707|569|1|14|59|||BILL NO 14 |H1|0.0|

708|570|1|14|59|||TILING |H1|0.0|

709|1628|1|14|59|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

710|2444|1|14|59|||--------------------------------------- ||0.0|
|||||||
|||||||

711|1629|1|14|59|||SUPPLEMENTARY PREAMBLES |H2|0.0|

712|1630|1|14|59|||Descriptions |H3|0.0|

713|1631|1|14|59|||Unless described as "fixed with adhesive to plaster (plaster


elsewhere)"||0.0|
||||||| descriptions of tiling on brick or concrete walls, columns, etc shall be
||||||| deemed to include 1:4 cement plaster backing and descriptions of tiling
||||||| on concrete floors, etc shall be deemed to include 1:3 plaster bedding
|||||||
|||||||

714|2445|1|14|59|||--------------------------------------- ||0.0|
|||||||
|||||||

715|1641|1|14|59|||WALL TILING |H2|0.0|

716|2683|1|14|59|||Slate tiles (PC Sum R120,00/m2 excluding VAT, delivered to


site),|H3|0.0|
||||||| flush pointed with tinted jointing compound

717|2684|1|14|59|A||On walls |m2|1|000.00|000.00


|||||||
|||||||

718|2685|1|14|59|B||On narrow widths |m2|1|000.00|000.00

719|1642|1|14|59|||Ceramic tiles (PC Sum R160,00/m2 excluding VAT, delivered to


site)|H3|0.0|
||||||| tile fixed with suitable adhesive to manufacturers recommendations
||||||| to plaster (plaster elsewhere) and flush pointed with tinted jointing
||||||| compound

720|1643|1|14|59|C||On walls |m2|55|000.00|00000.00


|||||||
|||||||

721|2626|1|14|59|D||On narrow widths |m2|7|000.00|0000.00

722|2627|1|14|59|E||Extra for mitred edge |m|6|000.00|0000.00


|||||||
|||||||

723|2617|1|14|59|||WALL TILE INSERTS |H2|0.0|

724|2624|1|14|59|||Extra over ceramic tiles for inset tiles size 200 x 200mm (PC
Sum|H3|0.0|
||||||| R100,00/No excluding VAT, delivered to site) tile fixed with suitable
||||||| adhesive to manufacturers recommendations to plaster (plaster
||||||| elsewhere) and flush pointed with tinted jointing compound
725|2625|1|14|59|F||On walls |No|5|000.00|000.00
|||||||
|||||||

726|1638|1|14|60|||FLOOR TILING |H2|0.0|

727|2686|1|14|60|||Slate tiles (PC Sum R120,00/m2 excluding VAT, delivered to


site),|H3|0.0|
||||||| flush pointed with tinted waterproof jointing compound

728|2687|1|14|60|A||On floors and landings |m2|1|000.00|000.00


|||||||
|||||||

729|2688|1|14|60|B||On narrow widths |m2|1|000.00|000.00


|||||||
|||||||

730|1634|1|14|60|||Ceramic tiles (PC Sum R160,00/m2 excluding VAT, delivered to


site)|H3|0.0|
||||||| fixed with suitable adhesive to manufacturers recommendations to
||||||| bedding (bedding elsewhere) and flush pointed with tinted
||||||| waterproof jointing compound

731|1635|1|14|60|C||On floors and landings |m2|137|000.00|00000.00


|||||||
|||||||

732|2628|1|14|60|D||On floors and landings laid diagonally with continuous joints


|m2|22|000.00|0000.00
|||||||
|||||||

733|3891|1|14|60|E||On soffit of worktop slab|m2|2|000.00|000.00


|||||||
|||||||

734|1636|1|14|60|F||On narrow widths |m2|2|000.00|000.00


|||||||
|||||||

735|1637|1|14|60|G||On treads and risers of stairs |m2|4|000.00|0000.00


|||||||
|||||||

736|3070|1|14|60|H||On margins 115mm wide of stretcher course tiles|m|20|00.00|


000.00
|||||||
|||||||

737|4080|1|14|60|J||On margins 230mm wide of stretcher course tiles|m|20|00.00|


0000.00
|||||||
|||||||

738|2616|1|14|60|K||On margins 345mm wide of stretcher course tiles |m|12|00.00|


0000.00
|||||||
|||||||
739|2108|1|14|60|||Ceramic mosaic tiles (PC Sum R200,00/m2 excluding VAT,
delivered|H3|0.0|
||||||| to site) fixed with suitable adhesive to manufacturer's
||||||| recommendations to bedding (bedding elsewhere) and flush
||||||| pointed with tinted waterproof jointing compound

740|2109|1|14|60|L||On floors |m2|3|000.00|000.00


|||||||
|||||||

741|2621|1|14|60|||FLOOR TILE INSERTS |H2|0.0|

742|2622|1|14|60|||Extra over floor tiles for tile inserts size 80 x 80mm (PC Sum|
H3|0.0|
||||||| R100,00/No excluding VAT, delivered to site) fixed with suitable
||||||| adhesive to manufacturers recommendations to bedding (bedding
||||||| elsewhere) and flush pointed with tinted waterproof jointing
||||||| compound

743|2623|1|14|60|M||On floors and landings |No|5|000.00|000.00


|||||||
|||||||

744|3799|1|14|60|||SUPPLY ONLY WALL AND FLOOR TILES |H2|0.0|

745|3800|1|14|60|N||Allow the budgetary amount of R1 000,00 (One Thousand Rand) NET


for|Item|1||0000.00
||||||| supply only of spare tiles

746|677|1|15|62|||BILL NO 15 |H1|0.0|

747|678|1|15|62|||PLUMBING AND DRAINAGE |H1|0.0|

748|1764|1|15|62|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

749|2446|1|15|62|||--------------------------------------- ||0.0|
|||||||
|||||||

750|1765|1|15|62|||SUPPLEMENTARY PREAMBLES |H2|0.0|

751|1766|1|15|62|||uPVC pipes and fittings |H3|0.0|

752|1767|1|15|62|||Sewer and drainage pipes and fittings shall be jointed and


sealed with||0.0|
||||||| butyl rubber rings
|||||||
|||||||
|||||||
|||||||Soil, waste and vent pipes and fittings shall be solvent weld jointed
|||||||
|||||||

753|1768|1|15|62|||Copper pipes |H3|0.0|


754|1769|1|15|62|||Pipes shall be hard drawn and half-hard pipes of the class
stated. Class 0||0.0|
||||||| (thin walled half hard), Class 2 (half hard) and class 3 (heavy walled half
||||||| hard) pipes shall only be bent with benders with inner and outer formers.
||||||| Fittings to copper waste, vent and anti-syphon pipes, capillary solder
||||||| fittings and compression fittings shall be "Rattler Watertech" type.
||||||| Capillary solder fittings shall comply with ISO 2016. Only compression
||||||| fittings shall be used in walls or in ground
|||||||
|||||||

755|1770|1|15|62|||Reducing fittings ||0.0|


|||||||
|||||||
|||||||
|||||||Where fittings have reducing ends or branches they are described as
|||||||
|||||||"reducing". In the case of pipes with diameters not exceeding 60mm only
||||||| largest end or branch size is give. Should the contractor wish to use
other
||||||| fittings and bushes or reducers he may do so on the understanding that
||||||| no claim in this regard will be entertained. In the case of pipes with
||||||| diameters exceeding 60mm all sizes are given and no claim for extra
||||||| bushes, reducers, etc will be entertained
|||||||
|||||||

756|1771|1|15|62|||Exposed concrete surfaces ||0.0|


|||||||
|||||||
|||||||
|||||||Exposed surfaces of concrete stormwater channels, cover slabs,
||||||| inspection eye marker slabs, gulley tops, cleaning eye tops, catchpits,
||||||| inspection chambers, etc shall be finished smooth with plaster
|||||||
|||||||

757|1772|1|15|63|||Excavations ||0.0|
|||||||
|||||||
|||||||
|||||||No claim for rock excavation will be entertained unless the contractor has
||||||| timeously notified the quantity surveyor thereof prior to backfilling
|||||||
|||||||
|||||||
|||||||"Soft rock" and "hard rock" shall be as defined in "Earthworks"
|||||||
|||||||

