INDEX
DESCRIPTION PAGE No
PREAMBLE
METAL RATES I
MANUFACTURED MATERIALS iv
SECON NH48III-61-QU-O001
Design Consultancy for Upgradation of Draft Detailed Project Report
NH-48 from Nelamangala to Hassan Rate Analysis
km 28/200 to km 191/200 Package-II Km 110/000 to Km 191/200
HIGHWAY PORTION
f)Over Head Charges @ 8% on (a+b+c+d+e)
c)Contractor's Profit @ 10% on (a+b) 10.00%
d)Contractor's Profit @ 10% on (a+b+c)
e)Contractor's Profit @ 10% on (a+b+c+d)
f)Contractor's Profit @ 10% on (a+b+c+d+e)
g)Contractor's Profit @ 10% on (a+b+c+d+e+f)
h)Contractor's Profit @ 10% on (a+b+c+d+e+f+g)
PIPE CULVERTS
f)Over Head Charges @ 8% on (a+b+c+d+e)
c)Contractor's Profit @ 10% on (a+b) 10.00%
d)Contractor's Profit @ 10% on (a+b+c)
e)Contractor's Profit @ 10% on (a+b+c+d)
f)Contractor's Profit @ 10% on (a+b+c+d+e)
g)Contractor's Profit @ 10% on (a+b+c+d+e+f)
h)Contractor's Profit @ 10% on (a+b+c+d+e+f+g)
REHABILITATION WORK
e)Over Head Charges @ 30% on (a+b+c+d)
f)Over Head Charges @ 30% on (a+b+c+d+e)
c)Contractor's Profit @ 10% on (a+b) 10.00%
d)Contractor's Profit @ 10% on (a+b+c)
e)Contractor's Profit @ 10% on (a+b+c+d)
f)Contractor's Profit @ 10% on (a+b+c+d+e)
g)Contractor's Profit @ 10% on (a+b+c+d+e+f)
h)Contractor's Profit @ 10% on (a+b+c+d+e+f+g)
CHAPTER-1
SITE CLEARANCE AND DISMANTLING
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
1.01 2.3 201 Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass,
bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of
trees cut earlier and disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned, up to a lead of 3000 metres
including removal and disposal of top organic soil not exceeding 150 mm in
thickness.
Unit = Hectare
Taking output = 1 Hectare
(i) By Mechanical Means
A In area of light jungle
a) Labour
Mate day 6.000 125.00 750.00 L-01
Mazdoor day 150.000 84.91 12735.87 L-03
b) Machinery
Tractor trolley hour 1.000 234.00 234.00 P&M-053
for extra 2 Km LS 200.00
c)Over Head Charges @ 8% on (a+b) 1113.59
d)Contractor's Profit @ 10% on (a+b+c) 1503.35
Rate per Hectare = a+b+c+d 16536.80
16537.00
1.02 2.1 201 Cutting of Trees, including cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps,
roots, stacking of serviceable material with all lifts and up to a lead of 3000
metres and earth filling in the depression/pit.
Unit = Each
Girth from 300 mm to 600 mm
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
a) Labour
Mate day 0.020 125.00 2.50 L-01
Mazdoors . day 0.600 84.91 50.94 L-03
b) Machinery
Tractor-trolley hour 0.100 234.00 23.40 P&M-053
c)Over Head Charges @ 8% on (a+b) 6.15
d)Contractor's Profit @ 10% on (a+b+c) 8.30
Rate for each tree = a+b+c+d 91.29
say 91.00
Girth from 600 mm to 900 mm
a) Labour
Mate day 0.040 125.00 5.00 L-01
Mazdoors day 0.900 84.91 76.42 L-03
b) Machinery
Tractor-trolley hour 0.300 234.00 70.20 P&M-053
c)Over Head Charges @ 8% on (a+b) 12.13
d)Contractor's Profit @ 10% on (a+b+c) 16.37
Rate for each tree = a+b+c+d 180.12
say 180.00
Girth from 900 mm to 1800 mm
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoors day 2.000 84.91 169.81 L-03
b) Machinery
Tractor-trolley hour 0.400 234.00 93.60 P&M-053
c)Over Head Charges @ 8% on (a+b) 21.87
d)Contractor's Profit @ 10% on (a+b+c) 29.53
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
Rate for each tree = a+b+c+d 324.81
say 325.00
Girth above 1800 mm
a) Labour
Mate day 0.160 125.00 20.00 L-01
Mazdoors day 4.000 84.91 339.62 L-03
b) Machinery
Tractor-trolley hour 0.600 234.00 140.40 P&M-053
c)Over Head Charges @ 8% on (a+b) 40.00
d)Contractor's Profit @ 10% on (a+b+c) 54.00
Rate for each tree = a+b+c+d 594.03
say 594.00
1.03 2.4 202 Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and
other structure comprising of masonry, cement concrete, wood work, steel
work, including T&P and scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable material and stacking the
serviceable material with all lifts and lead of 3000 metres
Unit = cum
Taking output = 1.25 cum (3T)
(i) Lime /Cement Concrete
By Mechanical Means for items No. 202( b)& ( c)
2.4(IIA) 202 a) Cement Concrete Grade M-15 & M-20
a) Labour
Mate day 0.020 125.00 2.50 L-01
Mazdoor for loading and unloading day 0.250 84.91 21.23 L-03
Mazdoor with Pneumatic breaker day 0.250 88.68 22.17 L-02
b) Machinery
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
Air Compressor 250 cfm with 2 leads of pneumatic breaker @ 1.5 cum hour 0.670 206.00 138.02
per hour P&M-001
Tractor-trolley
For I st km hour 0.270 234.00 63.18 P&M-053
Next 2 km t.km 6.000 8.37 50.22 P&M-095
c)Over Head Charges @ 8% on (a+b) 23.79
d)Contractor's Profit @ 10% on (a+b+c) 32.11
Cost for 1.25 cum = a+b+c+d 353.21
Rate per cum = (a+b+c+d)/ 1.25 282.57
say 283.00
2.4(IIB) 202 b) Reinforced cement concrete/Prestressed Concrete grade M-20 & above
a) Labour
Mate day 0.050 125.00 6.25 L-01
Mazdoor with Pneumatic breaker day 0.660 88.68 58.53 L-02
Blacksmith day 0.250 90.92 22.73 L-14
Mazdoor for loading and unloading day 0.250 84.91 21.23 L-03
b) Machinery
Air Compressor 250 cfm with 2 leads of pneumatic breaker @ 1.00 cum hour 1.000 206.00 206.00
per hour P&M-001
Tractor-trolley
For I st km hour 0.270 234.00 63.18 P&M-053
Next 2 km t.km 6.000 8.37 50.22 P&M-095
c)Over Head Charges @ 8% on (a+b) 34.25
d)Contractor's Profit @ 10% on (a+b+c) 46.24
Cost for 1.25 cum = a+b+c+d 508.63
Rate per cum = (a+b+c+d)/ 1.25 406.90
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
407.00
or 407.00
2.4(iiiB) 202 c) Stone Masonry/Brick Masonry in cement mortar (Cu m)
a) Labour
Mate day 0.030 125.00 3.75 L-01
Mazdoor for dismantling, loading and unloading. day 0.750 84.91 63.68 L-03
b) Machinery
Tractor-trolley
For I st km hour 0.270 234.00 63.18 P&M-053
Next 2 km t.km 5.750 8.37 48.13 P&M-095
c)Over Head Charges @ 8% on (a+b) 14.30
d)Contractor's Profit @ 10% on (a+b+c) 19.30
Cost for 1.25 cum = a+b+c+d 212.34
Rate per cum = (a+b+c+d)/ 1.25 169.87
say 170.00
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
Rate per cum = (a+b+c+d)/ 1.25 139.97
say 140.00
2.4(VA) 202 e) Steel Work in all types of sections upto height of 5m above plinth level
excluding cutting of rivet.
Unit = tonne
Taking output = 1 tonne
Including dismembering
a) Labour
Mate day 0.140 125.00 17.50 L-01
Blacksmith day 1.000 90.92 90.92 L-14
Mazdoor for dismantling, loading and unloading day 2.500 84.91 212.26 L-03
Add 2.5 per cent of cost of labour for gas cutting, ropes, pulleys etc. 8.02
b) Machinery
Tractor-trolley
For I st km hour 0.170 234.00 39.78 P&M-053
Next 2 km t.km 2.000 8.37 16.74 P&M-095
c)Over Head Charges @ 8% on (a+b) 30.82
d)Contractor's Profit @ 10% on (a+b+c) 41.60
Rate per tonne = a+b+c+d 457.64
say 458.00
2.4(iv) 202 f) Wood Work wrought framed and fixed in frames of trusses upto a
height of 5 m above plinth level
a) Labour
Mate day 0.060 125.00 7.50 L-01
Carpenter day 0.500 104.66 52.33 L-07
Mazdoor for dismantling, loading and unloading. day 1.000 84.91 84.91 L-03
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
b) Machinery
Tractor-trolley
For I st km hour 0.270 234.00 63.18 P&M-053
Next 2 km t.km 1.750 8.37 14.65 P&M-095
2.4(ix) 202 g) Removing all type of Hume Pipes and Stacking within a lead of 1000
(A+B+C) metres including Earthwork and Dismantling of Masonry Works.
Unit = metre
Taking output = 1 metre
A Upto 600 mm to 1200 mm dia
a) Labour
Mate day 0.03 125.00 4.17 L-01
Mazdoor day 0.81 84.91 68.49 L-03
c)Over Head Charges @ 8% on (a+b) 5.81
d)Contractor's Profit @ 10% on (a+b+c) 7.85
Rate per metre = a+b+c 86.32
say 86.00
Not 1. The excavation of earth, dismantling of stone masonry work in head walls
e and protection works is not included which is to be measured and paid
separately.
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
2. Credit for retrieved stone from masonry work may be taken as per actual
availability.
2.5(IB) 202 Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to
a lead of 3000 metres, stacking serviceable and unserviceable materials
separately
Unit = cum
Taking output = 1 cum
h) Granular courses
a) Labour
Mate day 0.040 125.00 5.00 L-01
Mazdoor for dismantling, loading and unloading. day 1.000 84.91 84.91 L-03
b) Machinery
Tractor-trolley
For I st km hour 0.330 234.00 77.22 P&M-053
Next 2 km t.km 3.600 8.37 30.13 P&M-095
c)Over Head Charges @ 8% on (a+b) 15.78
d)Contractor's Profit @ 10% on (a+b+c) 21.30
Rate per cum = a+b+c+d 234.34
say 234.00
By Mechanical Means
2.5(IIA) 202 i) Bituminous course
a) Labour
Mate day 0.010 125.00 1.25 L-01
Mazdoor day 0.300 84.91 25.47 L-03
b) Machinery
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
Tractor-trolley
For I st km hour 0.380 234.00 88.92 P&M-053
Next 2 km t.km 4.720 8.37 39.51 P&M-095
Farm tractor with ripper @ 60 cum per hour hour 0.017 252.00 4.28 P&M-055
c)Over Head Charges @ 8% on (a+b) 12.75
d)Contractor's Profit @ 10% on (a+b+c) 17.22
Rate per cum = a+b+c+d 189.41
189.00
or 189.00
3.15 305.4.3 j) Scarifying existing Bituminous surface to a depth of 50 mm by
mechanical means and disposal of scarifying material within all lifts and
lead upto 3000m.
unit = sqm
Taking output = 100 sqm
a) Labour
Mate day 0.010 125.00 1.25 L-01
Mazdoor day 0.250 84.91 21.23 L-03
b) Machinery
Tractor with ripper attachmant @ 60 cum per hour hour 0.080 252.00 20.16 P&M-055
Front end loader hour 0.200 520.00 104.00 P&M-017
Tipper 5.5 cum capacity,4 trips per hour
I st km hour 0.230 200.00 46.00 P&M-048
next 2 km t.km 23.600 1.74 41.06 P&M-047
c)Over Head Charges @ 8% on (a+b) 18.70
d)Contractor's Profit @ 10% on (a+b+c) 25.24
Rate for 100 sqm = a+b+c+d 277.64
Rate per sqm = (a+b+c+d)/100 2.78
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
say 2.80
2.13 202 k) Removal of Cement Concrete Pipe of Sewer Gutter
Removal of cement concrete pipe of sewer gutter 1500 mm dia under the
supervision of concerned department including disposal with all lifts and up to
a lead of 3000 metres and stacking of serviceable and unserviceable material
separately but excluding earth excavation and dismantling of masonry works.
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
Taking out put=10sqm
By Mechanical Means
a) Permenant building
a) plinth area with RCC roof slab sqm 10.000 100.00 1000.00
b) compound wall sqm 15.000 35.00 525.00
b)Dismantling of windows,doors etc Ls 200.00
Dismantling of alamirah, slab etc Ls 150.00
Tipper 5.5 cum capacity,4 trips per hour
1 st km hour 0.230 200.00 46.00
next 2 km t.km 50.000 1.74 87.00
c)Over Head Charges @ 8% on (a+b) 150.00
d)Contractor's Profit @ 10% on (a+b+c) 215.80
Cost for 10 metres = a+b+c+d 2373.80
Rate per sq metre = (a+b+c+d)/10 237.38
say 237.00
b) Semi permenant building
a) plinth area sqm 10.000 50.00 500.00
b) compound wall sqm 15.000 25.00 375.00
b)Dismantling of windows,doors etc Ls 200.00
Dismantling of alamirah, slab etc Ls 150.00
Tipper 5.5 cum capacity,4 trips per hour
I st km hour 0.230 200.00 46.00
next 2 km t.km 22.000 1.74 38.28
c)Over Head Charges @ 8% on (a+b) 104.74
d)Contractor's Profit @ 10% on (a+b+c) 141.40
Cost for 10 metres = a+b+c+d 1555.42
Rate per sq metre = (a+b+c+d)/10 155.54
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
say 156.00
c) Temperory building
a) plinth area sqm 10.000 50.00 500.00
b)Fencing m 15.000 10.00 150.00
c)Dismantling of windows,doors etc Ls 50.00
Tipper 5.5 cum capacity,4 trips per hour
I st km hour 0.230 200.00 46.00
next 2 km t.km 22.000 1.74 38.28
c)Over Head Charges @ 8% on (a+b) 62.74
d)Contractor's Profit @ 10% on (a+b+c) 84.70
Cost for 10 metres = a+b+c+d 931.72
Rate per sq metre = (a+b+c+d)/10 93.17
say 94.00
m) Removal of existing asphaltic wearing coat over the bridge deck
including disposal with all lifts and lead upto 3000 m
unit = sqm
Taking output = 10 sqm
a) Labour
Mate day 0.030 125.00 3.75 L-01
Mazdoor day 0.750 84.91 63.68 L-03
b) Machinery
Air compressor hour 0.750 206.00 154.50 P&M-001
Tractor trolley
1 st km hour 0.400 234.00 93.60 P&M-053
Next 2 km t.km 3.250 8.37 27.20 P&M-095
c)Over Head Charges @ 8% on (a+b) 27.42
d)Contractor's Profit @ 10% on (a+b+c) 37.02
Cost for 10 sqm = a+b+c+d 407.17
Rate per sqm = (a+b+c+d)/10 40.72
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
say 41.00
1.04 202 Back filling with granular material in the deep wells as per Technical
Specifications Clause and as directed by the engineer
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.280 125.00 35.00 L-01
Mazdoor day 7.000 84.91 594.34 L-03
b) Material
Gravel cum 8.000 149.32 1194.54 M-019
stone dust cum 4.000 231.61 926.45 M-003
c) Machinery
water tanker hour 0.050 160.00 8.00 P&M-060
plate compactor hour 2.500 50.00 125.00 P&M-086
d)Over Head Charges @ 8% on (a+b+c) 230.67
e)Contractor's Profit @ 10% on (a+b+c+d) 311.40
Rate per cum = (a+b+c+d+e)/10 342.54
say 343.00
1.05 2.10 202 Dismantling of Kilometre stone
Dismantling of Kilometre stone including cutting of earth, foundation
and disposal of dismantled material with all lifts and leads upto 1000 m
and backfilling of pit
Unit = Each
Taking output = one KM stone
2.10A A). 5th KM stone
Quanity of cement concrete = 0.392 cum
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
a) Labour
Mate day 0.130 125.00 16.25 L-01
Mazdoor day 0.750 84.91 63.68 L-03
b) Machinery
Tractor trolley hour 0.150 234.00 35.10 P&M-053
c)Over Head Charges @ 8% on (a+b) 9.20
d)Contractor's Profit @ 10% on (a+b+c) 12.42
Rate for one Vth KM stone = (a+b+c+d) 136.65
say 137.00
Ref. to
Ref. to
MoRTH
Sl No MoRTH Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No.
b) Machinery
Tractor trolley hour 0.020 234.00 4.68 P&M-053
c)Over Head Charges @ 8% on (a+b) 1.09
d)Contractor's Profit @ 10% on (a+b+c) 1.48
Rate for one Hectometre stone = (a+b+c+d) 16.24
say 16.00
CHAPTER - 2
EARTH WORK
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Earthwork in excavation in all type of soil including ordinary rock and
2.01 301 A) excluding marshy soil.
3.6 301 a) Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with
Disposal upto 5000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket
capacity including cutting and loading in tippers, trimming bottom and side
slopes, in accordance with requirements of lines, grades and cross sections,
and transporting all usable material to the embankment location within all lifts
and lead upto 5000 m and as directed by engineer.
Unit = cum
Taking output = 360 cum (720T) day
a) Labour
Mate day 0.08 125.00 10.00
Mazdoor day 2.00 200.00 400.00
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 60 cum per hour hour 6.00 840.00 5040.00
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 16.00 200.00 3200.00
For next 4 km lead t.km 2880.00 1.74 5011.20
c)Over Head Charges @ 8% on (a+b) 1092.90
d)Contractor's Profit @ 10% on (a+b+c) 1475.41
Cost for 360 cum = a+b+c+d 16229.51
Rate per cum = (a+b+c+d)/360 45.08
say 45.00
3.7 301 b) Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and
Tippers with Disposal upto 5000 metres.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Excavation for roadwork in ordinary rock with hydraulic excavator of 0.9 cum
bucket capacity including cutting and loading in tippers, trimming bottom and
side slopes, in accordance with requirements of lines, grades and cross
sections, and transporting all usable material to the embankment location
within all lifts and lead upto 5000 m and as directed by engineer.
Unit = cum
Taking output = 240 cum (540t)
a) Labour
Mate day 0.08 125.00 10.00
Mazdoor day 2.00 84.91 169.81
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity @ 36 cum per hour hour 6.00 840.00 5040.00
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 11.00 200.00 2200.00
For next 4 km lead t.km 2160.00 1.74 3758.40
c)Over Head Charges @ 8% on (a+b) 894.26
d)Contractor's Profit @ 10% on (a+b+c) 1207.25
Cost for 240 cum = a+b+c+d 13279.72
Rate per cum = (a+b+c+d)/240 55.33
say 55.00
A) Earthwork in excavation in all type of soil including ordinary rock and
2.01 (3.6+3.7) 301 excluding marshy soil.
Average rate (a+b)= 45+55/2 50.00
say 50.00
3.6 301 a) Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with
Disposal upto 1000 metres.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Excavation for roadwork in soil including marshy soil with hydraulic excavator
of 0.9 cum bucket capacity including cutting and loading in tippers, trimming
bottom and side slopes, in accordance with requirements of lines, grades and
cross sections,disposal of the unusable materials upto a lead of 1000 m and
as directed by engineer.
Unit = cum
Taking output = 360 cum (720T)
a) Labour
Mate day 0.08 125.00 10.00
Mazdoor day 2.00 84.91 169.81
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 60 cum per hour hour 6.00 840.00 5040.00
Tipper 5.5 cum capacity, 4 trips per hour. hour 16.00 200.00 3200.00
c)Over Head Charges @ 8% on (a+b) 673.58
d)Contractor's Profit @ 10% on (a+b+c) 909.34
Cost for 360 cum = a+b+c+d 10002.74
Rate per cum = (a+b+c+d)/360 27.79
say 28.00
3.7 301 b) Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and
Tippers with Disposal upto 1000 metres.
Excavation for roadwork in ordinary rock with hydraulic excavator of 0.9 cum
bucket capacity including cutting and loading in tippers, trimming bottom and
side slopes, in accordance with requirements of lines, grades and cross
sections,disposal of the unusable materials upto a lead of 1000 m and as
directed by engineer.
Unit = cum
Taking output = 240 cum (540t)
a) Labour
Mate day 0.08 125.00 10.00
Mazdoor day 2.00 84.91 169.81
b) Machinery
Hydraulic Excavator 0.90 cum bucket capacity @ 36 cum per hour hour 6.00 840.00 5040.00
Tipper 5.5 cum capacity, 4 trips per hour. hour 11.00 200.00 2200.00
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
c)Over Head Charges @ 8% on (a+b) 593.58
d)Contractor's Profit @ 10% on (a+b+c) 801.34
Cost for 240 cum = a+b+c+d 8814.74
Rate per cum = (a+b+c+d)/240 36.73
say 37.00
Earthwork in excavation in all type of soil including ordinary rock and
2.01 (3.6+3.7) B) marshy soil.
Average Rate (a+b)= 28+37/2 33.00
say 33.00
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Cost for 36 cum = a+b+c+d 5662.09
Rate per cum = (a+b+c+d)/36 157.28
say 157.00
Note 1. The quality and availability of rock shall be checked before affording credit.
2. In case some rock is issued to the contractor at site, the item of carriage
shall be restricted/reduced to that extent.
3.Being small quantity, manual loading will be economical in this case and
has been provided accordingly.
2.03 3.9 301 Excavation in Hard Rock (controlled blasting) with disposal upto 1000
metres
Excavation for roadway in hard rock with Controlled Blasting by drilling,
blasting and breaking, trimming of bottom and side slopes in accordance with
requirements of lines, grades and cross sections, loading in tipper and
stacking neatly the useful material for disposal by auction or utilising for
masonry and structural works as decided by the engineer and disposal of
unusable materials with all lifts and leads upto 1000 metres
Unit = cum
Taking output = 180 cum(432)
a) Labour
Mate day 0.22 125.00 27.50
Mazdoor day 3.00 84.91 254.72
Driller day 2.00 85.65 171.30
Blaster day 0.50 94.35 47.18
b) Machinery
Dozer 80 HP @ 30 cum per hour hour 6.00 2400.00 14400.00
Air compressor, 250 cfm with 2 jack hammers hour 6.00 206.00 1236.00
Front end loader 1 cum bucket capacity hour 6.00 520.00 3120.00
Tipper 5.5 cum capacity, 4 trips per hour. hour 8.20 200.00 1640.00
c) Materials
Gelatin 80 per cent kg 63.00 50.00 3150.00
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Electric Detonators @ 1 detonator for1/2 gelatin stick of 125 gms each each 1008.00 10.75 10836.00
Credit for exacavated rock found suitable for use@ 50 percent of cum 90.00 160.00 14400.00
excavated quantity blasted.
2.04 3.5 301 Excavation in Hard Rock (Requiring blasting) with disposal upto 1000
metres
Excavation for roadway in hard rock with Requiring Blasting by drilling,
blasting and breaking, trimming of bottom and side slopes in accordance with
requirements of lines, grades and cross sections, loading in tipper and
stacking neatly the useful material for disposal by auction or utilizing for
masonry or structural works as decided by the engineer and disposal of
unusable materials with all lifts and leads upto 1000 metres
Unit = cum
Taking output = 180 cum(432)
a) Labour
Mate day 0.22 125.00 27.50
Mazdoor day 3.00 84.91 254.72
Driller day 2.00 85.65 171.30
Blaster day 0.25 94.35 23.59
b) Machinery
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Dozer 80 HP @ 30 cum per hour hour 6.00 2400.00 14400.00
Air compressor, 250 cfm with 2 jack hammers hour 6.00 206.00 1236.00
Front end loader 1 cum bucket capacity hour 6.00 520.00 3120.00
Tipper 5.5 cum capacity, 4 trips per hour. hour 11.25 200.00 2250.00
c) Materials
Gelatin 80 per cent kg 63.00 50.00 3150.00
Electric Detonators @ 1 detonator for 2 gelatin stick of 125 gms each each 252.00 10.75 2709.00
Credit for exacavated rock found suitable for use@ 50 percent of cum 90.00 160.00 14400.00
excavated quantity blasted.
d)Over Head Charges @ 8% on (a+b+c) 2187.37
e)Contractor's Profit @ 10% on (a+b+c+d) 2952.95
Cost for 180 cum = a+b+c+d+e 18082.42
Rate per cum = (a+b+c+d+e)/180 100.46
say 100.00
Note: 1. The Quantity and availability of rock shall be checked before affording
credit.
2. In case some rock is issued to the contractor at site, the item of carruage
shall be reduced/ restricted to that extent.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Cost for 10 cum = (a+b+c+d) 819.16
Rate per cum = (a+b+c+d)/10 81.92
say 82.00
2.06 3.16 305 Construction of embankment with approved material obtained from
borrow pits
Construction of embankment with approved material obtained from borrow
pits with all lifts and leads upto 5000 m, transporting to site, spreading,
grading to required slope and compacting to meet requirement of table 300-
2.
Unit = cum
Taking output = 100 cum (160 T )
a) Labour
Mate day 0.04 125.00 5.00
Mazdoor day 1.00 84.91 84.91
b) Machinery
Hydraulic Excavator1 cum bucket capacity @ 60 cum per hour hour 1.67 840.00 1402.80
Tipper 10 tonne capacity( avg. lead 5 km) tonne 800.00 1.74 1392.00
.km
Add 10 per cent of cost of carriage to cover cost of loading and 139.20
unloading
Dozer 80 HP for spreading @ 200 cum per hour hour 0.50 2400.00 1200.00
Motor grader for grading @ 100 cum per hour hour 1.00 1545.00 1545.00
Water tanker6 KL capacity hour 4.00 160.00 640.00
Vibratory roller 8 -10 tonnes @ 100 cum per hour hour 1.00 994.00 994.00
c) Material
Cost of water KL 24.00 100.00 2400.00
Compensation for earth taken from private land Cum 100.00 56.50 5650.00
c)Over Head Charges @ 8% on (a+b) 1236.23
d)Contractor's Profit @ 10% on (a+b+c) 1668.91
Cost for 100 cum = a+b+c+d 18358.05
Rate per cum = (a+b+c+d)/100 183.58
say 184.00
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Note: Compensation for earth will vary from place to place and will have to be
assessed realistically as per particular ground situation. In case earth is
available from Govt. land, compensation for earth will not be required. The
position is required to be clearly stated in the cost estimate.
Dozer 80 HP for spreading @ 200 cum per hour hour 0.50 2400.00 1200.00
Motor grader for grading @ 50 cum per hour hour 2.00 1545.00 3090.00
Water tanker6 KL capacity hour 4.00 160.00 640.00
Mixer hour 16.00 150.00 2400.00
Vibratory roller 8 -10 tonnes @ 100 cum per hour hour 1.25 994.00 1242.50
c) Material
Gravel cum 30.00 149.32 4479.54
stone dust cum 40.00 231.61 9264.53
compensetation of land, for soil taken from borrow area cum 50.00 56.50 2825.00
Cost of water KL 24.00 100.00 240.00
d)Over Head Charges @ 8% on (a+b+c) 2303.06
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
e)Contractor's Profit @ 10% on (a+b+c+d) 3109.13
Cost for 100 cum = a+b+c+d+e 34200.47
Rate per cum = (a+b+c+d+e)/100 342.00
say 342.00
2.08 3.17 305 Construction of Embankment with Material Deposited from Roadway
Cutting
Construction of embankment with approved materials deposited at site from
roadway cutting and excavation from drain and foundation of other structures
graded and compacted to meet requirement of table 300-2.
Unit = cum
Taking output = 100 cum
a) Labour
Mate day 0.02 125.00 2.50
Mazdoor day 0.50 84.91 42.45
b) Machinery
Dozer 80 HP for spreading @ 200 cum per hour hour 0.50 2400.00 1200.00
Motor grader for grading @ 100 cum per hour hour 1.00 1545.00 1545.00
Water tanker6 KL capacity hour 4.00 160.00 640.00
Vibratory roller 8-10 tonnes @ 100 cum per hour hour 1.00 994.00 994.00
c) Material
Cost of water KL 24.00 100.00 2400.00
d)Over Head Charges @ 8% on (a+b+c) 545.92
e)Contractor's Profit @ 10% on (a+b+c+d) 736.99
Rate for 100 cum = a+b+c+d+e 8106.86
Rate per cum = (a+b+c+d+e)/100 81.07
say 56.00
Note: In case the earth cutting is done by dozer and pushed for filling in the
embankment, the input of dozer in the cost of embankment shall be deleted
as the same is already provided in the cost of excavation. However, if the
earth is dumped by tippers from roadway cutting, the input of dozer for
spreading is required to be provided.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
a) Labour
Mate day 0.080 125.00 10.00
Mazdoor day 2.000 84.91 169.81
b) Machinery
Tractor with ripper attachment hour 6.000 252.00 1512.00
Vibratory road roller 8-10 tonne capacity hour 7.500 994.00 7455.00
Water tanker6 KL capacity hour 4.000 160.00 640.00
c) Material
Cost of water KL 24.000 100.00 2400.00
d)Over Head Charges @ 8% on (a+b+c) 974.94
e)Contractor's Profit @ 10% on (a+b+c+d) 1316.18
Cost for 600 cum = (a+b+c+d+e) 14477.93
Rate per sqm = (a+b+c+d+e)/600 24.13
say 24.00
2.10 4.14 407 a) Construction of Median and Island with Soil Taken from Borrow area
A
Construction of median and Island above road level with approved material
brought from borrow pits with lift and leads up to 5000m, spread, sloped and
compacted as per clause 407
Unit = cum
Taking output =21 cum
a) Labour
Mate day 0.16 125.00 20.00
Mazdoor day 4.00 84.91 339.62
b) Machinery
Water tanker 6 KL capacity hour 1.00 160.00 160.00
Plate compactor @ 3.5 cum per hour hour 6.00 50.00 300.00
Hydraulic Excavator1.0 cum bucket capacity @60 cum per hour hour 0.500 840.00 420.00
Tipper 10 tonne capacity tonne 262.500 1.74 456.75
.km
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Add 10 per cent of cost of transportation to cover cost of loading and 45.68
unloading
c) Material
Cost of water KL 6.00 100.00 600.00
Compensation of Land cum 21.00 56.50 1186.50
d)Over Head Charges @ 8% on (a+b+c) 187.36
e)Contractor's Profit @ 10% on (a+b+c+d) 371.59
Cost for 21 cum = a+b+c+d+e 4087.50
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
e)Contractor's Profit @ 10% on (a+b+c+d) 556.48
Rate per cum = (a+b+c+d)/21 291.49
say 291.00
unit = cum
Taking output = 100 cum
a) Labour
Mate day 0.04 91.489 3.66
Mazdoor day 1.00 84.906 84.91
b) Machinery
Hydraulic Excavator 1 cum bucket capacity@ 60 cum per hour hour 1.67 840.00 1402.80
Tipper 10 tonne capacity t.km 875.00 1.74 1522.50
Add 10 percent of cost of carriage to cover cost of loading and unloading 152.25
Dozer 80HP for spreading@200 cum per hour hour 0.50 2400.00 1200.00
Motorgrader for grading@50cum per hour hour 2.00 1545.00 3090.00
Water tanker with 6KL capacity hour 4.00 160.00 640.00
Vibratory roller 8-10 tonnes@80 cum per hour hour 1.25 994.00 1242.50
c) Material
cost of water KL 24.00 188.125 4515.00
Compensation for earth taken from private land cum 100.00 56.50 5650.00
d)Over Head Charges @ 8% on (a+b+c) 1560.29
e)Contractor's Profit @ 10% on (a+b+c+d) 2106.39
Rate per cum = (a+b+c+d)/100 231.70
CHAPTER - 2
EARTH WORK
Remarks
L-01
L-03
P&M-026
P&M-048
P&M-047
Remarks
L-01
L-03
P&M-026
P&M-048
P&M-047
Remarks
L-01
L-03
P&M-026
P&M-048
L-01
L-03
P&M-026
P&M-048
Remarks
L-01
L-03
P&M-026
P&M-048
M-140
Remarks
L-01
L-03
L-20
L-17
P&M-014
P&M-001
P&M-017
P&M-048
M-045
Remarks
M-046
M-140
L-01
L-03
L-20
L-17
Remarks
P&M-014
P&M-001
P&M-017
P&M-048
M-045
M-046
M-140
L-01
L-03
P&M-014
Remarks
L-01
L-03
P&M-026
P&M-047
P&M-014
P&M-032
P&M-060
P&M-059
M-047
M-048
Remarks
L-01
L-03
P&M-026
P&M-047
P&M-014
P&M-032
P&M-060
P&M-010
P&M-059
M-019
M-003
M-048
M-047
Remarks
L-01
L-03
P&M-014
P&M-032
P&M-060
P&M-059
M-047
Remarks
L-01
L-03
P&M-055
P&M-032
P&M-060
P&M-059
M-047
Remarks
L-01
L-03
P&M-055
P&M-059
P&M-060
M-047
L-01
L-03
P&M-060
P&M-086
P&M-026
P&M-047
Remarks
M-047
L-01
L-03
M-019
M-047
P&M-060
P&M-086
Remarks
L-01
L-03
P&M-060
P&M-086
M-074
CHAPTER - 3
PAVEMENT COURSES - GRANULAR
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
3.01 4.1(I) 401 A Granular Sub-Base with Close Graded Material (Table:- 400-1)
(A)
Plant Mix Method
Construction of granular sub-base by providing close graded Material,
mixing in a mechanical mix plant at OMC, carriage of mixed Material
to work site, spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory power roller to
achieve the desired density, complete as per clause 401
Unit = cum
Taking output = 225 cum (495tonne)
a) Labour
Mate day 0.400 125.00 50.00
Mazdoor skilled day 2.000 88.68 177.37
Mazdoor day 8.000 84.91 679.25
b) Machinery
Wet mix plant @ 75 tonne capacity per hour hour 6.000 777.00 4662.00
Electric generator 125 KVA hour 6.000 450.00 2700.00
Water tanker 6 KL capacity 5 km lead with one trip per hour hour 4.500 160.00 720.00
Front end loader 1 cum bucket capacity hour 6.000 520.00 3120.00
Tipper 10 tonne tonne. 4950.000 1.74 8613.00
km
Add 10 per cent of cost of carriage to cover loading and 861.30
unloading
Motor Grader 110 HP hour 6.000 1545.00 9270.00
Vibratory roller 8-10 t hour 6.000 994.00 5964.00
c) Material
For Grading- I Material
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
53 mm to 9.5 mm @ 50 % cum 144.000 470.03 67684.39
9.5 mm to 2.36 mm @ 20 % cum 57.000 526.43 30006.23
2.36 mm and below @ 30 % cum 86.400 231.61 20011.39
Cost of water KL 27.000 100.00 2700.00
d)Over Head Charges @ 8% on (a+b+c) 12577.51
e)Contractor's Profit @ 10% on (a+b+c+d) 16979.64
Cost for 225 cum = a+b+c+d+e 186776.08
Rate per cum = (a+b+c+d+e)/225 830.12
say 830.00
Note Any one of the grading for material may be adopted as per design
3.01 4.2(I) 401 Granular Sub-Base with Coarse Graded Material (Table:- 400-2)
(B)
Plant Mix Method
Construction of granular sub-base by providing coarse graded
Material, mixing in a mechanical mix plant at OMC, carriage of mixed
Material to work site, spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory power roller to
achieve the desired density, complete as per clause 401
Unit = cum
Taking output = 300cum (660 tonne)
a) Labour
Mate day 0.400 125.00 50.00
Mazdoor skilled day 2.000 88.68 177.37
Mazdoor day 8.000 84.91 679.25
b) Machinery
Motor Grader 110 HP hour 6.000 1545.00 9270.00
Vibratory roller 8-10 t hour 6.000 994.00 5964.00
Water tanker 6 KL capacity 5 km lead with one trip per hour hour 3.000 160.00 480.00
Tractor- Rotavator hour 12.000 245.00 2940.00
c) Material
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
For Grading I Material
53 mm to 26.5 mm @ 35 % cum 134.400 477.77 64211.85
26.5 mm to 2.36 mm @ 45 % cum 172.800 560.36 96830.75
2.36 mm and below @ 20% cum 76.800 231.61 17787.90
Cost of water KL 18.000 100.00 1800.00
d)Over Head Charges @ 8% on (a+b+c) 16015.29
e)Contractor's Profit @ 10% on (a+b+c+d) 21620.64
Cost for 300 cum = a+b+c+d+e 237827.05
Rate per cum = (a+b+c+d+e)/300 792.76
say 793.00
Note Any one of the grading for material may be adopted as per design
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Front end loader 1 cum capacity hour 6.000 520.00 3120.00
Paver finisher hour 6.000 629.00 3774.00
Vibratory roller 8 - 10 tonne hour 3.900 994.00 3876.60
Water tanker 6 KL capacity hour 3.000 160.00 480.00
Tipper tonne. 4950.000 1.74 8613.00
km
Add 10 per cent of cost of carriage to cover cost of loading and 861.30
unloading
c) Material ( Table 400-11)
45 mm to 22.4 mm@ 30 per cent cum 89.100 477.77 42569.02
22.4 mm to 2.36 mm @ 40 per cent cum 118.800 560.36 66571.14
2.36 mm to 75 micron@ 30 per cent cum 89.100 231.61 20636.74
Cost of water KL 18.000 100.00 1800.00
d)Over Head Charges @ 8% on (a+b+c) 13046.50
e)Contractor's Profit @ 10% on (a+b+c+d) 17612.77
Cost for 225 cum = a+b+c+d+e 193740.50
Rate per cum = (a+b+c+d+e)/225 861.07
say 861.00
Note 1. Though vibratory roller is required only for 3 hours as per norms,
the same is required to be available at site for 6 hours to match with
other machines. The usage rates of vibratory roller may be multiplied
with a factor of 0.65
2. As three wheeled smooth steel rollers are commonly in use, the
same has been provided as an alternative which can be used if the
thickness of individual layer does not exceed 100 mm..
