Está en la página 1de 2

UNITED CEMENTS PVT.

LIMITED
STANDARD OPERATING PROCEDURE (SOP)
Doc.No. UCPL/ME/SOP/002
Rev.No: 00
Rubber Belt Conveyors Page 1 of 2
Eff. Dt.: 15TH AUGUST-2018

Approved By: Issued By:


Date: Date:

1. PURPOSE: - To establish a system for Operation, Maintenance and cleaning of Belt Conveyors.

2. SCOPE: - Applicable to lime stone crusher, raw material handling, raw mill feeding & reject material,
coal handling, coal mill feeding, gypsum and clinker extraction and cement mill feeding and reject
coarse belt.

3. DEFINITIONS:-
3.1 HOD- Head of Department
3.2 MECH-Mechanical
3.3 PPEs- Personal Protective Equipment
3.4 SI-Section in charge

4. RESPONSIBILITY: - HOD (MECH) is over all responsible. All section In-charges (SI).

5. DESCRIPTION OF PROCEDURE: - During the operation of belt conveyors , feeding from stockpile to
hopper & then hopper to ball mills, following work instructions should be followed to avoid/minimize the
dust emission from the transfer points/belt conveyors.

6. A. OPERATION OF BELT CONVEYOR :-

S. No. Activity Responsibility Remarks

All the operatives to be instructed to use PPE’s i.e. Dust Mask,


5.A.1 Helmet, Hand Gloves, Ear Plugs etc. while working near the belt SI
conveyor.
5.A.2 Only competent person may be deployed for the operation of the SI
Belt Conveyors.
5.A.3 The above persons are instructed not to wear loose cloths. SI
5.A.4 Checking of all the pull cords and other equipments and safety SI
devices provided in the system. Hooter signal to be given to other
working crew working in the adjacent area, to protect themselves
and remove all the material from the nearby area.
5.A.5 It is ensured that belt conveyor is not overfilled to avoid spillage of SI
material.
Proper operation of dust collectors and there should be proper SI
5.A.6
suction in the transfer point.
If fugitive emission is there near the transfer points following points SI
5.A.7
should be checked /rectified.
5.A.8 It is ensured that all venting line is clear at all the transfer points. SI
Plugging of entry of false air from dust collector & from ckt.

5. B. CLEANING BELOW BELT CONVEYOR:-

S. No. Activity Responsibility Remarks

Competent person is deployed for cleaning below belt SI


5.B.1
conveyor.
5.B.2 The above persons are instructed not to wear loose cloths. SI
Before starting the belt ensure that nobody is working in the vicinity of SI
5.B.3
belt conveyor
UNITED CEMENTS PVT. LIMITED
STANDARD OPERATING PROCEDURE (SOP)
Doc.No. UCPL/ME/SOP/002
Rev.No: 00
Rubber Belt Conveyors Page 2 of 2
Eff. Dt.: 15TH AUGUST-2018

Approved By: Issued By:


Date: Date:

5.B.4 No work is performed in belt conveyor during running of belt conveyor. SI


5.B.6 Operating it checks pull cord/sway switch. SI
The Guards to be placed properly in tail drum to protect the person
5.B.7 SI
from any eventuality while cleaning below the tail drum.

5. C. CLEANING OF DISCHARGE CHUTE:-

S. No. Activity Responsibility Remarks

5.C.1 Competent persons are deployed for the job. SI


5.C.2 Ensure for Proper illumination inside the chute SI
Ensure pocking ‘bari’ diameter is not more than one inch, its tip is SI
5.C.3
pointed & its weight is light.
The hammering on the bari is done by two persons (one by one) to SI
5.C.4
avoid tiredness.
Bari top should be flat enough to avoid slipping of hammer SI
5.C.6
from Bari.

APPLICATION OF THE PROCEDURE:

i.
RECORDS:

a) Proper record should be maintained in shift log register /maintenance register related with
operation and maintenance jobs.
b) Safety i.e. work permits should be maintained as per the safety requirement.

………………>>>>>>….<<<<<<………………..

También podría gustarte