758|1773|1|15|63|||Laying, backfilling, bedding, etc of pipes ||0.0|


|||||||
|||||||
|||||||
|||||||Pipes shall be laid and bedded and trenches shall be carefully backfilled
||||||| in accordance with the manufacturer's instructions
|||||||
|||||||
|||||||
|||||||Where no manufacturer's instructions exist pipes shall be laid in
||||||| accordance with Clauses 5.1 and 5.2 of each of the following:
|||||||
|||||||SABS 1200 L : Medium-pressure pipelines
|||||||
||||||| LD : Sewers
|||||||
||||||| LE : Stormwater drainage
|||||||
|||||||Pipe trenches etc shall be backfilled in accordance with Clauses 3, 5.5,
||||||| 5.6, 5.7 and 7 of SABS 1200 DB : Earthworks (Pipe trenches)
|||||||
|||||||Pipes shall be bedded in accordance with Clauses 3.1 to 3.4.1, 5.1 to 5.3
||||||| and 7 of SABS 1200 LB : Bedding (Pipes).
|||||||
|||||||Unless otherwise described bedding of rigid pipes shall be Class B
||||||| bedding.
|||||||
|||||||

759|1774|1|15|63|||Flush pans ||0.0|


|||||||
|||||||
|||||||
|||||||Flush pans shall have straight or side outlets and "P" or "S" traps as
||||||| necessary
|||||||
|||||||

760|1775|1|15|63|||Stainless steel basins, sinks, wash troughs, urinals, etc ||


0.0|
|||||||
|||||||
|||||||
|||||||Units shall have standard aprons on all exposed edges and tiling keys
||||||| against walls where applicable
|||||||
|||||||

761|1776|1|15|63|||Waste unions ||0.0|


|||||||
|||||||
|||||||
|||||||Descriptions of waste unions shall be deemed to include rubber or
||||||| vulcanite plugs and chains fixed to fittings
|||||||
|||||||

762|2447|1|15|63|||--------------------------------------- ||0.0|
|||||||
|||||||

763|1778|1|15|63|||DRAINAGE |H2|0.0|

764|1779|1|15|63|||SOIL DRAINAGE |H3|0.0|

765|1780|1|15|63|||uPVC pipes |H3|0.0|


766|1783|1|15|63|A||110mm Pipes vertically or ramped to cleaning eyes etc (No
excavation) |m|5|00.00|000.00
|||||||
|||||||

767|1781|1|15|63|B||110mm Pipes laid in and including trenches not exceeding 1m


deep |m|77|00.00|0000.00
|||||||
|||||||

768|1782|1|15|64|A||110mm Pipes laid in and including trenches exceeding 1 and not|


m|10|00.00|000.00
||||||| exceeding 2m deep
|||||||
|||||||

769|1784|1|15|64|||Extra over uPVC pipes for fittings |H3|0.0|

770|3379|1|15|64|B||110mm End cap |No|5|00.00|000.00


|||||||
|||||||

771|1786|1|15|64|C||110mm Bend |No|24|00.00|0000.00


|||||||
|||||||

772|1787|1|15|64|D||110mm Junction |No|5|00.00|000.00


|||||||
|||||||

773|1788|1|15|64|E||110mm Access bend |No|3|00.00|000.00


|||||||
|||||||

774|1789|1|15|64|F||110mm Access junction |No|7|00.00|000.00


|||||||
|||||||

775|1792|1|15|64|||"Marley" gulleys |H3|0.0|

776|1793|1|15|64|G||110mm Gulley not exceeding 500mm deep |No|3|000.00|000.00


|||||||
|||||||

777|3339|1|15|64|||Precast concrete circular inspection chambers (covers elsewhere)


|H3|0.0|

778|3340|1|15|64|H||Inspection chamber 900mm diameter and exceeding 1m and not|No|


1|0000.00|0000.00
||||||| exceeding 1,25m deep internally
|||||||
|||||||

779|3319|1|15|64|||Covers etc |H3|0.0|

780|3320|1|15|64|J||550mm Diameter x 75kg Type 4A cast iron double seal manhole


cover|No|1|000.00|000.00
||||||| and frame
|||||||
|||||||

781|1795|1|15|64|||Sundries |H3|0.0|

782|4081|1|15|64|K||Extra over excavation for pipe trenches, chambers, etc for


carting away|m3|7|00.00|000.00
||||||| surplus material to a dumping site to be located by the contractor

783|4082|1|15|64|L||Extra over backfilling to drain trenches, chambers, etc for


earth backfilling|m3|7|00.00|000.00
||||||| supplied by the contractor

784|1796|1|15|64|M||50 x 457 x 457mm Precast concrete inspection eye marker slab


set in|No|5|00.00|00.00
||||||| ground
|||||||
|||||||

785|1797|1|15|64|N||100mm Cast iron "ABC" cleaning eye |No|5|000.00|000.00


|||||||
|||||||

786|3322|1|15|64|P||Cutting into existing drain pipe for and forming junction with
110mm pipe |No|1|000.00|000.00
|||||||
|||||||

787|1798|1|15|64|||Testing |H3|0.0|

788|2955|1|15|64|Q||Testing drainage pipe system |Item|1||000.00


|||||||
|||||||

789|1679|1|15|65|||PLUMBING |H2|0.0|

790|1680|1|15|65|||RAINWATER DISPOSAL |H3|0.0|

791|2805|1|15|65|||2mm Thick Galvanised mild steel |H2|0.0|

792|2810|1|15|65|A||250 x 100mm Box gutters with and including hail guard over |m|
7|000.00|0000.00
|||||||
|||||||

793|2811|1|15|65|B||Extra over 250 x 100mm box gutter for stopped end |No|2|00.00|
000.00
|||||||
|||||||

794|2812|1|15|65|C||Extra over 250 x 100mm box gutter for outlet for 100mm pipe |
No|1|00.00|00.00
|||||||
|||||||

795|1681|1|15|65|||"Watertite" aluminium pre-painted white |H3|0.0|

796|1682|1|15|65|D||125mm Ogee eaves gutters |m|17|00.00|000.00


|||||||
|||||||
797|1683|1|15|65|E||Extra over gutter for stopped end |No|4|00.00|00.00
|||||||
|||||||

798|1684|1|15|65|F||Extra over gutter for angle |No|1|00.00|00.00


|||||||
|||||||

799|1685|1|15|65|G||Extra over gutter for outlet for 75mm uPVC downpipe |No|5|
00.00|00.00
|||||||
|||||||

800|1686|1|15|65|||"Marley" uPVC |H3|0.0|

801|2825|1|15|65|H||50mm Overflow pipe 300mm long with one end splay cut |No|1|
00.00|00.00
|||||||
|||||||

802|3352|1|15|65|J||110mm Weep pipe 350mm long|No|2|00.00|00.00


|||||||
|||||||

803|1687|1|15|65|K||75mm Diameter rainwater pipes |m|18|00.00|000.00


|||||||
|||||||

804|1688|1|15|65|L||Extra over 75mm diameter rainwater pipes for bend |No|4|00.00|


00.00
|||||||
|||||||

805|1689|1|15|65|M||Extra over 75mm diameter rainwater pipes for shoe |No|5|00.00|


00.00
|||||||
|||||||

806|2813|1|15|65|N||110mm Diameter rainwater pipes |m|4|00.00|000.00


|||||||
|||||||

807|2814|1|15|65|P||Extra over 110mm diameter rainwater pipes for bend |No|1|


00.00|00.00
|||||||
|||||||

808|1800|1|15|65|||SANITARY FITTINGS |H2|0.0|

809|4007|1|15|65|Q||Single inset wash trough (PC Sum R575,00 each excluding VAT,|
No|1|000.00|000.00
||||||| delivered to site) set in joinery fitting, including sealing all round wash
||||||| trough with silicon sealant
|||||||
|||||||

810|3220|1|15|65|R||Double end bowl sink, (PC Sum R700,00 each excluding VAT,
delivered|No|1|0000.00|0000.00
||||||| to site) set in joinery fitting, including sealing all round sink with
silicon
||||||| sealant
|||||||
|||||||

811|4085|1|15|65|S||Vanity basin with one taphole (PC Sum R360,00 each excluding
VAT,|No|5|000.00|0000.00
||||||| delivered to site), including sealing between rim of basin and vanity slab
||||||| with silicon sealant
|||||||
|||||||

812|4086|1|15|66|A||Lavatory basin with one taphole supported on half pedestal and


hanger|No|2|000.00|0000.00
||||||| mechanism (PC Sum R600,00 each excluding VAT, delivered to site),
||||||| including sealing between back of basin and wall with silicon sealant
|||||||
|||||||

813|3836|1|15|66|B||600 x 400 x 200mm Deep laboratory sink (PC Sum R850,00 each|No|
1|0000.00|0000.00
||||||| excluding VAT, delivered to site) fixed underneath counter, including
||||||| sealing between sink and counter with silicon sealant
|||||||
|||||||