CHAPTER - 3
PAVEMENT COURSES - GRANULAR
Remarks
L-01
L-02
L-03
P&M-062
P&M-018
P&M-060
P&M-017
P&M-047
P&M-032
P&M-059
Remarks
M-001
M-002
M-003
M-047
L-01
L-02
L-03
P&M-032
P&M-090
P&M-060
P&M-054
Remarks
M-015
M-016
M-003
M-047
L-01
L-02
L-03
P&M-062
P&M-018
Remarks
P&M-017
P&M-035
P&M-059
P&M-060
P&M-047
M-004
M-005
M-003
M-047
CHAPTER - 4
PAVEMENT COURSES - BITUMINOUS
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.25 kg per sqm on the prepared
granular surface cleaned with mechanical broom.
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate day 0.080 125.00 10.00
Mazdoor day 2.000 84.91 169.81
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 2.800 230.00 644.00
Air compressor 250 cfm hour 2.800 206.00 576.80
Emulsion pressure distributor @ 1750 sqm per hour hour 2.000 516.00 1032.00
c) Material
Bitumen emulsion @ 0.25 kg per sqm tonne 0.875 15998.80 13998.95
d)Over Head Charges @ 8% on (a+b+c) 1314.53
e)Contractor's Profit @ 10% on (a+b+c+d) 1774.61
Cost for 3500 sqm = a+b+c+d+e 19520.70
Rate per sqm = (a+b+c+d+e)/3500 5.58
say 6.00
4.02 5.2 503 b) Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
bituminous surface cleaned with mechanical broom.
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate day 0.080 125.00 10.00
Mazdoor day 2.000 84.91 169.81
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 2.800 230.00 644.00
Air compressor 250 cfm hour 2.800 206.00 576.80
Emulsion pressure distributor @ 1750 sqm per hour hour 2.000 516.00 1032.00
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
c) Material
Bitumen emulsion @ 0.2 kg per sqm tonne 0.700 15998.80 11199.16
d)Over Head Charges @ 8% on (a+b+c) 1090.54
e)Contractor's Profit @ 10% on (a+b+c+d) 1472.23
Cost for 3500 sqm = a+b+c+d+e 16194.55
Rate per sqm = (a+b+c+d+e)/3500 4.63
say 5.00
4.03 5.3(ii) 504 Bituminous Macadam
Providing and laying bituminous macadam with 100-120 TPH hot mix
plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading premixed with bituminous binder,
transported to site, laid over a previously prepared surface with paver
finisher to the required grade, level and alignment and rolled as per
clauses 501.6 and 501.7 to achieve the desired compaction
Unit = cum
Taking output = 205 cum (450 tonnes)
a) Labour
Mate day 0.840 125.00 105.00
Mazdoor working with HMP, mechanical broom, paver, roller, asphalt day 16.000 84.91 1358.49
cutter and assistance for setting out lines, levels and layout of
construction
Skilled mazdoor for checking line & levels day 5.000 88.68 443.42
b) Machinery
Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output hour 6.000 15100.00 90600.00
Mechanical broom hydraulic @ 1250 sqm per hour hour 2.200 230.00 506.00
Air compressor 250 cfm hour 2.200 206.00 453.20
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 1725.00 10350.00
Generator 250 KVA hour 6.000 600.00 3600.00
Front end loader 1 cum bucket capacity hour 6.000 520.00 3120.00
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Note: *1. Although the rollers are required only for 3 hours as per norms of
output, but the same have to be available at site for six hours as the hot
mix plant and paver will take six hours for mixing and paving the output of
450 tonnes considered in this analysis. To cater for the idle period of
these rollers, their usage rates have been multiplied by a factor of 0.65.
2.Quantity of Bitumen has been taken for analysis purpose. The actual
quantity will depend upon job mix formula.
3. Labour for traffic control, watch and ward and other miscellaneous
duties at site including sundries have been included in administrative
overheads of the contractor.
4. In case BM is laid over freshly laid tack coat, provision of Mechanical
broom and 2 mazdoors for the same shall be deleted as the same has
been included in the cost of tack coat.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Skilled mazdoor for checking line & levels day 5.000 88.68 443.42
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000 11167.00 67002.00
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 1725.00 10350.00
Generator 250 KVA hour 6.000 600.00 3600.00
Front end loader 1 cum bucket capacity hour 6.000 520.00 3120.00
Tipper 10 tonne capacity tonne.km 4950.0 1.74 8613.00
Add 10 per cent of cost of carriage to cover cost of loading and 861.30
unloading
*smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 3.900 297.00 1158.30
*Vibratory roller 8 tonnes for intermediate rolling. hour 3.900 994.00 3876.60
*Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 3.900 738.00 2878.20
c) Materials
Bitumen 60/70 @ 4.5 per cent of weight of mix (Grade II, 19mm tonne 20.250 13578.92 274973.18
nominal size)
Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 20.25 tonnes
Weight of aggregate = 450 -20.25 = 429.75 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 286.50 cum 286.50
Grading - II 19 mm (Nominal Size)
25 - 10 mm 30 per cent cum 85.950 609.43 52380.53
10 - 5 mm 28 per cent cum 80.220 560.77 44985.13
5 mm and below 40 per cent cum 114.600 369.00 42287.55
cement Filler @ 2 % of weight of aggregates tonne 8.595 231.61 1990.72
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Providing and laying semi dense bituminous concrete with 100-120 TPH
batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous
binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to
work site, laying with a hydrostatic paver finisher with sensor control to
the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per
MoRTH specification clause No. 508 complete in all respects
Unit = cum
Taking output = 195 cum (450 tonnes)
a) Labour
Mate day 0.840 125.00 105.00
Mazdoor working with HMP, mechanical broom, paver, roller, asphalt day 16.000 84.91 1358.49
cutter and assistance for setting out lines, levels and layout of
construction
Skilled mazdoor for checking line & levels day 5.000 88.68 443.42
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000 11167.00 67002.00
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 1725.00 10350.00
Generator 250 KVA hour 6.000 600.00 3600.00
Front end loader 1 cum bucket capacity hour 6.000 520.00 3120.00
Tipper 10 tonne capacity tonne.km 4050.000 1.74 8613.00
Add 10 per cent of cost of carriage to cover cost of loading and 861.30
unloading
*Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 3.900 297.00 1158.30
*Vibratory roller 8 tonnes for intermediate rolling. hour 3.900 994.00 3876.60
*Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour 3.900 738.00 2878.20
c) Material
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
4. In case SDBC is laid over freshly laid tack coat, provision of broom and
2 mazdoor shall be deleted as the same has been included in the cost of
tack coat.
5. The quantity of Bitumen to be adjusted as per job mix formula.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Add 10 per cent of cost of carriage to cover cost of loading and 861.30
unloading
*Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 3.900 297.00 1158.30
*Vibratory roller 8 tonnes for intermediate rolling. hour 3.900 994.00 3876.60
*Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 3.900 738.00 2878.20
c) Material
i) Bitumen@ 5.5 per cent of weight of mix tonne 24.750 16075.07 397858.04
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 24.75 tonnes
Weight of aggregate = 450 -24.75 = 425.25 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 283.5 cum
Grading - I-19 mm (Nominal Size)
20 - 10 mm @ 35 per cent cum 99.225 618.02 61322.74
10 - 5 mm @ 23 per cent cum 65.205 560.77 36565.14
5 mm and below 40 per cent cement cum 113.400 369.00 41844.74
Filler @ 2 per cent of weight of aggregates(rate of cement) tonne 8.550 3756.85 32121.07
d)Over Head Charges @ 8% on (a+b+c) 53846.24
e)Contractor's Profit @ 10% on (a+b+c+d) 72692.43
Cost for 191 cum = a+b+c+d+e 799616.72
Rate per cum = (a+b+c+d+e)/191 4186.47
4186.00
or 4186.00
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Note: *1. Although the rollers are required only for 3 hours as per norms of
output, but the same have to be available at site for six hours as the hot
mix plant and paver will take six hours for mixing and paving the output of
450 tonnes considered in this analysis. To cater for the idle period of
these rollers, their usage rates have been multiplied by a factor of 0.65
2.Quantity of Bitumen has been taken for analysis purpose. The actual
quantity will depend upon job mix formula.
3. Labour for traffic control, watch and ward and other miscellaneous
duties at site including sundries have been included in administrative
overheads of the contractor.
4. In case BC is laid over freshly laid tack coat, provision of mechanical
broom and 2 mazdoors shall be deleted as the same has been included
in the cost of tack coat.
5. The individual density for each size of aggregates to be used for
construction i.e. 37.5-25 mm, 25-10 mm etc. should be found in the
laboratory and accordingly the quantities should be ammended for use in
field. The average density of 1.5 tonne/cum is only a reference density in
this Data Book.
6. The individual percentage of aggregates should be calculated from the
total weight of dry aggregates i.e.. excluding the weight of bitumen. The
weight of filler will also be 2 per cent by weight of dry aggregates.
4.07 5.11 512 Close graded premix surfacing / Mixed Seal Surfacing for temperory
(Type B) diversion and treatment of shoulders.
Mechanical means using HMP of appropriate capacity not less than
75 tonnes/hour.
Providing, laying and rolling of close-graded premix surfacing material of
20 mm thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2
mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen
to the required line, grade and level to serve as wearing course on a
previously prepared base, including mixing in a suitable plant, laying and
rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to
required level and grade.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
unit = sqm
Taking output = 10250 sqm(205 Cum)
a) Labour
Mate day 0.840 125.00 105.00
Mazdoor working with HMP, road sweeper, paver and roller day 16.000 84.91 1358.49
Skilled mazdoor for checking line & levels day 5.000 88.68 443.42
b) Machinery
Hotmix Plant - 120 TPH capacity hour 6.000 15100.00 90600.00
Electric generator set 250 KVA hour 6.000 600.00 3600.00
Front end roller hour 6.000 520.00 3120.00
Tipper 10 tonne capacity t.km 4050.000 1.74 7047.00
Add 10 % of cost carriage to cover cost of loading and unloading 704.70
Paver finisher hydrostatic with sensor attachment hour 6.000 1725.00 10350.00
Smooth wheeled8-10 tonnes weight hour 6.000 297.00 1782.00
c) Materials
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum per 10 sqm cum 276.750 493.03 136446.63
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Unit = cum
Taking output = 450 cum (990 tonne)
a) Labour
Mate day 1.120 125.00 140.00
Mazdoor skilled day 6.000 88.68 532.10
Mazdoor day 22.000 84.91 1867.93
b) Machinery
Front end loader 1 cum bucket capacity hour 6.000 520.00 3120.00
Cement concrete batch mix plant @ 75 cum per hour hour 6.000 2880.00 17280.00
Electric generator 100 KVA hour 6.000 450.00 2700.00
Paver with electronic sensor @ 75 cum/hr. hour 6.000 1850.00 11100.00
Vibratory roller 8-10 t capacity hour 8.000 994.00 7952.00
Water tanker with 5 km lead 6 KL capacity hour 8.000 160.00 1280.00
Tipper tonne.km 8910.0 1.74 15503.40
Add 10 per cent of cost of carriage to cover cost of loading and 1550.34
unloading
c) Material
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes cum 405.000 605.61 245273.64
graded as per table 600-1 @ 0.90 cum/cum of concrete conforming to
clause 602.2.4.
Coarse Sand as per IS: 383 @ 0.45 cum/cum of concrete cum 203.000 395.76 80338.79
Cement @ 200 kg/cum of concrete tonne 67.500 3756.85 253587.38
Water KL 48.000 100.00 4800.00
d)Over Head Charges @ 8% on (a+b+c) 51762.05
e)Contractor's Profit @ 10% on (a+b+c+d) 69878.76
Cost for 450cum = a+b+c+d+e 768666.39
Rate per cum = (a+b+c+d+e)/450 1708.15
say 1708.00
Note The quantities for cement, coarse aggregate and fine aggregates are for
estimating only .The exact quantities will be as per mix design.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
Plastic sheath,1.25 mm thick for dowel bars sqm 46.670 5.38 250.85
Curing compound liter 1850.000 107.50 198875.00
Super plastisizer admixture IS marked as per 9103-1999 @ 0.5 per cent kg 2070.000 125.00 258750.00
by weight of cement
4.10 5.14 515 p.151 Providing and laying 25 mm thick mastic asphalt wearing course
with paving grade bitumen meeting the requirements given in table
500-29, prepared by using mastic cooker and laid to required level
and slope after cleaning the surface, including providing antiskid
surface with bitumen precoated finegrained hard stone chipping of
13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an
approximate spacing of 10 cm center to center in both directions,
pressed into surface when the temperature of surfaces is not less
than 1000C, protruding 1 mm to 4 mm over mastic surface, all
complete as per clause 515.
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
unit = sqm
Taking output = 35.00 sqm (0.87 cum ) assuming a density of 2.3
tonnes/cum.-2 tonnes
a) Labour
Mate day 0.440 125.00 55.00
Mazdoor day 10.000 84.91 849.06
Mazdoor skilled day 1.000 88.68 88.68
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 0.060 230.00 13.80
Air Compressor 250 cfm hour 0.060 206.00 12.36
Mastic cooker 1 tonne capacity hour 6.000 232.00 1392.00
Bitumen Boiler 1500 litres capacity hour 6.000 128.00 768.00
Tractor for towing and positioning of mastic cooker and bitumen boiler hour 1.000 234.00 234.00
c) Material
Base mastic (without coarse aggregates) = 60 per cent
Coarse aggregate (6.3mm to 13.2 mm) = 40 per cent .
Proportion of material required for mastic asphalt with coarse aggregates
(based on mix design done by CRRI for a specific case)
I) Bitumen 85/25 or 30/40 @ 10.2 per cent by weight of mix. 2 x 10.2/100 tonne 0.204 16985.71 3465.08
= 0.204
ii) Fine aggregate passing 2.36mm and retained on 0.075mm sieve @ cum 0.390 231.61 90.33
31.9 per cent by weight of mix = 2 x 31.9/100 = 0.638 tonnes =
0.638/1.625 = 0.39
iii) Lime stone dust filler with calcium content not less than 80 per cent by tonne 0.360 2445.63 880.43
weight @ 17.92 per cent by weight of mix = 2 x 17.92/100 = 0.36
iv) Coarse aggregates 6.3 mm to 13.2 mm @ 40 per cent by weight of cum 0.550 493.03 271.17
mix = 2 x 40/100 = 0.8 MT = 0.8/1.456 = 0.55
Ref. to
Ref. to
Sl MoRTH
MoRTH Description Unit Quantity Rate Rs Cost Rs
No Data book
Spec
Sl No.
v) Pre-coated stone chips of 13.2 mm nominal size for skid resistance = cum 0.018 493.03 8.87
35 x 0.005/10 = 0.018
vi) Bitumen for coating of chips @ 2 per cent by weight = 0.018 x 1.456 x kg 0.500 12.62 6.31
2/100 = 0.0005 MT = 0.5kg
Rate for 35 sqm = a+b+c 8135.09
d)Over Head Charges @ 8% on (a+b+c) 650.81
e)Contractor's Profit @ 10% on (a+b+c+d) 878.59
Total for 35 sqm=a+b+c+d+e 9664.49
Rate per sqm= (a+b+c+d+e)/35 276.13
say 276.00
Note 1.The rates for 50 mm & 40 mm thick layers may be worked out on pro-
rata basis.
2.Where tack coat is required to be provided before laying mastic asphalt,
the same is required to be measured and paid separately.
3.The quantities of binder, filler and aggregates are for estimating
purpose. Exact quantities shall be as per mix design.
4.This rate analysis is based on design made by CRRI for a specific case
and is meant for estimating purposes only. Actual design is required to be
done for each case.
CHAPTER - 4
ENT COURSES - BITUMINOUS
Remarks
L-01
L-03
P&M-031
P&M-001
P&M-004
P&M-060
M-034
M-047
Remarks
L-01
L-03
P&M-031
P&M-001
P&M-016
M-034
L-01
L-03
P&M-031
P&M-001
P&M-016
Remarks
M-034
L-01
L-03
L-02
P&M-021
P&M-031
P&M-001
P&M-034
P&M-081
P&M-017
Remarks
P&M-047
P&M-044
P&M-059
P&M-045
M-37
M-006
M-007
M-008
Remarks
L-01
L-03
Remarks
L-02
P&M-022
P&M-034
P&M-081
P&M-017
P&M-047
P&M-044
P&M-059
P&M-045
M-032
M-006
M-007
M-008
M-003
Remarks
Remarks
L-01
L-02
L-03
P&M-022
P&M-034
P&M-081
P&M-017
P&M-047
P&M-044
P&M-059
P&M-045
Remarks
M-032
M-009
M-010
M-003
Remarks
L-01
L-03
L-02
P&M-022
P&M-034
P&M-081
P&M-017
P&M-047
Remarks
P&M-044
P&M-059
P&M-045
M-035
M-012
M-007
M-008
M-003
Remarks
Remarks
L-01
L-03
L-02
P&M-021
P&M-081
P&M-017
P&M-047
P&M-034
P&M-044
M-022
M-032
Remarks
L-01
L-02
L-03
P&M-017
P&M-068
P&M-080
P&M-006
P&M-059
P&M-060
P&M-047
Remarks
M-011
M-020
M-027
M-047
Remarks
L-01
L-02
L-03
P&M-096
P&M-017
P&M-067
P&M-081
P&M-006
P&M-060
P&M-058
P&M-083
P&M-088
M-011
M-020
M-027
M-028
M-029
M-049
M-050
M-051
M-052
Remarks
M-053
M-054
M-055
M-047
Remarks
L-01
L-02
L-03
P&M-031
P&M-001
P&M-030
P&M-005
P&M-053
M-036
M-003
M-138
M-022
Remarks
M-022
M-142
CHAPTER - 5
RATE ANALYSIS FOR CD STRUCTURES(BOX CULVERTS)
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
5.01 304 p.323 a) Earthwork in excavation for foundation of structure for all types of soil
and soft disintegrated rock including setting out, breaking of clods,
construction of necessary cofferdams, shoring, bracing and propping
arrangement at stressed zone, dewatering to the satisfaction of the
Engineer, refilling of the excavated area, transporting the surplus useful
materials to the embankment site as well as disposal of unusable materials
with all leads and lifts, all labour, machinery, materials, all leads and lifts,
etc, complete as per Technical Specification Clause 304 and as directed by
the Engineer
I) Ordinary Soil
Unit = cum
Taking output = 240 cum
a) Labour
Mate day 0.32 125.00 40.00 L-01
Mazdoor day 8.00 84.91 679.25 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 10.67 200.00 2134.00 P&M-026
For next 4 km lead t.km 1920 1.74 3340.80 P&M-026
c)Over Head Charges @ 20% on (a+b) 2246.81
d)Contractor's Profit @ 10% on (a+b+c) 1348.09
Rate for 240 cum = a+b+c+d 14828.94
Rate per cum = (a+b+c+d)/240 61.79
say 62.00
304(326) p.323 ii)Soft Disintegrated Rock
Unit = cum
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Taking output = 180 cum
a) Labour
Mate day 0.24 125.00 30.00 L-01
Mazdoor day 6.00 84.91 509.43 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 8.25 200.00 1650.00 P&M-048
For next 4 km lead t.km 1620 1.74 2818.80 P&M-047
304,302 p.327 b) Earthwork in excavation for foundation in hard rock (Blasting Prohibited)
including setting out, construction of necessary cofferdams, shoring,
bracing and propping arrangement at stressed zone, dewatering, loading,
transporting and stacking neatly the useful materials for disposal by
auction or by utilizing for masonry or structural works and disposal of
unusable materials with all leads and lifts to the satisfaction of the
Engineer, all labour, machinery, materials, all leads and lifts, etc, complete
as per Technical Specification Clause 304,302 and as directed by the
Engineer .
Unit = cum
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Taking output = 10 cum
a) Labour
Mate day 0.20 125.00 25.00 L-01
Mazdoor day 5.00 84.91 424.53 L-03
b) Machinery
Air compressor hour 6.00 206.00 1236.00 P&M-026
Tipper 5.5 cum capacity, 1 trip per hour.
For 1st km lead hour 1.81 200.00 362.00 P&M-048
For next 4 km lead t.km 90.00 1.74 156.60 P&M-047
Credit for exacavated rock found suitable for use@ 50 percent of excavated cum 5.00 160.00 800.00 M-140
quantity.
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Mate day 0.35 125.00 43.75 L-01
Driller day 0.50 85.65 42.82 L-03
Blaster day 0.25 94.35 23.59 L-20
Mazdoor day 8.00 84.91 679.25 L-17
b) Machinery
Air compressor hour 1.00 206.00 206.00 P&M-001
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 0.45 200.00 90.00 P&M-048
For next 4 km lead t.km 96.00 1.74 167.04 P&M-047
c) Materials
Blasting material kg 3.50 50.00 175.00 M-045
Detonator Electric nos 14.00 10.75 150.50 M-046
Credit for exacavated rock found suitable for use@ 50 percent of excavated cum 5.00 160.00 800.00 M-140
quantity.
5.02 1500,1700 p.335 Providing and laying Plain Cement Concrete M15 grade with 40 mm down
& 2100 graded crushed stone aggregate below foundation, sub-structure including
all labour, materials, machinery, transporting concrete from batching plant
by transit mixer, placing it in position and compacting with needle vibrator,
moist curing, all leads and lifts, etc. complete as per drawing, Technical
Specification Section 1500,1700,2100 and as directed by the Engineer
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-018
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.00 300.31 8108.30 M-023
40 mm Aggregate cum 64.80 437.70 28362.65 M-024
20 mm Aggregate cum 32.40 678.12 21971.23 M-025
10 mm Aggregate cum 10.80 615.15 6643.67 M-026
d) Form Work charges @ 4% of (a+b+c) 9585.32
e) Over Head Charges @ 20% on (a+b+c+d) 49843.64
f)Contractor's Profit @ 10% on (a+b+c+d+e) 29906.19
Rate for 120 cum = a+b+c+d+e+f 328968.04
Rate per cum = (a+b+c+d+e+f)/120 2741.40
say 2741.00
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
5.03 1600 p.489 Providing, cutting, bending and fixing in position HYSD reinforcement
made with high corrosion resistive material in structures including all
labour, materials, machinery, all leads and lifts, etc. complete as per
drawing, Technical Specification Section 1600 and as directed by the
Engineer
unit = tonne
Taking output = 1 tonne
a) Labour
Mate day 0.44 125.00 55.00 L-01
Mazon day 3.00 104.66 313.97 L-05
Mazdoor day 8.00 84.91 679.25 L-03
b) Materials
HYSD Reinforcement t 1.05 29668.15 31151.56 M-029
Binding wire kg 8.00 38.70 309.60 M-073
c)Over Head Charges @ 20% on (a+b) 6501.87
d)Contractor's Profit @ 10% on (a+b+c) 3901.12
Rate for 1 tonne = a+b+c+d 42912.37
Rate per tonne = (a+b+c+d)/1 tonne 42912.37
say 42912.00
5.04 1500,1700, p.478 Providing and laying M-30 grade Reinforced Cement Concrete Cast-in-situ
2200 Box Culvert, Wing Wall, Return Wall, Kerb with 20mm down graded crushed
stone aggregates all labour, materials, machinery, (excluding
reinforcement), shuttering and supporting arrangements, transporting
concrete from batching plant by transit mixer, placing it in position,
compacting properly with needle vibrator, moist curing for 14 days, all
leads and lifts, etc. complete as per drawing , Technical Specification
Clause 809and Section 1500,1700,2100 and as directed by the Engineer
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.88 125.00 110.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 19.00 84.91 1613.21 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-080
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 48.79 3756.85 183296.71 M-027
Coarse sand cum 27.30 395.76 10804.18 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.30 300.31 8198.39 M-023
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
d) Form Work charges @ 25% of (a+b+c) 78160.40
e) Over Head Charges @ 20% on (a+b+c+d) 78160.40
f)Contractor's Profit @ 10% on (a+b+c+d+e) 46896.24
Rate for 120 cum = a+b+c+d+e+f 515858.63
Rate per cum = (a+b+c+d+e+f)/120 4298.82
say 4299.00
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
5.05 1500,1700, p.478 Providing and laying M30 grade Reinforced Cement Concrete with 20 mm
2200 down graded crushed stone aggregates for Crash Barrier and Kerb
including all labour, materials, machinery, shuttering and supporting
arrangements, (excluding reinforcement), transporting concrete from
batching plant by transit mixer, placing it in position, compacting properly
with needle vibrator, moist curing for 14 days, all leads and lifts, etc.
complete as per drawing, Technical Specification Section 1500,1700,2100 &
2200 and as directed by the Engineer .
unit = m
Taking output = 10 m
a) M 30 Grade Concrete cum 3.00 2866 8598.00 sub analysis
b) Labour
Mate day 0.04 125.00 5.00 L-01
Mazdoor day 1.00 84.91 84.91 L-03
c)Over Head Charges @ 20% on (a+b) 1737.58
d)Contractor's Profit @ 10% on (a+b+c) 1042.55
Rate for 10 m = a+b+c+d 11468.04
Rate per m = (a+b+c+d)/10 1146.80
say 1147.00
SUB ANALYSIS M 30
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.88 125.00 110.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 19.00 84.91 1613.21 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-080
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 48.79 3756.85 183296.71 M-027
Coarse sand cum 27.30 395.76 10804.18 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.30 300.31 8198.39 M-023
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
d) Form Work charges @ 10% of (a+b+c) 31264.16
Rate for 120 cum = a+b+c+d 343905.76
Rate per cum = (a+b+c+d)/120 2865.88
say 2866.00
5.06 2200 p.463 Providing filter media behind Abutment, Wing Wall, Retaining Wall and
Return Wall and below pitching in slopes including all labour, materials,
machinery, all leads and lifts, etc. complete as per drawings, Technical
Specification Clause 305, 2504 and as directed by the Engineer
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.32 125.00 40.00 L-01
Mazdoor day 7.00 84.91 594.34 L-03
Mazdoor skilled day 1.00 88.68 88.68 L-02
b) Machinery
Water Tanker hour 0.06 160.00 9.60 P&M-060
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
c) Materials
Filler media of stone aggregate
unit = cum
Total = 12 cum
40 mm Aggregate 30 per cent cum 3.60 437.70 1575.70 M-024
20 mm Aggregate 40 per cent cum 4.80 678.12 3255.00 M-025
10 mm Aggregate 20 per cent cum 2.40 615.15 1476.37 M-026
6 mm and Below 10 per cent cum 1.20 369.00 442.80 M-008
d)Over Head Charges @ 20% on (a+b+c) 1496.50
e)Contractor's Profit @ 10% on (a+b+c+d) 897.90
Rate for 10 cum = a+b+c+d+e 9876.90
Rate per cum = (a+b+c+d+e)/10 987.69
say 988.00
5.07 710.1.4 of p.462 Back filling behind Abutment, Wing wall, Retaining Wall and Return Wall
IRC:73 & with selected granular material of approved quality including all labour,
2200 materials, machinery, all leads and lifts, etc. complete as per drawings,
Technical Specification Clause 710.1.4 of IRC & 2200 and as directed by
the Engineer
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.28 125.00 35.00 L-01
Mazdoor day 7.00 84.91 594.34 L-03
b) Machinery
Plate compactor/Power rammer hour 2.50 50.00 125.00 P&M-086
Water Tanker hour 0.05 160.00 8.00 P&M-060
concrete mixer hour 2.50 150.00 375.00 P&M-009
c) Materials
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Granular material
unit = cum
Total = 10 cum
Gravel cum 8.00 149.32 1194.54 M-019
Stone dust cum 4.00 231.61 926.45 M-003
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
d)Contractor's Profit @ 10% on (a+b+c) 270.05
Rate for 30 Nos = a+b+c+d 2970.60
Rate per pipe = (a+b+c+d)/30 99.02
say 99.00
SUB ANALYSIS
CEMENT MORTAR 1:3
unit = cum
Taking output = 1 cum
a) Labour
Mate day 0.04 125.00 5.00 L-01
Mazdoor day 0.90 84.91 76.42 L-03
b) Materials
Cement MT 0.51 3756.85 1915.99 M-027
Sand cum 1.05 395.76 415.55 M-020
Rate for 1 cum = a+b 2412.95
say 2413.00
5.09 1500,1700 p.435 Providing and laying M15 grade Plain Cement Concrete with 20mm down
&2100 graded crushed stone aggregate for Head Wall, Wing Wall, Cradle, Curtain
Wall at upstream and downstream of structures including all labour,
materials, machinery, transporting of concrete from batching plant by
transit mixer, placing it in position, compacting with needle vibrator, moist
curing for 14 days,, all leads and lifts, etc. complete as per drawing,
Technical Specification Section 1500,1700 and as directed by the Engineer
unit = cum
Taking output =120 cum
a) Materials
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cu.m 27.00 395.76 10685.45 M-020
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.00 300.31 8108.30 M-010
20mm Aggregate cu.m 64.80 678.12 43942.45 M-025
10 mm Aggregate cu.m 43.20 615.15 26574.69 M-026
b) Labour
Mate day 0.84 125 105.00 L-01
Mason day 3.00 104.65531 313.97 L-05
Mazdoor day 18.00 84.905784 1528.30 L-03
c) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-080
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
d) Form Work @ 10% of (a+b+c) 25317.25
e) Over Head Charges @ 20% on (a+b+c+d) 55697.95
f)Contractor's Profit @ 10% on (a+b+c+d+e) 33418.77
Rate for 120 cum = a+b+c+d+e+f 367606.45
Rate per cum =(a+b+c+d+e+f)/120 3063.39
say 3063.00
5.10 2507.2 p.527 Providing and laying flexible apron in the upstream and downstream of
structure for protection against scour with stone boulders weighing not
less than 40 kg each including all labour , materials, machinery, all leads
and lifts, compacting to the satisfaction of the Engineer etc. complete as
per drawing, Technical Specification Section 2500 and as directed by the
Engineer .
unit = cum
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Taking output =1 cum
a) Materials
Stone cu.m 1.00 335.00 335.00 M-057
Stone Spalls cu.m 0.20 586.00 117.20 M-058
b) Labour
Mate day 0.05 125.00 6.25 L-01
Mason day 0.25 104.66 26.16 L-05
Mazdoor day 1.00 84.91 84.91 L-03
c) Overhead charges @ 20% on (a+b) 113.90
d) Contractor's profit @ 10% on (a+b+c) 68.34
Rate for 1 cum 751.77
5.11 800 Providing and fixing marker posts to burried culverts including painting
and lettering of the details, all labour, materials, all leads and lifts etc.,
complete as per drawing laid in IRC7-1971 and as directed by the Engineer.
unit = No
Taking output = 1 No
a) Labour
Mason day 0.20 104.66 20.93 L-05
b) Material
RCC M20 Grade cum 0.02 2459.00 41.80 sub analysis
PCC M15 Grade cum 0.12 2077.00 249.24 sub analysis
Painting with cement paint sqm 1.80 48.38 87.08 M-071
c)Over Head Charges @ 20% on (a+b) 79.81
d)Contractor's Profit @ 10% on (a+b+c) 47.89
Cost for 1 No = a+b+c+d 526.74
Rate per No = (a+b+c+d)/1 526.74
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
say 527.00
SUB ANALYSIS
RCC M20 with Batching plant
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125 105.00 L-01
Mason day 3.00 105 313.97 L-05
Mazdoor day 18.00 85 1528.30 L-03
b) Material
Cement t 41.66 3756.85 156510.37 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.00 369.00 9963.03 M-023
20 mm Aggregates cum 64.80 620.88 40232.98 M-025
10 mm Aggregates cum 43.20 615.15 26574.69 M-026
c) Machinery
Batching plant hour 6.00 1440 8640.00 P&M-002
Generator (250 KVA) hour 6.00 450 2700.00 P&M-080
Front end loader hour 6.00 520 3120.00 P&M-017
TRANSMIT MIXER
Ist km hour 15.00 600 9000.00 P&M-049
tonne-
Next 9 km 2700.00 4.94 13338.00 P&M-050
km
Concrete pump hour 6.00 165 990.00 P&M-007
d) Form work @ 4% of (a+b+c) 11348.07
Rate for 120 cum = (a+b+c+d) 295049.86
Rate per cum = (a+b+c+d)/120 2458.75
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
say 2459.00
SUB ANALYSIS
PCC M-15 WITH 40 mm DOWN GRADED MATERIAL
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125 105.00 L-01
Mason day 3.00 105 313.97 L-05
Mazdoor day 18.00 85 1528.30 L-03
b) Material
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.00 300.31 8108.30 M-023
40 mm aggregate cum 64.80 437.70 28362.65 M-024
20 mm aggregate cum 32.40 678.12 21971.23 M-025
10 mm aggregate cum 10.80 615.15 6643.67 M-026
c) Machinery
Batching plant hour 6.00 1440 8640.00 P&M-002
Generator hour 6.00 450 2700.00 P&M-080
Front end loader hour 6.00 520 3120.00 P&M-017
TRANSIT MIXER
Ist km hour 15.00 600 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165 990.00 P&M-007
d) Form work @ 4% of (a+b+c) 9585.32
Rate for 120 cum = (a+b+c+d) 249218.21
Rate per cum = (a+b+c+d)/120 2076.82
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
say 2077.00
5.12 803 p.220 Applying cement paint of approved quality to the surface of concrete Crash
Barrier, Kerb including all labour, materials, all leads and lifts etc. complete
as per drawing, Technical Specification Section 800 and as directed by the
Engineer.
unit = sqm
Taking output =40 sqm
a) Labour
Mate day 0.12 125.00 15.00 L-01
Painter day 2.00 93.21 186.41 L-21
Mazdoor day 1.00 84.91 84.91 L-03
b) Materials
Paint 1st Quality Litre 6.00 134.38 806.25 M-072
Filling material LS 180.00
c)Over Head Charges @ 20% on (a+b) 254.51
d)Contractor's Profit @ 10% on (a+b+c) 152.71
Rate for 40 sqm = a+b+c+d 1679.79
Rate per sqm = (a+b+c+d)/40 41.99
say 42.00
5.13 801 p.211 Painting of Culvert No. and span arrangement on bridge ends including all
labour, materials, all leads and lifts etc. complete as per drawing, Technical
Specification Section 800 and as directed by the Engineer.
unit = Nos
Taking output = 1 Nos
a)Painting (colour) sqm 0.09 36.00 3.24 sub analysis
b)Lettering (white) cm/lr 20.00 0.24 4.80 sub analysis
c)Over Head Charges @ 20% on (a+b) 1.61
d)Contractor's Profit @ 10% on (a+b+c) 0.96
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Rate for 1 No = a+b+c+d 10.61
Rate per No = (a+b+c+d)/1 10.61
say 11.00
p.221 SUB ANALYSIS
printing new letters and figures of any shade with synthetic enamel paint black or
any other approved color is to give an even shade (Hindi Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.12 125.00 15.00 L-01
Painter day 2.00 93.21 186.41 L-21
Mazdoor day 1.00 84.91 84.91 L-03
b) Materials
Paint conforming to requirement Litre 0.70 134.38 94.06 M-072
Rate for 1600 cm = a+b+c+d 380.38
Rate per letter per cm = (a+b+c+d)/1600 0.24
say 0.24
p.212 SUB ANALYSIS
printing new letters and figures of any shade with synthetic enamel paint black or
any other approved color is to give an even shade (English Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.07 125.00 8.75 L-01
Painter day 1.25 93.21 116.51 L-21
Mazdoor day 0.50 84.91 42.45 L-03
b) Materials
Paint conforming to requirement Litre 0.50 134.38 67.19 M-072
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Rate for 1600 cm = a+b+c+d 234.90
Rate per letter per cm = (a+b+c+d)/1600 0.15
say 0.15
5.14 808 p.236 Providing and laying 50 mm diameter heavy duty MS pipe over Crash
Barrier as per IS: 1239 with expansion gap at every 20 m interval along with
providing insert plate at 2 m interval, painting with single coat of zinc-rich
primer and two coats of top coat epoxy paint including all labour, materials,
machinery, all leads and lifts, etc. complete as per drawing, Technical
Specifications Section.800 and as directed by the Engineer .
unit = m
Taking output = 10 m
a)Labour
Mate day 0.01 125.00 1.75 L-01
Mazdoor day 0.35 84.91 29.72 L-03
Welder day 0.01 104.66 1.05 L-11
b)Materials
MS Pipe m 10.00 215.00 2150.00 M-119
Insert Plate kg 25.00 29.89 747.13 M-121
Lugs kg 6.75 29.89 201.72 M-121
Welding torch and consumables 154.94
c)Over Head Charges @ 20% on (a+b) 657.26
394.36
d)Contractor's Profit @ 10% on (a+b+c)
CHAPTER - 5A
CD STRUCTURES( PIPE CULVERTS)
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
5.01 304 p.323 a) Earthwork in excavation for foundation of structure for all types of soil
and soft disintegrated rock including setting out, breaking of clods,
construction of necessary cofferdams, shoring, bracing and propping
arrangement at stressed zone, dewatering to the satisfaction of the
Engineer, refilling of the excavated area, transporting the surplus useful
materials to the embankment site as well as disposal of unusable materials
with all leads and lifts, all labour, machinery, materials, all leads and lifts,
etc, complete as per Technical Specification Clause 304 and as directed by
the Engineer
I) Ordinary Soil
Unit = cum
Taking output = 240 cum
a) Labour
Mate day 0.32 125.00 40.00 L-01
Mazdoor day 8.00 84.91 679.25 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 10.67 200.00 2134.00 P&M-048
For next 4 km lead t.km 1920 1.74 3340.80 P&M-047
c)Over Head Charges @ 8% on (a+b) 898.72
d)Contractor's Profit @ 10% on (a+b+c) 1213.28
Rate for 240 cum = a+b+c+d 13346.05
Rate per cum = (a+b+c+d)/240 55.61
say 56.00
304(326) p.323 ii)Soft Disintegrated Rock
Unit = cum
Taking output = 180 cum
a) Labour
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
Mate day 0.24 125.00 30.00 L-01
Mazdoor day 6.00 84.91 509.43 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 8.25 200.00 1650.00 P&M-048
For next 4 km lead t.km 1620 1.74 2818.80 P&M-047
304,302 p.327 b) Earthwork in excavation for foundation in hard rock (Blasting Prohibited)
including setting out, construction of necessary cofferdams, shoring,
bracing and propping arrangement at stressed zone, dewatering, loading,
transporting and stacking neatly the useful materials for disposal by
auction or by utilizing for masonry or structural works and disposal of
unusable materials with all leads and lifts to the satisfaction of the
Engineer, all labour, machinery, materials, all leads and lifts, etc, complete
as per Technical Specification Clause 304,302 and as directed by the
Engineer .
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.20 125.00 25.00 L-01
Mazdoor day 5.00 84.91 424.53 L-03
b) Machinery
Air compressor hour 6.00 206.00 1236.00 P&M-001
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
Tipper 5.5 cum capacity, 1 trip per hour.
For 1st km lead hour 1.81 200.00 362.00 P&M-048
For next 4 km lead t.km 90.00 1.74 156.60 P&M-047
Credit for exacavated rock found suitable for use@ 50 percent of excavated cum 5.00 160.00 800.00 M-140
quantity.
c)Over Head Charges @ 8% on (a+b) 176.33
d)Contractor's Profit @ 10% on (a+b+c) 238.05
Rate for 10 cum = a+b+c+d 1818.51
Rate per cum = (a+b+c+d)/10 181.85
say 182.00
304,302 p.326
c) Earthwork in excavation for foundation in hard rock (Requiring Blasting)
including setting out, construction of necessary cofferdams, shoring,
bracing and propping arrangement at stressed zone, dewatering, loading,
transporting and stacking neatly the useful materials for disposal by
auction or by utilizing for masonry or structural works and disposal of
unusable materials with all leads and lifts, all labour, machinery, materials,
with all safety precautions to the satisfaction of the Engineer, all leads and
lifts, etc, complete as per Technical Specification Clause 304,302 and as
directed by the Engineer
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.35 125.00 43.75 L-01
Driller day 0.50 85.65 42.82 L-20
Blaster day 0.25 94.35 23.59 L-17
Mazdoor day 8.00 84.91 679.25 L-03
b) Machinery
Air compressor hour 1.00 206.00 206.00 P&M-001
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 0.45 200.00 90.00 P&M-048
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
For next 4 km lead t.km 96.00 1.74 167.04 P&M-047
c) Materials
Blasting material kg 3.50 50.00 175.00 M-045
Detonator Electric nos 14.00 10.75 150.50 M-046
Credit for exacavated rock found suitable for use@ 50 percent of excavated cum 5.00 160.00 800.00 M-140
quantity.
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
Next 9km t.km 2700 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.00 369.00 9963.03 M-023
40 mm Aggregate cum 64.80 437.70 28362.65 M-024
20 mm Aggregate cum 32.40 678.12 21971.23 M-025
10 mm Aggregate cum 10.80 615.15 6643.67 M-026
d) Form Work charges @ 4% of (a+b+c) 9659.51
e)Over Head Charges @ 8% on (a+b+c+d) 20091.77
f)Contractor's Profit @ 10% on (a+b+c+d+e) 27123.89
Rate for 120 cum = a+b+c+d+e+f 298362.80
Rate per cum = (a+b+c+d+e+f)/120 2486.36
say 2486.00
5.03 710.1.4 p.462 Back filling behind Abutment, Wing wall, Retaining Wall and Return Wall
Of with selected granular material of approved quality including all labour,
IRC:78 & materials, machinery, all leads and lifts, etc. complete as per drawings,
2200 Technical Specification Clause 710.1.4 of IRC:78 & 2200 and as directed by
the Engineer
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.28 125.00 35.00 L-01
Mazdoor day 7.00 84.91 594.34 L-03
b) Machinery
Plate compactor/Power rammer hour 2.50 50.00 125.00 P&M-086
Water Tanker hour 0.05 160.00 8.00 P&M-060
concrete mixer hour 2.50 150.00 375.00 P&M-009
c) Materials
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
Granular material
unit = cum
Total = 10 cum
Gravel cum 8.00 149.32 1194.54 M-019
Stone dust cum 4.00 231.61 926.45 M-003
5.04 1500,17 p.435 Providing and laying M15 grade Plain Cement Concrete with 20mm down
00&2100 graded crushed stone aggregate for Head Wall, Wing Wall, Cradle, Curtain
Wall at upstream and downstream of structures including all labour,
materials, machinery, transporting of concrete from batching plant by
transit mixer, placing it in position, compacting with needle vibrator, moist
curing for 14 days, all leads and lifts, etc. complete as per drawing,
Technical Specification Section 1500,1700 and as directed by the Engineer
unit = cum
Taking output =120 cum
a) Materials
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cu.m 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.00 369.00 9963.03 M-023
20mm Aggregate cu.m 64.80 678.12 43942.45 M-025
10 mm Aggregate cu.m 43.20 615.15 26574.69 M-026
b) Labour
Mate day 0.84 125 105.00 L-01
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
Mason day 3.00 104.65531 313.97 L-05
Mazdoor day 18.00 84.905784 1528.30 L-03
c) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-080
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
d) Form Work @ 10% of (a+b+c) 25502.72
e)Over Head Charges @ 8% on (a+b+c+d) 22442.40
f)Contractor's Profit @ 10% on (a+b+c+d+e) 30297.23
Rate for 120 cum = a+b+c+d+e+f 333269.57
Rate per cum =(a+b+c+d+e+f)/120 2777.25
say 2777.00
5.05 2900 p.272 Providing, laying and joining NP4 class Hume Pipe as per IS 458-1988 for
culverts over granular filling with sand or granular material passing
through 5.6 mm sieve size compacted and rammed including all labour,
materials, machinery, all leads and lifts, etc. complete as per drawing,
Technical Specification Section 2900, IRC: SP: 13-1973 and as directed by
the Engineer
a)900 mm dia
Unit = metre
Taking output = 12.5 metres ( 5 pipes of 2.5 m length each )
a) Labour
Mate day 0.18 125.00 22.50 L-01
Mason day 0.50 104.66 52.33 L-05
Mazdoor day 4.00 84.91 339.62 L-03
b) Material
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
Sand at site cum 0.04 395.76 13.85 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 0.04 369.00 12.92 M-023
Cement at site tonne 0.05 3756.85 187.84 M-027
RCC pipe NP-4 /prestressed concrete pipe (900 mm dia) metre 12.50 2525.04 31563.01 M-130
collar at site Nos 4.00 387.56 1550.25 M-131
Granular material passing 5.6 mm sieve for sides cum 4.50 369.00 1660.51 M-008
c) Overhead charges @ 8% on (a+b) 2832.23
d) Contractor's profit @ 10% on (a+b+c) 3823.50
Cost for 12.5 metres = a+b+c+d 42058.55
Rate per metre = (a+b+c+d)/12.5 3364.68
say 3365.00
p.274 b)1000 mm dia
Unit = metre
Taking output = 12.5 metres ( 5 pipes of 2.5 m length each )
a) Labour
Mate day 0.18 125.00 22.50 L-01
Mason day 0.50 104.66 52.33 L-05
Mazdoor day 4.00 84.91 339.62 L-03
b) Material
Sand at site cum 0.04 395.76 13.85 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 0.04 369.00 12.92 M-023
Cement at site tonne 0.05 3756.85 187.84 M-027
RCC pipe NP-4/prestressed concrete pipe including (1000 mm Dia) metre 12.50 3277.19 40964.83 M-132
collar at site Nos 4.00 387.56 1550.25 M-131
Granular material passing 5.6 mm sieve for sides cum 4.50 369.00 1660.51 M-008
c) Overhead charges @ 8% on (a+b) 3584.37
d) Contractor's profit @ 10% on (a+b+c) 4838.90
Cost for 12.5 metres = a+b+c+d 53227.91
Rate per metre = (a+b+c+d)/12.5 4258.23
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
say 4258.00
p.274 c)1200 mm dia
Unit = metre
Taking output = 12.5 metres ( 5 pipes of 2.5 m length each )
a) Labour
Mate day 0.18 125.00 22.50 L-01
Mason day 0.50 104.66 52.33 L-05
Mazdoor day 4.00 84.91 339.62 L-03
b) Material
Sand at site cum 0.04 395.76 13.85 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 0.04 369.00 12.92 M-010
Cement at site tonne 0.05 3756.85 187.84 M-027
RCC pipe NP-4/prestressed concrete pipe including(1200 mm Dia) metre 12.50 4396.37 54954.66 M-133
collar at site Nos 4.00 387.56 1550.25 M-131
Granular material passing 5.6 mm sieve for sides cum 4.50 369.00 1660.51 M-008
c) Overhead charges @ 8% on (a+b) 4703.56
d) Contractor's profit @ 10% on (a+b+c) 6349.80
Cost for 12.5 metres = a+b+c+d 69847.84
Rate per metre = (a+b+c+d)/12.5 5587.83
Note 1. The rate analysis does not include excavation, cement /masonry works in say 5588.00
head walls, backfilling, protection works and parapet walls.
5.06 2507.2 p.527 Providing and laying flexible apron in the upstream and downstream of
structure for protection against scour with stone boulders weighing not
less than 40 kg each including all labour , materials, machinery, all leads
and lifts, compacting to the satisfaction of the Engineer etc. complete as
per drawing, Technical Specification Section 2500 and as directed by the
Engineer .
unit = cum
Taking output =1 cum
a) Materials
Stone cu.m 1.00 335.00 335.00 M-057
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
Stone Spalls cu.m 0.20 586.00 117.20 M-058
b) Labour
Mate day 0.05 125.00 6.25 L-01
Mason day 0.25 104.66 26.16 L-05
Mazdoor day 1.00 84.91 84.91 L-03
c) Overhead charges @ 8% on (a+b) 45.56
d) Contractor's profit @ 10% on (a+b+c) 61.51
Rate for 1 cum 676.59
say 677.00
5.07 2504 p.522 Providing and laying 300 mm thick stone boulder pitching on slopes filter
including all labour, materials, machinery, all leads and lifts, etc. complete as
per drawing, Technical Specification Section 2500 and as directed by the
Engineer .
unit = cum
Taking output =1 cum
a) Materials
Stone cu.m 1.00 335.00 335.00 M-057
Stone Spalls cu.m 0.20 586.00 117.20 M-058
b) Labour
Mate day 0.04 125.00 5.00 L-01
Mason day 0.35 104.66 36.63 L-05
Mazdoor day 0.75 84.91 63.68 L-03
c)Over Head Charges @ 8% on (a+b) 44.60
d)Contractor's Profit @ 10% on (a+b+c) 60.21
Rate for 1 cum = a+b+c+d 662.32
say 662.00
5.08 800 Providing and fixing marker posts (with M20 concrete) to burried culverts
including painting and lettering of the details, all labour, materials, all leads
and lifts etc., complete as per drawing laid in IRC-1971 and as directed by
the Engineer.
unit = No
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
Taking output = 1 No
a) Labour
Mason day 0.20 104.66 20.93 L-05
b) Material
RCC M20 Grade cum 0.02 2459.00 41.80 sub analysis
PCC M15 Grade cum 0.12 2093.00 251.16 sub analysis
Painting with cement paint sqm 1.80 48.38 87.08 M-071
c)Over Head Charges @ 8% on (a+b) 32.08
d)Contractor's Profit @ 10% on (a+b+c) 43.30
Cost for 1 No = a+b+c+d 476.35
Rate per No = (a+b+c+d)/1 476.35
say 476.00
SUB ANALYSIS
RCC M20 with Batching plant
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125 105.00 L-01
Mason day 3.00 105 313.97 L-05
Mazdoor day 18.00 85 1528.30 L-03
b) Material
Cement t 41.66 3756.85 156510.37 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.00 369.00 9963.03 M-023
20 mm Aggregates cum 64.80 620.88 40232.98 M-025
10 mm Aggregates cum 43.20 615.15 26574.69 M-026
c) Machinery
Batching plant hour 6.00 1440 8640.00 P&M-002
Generator (250 KVA) hour 6.00 450 2700.00 P&M-080
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
Front end loader hour 6.00 520 3120.00 P&M-017
TRANSIT MIXER
1st km hour 15.00 600 9000.00 P&M-049
tonne-
Next 10 km 2700.00 4.94 13338.00 P&M-050
km
Concrete pump hour 6.00 165 990.00 P&M-007
d) Form work @ 4% of (a+b+c) 11348.07
Rate for 120 cum = (a+b+c+d) 295049.86
Rate per cum = (a+b+c+d)/120 2458.75
say 2459.00
SUB ANALYSIS
PCC M-15 WITH 40 mm DOWN GRADED MATERIAL
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125 105.00 L-01
Mason day 3.00 105 313.97 L-05
Mazdoor day 18.00 85 1528.30 L-03
b) Material
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.38mm) cum 27.00 369.00 9963.03 M-023
40 mm aggregate cum 64.80 437.70 28362.65 M-024
20 mm aggregate cum 32.40 678.12 21971.23 M-025
10 mm aggregate cum 10.80 615.15 6643.67 M-026
c) Machinery
Batching plant hour 6.00 1440 8640.00 P&M-002
Generator hour 6.00 450 2700.00 P&M-080
Front end loader hour 6.00 520 3120.00 P&M-017
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
TRANSIT MIXER
Ist km hour 15.00 600 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165 990.00 P&M-007
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
d) Form work @ 4% of (a+b+c) 9659.51
Rate for 120 cum = (a+b+c+d) 251147.14
Rate per cum = (a+b+c+d)/120 2092.89
say 2093.00
5.09 801 p.211 Painting of Culvert No. and span arrangement on bridge ends including all
labour, materials, all leads and lifts etc. complete as per drawing, Technical
Specification Section 800 and as directed by the Engineer.
unit = Nos
Taking output = 1 Nos
a)Painting (colour) sqm 0.09 36.00 3.24 sub analysis
b)Lettering (white) cm/lr 20.00 0.24 4.80 sub analysis
c)Over Head Charges @ 8% on (a+b) 0.64
d)Contractor's Profit @ 10% on (a+b+c) 0.87
Rate for 1 No = a+b+c+d 9.55
Rate per No = (a+b+c+d)/1 9.55
say 10.00
Ref. to
Sl No MoRT & Description Unit Qty Rate Rs Cost Rs Remarks
H Spec.
p.221 SUB ANALYSIS
printing new letters and figures of any shade with synthetic enamel paint black or
any other approved color is to give an even shade (Hindi Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.12 125.00 15.00 L-01
Painter day 2.00 93.21 186.41 L-21
Mazdoor day 1.00 84.91 84.91 L-03
b) Materials
Paint conforming to requirement Litre 0.70 134.38 94.06 M-072
Rate for 1600 cm = a+b+c+d 380.38
Rate per letter per cm = (a+b+c+d)/1600 0.24
say 0.24
p.212 SUB ANALYSIS
printing new letters and figures of any shade with synthetic enamel paint black or
any other approved color is to give an even shade (English Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.07 125.00 8.75 L-01
Painter day 1.25 93.21 116.51 L-21
Mazdoor day 0.50 84.91 42.45 L-03
b) Materials
Paint conforming to requirement Litre 0.50 134.38 67.19 M-072
Rate for 1600 cm = a+b+c+d 234.90
Rate per letter per cm = (a+b+c+d)/1600 0.15
say 0.15
CHAPTER - 6
MINOR BRIDGES AND STRUCTURES
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
6.01 304 p.323 a) Earthwork in excavation for foundation of structure for all types of
soil and soft disintegrated rock including setting out, breaking of
clods, construction of necessary cofferdams, shoring, bracing and
propping arrangement at stressed zone, dewatering to the
satisfaction of the Engineer, refilling of the excavated area,
transporting the surplus useful materials to the embankment site as
well as disposal of unusable materials with all leads and lifts, all
labour, machinery, materials, all leads and lifts, etc, complete as per
Technical Specifications Clause 304 and as directed by the Engineer.
A)Ordinary Soil
Unit = cum
Taking output = 240 cum (480t)
a) Labour
Mate day 0.32 125.00 40.00 L-01
Mazdoor day 8.00 84.91 679.25 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 10.670 200.00 2134.00 P&M-048
For next 4 km lead t.km 1920.000 1.74 3340.80 P&M-047
c)Over Head Charges @ 20% on (a+b) 2246.81
d)Contractor's Profit @ 10% on (a+b+c) 1348.09
Rate for 240 cum = a+b+c+d 14828.94
Rate per cum = (a+b+c+d)/240 61.79
say 62.00
304 p.326 B)Soft Disintegrated Rock
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Unit = cum
Taking output = 180 cum (405t)
a) Labour
Mate day 0.24 125.00 30.00 L-01
Mazdoor day 6.00 84.91 509.43 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 8.250 200.00 1650.00 P&M-048
For next 4 km lead t.km 1620.000 1.74 2818.80 P&M-047
c)Over Head Charges @ 20% on (a+b) 2009.65
d)Contractor's Profit @ 10% on (a+b+c) 1205.79
Rate for 180 cum = a+b+c+d 13263.67
Rate per cum = (a+b+c+d)/180 73.69
say 74.00
average of (a+b)= (62+74)/2 68.00
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.20 125.00 25.00 L-01
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mazdoor day 5.00 84.91 424.53 L-03
b) Machinery
Air compressor hour 6.00 206.00 1236.00 P&M-026
Tipper 5.5 cum capacity, 1 trip per hour.
For 1st km lead hour 1.810 200.00 362.00 P&M-048
Credit for exacavated rock found suitable for use@ 50 percent of cum 5.00 160.00 800.00 M-140
excavated quantity.
c)Over Head Charges @ 20% on (a+b) 409.51
d)Contractor's Profit @ 10% on (a+b+c) 245.70
Rate for 10 cum = a+b+c+d 1902.74
Rate per cum = (a+b+c+d)/10 190.27
say 190.00
304,302 p.326 c) Earthwork in excavation for foundation in hard rock (Requiring
Blasting) including setting out, construction of necessary
cofferdams, shoring, bracing and propping arrangement at stressed
zone, dewatering, loading, transporting and stacking neatly the
useful materials for disposal by auction or by utilizing for masonry or
structural works and disposal of unusable materials with all leads
and lifts, all labour, machinery, materials, with all safety precautions
to the satisfaction of the Engineer, all leads and lifts, etc, complete
as per Technical Specifications Clause 304,302 and as directed by the
Engineer.
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.35 125.00 43.75 L-01
Driller day 0.50 85.65 42.82 L-03
Blaster day 0.25 94.35 23.59 L-20
Mazdoor day 8.00 84.91 679.25 L-17
b) Machinery
Air compressor with pneumatic breaker hour 1.00 206.00 206.00 P&M-001
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 0.450 200.00 90.00 P&M-048
For next 4 km lead t.km 96.000 1.74 167.04 P&M-047
c) Materials
Blasting material kg 3.50 50.00 175.00 M-045
Detonator Electric nos 14.00 10.75 150.50 M-046
Credit for exacavated rock found suitable for use@ 50 percent of cum 5.00 160.00 800.00 M-140
excavated quantity.
d)Over Head Charges @ 20% on (a+b+c) 315.59
e)Contractor's Profit @ 10% on (a+b+c+d) 189.35
Rate for 10 cum = a+b+c+d+e 1282.89
Rate per cum = (a+b+c+d+e)/10 128.29
say 128.00
6.02 1500,1700 p.335 Providing and laying Plain Cement Concrete M25 grade with 40 mm
& 2100 down graded crushed stone aggregate below foundation, sub-
structure including all labour, materials, machinery, transporting
concrete from batching plant by transit mixer, placing it in position
and compacting withs needle vibrator, moist curing, all leads and
lifts, etc. complete as per drawing, Technical Specification Section
1500,1700,2100 and as directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-018
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 10 km t.km 3000.00 4.94 14820.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 47.95 3756.85 180140.96 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
40 mm Aggregate cum 43.20 437.70 18908.44 M-024
20 mm Aggregate cum 43.20 678.12 29294.97 M-025
10 mm Aggregate cum 21.60 615.15 13287.34 M-026
d) Form Work charges @ 10% of (a+b+c) 30349.75
e) Over Head Charges @ 20% on (a+b+c+d) 66769.44
f)Contractor's Profit @ 10% on (a+b+c+d+e) 40061.67
Rate for 120 cum = a+b+c+d+e+f 440678.32
Rate per cum = (a+b+c+d+e+f)/120 3672.32
say 3672.00
6.03 1600 p.489 Providing, cutting, bending and fixing in position, HYSD
reinforcement made with high corrosion resistive material, in
structures including all labour, materials, machinery, all leads and
lifts, etc. complete as per drawing, Technical Specifications Section
1600 and as directed by the Engineer.
unit = tonne
Taking output = 1 tonne
a) Labour
Mate day 0.44 125.00 55.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 8.00 84.91 679.25 L-03
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
b) Materials
HYSD Reinforcement t 1.05 29668.15 31151.56 M-029
Binding wire kg 8.00 38.70 309.60 M-073
c)Over Head Charges @ 20% on (a+b) 6501.87
d)Contractor's Profit @ 10% on (a+b+c) 3901.12
Rate for 1 tonne = a+b+c+d 42912.37
Rate per tonne = (a+b+c+d)/1 tonne 42912.37
say 42912.00
6.04 1800 p.490 Providing and placing in position High Tensile Steel strands
conforming to IS 6006:1983(class II) and IS 14268:1995(low relaxation
strand) including anchorage devices (tested as per BS: 4447 or FIP
regulation), providing additional length of cable for attaching jacks,
placing corrugated HDPE sheathing ducts in position, guides and
grips as per IRC Specification, protection with epoxy painting,
accessories for stressing, stressing operations and grouting
including all labour, materials, machinery, all leads and lifts,
etc.complete as per drawing, Technical Specifications Section 1800
and as directed by the Engineer.
unit = tonne
Taking output = 0.377 tonne
a) Labour
I) For making and fixing cables, anchorages
Mate day 0.160 125.00 20.00 L-08
Blacksmith day 1.000 90.92 90.92 L-21
Mazdoor day 3.000 84.91 254.72 L-10
ii) For prestressing
Mate day 0.050 125.00 6.25 L-08
Fitter day 0.250 93.21 23.30 L-17
Mazdoor day 1.000 84.91 84.91 L-10
iii) For grouting
Mate day 0.050 125.00 6.25 L-08
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mason day 0.250 104.66 26.16 L-12
Mazdoor day 1.000 84.91 84.91 L-10
b) Machinery
Stressing jack with pump hour 2.500 200.00 500.00 P&M-084
Grouting pump with agitator hour 1.000 165.00 165.00 P&M-007
Generator hour 3.500 240.00 840.00 P&M-019
c) Materials
H.T. Strand @ 9.42 kg/m t 0.385 45599.35 17555.75 M-031
HDPE Sheating duct m 42.000 80.63 3386.25 M-134
Tube anchorage set nos 2.000 1720.00 3440.00 M-135
Cement for grouting t 0.125 3756.85 469.61 M-027
Miscellaneous items @ 0.5 % of cost of materials 124.26
d)Over Head Charges @ 20% on (a+b+c) 5415.65
e)Contractor's Profit @ 10% on (a+b+c+d) 3249.39
Rate for 0.377 tonne = a+b+c+d 35743.32
Rate per tonne = (a+b+c+d)/0.377 tonne 94809.87
say 94810.00
6.05 1200,1500 p.458 Providing and laying M35 grade Reinforced Cement Concrete with 20
, 1700 mm down graded crushed stone aggregates in substructure and
foundation including shuttering and supporting arrangements,,
(excluding reinforcement ) transporting concrete from batching plant
by transit mixer, placing it in position, compacting with needle
vibrator, moist curing for 14 days, all labour, materials, machinery, all
leads and lifts, etc. complete as per drawing, Technical
Specifications Section 1500, 1700 and 2200 and as directed by the
Engineer.
unit = cum
Taking output = 120 cum
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor fo concreting day 18.000 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 50.64 3756.85 190246.88 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
6.06 1500, p.478 Providing and laying M30 grade Reinforced Cement Concrete with 20
1700, mm down graded crushed stone aggregates in superstructure
2100 including shuttering and supporting arrangements, (excluding
reinforcement) transporting concrete from batching plant by transit
mixer, placing it in position, compacting with needle vibrator, moist
curing for 14 days, all labour, materials, machinery, all leads and lifts,
etc. complete as per drawing, Technical Specifications Section 1500,
1700 and 2200 and as directed by the Engineer.
(367) unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.88 125.00 110.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor for concreting day 19.00 84.91 1613.21 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-080
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 48.80 3756.85 183334.28 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
d)Height effect charges @ 1.6% on (a+b+c) 4999.53
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
e)Form work charges @ 25% on (a+b+c+d) 79367.47
f)Over Head Charges @ 20% on (a+b+c+d+e) 79367.47
g)Contractor's Profit @ 10% on (a+b+c+d+e+f) 47620.48
Rate for 120 cum = a+b+c+d+e+f+g 523825.29
Rate per cum = (a+b+c+d+e+f+g) / 120 4365.21
say 4365.00
6.07 1500, p.458 Providing and laying M30 grade Reinforced Cement Concrete with 20
1700, mm down graded crushed stone aggregates in substructure and
2100 foundation including shuttering and supporting arrangements,
(excluding reinforcement) transporting concrete from batching plant
by transit mixer, placing it in position, compacting with needle
vibrator, moist curing for 14 days, all labour, materials, machinery, all
leads and lifts, etc. complete as per drawing, Technical Specifications
Section 1500, 1700 and 2200 and as directed by the Engineer.
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 48.80 3756.85 183334.28 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 51.60 3756.85 193853.46 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
Admixture @ 0.4% of cement kg 206.40 51.00 10526.40 M-103
d)Form work charges @ 25% on (a+b+c) 83415.16
e) Over Head Charges @ 20% on (a+b+c+d) 83415.16
f)Contractor's Profit @ 10% on (a+b+c+d+e) 50049.10
Rate for 120 cum = a+b+c+d+e+f 550540.09
Rate per cum = (a+b+c+d+e+f) / 120 4587.83
say 4588.00
6.09 1,800 p.502 Providing precast/cast-in-situ M-40 grade Pre Stressed Concrete with
20 mm down graded crushed stone aggregates for Girder in casting
yard/ at site including shuttering and supporting arrangements,
(excluding reinforcement) transporting concrete from batching plant
by transit mixer, placing it in position, compacting with needle
vibrator, moist curing for 7 days, all labour, materials, machinery, all
leads and lifts, erection (for precast elements) etc. complete as per
drawing, Technical Specifications Section 1500,1600,1700,2300 and
as directed by the Engineer.
unit = cum
Taking output = 1 cum
i) Erection and dismantling
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mate day 0.12 125.00 15.00 L-01
Mazdoor skilled day 1.00 88.68 88.68 L-02
Mazdoor day 2.00 84.91 169.81 L-03
ii) Concreting by batching plant and stationary concrete pump
Mate day 0.03 125.00 3.75 L-01
Mazdoor skilled day 0.05 88.68 4.43 L-02
Mazdoor day 0.60 84.91 50.94 L-03
iii) Curing
Mate day 0.01 125.00 1.25 L-01
Mazdoor day 0.35 84.91 29.72 L-03
iv) Handling of precast girder, stacking in stockyard and again
loading in trailor
Mate day 0.01 125.00 1.25 L-01
Mazdoor day 0.25 84.91 21.23 L-03
v) Placement of girders in position over pier caps with the help of
guide bar, channel levelling etc
Mate day 0.01 125.00 1.25 L-01
Mason day 0.06 104.66 6.28 L-05
Mazdoor day 0.24 84.91 20.38 L-03
b) Machinery
I) At casting yard
Batching plant hour 0.05 1440.00 72.00 P&M-002
Generator hour 0.05 450.00 22.50 P&M-080
Front end loader hour 0.05 520.00 26.00 P&M-017
Transit mixer hour 0.10 600.00 60.00 P&M-049
Concrete Pump hour 0.05 165.00 8.25 P&M-007
ii) For transportation and placement at site
crane hour 0.30 550.00 165.00 P&M-011
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Trailor 80 tonne capacity hour 0.40 420.00 168.00 P&M-089
c) Materials
Cement t 0.47 3756.85 1765.72 M-027
Coarse sand cum 0.23 395.76 89.05 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 0.23 300.31 67.57 M-023
unit = No
Taking output = 1 No
a) Labour
I) For fabrication
Mate day 0.02 125.00 2.50 L-01
Blacksmith skilled day 0.02 90.92 1.82 L-05
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mazdoor day 0.02 84.91 1.70 L-03
ii) For fixing in position
Mate day 0.01 125.00 1.25 L-01
Mason day 0.01 104.66 1.05 L-05
Mazdoor day 0.20 84.91 16.98 L-03
b)Materials
Corrosion resistant structural steel kg 4.00 22.00 88.00 M-104
GI pipe 100 mm dia m 1.00 300.00 300.00 M-105
GI bolt 10 mm dia Nos 6.00 4.80 28.80 M-106
Galvanised MS flat clamp Nos 2.00 25.00 50.00 M-107
Miscellaneous @ 5% cost of materials 23.34
c)Over Head Charges @ 20% on (a+b) 103.09
d)Contractor's Profit @ 10% on (a+b+c) 61.85
Rate for 1 No = a+b+c+d 680.37
Rate per pipe = (a+b+c+d) / 1 680.37
say 680.00
6.11 2200 p.463 Providing filter media behind Abutment, Wing Wall, Retaining Wall
and Return Wall and below pitching in slopes including all labour,
materials, machinery, all leads and lifts, etc. complete as per
drawings, Technical Specifications Clause 305, 2504 and as directed
by the Engineer.
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.32 125.00 40.00 L-01
Mazdoor day 7.00 84.91 594.34 L-03
Mazdoor skilled day 1.00 88.68 88.68 L-02
b) Machinery
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Water Tanker hour 0.06 160.00 9.60 P&M-060
c) Materials
Filler media of stone aggregate
unit = cum
Total = 12 cum
40 mm Aggregate 30 per cent cum 3.60 437.70 1575.70 M-024
20 mm Aggregate 40 per cent cum 4.80 678.12 3255.00 M-025
10 mm Aggregate 20 per cent cum 2.40 615.15 1476.37 M-026
6 mm and Below 10 per cent cum 1.20 369.00 442.80 M-008
d)Over Head Charges @ 20% on (a+b+c) 1496.50
e)Contractor's Profit @ 10% on (a+b+c+d) 897.90
Rate for 10 cum = a+b+c+d+e 9876.90
Rate per cum = (a+b+c+d+e)/10 987.69
say 988.00
Back filling behind Abutment, Wing wall, Retaining Wall and Return
Wall with selected granular material of approved quality including all
6.12 309 labour, materials, machinery, all leads and lifts, etc. complete as per
drawings, Technical Specifications Clause 309 and as directed by the
Engineer.
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.28 125.00 35.00 L-01
Mazdoor day 7.00 84.91 594.34 L-03
b) Machinery
Plate compactor/Power rammer hour 2.50 50.00 125.00 P&M-086
Water Tanker hour 0.05 160.00 8.00 P&M-060
concrete mixer hour 2.50 150.00 375.00 P&M-009
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c) Materials
Granular material
unit = cum
Total = 10 cum
Gravel cum 8.00 149.32 1194.54 M-019
Stone dust cum 4.00 231.61 926.45 M-003
d)Over Head Charges @ 20% on (a+b+c) 651.67
e)Contractor's Profit @ 10% on (a+b+c+d) 391.00
Rate for 10 cum = a+b+c+d+e 4301.00
Rate per cum = (a+b+c+d+e)/10 430.10
say 430.00
6.13 2706 & p.461 Providing and fixing weep holes in Abutment, Wing Wall, Retaining
2200 Wall, Return Wall including all labour, materials, machinery, all leads
and lifts etc. complete as per drawing, Technical Specifications
Clause 2706,and Section 2700 and as directed by the Engineer.
unit = Nos
Taking output = 30 Nos
a) Labour
Mate day 0.03 125.000 3.75 L-01
Mason day 0.50 104.655 52.33 L-05
Mazdoor day 0.25 84.906 21.23 L-03
b) Materials
AC pipe 100 mm dia m 31.50 35.000 1102.50 M-102
MS clamp Nos 30.00 25.000 750.00 M-108
Collar for AC pipe(average) Nos 10.00 20.000 200.00 M-107
Cement motor 1:3 cum 0.05 2413.000 120.65 sub analysis
c)Over Head Charges @ 20% on (a+b) 450.09
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
d)Contractor's Profit @ 10% on (a+b+c) 270.05
Rate for 30 Nos = a+b+c+d 2970.60
Rate per pipe = (a+b+c+d)/30 99.02
say 99.00
SUB ANALYSIS
CEMENT MORTAR 1:3
unit = cum
Taking output = 1 cum
a) Labour
Mate day 0.040 125.00 5.00 L-01
Mazdoor day 0.900 84.91 76.42 L-03
b) Materials
Cement t 0.510 3756.85 1915.99 M-027
Sand cum 1.050 395.76 415.55 M-020
Rate for 1 cum = a+b 2412.95
say 2413.00
6.14 2000 & p.467 Proving and laying true to line, level and orientation Elastomeric
2200 Bearing from MoRT&H accredited supplier including all labour,
materials, machinery, all leads and lifts etc, complete as per drawing,
Technical Specifications Clause 2005,2008,2808 and as directed by
the Engineer.
unit = cu.cm
Taking output = 19200 cu.cm
a) Labour
Mate day 0.060 125.00 7.50 L-01
Mazdoor day 1.000 84.91 84.91 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Elastomeric bearing cu. cm 14655.00 0.404 5927.49 M-110
Miscellaneous @ 1% cost of materials 59.27
c)Over Head Charges @ 20% on (a+b) 1224.70
d)Contractor's Profit @ 10% on (a+b+c) 734.82
Rate for 19200 cu.cm = a+b+c+d 8083.04
Rate per cu.cm of Elastomer Bearing = (a+b+c+d)/19200 0.42
say 0.42
6.15 2000& p.469 Providing and laying true to line, level and orientation Pot-cum-PTFE
2200 Bearing from MoRT&H accredited supplier consisting of a metal
piston supported by a disc or unreinforced elastomer confined within
a metal cylinder, sealing ring, dust seal, wiper seal, dimpled PTFE
sheet and silicon grease sliding against stainless steel backing
surface, complete assembly made of cast steel/fabricated structural
steel, all labour, materials, machinery, all leads and lifts, etc.
complete as per drawing, Technical Specifications Section
2000,2200,2006 and as directed by the Engineer.
unit = Nos
Taking output = 1 No
(A) 200 ton capacity fixed bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 32479.41 32479.41 M-111
Miscellaneous @ 1% cost of materials 324.79
c)Over Head Charges @ 20% on (a+b) 6597.18
d)Contractor's Profit @ 10% on (a+b+c) 3958.31
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Rate for 1 No = a+b+c+d 43541.39
Rate per Fixed bearing = (a+b+c+d)/1 43541.39
say 43541.00
(B) 200 ton capacity sliding bearing(fixed in longitudinal direction or fixed in transverse direction)
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 45537.45 45537.45 M-112
Miscellaneous @ 1% cost of materials 455.37
c)Over Head Charges @ 20% on (a+b) 9234.91
d)Contractor's Profit @ 10% on (a+b+c) 5540.94
Rate for 1 No = a+b+c+d 60950.38
Rate per sliding bearing = (a+b+c+d)/1 60950.38
say 60950.00
(C) 100 ton capacity fixed bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 27706.92 27706.92 M-113
Miscellaneous @ 1% cost of materials 277.07
c)Over Head Charges @ 20% on (a+b) 5633.14
d)Contractor's Profit @ 10% on (a+b+c) 3379.88
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Rate for 1 No = a+b+c+d 37178.71
Rate per sliding bearing = (a+b+c+d)/1 37178.71
say 37179.00
(D) 100 ton capacity sliding bearing(fixed in transverse direction)
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 37821.94 37821.94 M-114
Miscellaneous @ 1% cost of materials 378.22
c)Over Head Charges @ 20% on (a+b) 7676.37
d)Contractor's Profit @ 10% on (a+b+c) 4605.82
Rate for 1 No = a+b+c+d 50664.05
Rate per sliding bearing = (a+b+c+d)/1 50664.05
say 50664.00
(E) 100 ton capacity free bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 37119.32 37119.32 M-115
Miscellaneous @ 1% cost of materials 371.19
c)Over Head Charges @ 20% on (a+b) 7534.44
d)Contractor's Profit @ 10% on (a+b+c) 4520.67
Rate for 1 No = a+b+c+d 49727.32
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Rate per free bearing = (a+b+c+d)/1 49727.32
say 49727.00
(F) 200 ton capacity free bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 44410.62 44410.62 M-116
Miscellaneous @ 1% cost of materials 444.11
c)Over Head Charges @ 20% on (a+b) 9007.28
d)Contractor's Profit @ 10% on (a+b+c) 5404.37
Rate for 1 No = a+b+c+d 59448.08
Rate per free bearing = (a+b+c+d)/1 59448.08
say 59448.00
6.16 2600 p513 Providing and fixing Compression Seal type Expansion Joint from
MoRT&H accredited supplier with all labour, materials, machinery, all
leads and lifts, etc., complete as per drawings, Technical
Specifications Section 2600 and as directed by the Engineer.
unit = metre
Taking output = 12 metre
a) Labour
Mate day 0.036 125.00 4.50 L-01
Mazdoor day 0.600 84.91 50.94 L-03
Mazdoor skilled day 0.300 88.68 26.61 L-02
b) Materials
Compression seal with angle m 12.000 5567.90 66814.78 M-117
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Miscellaneous @ 5% of cost of angle section 3340.74
c)Over Head Charges @ 20% on (a+b) 14047.51
d)Contractor's Profit @ 10% on (a+b+c) 8428.51
Rate for 12 metre = a+b+c+d 92713.58
Rate per metre = (a+b+c+d)/12 7726.13
say 7726.00
6.17 2607 p.515 Providing and fixing Elastomeric Strip Seal type Expansion Joint
from MoRT&H accredited supplier with all labour, materials,
machinery, all leads and lifts, etc. complete as per drawing, Technical
Specifications Section 2600 and as directed by the Engineer.
unit = metre
Taking output = 12 metre
a) Labour
Mate day 0.050 125.00 6.25 L-01
Mazdoor day 1.000 84.91 84.91 L-03
Mazdoor skilled day 0.250 88.68 22.17 L-02
b) Materials
Complete assembly of strip steel expansion joint m 12.000 6363.31 76359.74 M-118
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
6.18 1500,1700 p.335 Providing and laying M15 grade Plain Cement Concrete with 20 mm
& 2100 down graded crushed stone aggregates under Approach Slab with
shuttering and supporting arrangements, transporting concrete from
batching plant by transit mixer, placing it in position, compacting with
needle vibrator, moist curing, all labour, materials, machinery, all
leads and lifts, etc. complete as per drawing, Technical
Specifications Section 1500, 1700 and as directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-018
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
10 mm Aggregate cum 10.80 615.15 6643.67 M-026
d)Over Head Charges @ 20% on (a+b+c) 47926.58
e)Contractor's Profit @ 10% on (a+b+c+d) 28755.95
Rate for 120 cum = a+b+c+d+e 316315.42
Rate per cum = (a+b+c+d+e)/120 2635.96
say 2636.00
6.19 1500,1700 p.478 Providing and laying M30 grade Reinforced Cement Concrete with 20
, 2200 mm down graded crushed stone aggregates for Approach Slab
including all labour, materials, machinery, shuttering and supporting
arrangements,, (excluding reinforcement ) transporting concrete from
batching plant by transit mixer, placing it in position, compacting with
needle vibrator, moist curing for 14 days, all leads and lifts, etc.
complete as per drawing, Technical Specifications Section
1500,1600,1700,and Clause 2704 and as directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 18.000 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 48.80 3756.85 183334.28 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
unit = m
Taking output = 10 m
a) M 40 Grade Concrete cum 3.000 3076.00 9228.00 sub analysis
b) Labour
Mate day 0.080 125.00 10.00 L-01
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mazdoor day 2.000 84.91 169.81 L-03
c)Over Head Charges @ 20% on (a+b) 1881.56
d)Contractor's Profit @ 10% on (a+b+c) 1128.94
Rate for 10 m = a+b+c+d 12418.31
Rate per m = (a+b+c+d)/10 1241.83
say 1242.00
SUB ANALYSIS
M-40 GRADE CONCRETE
unit = cum
Taking output = 120 cum
p483 a) Labour
Mate day 0.940 125.00 117.50 L-01
Mason day 3.500 104.66 366.29 L-05
Mazdoor day 20.000 84.91 1698.12 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 51.60 3756.85 193853.46 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
Admixture @0.4% of cement kg 206.40 51.00 10526.40 M-103
d)Form work charges @ 0.1 on (a+b+c) 33551.54
Total,a+b+c+d 369066.94
(a+b+c+d)/120 3075.56
say 3076.00
6.21 1200,1500 p.478 Providing and laying M30 grade Reinforced Cement Concrete with 20
, 1700 mm down graded crushed stone aggregates for Crash Barrier and
Kerb (other than Major Bridge and Flyover) excluding reinforcement
including shuttering and supporting arrangements, transporting
concrete from batching plant by transit mixer, placing it in position,
compacting with needle vibrator, moist curing for 14 days, all labour,
materials, machinery, all leads and lifts, etc. complete as per drawing,
Technical Specifications Clause 809, and Section 1500,1700,2100 and
as directed by the Engineer.
unit = m
Taking output = 10 m
a)M 30 Grade Concrete cum 3.000 2881.000 8643.00 sub analysis
b) Labour
Mate day 0.070 125.00 8.75 L-01
Mazdoor day 2.000 84.91 169.81 L-03
c)Over Head Charges @ 20% on (a+b) 1764.31
d)Contractor's Profit @ 10% on (a+b+c) 1058.59
Rate for 10 m = a+b+c+d 11644.46
Rate per cum = (a+b+c+d)/10 1164.45
say 1164.00
SUB ANALYSIS M 30
a) Labour
Mate day 0.880 125.00 110.00 L-01
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 19.000 84.91 1613.21 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 48.79 3756.85 183296.71 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
unit = m
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Taking output = 10 m
a)Labour
Mate day 0.014 125.00 1.75 L-01
Mazdoor day 0.35 84.91 29.72 L-03
Welder day 0.01 104.66 1.05 L-11
b)Materials
MS Pipe m 10 215.00 2150.00 M-119
Insert Plate kg 25 29.89 747.13 M-120
Lugs kg 6.75 29.89 201.72 M-121
Welding torch and consumables 154.94
c)Over Head Charges @ 20% on (a+b) 657.26
d)Contractor's Profit @ 10% on (a+b+c) 394.36
Rate for 10 m = a+b+c+d 4337.92
Rate per m = (a+b+c+d)/10 433.79
say 434.00
6.23 1100 & p.426 Providing ,laying and installation of 1200 mm diameter bored cast-in-
1700 situ Pile with M35 grade Reinforced Cement Concrete comprising 20
mm down graded crushed stone aggregates excluding
reinforcement,but including hydraulic drilling (either by
rotary/percussion method) with bentonite slurry suspension, placing
reinforcement on cleaning of dredged hole ,transporting concrete
from batching plant by transit mixer, placing it in position by tremie
method, all labour, materials, machinery, all leads and lifts, testing as
per clause 1113 etc. complete as per drawing, Technical
Specifications Clause1100 and as directed by the Engineer.