814|1807|1|15|66|C||Close coupled wall mounted wash down suite and 9 litre top
flush cistern|No|5|0000.00|00000.00
||||||| with double flap seat, including cast iron cradle bracket (PC Sum
||||||| R2200,00 each excluding VAT, delivered to site)
|||||||
|||||||

815|3223|1|15|66|D||Wall mounted over rim water supply single taphole bidet,


including|No|1|0000.00|0000.00
||||||| mounting bracket (PC Sum R1200,00 each excluding VAT, delivered to
||||||| site)
|||||||
|||||||

816|3830|1|15|66|E||1 800 x 800mm Bath (PC Sum R1100,00 each excluding VAT,
delivered|No|2|0000.00|0000.00
||||||| to site), including sealing edges of bath with silicon sealant
|||||||
|||||||

817|1810|1|15|66|||WASTE UNIONS ETC |H2|0.0|

818|2786|1|15|66|||"Cobra Watertech" |H3|0.0|

819|1813|1|15|66|F||38mm 316-40 CP Bath or sink waste union with plug and chain |
No|4|00.00|000.00
|||||||
|||||||

820|3831|1|15|66|G||38mm CP code 330 "Excentra" combined pop-up bath waste and|No|


2|0000.00|0000.00
||||||| overflow
|||||||
|||||||

821|1814|1|15|66|||TRAPS ETC |H2|0.0|

822|1815|1|15|66|||uPVC |H3|0.0|

823|1816|1|15|66|H||40mm "P" or "S" trap |No|3|00.00|00.00


|||||||
|||||||

824|2783|1|15|66|J||40 x 300mm Sink combination for double bowl with deep seal "P"
trap |No|1|00.00|00.00

825|1819|1|15|66|||"Cobra Watertech" |H3|0.0|

826|1820|1|15|66|K||40mm 373 Shower trap including chromium plated grating |No|5|


000.00|000.00
|||||||
|||||||

827|1821|1|15|66|L||32 x 40mm 345/40 CP Bottle trap |No|8|000.00|0000.00

828|3839|1|15|66|M||32 x 40mm 365 CP bidet bottle trap with outlet for 40mm uPVC |
No|1|000.00|000.00

829|1822|1|15|66|||TAPS, VALVES, ETC |H2|0.0|

830|1823|1|15|66|||Brass |H3|0.0|

831|3336|1|15|66|N||25mm Fullway gate valve |No|1|000.00|000.00


|||||||
|||||||

832|3844|1|15|66|P||54mm Fullway gate valve |No|1|000.00|000.00


|||||||
|||||||

833|1825|1|15|67|||"Cobra watertech" |H3|0.0|

834|1827|1|15|67|A||15mm VIC 232/350 CP angle regulating valve |No|4|000.00|000.00


|||||||
|||||||

835|2953|1|15|67|B||15mm 210 Nursery tap |No|3|00.00|000.00


|||||||
|||||||

836|1829|1|15|67|C||15mm 139RB Stopcock |No|3|00.00|000.00


|||||||
|||||||

837|1830|1|15|67|D||20mm 139RB Stopcock |No|4|000.00|000.00


|||||||
|||||||

838|2774|1|15|67|E||15mm Underwall stop tap (PC Sum R180,00 each excluding VAT,|No|
7|000.00|0000.00
||||||| delivered to site)
|||||||
|||||||

839|1838|1|15|67|F||15mm Single taphole sink mixer with swivel spout outlet and
angle|No|2|0000.00|0000.00
||||||| regulating valves (PC Sum R780,00 each excluding VAT, delivered to
||||||| site)
|||||||
|||||||

840|3907|1|15|67|G||15mm Single taphole tubular sink mixer with swivel spout outlet
with|No|1|0000.00|0000.00
||||||| 290mm throw, including angle regulating valves (PC Sum R920,00 each
||||||| excluding VAT, delivered to site)
|||||||
|||||||

841|3828|1|15|67|H||15mm Single taphole basin mixer, including pop-up waste and


angle|No|7|0000.00|0000.00
||||||| regulating valves (PC Sum R975,00 each excluding VAT, delivered to
||||||| site)
|||||||
|||||||

842|3381|1|15|67|J||15mm Wall type bath mixer, including hand shower attachment (PC
Sum|No|2|0000.00|0000.00
||||||| R1150,00 each excluding VAT, delivered to site)
|||||||
|||||||

843|3706|1|15|67|K||15mm Single taphole bidet mixer, including pop-up waste and


angle|No|1|0000.00|0000.00
||||||| regulating valves (PC Sum R1075,00 each excluding VAT, delivered to
||||||| site)
|||||||
|||||||

844|4017|1|15|67|L||15mm Built-in shower mixer with round cover plate (PC Sum
R515,00|No|4|000.00|0000.00
||||||| each excluding VAT, delivered to site)
|||||||
|||||||

845|3833|1|15|67|M||15mm Overhead shower arm with sliding wall flange (PC Sum
R35,00|No|4|000.00|0000.00
||||||| each excluding VAT, delivered to site)
|||||||
|||||||

846|4021|1|15|67|N||Shower rose with adjustable balljoint connector (PC Sum R195,00


each|No|4|
||||||| excluding VAT, delivered to site)
|||||||
|||||||

847|1834|1|15|67|P||22mm PBI.342 Expansion valve |No|4|000.00|000.00


|||||||
|||||||
848|1835|1|15|67|Q||22mm PBI.10 Vacuum breaker |No|8|00.00|000.00
|||||||
|||||||

849|1836|1|15|67|R||22mm PA 5.1 Master box |No|4|0000.00|0000.00


|||||||
|||||||

850|2952|1|15|67|S||20mm Kent water meter in and including cast iron valve box |
No|1|000.00|000.00
|||||||
|||||||

851|1845|1|15|68|||SANITARY PLUMBING |H2|0.0|

852|1846|1|15|68|||uPVC pipes |H3|0.0|

853|1847|1|15|68|A||40mm Pipes |m|91|00.00|0000.00


|||||||
|||||||

854|1849|1|15|68|B||110mm Pipes |m|12|00.00|000.00


|||||||
|||||||

855|1850|1|15|68|||Extra over uPVC pipes for fittings |H3|0.0|

856|1853|1|15|68|C||50 x 40mm Reducer |No|12|0.00|00.00


|||||||
|||||||

857|1855|1|15|68|D||110mm Reducer |No|1|00.00|00.00


|||||||
|||||||

858|1856|1|15|68|E||40mm Bend |No|44|0.00|000.00


|||||||
|||||||

859|1858|1|15|68|F||110mm Bend |No|13|00.00|000.00


|||||||
|||||||

860|1859|1|15|68|G||40mm Adaptor coupling |No|7|0.00|00.00


|||||||
|||||||

861|1860|1|15|68|H||40mm Junction |No|20|00.00|000.00


|||||||
|||||||

862|1865|1|15|68|J||110mm Double reducing junction |No|1|000.00|000.00


|||||||
|||||||

863|1866|1|15|68|K||110mm Pan connector |No|6|00.00|000.00


|||||||
|||||||
864|1867|1|15|68|L||40mm Access bend |No|23|0.00|000.00
|||||||
|||||||

865|1869|1|15|68|M||110mm Access bend |No|6|00.00|000.00


|||||||
|||||||

866|1870|1|15|68|N||40mm Access junction |No|7|00.00|00.00


|||||||
|||||||

867|1871|1|15|68|P||110mm Access junction |No|7|00.00|000.00


|||||||
|||||||

868|1874|1|15|68|Q||110mm Access reducing junction |No|1|00.00|00.00


|||||||
|||||||

869|2957|1|15|68|R||110mm "GI Two-way" vent valve |No|1|00.00|00.00


|||||||
|||||||

870|1877|1|15|68|||Testing |H3|0.0|

871|2954|1|15|68|S||Testing waste pipe system |Item|1||000.00


|||||||
|||||||

872|1879|1|15|68|||WATER SUPPLIES |H2|0.0|

873|1880|1|15|68|||High density polyethelene class 10 type IV pressure pipes |H3|


0.0|

874|1881|1|15|68|T||25mm Pipes laid in and including trenches not exceeding 1m deep


|m|135|00.00|0000.00
|||||||
|||||||

875|1882|1|15|68|||Extra over polyethelene pipes for "Plasson" compression fittings


|H3|0.0|

876|1883|1|15|68|U||25mm Fittings |No|35|00.00|000.00


|||||||
|||||||

877|1884|1|15|69|||Class 0 copper pipes |H3|0.0|

878|1885|1|15|69|A||15mm Pipes |m|268|00.00|0000.00


|||||||
|||||||

879|1886|1|15|69|B||22mm Pipes |m|280|00.00|0000.00


|||||||
|||||||

880|1887|1|15|69|||Extra over Class 0 copper pipes for capillary fittings |H3|0.0|


881|1888|1|15|69|C||15mm Fittings |No|355|0.00|0000.00
|||||||
|||||||

882|1889|1|15|69|D||22mm Fittings |No|260|00.00|0000.00


|||||||
|||||||

883|1890|1|15|69|||Extra over Class 0 copper pipes for brass compression fittings |


H3|0.0|

884|1891|1|15|69|E||15mm Fittings |No|45|00.00|000.00


|||||||
|||||||

885|1892|1|15|69|F||22mm Fittings |No|55|00.00|0000.00


|||||||
|||||||

886|3337|1|15|69|||Sundries |H3|0.0|

887|3338|1|15|69|G||225 x 225mm Cast iron stopcock box, including brick chamber


below not|No|1|000.00|000.00
||||||| exceeding 750mm deep internally
|||||||
|||||||

888|1893|1|15|69|||ELECTRIC WATER HEATERS |H2|0.0|

889|1894|1|15|69|||"Kwikot Megaflo" |H3|0.0|

890|1896|1|15|69|H||200 Litre horizontal electric water heater |No|2|0000.00|


0000.00

891|4022|1|15|69|J||250 Litre horizontal electric water heater |No|2|0000.00|


0000.00

892|1897|1|15|69|||0,6mm Galvanised sheet steel |H3|0.0|

893|1899|1|15|69|K||1 700 x 650mm Drip tray with 100mm high upstand with top edge
bent|No|4|201.00|804.00
||||||| over all around including 50mm diameter overflow pipe 1 000mm long
||||||| approximately 5m above ground level
|||||||
|||||||

894|1900|1|15|69|||Testing |H3|0.0|

895|2956|1|15|69|L||Testing water pipe system |Item|1||000.00


|||||||
|||||||

896|1902|1|15|69|||SLEEVES |H2|0.0|

897|2695|1|15|69|||uPVC pipes |H3|0.0|

898|3692|1|15|69|M||110mm Pipe, including draw wire |m|12|00.00|000.00


|||||||
|||||||
899|2696|1|15|69|N||110mm Pipes, including draw wire laid in and including trenches
not|m|15|00.00|000.00
||||||| exceeding 1m deep
|||||||
|||||||

900|2979|1|15|70|||Extra over uPVC pipes for fittings |H3|0.0|

901|2980|1|15|70|A||110mm Bend|No|5|00.00|000.00
|||||||
|||||||

902|2981|1|15|70|||Sumps, catchpits, inspection chambers, etc (gratings and covers|


H3|0.0|
||||||| elsewhere)

903|2982|1|15|70|B||Drawbox size 450 x 600mm internally and not exceeding 750mm


deep |No|1|000.00|000.00
|||||||
|||||||

904|2983|1|15|70|||Gratings, covers, etc |H3|0.0|

905|2984|1|15|70|C||450 x 600mm x 68kg Type 9D cast iron single seal manhole cover
and|No|1|000.00|000.00
||||||| frame

906|2784|1|15|70|||PVC sleeves for pipes not exceeding 100mm diameter |H3|0.0|

907|2785|1|15|70|D||Sleeve exceeding 250mm and not exceeding 500mm long |No|1|


00.00|00.00

908|1903|1|15|70|||PVC sleeves for pipes exceeding 100mm and not exceeding 200mm|
H3|0.0|
||||||| diameter

909|1904|1|15|70|E||Sleeve not exceeding 250mm long |No|8|00.00|000.00


|||||||
|||||||

910|826|1|16|72|||BILL NO 16 |H1|0.0|

911|827|1|16|72|||GLAZING |H1|0.0|

912|2377|1|16|72|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

913|2448|1|16|72|||--------------------------------------- ||0.0|
|||||||
|||||||

914|830|1|16|72|||GLAZING TO WOOD WITH PINNED ON BEADS (BEADS|H2|0.0|


||||||| ELSEWHERE)

915|831|1|16|72|||4mm Clear float glass |H3|0.0|


916|832|1|16|72|A||Panes exceeding 0,1 and not exceeding 0,5m2 |m2|10|000.00|
0000.00

917|834|1|16|72|B||Panes exceeding 0,5m2 and not exceeding 2m2 |m2|4|000.00|000.00

918|2699|1|16|72|||4mm Obscure glass |H3|0.0|

919|2700|1|16|72|C||Panes exceeding 0,1 and not exceeding 0,5m2 |m2|3|000.00|000.00

920|836|1|16|72|||6,5mm "Fadeban" normal strength clear laminated safety glass |H3|


0.0|

921|838|1|16|72|D||Panes exceeding 0,5m2 and not exceeding 2m2 |m2|28|000.00|


00000.00

922|841|1|16|72|||MIRRORS |H2|0.0|

923|2497|1|16|72|E||Allow the budgetary amount of R4 125,00 (Four Thousand One


Hundred|Item|1||0000.00
||||||| And Twenty Five Rand) NET for mirrors

924|845|1|17|73|||BILL NO 17 |H1|0.0|

925|846|1|17|73|||PAINTWORK |H1|0.0|

926|2378|1|17|73|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||
|||||||
|||||||NOTE: Unless otherwise described all paints, varnishes, etc required for
||||||| the works are to be supplied by "Midas Paints Southern Cape (Pty) Ltd"
|||||||
|||||||

927|2449|1|17|73|||--------------------------------------- ||0.0|
|||||||
|||||||

928|850|1|17|73|||PAINTWORK, ETC TO NEW WORK |H2|0.0|

929|851|1|17|73|||ON FLOATED PLASTER |H2|0.0|

930|852|1|17|73|||One coat "Pliolite Based" masonry primer and two coats Pure|H3|
0.0|
||||||| Acrylic 240 S.C. paint

931|853|1|17|73|A||On internal walls |m2|728|00.00|00000.00

932|854|1|17|73|||One coat "Pliolite Based" masonry primer and two coats Acrylic
220|H3|0.0|
||||||| paint

933|855|1|17|73|B||On ceilings and cornices |m2|174|00.00|0000.00

934|856|1|17|73|||One coat "Pliolite Based" masonry primer and two coats Acrylic
200|H3|0.0|
||||||| S.C.

935|857|1|17|73|C||On external walls |m2|481|00.00|0000.00

936|858|1|17|73|D||On external walls in foundations |m2|156|00.00|0000.00


|||||||
|||||||

937|859|1|17|73|E||On chimney cowls |m2|3|00.00|00.00

938|3331|1|17|73|||ON SMOOTH CONCRETE |H2|0.0|

939|3332|1|17|73|||Acid etch with Sika Motastrip, one coat Sikaflor 94 solvent


free|H3|0.0|
||||||| epoxy primer and two coats Sikaflor 7520 epoxy coating to
||||||| approved colour

940|3333|1|17|73|F||On power floated floors |m2|52|00.00|0000.00

941|862|1|17|74|||ON WOOD |H2|0.0|

942|3385|1|17|74|||Two coats aluminium wood primer |H3|0.0|

943|3911|1|17|74|A||On back of grooved boarded ceilings|m2|2|00.00|00.00


|||||||
|||||||

944|864|1|17|74|B||On backs of frames, linings, etc not exceeding 300mm wide |m|
823|0.00|0000.00

945|2755|1|17|74|||One coat white wood primer, one coat universal undercoat and
two|H3|0.0|
||||||| coats "Thixogel" satin enamel paint

946|4087|1|17|74|C||On doors |m2|74|00.00|0000.00

947|4088|1|17|74|D||On door frames, architraves, etc |m2|57|00.00|0000.00

948|868|1|17|74|E||On gallery beams, etc |m2|59|00.00|0000.00

949|3900|1|17|74|||Knotting compound as required, one coat white wood primer, one|


H3|0.0|
||||||| coat universal undercoat and two coats "Thixogel" satin enamel
||||||| paint

950|3901|1|17|74|F||On grooved boarded ceilings |m2|38|00.00|0000.00


|||||||
|||||||

951|865|1|17|74|||One coat white wood primer, one coat universal undercoat and two|
H3|0.0|
||||||| coats high gloss enamel paint