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
a) Labour
Mate day 0.18 125.00 22.50 L-01
Mazdoor day 4.50 84.91 382.08 L-03
b) Machinery (For boring and construction)
Hire and running charges of hydraulic piling rig with power unit and hour 6.00 3525.00 21150.00 P&M-036
complete accessories including shifting from one bore location to another
Hire and running charges of light crane for lowering reinforcement cage hour 0.50 550.00 275.00 P&M-074
Hire and running charges for bentonite pump hour 6.00 165.00 990.00 P&M-007
Loader 1 cum bucket capacity hour 0.50 520.00 260.00 P&M-017
Tipper 5.5 cum capacity for disposal of muck from pile bore hole hour 0.50 200.00 100.00 P&M-048
Bentonite kg 385.00 32.25 12416.25 M-136
c) Materials
Concrete M35 cum 10.17 2860.00 29086.20 sub analysis
Concrete to be cast with a tremie pipe 200 mm dia
d)Over Head Charges @ 20% on (a+b+c) 12936.41
e)Contractor's Profit @ 10% on (a+b+c+d) 7761.84
Rate for 9 m = a+b+c+d+e 85380.27
Rate per m = (a+b+c+d+e)/9 9486.70
say 9487.00
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 50.28 3756.85 188894.42 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Coarse sand cum 27.00 369.00 9963.03 M-023
6.24 2504 p.522 Providing and laying 300 mm thick stone boulder pitching on slopes
including laying of 150mm thick filter media underneath including all
labour, materials, machinery, all leads and lifts, etc. complete as per
drawing, Technical Specifications Section 2500 and as directed by
the Engineer.
unit = cum
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Taking output = 1cum
a) Labour
Mate day 0.040 125.00 5.00 L-01
Mason day 0.350 104.66 36.63 L-05
Mazdoor day 0.750 84.91 63.68 L-03
b) Materials
Stone (weighing not less than 40 kg each) cum 1.000 335.00 335.00 M-057
Stone spalls cum 0.200 586.00 117.20 M-058
c)Over Head Charges @ 20% on (a+b) 111.50
d)Contractor's Profit @ 10% on (a+b+c) 66.90
Rate for 1 cum = a+b+c+d 735.91
Rate per cum = (a+b+c+d)/1 735.91
say 736.00
6.25 801 p.211 Painting of Bridge No. and span arrangement on bridge ends
including all labour, materials, all leads and lifts etc. complete as per
drawing, Technical Specifications Section 800 and as directed by the
Engineer.
unit = Nos
Taking output = 1 Nos
a)Painting (colour) sqm 0.090 36.00 3.24 sub analysis
b)Lettering (white) cm/lr 20.000 0.24 4.80 sub analysis
c)lettering (hindi) cm/lr 20.000 0.20 4.00 sub analysis
d)Over Head Charges @ 20% on (a+b+c) 2.41
e)Contractor's Profit @ 10% on (a+b+c+d) 1.44
Rate for 1 cum = a+b+c+d 15.89
Rate per cum = (a+b+c+d)/1 15.89
say 16.00
801 p.221 SUB ANALYSIS
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
printing new letters and figures of any shade with synthetic enamel paint
black or any other approved color is to give an even shade (Hindi Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.120 125.00 15.00 L-01
Painter day 2.000 93.21 186.41 L-21
Mazdoor day 1.000 84.91 84.91 L-03
b) Materials
Paint conforming to requirement Litre 0.700 134.38 94.06 M-072
Rate for 1600 cm = a+b 380.38
Rate per letter per cm = (a+b)/1600 0.24
say 0.24
801 p.212 SUB ANALYSIS
printing new letters and figures of any shade with synthetic enamel paint
black or any other approved color is to give an even shade (English
Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.070 125.00 8.75 L-01
Painter day 1.250 93.21 116.51 L-21
Mazdoor day 0.500 84.91 42.45 L-03
b) Materials
Paint conforming to requirement Litre 0.500 134.38 67.19 M-072
Rate for 1600 cm = a+b+c+d 234.90
Rate per letter per cm = (a+b+c+d)/1600 0.15
say 0.15
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
6.26 803 p.220 Applying cement paint of approved quality to the surface of concrete
Crash Barrier, Kerb including all labour, materials, all leads and lifts
etc. complete as per drawing, Technical Specifications Section 800
and as directed by the Engineer.
unit = sqm
Taking output =40 sqm
a) Labour
Mate day 0.120 125.00 15.00 L-01
Painter day 2.000 93.21 186.41 L-21
Mazdoor day 1.000 84.91 84.91 L-03
b) Materials
Paint 1st Quality Litre 6.000 134.38 806.25 M-072
Filling material LS 180.00
c)Over Head Charges @ 20% on (a+b) 254.51
d)Contractor's Profit @ 10% on (a+b+c) 152.71
Rate for 40 sqm = a+b+c+d 1679.79
Rate per sqm = (a+b+c+d)/40 41.99
say 42.00
6.27 509, 515 p.138, Providing and laying 65 mm thick wearing coat (25mm Mastic asphalt
p.151 and 40 mm Bituminous Concrete) including all labours,material and
machinery, all leads and lifts etc as per drawing
a)
unit = sqm
Taking output =1 sqm
a) 25 mm thick mastic asphalt sqm 1.000 291.000 291.000 sub analysis
b) 40 mm thick Bituminous concrete cum 0.040 3238.000 129.520 sub analysis
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c)Overhead charges @ 0.2 on (a+b) 84.10
d)Contractor's profit @ 0.1 on (a+b+c) 50.46
Rate for 1 sqm of wearing coat =a+b+c+d 555.086
Rate per sqm = (a+b+c+d) 555.09
say 555.00
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
SUB ANALYSIS
509 p.138 Providing and laying 40mm thick bituminous concrete from
electronically controlled hot mix plant using graded crushed stone
aggregate with bituminous binder as per job mix formulae,
transporting the mix to work site in closed condition to lay the mix at
designated temperature specified in MoRT&H, laying with hydrostatic
censor-controlled paver finished to the required line and level,rolling
with smooth wheeled vibratory and tandem roller to achieve desired
compaction complete, all labours and materials, all leads and lifts etc
as per drawing
unit = cum
Taking output =191 cum(450t)
a) labour
Mate day 0.840 125.00 105.00 L-01
Mazdoor day 16.000 84.91 1358.49 L-03
Mazdoor skilled day 5.000 88.68 443.42 L-02
b)Machinery
Hot mix plant @ 75t/hr capacity hour 6.000 15100.00 90600.00 P&M-021
Paver finisher @ 75 cum/hr hour 6.000 1725.00 10350.00 P&M-034
Generator hour 6.000 450.00 2700.00 P&M-018
Front end loader hour 6.000 520.00 3120.00 P&M-017
Tipper hour 6.000 200.00 1200.00 P&M-048
Add 10% of cost carriage for loading and unloading 120.00
Vibratory roller hour 3.900 994.00 3876.60 P&M-059
c) Materials
I) Bitumen (CRMB55) grade t 22.500 16075.07 361689.13 M-035
ii) Aggregate (Grade I)
20 - 10 mm 35% cum 99.750 618.02 61647.20 M-012
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
10 - 5 mm 23% cum 65.550 560.77 36758.61 M-013
5 mm and below 40% cum 114.000 369.00 42066.14 M-008
Filler at 2% of weight of aggregates t 8.500 281.00 2388.50 M-003
Rate for 191 cum = a+b+c+d 618423.09
Rate per cum = (a+b+c+d)/191 3237.82
say 3238.00
SUB ANALYSIS
515 p.151 Providing and laying 25mm thick mastic asphalt over bituminous
concrete with paving grade bitumen as per job mix formulae, using
mastic cooker, laid to required level, line and slope after cleaning
bituminous surface, providing anti-skid surface with bitumen
precoated angular hard stone chips of 13.2mm nominal size, pressed
into the surface, all labours and materials, hiring charges of
machinery, all leads and lifts etc, complete as per drawing
unit = sqm
Taking output =35 sqm
a) Labour
Mate day 0.440 125.00 55.00 L-01
Mazdoor day 10.000 84.91 849.06 L-03
Mazdoor skilled day 1.000 88.68 88.68 L-02
b) Machinery
Mechanical broom hour 0.060 230.00 13.80 P&M-031
Air Compressor hour 0.060 206.00 12.36 P&M-001
Mastic cooker hour 6.000 232.00 1392.00 P&M-030
Bitumen Boiler hour 6.000 128.00 768.00 P&M-005
Tractor hour 1.000 234.00 234.00 P&M-053
c) Material
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
I) Bitumen 30/40 grade @ 15 percent by weight of mix 2 x 15/100 t 0.300 16985.71 5095.71 M-036
ii) Fine aggregate 6mm and 20mm @ 25 percent by weight of mix = 2 x cum 0.310 595.69 184.66 M-014
25/100 = 0.5 tonnes = 0.5/1.625 = 0.31
iii) Lime stone dust filler with calcium content not less than 80 percent by t 0.500 2445.63 1222.81 M-138
weight @ 25 percent by weight of mix = 2 x 25/100 = 0.5
iv) Coarse aggregates 6mm to 10mm @ 35 percent by weight mix = 2 x cum 0.480 560.77 269.17 M-013
35/100 = 0.7 mt = 0.7/1.456 = 0.48
Rate for 35 sqm = a+b+c+d 10185.26
Rate per sqm = (a+b+c+d)/35 291.01
say 291.00
6.28 3100 p.199 Providing and Laying true to line, level and orientation Mechanically
Stabilized Reinforced Earth Wall (measured on Face Area) of
minimum 180mm thickness from MoRT&H accredited supplier
including all labour, materials, machinery, all leads and lifts, but
excluding backfilling with earth (to be separately paid as per BoQ
item) etc. complete in the presence of supplier's representative as
per drawing, Technical Specifications Section 3100 and as directed
by the Engineer
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Galvanised carbon steel strip m 450.000 99 44505.00 M-123
Miscellaneous @ 10% cost of materials 4450.50
Rate for 450 m = a+b+c+d 49775.99
Rate per m = (a+b+c+d)/450 110.61
say 111.00
450m= 24 sqm of facing element per sqm rate = 51570/24 2074.00
3104 p.201 Facing element of RCC (Standard size 1.5m x 1.5m)
unit = sqm
Taking output =75 sqm
a) Labour
Mate day 0.180 125 22.50 L-01
Mazdoor day 3.000 85 254.72 L-03
Mazdoor skilled day 1.500 89 133.03 L-02
b) Machinery
Light crane(lifting) m 6.000 230 1380.00 P&M-013
c) Material
Pre-cast RCC M-35 facing element cum 13.500 2881 38893.50 sub analysis
HYSD steel @ 5kg/sqm t 0.380 29668 11273.90 M-029
miscellaneous @ 2% of cost of materials 1003.35
Rate for 75 sqm = a+b+c+d 52960.99
Rate per sqm = (a+b+c+d)/75 706.15
say 707.00
b) RE-WALL
unit= 1sqm area of facing wall
a) Facing element sqm 707.00 sub analysis
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
b) Assembling,joining and laying of reinforcing element( with galvanised sub analysis
steel strip) sqm 2074.00
c)Excavation on foundation including back filling LS 10.00
d)Foundation concrete M20 cum 0.030 2457 73.71 sub analysis
e) Filter media cum 0.600 729 437.40 sub analysis
f) Capping Beam M30 cum 0.020 3052 61.04 sub analysis
g) Reinforcement for capping beam kg 3.000 22 66.00 M-061
h)Drainage and maintainance work LS 165.00
c)Over Head Charges @ 20% on (a+b) 718.83
d)Contractor's Profit @ 10% on (a+b+c) 431.30
Rate per sqm of RE- Wall 4744.28
say 4744.00
b) drainage pipe
Narrow filter sub-surface drain
unit=m
Taking out put 1m
a) Labour
Mate day 0.04 125 5.00 L-01
Mazdoor day 0.50 85 42.45 L-03
Mazdoor skilled day 0.25 89 22.17 L-02
b) Material
Perforated geosynthetic pipe m 1.00 125 125.00 M-137
Miscellaneous @ 2% of material 2.50
c)Over Head Charges @ 20% on (a+b) 39.42
d)Contractor's Profit @ 10% on (a+b+c) 23.65
Rate for 1m=a+b+c+d 260.20
say 260.00
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
1200,1500 p.361 M35 GRADE CONCRETE
& 1700
Using Batching plant, Transit mixer and crane/ concrete pump
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Materials
Cement t 50.28 3756.85 188894.42 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
say 2852.00
6.29 1400 & p.453 Providing and laying Random Rubble Masonry in cement mortar 1:3
2200 for sub structure, dressing, preparing joints including all labour,
materials, machinery, all leads and lifts complete as per drawing,
Technical Specifications Section 1400,2200 and as directed by the
Engineer.
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
6.30 1500, Providing and laying M20 grade Reinforced Cement Concrete with 20
1700, mm down graded crushed stone aggregates for Drain cover slab over
2300 concrete drain including reinforcement, shuttering and supporting
arrangements, transporting concrete from batching plant by transit
mixer, placing it in position, compacting with needle vibrator, moist
curing for 14 days, all labour, materials, machinery, all leads and lifts,
etc. complete as per drawing, Technical Specifications Clause
809,and Section 1500,1700,2100 and as directed by the Engineer.
unit = m
Taking output =1 m
M20 RCC Slab cum 0.2025 3233 654.6825 sub analysis
HYSD steel reinforcement t 0.008 32509.00 258.39
Labour for lifting and placing in position 45.65
c)Over Head Charges @ 20% on (a+b) 239.68
d)Contractor's Profit @ 10% on (a+b+c) 119.84
Rate for 1m of drainage cover 1318.24
Rate per m 1318.24
say 1319.00
SUB ANALYSIS
RCC M20 with Batching plant
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Material
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Cement t 41.66 3756.85 156510.37 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
6.31 2507.2 p.527 Providing and laying flexible apron in the upstream and downstream
of structure for protection against scour with stone boulders
weighing not less than 40 kg each including all labour , materials,
machinery, all leads and lifts, compacting to the satisfaction of the
Engineer etc. complete as per drawing, Technical Specification
Section 2500 and as directed by the Engineer
unit = cum
Taking output =1 cum
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
a) Materials
Stone cu.m 1.00 335.00 335.00 M-057
Stone Spalls cu.m 0.20 586.00 117.20 M-058
b) Labour
Mate day 0.05 125.00 6.25 L-01
Mason day 0.25 104.66 26.16 L-05
Mazdoor day 1.00 84.91 84.91 L-03
c)Over Head Charges @ 20% on (a+b) 113.90
d) Contractor's profit @ 10% on (a+b+c) 68.34
Rate for 1 cum 751.77
say 752.00
CHAPTER - 6A
MAJOR BRIDGES
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
6.01 304 p.323 a) Earthwork in excavation for foundation of structure for all types of soil
and soft disintegrated rock including setting out, breaking of clods,
construction of necessary cofferdams, shoring, bracing and propping
arrangement at stressed zone, dewatering to the satisfaction of the
Engineer, refilling of the excavated area, transporting the surplus useful
materials to the embankment site as well as disposal of unusable materials
with all leads and lifts, all labour, machinery, materials, all leads and lifts,
etc, complete as per Technical Specifications Clause 304 and as directed
by the Engineer.
A)Ordinary Soil
Unit = cum
Taking output = 240 cum (480t)
a) Labour
Mate day 0.32 125.00 40.00 L-01
Mazdoor day 8.00 84.91 679.25 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 10.670 200.00 2134.00 P&M-048
For next 4 km lead t.km 1920.000 1.74 3340.80 P&M-047
c) Overhead charges @ 0.25 on (a+b) 2808.51
d) Contractor's profit @ 0.1 on (a+b+c) 1404.26
Rate for 240 cum = a+b+c+d 15446.81
Rate per cum = (a+b+c+d)/240 64.36
say 64.00
304 p.326 B)Soft Disintegrated Rock
Unit = cum
Taking output = 180 cum (405t)
a) Labour
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mate day 0.24 125.00 30.00 L-01
Mazdoor day 6.00 84.91 509.43 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 8.250 200.00 1650.00 P&M-048
For next 4 km lead t.km 1620.000 1.74 2818.80 P&M-047
c) Overhead charges @ 0.25 on (a+b) 2512.06
d) Contractor's profit @ 0.1 on (a+b+c) 1256.03
Rate for 180 cum = a+b+c+d 13816.32
Rate per cum = (a+b+c+d)/180 76.76
say 77.00
average of (a+b)= (64+77)/2 70.50
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.20 125.00 25.00 L-01
Mazdoor day 5.00 84.91 424.53 L-03
b) Machinery
Air compressor hour 6.00 206.00 1236.00 P&M-001
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Tipper 5.5 cum capacity, 1 trip per hour.
For 1st km lead hour 1.810 200.00 362.00 P&M-048
Credit for exacavated rock found suitable for use@ 50 percent of excavated cum 5.00 160.00 800.00 M-140
quantity.
c) Overhead charges @ 0.25 on (a+b) 511.88
d) Contractor's profit @ 0.1 on (a+b+c) 255.94
Rate for 10 cum = a+b+c+d 2015.35
Rate per cum = (a+b+c+d)/10 201.54
say 202.00
304,302 p.326 c) Earthwork in excavation for foundation in hard rock (Requiring Blasting)
including setting out, construction of necessary cofferdams, shoring,
bracing and propping arrangement at stressed zone, dewatering, loading,
transporting and stacking neatly the useful materials for disposal by
auction or by utilizing for masonry or structural works and disposal of
unusable materials with all leads and lifts, all labour, machinery, materials,
with all safety precautions to the satisfaction of the Engineer, all leads and
lifts, etc, complete as per Technical Specifications Clause 304,302 and as
directed by the Engineer.
Unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.35 125.00 43.75 L-01
Driller day 0.50 85.65 42.82 L-03
Blaster day 0.25 94.35 23.59 L-20
Mazdoor day 8.00 84.91 679.25 L-17
b) Machinery
Air compressor with pneumatic breaker hour 1.00 206.00 206.00 P&M-001
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 0.450 200.00 90.00 P&M-048
For next 4 km lead t.km 96.000 1.74 167.04 P&M-047
c) Materials
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Blasting material kg 3.50 50.00 175.00 M-045
Detonator Electric nos 14.00 10.75 150.50 M-046
Credit for exacavated rock found suitable for use@ 50 percent of excavated cum 5.00 160.00 800.00 M-140
quantity.
d) Overhead charges @ 0.25 on (a+b+c) 394.49
e) Contractor's profit @ 0.1 on (a+b+c+d) 197.24
Rate for 10 cum = a+b+c+d+e 1369.68
Rate per cum = (a+b+c+d+e)/10 136.97
say 137.00
6.02 1500,1700 p.335 Providing and laying Plain Cement Concrete M25 grade with 40 mm down
& 2100 graded crushed stone aggregate below foundation, sub-structure including
all labour, materials, machinery, transporting concrete from batching plant
by transit mixer, placing it in position and compacting withs needle
vibrator, moist curing, all leads and lifts, etc. complete as per drawing,
Technical Specification Section 1500,1700,2100 and as directed by the
Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-018
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c) Materials
Cement t 47.95 3756.85 180140.96 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
40 mm Aggregate cum 43.20 437.70 18908.44 M-024
20 mm Aggregate cum 43.20 678.12 29294.97 M-025
10 mm Aggregate cum 21.60 615.15 13287.34 M-026
d) Form Work charges @ 10% of (a+b+c) 30201.55
e) Overhead charges @ 0.25 on (a+b+c+d) 83054.25
f) Contractor's profit @ 0.1 on (a+b+c+d+e) 41527.13
Rate for 120 cum = a+b+c+d+e+f 456798.39
Rate per cum = (a+b+c+d+e+f)/120 3806.65
say 3807.00
6.03 1600 p.489 Providing, cutting, bending and fixing in position HYSD reinforcement
made with high corrosion resistive material, in structures including all
labour, materials, machinery, all leads and lifts, etc. complete as per
drawing, Technical Specifications Section 1600 and as directed by the
Engineer.
unit = tonne
Taking output = 1 tonne
a) Labour
Mate day 0.44 125.00 55.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 8.00 84.91 679.25 L-03
b) Materials
HYSD Reinforcement t 1.05 29668.15 31151.56 M-029
Binding wire kg 8.00 38.70 309.60 M-073
c) Overhead charges @ 0.25 on (a+b) 8127.34
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
d) Contractor's profit @ 0.1 on (a+b+c) 4063.67
Rate for 1 tonne = a+b+c+d 44700.38
Rate per tonne = (a+b+c+d)/1 tonne 44700.38
say 44700.00
6.04 1800 p.490 Providing and placing in position High Tensile Steel strands conforming to
IS 6006:1983(class II) and IS 14268:1995(low relaxation strand) including
anchorage devices (tested as per BS: 4447 or FIP regulation), providing
additional length of cable for attaching jacks, placing corrugated HDPE
sheathing ducts in position, guides and grips as per IRC Specification,
protection with epoxy painting, accessories for stressing, stressing
operations and grouting including all labour, materials, machinery, all leads
and lifts, etc.complete as per drawing, Technical Specifications Section
1800 and as directed by the Engineer.
unit = tonne
Taking output = 0.377 tonne
a) Labour
I) For making and fixing cables, anchorages
Mate day 0.160 125.00 20.00 L-08
Blacksmith day 1.000 90.92 90.92 L-21
Mazdoor day 3.000 84.91 254.72 L-10
ii) For prestressing
Mate day 0.050 125.00 6.25 L-08
Fitter day 0.250 93.21 23.30 L-17
Mazdoor day 1.000 84.91 84.91 L-10
iii) For grouting
Mate day 0.050 125.00 6.25 L-08
Mason day 0.250 104.66 26.16 L-12
Mazdoor day 1.000 84.91 84.91 L-10
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
b) Machinery
Stressing jack with pump hour 2.500 200.00 500.00 P&M-084
Grouting pump with agitator hour 1.000 165.00 165.00 P&M-007
Generator hour 3.500 240.00 840.00 P&M-019
c) Materials
H.T. Strand @ 9.42 kg/m t 0.385 45599.35 17555.75 M-031
HDPE Sheating duct m 42.000 80.63 3386.25 M-134
Tube anchorage set nos 2.000 1720.00 3440.00 M-135
Cement for grouting t 0.125 3756.85 469.61 M-027
Miscellaneous items @ 0.5 % of cost of materials 124.26
d) Overhead charges @ 0.25 on (a+b+c) 6769.57
e) Contractor's profit @ 0.1 on (a+b+c+d) 3384.78
Rate for 0.377 tonne = a+b+c+d 37232.63
Rate per tonne = (a+b+c+d)/0.377 tonne 98760.29
say 98760.00
6.05 1200,1500, p.458 Providing and laying M35 grade Reinforced Cement Concrete with 20 mm
1700 down graded crushed stone aggregates in substructure and foundation
including shuttering and supporting arrangements,, (excluding
reinforcement ) transporting concrete from batching plant by transit mixer,
placing it in position, compacting with needle vibrator, moist curing for 14
days, all labour, materials, machinery, all leads and lifts, etc. complete as
per drawing, Technical Specifications Section 1500, 1700 and 2200 and as
directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mazdoor fo concreting day 18.000 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 50.64 3756.85 190246.88 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
6.06 1500, p.478 Providing and laying M30 grade Reinforced Cement Concrete with 20 mm
1700, 2100 down graded crushed stone aggregates in superstructure including
shuttering and supporting arrangements, (excluding reinforcement)
transporting concrete from batching plant by transit mixer, placing it in
position, compacting with needle vibrator, moist curing for 14 days, all
labour, materials, machinery, all leads and lifts, etc. complete as per
drawing, Technical Specifications Section 1500, 1700 and 2200 and as
directed by the Engineer.
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
d)Height effect charges @ 1.6% on (a+b+c) 4999.53
e)Form work charges @ 25% on (a+b+c+d) 79367.47
f)Overhead charges @ 0.25 on (a+b+c+d+e) 99209.33
g)Contractor's profit @ 0.1 on (a+b+c+d+e+f) 49604.67
Rate for 120 cum = a+b+c+d+e+f+g 545651.34
Rate per cum = (a+b+c+d+e+f+g) / 120 4547.09
say 4547.00
6.07 1500, p.458 Providing and laying M30 grade Reinforced Cement Concrete with 20 mm
1700, 2100 down graded crushed stone aggregates in substructure and foundation
including shuttering and supporting arrangements, (excluding
reinforcement) transporting concrete from batching plant by transit mixer,
placing it in position, compacting with needle vibrator, moist curing for 14
days, all labour, materials, machinery, all leads and lifts, etc. complete as
per drawing, Technical Specifications Section 1500, 1700 and 2200 and as
directed by the Engineer.
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 48.80 3756.85 183334.28 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
1st km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 51.60 3756.85 193853.46 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
Admixture @ 0.4% of cement kg 206.40 51.00 10526.40 M-103
d)Form work charges @ 25% on (a+b+c) 83415.16
e)Overhead charges @ 0.25 on (a+b+c+d) 104268.96
f)Contractor's profit @ 0.1 on (a+b+c+d+e) 52134.48
Rate for 120 cum = a+b+c+d+e+f 573479.26
Rate per cum = (a+b+c+d+e+f) / 120 4778.99
say 4779.00
6.09 1,800 p.502 Providing precast/cast-in-situ M-40 grade Pre Stressed Concrete with 20
mm down graded crushed stone aggregates for Girder in casting yard/ at
site including shuttering and supporting arrangements, (excluding
reinforcement) transporting concrete from batching plant by transit mixer,
placing it in position, compacting with needle vibrator, moist curing for 7
days, all labour, materials, machinery, all leads and lifts, erection (for
precast elements) etc. complete as per drawing, Technical Specifications
Section 1500,1600,1700,2300 and as directed by the Engineer.
unit = cum
Taking output = 1 cum
i) Erection and dismantling
Mate day 0.12 125.00 15.00 L-01
Mazdoor skilled day 1.00 88.68 88.68 L-02
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mazdoor day 2.00 84.91 169.81 L-03
ii) Concreting by batching plant and stationary concrete pump
Mate day 0.03 125.00 3.75 L-01
Mazdoor skilled day 0.05 88.68 4.43 L-02
Mazdoor day 0.60 84.91 50.94 L-03
iii) Curing
Mate day 0.01 125.00 1.25 L-01
Mazdoor day 0.35 84.91 29.72 L-03
iv) Handling of precast girder, stacking in stockyard and again loading in
trailor
Mate day 0.01 125.00 1.25 L-01
Mazdoor day 0.25 84.91 21.23 L-03
v) Placement of girders in position over pier caps with the help of guide
bar, channel levelling etc
Mate day 0.01 125.00 1.25 L-01
Mason day 0.06 104.66 6.28 L-05
Mazdoor day 0.24 84.91 20.38 L-03
b) Machinery
I) At casting yard
Batching plant hour 0.05 1440.00 72.00 P&M-002
Generator hour 0.05 450.00 22.50 P&M-080
Front end loader hour 0.05 520.00 26.00 P&M-017
Transit mixer hour 0.10 600.00 60.00 P&M-049
Concrete Pump hour 0.05 165.00 8.25 P&M-007
ii) For transportation and placement at site
crane hour 0.30 550.00 165.00 P&M-011
Trailor 80 tonne capacity hour 0.40 420.00 168.00 P&M-089
c) Materials
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Cement t 0.47 3756.85 1765.72 M-027
Coarse sand cum 0.23 395.76 89.05 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 0.23 300.31 67.57 M-023
unit = No
Taking output = 1 No
a) Labour
I) For fabrication
Mate day 0.02 125.00 2.50 L-01
Blacksmith skilled day 0.02 90.92 1.82 L-05
Mazdoor day 0.02 84.91 1.70 L-03
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
ii) For fixing in position
Mate day 0.01 125.00 1.25 L-01
Mason day 0.01 104.66 1.05 L-05
Mazdoor day 0.20 84.91 16.98 L-03
b)Materials
Corrosion resistant structural steel kg 4.00 22.00 88.00 M-104
GI pipe 100 mm dia m 1.00 300.00 300.00 M-105
GI bolt 10 mm dia Nos 6.00 4.80 28.80 M-106
Galvanised MS flat clamp Nos 2.00 25.00 50.00 M-107
Miscellaneous @ 5% cost of materials 23.34
c)Overhead charges @ 0.25 on (a+b) 128.86
d)Contractor's profit @ 0.1 on (a+b+c) 64.43
Rate for 1 No = a+b+c+d 708.72
Rate per pipe = (a+b+c+d) / 1 708.72
say 709.00
6.11 2200 p.463 Providing filter media behind Abutment, Wing Wall, Retaining Wall and
Return Wall and below pitching in slopes including all labour, materials,
machinery, all leads and lifts, etc. complete as per drawings, Technical
Specifications Clause 305, 2504 and as directed by the Engineer.
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.32 125.00 40.00 L-01
Mazdoor day 7.00 84.91 594.34 L-03
Mazdoor skilled day 1.00 88.68 88.68 L-02
b) Machinery
Water Tanker hour 0.06 160.00 9.60 P&M-060
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c) Materials
Filler media of stone aggregate
unit = cum
Total = 12 cum
40 mm Aggregate 30 per cent cum 3.60 437.70 1575.70 M-024
20 mm Aggregate 40 per cent cum 4.80 678.12 3255.00 M-025
10 mm Aggregate 20 per cent cum 2.40 615.15 1476.37 M-026
6 mm and Below 10 per cent cum 1.20 369.00 442.80 M-008
d)Overhead charges @ 0.25 on (a+b+c) 1870.62
e)Contractor's profit @ 0.1 on (a+b+c+d) 935.31
Rate for 10 cum = a+b+c+d+e 10288.43
Rate per cum = (a+b+c+d+e)/10 1028.84
say 1029.00
Back filling behind Abutment, Wing wall, Retaining Wall and Return Wall
with selected granular material of approved quality including all labour,
6.12 309 materials, machinery, all leads and lifts, etc. complete as per drawings,
Technical Specifications Clause 309 and as directed by the Engineer.
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.28 125.00 35.00 L-01
Mazdoor day 7.00 84.91 594.34 L-03
b) Machinery
Plate compactor/Power rammer hour 2.50 50.00 125.00 P&M-086
Water Tanker hour 0.05 160.00 8.00 P&M-060
concrete mixer hour 2.50 150.00 375.00 P&M-009
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c) Materials
Granular material
unit = cum
Total = 10 cum
Gravel cum 8.00 149.32 1194.54 M-019
Stone dust cum 4.00 231.61 926.45 M-003
d)Overhead charges @ 0.25 on (a+b+c) 814.58
e)Contractor's profit @ 0.1 on (a+b+c+d) 407.29
Rate for 10 cum = a+b+c+d+e 4480.21
Rate per cum = (a+b+c+d+e)/10 448.02
say 448.00
6.13 2706 & p.461 Providing and fixing weep holes in Abutment, Wing Wall, Retaining Wall,
2200 Return Wall including all labour, materials, machinery, all leads and lifts etc.
complete as per drawing, Technical Specifications Clause 2706,and Section
2700 and as directed by the Engineer.
unit = Nos
Taking output = 30 Nos
a) Labour
Mate day 0.03 125.000 3.75 L-01
Mason day 0.50 104.655 52.33 L-05
Mazdoor day 0.25 84.906 21.23 L-03
b) Materials
AC pipe 100 mm dia m 31.50 35.000 1102.50 M-102
MS clamp Nos 30.00 25.000 750.00 M-108
Collar for AC pipe(average) Nos 10.00 20.000 200.00 M-107
Cement motor 1:3 cum 0.05 2413.000 120.65 sub
analysis
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c)Overhead charges @ 0.25 on (a+b) 562.61
d)Contractor's profit @ 0.1 on (a+b+c) 281.31
Rate for 30 Nos = a+b+c+d 3094.37
Rate per pipe = (a+b+c+d)/30 103.15
say 103.00
SUB ANALYSIS
CEMENT MORTAR 1:3
unit = cum
Taking output = 1 cum
a) Labour
Mate day 0.040 125.00 5.00 L-01
Mazdoor day 0.900 84.91 76.42 L-03
b) Materials
Cement t 0.510 3756.85 1915.99 M-027
Sand cum 1.050 395.76 415.55 M-020
Rate for 1 cum = a+b 2412.95
say 2413.00
6.14 2000 & p.467 Proving and laying true to line, level and orientation Elastomeric Bearing
2200 from MoRT&H accredited supplier including all labour, materials,
machinery, all leads and lifts etc, complete as per drawing, Technical
Specifications Clause 2005,2008,2808 and as directed by the Engineer.
unit = cu.cm
Taking output = 19200 cu.cm
a) Labour
Mate day 0.060 125.00 7.50 L-01
Mazdoor day 1.000 84.91 84.91 L-03
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Elastomeric bearing cu. cm 14655.00 0.404 5927.49 M-110
Miscellaneous @ 1% cost of materials 59.27
c)Overhead charges @ 0.25 on (a+b) 1530.88
d)Contractor's profit @ 0.1 on (a+b+c) 765.44
Rate for 19200 cu.cm = a+b+c+d 8419.83
Rate per cu.cm of Elastomer Bearing = (a+b+c+d)/19200 0.44
say 0.44
6.15 2000& p.469 Providing and laying true to line, level and orientation Pot-cum-PTFE
2200 Bearing from MoRT&H accredited supplier consisting of a metal piston
supported by a disc or unreinforced elastomer confined within a metal
cylinder, sealing ring, dust seal, wiper seal, dimpled PTFE sheet and silicon
grease sliding against stainless steel backing surface, complete assembly
made of cast steel/fabricated structural steel, all labour, materials,
machinery, all leads and lifts, etc. complete as per drawing, Technical
Specifications Section 2000,2200,2006 and as directed by the Engineer.
unit = Nos
Taking output = 1 No
(A) 200 ton capacity fixed bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 32479.41 32479.41 M-111
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Miscellaneous @ 1% cost of materials 324.79
c)Overhead charges @ 0.25 on (a+b) 8246.47
d)Contractor's profit @ 0.1 on (a+b+c) 4123.24
Rate for 1 No = a+b+c+d 45355.61
Rate per Fixed bearing = (a+b+c+d)/1 45355.61
say 45356.00
(B) 200 ton capacity sliding bearing(fixed in longitudinal direction or fixed in transverse direction)
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 45537.45 45537.45 M-112
Miscellaneous @ 1% cost of materials 455.37
c)Overhead charges @ 0.25 on (a+b) 11543.63
d)Contractor's profit @ 0.1 on (a+b+c) 5771.82
Rate for 1 No = a+b+c+d 63489.97
Rate per sliding bearing = (a+b+c+d)/1 63489.97
say 63490.00
(C) 100 ton capacity fixed bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 27706.92 27706.92 M-113
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Miscellaneous @ 1% cost of materials 277.07
c)Overhead charges @ 0.25 on (a+b) 7041.42
d)Contractor's profit @ 0.1 on (a+b+c) 3520.71
Rate for 1 No = a+b+c+d 38727.82
Rate per sliding bearing = (a+b+c+d)/1 38727.82
say 38728.00
(D) 100 ton capacity sliding bearing(fixed in transverse direction)
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 37821.94 37821.94 M-114
Miscellaneous @ 1% cost of materials 378.22
c)Overhead charges @ 0.25 on (a+b) 9595.46
d)Contractor's profit @ 0.1 on (a+b+c) 4797.73
Rate for 1 No = a+b+c+d 52775.05
Rate per sliding bearing = (a+b+c+d)/1 52775.05
say 52775.00
(E) 100 ton capacity free bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 37119.32 37119.32 M-115
Miscellaneous @ 1% cost of materials 371.19
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c)Overhead charges @ 0.25 on (a+b) 9418.05
d)Contractor's profit @ 0.1 on (a+b+c) 4709.03
Rate for 1 No = a+b+c+d 51799.29
Rate per free bearing = (a+b+c+d)/1 51799.29
say 51799.00
(F) 200 ton capacity free bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 44410.62 44410.62 M-116
Miscellaneous @ 1% cost of materials 444.11
c)Overhead charges @ 0.25 on (a+b) 11259.11
d)Contractor's profit @ 0.1 on (a+b+c) 5629.55
Rate for 1 No = a+b+c+d 61925.08
Rate per free bearing = (a+b+c+d)/1 61925.08
say 61925.00
6.16 2600 p513 Providing and fixing Compression Seal type Expansion Joint from MoRT&H
accredited supplier with all labour, materials, machinery, all leads and lifts,
etc., complete as per drawings, Technical Specifications Section 2600 and
as directed by the Engineer.
unit = metre
Taking output = 12 metre
a) Labour
Mate day 0.036 125.00 4.50 L-01
Mazdoor day 0.600 84.91 50.94 L-03
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mazdoor skilled day 0.300 88.68 26.61 L-02
b) Materials
Compression seal with angle m 12.000 5567.90 66814.78 M-117
unit = metre
Taking output = 12 metre
a) Labour
Mate day 0.050 125.00 6.25 L-01
Mazdoor day 1.000 84.91 84.91 L-03
Mazdoor skilled day 0.250 88.68 22.17 L-02
b) Materials
Complete assembly of strip steel expansion joint m 12.000 6363.31 76359.74 M-118
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
say 9200.00
6.18 1500,1700 p.335 Providing and laying M15 grade Plain Cement Concrete with 20 mm down
& 2100 graded crushed stone aggregates under Approach Slab with shuttering and
supporting arrangements, transporting concrete from batching plant by
transit mixer, placing it in position, compacting with needle vibrator, moist
curing, all labour, materials, machinery, all leads and lifts, etc. complete
as per drawing, Technical Specifications Section 1500, 1700 and as
directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-018
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
40 mm Aggregate cum 64.80 437.70 28362.65 M-024
20 mm Aggregate cum 32.40 678.12 21971.23 M-025
10 mm Aggregate cum 10.80 615.15 6643.67 M-026
d)Overhead charges @ 0.25 on (a+b+c) 59908.22
e)Contractor's profit @ 0.1 on (a+b+c+d) 29954.11
Rate for 120 cum = a+b+c+d+e 329495.23
Rate per cum = (a+b+c+d+e)/120 2745.79
say 2746.00
6.19 1500,1700, p.478 Providing and laying M30 grade Reinforced Cement Concrete with 20 mm
2200 down graded crushed stone aggregates for Approach Slab including all
labour, materials, machinery, shuttering and supporting arrangements,,
(excluding reinforcement ) transporting concrete from batching plant by
transit mixer, placing it in position, compacting with needle vibrator, moist
curing for 14 days, all leads and lifts, etc. complete as per drawing,
Technical Specifications Section 1500,1600,1700,and Clause 2704 and as
directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 18.000 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 48.80 3756.85 183334.28 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c)Overhead charges @ 0.25 on (a+b) 2351.95
d)Contractor's profit @ 0.1 on (a+b+c) 1175.98
Rate for 10 m = a+b+c+d 12935.74
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
Admixture @0.4% of cement kg 206.40 51.00 10526.40 M-103
d)Form work charges @ 0.1 on (a+b+c) 33551.54
Total,a+b+c+d 369066.94
(a+b+c+d)/120 3075.56
say 3076.00
6.21 1200,1500, p.478 Providing and laying M30 grade Reinforced Cement Concrete with 20 mm
1700 down graded crushed stone aggregates for Crash Barrier and Kerb (other
than Major Bridge and Flyover) excluding reinforcement including
shuttering and supporting arrangements, transporting concrete from
batching plant by transit mixer, placing it in position, compacting with
needle vibrator, moist curing for 14 days, all labour, materials, machinery,
all leads and lifts, etc. complete as per drawing, Technical Specifications
Clause 809, and Section 1500,1700,2100 and as directed by the Engineer.
unit = m
Taking output = 10 m
a)M 30 Grade Concrete cum 3.000 2864.000 8592.00 sub
analysis
b) Labour
Mate day 0.070 125.00 8.75 L-01
Mazdoor day 2.000 84.91 169.81 L-03
c)Overhead charges @ 0.25 on (a+b) 2192.64
d)Contractor's profit @ 0.1 on (a+b+c) 1096.32
Rate for 10 m = a+b+c+d 12059.52
Rate per cum = (a+b+c+d)/10 1205.95
say 1206.00
SUB ANALYSIS M 30
a) Labour
Mate day 0.880 125.00 110.00 L-01
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 19.000 84.91 1613.21 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 48.79 3756.85 183296.71 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
unit = m
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Taking output = 10 m
a)Labour
Mate day 0.014 125.00 1.75 L-01
Mazdoor day 0.35 84.91 29.72 L-03
Welder day 0.01 104.66 1.05 L-11
b)Materials
MS Pipe m 10 215.00 2150.00 M-119
Insert Plate kg 25 29.89 747.13 M-120
Lugs kg 6.75 29.89 201.72 M-121
Welding torch and consumables 154.94
Epoxy coating (per tonne of reinforcement) t 0.012 25.00 0.31
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
a) Labour
Mate day 0.18 125.00 22.50 L-01
Mazdoor day 4.50 84.91 382.08 L-03
b) Machinery (For boring and construction)
Hire and running charges of hydraulic piling rig with power unit and complete hour 6.00 3525.00 21150.00 P&M-036
accessories including shifting from one bore location to another
Hire and running charges of light crane for lowering reinforcement cage hour 0.50 550.00 275.00 P&M-074
Hire and running charges for bentonite pump hour 6.00 165.00 990.00 P&M-007
Loader 1 cum bucket capacity hour 0.50 520.00 260.00 P&M-017
Tipper 5.5 cum capacity for disposal of muck from pile bore hole hour 0.50 200.00 100.00 P&M-048
Bentonite kg 385.00 32.25 12416.25 M-136
c) Materials
Concrete M35 cum 10.17 2843.00 28913.31 sub
analysis
Concrete to be cast with a tremie pipe 200 mm dia
d)Overhead charges @ 0.25 on (a+b+c) 16127.28
e)Contractor's profit @ 0.1 on (a+b+c+d) 8063.64
Rate for 9 m = a+b+c+d+e 88700.06
Rate per m = (a+b+c+d+e)/9 9855.56
say 9856.00
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mazdoor day 18.000 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 50.28 3756.85 188894.42 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Coarse sand cum 27.00 300.31 8108.30 M-023
6.24 2504 p.522 Providing and laying 300 mm thick stone boulder pitching on slopes
including laying of 150mm thick filter media underneath including all
labour, materials, machinery, all leads and lifts, etc. complete as per
drawing, Technical Specifications Section 2500 and as directed by the
Engineer.
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
unit = cum
Taking output = 1cum
a) Labour
Mate day 0.040 125.00 5.00 L-01
Mason day 0.350 104.66 36.63 L-05
Mazdoor day 0.750 84.91 63.68 L-03
b) Materials
Stone (weighing not less than 40 kg each) cum 1.000 335.00 335.00 M-057
Stone spalls cum 0.200 409.07 81.81 M-058
c)Overhead charges @ 0.25 on (a+b) 130.53
d)Contractor's profit @ 0.1 on (a+b+c) 65.27
Rate for 1 cum = a+b+c+d 717.92
Rate per cum = (a+b+c+d)/1 717.92
say 718.00
6.25 801 p.211 Painting of Bridge No. and span arrangement on bridge ends including all
labour, materials, all leads and lifts etc. complete as per drawing, Technical
Specifications Section 800 and as directed by the Engineer.
unit = Nos
Taking output = 1 Nos
a)Painting (colour) sqm 0.090 36.00 3.24 sub
analysis
b)Lettering (white) cm/lr 20.000 0.24 4.80 sub
analysis
c)lettering (hindi) cm/lr 20.000 0.20 4.00 sub
analysis
c)Overhead charges @ 0.25 on (a+b) 3.01
d)Contractor's profit @ 0.1 on (a+b+c) 1.51
Rate for 1 cum = a+b+c+d 16.56
Rate per cum = (a+b+c+d)/1 16.56
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
say 17.00
801 p.221 SUB ANALYSIS
printing new letters and figures of any shade with synthetic enamel paint black or
any other approved color is to give an even shade (Hindi Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.120 125.00 15.00 L-01
Painter day 2.000 93.21 186.41 L-21
Mazdoor day 1.000 84.91 84.91 L-03
b) Materials
Paint conforming to requirement Litre 0.700 134.38 94.06 M-072
Rate for 1600 cm = a+b 380.38
Rate per letter per cm = (a+b)/1600 0.24
say 0.24
801 p.212 SUB ANALYSIS
printing new letters and figures of any shade with synthetic enamel paint black or
any other approved color is to give an even shade (English Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.070 125.00 8.75 L-01
Painter day 1.250 93.21 116.51 L-21
Mazdoor day 0.500 84.91 42.45 L-03
b) Materials
Paint conforming to requirement Litre 0.500 134.38 67.19 M-072
Rate for 1600 cm = a+b+c+d 234.90
Rate per letter per cm = (a+b+c+d)/1600 0.15
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
say 0.15
6.26 803 p.220 Applying cement paint of approved quality to the surface of concrete Crash
Barrier, Kerb including all labour, materials, all leads and lifts etc. complete
as per drawing, Technical Specifications Section 800 and as directed by the
Engineer.
unit = sqm
Taking output =40 sqm
a) Labour
Mate day 0.120 125.00 15.00 L-01
Painter day 2.000 93.21 186.41 L-21
Mazdoor day 1.000 84.91 84.91 L-03
b) Materials
Paint 1st Quality Litre 6.000 134.38 806.25 M-072
Filling material LS 180.00
c)Overhead charges @ 0.25 on (a+b) 318.14
d)Contractor's profit @ 0.1 on (a+b+c) 159.07
Rate for 40 sqm = a+b+c+d 1749.78
Rate per sqm = (a+b+c+d)/40 43.74
say 44.00
6.27 509, 515 p.138, Providing and laying 65 mm thick wearing coat (25mm Mastic asphalt and
p.151 40 mm Bituminous Concrete) including all labours,material and machinery,
all leads and lifts etc as per drawing
a)
unit = sqm
Taking output =1 sqm
a) 25 mm thick mastic asphalt sqm 1.000 284.000 284.000 sub
analysis
b) 40 mm thick Bituminous concrete cum 0.040 3238.000 129.520 sub
analysis
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c)Overhead charges @ 0.25 on (a+b) 103.38
d)Contractor's profit @ 0.1 on (a+b+c) 51.69
unit = cum
Taking output =191 cum(450t)
a) labour
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mate day 0.840 125.00 105.00 L-01
Mazdoor day 16.000 84.91 1358.49 L-03
Mazdoor skilled day 5.000 88.68 443.42 L-02
b)Machinery
Hot mix plant @ 75t/hr capacity hour 6.000 15100.00 90600.00 P&M-021
Paver finisher @ 75 cum/hr hour 6.000 1725.00 10350.00 P&M-034
Generator hour 6.000 450.00 2700.00 P&M-018
Front end loader hour 6.000 520.00 3120.00 P&M-017
Tipper hour 6.000 200.00 1200.00 P&M-048
Add 10% of cost carriage for loading and unloading 120.00
Vibratory roller hour 3.900 994.00 3876.60 P&M-059
c) Materials
I) Bitumen (CRMB55) grade t 22.500 16075.07 361689.13 M-035
ii) Aggregate (Grade I)
20 - 10 mm 35% cum 99.750 618.02 61647.20 M-012
10 - 5 mm 23% cum 65.550 560.77 36758.61 M-013
5 mm and below 40% cum 114.000 369.00 42066.14 M-008
Filler at 2% of weight of aggregates t 8.500 281.00 2388.50 M-003
Rate for 191 cum = a+b+c+d 618423.09
Rate per cum = (a+b+c+d)/191 3237.82
say 3238.00
SUB ANALYSIS
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
515 p.151 Providing and laying 25mm thick mastic asphalt over bituminous concrete
with paving grade bitumen as per job mix formulae, using mastic cooker,
laid to required level, line and slope after cleaning bituminous surface,
providing anti-skid surface with bitumen precoated angular hard stone
chips of 13.2mm nominal size, pressed into the surface, all labours and
materials, hiring charges of machinery, all leads and lifts etc, complete as
per drawing
unit = sqm
Taking output =35 sqm
a) Labour
Mate day 0.440 125.00 55.00 L-01
Mazdoor day 10.000 84.91 849.06 L-03
Mazdoor skilled day 1.000 88.68 88.68 L-02
b) Machinery
Mechanical broom hour 0.060 230.00 13.80 P&M-031
Air Compressor hour 0.060 206.00 12.36 P&M-001
Mastic cooker hour 6.000 232.00 1392.00 P&M-030
Bitumen Boiler hour 6.000 128.00 768.00 P&M-005
Tractor hour 1.000 0.00 0.00 P&M-053
c) Material
I) Bitumen 30/40 grade @ 15 percent by weight of mix 2 x 15/100 t 0.300 16985.71 5095.71 M-036
ii) Fine aggregate 6mm and 20mm @ 25 percent by weight of mix = 2 x 25/100 = cum 0.310 595.69 184.66 M-014
0.5 tonnes = 0.5/1.625 = 0.31
iii) Lime stone dust filler with calcium content not less than 80 percent by weight t 0.500 2445.63 1222.81 M-138
@ 25 percent by weight of mix = 2 x 25/100 = 0.5
iv) Coarse aggregates 6mm to 10mm @ 35 percent by weight mix = 2 x 35/100 = cum 0.480 560.77 269.17 M-013
0.7 mt = 0.7/1.456 = 0.48
Rate for 35 sqm = a+b+c+d 9951.26
Rate per sqm = (a+b+c+d)/35 284.32
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
say 284.00
6.28 3100 p.199 Providing and Laying true to line, level and orientation Mechanically
Stabilized Reinforced Earth Wall (measured on Face Area) of minimum
180mm thickness from MoRT&H accredited supplier including all labour,
materials, machinery, all leads and lifts, but excluding backfilling with
earth (to be separately paid as per BoQ item) etc. complete in the presence
of supplier's representative as per drawing, Technical Specifications
Section 3100 and as directed by the Engineer
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Taking output =75 sqm
a) Labour
Mate day 0.180 125 22.50 L-01
Mazdoor day 3.000 85 254.72 L-03
Mazdoor skilled day 1.500 89 133.03 L-02
b) Machinery
Light crane m 6.000 230 1380.00 M-123
c) Material
Pre-cast RCC M-35 facing element cum 13.500 2864 38664.00 sub
analysis
HYSD steel @ 5kg/sqm t 0.380 29668 11273.90 M-029
miscellaneous @ 2% of cost of materials 998.76
Rate for 75 sqm = a+b+c+d 52726.90
Rate per sqm = (a+b+c+d)/75 703.03
say 704.00
b) RE-WALL
unit= 1sqm area of facing wall
a) Facing element sqm 704.00 sub
analysis
b) Assembling,joining and laying of reinforcing element( with galvanised steel sub
strip) sqm 2074.00 analysis
c)Excavation on foundation including back filling LS 10.00
d)Foundation concrete M20 cum 0.030 2457 73.71 sub
e) Filter media cum 0.600 729 437.40 analysis
sub
f) Capping Beam M30 cum 0.020 3052 61.04 analysis
sub
g) Reinforcement for capping beam kg 3.000 44 132.00 analysis
M-061
h)Drainage and maintainance work LS 165.00
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
c)Overhead charges @ 0.25 on above 914.29
d)Contractor's profit @ 0.1 on above 457.14
Rate per sqm of RE- Wall 5028.58
say 5029.00
b) drainage pipe
Narrow filter sub-surface drain
unit=m
Taking out put 1m
a) Labour
Mate day 0.04 125 5.00 L-01
Mazdoor day 0.50 85 42.45 L-03
Mazdoor skilled day 0.25 89 22.17 L-02
b) Material
Perforated geosynthetic pipe m 1.00 125 125.00 M-137
Miscellaneous @ 2% of material 2.50
c)Over Head Charges @ 25% on (a+b) 49.28
d)Contractor's profit @ 0.1 on above 24.64
Rate for 1m=a+b+c+d 271.05
say 271.00
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Materials
Cement t 50.28 3756.85 188894.42 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Taking out put = 1 cum
a) Labour
Mate day 0.100 125 12.50 L-01
Mason day 1.200 105 125.59 L-05
Mazdoor day 1.200 85 101.89 L-03
b) Material
Stone cum 1.000 335 335.00 M-057
through and bond stone Nos 7.000 27 188.13 M-124
(0.7 no x 0.24m x 0.24m x 0.39 = 0.16 cum)
Cement Mortar 1:3 cu.m 0.330 2413 796.29 sub
analysis
c)Overhead charges @ 0.25 on (a+b) 389.85
d)Contractor's profit @ 0.1 on (a+b+c) 194.92
Rate for 1 m = a+b+c+d 2144.16
Rate per cum = (a+b+c+d)/1 2144.16
say 2145.00
6.30 1500, Providing and laying M20 grade Reinforced Cement Concrete with 20 mm
1700, 2300 down graded crushed stone aggregates for Drain cover slab over concrete
drain including reinforcement, shuttering and supporting arrangements,
transporting concrete from batching plant by transit mixer, placing it in
position, compacting with needle vibrator, moist curing for 14 days, all
labour, materials, machinery, all leads and lifts, etc. complete as per
drawing, Technical Specifications Clause 809,and Section 1500,1700,2100
and as directed by the Engineer.
unit = m
Taking output =1 m
M20 RCC Slab cum 0.2025 3233 654.6825 sub analysis
HYSD steel reinforcement t 0.008 32509.00 258.39
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Labour for lifting and placing in position 45.65
c)Overhead charges @ 0.25 on (a+b) 239.68
d)Contractor's profit @ 0.1 on (a+b+c) 119.84
Rate for 1m of drainage cover 1318.24
Rate per m 1318.24
say 1319.00
SUB ANALYSIS
RCC M20 with Batching plant
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Material
Cement t 41.66 3756.85 156510.37 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-023
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Next 9 km tonne- 2700.00 4.94 13338.00
km P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
d) Form work @ 4% of (a+b+c) 14921.46
Rate for 120 cum = (a+b+c+d) 387957.99
Rate per cum = (a+b+c+d)/120 3232.98
say 3233.00
6.31 2507.2 p.527 Providing and laying flexible apron in the upstream and downstream of
structure for protection against scour with stone boulders weighing not
less than 40 kg each including all labour , materials, machinery, all leads
and lifts, compacting to the satisfaction of the Engineer etc. complete as
per drawing, Technical Specification Section 2500 and as directed by the
Engineer
unit = cum
Taking output =1 cum
a) Materials
Stone cu.m 1.00 335.00 335.00 M-057
Stone Spalls cu.m 0.20 586.00 117.20 M-058
b) Labour
Mate day 0.05 125.00 6.25 L-01
Mason day 0.25 104.66 26.16 L-05
Mazdoor day 1.00 84.91 84.91 L-03
c) Overhead charges @ 25% on (a+b) 142.38
d) Contractor's profit @ 10% on (a+b+c) 71.19
Rate for 1 cum 783.09
say 783.00
6.32 1300 & Brick masonry work in 1:3 in sub-structure complete excluding pointing
2200 and plastering, as per drawing and Technical Specifications
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Unit = cum
Taking output = 1 cum
a) Material
Bricks Ist class each 500.00 3.00 1500.00 M-079
Cement mortar 1:3 (Rate as in Item 12.6 A sub-analysis) cum 0.24 2412.00 578.88 Sub-
analysis
Plastering with cement mortar (1:3 ) Sqm 10.00 45.00 450.00 Sub-
analysis
Pointing with cement mortar (1:3 ) Sqm 10.00 17.00 170.00 Sub-
analysis
b) Labour
Mate day 0.06 125.00 7.50 L-12
Mason day 0.80 104.66 83.72 L-11
Mazdoor day 0.80 84.91 67.92 L-13
Add for scaffolding @ 5 per cent of cost of material and labour 142.90
c)Over Head Charges @ 20% on (a+b) 600.19
d) Contractor's profit @ 10% on (a+b+c) 360.11
Rate per cum (a+b+c+d) 3961.23
say 3961.00
SUB-ANALYSIS
1300 & Pointing with cement mortar (1:3 ) on brick work in substructure as per
2200 Technical Specifications
Unit = 1 sqm
Taking output = 1 sqm
a) Material
Cement mortar 1:3 (Rate as in Item 12.6 ) cum 0.003 2412.00 7.24 Item 12.6
(A)
b) Labour
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
Mate day 0.004 125.00 0.50 L-12
Mason day 0.050 104.66 5.23 L-11
Mazdoor day 0.050 84.91 4.25 L-13
Rate per 1 sqm (a+b+c+d) 17.21
say 17.00
Note Scaffolding is already included in item 13.1
SUB-ANALYSIS
1300 & Plastering with cement mortar (1:3 ) on brick work in sub-structure as per
2200 Technical Specifications
Unit = 1 sqm
Taking output = 1 sqm
a) Material
Cement mortar 1:3 (Rate as in Item 12.6) cum 0.014 2412.00 34.73 Item 12.6
(A)
b) Labour
Mate day 0.004 125.00 0.50 L-12
Mason day 0.050 104.66 5.23 L-11
Mazdoor day 0.050 84.91 4.25 L-13
Rate per 1 sqm (a+b+c+d) 44.71
say 45.00
Note 1.Scaffolding is already included in item no. 13.1
2.The number of masons and Mazdoors already catered in the cement mortar
have been taken into account while providing these categories in brick masonry,
pointing and plastering.
SUB-ANALYSIS
Cement Mortar 1:3 (1 cement : 3 sand)
Unit = 1 cum
Taking output = 1 cum
Ref. to
Sl No MoRT & H Description Unit Qty Rate Rs Cost Rs Remarks
Spec.
a) Materials
Cement tonne 0.51 3756.85 1915.99 M-081
Sand cum 1.05 395.76 415.55 M-005
b) Labour
Mate day 0.04 91.49 3.66 L-12
Mazdoor day 0.90 84.91 76.42 L-13
Total Material and Labour = (a+b) say 2412.00
CHAPTER - 7
ROB
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
7.01 304 A) p.323 a) Earthwork in excavation for foundation of structure for all types of
soil and soft disintegrated rock including setting out, breaking of
clods, construction of necessary cofferdams, shoring, bracing and
propping arrangement at stressed zone, dewatering to the
satisfaction of the Engineer, refilling of the excavated area,
transporting the surplus useful materials to the embankment site as
well as disposal of unusable materials with all leads and lifts, all
labour, machinery, materials, all leads and lifts, etc, complete as per
Technical Specification Clause 304 and as directed by the Engineer.
I) Ordinary Soil
Unit = cum
Taking output = 240 cum
a) Labour
Mate day 0.32 125.00 40.00 L-01
Mazdoor day 8.00 84.91 679.25 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 10.670 200.00 2134.00 P&M-048
For next 4 km lead t.km 1920.000 1.74 3340.80 P&M-047
c) Overhead charges @ 0.25 on (a+b) 2808.51
d) Contractor's profit @ 0.1 on (a+b+c) 1404.26
Rate for 240 cum = a+b+c+d 15446.81
Rate per cum = (a+b+c+d)/240 64.36
say 64.00
304 B) p.326 ii) Soft Disintegrated Rock
Unit = cum
Taking output = 180 cum
a) Labour
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Mate day 0.24 125.00 30.00 L-01
Mazdoor day 6.00 84.91 509.43 L-03
b) Machinery
Hydraulic Excavator hour 6.00 840.00 5040.00 P&M-026
Tipper 5.5 cum capacity, 4 trips per hour.
For 1st km lead hour 8.250 200.00 1650.00 P&M-048
For next 2 km lead t.km 1215.000 1.74 2114.10 P&M-047
c) Overhead charges @ 0.25 on (a+b) 2335.88
d) Contractor's profit @ 0.1 on (a+b+c) 1167.94
Rate for 180 cum = a+b+c+d 12847.36
Rate per cum = (a+b+c+d)/180 71.37
say 71.00
Earthwork in excavation for foundation in all soil including soft rock
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
For next 2 km lead t.km 48 1.74 83.52 P&M-047
Credit for exacavated rock found suitable for use@ 50 percent of cum 5.00 160.00 800.00 M-140
excavated quantity.
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
say 125.00
7.02 1500,1700 & p.335 Providing and laying Plain Cement Concrete M25 grade with 40 mm
2100 down graded crushed stone aggregate below foundation, sub-
structure including all labour, materials, machinery, transporting
concrete from batching plant by transit mixer, placing it in position
and compacting with needle vibrator, moist curing, all leads and lifts,
etc. complete as per drawing, Technical Specification Section
1500,1700,2100 and as directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-018
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 47.95 3756.85 180140.96 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone Aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
40 mm Aggregate cum 43.20 437.70 18908.44 M-024
20 mm Aggregate cum 43.20 678.12 29294.97 M-025
10 mm Aggregate cum 21.60 615.15 13287.34 M-026
d) Form Work charges @ 10% of (a+b+c) 30201.55
e) Overhead charges @ 0.25 on (a+b+c+d) 83054.25
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
f) Contractor's profit @ 0.1 on (a+b+c+d+e) 41527.13
Rate for 120 cum = a+b+c+d+e+f 456798.39
Rate per cum = (a+b+c+d+e+f)/120 3806.65
say 3807.00
7.03 1600 p.489 Providing, cutting, bending and fixing in position HYSD
reinforcement made with high corrosion resistive material in
structures including all labour, materials, machinery, all leads and
lifts, etc. complete as per drawing, Technical Specification Section
1600 and as directed by the Engineer.
unit = tonne
Taking output = 1 tonne
a) Labour
Mate day 0.44 125.00 55.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 8.00 84.91 679.25 L-03
b) Materials
HYSD Reinforcement t 1.05 29668.15 31151.56 M-029
Binding wire kg 8.00 38.70 309.60 M-073
c) Overhead charges @ 0.25 on (a+b) 8127.34
d) Contractor's profit @ 0.1 on (a+b+c) 4063.67
Rate for 1 tonne = a+b+c+d 44700.38
Rate per tonne = (a+b+c+d)/1 tonne 44700.38
say 44700.00
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
7.04 1800 p.490 Providing and placing in position High Tensile Steel strands
conforming to IS 6006:1983(class II) and IS 14268:1995(low relaxation
strand) including anchorage devices (tested as per BS: 4447 or FIP
regulation), providing additional length of cable for attaching jacks,
placing corrugated HDPE sheathing ducts in position, guides and
grips as per IRC Specification, protection with epoxy painting,
accessories for stressing, stressing operations and grouting
including all labour, materials, machinery, all leads and lifts,
etc.complete as per drawing, Technical Specifications Section 1800
and as directed by the Engineer.
unit = tonne
Taking output = 0.377 tonne
a) Labour
I) For making and fixing cables, anchorages
Mate day 0.160 125.00 20.00 L-01
Blacksmith day 1.000 90.92 90.92 L-14
Mazdoor day 3.000 84.91 254.72 L-03
ii) For prestressing
Mate day 0.050 125.00 6.25 L-01
Fitter day 0.250 93.21 23.30 L-10
Mazdoor day 1.000 84.91 84.91 L-03
iii) For grouting
Mate day 0.050 125.00 6.25 L-01
Mason day 0.250 104.66 26.16 L-05
Mazdoor day 1.000 84.91 84.91 L-03
b) Machinery
Stressing jack with pump hour 2.500 200.00 500.00 P&M-084
Grouting pump with agitator hour 1.000 165.00 165.00 P&M-007
Generator hour 3.500 240.00 840.00 P&M-019
c) Materials
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
H.T. Strand @ 9.42 kg/m t 0.385 45599.35 17555.75 M-031
HDPE Sheating duct m 42.000 80.63 3386.25 M-134
Tube anchorage set nos 2.000 1720.00 3440.00 M-135
Cement for grouting t 0.125 3756.85 469.61 M-027
Miscellaneous items @ 0.5 % of cost of materials 124.26
d) Overhead charges @ 0.25 on (a+b+c) 6769.57
e) Contractor's profit @ 0.1 on (a+b+c+d) 3384.78
Rate for 0.377 tonne = a+b+c+d 37232.63
Rate per tonne = (a+b+c+d)/ 0.337 tonne 98760.29
say 98760.00
7.05 1100,1600 & Casting and installation of bored cast in-situ pile of M35 grade
1700(424) cement concrete
d) Overhead with 20@mm
charges down
0.25 graded crushed stone aggregates,
on (a+b+c) 16455.02
excluding reinforcement, but including carrying out all the necessary
e)
tests Contractor's
viz initial andprofit @ 0.1
routine loadon (a+b+c+d)
tests, as per IS:2911 (part IV), 8227.51
conducting
Rate for 10 m "Integrity"
= a+b+c+d Testing if required by the Engineer- in - charge, 90502.60
with
Rate all
perlabours
metre =and materials, machineries, transporting concrete
(a+b+c+d)/10 9050.26
from batching plant by transit mixer, placing it in position, all leads
SUBlifts
and ANALYSIS
etc, complete as per drawing.MoRT&H Technical
1200,1500 & Specification No.1100,1600,1700, Technical Specification Vol.V and as
M35 GRADE CONCRETE
1700(361) directed by the Engineer-in-charge.
Using Batching plant, Transit mixer and crane/ concrete pump
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Materials
Cement t 50.28 3756.85 188894.42 M-027
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Coarse sand cum 27.00 395.76 10685.45 M-020
crushed stone aggregate 4.75-2.36 cum 27.00 369.00 9963.03 M-023
20 mm aggregate cum 64.80 678.12 43942.45 M-025
10 mm aggregate cum 43.20 615.15 26574.69 M-026
Admixture kg 172.80 51.00 8812.80 M-103
Add 5% of cost of material and labour to form the sump,protective 14042.85
bunds,chiselling
c) Machinery and making arrangements for under water concreting with
tremie pipe
Batching plant @ 20 cum/hr hour 6.00 1440.00 8640.00 P&M-002
Generator 100 KVA hour 6.00 450.00 2700.00 P&M-080
Front end loader hour 6.00 520.00 3120.00 P&M-017
TRANSIT MIXER
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
Rate for 120 cum = (a+b+c) 342650.97
Rate per cum = (a+b+c)/120 2855.42
say 2856.00
Taking output = 9 m
Mate day 0.180 125.00 22.50
Mazdoor day 4.500 84.91 382.08
b)Machinery ( for boring and construction)
Hydraulic piling rig with bentonite pump hour 6.000 3525.00 21150.00
Light crane hour 0.500 550.00 275.00
Loader hour 0.500 520.00 260.00
Tipper hour 0.500 200.00 100.00
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
7.05 1200,1500, p.458 Providing and laying M35 grade Reinforced Cement Concrete with 20
1700 mm down graded crushed stone aggregates in substructure and
foundation excluding reinforcement including shuttering and
supporting arrangements, transporting concrete from batching plant
by transit mixer, placing it in position, compacting with needle
vibrator, moist curing for 14 days, all labour, materials, machinery, all
leads and lifts, etc. complete as per drawing, Technical Specification
Section 1500, 1700 and 2200 and as directed by the Engineer
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 18.000 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 50.64 3756.85 190246.88 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone Aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
20 mm aggregate cum 64.80 678.12 43942.45 M-025
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
10 mm aggregate cum 43.20 615.15 26574.69 M-026
d)Height effect charges @ 1.4% on (a+b+c) 4496.07
e)Form work charges @ 10% on (a+b+c+d) 32564.39
f)Overhead charges @ 0.25 on (a+b+c+d+e) 89552.06
g)Contractor's profit @ 0.1 on (a+b+c+d+e+f) 44776.03
Rate for 120 cum = a+b+c+d+e+f+g 492536.32
Rate per cum = (a+b+c+d+e+f+g) / 120 4104.47
say 4104.00
Next 10 km t.km 3000.00 4.94 14820.00
e)Form work charges @ 10% on (a+b+c+d) 31888.42
7.06 1500, 1600, p.483 Providing and laying M40 grade Reinforced Cement Concrete with 20
1700 mm down graded crushed stone aggregates in Deck Slab including
shuttering and supporting arrangements, (excluding reinforcement)
transporting concrete from batching plant by transit mixer, placing it
in position, compacting with needle vibrator, moist curing for 14
days, all labour, materials, machinery, all leads and lifts, etc.
complete as per drawing, Technical Specification Section 1500, 1700
and 2300 and as directed by the Engineer
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.94 125.00 117.50 L-01
Mason day 3.50 104.66 366.29 L-05
Mazdoor day 20.00 84.91 1698.12 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-080
Front end loader hour 6.00 520.00 3120.00 P&M-017
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 51.60 3756.85 193853.46 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone Aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
Admixture @ 0.4% of cement kg 206.40 51.00 10526.40
d)Form work charges @ 25% on (a+b+c) 83878.85
e)Overhead charges @ 0.25 on (a+b+c+d) 104848.56
f)Contractor's profit @ 0.1 on (a+b+c+d+e) 52424.28
Rate for 120 cum = a+b+c+d+e+f 576667.09
Rate per cum = (a+b+c+d+e+f) / 120 4805.56
say 4806.00
7.07 1800,2300, p.502 Providing precast/cast-in-situ M-40 grade Pre Stressed Concrete with
20 mm down graded crushed stone aggregates for Girder in casting
yard/ at site including shuttering and supporting arrangements,
(excluding reinforcement) transporting concrete from batching plant
by transit mixer, placing it in position, compacting with needle
vibrator, moist curing for 7 days, all labour, materials, machinery, all
leads and lifts, , erection (for precast elements) etc. complete as per
drawing, Technical Specification Section 1500,1600,1700,2300 and as
directed by the Engineer.
unit = cum
Taking output = 1 cum
a) Labour
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
i) Erection and dismantling
Mate day 0.12 125.00 15.00
Mazdoor skilled day 1.00 88.68 88.68
Mazdoor day 2.00 84.91 169.81
ii) Concreting by batching plant and stationary concrete pump
Mate day 0.03 125.00 3.75 L-01
Mazdoor skilled day 0.05 88.68 4.43 L-02
Mazdoor day 0.60 84.91 50.94 L-03
iii) Curing
Mate day 0.01 125.00 1.25 L-01
Mazdoor day 0.35 84.91 29.72 L-03
iv) Handling of precast girder, stacking in stockyard and again
loading in trailor
Mate day 0.01 125.00 1.25 L-01
Mazdoor day 0.25 84.91 21.23 L-03
v) Placement of girders in position over pier caps with the help of
guide bar, channel levelling etc
Mate day 0.01 125.00 1.25 L-01
Mason day 0.06 104.66 6.28 L-05
Mazdoor day 0.24 84.91 20.38 L-03
b) Machinery
I) At casting yard
Batching plant hour 0.05 1440.00 72.00 P&M-002
Generator hour 0.05 450.00 22.50 P&M-080
Front end loader hour 0.05 520.00 26.00 P&M-017
Transit mixer hour 0.10 600.00 60.00 P&M-049
Concrete Pump hour 0.05 165.00 8.25 P&M-050
ii) For transportation and placement at site
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
crane hour 0.30 550.00 165.00 P&M-011
Trailor 80 tonne capacity hour 0.40 420.00 168.00 P&M-089
c) Materials
Cement t 0.47 3756.85 1765.72 M-027
Coarse sand cum 0.23 395.76 89.05 M-020
Crushed stone Aggregate (4.75mm to 2.36mm) cum 0.23 369.00 83.03 M-023
20 mm Aggregate cum 0.54 678.12 366.19 M-025
10 mm Aggregate cum 0.36 615.15 221.46 M-026
Admixtures 0.4% of cement kg 1.88 51.00 95.88 M-103
Miscellaneous charges @ 1% of material cost for binding 25.38
wire,foam,packing tape,shuttering oil,HDPE pipe reinforcement for holding,
sheathing, unbounding of strand,bolt and nuts etc
d) Form work, curing, pretensioning @ 5% of (a+b+c) 179.12
e)Overhead charges @ 0.25 on (a+b+c+d) 940.39
f)Contractor's profit @ 0.1 on (a+b+c+d+e) 470.19
Rate for 1 cum = a+b+c+d+e+f 5172.12
Rate per cum = (a+b+c+d+e+f) / 1 5172.12
say 5172.00
7.08 2705 p.499 Providing and laying 100 mm dia GI Drainage Spout complete true to
line, level and orientation as per drawing, all labour, materials,
machinery, all leads and lifts etc. complete as per drawing, Technical
Specification Clause 2705 and as directed by the Engineer.
unit = No
Taking output = 1 No
a) Labour
I) For fabrication
Mate day 0.02 125.00 2.50 L-01
Blacksmith skilled day 0.02 90.92 1.82 L-14
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Mazdoor day 0.02 84.91 1.70 L-03
ii) For fixing in position
Mate day 0.01 125.00 1.25 L-01
Mason day 0.01 104.66 1.05 L-05
Mazdoor day 0.20 84.91 16.98 L-03
b)Materials
Corrosion resistant structural steel kg 4.00 22.00 88.00 M-104
GI pipe 100 mm dia m 1.00 300.00 300.00 M-105
GI bolt 10 mm dia Nos 6.00 4.80 28.80 M-106
Galvanised MS flat clamp Nos 2.00 25.00 50.00 M-107
Miscellaneous @ 5% cost of materials 23.34
c)Overhead charges @ 0.25 on (a+b) 128.86
d)Contractor's profit @ 0.1 on (a+b+c) 64.43
Rate for 1 No = a+b+c+d 708.72
Rate per pipe = (a+b+c+d) / 1 708.72
say 709.00
7.09 2200 p.463 Providing filter media behind Abutment, Wing Wall, Retaining Wall
and Return Wall and below pitching in slopes including all labour,
materials, machinery, all leads and lifts, etc. complete as per
drawings, Technical Specification Clause 305, 2504 and as directed
by the Engineer.