952|866|1|17|74|G||On grooved boarded ceilings |m2|2|00.00|00.00


|||||||
|||||||

953|878|1|17|74|H||On windows, sash doors and fanlights in multi colours |m2|70|


00.00|0000.00
|||||||
|||||||

954|2749|1|17|74|||One coat aluminium wood primer, one coat universal undercoat


and|H3|0.0|
||||||| two coats high gloss enamel paint

955|876|1|17|74|J||On doors |m2|14|00.00|000.00

956|2748|1|17|74|K||On windows, sash doors and fanlights |m2|11|00.00|000.00


|||||||
|||||||

957|880|1|17|74|L||On door frames, architraves, etc |m2|5|00.00|000.00

958|882|1|17|74|M||On pergola beams, etc |m2|58|00.00|0000.00


|||||||
|||||||

959|894|1|17|74|||Knotting compound as required, one coat white wood primer, one|


H3|0.0|
||||||| coat universal undercoat and two coats high gloss enamel paint

960|895|1|17|74|N||On fascia boards |m2|9|00.00|000.00

961|4091|1|17|74|||Two coats universal undercoat and two coats Acrylic 220 paint |
H3|0.0|

962|4092|1|17|74|P||On skirtings, rails, etc not exceeding 300mm girth |m|185|0.00|


0000.00

963|4093|1|17|75|||Two coats universal undercoat and two coats Thixogel satin


enamel|H3|0.0|
||||||| paint

964|4094|1|17|75|A||On skirtings, rails, etc not exceeding 300mm girth |m|252|0.00|


0000.00

965|886|1|17|75|||One coat "Arbourcoat Fancourt Imbuia" reduced 10% with mineral|


H3|0.0|
||||||| turpentine and two coats "Arbourcoat Fancourt Imbuia" varnish

966|4089|1|17|75|B||On doors |m2|2|00.00|00.00

967|888|1|17|75|C||On windows, sash doors and fanlights |m2|80|00.00|0000.00

968|4090|1|17|75|D||On door frames, architraves, etc |m2|1|00.00|00.00

969|890|1|17|75|E||On cills and head linings |m2|23|00.00|000.00

970|893|1|17|75|F||On roof lights |m2|14|00.00|000.00

971|2765|1|17|75|G||On gates, grilles, balustrades, etc (both sides measured over


the full flat|m2|19|00.00|000.00
||||||| area)
|||||||
|||||||

972|2771|1|17|75|H||On rails, bars, cappings, etc |m2|1|00.00|00.00


|||||||
|||||||

973|2766|1|17|75|J||On skirtings, rails, etc not exceeding 300mm girth |m|57|00.00|


000.00

974|901|1|18|77|||BILL NO 18 |H1|0.0|

975|902|1|18|77|||EXTERNAL WORK |H1|0.0|

976|1928|1|18|77|||NOTE: Tenderers are advised to study the Model Preambles for


Trades||0.0|
||||||| before pricing this bill
|||||||
|||||||

977|2450|1|18|77|||--------------------------------------- ||0.0|
|||||||
|||||||

978|3004|1|18|77|||SITE PREPARATION |H1|0.0|

979|3008|1|18|77|||EARTHWORKS |H2|0.0|

980|2958|1|18|77|||SITE CLEARANCE ETC |H3|0.0|

981|2959|1|18|77|||Site clearance |H3|0.0|

982|2960|1|18|77|A||Digging up and removing rubbish, debris, vegetation, hedges,


shrubs and|m2|1206|0.00|0000.00
||||||| trees not exceeding 200mm girth, bush, etc

983|2961|1|18|77|B||Stripping average 250mm thick layer of top soil and stockpiling


on site|m2|813|00.00|0000.00
|||||||
|||||||

984|3005|1|18|77|||BULK EXCAVATION, FILLING, ETC |H3|0.0|

985|3006|1|18|77|||Open face excavation in earth over sloping site |H3|0.0|

986|3007|1|18|77|C||Open face excavation |m3|5|00.00|000.00

987|3009|1|18|77|||Extra over all excavations for carting away |H3|0.0|

988|3010|1|18|77|D||Surplus material from excavations and/or stock piles on site to


a dumping|m3|5|00.00|000.00
||||||| site to be located by the contractor

989|4110|1|18|77|||Earth filling supplied by the contractor compacted to 95% Mod|


H3|0.0|
||||||| AASHTO density

990|4111|1|18|77|E||Over site, etc |m3|70|00.00|0000.00


|||||||
|||||||

991|1929|1|18|78|||BOUNDARY WALLS |H1|0.0|


992|1932|1|18|78|||EARTHWORKS |H2|0.0|

993|1933|1|18|78|||EXCAVATION, FILLING, ETC |H3|0.0|

994|1934|1|18|78|||Excavation in earth not exceeding 2m deep |H3|0.0|

995|1935|1|18|78|A||Trenches |m3|30|00.00|000.00
|||||||
|||||||

996|2535|1|18|78|B||Holes |m3|2|00.00|00.00
|||||||
|||||||

997|1938|1|18|78|||Extra over all excavations for carting away |H3|0.0|

998|1939|1|18|78|C||Surplus material from excavations and/or stock piles on site to


a dumping|m3|32|00.00|000.00
||||||| site to be located by the contractor
|||||||
|||||||

999|1940|1|18|78|||Risk of collapse of excavations |H3|0.0|

1000|1941|1|18|78|D||Sides of trench and hole excavations not exceeding 1,5m deep


|m2|86|0.00|000.00
|||||||
|||||||

1001|1943|1|18|78|||Keeping excavations free of water |H3|0.0|

1002|1944|1|18|78|E||Keeping excavations free of water |Item|1||000.00


|||||||
|||||||

1003|1945|1|18|78|||Earth filling supplied by the contractor compacted to 95% Mod|


H3|0.0|
||||||| AASHTO density

1004|1947|1|18|78|F||Backfilling to trenches, holes, etc |m3|7|00.00|000.00


|||||||
|||||||

1005|1960|1|18|78|||CONCRETE, FORMWORK AND REINFORCEMENT |H2|0.0|

1006|1961|1|18|78|||UNREINFORCED CONCRETE CAST AGAINST EXCAVATED|H3|0.0|


||||||| SURFACES

1007|1964|1|18|78|||20Mpa/19mm concrete |H3|0.0|

1008|2536|1|18|78|G||Bases |m3|1|000.00|000.00
|||||||
|||||||

1009|1965|1|18|78|H||Strip footings |m3|10|000.00|0000.00


|||||||
|||||||

1010|1967|1|18|78|J||Steps |m3|0.1|000.00|00.00
|||||||
|||||||

1011|1968|1|18|78|||REINFORCED CONCRETE |H3|0.0|

1012|1969|1|18|78|||20Mpa/19mm concrete |H3|0.0|

1013|1970|1|18|78|K||Filling to cavities of hollow walls |m3|7|000.00|0000.00


|||||||
|||||||

1014|2870|1|18|79|||ROUGH FORMWORK (DEGREE OF ACCURACY III) |H3|0.0|

1015|2871|1|18|79|||Rough formwork to sides |H3|0.0|

1016|2872|1|18|79|A||Edges, risers, ends and reveals not exceeding 300mm high or


wide |m|1|00.00|00.00

1017|2537|1|18|79|||REINFORCEMENT |H3|0.0|

1018|2538|1|18|79|||High tensile steel reinforcement to structural concrete work |


H3|0.0|

1019|2539|1|18|79|B||20mm Diameter bars |t|0.03|0000.00|000.00

1020|2541|1|18|79|||PRECAST CONCRETE |H2|0.0|

1021|2542|1|18|79|||Precast concrete finished smooth on exposed surfaces including|


H3|0.0|
||||||| bedding, jointing and pointing

1022|2582|1|18|79|C||Pyramid shaped capping size 520 x 520 x 340mm high extreme


with|No|5|000.00|000.00
||||||| 75mm thick base, including bedding to top of brick pier in cement mortar
|||||||
|||||||

1023|1993|1|18|79|||MASONRY |H2|0.0|

1024|1995|1|18|79|||Brickwork of NFX clay bricks (14Mpa nominal compressive|H3|


0.0|
||||||| strength) in Class I mortar

1025|2540|1|18|79|D||Piers |m3|2|000.00|0000.00

1026|3863|1|18|79|E||One brick walls |m2|29|000.00|0000.00

1027|1998|1|18|79|F||345mm Hollow walls |m2|51|000.00|0000.00


|||||||
|||||||

1028|1999|1|18|79|||BRICKWORK SUNDRIES |H3|0.0|

1029|2000|1|18|79|G||Brick coping on 345mm cavity wall formed of 75mm high base


twice|m|41|00.00|0000.00
||||||| projected and twice wheathered top 780mm overall girth including closing
||||||| of hollow walls horisontally (plaster elsewhere measured)
|||||||
|||||||
1030|2049|1|18|79|||Brickwork reinforcement |H3|0.0|