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.32 125.00 40.00 L-01
Mazdoor day 7.00 84.91 594.34 L-03
Mazdoor skilled day 1.00 88.68 88.68 L-02
b) Machinery
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Water Tanker hour 0.06 160.00 9.60 P&M-060
c) Materials
Filler media of stone aggregate
unit = cum
Total = 12 cum
40 mm Aggregate 30 per cent cum 3.60 437.70 1575.70 M-024
20 mm Aggregate 40 per cent cum 4.80 678.12 3255.00 M-025
10 mm Aggregate 20 per cent cum 2.40 615.15 1476.37 M-026
6 mm and Below 10 per cent cum 1.20 369.00 442.80 M-008
d)Overhead charges @ 0.25 on (a+b+c) 1870.62
e)Contractor's profit @ 0.1 on (a+b+c+d) 935.31
Rate for 10 cum = a+b+c+d+e 10288.43
Rate per cum = (a+b+c+d+e)/10 1028.84
say 1029.00
7.10 2200, p.462 Back filling behind Abutment, Wing wall, Retaining Wall and Return
710.1.4 of Wall and below pitching on slopes with selected granular material of
IRC:78 approved quality including all labour, materials, machinery, all leads
and lifts, etc. complete as per drawings, Technical Specification
Clause 309 and as directed by the Engineer.
unit = cum
Taking output = 10 cum
a) Labour
Mate day 0.28 125.00 35.00 L-01
Mazdoor day 7.00 84.91 594.34 L-03
b) Machinery
Plate compactor/Power rammer hour 2.50 50.00 125.00 P&M-086
Water Tanker hour 0.05 160.00 8.00 P&M-060
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
concrete mixer hour 2.50 150.00 375.00 P&M-009
c) Materials
Granular material
unit = cum
Total = 10 cum
Gravel cum 8.00 149.32 1194.54 M-019
Stone dust cum 4.00 231.61 926.45 M-003
d)Overhead charges @ 0.25 on (a+b+c) 814.58
e)Contractor's profit @ 0.1 on (a+b+c+d) 407.29
Rate for 10 cum = a+b+c+d+e 4480.21
Rate per cum = (a+b+c+d+e)/10 448.02
say 448.00
7.11 2706 & 2200 p.461 Providing and fixing weep holes in Abutment, Wing Wall, Retaining
Wall, Return Wall including all labour, materials, machinery, all leads
and lifts etc. complete as per drawing, Technical Specification Clause
2706,and Section 2700 and as directed by the Engineer
unit = Nos
Taking output = 30 Nos
a) Labour
Mate day 0.03 125.000 3.75 L-01
Mason day 0.50 104.655 52.33 L-05
Mazdoor day 0.25 84.906 21.23 L-03
b) Materials
AC pipe 100 mm dia m 31.50 35.000 1102.50 M-102
MS clamp Nos 30.00 25.000 750.00 M-108
Collar for AC pipe(average) Nos 10.00 20.000 200.00 M-107
Cement motor 1:3 cum 0.05 2413.000 120.65 sub analysis
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
c)Overhead charges @ 0.25 on (a+b) 562.61
d)Contractor's profit @ 0.1 on (a+b+c) 281.31
Rate for 30 Nos = a+b+c+d 3094.37
Rate per pipe = (a+b+c+d)/30 103.15
say 103.00
SUB ANALYSIS
CEMENT MORTAR 1:3
unit = cum
Taking output = 1 cum
a) Labour
Mate day 0.040 125.00 5.00 L-01
Mazdoor day 0.900 84.91 76.42 L-03
b) Materials
Cement t 0.510 3756.85 1915.99 M-027
Sand cum 1.050 395.76 415.55 M-020
Rate for 1 cum = a+b 2412.95
say 2413.00
7.12 2000 & 2200 p.467 Proving and laying true to line, level and orientation Elastomeric
Bearing from MoRT&H accredited supplier including all labour,
materials, machinery, all leads and lifts etc, complete as per drawing,
Technical Specification Clause 2005,2008,2808 and as directed by the
Engineer.
unit = cu.cm
Taking output = 19200 cu.cm
a) Labour
Mate day 0.060 125.00 7.50 L-01
Mazdoor day 1.000 84.91 84.91 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
b) Materials
Elastomeric bearing cu. cm 14655.00 0.404 5927.49 M-110
Miscellaneous @ 1% cost of materials 59.27
c)Overhead charges @ 0.25 on (a+b) 1530.88
d)Contractor's profit @ 0.1 on (a+b+c) 765.44
Rate for 19200 cu.cm = a+b+c+d 8419.83
Rate per cu.cm of Elastomer Bearing = (a+b+c+d)/19200 0.44
say 0.44
7.13 2000& 2200 p.469 Providing and laying true to line, level and orientation Pot-cum-PTFE
Bearing from MoRT&H accredited supplier consisting of a metal
piston supported by a disc or unreinforced elastomer confined within
a metal cylinder, sealing ring, dust seal, wiper seal, dimpled PTFE
sheet and silicon grease sliding against stainless steel backing
surface, complete assembly made of cast steel/fabricated structural
steel, all labour, materials, machinery, all leads and lifts, etc.
complete as per drawing, Technical Specification Section
2000,2200,2006 and as directed by the Engineer.
unit = Nos
Taking output = 1 No
(A) 200 ton capacity fixed bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 32479.41 32479.41 M-111
Miscellaneous @ 1% cost of materials 324.79
c)Overhead charges @ 0.25 on (a+b) 8246.47
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
d)Contractor's profit @ 0.1 on (a+b+c) 4123.24
Rate for 1 No = a+b+c+d 45355.61
Rate per Fixed bearing = (a+b+c+d)/1 45355.61
say 45356.00
(B) 200 ton capacity sliding bearing(fixed in longitudinal direction)
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 45537.45 45537.45 M-112
Miscellaneous @ 1% cost of materials 455.37
c)Overhead charges @ 0.25 on (a+b) 11543.63
d)Contractor's profit @ 0.1 on (a+b+c) 5771.82
Rate for 1 No = a+b+c+d 63489.97
Rate per sliding bearing = (a+b+c+d)/1 63489.97
say 63490.00
(C) 100 ton capacity fixed bearing
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 27706.92 27706.92 M-113
Miscellaneous @ 1% cost of materials 277.07
c)Overhead charges @ 0.25 on (a+b) 7041.42
d)Contractor's profit @ 0.1 on (a+b+c) 3520.71
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Rate for 1 No = a+b+c+d 38727.82
Rate per sliding bearing = (a+b+c+d)/1 38727.82
say 38728.00
(D) 100 ton capacity sliding bearing(fixed in transverse direction)
a) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 1.500 84.91 127.36 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Pot bearing Nos 1.000 37821.94 37821.94 M-114
Miscellaneous @ 1% cost of materials 378.22
c)Overhead charges @ 0.25 on (a+b) 9595.46
d)Contractor's profit @ 0.1 on (a+b+c) 4797.73
Rate for 1 No = a+b+c+d 52775.05
Rate per sliding bearing = (a+b+c+d)/1 52775.05
say 52775.00
7.14 2600 p.513 Providing and fixing Compression Seal type Expansion Joint from
MoRT&H accredited supplier with all labour, materials, machinery, all
leads and lifts, etc., complete as per drawings, Technical
Specification Section 2600 and as directed by the Engineer.
unit = metre
Taking output = 12 metre
a) Labour
Mate day 0.036 125.00 4.50 L-01
Mazdoor day 0.600 84.91 50.94 L-03
Mazdoor skilled day 0.300 88.68 26.61 L-02
b) Materials
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Compression seal with angle m 12.000 5567.90 66814.78 M-117
Miscellaneous @ 5% of cost of angle section 3340.74
c)Overhead charges @ 0.25 on (a+b) 7023.76
d)Contractor's profit @ 0.1 on (a+b+c) 19315.33
Rate for 12 metre = a+b+c+d 96576.65
Rate per metre = (a+b+c+d)/12 8048.05
say 8048.00
7.15 2607 p.515 Providing and fixing Elastomeric Strip Seal type Expansion Joint
from MoRT&H accredited supplier with all labour, materials,
machinery, all leads and lifts, etc. complete as per drawing, Technical
Specification Section 2600 and as directed by the Engineer.
unit = metre
Taking output = 12 metre
a) Labour
Mate day 0.050 125.00 6.25 L-01
Mazdoor day 1.000 84.91 84.91 L-03
Mazdoor skilled day 0.250 88.68 22.17 L-02
b) Materials
Complete assembly of strip steel expansion joint m 12.000 6363.31 76359.74 M-118
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
7.16 1500,1700 & p.335 Providing and laying M15 grade Plain Cement Concrete with 20 mm
2100 down graded crushed stone aggregates under Approach Slab with
shuttering and supporting arrangements, transporting concrete from
batching plant by transit mixer, placing it in position, compacting with
needle vibrator, moist curing, all labour, materials, machinery, all
leads and lifts, etc. complete as per drawing, Technical Specification
Section 1500, 1700 and as directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-002
Generator hour 6.00 450.00 2700.00 P&M-018
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone Aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
40 mm Aggregate cum 64.80 437.70 28362.65 M-024
20 mm Aggregate cum 32.40 678.12 21971.23 M-025
10 mm Aggregate cum 10.80 615.15 6643.67 M-026
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
d)Overhead charges @ 0.25 on (a+b+c) 60371.91
e)Contractor's profit @ 0.1 on (a+b+c+d) 30185.95
Rate for 120 cum = a+b+c+d+e 332045.50
Rate per cum = (a+b+c+d+e)/120 2767.05
say 2767.00
7.17 1500,1700, p.478 Providing and laying M30 grade Reinforced Cement Concrete with 20
2200 mm down graded crushed stone aggregates for Approach Slab
including all labour, materials, machinery, shuttering and supporting
arrangements, (excluding reinforcement) transporting concrete from
batching plant by transit mixer, placing it in position, compacting with
needle vibrator, moist curing for 14 days, all leads and lifts, etc.
complete as per drawing, Technical Specification Section
1500,1600,1700,2704 and as directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 18.000 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Cement t 48.80 3756.85 183334.28 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone Aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
d)Overhead charges @ 0.02 on (a+b+c) 6284.70
e)Overhead charges @ 0.25 on (a+b+c+d) 80129.97
f)Contractor's profit @ 0.1 on (a+b+c+d+e) 40064.99
Rate for 120 cum = a+b+c+d+e+f 440714.84
Rate per cum = (a+b+c+d+e)/120 3672.62
say 3673.00
7.18 1500, 1700, p.483 Providing and laying M40 grade Reinforced Cement Concrete with 20
2200 mm down graded crushed stone aggregates for Crash Barrier and
Kerb including shuttering and supporting arrangements, (excluding
reinforcement) transporting concrete from batching plant by transit
mixer, placing it in position, compacting with needle vibrator, moist
curing for 14 days, all labour, materials, machinery, all leads and lifts,
etc. complete as per drawing, Technical Specification Section
809,1500,1700,2100 and as directed by the Engineer.
unit = m
Taking output = 10 m
a)M 40 Grade Concrete cum 3.000 3076.000 9228.00 sub analysis
b) Labour
Mate day 0.080 125.00 10.00 L-01
Mazdoor day 2.000 84.91 169.81 L-03
c)Overhead charges @ 0.25 on (a+b+c+d) 2351.95
d)Contractor's profit @ 0.1 on (a+b+c+d+e) 1175.98
Rate for 10 m = a+b+c+d+e+f 12935.74
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Rate per cum = (a+b+c+d+e+f)/10 1293.57
say 1294.00
SUB ANALYSIS M 40
a) Labour
Mate day 0.940 125.00 117.50 L-01
Mason day 3.500 104.66 366.29 L-05
Mazdoor day 20.000 84.91 1698.12 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 51.60 3756.85 193853.46 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone Aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
Admixture kg 206.40 51.00 10526.40 M-103
d)Form work charges @ 10% on (a+b+c) 33551.54
Rate for 120 cum = a+b+c+d+e+f 369066.94
Rate per cum= (a+b+c+d+e+f) / 120 3075.56
say 3076.00
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
7.19 808 p.236 Providing and laying 50 mm diameter heavy duty MS pipe over Crash
Barrier as per IS: 1239 with expansion gap at every 20 m interval
along with providing insert plate at 2 m interval, painting with single
coat of zinc-rich primer and two coats of top coat epoxy paint
including all labour, materials, machinery, all leads and lifts, etc.
complete as per drawing, Technical Specification Section.800 and as
directed by the Engineer.
unit = m
Taking output = 10 m
a)Labour
Mate day 0.014 125.00 1.75 L-01
Mazdoor day 0.35 84.91 29.72 L-03
Welder day 0.01 104.66 1.05 L-11
b)Materials
MS Pipe m 10 215.00 2150.00 M-119
Insert Plate kg 25 29.89 747.13 M-120
Lugs kg 6.75 29.89 201.72 M-121
Welding torch and consumables 154.94
c)Overhead charges @ 0.25 on (a+b) 821.58
d)Contractor's profit @ 0.1 on (a+b+c) 410.79
Rate for 10 m = a+b+c+d 4518.67
Rate per m = (a+b+c+d)/10 451.87
say 452.00
7.20 2504 p.522 Providing and laying 300 mm thick stone boulder pitching on slopes
including all labour, materials, machinery, all leads and lifts, etc.
complete as per drawing, Technical Specification Section 2500 and as
directed by the Engineer.
unit = cum
Taking output = 1cum
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
a) Labour
Mate day 0.040 125.00 5.00 L-01
Mason day 0.350 104.66 36.63 L-05
Mazdoor day 0.750 84.91 63.68 L-03
b) Materials
Stone (weighing not less than 40 kg each) cum 1.000 335.00 335.00 M-057
Stone spalls cum 0.200 586.00 117.20 M-058
c)Overhead charges @ 0.25 on (a+b) 139.38
d)Contractor's profit @ 0.1 on (a+b+c) 69.69
Rate for 1 cum = a+b+c+d 766.57
Rate per cum = (a+b+c+d)/1 766.57
say 767.00
7.21 801 p.211 Painting of ROB No. and span arrangement on bridge ends including
all labour, materials, all leads and lifts etc. complete as per drawing,
Technical Specification Section 800 and as directed by the Engineer.
unit = Nos
Taking output = 1 Nos
a)Painting (colour) sqm 0.090 36.00 3.24 sub analysis
b)Lettering (hindi) cm/lr 20.000 0.24 4.80 sub analysis
c) lettering(english) cm/lr 20.000 0.20 4.00 sub analysis
c)Overhead charges @ 0.25 on (a+b) 3.01
d)Contractor's profit @ 0.1 on (a+b+c) 1.51
Rate for 1 cum = a+b+c+d 16.56
Rate per cum = (a+b+c+d)/1 16.56
say 17.00
SUB ANALYSIS
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
801 p.221 printing new letters and figures of any shade with synthetic enamel paint
black or any other approved color is to give an even shade (Hindi Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.120 125.00 15.00 L-01
Painter day 2.000 93.21 186.41 L-21
Mazdoor day 1.000 84.91 84.91 L-03
b) Materials
Paint conforming to requirement Litre 0.700 134.38 94.06 sub analysis
Rate for 1600 cm = a+b 380.38
Rate per letter per cm = (a+b+c+d)/1600 0.24
say 0.24
SUB ANALYSIS
801 p.212 printing new letters and figures of any shade with synthetic enamel paint
black or any other approved color is to give an even shade (English
Letters)
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.070 125.00 8.75 L-01
Painter day 1.250 93.21 116.51 L-21
Mazdoor day 0.500 84.91 42.45 L-03
b) Materials
Paint conforming to requirement Litre 0.500 134.38 67.19 M-072
Rate for 1600 cm = a+b 234.90
Rate per letter per cm = (a+b/1600 0.15
say 0.15
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
7.22 803 p.220 Applying cement paint of approved quality to the surface of concrete
Crash Barrier, Kerb including all labour, materials, all leads and lifts
etc. complete as per drawing, Technical Specification Section 800
and as directed by the Engineer.
unit = sqm
Taking output =40 sqm
a) Labour
Mate day 0.120 125.00 15.00 L-01
Painter day 2.000 93.21 186.41 L-21
Mazdoor day 1.000 84.91 84.91 L-03
b) Materials
Paint 1st Quality Litre 6.000 134.38 806.25 M-072
Filling material LS 180.00
c)Overhead charges @ 0.25 on (a+b) 318.14
d)Contractor's profit @ 0.1 on (a+b+c) 159.07
Rate for 40 sqm = a+b+c+d 1749.78
Rate per sqm = (a+b+c+d)/40 43.74
say 44.00
7.23 509, 515 p138, Providing and laying 65 mm thick wearing coat (25 mm mastic
p151 asphalt over 40 mm bituminous concrete) including all labour,
materials, machinery, all leads and lifts, etc. complete as per
drawing, Technical Specification Clause 509,515 and as directed by
the Engineer.
unit = sqm
Taking output =1 sqm
a) 25 mm thick mastic asphalt sqm 1.000 291.000 291.000 sub analysis
b) 40 mm thick Bituminous concrete cum 0.040 3236.000 129.440 sub analysis
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
c)Overhead charges @ 0.25 on (a+b) 105.11
d)Contractor's profit @ 0.1 on (a+b+c) 52.56
unit = cum
Taking output =191 cum
a) labour
Mate day 0.840 125.00 105.00 L-01
Mazdoor day 16.000 84.91 1358.49 L-03
Mazdoor skilled day 5.000 88.68 443.42 L-02
b)Machinery
Hot mix plant @ 75t/hr capacity hour 6.000 15100.00 90600.00 P&M-021
Paver finisher @ 75 cum/hr hour 6.000 1725.00 10350.00 P&M-034
Generator hour 6.000 450.00 2700.00 P&M-018
Front end loader hour 6.000 520.00 3120.00 P&M-017
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Tipper hour 6.000 200.00 1200.00 P&M-048
Add 10% of cost carriage for loading and unloading 120.00
Vibratory roller hour 3.900 994.00 3876.60 P&M-059
c) Materials
I) Bitumen (CRMB55) grade t 22.500 16075.07 361689.13 M-035
ii) Aggregate (Grade I)
20 - 10 mm 35% cum 99.750 618.02 61647.20 M-012
10 - 5 mm 23% cum 65.550 560.77 36758.61 M-013
5 mm and below 40% cum 114.000 369.00 42066.14 M-008
Filler at 2% of weight of aggregates t 8.620 231.61 1996.51 M-003
Rate for 191 cum = a+b+c+d 618031.10
Rate per cum = (a+b+c+d)/191 3235.76
say 3236.00
515 p.151 SUB ANALYSIS
Providing and laying 25mm thick mastic asphalt over bituminous
concrete with paving grade bitumen as per job mix formulae, using
mastic cooker, laid to required level, line and slope after cleaning
bituminous surface, providing anti-skid surface with bitumen
precoated angular hard stone chips of 13.2mm nominal size, pressed
into the surface, all labours and materials, hiring charges of
machinery, all leads and lifts etc, complete as per drawing
unit = sqm
Taking output =35 sqm
a) Labour
Mate day 0.440 125.00 55.00 L-01
Mazdoor day 10.000 84.91 849.06 L-03
Mazdoor skilled day 1.000 88.68 88.68 L-02
b) Machinery
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Mechanical broom hour 0.060 230.00 13.80 P&M-031
Air Compressor hour 0.060 206.00 12.36 P&M-001
Mastic cooker hour 6.000 232.00 1392.00 P&M-030
Bitumen Boiler hour 6.000 128.00 768.00 P&M-005
Tractor hour 1.000 234.00 234.00 P&M-053
c) Material
I) Bitumen 30/40 grade @ 15 percent by weight of mix 2 x 15/100 t 0.300 16985.71 5095.71 M-036
ii) Fine aggregate 6mm and 20mm @ 25 percent by weight of mix = 2 x cum 0.310 595.69 184.66 M-014
25/100 = 0.5 tonnes = 0.5/1.625 = 0.31
iii) Lime stone dust filler with calcium content not less than 80 percent by t 0.500 2445.63 1222.81 M-138
weight @ 25 percent by weight of mix = 2 x 25/100 = 0.5
iv) Coarse aggregates 6mm to 10mm @ 35 percent by weight mix = 2 x cum 0.480 560.77 269.17 M-013
35/100 = 0.7 mt = 0.7/1.456 = 0.48
Rate for 35 sqm = a+b+c+d 10185.26
Rate per sqm = (a+b+c+d)/35 291.01
say 291.00
7.24 1100 & 1700 p.426 Providing ,laying and installation of 1200 mm diameter bored cast-in-
situ Pile with M35 grade Reinforced Cement Concrete comprising 20
mm down graded crushed stone aggregates excluding
reinforcement,but including hydraulic drilling (either by
rotary/percussion method) with bentonite slurry suspension, placing
reinforcement on cleaning of dredged hole ,transporting concrete
from batching plant by transit mixer, placing it in position by tremie
method, all labour, materials, machinery, all leads and lifts, testing as
per clause 1113 etc. complete as per drawing, Technical
Specifications Clause1100 and as directed by the Engineer.
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
a) Labour
Mate day 0.18 125.00 22.50 L-01
Mazdoor day 4.50 84.91 382.08 L-03
b) Machinery (For boring and construction)
Hire and running charges of hydraulic piling rig with power unit and hour 6.00 3525.00 21150.00
complete accessories including shifting from one bore location to another P&M-036
Hire and running charges of light crane for lowering reinforcement cage hour 0.50 550.00 275.00 P&M-074
Hire and running charges for bentonite pump hour 6.00 165.00 990.00 P&M-007
Loader 1 cum bucket capacity hour 0.50 520.00 260.00 P&M-017
Tipper 5.5 cum capacity for disposal of muck from pile bore hole hour 0.50 200.00 100.00 P&M-048
Bentonite kg 385.00 32.25 12416.25 M-136
c) Materials
Concrete M35 cum 10.17 2860.00 29086.20 sub analysis
Concrete to be cast with a tremie pipe 200 mm dia
d)Overhead charges @ 0.25 on (a+b+c) 16170.51
e)Contractor's profit @ 0.1 on (a+b+c+d) 8085.25
Rate for 9 m = a+b+c+d+e 88937.79
Rate per m = (a+b+c+d+e)/9 9881.98
say 9882.00
7.25 3100 p.199 Providing and Laying true to line, level and orientation Mechanically
Stabilized Reinforced Earth Wall (measured on Face Area) of
minimum 180mm thickness from MoRT&H accredited supplier
including all labour, materials, machinery, all leads and lifts, but
excluding backfilling with earth (to be separately paid as per BoQ
item) etc. complete in the presence of supplier's representative as
per drawing, Technical Specifications Section 3100 and as directed
by the Engineer
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
(a) Reinforced earth wall
unit = sqm
Taking output =1 sqm
3102 p.199 Assembling joining and laying of reinforcing elements (with steel strip)
unit = m
Taking output =450 m (450m of reinforcing
a) Labour element is equivalent to
24sqmt of facing area)
Mate day 0.360 125 45.00 L-01
Mazdoor day 6.000 85 509.43 L-03
Mazdoor skilled day 3.000 89 266.05 L-02
b) Material
Galvanised carbon steel strip m 450.000 99 44505.00 M-123
Miscellaneous @ 10% cost of materials 4450.50
Rate for 450 m = a+b+c+d 49775.99
Rate per m = (a+b+c+d)/450 110.61
say 111.00
450m= 24 sqm of facing element per sqm rate = 51570/24 2074.00
3104 p.201 Facing element of RCC (Standard size 1.5m x 1.5m)
unit = sqm
Taking output =75 sqm
a) Labour
Mate day 0.180 125 22.50 L-01
Mazdoor day 3.000 85 254.72 L-03
Mazdoor skilled day 1.500 89 133.03 L-02
b) Machinery
Light crane m 6.000 230 1380.00 P&M-071
c) Material
Ref to
Sl No MoRT&H Description Unit Qty Rate Rs Cost Rs Remarks
Spec
Pre-cast RCC M-35 facing element cum 13.500 2881 38893.50 sub analysis
HYSD steel @ 5kg/sqm t 0.380 29668 11273.90 M-029
miscellaneous @ 2% of cost of materials 1003.35
Rate for 75 sqm = a+b+c+d 52960.99
Rate per sqm = (a+b+c+d)/75 706.15
say 707.00
b) RE-WALL
unit= 1sqm area of facing wall
CHAPTER-8
DRAINAGE AND PROTECTION WORKS
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
8.01 3.22 307 Turfing with Sods
Furnishing and laying of the live sods of perennial turf forming grass on
embankment slope, verges or other locations shown on the drawing or as
directed by the engineer including preparation of ground, fetching of sods
and watering.
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate day 0.12 125.00 15.00 L-01
Mazdoor for preparation of ground and fetching of sods day 3.00 84.91 254.72 L-03
b) Machinery
Water tanker including watering for 3 months hour 2.00 160.00 320.00 P&M-060
Tractor-trolley hour 1.00 234.00 234.00 P&M-053
c) Material
Farm yard manure @ 0.18 cum per 100 sqm at site of work cum 0.18 350.00 63.00 M-056
Cost of water KL 12.00 100.00 1200.00 M-047
d)Over Head Charges @ 8% on (a+b+c) 166.94
e)Contractor's Profit @ 10% on (a+b+c+d) 225.37
Cost for 100 sqm = a+b+c+d+e 2479.02
Rate per 100 sqm = (a+b+c+d+e)/100 24.79
say 25.00
8.02 15.5 2504 Providing and laying of granular material 150 mm thick underneath
pitching in slopes including labours and materials with all leads and lifts..
etc complete as per drawing, technical specifications and as directed by
the engineer.
unit = cum
Taking output = 1cum
a) Labour
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Mate day 0.050 125.00 6.25 L-01
Mazdoor skilled day 0.250 88.68 22.17 L-02
Mazdoor day 1.000 84.91 84.91 L-03
b) Materials
Gravel cum 0.800 149.32 119.45 M-019
Stone dust cum 0.400 231.61 92.65 M-003
c)Over Head Charges @ 8% on (a+b) 26.03
d)Contractor's Profit @ 10% on (a+b+c) 35.15
Rate for 1 cum = a+b+c+d 386.61
Rate per cum = (a+b+c+d)/1 386.61
say 387.00
Providing and laying 300 mm thick stone boulder pitching on slopes ,
embankment over a prepared layer of 150 mm thick granular material
underneath,(as per item 8.02) including labours, materials all leads
8.03 15.4 2504
and lift.. Etc complete as per drawing, technical specifications and as
directed by the engineer.
unit = cum
Taking output = 1cum
a) Labour
Mate day 0.040 125.00 5.00 L-01
Mason day 0.350 104.66 36.63 L-05
Mazdoor day 0.750 84.91 63.68 L-03
b) Materials
Stone( departmental material)
Mazoor( skilled) for dressing day 1.500 88.68 133.03 L-02
c)Over Head Charges @ 8% on (a+b) 19.07
d)Contractor's Profit @ 10% on (a+b+c) 25.74
Rate for 1 cum = a+b+c+d 283.14
Rate per cum = (a+b+c+d)/1 283.14
283.00
or 283.00
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Providing and laying the concrete drain for roadways using the
8.04 (A) materials like Reinforced cement concrete, Plain cement concrete
and steel reinforcement directed as per Engineer
a) Along the Median
unit = metre
Taking output = 1 m
a) CONTENTS
RCC M-20 Grade cum 0.375 2459 922.125 sub analysis
PCC M-15 Grade cum 0.071 2059 146.189 sub analysis
Steel Reinforcement kg 12 33.325 399.9 M-061
c)Over Head Charges @ 8% on (a+b) 117.45712
d)Contractor's Profit @ 10% on (a+b+c) 158.57
Rate for 1 metre = (a+b+c) 1744.24
say 1744.00
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
c) Brick drains in soil
construction of Brick drain along the compound wall in truck parking area
complete as per drawings and directed by the engineer
unit = metre
Taking output = 10 metres
a) Labour
Mate day 0.01 125 1.25 L-01
Mazdoor for dressing of bed and side of drain day 0.25 84.905784 21.23 L-03
b) Machinery
Hydraulic excavator 1 cum bucket capacity @ 30 metres per hour hour 0.33 840 277.20 P&M-026
c) Materials
PCC M-15 cum 1.41 2059 2903.19 sub analysis
Brick ( 19 x 9 x 9) cm cum 3.25 2397.6 7792.20 M-059
1:3 cement plaster sqm 0.056 90 5.04 M-060
d)Over Head Charges @ 8% on (a+b+c) 880.01
e)Contractor's Profit @ 10% on (a+b+c+d) 1188.01
Rate for 10 m =(a+b+c+d+e) 13068.13
Rate per metre =(a+b+c+d+e)/10 1306.81
1307.00
or 1307.00
SUB ANALYSIS
PCC M-15 GRADE CONCRETE
unit = cum
Taking output = 120cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 18.000 84.91 1528.30 L-03
b) Material
Cement t 33.000 3756.85 123976.05 M-027
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Coarse sand cum 27.000 395.76 10685.45 M-020
Crushed stone aggregates cum 27.000 369.00 9963.03 M-023
40 mm aggregate cum 64.800 409.07 26507.92 M-024
20 mm aggregate cum 32.400 620.88 20116.49 M-025
10 mm aggregate cum 10.800 615.15 6643.67 M-026
c) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
1st Km hour 15.000 600.00 9000.00 P&M-049
next 9km t.km 2700.00 4.94 13338.00 P&M-050
concret pump hour 6.000 165.00 990.00 P&M-007
d) Form work @ 4% of (a+b+c) 9505.12
Rate for 120 cum = (a+b+c+d) 247133.00
Rate per cum = (a+b+c+d)/120 2059.44
say 2059.00
RCC M-20 CONCRETE GRADE
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 18.000 84.91 1528.30 L-03
b) Material
Cement t 41.660 3756.85 156510.37 M-027
Coarse sand cum 27.000 395.76 10685.45 M-020
Crushed stone aggregates cum 27.000 369.00 9963.03 M-023
20 mm aggregate cum 64.800 620.88 40232.98 M-025
10 mm aggregate cum 43.200 615.15 26574.69 M-026
c) Machinery
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
I st km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
d)Form work @ 4% on cost of (a+b+c) 11348.07
Rate for 120 cum =(a+b+c+d) 295049.86
Rate per cum =(a+b+c+d)/120 2458.75
say 2459.00
SUB ANALYSIS
PCC M20 with Batching plant
unit = cum
Taking output = 120cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 18.000 84.91 1528.30 L-03
b) Material
Cement t 41.660 3756.85 156510.37 M-027
Coarse sand cum 27.000 395.76 10685.45 M-020
Crushed stone aggregates cum 27.000 369.00 9963.03 M-023
40 mm aggregates cum 64.800 409.07 26507.92 M-024
20 mm Aggregates cum 32.400 620.88 20116.49 M-025
10 mm Aggregates cum 10.800 615.15 6643.67 M-026
c) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
I st km hour 15.000 600.00 9000.00 P&M-049
Next 9 km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
SUB ANALYSIS
PCC M-15 GRADE CONCRETE
unit = cum
Taking output = 120cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 18.000 84.91 1528.30 L-03
b) Material
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Cement t 33.000 3756.85 123976.05 M-027
Coarse sand cum 27.000 395.76 10685.45 M-020
Crushed stone aggregates cum 27.000 337.30 9107.10 M-023
40 mm aggregate cum 64.800 437.70 28362.65 M-024
20 mm aggregate cum 32.400 678.12 21971.23 M-025
10 mm aggregate cum 10.800 615.15 6643.67 M-026
c) Machinery
Batching plant hour 6.000 1200.00 7200.00 P&M-002
generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
1st Km hour 15.000 890.00 13350.00 P&M-049
next 14.5 km t.km 4350.00 4.94 21489.00 P&M-050
concret pump hour 6.000 165.00 990.00 P&M-007
d) Form work @ 4% of (a+b+c) 10061.70
Rate for 120 cum = (a+b+c+d) 261604.12
Rate per cum = (a+b+c+d)/120 2180.03
say 2181.00
RCC M-20 CONCRETE GRADE
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 18.000 84.91 1528.30 L-03
b) Material
Cement t 41.660 3756.85 156510.37 M-027
Coarse sand cum 27.000 685.02 18495.65 M-020
Crushed stone aggregates cum 27.000 337.30 9107.10 M-023
20 mm aggregate cum 64.800 691.00 44776.80 M-025
10 mm aggregate cum 43.200 560.30 24204.96 M-026
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
c) Machinery
Batching plant hour 6.000 1200.00 7200.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
I st km hour 15.000 890.00 13350.00 P&M-049
Next 14.5 km t.km 4350.000 4.94 21489.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
d)Form work @ 4% on cost of (a+b+c) 12155.65
Rate for 120 cum =(a+b+c+d) 316046.80
Rate per cum =(a+b+c+d)/120 2633.72
say 2634.00
SUB ANALYSIS
PCC M20 with Batching plant
unit = cum
Taking output = 120cum
a) Labour
Mate day 0.840 146.00 122.64 L-01
Mason day 3.000 166.00 498.00 L-05
Mazdoor day 18.000 116.00 2088.00 L-03
b) Material
Cement t 41.660 3414.20 142235.57 M-027
Coarse sand cum 27.000 685.02 18495.65 M-020
Crushed stone aggregates cum 27.000 337.30 9107.10 M-023
40 mm aggregates cum 64.800 558.50 36190.80 M-024
20 mm Aggregates cum 32.400 691.00 22388.40 M-025
10 mm Aggregates cum 10.800 560.30 6051.24 M-026
c) Machinery
Batching plant hour 6.000 1526.00 9156.00 P&M-002
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Transit mixer
I st km hour 15.000 890.00 13350.00 P&M-049
Next 14.5 km t.km 4350.000 4.94 21489.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Unit = metre
Taking output = 10 metres
A Mechanical Means
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
a) Labour
Mate day 0.150 125.00 18.75 L-12
Mazdoor for dressing of bed and side of drain day 3.750 84.91 318.40 L-13
b) Machinery
Hydraulic Excavator 0.3 cum bucket capacity @ 15 metres per hour hour 5.025 840.00 4221.00 P&M-026
b)Over Head Charges @ 8% on (a) 364.65
c)Contractor's Profit @ 10% on (a+b) 492.28
Rate per 10 metre 5415.08
Rate per metre =(a+b+c)/10 541.51
say 542.00
B Manual Means
a) Labour
Mate day 0.900 125.00 112.50 L-12
Mazdoor day 22.500 84.91 1910.38 L-13
b)Over Head Charges @ 8% on (a) 161.83
c)Contractor's Profit @ 10% on (a+b) 218.47
Rate per 10 metre 2403.18
Rate per metre =(a+b+c)/10 240.32
say 241.00
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
371.00
or 371.00
unit = metre
Taking output = 1 m
b) Across the road (On super elevated section)
CONTENTS
PCC M-20 Grade of concrete cum 0.04 2341 93.64 sub analysis
PCC M-15 Grade of concrete cum 0.065 2059 133.835 sub analysis
c)Over Head Charges @ 8% on (a+b) 18.20
d)Contractor's Profit @ 10% on (a+b+c) 24.567
Rate for 1 metre = (a+b+c) 270.24
270.00
or 270.00
Providing energy dissipation basin at the toe of chutes in M-20
8.06 concrete
a) Contents
M-20 Grade concrete cum 0.18 2341 421.38 sub analysis
Fixing charges of the basin in position @ 5 % 21.07
b)Over Head Charges @ 8% on (a) 35.40
c)Contractor's Profit @ 10% on (a+b) 47.78
Rate per No. 525.63
say 526.00
Providing and laying Precast Plain Cement Concrete M-15 Concrete
block in the shoulders at the inner portion of superelevated portion to
8.07
prevent the shoulders from the erosion,etc directed as per Engineer-
in-charge
unit = each
Taking output = 1 block
a) Labour
Mate day 0.860 125.00 107.50 L-01
Mason day 1.500 104.66 156.98 L-05
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Mazdoor day 20.000 84.91 1698.12 L-03
b) Material
Cement t 4.130 3756.85 15515.79 M-027
Coarse sand cum 3.375 395.76 1335.68 M-020
Crushed stone aggregates cum 3.375 369.00 1245.38 M-023
40 mm aggregate cum 8.100 409.07 3313.49 M-024
20 mm aggregate cum 4.050 620.88 2514.56 M-025
10 mm aggregate cum 1.350 615.15 830.46 M-026
c) Machinery
Concrete mixer 0.40/0.28 cum capacity hour 6.000 150.00 900.00 P&M-009
Generator 63 KVA hour 6.000 240.00 1440.00 P&M-019
d) Form work @ 4% of (a+b+c) 1162.32
e)Over Head Charges @ 8% on (a+b+c+d) 2417.62
f)Contractor's Profit @ 10% on (a+b+c+d+e) 3263.79
Rate for 15 cum = (a+b+c+d) 35901.69
Rate per cum = (a+b+c+d)/15 2393.45
2393.00
Rate per Block cum 0.025 2393.00 59.83
Add some lumpsum for fixing the concrete blocks at the position each 6.00
Total Rate per Block 65.83
say 66.00
8.08 Proving RCC Hume pipes of 300 mm dia at the intervals of 200 metre
across the road directed as per the Engineer-in-charge
unit = metre
taking output = 1 metre
a) CONTENTS
RCC hume pipe 300 mm dia m 10 155.17 1551.66 M-062
Collars @ every 2.5 m No. 3 49 147.00 M-063
Add 5% for fixing the pipes in the position and for excavation work each 84.93
b)Over Head Charges @ 8% on (a) 142.69
c)Contractor's Profit @ 10% on (a+b) 192.63
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Rate per metre pipe 2118.90
say 2119.00
8.09
Proving GI pipes of 50 mm dia and length of 3m at the raised foot
path in bus laybyes at four corners across the foot path to remove
the water to outside from the bus laybye area directed as per the
Engineer-in-charge
unit =metre
taking output = 3 metre
a) CONTENTS
GI pipe 50 mm dia m 3.00 201.025 603.08 M-064
Add 5% for fixing the pipes in the position and for excavation work each 30.15
b)Over Head Charges @ 8% on (a) 50.66
c)Contractor's Profit @ 10% on (a+b) 68.39
Rate per metre pipe/3 250.76
251.00
or 252.00
8.10 8.10 408 Cast in Situ Cement Concrete M20 Kerb
Construction of cement concrete kerb with top and bottom width 115 and
165 mm respectively, 250 mm high in M 20 grade PCC on M15 grade
foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in
PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with
kerb laying machine, foundation concrete laid manually, all complete as
per clause 408
A) For L-shaped kerb
unit = Running metre
Taking output = 360 m
a) Labour
Mate day 0.120 125.00 15.00 L-01
Mason day 1.000 104.66 104.66 L-05
Mazdoor day 2.000 84.91 169.81 L-03
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
b) Machinery
Kerb casting machine @ 60 metres/hour hour 6.000 200.00 1200.00 P&M-029
Concrete batching and mixing plant @ 15 cum/hr. hour 1.600 1200.00 1920.00 P&M-003
Water tanker6 KL capacity hour 5.000 160.00 800.00 P&M-060
Tipper 5.5 cum capacity hour 6.000 200.00 1200.00 P&M-048
c) Materials
PCC M-20 for kerb cum 45.360 2341.00 106187.76 sub analysis
d)Over Head Charges @ 8% on (a+b+c) 8927.78
e)Contractor's Profit @ 10% on (a+b+c+d) 12052.50
Rate for 360 m = (a+b+c+d+e) 132577.51
Rate per metre = (a+b+c+d+e)/360 368.27
say 368.00
B) Barrier Kerb
unit = Running metre
Taking output = 360 m
a) Labour
Mate day 0.120 125.00 15.00 L-01
Mason day 1.000 104.66 104.66 L-05
Mazdoor day 2.000 84.91 169.81 L-03
b) Machinery
Kerb casting machine @ 60 metres/hour hour 6.000 200.00 1200.00 P&M-029
Concrete batching and mixing plant @ 15 cum/hr. hour 1.600 1200.00 1920.00 P&M-003
Water tanker6 KL capacity hour 5.000 160.00 800.00 P&M-060
Tipper 5.5 cum capacity hour 6.000 200.00 1200.00 P&M-048
c) Materials
PCC M-20 for kerb cum 16.200 2341.00 37924.20 sub analysis
d)Over Head Charges @ 8% on (a+b+c) 3466.69
e)Contractor's Profit @ 10% on (a+b+c+d) 4680.04
Rate for 360 m = (a+b+c+d+e) 51480.40
Rate per metre = (a+b+c+d+e)/360 143.00
143.00
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
or 143.00
C) Mountable Kerb
TYPE-I
unit = Running metre
Taking output = 360 m
a) Labour
Mate day 0.120 125.00 15.00 L-01
Mason day 1.000 104.66 104.66 L-05
Mazdoor day 2.000 84.91 169.81 L-03
b) Machinery
Kerb casting machine @ 60 metres/hour hour 6.000 200.00 1200.00 P&M-029
Concrete batching and mixing plant @ 15 cum/hr. hour 1.600 1200.00 1920.00 P&M-003
Water tanker6 KL capacity hour 5.000 160.00 800.00 P&M-060
Tipper 5.5 cum capacity hour 6.000 200.00 1200.00 P&M-048
c) Materials
PCC M-20 for kerb cum 15.480 2341.00 36238.68 sub analysis
d)Over Head Charges @ 8% on (a+b+c) 3331.85
e)Contractor's Profit @ 10% on (a+b+c+d) 4164.81
Rate for 360 m = (a+b+c+d+e) 49144.81
Rate per metre = (a+b+c+d+e)/360 136.51
137.00
or 137.00
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Channel post 150 x 75 x 5 mm,1.8 m long,3 Nos @ 16.4 kg per metre kg 88.560 32.25 2856.06
M-066
Spacer 150 x 75 x 5 mm channel 0.33 m long,3 Nos @ 16.4 kg per 32.25 523.74
kg 16.240 M-067
metre
Add 25 per cent of the cost of material for fabrication, nuts, bolts and
1232.58
washers etc.)