1031|2051|1|18|79|H||150mm Wide reinforcement built in horizontally |m|368|0.00|


000.00
|||||||
|||||||

1032|2525|1|18|79|||Galvanised hoop iron cramps, ties, etc |H3|0.0|

1033|2526|1|18|79|J||30 x 1,6mm Wall tie 400mm long with both ends built into
brickwork over|No|115|0.00|000.00
||||||| control joints
|||||||
|||||||

1034|2527|1|18|79|||Joint forming material in movement joints |H3|0.0|

1035|2528|1|18|79|K||10mm "Jointex" built in vertically through brick walls |m2|5|


00.00|000.00
|||||||
|||||||

1036|2529|1|18|80|||WATERPROOFING |H2|0.0|

1037|2530|1|18|80|||JOINT SEALANTS, ETC |H3|0.0|

1038|2531|1|18|80|||Secoflex joint sealant with backing cord, bond breaker, primer,


etc |H3|0.0|

1039|2532|1|18|80|A||10 x 10mm In vertical expansion joints, including raking out


expansion|m|29|00.00|000.00
||||||| joint filler as necessary
|||||||
|||||||

1040|2006|1|18|80|||CARPENTRY & JOINERY |H2|0.0|

1041|2007|1|18|80|||GATES |H3|0.0|

1042|2008|1|18|80|||Wrought meranti gates and frames |H3|0.0|

1043|2009|1|18|80|B||Single gate and post type N as per Drawing No. F93/1938/501


rev A|No|1|000.00|000.00
|||||||
|||||||

1044|3703|1|18|80|C||Single gate and post type P as per Drawing No. F93/1938/501


rev A|No|2|000.00|0000.00
|||||||
|||||||

1045|3403|1|18|80|D||Single gate and poles type Q as per Drawing No. F93/1938/501


rev A|No|1|000.00|000.00
|||||||
|||||||

1046|2012|1|18|80|||IRONMONGERY |H2|0.0|
1047|2013|1|18|80|||HINGES, BOLTS, ETC |H3|0.0|

1048|2014|1|18|80|||Brass |H3|0.0|

1049|2015|1|18|80|E||305mm Reversible non lift off pattern hinges |No|8|00.00|


000.00
|||||||
|||||||

1050|2016|1|18|80|||CATCHES, CABIN HOOKS, ETC |H3|0.0|

1051|2017|1|18|80|||Brass |H3|0.0|

1052|2018|1|18|80|F||GG/001/CB Gothic gate latches |No|4|000.00|000.00


|||||||
|||||||

1053|2019|1|18|80|||PLASTERING |H2|0.0|

1054|2020|1|18|80|||EXTERNAL PLASTER |H3|0.0|

1055|2021|1|18|80|||Cement plaster on brickwork |H3|0.0|

1056|2022|1|18|80|G||On walls |m2|142|00.00|0000.00


|||||||
|||||||

1057|2880|1|18|80|H||Set sloping on top of walls average 30mm thick |m2|2|00.00|


00.00
|||||||
|||||||

1058|2580|1|18|80|J||On narrow widths |m2|1|00.00|00.00

1059|2023|1|18|80|K||On projecting soffits, sides and weathered top of brick coping


840mm|m2|34|00.00|0000.00
||||||| girth
|||||||
|||||||

1060|3313|1|18|81|A||Plaster moulding type "A" as detail No 1 of Annexure "A" of


these bills of|m|9|00.00|000.00
||||||| quantities
|||||||
|||||||

1061|2036|1|18|81|||PAINTWORK |H2|0.0|

1062|2037|1|18|81|||PAINTWORK ETC TO NEW WORK |H3|0.0|

1063|2038|1|18|81|||ON FLOATED PLASTER |H3|0.0|

1064|2039|1|18|81|||One coat Acrylic 200 high cover (2m2 per litre), fill
imperfections|H3|0.0|
||||||| with external filler mixed with aggregate, one coat masonry primer
||||||| to filled areas and two coats Acrylic 200 high cover (5m2 per litre)

1065|2040|1|18|81|B||On external walls |m2|177|00.00|0000.00


|||||||
|||||||

1066|2041|1|18|81|||ON WOOD |H3|0.0|

1067|2042|1|18|81|||Knotting compound as rquired, one coat aluminium wood primer,|


H3|0.0|
||||||| one coat universal undercoat and two coats high gloss enamel
||||||| paint

1068|2043|1|18|81|C||On gates |m2|7|00.00|000.00


|||||||
|||||||

1069|2044|1|18|81|D||On stiles |m2|2|00.00|00.00


|||||||
|||||||

1070|2498|1|18|81||| ||0.0|
|||||||
|||||||
|||||||
|||||||

1071|2025|1|18|81|||STORMWATER DRAINAGE |H1|0.0|

1072|2972|1|18|81|||Subsoil Drainage |H3|0.0|

1073|2973|1|18|81|E||110mm Slotted uPVC agricultural pipes laid in and including


trenches not|m|32|00.00|0000.00
||||||| exceeding 1m deep, including 13mm crushed stone encasing size 300 x
||||||| 300mm and "Bidim U-14" geofabric filter blanket wrapped around
||||||| encasing with 150mm side and 300mm end laps including stitching
|||||||
|||||||

1074|2975|1|18|81|F||500 x 500 x 500mm encasing to end of 110mm pipe formed of


13mm|No|3|00.00|000.00
||||||| crushed stone wrapped around with "Bidim U-14" geofabric filter blanket
||||||| with 150mm side and 300mm end laps, including stitching
|||||||
|||||||

1075|2026|1|18|81|||uPVC pipes |H3|0.0|

1076|2027|1|18|81|G||110mm Pipes laid in and including trenches not exceeding 1m


deep |m|34|00.00|0000.00
|||||||
|||||||

1077|2833|1|18|81|H||160mm Pipes laid in and including trenches not exceeding 1m


deep |m|83|00.00|0000.00
|||||||
|||||||

1078|2837|1|18|81|J||160mm Pipes laid in and including trenches exceeding 1m and


not|m|36|00.00|0000.00
||||||| exceeding 2m deep
|||||||
|||||||
1079|2029|1|18|82|||Extra over uPVC pipes for fittings |H3|0.0|

1080|2839|1|18|82|A||110 x 75mm Reducer |No|5|00.00|000.00


|||||||
|||||||

1081|3868|1|18|82|B||160 x 110mm Reducer |No|8|000.00|0000.00


|||||||
|||||||

1082|2030|1|18|82|C||110mm Bend |No|8|00.00|000.00


|||||||
|||||||

1083|2835|1|18|82|D||160mm Bend |No|6|000.00|0000.00


|||||||
|||||||

1084|2031|1|18|82|E||110mm Junction |No|4|00.00|000.00


|||||||
|||||||

1085|2834|1|18|82|F||160mm Junction |No|6|000.00|0000.00


|||||||
|||||||

1086|2921|1|18|82|||Sundries |H3|0.0|

1087|3874|1|18|82|G||Cutting into side of existing inspection chamber for and


connecting|No|1|000.00|000.00
||||||| 300mm pipe and making good
|||||||
|||||||

1088|2034|1|18|82|||Sumps, catchpits, inspection chambers, etc (covers elsewhere) |


H3|0.0|

1089|2035|1|18|82|H||Rainwater sump 230 x 230mm internally and not exceeding 750mm


deep |No|10|000.00|0000.00
|||||||
|||||||

1090|2840|1|18|82|J||Rainwater sump 230 x 230mm internally and exceeding 750 and


not|No|6|000.00|0000.00
||||||| exceeding 1500mm deep
|||||||
|||||||

1091|3297|1|18|82|K||Rainwater sump 450 x 450mm internally and not exceeding 750mm


deep |No|2|000.00|000.00
|||||||
|||||||

1092|3014|1|18|82|||Gratings, covers, etc |H3|0.0|

1093|3015|1|18|82|L||230 x 230mm x 6kg Cast iron dished grating and frame |No|16|
000.00|0000.00
|||||||
|||||||

1094|3298|1|18|82|M||450 x 450mm x 26kg Cast iron dished grating and frame |No|2|
000.00|000.00
|||||||
|||||||