d)Over Head Charges @ 8% on (a+b+c) 505.93
e)Contractor's Profit @ 10% on (a+b+c+d) 683.01
Cost for 4.5 metre = a+b+c+d+e 7513.12
Rate per metre = (a+b+c+d+e)/4.5 1669.58
say 1670.00
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Ref. to
Ref. to
MoRTH
Sl No MoRT & H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
2 Gates LS 30000.00
Brickwork cum 34.5 2397.6 82717.20 M-059
Random Rubble masonry in foundation cum 42.3 2059.00 87095.70 sub analysis
Painting with cement paint sqm 332.5 48.375 16084.69 M-071
b)Over Head Charges @ 8% on (a) 21075.82
c)Contractor's Profit @ 10% on (a+b) 28452.35
Rate per 100 metre 312975.85
Rate per metre =(a+b+c)/100 3129.76
say 3130.00
CHAPTER-9
ROAD FURNITURE
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
9.01 8.14 804 Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design
as per IRC:8-1980, fixing in position including painting and printing etc as
per drawing.
a) 5th kilometre stone (precast)
Unit = Nos.
Taking output = 1 No.
a) M-15 grade of concrete cum 0.21 2059.00 432.39
b) M-20 grade of concrete cum 0.18 2341.00 421.38
c) Excavation in soil for foundation cum 0.27 50.00 13.50
d) Painting two coats on concrete surface sqm 1.22 27.00 32.94
per cm
e) Lettering on km post (average 100 letters of 16 cm height
per 458.00 0.20 91.60
each)
letter
Transportation and fixing
f) Labour
Mate day 0.04 125.00 5.38
Mason day 0.10 104.66 10.47
Mazdoor including loading/unloading day 1.00 84.91 84.91
g) Machinery
Tractor-trolley hour 1.00 234.00 234.00
h) Overhead charges @ 8% on (a+b+f+g) 106.12
i) Contractor's profit @ 10% on (a+b+f+g+h) 143.27
Cost for 1 No. 5th km stone = a+b+c+ d+e +f+g+h +i 1575.95
Rate for each 5th km stone = (a+b+c+ d+e +f+g+h +i ) /1 1575.95
say 1576.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
SUB ANALYSIS
803
Painting two coats on New Concrete surfaces
(220)
Painting two coats after filling the surface with synthetic enamel paint
in all shades on new plastered concrete surfaces
unit = sqm
Taking output = 40 sqm
a) Labour
Mate day 0.12 125.00 15.00
Painter day 2.00 93.21 186.41
Mazdoor day 1.00 84.91 84.91
b) Material
Paint conforming to requirement of clause 803.3 litre 6.00 134.38 806.25
Rate for 40 sqm = (a+b+c+d) 1092.57
Rate per sqm = (a+b+c+d)/40 27.31
say 27.00
801 SUB ANALYSIS
(212) printing new letters and figures of any shade with synthetic enamel paint
black or any other approved color is to give an even shade (English
Letters)
Technical specification as per IRC :7-1971,Technical Specification
Vol.V and as directed by the Engineer-in-charge.
unit = cm
Taking output = 100 letters by 16 cm height
a)Labour
Mate day 0.07 125.00 8.75
Painter day 1.25 93.21 116.51
Mazdoor day 0.50 84.91 42.45
b) Materials
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
Paint conforming to requirement Litre 0.50 134.38 67.19
c)Over Head Charges @ 8% on (a+b) 18.79
d)Contractor's Profit @ 10% on (a+b+c) 25.37
Rate for 1600 cm = a+b+c+d 279.06
Rate per letter per cm = (a+b+c+d)/1600 0.17
say 0.25
b) Ordinary km stone PCC M-20
Unit = Nos.
Taking output = 1 No.
a) M-15 grade of concrete cum 0.18 2059.00 360.33
b) M-20 grade of concrete cum 0.10 2341.00 234.10
c) Excavation in soil for foundation cum 0.22 50.00 11.00
d) Painting two coats on concrete surface sqm 0.77 27.00 20.79
per cm 0.20 49.60
e) Lettering on km post (average 100 letters of 16 cm height
per 248.00
each)
letter
Transportation and fixing
f) Labour
Mate day 0.02 125.00 2.88
Mason day 0.07 104.66 7.33
Mazdoor including loading/unloading day 0.50 84.91 42.45
g) Machinery
Tractor-trolley hour 0.43 234.00 100.62
h) Overhead charges @ 8% on (a+b+f+g) 59.82
i) Contractor's profit @ 10% on (a+b+f+g+h) 80.75
Cost for 1 No. km stone = a+b+c+ d+e +f+g+h +i 969.66
Rate for each km stone = (a+b+c+ d+e +f+g+h +i )/1 969.66
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
say 970.00
c) Hectometre Stone
Unit = Nos.
Taking output = 1 No.
a) PCC M-15 grade of concrete cum 0.04 2059.00 78.24
b) RCC M-20 grade of concrete cum 0.01 2459.00 24.59
c) Steel reinforcement @ 5kg per sqm kg 1.03 44.15 45.47
d) Excavation in soil for foundation cum 0.04 51.00 2.04
e) Painting two coats on concrete surface sqm 0.22 27.00 5.94
per cm 0.20 20.00
f) Lettering on km post (average 100 letters of 16 cm height
per 100.00
each)
letter
Transportation and fixing
f) Labour
Mate day 0.01 125.00 1.25
Mason day 0.05 104.66 4.76
Mazdoor including loading/unloading day 0.21 84.91 17.83
g) Machinery
Tractor-trolley hour 0.18 234.00 42.12
h) Overhead charges @ 8% on (a+b+f+g) 13.50
i) Contractor's profit @ 10% on (a+b+f+g+h) 16.88
Cost for 1 No. 5th km stone = a+b+c+ d+e +f+g+h +i 272.63
Rate for each Hectometre Stone = (a+b+c+ d+e +f+g+h +i ) /1 272.63
say 273.00
RCC M-20 CONCRETE GRADE
unit = cum
Taking output = 120 cum
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
a) Labour
Mate day 0.84 125.00 105.00
Mason day 3.00 104.66 313.97
Mazdoor day 18.00 84.91 1528.30
b) Material
Cement t 41.66 3756.85 156510.37
Coarse sand cum 27.00 395.76 10685.45
Crushed stone aggregates cum 27.00 369.00 9963.03
20 mm aggregate cum 64.80 620.88 40232.98
10 mm aggregate cum 43.20 615.15 26574.69
c) Machinery
Batching plant hour 6.00 1440.00 8640.00
Generator hour 6.00 450.00 2700.00
Front end loader hour 6.00 520.00 3120.00
Transit mixer
I st km hour 15.00 600.00 9000.00
Next 9 km t.km 2700.00 4.94 13338.00
Concrete pump hour 6.00 165.00 990.00
d)Form work @ 4% on cost of (a+b+c) 11348.07
Rate for 120 cum =(a+b+c+d) 295049.86
Rate per cum =(a+b+c+d)/120 2458.75
say 2459.00
Reinforced cement concrete M15 grade boundary pillars of standard
806
9.02 8.16 design as per IRC:25-1967, fixed in position including finishing and
(229)
lettering but excluding painting
Unit = Nos.
Taking output = 1 No.
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
a) PCC M-15 grade of concrete cum 0.16 2059.00 335.62
b) RCC M-20 grade of concrete cum 0.02 2459.00 51.64
b) Steel reinforcement @ 5kg per sqm kg 0.20 33.33 6.67
c) Excavation in soil for foundation cum 0.18 50.00 9.00
d) Painting two coats on concrete surface sqm 0.11 27.00 2.97
per cm 0.20 8.00
e) Lettering on km post (average 100 letters of 16 cm height each) per 40.00
letter
Transportation and fixing
f) Labour
Mate day 0.01 125.00 1.25
Mazdoor including loading/unloading day 0.25 84.91 21.23
g) Machinery
Tractor-trolley hour 0.11 234.00 24.57
h) over head @ 8% on (a+b+f+g) 34.74
i) Contractor's profit @ 10% on (a+b+f+g+h) 46.90
Cost for 1 No. boundary pillars stone = a+b+c+ d+e +f+g+h +i 542.59
Rate for each boundry stone = (a+b+c+ d+e +f+g+h+i)/1 542.59
say 543.00
SUB ANALYSIS
Unit = 1 MT
Taking output = 1 MT
a) Material
HYSD bars including 5 per cent for laps and wastage MT 1.05 29668 31151.56
Binding wires kg 8.00 38.70 309.60
b) Labour for cutting, bending, tying and placing in position
Mate day 0.44 125.00 55.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
Blacksmith day 3.00 90.92 272.75
mazdoor day 8.00 84.91 679.25
c)Over Head Charges @ 8% on (a+b) 2597.45
d)Contractor's Profit @ 10% on (a+b+c) 3506.56
Rate for 1 tonne 38572.17
say 38572.00
With out O.H and C.P rate for 1 MT = 32468.15
say 32468.00
Unit = sqm
Taking output = 600 sqm
a) Labour
Mate day 0.03 125.00 3.75
Mazdoor day 0.75 84.91 63.68
b) Machinery
Road marking machine @ 60 sqm per hour hour 10.00 60.00 600.00
Tractor-trolley hour 0.50 0.00 0.00
c) Material
Hot applied thermoplastic compound Litre 1500.00 188.13 282187.50
Reflectorising glass beads kg 150.00 107.50 16125.00
d)Over Head Charges @ 8% on (a+b+c) 23918.39
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
e)Contractor's Profit @ 10% on (a+b+c+d) 32289.83
Cost for 600 sqm = a+b+c+d+e 355188.16
Rate per sqm = a+b+c+d+e)/600 591.98
say 592.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
say 51.00
(ii) Up to 10 cm in width
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate day 0.07 125.00 8.75
Painter day 0.35 93.21 32.62
Mazdoor day 1.35 84.91 114.62
b) Material
Road marking paint Litre 1.48 156.95 232.29
c)Over Head Charges @ 8% on (a+b) 31.06
d)Contractor's Profit @ 10% on (a+b+c) 41.93
Cost for 10 sqm = a+b+c+d 461.28
Rate per sqm = (a+b+c+d)/10 46.13
say 46.00
8.8 803 c) Painting two coats on New Concrete surfaces
(220) Painting Kerbs with approved black and white paints as directed by the
Engineer and as per Technical Specifications clause 408
unit = sqm
Taking output = 40 sqm
a) Labour
Mate day 0.12 125.00 15.00
Painter day 2.00 93.21 186.41
Mazdoor day 1.00 84.91 84.91
b) Material
Paint conforming to requirement of clause 803.3 litre 6.00 134.38 806.25
Rate for 40 sqm = (a+b+c+d) 1092.57
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
Rate per sqm = (a+b+c+d)/40 27.31
say 28.00
9.04 8.4 801 Retro-Reflectorised Traffic Signs
a) Cautionary sign
90 CM EQUILATERAL TRIANGLE
Unit = Each
Taking output = one traffic sign
i) Excavation for foundation cum 0.22 50.00 10.80
ii) Cement concrete M15 grade cum 0.12 2059.00 247.08
iii) Painting angle iron post two coats sqm 0.43 32.00 13.76
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25
Mazdoor day 0.25 84.91 21.23
b) Material
Mild steel angle iron 75 x 75 x 6 mm kg 19.00 29.56 561.69
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of
size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts,
11.23
bolts etc.
90 cm equilateral triangle sqm 0.35 10750.00 3762.50
c) Machinery
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
Tractor-trolley hour 0.01 234.00 2.34
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 370.55
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 500.24
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 5502.67
say 5503.00
b) Mandatory sign
60 CM CIRCULAR
Unit = Each
Taking output = one traffic sign
i) Excavation for foundation cum 0.22 51.00 11.02
ii) Cement concrete M15 grade cum 0.12 2059.00 247.08
iii) Painting angle iron post two coats sqm 0.43 32.00 13.76
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25
Mazdoor day 0.25 84.91 21.23
b) Material
Mild steel angle iron 75 x 75 x 6 mm kg 19.00 29.56 561.69
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of
size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts,
11.23
bolts etc.
60 cm circular sqm 0.28 10750.00 3042.25
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 312.95
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 422.48
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 4647.27
say 4647.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
c) Route marker sign
60 CM X 45 CM RECTANGULAR SIGN BORD
Unit = Each
Taking output = one traffic sign
i) Excavation for foundation cum 0.22 51.00 11.02
ii) Cement concrete M15 grade cum 0.12 2059.00 247.08
iii) Painting angle iron post two coats sqm 0.43 29.03 12.48
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25
Mazdoor day 0.25 84.91 21.23
b) Material
Mild steel angle iron 75 x 75 x 6 mm kg 19.00 29.56 561.69
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of
size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts,
11.23
bolts etc.
60 cm x 45 cm Rectangular sign board sqm 0.27 10750.00 2902.50
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 301.67
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 407.25
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 4479.73
say 4480.00
d) Informatory sign
80 CM X 60 CM RECTANGULAR SIGN BORD
Unit = Each
Taking output = one traffic sign
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
i) Excavation for foundation cum 0.22 51.00 11.02
ii) Cement concrete M15 grade cum 0.12 2059.00 247.08
iii) Painting angle iron post two coats sqm 0.43 29.03 12.48
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25
Mazdoor day 0.25 84.91 21.23
b) Material
Mild steel angle iron 75 x 75 x 6 mm kg 19.00 29.56 561.69
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of
size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts,
11.23
bolts etc.
80 cm x 60 cm Rectangular sign board sqm 0.48 10750.00 5160.00
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 482.27
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 651.06
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 7161.64
say 7162.00
e) Village and Place Identification Signs with size 0.15 sqm size
801
Board.
Unit = each
Taking output = one traffic sign
i) Excavation for foundation cum 0.22 51.00 11.02
ii) Cement concrete M15 grade cum 0.12 2059.00 247.08
iii) Painting angle iron post 2 coats sqm 0.43 29.03 12.48
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
Mazdoor day 0.30 84.91 25.47
b) Material
Mild steel angle iron 75 mm x 75 mm x 6 mm, 2.85 metres long, 2 nos kg 75.50 29.56 2231.97
Aluminium sheeting fixed with encapsulated lens type reflective 10750.00 1612.50
sqm 0.15
sheeting
Add 2 per cent of cost of materials for drilling holes, nuts, bolts,
76.89
fabrication etc.
c) Machinery
Tractor-trolley hour 0.02 234.00 4.68
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 337.87
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 456.12
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 5017.32
3344.88
say 3345.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
Aluminium sheeting fixed with encapsulated lens type reflective
sqm 0.30 10750.0 3225.0
sheeting
Add 2 per cent of cost of materials for drilling holes, nuts, bolts,
109.14
fabrication etc.
c) Machinery
Tractor-trolley hour 0.02 0.00 0.00
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 469.12
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 633.32
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 6966.50
4644.33
say 4644.00
g) Median opening with fluorescent lime yellow
0.81 sqm rectangular board
Unit = Each
Taking output = one traffic sign
i) Excavation for foundation cum 0.22 50.00 10.80
ii) Cement concrete M15 grade cum 0.12 2059.00 247.08
iii) Painting angle iron post two coats sqm 0.43 29.03 12.48
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25
Mazdoor day 0.25 84.91 21.23
b) Material
Mild steel angle iron 75 x 75 x 6 mm kg 19.00 29.56 561.69
Aluminium sheeting fixed with encapsulated lens type retro reflective
sheeting of size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts,
11.23
bolts etc.
0.81 sqm rectangular board sqm 0.81 10750.00 8707.50
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 766.05
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 1034.16
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 11375.81
say 11376.00
h) Sign boards (major road ahead) with fluorescent lime
80 CM X 60 CM RECTANGULAR SIGN BORD
Unit = Each
Taking output = one traffic sign
i) Excavation for foundation cum 0.22 54.00 11.66
ii) Cement concrete M15 grade cum 0.12 2059.00 247.08
iii) Painting angle iron post two coats sqm 0.43 29.03 12.48
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25
Mazdoor day 0.25 84.91 21.23
b) Material
Mild steel angle iron 75 x 75 x 6 mm kg 19.00 29.56 561.69
Aluminium sheeting fixed with encapsulated lens type retro reflective
sheeting of size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts,
11.23
bolts etc.
0.48 sqm rectangular board sqm 0.48 10750.00 5160.00
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 482.32
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 520.90
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 7032.18
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
say 7032.00
i) Lettering and arrow marks on sign board to be provided separately as
Note per actual requirement. Rates for these items have been analysed
separately
ii) Rate for excavation, cement concrete M-15 and painting may be taken
from respective chapters
SUB ANALYSIS
803 Painting on Steel Surfaces
Providing and applying two coats of ready mix paint of approved brand on
steel surface after through cleaning of surface to give an even shade
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate day 0.03 125.00 3.75
Painter day 0.45 93.21 41.94
Mazdoor day 0.25 84.91 21.23
b) Material
Paint ready mixed approved brand. Litre 1.25 134.38 167.97
Add @ 1 per cent on cost of material for scaffolding 1.68
Add @ 5 per cent cost of labour and materials to prepare the surface 11.74
by filling minuts roughness on the surface and priming the surface
before laying 2 coats of painting.
Cost for 10 sqm = a+b+c+d 248.31
Rate per sqm= (a+b+c+d)/10 24.83
say 25.00
8.35 BS:873
(part 4) I) A) Road studs with lens reflectors
1973
unit = Nos.
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
Taking output = 50 Nos.
a) Labour
Mate day 0.04 125.00 5.00
Mazdoor day 1.00 84.91 84.91
b) Material
Aluminium studs 100 x 100 mm fitted with red flash Nos. 50.00 322.50 16125.00
Add 10 % of cost of material for fixing and installation 1612.50
c)Over Head Charges @ 8% on (a+b) 1426.19
d)Contractor's Profit @ 10% on (a+b+c) 1925.36
Rate for 50 Nos. 21178.96
Rate per No. 423.58
say 424.00
9.05 Overhead sign Board
Cantilever type (1500 x 1000)
Unit = Each
Taking output = one traffic sign
i) Excavation for foundation cum 1.25 54.00 67.50
ii) Cement concrete M15 grade cum 0.70 2059.00 1441.30
iii) Painting iron post two coats sqm 0.67 29.03 19.45
a) Labour (For fixing at site)
Mate day 0.45 125.00 56.25
Mazdoor day 0.50 84.91 42.45
b) Material
Mild steel channel section 175 x 175 x 20 mm of 2.85 m length kg 105.00 29.56 3104.06
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of
size including lettering and signs as applicable
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
Add 15 per cent of cost of angle iron towards cost of drilling holes, nuts,
465.61
bolts etc.
150 cm x 100 cm Rectangular sign board sqm 1.50 10750.00 16125.00
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 1705.92
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 2302.99
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 25332.87
say 25333.00
9.06 8.15 805 a & c Road Delineators
Supplying and installation of delineators (road way indicators, hazard
markers, object markers), 80-100 cm high above ground level, painted
black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular
or 75 mm dia circular reflectorised panels at the top, buried or pressed into
the ground and conforming toIRC-79 and the drawings.
Unit = Each
Taking output= 30 Nos.
a) Labour
Mate day 0.04 125.00 5.00
Mazdoor for fixing day 1.00 84.91 84.91
b) Material
Cost of approved type of delineators from ISI certified firm as per the
each 30.00 537.50 16125.00
standard drawing given in IRC - 79
Add 10 per cent cost of material for installation 1612.50
c)Over Head Charges @ 8% on (a+b) 1426.19
d)Contractor's Profit @ 10% on (a+b+c) 1925.36
Cost for 30 Nos. delineators = (a+b+ c+d) 21178.96
Rate per delineators = (a+b+c+d) /30 705.97
say 706.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs
Data book
Spec
Sl No
In case of soft ground, a proper foundation may be provided as per
approved design. In case foundation is required to be provided, the items
Note
of excavation and foundation concrete are required to be measured and
paid separately.
b) Cluster of Reflectors on intersections & median gaps
unit = each
Taking output = 1 No
a) Contents
Earthwork excavation (1 x .35 x .35 x .95) cum 0.12 51.00 5.92
PCC M-15 cum 0.12 2059.00 238.84
Red reflectors each 1.00 483.75 483.75
b)Over Head Charges @ 8% on (a) 58.28
c)Contractor's Profit @ 10% on (a+b) 78.68
Rate per reflector 865.47
say 865.00
CHAPTER-9
ROAD FURNITURE
Remarks
sub analysis
sub analysis
M-068
sub analysis
sub analysis
L-01
L-05
L-03
P&M-053
Remarks
L-01
L-21
L-03
M-072
L-01
L-21
L-03
Remarks
M-072
sub analysis
sub analysis
M-068
sub analysis
sub analysis
L-01
L-05
L-03
P&M-053
Remarks
sub analysis
sub analysis
M-068
sub analysis
sub analysis
L-01
L-05
L-03
P&M-053
Remarks
L-01
L-05
L-03
M-027
M-020
M-023
M-025
M-026
P&M-002
P&M-080
P&M-017
P&M-049
P&M-050
P&M-007
Remarks
sub analysis
sub analysis
M-104
M-068
sub analysis
sub analysis
L-01
L-03
P&M-053
M-029
M-073
L-01
Remarks
L-14
L-03
L-01
L-03
P&M-043
P&M-053
M-074
M-075
Remarks
L-01
L-21
L-03
M-076
Remarks
L-01
L-21
L-03
M-076
L-01
L-21
L-03
M-072
Remarks
M-068
sub analysis
sub analysis
L-01
L-03
M-078
M-079
Remarks
P&M-053
M-068
sub analysis
sub analysis
L-01
L-03
M-078
M-079
P&M-053
Remarks
M-068
sub analysis
sub analysis
L-01
L-03
M-078
M-079
P&M-053
Remarks
M-068
sub analysis
sub analysis
L-01
L-03
M-078
M-079
P&M-053
M-068
sub analysis
sub analysis
L-01
Remarks
L-03
M-078
M-079
P&M-053
M-068
sub analysis
sub analysis
L-01
L-03
M-078
Remarks
M-079
P&M-053
M-068
sub analysis
sub analysis
L-01
L-03
M-078
M-079
Remarks
P&M-053
M-068
sub analysis
sub analysis
L-01
L-03
M-078
M-079
P&M-053
Remarks
L-01
L-21
L-02
M-072
Remarks
L-01
L-03
M-080
M-068
sub analysis
sub analysis
L-01
L-03
M-078
Remarks
M-079
P&M-053
L-01
L-03
M-081
Remarks
M-068
sub analysis
M-082
CHAPTER-10
MISCILLANEOUS ITEMS
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
10.01 11.8 307 Planting and Maintaining of Flowering Plants and Shrubs
(a) Planting flowering plants and shrubs in central verge
Unit = Running metres 200 plants and 800 shrubs in two rows in one
km length of road where width of verge is 3m and above.