1095|2963|1|18|82||| ||0.0|
|||||||
|||||||
|||||||
|||||||

1096|2476|1|18|82|||GRASSING, PLANTERS, ETC |H1|0.0|

1097|3300|1|18|82|||Excavation in earth not exceeding 2m deep |H3|0.0|

1098|3302|1|18|82|N||Reduce levels for flower beds |m3|16|00.00|000.00


|||||||
|||||||

1099|3012|1|18|82|||Extra over all excavations for carting away |H3|0.0|

1100|3013|1|18|82|P||Surplus material from excavations and/or stock piles on site


to a dumping|m3|16|00.00|000.00
||||||| site to be located by the contractor

1101|3306|1|18|82|||Ground preparation |H3|0.0|

1102|3307|1|18|82|Q||Cut to fill over site to landscape levels |m2|589|0.00|


0000.00
|||||||
|||||||

1103|3303|1|18|83|||Earth filling obtained from the excavations and /or prescribed


stock|H3|0.0|
||||||| piles on site (not compacted)

1104|3304|1|18|83|A||Over site |m3|324|00.00|0000.00


|||||||
|||||||

1105|2477|1|18|83|||Garden soil filling obtained from prescribed stock piles on


site |H3|0.0|

1106|2479|1|18|83|B||To planters |m3|23|00.00|000.00


|||||||
|||||||

1107|2478|1|18|83|C||Under grass sods |m3|59|00.00|0000.00


|||||||
|||||||

1108|2480|1|18|83|||Grassing |H3|0.0|

1109|2481|1|18|83|D||Lay roll-on lawn on topsoil (topsoil elsewhere measured) |m2|


589|0.00|0000.00
|||||||
|||||||
1110|2499|1|18|83||| ||0.0|
|||||||
|||||||
|||||||
|||||||

1111|2001|1|18|83|||PAVING |H1|0.0|

1112|2468|1|18|83|||EXCAVATION, FILLING, ETC |H2|0.0|

1113|2469|1|18|83|||Excavation in earth not exceeding 2m deep |H3|0.0|

1114|2467|1|18|83|E||Reduce levels under floors, pavings, etc |m3|40|00.00|0000.00


|||||||
|||||||

1115|2988|1|18|83|||Extra over all excavations for carting away |H3|0.0|

1116|2989|1|18|83|F||Surplus material from excavations and/or stock piles on site


to a dumping|m3|35|00.00|000.00
||||||| site to be located by the contractor

1117|2873|1|18|83|||Garden soil filling obtained from prescribed stock piles on


site |H3|0.0|

1118|2874|1|18|83|G||Under grass blocks and pavers |m3|2|00.00|00.00


|||||||
|||||||

1119|2471|1|18|83|||Earth filling supplied by the contractor under paving, etc |H3|


0.0|

1120|3011|1|18|83|H||Filling of CBR > 7 compacted to 90% Mod AASHTO density under


floors,|m3|11|00.00|000.00
||||||| steps, pavings, etc
|||||||
|||||||

1121|2987|1|18|83|J||Selected layer of CBR > 15 compacted to 93% Mod AASHTO


density|m3|21|00.00|0000.00
||||||| under floors, steps, pavings, etc
|||||||
|||||||

1122|2986|1|18|83|K||Sub-base course of CBR > 45 and PI < 10 compacted to 95% Mod|


m3|14|000.00|0000.00
||||||| AASHTO density under pavings, etc
|||||||
|||||||

1123|1953|1|18|83|||Compaction of surfaces |H3|0.0|

1124|1954|1|18|83|L||Compaction of ground surfaces under floors etc including


scarifying for a|m2|144|0.00|000.00
||||||| depth of 150mm, breaking down oversize material, adding suitable
||||||| material where necessary and compacting to 90% Mod AASHTO density
|||||||
|||||||
1125|2844|1|18|84|||PAVING |H2|0.0|

1126|3308|1|18|84|||Grey cement cobble paving with butt joints on 25mm thick river|
H3|0.0|
||||||| sand bed with sand and cement mixture swept into joints and
||||||| hosed down, including preparation of ground or filling

1127|3309|1|18|84|A||Cobble paving to falls |m2|84|00.00|0000.00


|||||||
|||||||

1128|3310|1|18|84|B||460mm Wide cobble dished channel, including 50mm thick mortar


bed |m|59|00.00|0000.00
|||||||
|||||||

1129|2845|1|18|84|||Paving of "Corobrick Colonial Red" paving bricks with butt


joints on|H3|0.0|
||||||| 25mm thick river sand bed with sand and cement mixture swept
||||||| into joints and hosed down, including preparation of ground or
||||||| filling

1130|2847|1|18|84|C||220mm Wide brick-on-flat header course edging on 50mm thick


mortar|m|38|00.00|0000.00
||||||| bed
|||||||
|||||||

1131|2462|1|18|84|D||75mm Wide brick-on-end header course edging on and including


300 x|m|62|00.00|0000.00
||||||| 75mm 15Mpa/19mm unreinforced concrete bedding, including all
||||||| necessary excavations, etc
|||||||
|||||||

1132|3972|1|18|84|||Paving of "Revelstone" pavers with open joints with grass


infill on|H3|0.0|
||||||| and including 50mm thick river sand bed, including preparation of
||||||| ground or filling

1133|3973|1|18|84|E||450 x 450 x 45mm Thick "Saxon Sandstone" random edge pavers|


m2|6|000.00|000.00
|||||||
|||||||

1134|2848|1|18|84|||Grey Inca "K" grass blocks 600 x 400 x 90mm thick |H3|0.0|

1135|2853|1|18|84|F||Grass blocks laid on topsoil fill (fill elsewhere measured),


including|m2|13|00.00|0000.00
||||||| planting of grass in blocks
|||||||
|||||||

1136|2465|1|18|84|||Precast paving slabs 450 x 450 x 50mm thick laid with 50mm
wide|H3|0.0|
||||||| exposed aggregate joints on 50mm thick river sand bed

1137|2466|1|18|84|G||Paving in drying yards |m2|9|00.00|000.00


|||||||
|||||||

1138|3404|1|18|84|||Standard grade sleeper beams as pavers |H3|0.0|

1139|3405|1|18|84|H||Sleeper beam size 1 800 x 240 x 120mm on compacted fill |No|


5|000.00|000.00
|||||||
|||||||

1140|2930|1|18|84|||Joint forming material in movement joints |H3|0.0|

1141|3899|1|18|84|J||10mm Joints not exceeding 300mm high|m|25|0.00|000.00


|||||||
|||||||

1142|2931|1|18|85|||JOINT SEALANTS, ETC |H3|0.0|

1143|2932|1|18|85|||Secoflex joint sealant with backing cord, bond breaker, primer,


etc |H3|0.0|

1144|2933|1|18|85|A||10 x 10mm In vertical expansion joints, including raking out


expansion|m|25|00.00|000.00
||||||| joint filler as necessary
|||||||
|||||||

1145|955|1|19|87|||BILL NO 20 |H1|0.0|

1146|956|1|19|87|||PROVISIONAL SUMS |H1|0.0|

1147|2397|1|19|87|||NOTE: The following provisional sums are for work to be


carried out by||0.0|
||||||| selected sub-contractors in terms of Clause 21 of the Principal Building
||||||| Agreement
|||||||
|||||||
|||||||
|||||||NOTE: Tenderers are referred to the definition of general attendance on
||||||| nominated or selected sub-contracts given in Clause B7.3 of the
||||||| preliminaries
|||||||
|||||||
|||||||
|||||||NOTE: All provisional and prime cost sums are NET i.e. there is no cash
||||||| discount
|||||||
|||||||

1148|2452|1|19|87|||--------------------------------------- ||0.0|
|||||||
|||||||

1149|3925|1|19|87|||BRAAI CUPBOARD |H2|0.0|

1150|3291|1|19|87|A||Allow the provisional sum of R5 000,00 (Five Thousand Rand)


NET for|Item|1||5000.00
||||||| Braai cupboard to be executed by a sub-contractor
1151|3292|1|19|87|B||Add for profit |%|5||250.00

1152|3293|1|19|87|C||Allow for attendance |%|2.5||125.00

1153|3286|1|19|87|||BUILT-IN CUPBOARDS TO BEDROOMS |H2|0.0|

1154|3287|1|19|87|D||Allow the provisional sum of R52 500,00 (Fifty Two Thousand


Five|Item|1||52500.00
||||||| Hundred Rand) NET for built-in cupboards to be executed by a
||||||| sub-contractor

1155|3288|1|19|87|E||Add for profit |%|5||2625.00

1156|3289|1|19|87|F||Allow for attendance |%|2.5||1312.50

1157|2482|1|19|87|||KITCHEN AND LAUNDRY CUPBOARDS, INCLUDING|H2|0.0|


||||||| COUNTER TOPS

1158|2114|1|19|87|G||Allow the provisional sum of R63 000,00 (Sixty Three Thousand


Rand)|Item|1||63000.00
||||||| NET for kitchen and laundry cupboards to be executed by a
||||||| sub-contractor

1159|1148|1|19|87|H||Add for profit |%|5||3150.00

1160|1149|1|19|87|J||Allow for attendance |%|2.5||1575.00

1161|3290|1|19|88|||VANITY CUPBOARDS, BATH SURROUNDS AND BATH|H2|0.0|


||||||| PANELS

1162|2117|1|19|88|A||Allow the provisional sum of R20 500,00 (Twenty Thousand Five|


Item|1||20500.00
||||||| Hundred Rand ) NET for vanity cupboards, including tops and bath
||||||| surrounds and bath panels to be executed by a sub-contractor

1163|2484|1|19|88|B||Add for profit |%|5||1025.00

1164|2485|1|19|88|C||Allow for attendance |%|2.5||512.50

1165|1446|1|19|88|||INTEGRATED ELECTRICAL APPLIANCES |H2|0.0|

1166|1505|1|19|88|D||Allow the provisional sum of R12 000,00 (Twelve Thousand Rand)


NET|Item|1||12000.00
||||||| for integrated electrical appliances to be executed by a sub-contractor

1167|1506|1|19|88|E||Add for profit |%|5||600.00

1168|1507|1|19|88|F||Allow for attendance |%|2.5||300.00

1169|3054|1|19|88|||FIRE PLACE SURROUNDS |H2|0.0|

1170|3055|1|19|88|G||Allow the provisional sum of R6 000,00 (Six Thousand Rand) NET


for fire|Item|1||6000.00
||||||| place surrounds to be installed by a sub-contractor

1171|3056|1|19|88|H||Add for profit |%|5||300.00


|||||||
|||||||
1172|3057|1|19|88|J||Allow for general attendance on sub-contractor |%|2.5||150.00
|||||||
|||||||

1173|3058|1|19|88|||THATCH ROOFING |H2|0.0|

1174|3059|1|19|88|K||Allow the provisional sum of R207 000,00 (Two Hundred and


Seven|Item|1||207000.00
||||||| Thousand Rand) NET for thatch roofing and eight roof windows to be
||||||| installed by a sub-contractor

1175|3060|1|19|88|L||Add for profit |%|5||10350.00

1176|3061|1|19|88|M||Allow for attendance |%|5||10350.00

1177|1176|1|19|88|||TIMBER FLOORING |H2|0.0|

1178|1177|1|19|88|N||Allow the provisional sum of R32 400,00 (Thirty Two Thousand


Four|Item|1||32400.00
||||||| Hundred Rand) NET for timber flooring to be executed by a
||||||| sub-contractor

1179|1178|1|19|88|P||Add for profit |%|5||1620.00

1180|1179|1|19|88|Q||Allow for attendance |%|2.5||810.00


|||||||
|||||||

1181|3232|1|19|89|||GAS INSTALLATION AND COMISSIONING |H2|0.0|

1182|3233|1|19|89|A||Allow the sum of R10 000,00 (Ten Thousand Rand) NET for the
gas|Item|1||10000.00
||||||| installation, including gas cylinders to be executed by a sub-contractor

1183|3234|1|19|89|B||Add for profit |%|5||500.00


|||||||
|||||||

1184|3235|1|19|89|C||Allow for attendance |%|2.5||250.00


|||||||
|||||||

1185|1252|1|19|89|||ELECTRICAL INSTALLATION |H2|0.0|

1186|1310|1|19|89|D||Allow the provisional sum of R129 840,00 (One Hundred And


Twenty|Item|1||129840.00
||||||| Nine Thousand Eight Hundred and Forty Rand) NET for electrical
||||||| installation to be executed by a sub-contractor

1187|1311|1|19|89|E||Add for profit |%|5||6492.00

1188|1312|1|19|89|F||Allow for attendance |%|2.5||3246.00

1189|1318|1|19|89|||UNDERFLOOR HEATING |H2|0.0|

1190|1376|1|19|89|G||Allow the provisional sum of R15 130,00 (Fifteen Thousand One


Hundred|Item|1||15130.00
||||||| and Thirty Rand) NET for underfloor heating to be executed by a
||||||| sub-contractor
1191|1377|1|19|89|H||Add for profit |%|5||756.50

1192|1378|1|19|89|J||Allow for attendance |%|2.5||378.25

1193|1382|1|19|89|||COMMUNAL AERIAL TELEVISION SYSTEM |H2|0.0|

1194|1440|1|19|89|K||Allow the provisional sum of R8 000,00 (Eight Thousand Rand)


NET for|Item|1||8000.00
||||||| communal aerial television system to be executed by a sub-contractor

1195|1441|1|19|89|L||Add for profit |%|5||400.00

1196|1442|1|19|89|M||Allow for attendance |%|2.5||200.00

1197|4100|1|19|89|||INTERCOM INSTALLATION |H2|0.0|

1198|4101|1|19|89|N||Allow the provisional sum of R2 700,00 (Two Thousand Seven


Hundred|Item|1||2700.00
||||||| Rand) NET for the intercom installation to be executed by a
||||||| sub-contractor

1199|4102|1|19|89|P||Add for profit |%|5||135.00


|||||||
|||||||

1200|4103|1|19|89|Q||Allow for attendance |%|2.5||67.50


|||||||
|||||||

1201|2758|1|19|90|||SWIMMING POOL |H2|0.0|

1202|2759|1|19|90|A||Allow the provisionsal amount of R60 000,00 (Sixty Thousand


Rand) for|Item|1||60000.00
||||||| the swimming pool and associated builder's work to be executed by a
||||||| sub-contractor

1203|4097|1|19|90|B||Add for profit |%|5||3000.00

1204|4098|1|19|90|C||Allow for attendance |%|2.5||1500.00

1205|2760|1|19|90|||BUDGET ALLOWANCES |H1|0.0|

1206|2762|1|19|90|||BUILDER'S WORK |H2|0.0|

1207|2761|1|19|90|D||Allow the budgetary amount of R2 500,00 (Two Thousand Five


Hundred|Item|1||2500.00
||||||| Rand) NET for builder's work to be used as directed by the Architect and
||||||| deducted in whole or in part if not required

1208|3417|1|20|92|1||PRELIMINARIES |Page|20|0|143400.00

1209|1613|1|20|92|2||EARTHWORKS |Page|23|0|34391.60

1210|1605|1|20|92|3||CONCRETE, FORMWORK AND REINFORCEMENT |Page|28|0|121687.38

1211|1614|1|20|92|4||PRECAST CONCRETE |Page|29|0|885.60

1212|1606|1|20|92|5||MASONRY |Page|33|0|186123.40
1213|1615|1|20|92|6||WATERPROOFING |Page|36|0|17033.85

1214|1607|1|20|92|7||ROOF COVERINGS |Page|37|0|14951.90

1215|1616|1|20|92|8||CARPENTRY AND JOINERY |Page|44|0|193228.60

1216|1608|1|20|92|9||CEILINGS, PARTITIONS AND ACCESS FLOORING |Page|47|0|15508.30

1217|2629|1|20|92|10||FLOOR COVERINGS, WALL LININGS, ETC |Page|48|0|27053.00

1218|1617|1|20|92|11||IRONMONGERY |Page|52|0|20222.30

1219|1609|1|20|92|12||METALWORK |Page|55|0|36383.40

1220|1618|1|20|92|13||PLASTERING |Page|58|0|103894.60

1221|1610|1|20|92|14||TILING |Page|61|0|65231.00

1222|1619|1|20|92|15||PLUMBING AND DRAINAGE |Page|71|0|125376.25

1223|1611|1|20|92|16||GLAZING |Page|72|0|18799.70

1224|1620|1|20|92|17||PAINTWORK |Page|76|0|59871.80

1225|1612|1|20|92|18||EXTERNAL WORK |Page|86|0|127464.79

1226|1621|1|20|92|19||PROVISIONAL AMOUNTS |Page|91|0|678550.25

1227|1600|1|20|92|||SUB-TOTAL |ST|0.0||Sub Total

1228|4023|1|20|92|||Allow the sum of R30 000,00 (Thirty Thousand Rand) for


contingencies to be|Item|1||30000.00
||||||| used as directed by the architect and deducted in whole or in part if not
||||||| required

1229|1603|1|20|93|||ADD: Value Added Tax (14%) |VAT|14||282808.08