Taking output = 1000 metres
a) Labour
Mate day 1.20 125.00 150.00 L-01
Mazdoor day 12.00 84.91 1018.87 L-03
b) Machinery
Water tanker6 KL capacity hour 6.00 160.00 960.00 P&M-060
c) Material
Plants each 200.00 36.55 7310.00 M-084
Shrubs each 800.00 16.13 12900.00 M-085
Manure sludge/Farm yard manure cum 63.64 350.00 22274.00 M-056
Pesticide kg 0.50 146.20 73.10 M-087
Cost of water KL 36.00 100.00 3600.00 M-047
d)Over Head Charges @ 8% on (a+b+c) 3862.88
e)Contractor's Profit @ 10% on (a+b+c+d) 5214.88
Rate per Km = (a+b+c+d+e) 57363.73
say 57364.00
(b) Maintenance of flowering plants and shrubs in central verge for one
month
Unit = km
Taking output = one km
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
a) Labour
Mate day 36.00 125.00 4500.00 L-01
Mazdoor day 365.00 84.91 30990.61 L-03
b) Machinery
Water tanker 6 KL capacity hour 90.00 160.00 14400.00 P&M-060
c) Material
Manure Sludge / farm yard manure at site cum 10.00 350.00 3500.00 M-056
Cost of water KL 180.00 100.00 18000.00 M-047
Replacement of casualties @ 10 per cent
Plants each 20.00 36.55 731.00 M-084
Shrubs each 80.00 16.13 1290.00 M-085
Pesticides kg 1.50 146.20 219.30 M-087
d)Over Head Charges @ 8% on (a+b+c) 5890.47
e)Contractor's Profit @ 10% on (a+b+c+d) 7952.14
Rate per Km for one year = (a+b+c+d+e) 87473.52
Rate per km/ month =(a+b+c+d+e)/12 7289.46
say 7289.00
10.02 4.16 409 FOOTPATHS AND SEPARATORS
Construction of footpath / separator by providing a 100 mm thick PCC
M15, 1:3 cement mortar(12mm thick) overlaid by chequered tiles of 22 mm
as per Clause 401
Unit = sqm
Taking output = 300 sqm
a) Labour
Mate day 1.36 125.00 170.00 L-01
Mason day 4.00 104.66 418.62 L-05
Mazdoor day 30.00 84.91 2547.17 L-03
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
b) Machinery
Vibratory roller 8-10 tonnes @ 60cum per hour hour 0.75 994.00 745.50 P&M-059
Water tanker 6 KL capacity @ one trip per hour hour 2.00 160.00 320.00 P&M-060
Concrete mixer 0.4/0.28 cum per hour hour 6.00 150.00 900.00 P&M-009
For cement concrete grade M-15,30 cum
Aggregate 12 mm crushed @ 0.9 cum of concrete cum 27.00 615.15 16609.18 M-026
Sand @ 0.45 cum/cum of concrete cum 13.50 395.76 5342.73 M-020
Cement Tonne 7.52 3756.85 28251.51 M-027
For cement mortar(1:3)
Sand cum 3.84 395.76 1519.71 M-020
Cement Tonne 1.83 3756.85 6875.04 M-027
Precast cement concrete tiles 254 x 406 mm and 22 mm thick sqm 300.00 188.13 56437.50 M-088
Cost of water KL 12.00 100.00 1200.00 M-047
c)Over Head Charges @ 8% on (a+b) 9706.96
d)Contractor's Profit @ 10% on (a+b+c) 13104.39
Cost for 300 sqm = (a+b+c+d+e) 144148.31
Cost per sqm =(a+b+c+d+e)/300 480.49
say 480.00
Providing bus shelters as per drawing, Technical Specifications and
10.03 127 directed by the engineer
Unit = Each
Taking output = 1 No
Earth work cum 17.35 50.00 867.50 M-068
Filling of sand cum 2.75 395.76 1088.33 M-021
Crushed stone aggregates cum 2.75 369.00 1014.75 M-023
PCC M-15 (below chequared tiles,in foundation... etc.) cum 8.00 2059.00 16472.00 sub analysis
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
RCC M-20 cum 4.00 2459.00 9836.00 sub analysis
Brick work cum 14.00 2397.60 33566.40 M-059
Plastering Sqm 85.00 70.00 5950.00 M-090
50 mm thick cuddapah slab sqm 9.00 166.63 1499.63 M-091
HYSD reinforcement MT 0.12 29668.15 3560.18 M-029
Purlin and Rafter MT 1.20 29668.15 35601.78 M-028
AC sheet Sqm 66.00 145.13 9578.25 M-092
Painting with epoxy coated at inside face sqm 32.00 134.38 4300.00 M-072
Painting cement based at outside face sqm 48.00 50.53 2425.20 M-094
Chequered tiles Sqm 50.00 231.13 11556.25 M-093
b) Machinery
Tractor trolley hour 3.00 234.00 702.00 P&M-053
c)Over Head Charges @ 8% on (a+b) 11041.46
d)Contractor's Profit @ 10% on (a+b+c) 14905.97
Rate per Bus shelter =(a+b+c+d) 163965.70
say 163966.00
10.04 123 Providing cellular phones with roaming facility and using charge as
Rs. 2000 & roaming chrge as Rs.1000 per month complete as per
Technical Specifications Clause 123A
Unit = Each
Taking output = 1 month
Cellular phones Avg. rate per phone , 4000 Rs for 36 month Nos 110.00
Using charge per month 2000.00
Roaming charge per month Avg. 1000.00
Rate per month 3110.00
say 3110.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
10.05 124 Providing and maintaining vehicles for the engineer and the employer
including providing driver, POL etc as per Technical Specifications
Clause 124
unit = vehicle month
Taking output = 1 vehicle per month
a) 2500 cc and above (A/C) Diesel or equivalent
HIRE CHARGES
2500 cc Hard top passenger car (A/C) with diesel charge each 1.00 13500.00 13500.00
Driver charge month 1.00 5000.00 5000.00
b)Over Head Charges @ 8% on (a) 1480.00
c)Contractor's Profit @ 10% on (a+b) 1998.00
Rate per month per vehicle 21978.00
say 22000.00
10.06 Supply of colour record photographs with negatives and two colour
prints in approved size there from mounted in album as per Technical
specifications Clause 125
Unit = set
Taking output = 100 sets
Cost of film roll Roll 3.00 125.00 375.00
Developing charges Roll 3.00 20.00 60.00
Printing charges for two prints Set 100.00 25.00 2500.00
Cost of album including mounting and captioning each 2.00 400.00 800.00
Photography charges Ls 750.00
Rate for 100 sets of prints 4485.00
Rate per set 44.85
say 45.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
10.07 Supply of additional prints of coloured photographs of approved size
as per Technical Specifications Clause 125
Unit = Each
Taking output = 100 Nos
Printing charges each 100.00 14.00 1400.00
Cost of album each 1.00 400.00 400.00
Cost for 100 Nos 1800.00
Cost per photo 18.00
say 18.00
10.08 Supply of colour video cassettes during construction as per
Technical Specifications Clause 126
Unit = set
Taking output = 1 Set
Cost of VHS video cassette and CD each 1.00 600.00 600.00
Videographer charges including video camera rent, lighting and charges Ls 5200.00
for assistance etc.,
Editing charges including titles, special effects etc., Ls 550.00
Charges for script and narration in english(audio) Ls 550.00
Video cassettesand CDs for additional copies (4 copies each) each 4.00 500.00 2000.00
Recording charges for additional 4 copies each 4.00 150.00 600.00
Rate per set 9500.00
say 9500.00
10.09 8.36 a) TRAFFIC CONE
Provision of red fluorescentwith white reflective sleeve traffic cone made of
low density polyethylene (LDPE) material with a square base of 390 x 390
x 35 mm and a height of 770 mm,4 kg in weight, placed at 1.5 m interval ,
all as per BS: 873
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Unit = Each
Taking output = 68 Nos
a) Labour
Mate day 0.02 125.00 2.50 L-01
Mazdoor day 0.50 84.91 42.45 L-03
b) Material
Traffic cones with 150 mm reflective sleeve Nos 68.00 537.50 36550.00 M-095
c) Machinery
Tractor trolley hour 0.10 234.00 23.40 P&M-053
d)Over Head Charges @ 8% on (a+b+c) 2929.47
e)Contractor's Profit @ 10% on (a+b+c+d) 3954.78
Cost for 68 Nos = (a+b+c+d+e) 43502.60
Rate per No = (a+b+c+d+e)/68 639.74
say 640.00
8.45 b) Drum Delineator in construction zone
Provision of empty bitumen drum delineator, 300 mm in diameter, 800 mm
high, filled with earth for stability, painted in circunferential strips of
alternate black and white 100 mm wide fitted with reflectors 3 Nos. of 7.5
cm dia, all as per IRC:SP:55-2001
Unit = each
Taking output = one drum delineator
a) Labour
Mate day 0.02 125.00 2.50 L-01
Mazdoor day 0.25 84.91 21.23 L-03
Painter day 0.25 93.21 23.30 L-21
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
b) Material
empty bitumen drum Nos 1.00 354.75 354.75 M-096
Paint Litre 0.50 134.38 67.19 M-072
c)Over Head Charges @ 8% on (a+b) 37.52
d)Contractor's Profit @ 10% on (a+b+c) 50.65
Rate per drum delineator = (a+b+c+d) 557.13
say 557.00
c) Flag man
Positioning of a smart flagman with a yellow vest and a yellow cap and a
red flag 600 x 600 mm securely fastened to a staff 1 m in length for
grouting the traffic
unit = each
Taking output = one flagman
a) Labour
Mate day 0.04 125.00 5.00 L-01
Mazdoor day 1.00 84.91 84.91 L-03
b) Material
Flag of red colour cloth 600 x 600 mm each 1.00 64.50 64.50 M-097
Wooden staff for fastening of flag 25 mm dia, one m long each 1.00 53.75 53.75 M-098
c)Over Head Charges @ 8% on (a+b) 16.65
d)Contractor's Profit @ 10% on (a+b+c) 22.48
Rate per flagman = (a+b+c+d) 247.29
say 247.00
8.43 d) Portable barricade in construction zone
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Installation of a steel portable barricade with horizontal rail 300 mm wide,
2.5 m in length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron
section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and
white stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2
coats of yellow paint, complete as per IRC:SP:55-2001
unit = each
Taking output = one steel portable barricade
a) Labour
Mate day 0.02 125.00 2.50 L-01
Mazdoor day 0.25 84.91 21.23 L-03
Painter day 0.50 93.21 46.60 L-21
Welder day 0.25 104.66 26.16 L-11
b) Material
Angle iron 45 x 45 x 5 mm kg 25.00 29.56 739.06 M-078
MS sheet of 300 mm wide, 2.5 m long and 2.6 mm thick kg 15.00 83.85 1257.75 M-099
Paint litre 0.50 134.38 67.19 M-072
Add 2 % of cost of steel for welding consumables, nuts and bolts and 41.28
drilling holes
c)Over Head Charges @ 8% on (a+b) 176.14
d)Contractor's Profit @ 10% on (a+b+c) 237.79
Rate per barricade = (a+b+c+d) 2615.71
say 2616.00
10.10 Providing and maintaining site office (A/C) for Team leader and his
staffs on rental basis including new furniture and fixtures etc.,as per
Technical Specifications Clause 120.(Approximate carpet area 150
sqm)
unit = month
Taking output = 1 month
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
a) Contents
Rental charges for office building month Ls 10000.00
Consumption charges for electricity month Ls 8500.00
Consumption charges forWater supply month Ls 1500.00
Hire charges for furniture & other fixtures like fans, tube lights etc… month Ls 5000.00
Telephone charges month Ls 12000.00
Rate per month 37000.00
say 37000.00
10.11 Providing and maintaining site office (A/C) for PIU on rental basis
including new furniture and fixtures etc.,as per Technical
Specifications Clause 120.(Approximate carpet area 150 sqm)
unit = month
Taking output = 1 month
a) Contents
Rental charges for office building month Ls 10000.00
Consumption charges for electricity month Ls 5500.00
Consumption charges forWater supply month Ls 1000.00
Hire charges for furniture & other fixtures like fans,tube lights etc… month Ls 3500.00
Telephone charges month Ls 10000.00
Rate per month 30000.00
say 30000.00
10.12 Providing and maintaining site office (A/C) for Resident engineer and
their staffs on rental basis including new furniture and fixtures etc.,as
per Technical Specifications Clause 120.(Approximate carpet area
250 sqm)
unit = month
Taking output = 1 month
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
a) Contents
Rental charges for office building month Ls 25000.00
Consumption charges for electricity month Ls 8500.00
Consumption charges forWater supply month Ls 1500.00
Hire charges for furniture & other fixtures like fans,tube lights etc… month Ls 4000.00
Telephone charges month Ls 7000.00
Rate per month 46000.00
say 46000.00
10.13 Providing and maintaining the equipments including Road software,
computer, generator, plotter, printer etc… as per Technical
specifications Clause 121.2
unit =packge
Taking output =1 package
Executive tables No. 14.00 12000.00 168000
Executive chairs No. 14.00 5000.00 70000
Tables No. 14.00 6000.00 84000
Ordinary chairs - Type 1 No. 39.00 2000.00 78000
Tables(for all other staff) No. 12.00 2500.00 30000
Ordinary chairs –Type-II (for all other staff) No. 20.00 1000.00 20000
Stools No. 10.00 800.00 8000
Steel Almirah 1980mmx915mmx485mm No. 19.00 10000.00 190000
Steel Almirah 1270mmx765mmx440mm No. 10.00 7000.00 70000
Computer with printer and accessories
a)server No. 25.00 50000.00 1250000
b) LAN No. 3.00 10000.00 30000
c)E-Mail Facility No. 3.00 2000.00 6000
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Autocad 2000 or 2004 No. 25.00 80000.00 2000000
Novapoint software No. 1.00 500000.0 500000
MS office No. 25.00 5000.00 125000
Printer
A3 size HP 1180 or equivalent No. 3.00 25000.00 75000
A4 size Laser jet HP model or equivalent 8100N (1200 DPI) No. 8.00 25000.00 200000
UPS support for all computers (3 hrs backup) No. 3.00 80000.00 240000
Refrigerator No. 3.00 15000.00 45000
Air conditioners (Split-units) No. 20.00 40000.00 800000
Photo copier No. 3.00 125000.00 375000
Fax machine No. 3.00 30000.00 90000
4Drawer filing cabinet with visafile suspension system No. 16.00 4000.00 64000
Visitor’s chairs /conference room chairs No. 18.00 2000.00 36000
Tables for computers with 3 drawers, key board/mouse pull out trays size No. 25.00 5000.00 125000
1664mm x 900mm
Conference table No. 3.00 15500.00 46500
Revolving chairs for computer room / drawing room No. 10.00 4500.00 45000
EPBX for 20 connections including hand set and cabling No. 3.00 25000.00 75000
Ceiling fans No. 40.00 1000.00 40000
Water purifier No. 3.00 10000.00 30000
Total cost for the equipments and furnitures 6915500.0
10.14 10.4 (a) I) Filling pot-holes and patch repairs with open graded premix
surfacing,20 mm
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Removal of all failed material, trimming of completed excavation to provide
firm vertical faces, cleaning of surface, painting of tack coat on the sides
and base of excavation as per clause 503, back filling the pot holes with
hot bituminous material as per clause 511, compacting, trimming and
finishing the surface to form a smooth continuous surface, all as per clause
3004.2
Unit = sqm
Taking output = 10250 sqm
a) Labour
Mate day 3.76 125.00 470.00 L-01
Mazdoor day 90.00 84.91 7641.52 L-03
Mazdoor skilled day 4.00 88.68 354.74 L-02
b) Material
Crushed stone aggregates of 13.2 mm Cum 184.50 493.03 90964.42 M-022
Crushed stone aggregates of 11.2 mm Cum 92.25 615.15 56748.03 M-026
Bitumen 80/100 @ 14.6 kg/10 sqm Tonne 14.97 12551.57 187897.03 M-37
Bitumen emulsion for tack coat including vertical sides of pot-hole Tonne 2.46 15998.80 39357.05 M-034
c) Machinery
Air compressor Hour 6.00 206.00 1236.00 P&M-001
HMP 100-110 TPH capacity Hour 6.00 11167.00 67002.00 P&M-022
Tipper 10 tonnes capacity Hour 45.00 200.00 9000.00 P&M-048
Smooth Wheeled roller 8-10 tonne Hour 12.00 297.00 3564.00 P&M-044
d)Over Head Charges @ 8% on (a+b+c) 37138.78
e)Contractor's Profit @ 10% on (a+b+c+d) 50137.36
Cost for 10250 sqm =(a+b+c+d+e) 551510.93
Rate per sqm = (a+b+c+d+e)/10250 53.81
say 54.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
10.5 ii) Filling pot-holes and patch repairs with open graded premix
surfacing,40 mm
Removal of all failed material, trimming of completed excavation to provide
firm vertical faces, cleaning of surface, painting of tack coat on the sides
and base of excavation as per clause 503, back filling the pot holes with
hot bituminous material as per clause 504, compacting, trimming and
finishing the surface to form a smooth continuous surface, all as per clause
3004.2
Unit = sqm
Taking output = 4900 sqm (196 cum)
a) Labour
Mate day 2.92 125.00 365.00 L-01
Mazdoor day 70.00 84.91 5943.40 L-03
Mazdoor skilled day 3.00 88.68 266.05 L-02
b) Material
20 – 10 mm 35 % Cum 99.75 618.02 61647.20 M-012
10 – 5 mm 23% Cum 65.55 560.77 36758.61 M-013
5 mm and below Cum 114.00 300.31 34235.03 M-010
Filler 2 % by weight of aggregates (cement) Cum 3.92 3756.85 14726.85 M-027
Add 5 % for wastage 736.34
Bitumen 80/100 Tonne 22.50 12551.57 282410.37 M-37
Bitumen emulsion for tack coat including vertical sides of pot-hole Tonne 1.18 15998.80 18878.59 M-034
c) Machinery
Air compressor Hour 6.00 206.00 1236.00 P&M-001
HMP 100-110 TPH capacity Hour 6.00 11167.00 67002.00 P&M-022
Tipper 10 tonnes capacity Hour 45.00 200.00 9000.00 P&M-048
Smooth Wheeled roller 8-10 tonne Hour 12.00 297.00 3564.00 P&M-044
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
d)Over Head Charges @ 8% on (a+b+c) 42941.55
e)Contractor's Profit @ 10% on (a+b+c+d) 57971.10
Cost for 4900 sqm =(a+b+c+d+e) 637682.09
Rate per sqm = (a+b+c+d+e)/4900 130.14
say 130.00
5.7(ii) 508 b) Providing renewal coat with 25mm thick Semi dense Bituminous
Concrete on existing carriageway complete as per Technical
Specifications Clause 508 and as per directions of the Engineer.
Unit = cum
Taking output = 195 cum (450 tonnes)
a) Labour
Mate day 0.840 125.00 105.00 L-01
Mazdoor working with HMP, mechanical broom, paver, roller, asphalt day 16.000 84.91 1358.49
cutter and assistance for setting out lines, levels and layout of
construction
Skilled mazdoor for checking line & levels day 5.000 88.68 443.42
b) Machinery 0.00
Batch mix HMP @ 75 tonne per hour hour 6.000 11167.00 67002.00 P&M-022
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 1725.00 10350.00 P&M-034
Generator 250 KVA hour 6.000 600.00 3600.00 P&M-081
Front end loader 1 cum bucket capacity hour 6.000 520.00 3120.00 P&M-017
Tipper 10 tonne capacity tonne. 4950.000 1.74 8613.00 P&M-047
km
Add 10 per cent of cost of carriage to cover cost of loading and 861.30
unloading
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
*Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 3.900 297.00 1158.30 P&M-044
*Vibratory roller 8 tonnes for intermediate rolling. hour 3.900 994.00 3876.60 P&M-059
*Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour 3.900 738.00 2878.20 P&M-045
c) Material
* Grading II: 10 mm (Nominal Size)
i) Bitumen 60/70 @ 5 per cent of weight of mix tonne 22.500 13578.92 305525.76 M-032
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 22.5 tonnes
Weight of aggregate = 450-22.5 = 427.5 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 285 cum
9.5 - 4.75 mm @ 57 per cent cum 162.450 496.85 80713.03 M-009
4.75 and below @ 41 per cent cum 116.850 300.31 35090.90 M-010
Filler @ 2 % of weight of aggregates tonne 8.550 231.61 1980.29 M-003
d)Over Head Charges @ 8% on (a+b+c) 42134.10
e)Contractor's Profit @ 10% on (a+b+c+d) 56881.04
Cost for 195 cum = a+b+c+d+e 625691.44
Rate per cum = (a+b+c+d+e)/195 (For Grading-II) 3208.67
3209.00
or 3209.00
10.2 c) Maintanance of earthen shoulder (filling with fresh soil)
Making up loss of material / irregularities on shoulder to design level by
adding fresh approved soil and compacting it with appropriate equipment
unit = sqm
Taking output = 100 sqm
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Assuming average thickness of filling to be 150 mm
Quantity of fresh material = 15 cum ( 24 t )
a) Labour
Mate day 0.18 125.00 22.50 L-01
Mazdoor day 4.50 110.00 495.00 L-03
b) Machinery
Excavator 1.0 cum bucket capacity @ 60 cum per hour hour 0.25 840.00 210.00 P&M-026
Tipper 5km t.km 120.00 1.74 208.80 P&M-047
Add 10 per cent of cost of transportation to cover cost of loading and 20.88
unloading
Plate compactor @ 25 sqm per hour hour 12.00 100.00 1200.00 P&M-086
c)Over Head Charges @ 8% on (a+b) 172.57
d)Contractor's Profit @ 10% on (a+b+c) 232.98
Rate for 110 sqm = (a+b+c+d) 2562.73
Rate per sqm =(a+b+c+d)/110
say 23.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Cover slab cum 0.10 1157.00 115.70 sub analysis
Reinforcement kg 8.75 22.00 192.50 M-061
Overhead charges @ 8% on above 184.29
Contractor's profit @ 10% on above 248.79
Rate per metre 2736.72
say 2737.00
B) Providing and laying of Lateral drain in toll booth area completeas
per drawing and directed as per engineer
unit = metre
Taking output = 1 metre
CONTENTS
PCC M-15 cum 0.13 2059.00 267.67 sub analysis
Brick work cum 0.36 2397.60 863.14 M-059
Plastering 1:4 sqm 2.20 70.00 154.00 M-090
Cover slab cum 0.12 1157.00 133.06 sub analysis
Reinforcement kg 9.30 33.33 309.92 M-061
Overhead charges @ 8% on above 138.22
Contractor's profit @ 10% on above 186.60
Rate per metre 2052.61
say 2053.00
C) Providing and laying cable duct in toll booth area complete as per
drawing and as directed by the engineer
unit = metre
Taking output = 1 metre
CONTENTS
PCC M-15 cum 0.20 2059.00 403.56 sub analysis
Brick work cum 0.29 1500.00 435.00 M-059
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
Plastering 1:4 sqm 5.75 70.00 402.50 M-090
Cover slab cum 0.10 1157.00 115.70 sub analysis
PVC duct m 1.00 60.00 60.00
Overhead charges @ 8% on above 113.34
Contractor's profit @ 10% on above 153.01
Rate per metre 1683.12
say 1683.00
D) 90 CM EQUILATERAL TRIANGLE for barrier ahead
Unit = Each
Taking output = one traffic sign
i) Excavation for foundation cum 0.22 51.00 11.02 M-068
ii) Cement concrete M15 grade cum 0.12 2059.00 247.08 sub analysis
iii) Painting angle iron post two coats sqm 0.43 22.00 9.46 M-104
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25 L-01
Mazdoor day 0.25 84.91 21.23 L-03
b) Material
Mild steel angle iron 75 x 75 x 6 mm kg 19.00 29.56 561.69 M-078
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of
size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts, 11.23
bolts etc.
90 cm equilateral triangle sqm 0.35 10750.00 3500.00 M-079
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34 P&M-053
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 349.22
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 471.45
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 5185.97
say 5186.00
E) Informatory sign
21 CM X 25 CM RECTANGULAR SIGN BORD
Unit = Each
Taking output = one traffic sign
i) Excavation for foundation cum 0.22 50.00 10.80 M-068
ii) Cement concrete M15 grade cum 0.12 2059.00 247.08 sub analysis
iii) Painting angle iron post two coats sqm 0.43 36.00 15.48 sub analysis
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25 L-01
Mazdoor day 0.25 84.91 21.23 L-03
b) Material
Mild steel angle iron 75 x 75 x 6 mm kg 19.00 29.56 561.69 M-078
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of
size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts, 11.23
bolts etc.
21 cm x 25 cm Rectangular sign board sqm 0.05 10750.00 530.00 M-079
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34 P&M-053
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 112.09
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 151.32
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 1664.50
say 1665.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
F) 21 CM X 27 CM RECTANGULAR SIGN BORD
Unit = Each
Taking output = one traffic sign
i) Excavation for foundation cum 0.43 50.00 21.60 M-068
ii) Cement concrete M15 grade cum 0.24 2059.00 494.16 sub analysis
iii) Painting angle iron post two coats sqm 0.86 36.00 30.96 sub analysis
a) Labour (For fixing at site)
Mate day 0.01 125.00 1.25 L-01
Mazdoor day 0.25 84.91 21.23 L-03
b) Material
Mild steel angle iron 75 x 75 x 6 mm kg 38.00 29.56 1123.38 M-078
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of
size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts, 22.47
bolts etc.
21 cm x 27 cm Rectangular sign board sqm 0.06 10750.00 567.00 M-079
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34 P&M-053
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 182.75
e) Contractor's profit @ 10% on (I+ii+iii+a+b+c+d) 246.71
Rate per traffic sign board = (I+ii+iii+a+b+c+d+e) 2713.84
say 2714.00
Ref. To
Ref. to
MoRT&H
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Data book
Spec
Sl No
i) Excavation for foundation cum 5.00 50.00 250.00 M-068
ii) Cement concrete M15 grade cum 1.20 2059.00 2470.80 sub analysis
iii) Painting iron post two coats sqm 4.70 36.00 169.20 sub analysis
a) Labour (For fixing at site)
Mate day 0.45 125.00 56.25 L-01
Mazdoor day 0.50 84.91 42.45 L-03
b) Material
Mild steel channel section 175 x 175 x 20 mm of 2.85 m length kg 205.00 29.56 6060.31 M-078
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of
size including lettering and signs as applicable
Add 15 per cent of cost of angle iron towards cost of drilling holes, nuts, 121.21
bolts etc.
150 cm x 100 cm Rectangular sign board sqm 8.40 10000.00 84000.00 M-079
c) Machinery
Tractor-trolley hour 0.01 234.00 2.34 P&M-053
d) Overhead charges @ 8% on (I+ii+iii+a+b+c) 7453.80
Chapter 11
REHABILITATION OF STRUCTURES
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
11.01 1500,1700, P.458 Providing and laying M30 grade Reinforced Cement Concrete with 20 mm
2100 down graded crushed stone aggregates in substructure and foundation
(excluding reinforcement), including shuttering and supporting
arrangements, transporting concrete from batching plant by transit mixer,
placing it in position, compacting with needle vibrator, moist curing for 14
days, all labour, materials, machinery, all leads and lifts, etc. complete as
per drawing, Technical Specification Section 1500, 1700 and 2200 and as
directed by the Engineer
unit = cum
Taking output = 120cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-067
Generator hour 6.00 450.00 2700.00 P&M-080
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 48.80 3756.85 183334.28 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 300.31 8108.30 M-010
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
d)Height effect charges @ 1.6% on (a+b+c) 4998.09
e)Form work charges @ 10% on (a+b+c+d) 31737.85
f)Overhead charges @ 0.3 on (a+b+c+d+e) 104734.91
g)Contractor's profit @ 0.1 on (a+b+c+d+e+f) 45385.13
Rate for 120 cum = a+b+c+d+e+f+g 499236.42
Rate per cum = (a+b+c+d+e+f+g) / 120 4160.30
say 4160.00
11.02 1500, 1700, P.478 Providing and laying M30 grade Reinforced Cement Concrete with 20 mm
2200 down graded crushed stone aggregates in superstructure (excluding
reinforcement), including shuttering and supporting arrangements,
transporting concrete from batching plant by transit mixer, placing it in
position, compacting with needle vibrator, moist curing for 14 days, all
labour, materials, machinery, all leads and lifts, etc. complete as per
drawing, Technical Specification Section 1500, 1700 and 2200 and as
directed by the Engineer
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.880 125.00 110.00 L-01
Mason day 3.000 104.66 313.97 L-05
Mazdoor day 19.000 84.91 1613.21 L-03
b) Machinery
Batching plant hour 6.000 1440.00 8640.00 P&M-067
Generator hour 6.000 450.00 2700.00 P&M-080
Front end loader hour 6.000 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.000 600.00 9000.00 P&M-049
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
Next 9km t.km 2700.000 4.94 13338.00 P&M-050
Concrete pump hour 6.000 165.00 990.00 P&M-007
c) Materials
Cement t 48.80 3756.85 183334.28 M-027
Coarse sand cum 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cum 27.00 369.00 9963.03 M-023
20 mm Aggregate cum 64.80 678.12 43942.45 M-025
10 mm Aggregate cum 43.20 615.15 26574.69 M-026
d) Form Work charges @ 25% of (a+b+c) 78581.27
e)Overhead charges @ 0.3 on (a+b+c+d) 117871.91
f)Contractor's profit @ 0.1 on (a+b+c+d+e) 51077.83
Rate for 120 cum = a+b+c+d+e+f 561856.09
Rate per cum = (a+b+c+d+e+f)/120 4682.13
say 4682.00
11.03 1500, 1700, P.478 Providing and laying M30 grade Reinforced Cement Concrete with 20 mm
2200 down graded crushed stone aggregates for Crash Barrier and Kerb (Major
Bridge) (excluding reinforcement) including shuttering and supporting
arrangements, transporting concrete from batching plant by transit mixer,
placing it in position, compacting with needle vibrator, moist curing for 14
days, all labour, materials, machinery, all leads and lifts, etc. complete as
per drawing, Technical Specification Section 809,1500,1700,2100 and as
directed by the Engineer
unit = m
Taking output = 10 m
a)M 30 Grade Concrete cum 3.000 3274.22 9822.66 sub
analysis
b) Labour
Mate day 0.040 125.00 5.00 L-01
Mazdoor day 19.000 84.91 1613.21 L-03
c)Overhead charges @ 0.3 on (a+b) 3432.26
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
d)Contractor's profit @ 0.1 on (a+b+c) 1487.31
Rate for 10 m = a+b+c+d 16360.44
Rate per cum = (a+b+c+d+e+f)/10 1636.04
say 1636.00
11.04 1600 P.489 Providing, cutting, bending and fixing in position HYSD reinforcement in
structures including all labour, materials, machinery, all leads and lifts, etc.
complete as per drawing, Technical Specification Section 1600 and as
directed by the Engineer. MoRT&H Technical Specification No.1600,
Technical Specification Vol.V and as directed by the Engineer-in-charge.
unit = tonne
Taking output = 1 tonne
a) Labour
Mate day 0.44 125.00 55.00 L-01
Mazon day 3.00 104.66 313.97 L-05
Mazdoor day 8.00 84.91 679.25 L-03
b) Materials
HYSD Reinforcement t 1.05 29668.15 31151.56 M-029
Binding wire kg 8.00 38.70 309.60 M-073
c) Overhead charges @ 0.3 on (a+b) 9752.81
d) Contractor's profit @ 0.1 on (a+b+c) 4226.22
Rate for 1 tonne = a+b+c+d 46488.40
Rate per tonne = (a+b+c+d)/1 tonne 46488.40
say 46488.00
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
11.05 2800 P.539 Providing and laying non-shrink cementitious micro concrete (Renderoc
RG or equivalent) applying bonding agent (Nitobond SBR or equivalent) on
old surface, cleaning dirt and dust, box cutting of spalled concrete,
cleaning rust, scales from exposed and corroded reinforcement, applying
Zinc-rich primer (Nitozinc rich-90 or equivalent) complete with sand
blasting and water jetting, shuttering and supporting arrangement, all
labour, materials, machinery, all leads and lifts, etc. complete as per
drawing , Technical Specification Section 2800 and as directed by the
Engineer.
unit = sqm
Taking output = 10 sqm
a) Labour
Mate day 0.10 125.00 12.50 L-01
Mazdoor skilled day 1.25 88.68 110.85 L-02
Mazdoor day 1.25 84.91 106.13 L-03
b) Machinery
Air Compressor hour 1.00 206.00 206.00 P&M-001
Sand blasting equipment hour 1.00 250.00 250.00 P&M-098
Water Tanker hour 0.02 160.00 3.20 P&M-060
Generator hour 1.00 240.00 240.00 P&M-019
c) Materials
Bonding Agent Ltr 2.25 1037.38 2334.09 M-127
Zinc rich primer Ltr 1.45 130.08 188.61 M-128
Cementitious microconcrete t 0.53 15587.50 8183.44 M-129
Wastage @ 3% of above 349.04
d)Form work charges @ 25% on (a+b+c) 2995.97
e)Overhead charges @ 0.3 on (a+b+c+d) 4493.95
f)Contractor's profit @ 0.1 on (a+b+c+d+e) 1947.38
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
Rate for 10 cum = a+b+c+d+e+f 21421.17
Rate per cum = (a+b+c+d+e+f) / 10 2142.12
say 2142.00
11.06 2800 P.539 Providing and laying non-shrink cementitious micro concrete (Renderoc
RG or equivalent) applying bonding agent (Nitobond SBR or equivalent) on
old surface, cleaning dirt and dust, box cutting of honey combed area etc
complete with sand blasting and water jetting, shuttering and supporting
arrangement, all labour, materials, machinery, all leads and lifts, etc.
complete as per drawing, Technical Specification Section 2800 and as
directed by the Engineer.
unit = sqm
Taking output = 10 sqm
a) Labour
Mate day 0.10 125.00 12.50 L-01
Mazdoor skilled day 1.25 88.68 110.85 L-02
Mazdoor day 1.25 84.91 106.13 L-03
b) Machinery
Air Compressor hour 1.00 206.00 206.00 P&M-001
Sand blasting equipment hour 1.00 250.00 250.00 P&M-098
Water Tanker hour 0.02 160.00 3.20 P&M-060
Generator hour 1.00 240.00 240.00 P&M-019
c) Materials
Bonding Agent Ltr 2.25 1037.38 2334.09 M-127
Cementitious microconcrete t 0.53 15587.50 8183.44 M-129
Wastage @ 3% of above 343.39
d)Form work charges @ 25% on (a+b+c) 2947.40
e)Overhead charges @ 0.3 on (a+b+c+d) 4421.10
f)Contractor's profit @ 0.1 on (a+b+c+d+e) 1915.81
Rate for 10 sqm= a+b+c+d+e+f 21073.92
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
Rate per sqm= (a+b+c+d+e+f) / 10 2107.39
say 2107.00
11.07 1500,1700 & P.335 Providing and laying M15 grade Plain Cement Concrete with 20mm down
2100 graded crushed stone aggregate for Head Wall, Wing Wall, Cradle, Curtain
Wall at upstream and downstream of structures including all labour,
materials, machinery, transporting of concrete from batching plant by
transit mixer, placing it in position, compacting with needle vibrator, moist
curing, all leads and lifts, etc. complete as per drawing, Technical
Specification Section 1500,1700 and as directed by the Engineer.
unit = cum
Taking output = 120 cum
a) Labour
Mate day 0.84 125.00 105.00 L-01
Mason day 3.00 104.66 313.97 L-05
Mazdoor day 18.00 84.91 1528.30 L-03
b) Machinery
Batching plant hour 6.00 1440.00 8640.00 P&M-067
Generator hour 6.00 450.00 2700.00 P&M-080
Front end loader hour 6.00 520.00 3120.00 P&M-017
Transit mixer
Ist km hour 15.00 600.00 9000.00 P&M-049
Next 9 km t.km 2700.00 4.94 13338.00 P&M-050
Concrete pump hour 6.00 165.00 990.00 P&M-007
c) Materials
Cement t 33.04 3756.85 124126.32 M-027
Coarse sand cu.m 27.00 395.76 10685.45 M-020
Crushed stone aggregate (4.75mm to 2.36mm) cu.m 27.00 300.31 8108.30 M-010
20mm Aggregate cu.m 64.8 678.12 43942.45 M-025
10 mm Aggregate cu.m 43.2 615.15 26574.69 M-026
d) Form Work charges @ 4% of (a+b+c) 10126.90
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
e) Overhead charges @ 0.3 on (a+b+c+d) 78989.81
f) Contractor's profit @ 0.1 on (a+b+c+d+e) 34228.92
Rate for 120 cum = a+b+c+d+e+f 376518.12
Rate per cum = (a+b+c+d+e+f)/120 3137.65
say 3138.00
11.08 2507.2 p.527 Providing and laying flexible apron in the upstream and downstream of
structure for protection against scour with stone boulders weighing not
less than 40 kg each including all labour , materials, machinery, all leads
and lifts, compacting to the satisfaction of the Engineer etc. complete as
per drawing, Technical Specification Section 2500 and as directed by the
Engineer
unit = cum
Taking output =1 cum
a) Materials
Stone cu.m 1 335.00 335.00 M-057
Stone Spalls cu.m 0.2 586.00 117.20 M-058
b) Labour
Mate day 0.05 125.00 6.25 L-01
Mason day 0.25 104.66 26.16 L-05
Mazdoor day 1 84.91 84.91 L-03
c) Overhead charges @ 30% on (a+b) 170.86
d) Contractor's profit @ 10% on (a+b+c) 74.04
Rate for 1 cum 814.41
say 814.00
11.09 2600 p.513 Providing and fixing Compression Seal type Expansion Joint from MoRT&H
accredited supplier with all labour, materials, machinery, all leads and lifts,
etc., complete as per drawings, Technical Specification Section 2600 and
as directed by the Engineer.
unit = metre
Taking output = 12 metre
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
a) Labour
Mate day 0.036 125.00 4.50 L-01
Mazdoor day 0.600 84.91 50.94 L-03
Mazdoor skilled day 0.300 88.68 26.61 L-02
b) Materials
Compression seal with angle m 12.000 5567.90 66814.78 M-117
Miscellaneous @ 5% of cost of angle section 3340.74
c)Overhead charges @ 0.3 on (a+b) 21071.27
d)Contractor's profit @ 0.1 on (a+b+c) 9130.88
Rate for 12 metre = a+b+c+d 100439.72
Rate per metre = (a+b+c+d)/12 8369.98
say 8370.00
11.10 2600 Providing and fixing Elastomeric Strip Seal type Expansion Joint from
MoRT&H accredited supplier after removing existing worn out / damaged
with all labour, materials, machinery, all leads and lifts, etc. complete as per
drawing, Technical Specification Section 2600 and as directed by the
Engineer.
unit = metre
Taking output = 12 metre
a) Labour
Mate day 0.050 125.00 6.25 L-01
Mazdoor day 1.000 84.91 84.91 L-03
Mazdoor skilled day 0.250 88.68 22.17 L-02
b) Materials
Complete assembly of strip steel expansion joint m 12.000 6363.31 76359.74 M-118
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
d)Contractor's profit @ 0.1 on (a+b+c) 10437.84
Rate for 12 metre = a+b+c+d 114816.21
Rate per metre = (a+b+c+d)/12 9568.02
say 9568.00
11.11 2000 & 2200 p.467 Proving and laying true to line, level and orientation Elastomeric Bearing
from MoRT&H accredited supplier after removing existing worn out /
damaged including all labour, materials, machinery, all leads and lifts etc,
complete as per drawing, Technical Specification Section 2005,2008,2808
and as directed by the Engineer.
unit = cum
Taking output = 19200 cum
a) Labour
Mate day 0.060 125.00 7.50 L-01
Mazdoor day 1.000 84.91 84.91 L-03
Mazdoor skilled day 0.500 88.68 44.34 L-02
b) Materials
Elastomeric bearing cu.cm 14655.00 0.404 5927.49 M-110
Miscellaneous @ 1% cost of materials 59.27
c)Overhead charges @ 0.3 on (a+b) 1837.05
d)Contractor's profit @ 0.1 on (a+b+c) 796.06
Rate for 19200 cum = a+b+c+d 8756.62
Rate per Elastomer Bearing = (a+b+c+d)/19200 0.46
say 0.46
Ref. to
Sl No MoRT&H Description Unit Quantity Rate Rs Cost Rs Remarks
Spec
11.12 808 p.236 Providing and laying 50 mm diameter heavy duty MS pipe over Crash
Barrier as per IS: 1239 with expansion gap at every 20 m interval along with
providing insert plate at 2 m interval, painting with single coat of zinc-rich
primer and two coats of top coat epoxy paint including all labour, materials,
machinery, all leads and lifts, etc. complete as per drawing, Technical
Specification Section.800 and as directed by the Engineer.
unit = m
Taking output = 10 m
a)Labour
Mate day 0.014 125.00 1.75 L-01
Mazdoor day 0.350 84.91 29.72 L-03
Welder day 0.010 104.66 1.05 L-02
b)Materials
MS Pipe m 10.00 215.000 2150.00 M-119
Insert Plate kg 25.000 30.00 750.00
Lugs kg 6.750 30.00 202.50
Welding torch and consumables 155.13
c)Overhead charges @ 0.3 on (a+b) 987.04
d)Contractor's profit @ 0.1 on (a+b+c) 427.72
Rate for 10 m = a+b+c+d 4704.90
Rate per m = (a+b+c+d)/10 470.49
say 470.00
CHAPTER-12
PROVISIONAL ITEMS
Ref. to
Sl No MoRT & Description Unit Quantity Rate Rs Cost Rs
H Spec
Boring for soil investigation including conducting necessary tests and preparation
12.01 of report complete as per direction of the Engineer and Technical Specifications
Section 2400.
Unit = metre
Taking output = 1 metre
a) CONTENTS
Boring charges M 1.000 660 660.00
Conducting SPT TEST M 1.000 160 160.00
UDS samples & others M 1.000 160 160.00
Miscellaneous such transportation charges etc., Ls 120.00
Setting up borewells Ls 120.00
Additional charges for carbide and diamond bits Ls 240.00
b)Over Head Charges @ 8% on (a) 116.80
c)Contractor's Profit @ 10% on (a+b) 157.68
Rate per metre 1734.48
say 1735.00
12.02 LOAD TEST FOR ROB'S AND MAJOR BRIDGES
CONTENTS
1 Vechicles for testings & materials approved from SCR (priliminary) 1.5 Lakhs
2 Instrumentation for Deflection measurement 2.5 Lakhs
Ref. to
Sl No MoRT & Description Unit Quantity Rate Rs Cost Rs
H Spec
3 Positioning of cribs, supports & loading procedure and approval from SCR (Final) 1.5 Lakhs
4 Loading Test, labourers and miscellaneous items completion of report and 2.5 Lakhs
approval from SCR
Overhead charges @ 25% of above 2 Lakhs
Contractor's profit @ 10% of above 1 Lakhs
Total Rate for 1 load test 11.00 Lakhs
RATE OF METAL
RATES OF LABOUR
Rate for Rate for
Sl.NO Name Of Labour 2002-2003 2005-2006
L-01 Mate/ Supervisor 79.91 125
L-02 Mazdoor(skilled) 77.46 89
L-03 Mazdoor 74.16 85
L-04 Chiseller/ Breaker 83.44 96
L-05 Mason Ist class 91.41 105
L-06 Mason IInd class 83.41 95
L-07 Carpenter Ist class 91.41 105
L-08 Electrician 78.46 90
L-09 Mechanic 90.46 104
L-10 Fitter Ist class 81.41 93
L-11 Welder Ist class 91.41 105
L-12 Welder IInd class 80.81 93
L-13 Plumber Ist class 86.41 99
L-14 Black smith Ist class 79.41 91
L-15 Operator 82.96 95
L-16 Well sinker 101.41 116
L-17 Blaster 82.41 94
L-18 Wooder 78.36 90
L-19 diver 95.46 109
L-20 Hand Driller 74.81 86
L-21 Painter 81.41 93
P&M-005 Bitumen Boiler oil fired Bitumen Spraying capacity in litre 1500
P&M-006 Concrete Paver Finisher with 40 HP Motor Paving of concrete surface cum / hour 20
P&M-007 Concrete Pump of 45 & 30 cum capacity Pumping of concrete cum / hour 33 / 22
P&M-009 Concrete Mixer (a) 0.4/0.28 cum Concrete Mixing cum/hour 2.5
P&M-016 Emulsion Pressure Distributor Applying emulsion tack coat sqm/hour 1750
P&M-017 Front End loader 1 cum bucket capacity Soil loading / Aggregate loading cum/hour 60 /25
P&M-018 Generator (a) 125 KVA Genration of electric Energy KVA 100
P&M-032 Motor Grader 3.35 mtr blade Clearing /Spreading /GSB /WBM cum/hour 200/200/50/50
Output of
Sl. No. Description of Machine Activity Output
Machine
P&M-033 Mobile slurry seal equipment Mixing and laying slurry seal sqm/hour 2700
Output of
Sl. No. Description of Machine Activity Output
Machine
Paver Finisher Hydrostatic with sensor control
P&M-034 Paving of DBM/ BM/SDC/ Premix cum/hour 40
100 TPH
P&M-035 Paver Finisher Mechanical 100 TPH Paving of WMM /Paving of DLC cum/hour 40/30
0.75 m dia to 1.2 m dia Boring
P&M-036 Piling Rig with Bantonite Pump Rm/hour 2 to 3
attachment
P&M-037 Pneumatic Road Roller Rolling of Asphalt Surface cum/hour 25
P&M-038 Pneumatic Sinking Plant Pneumatic Sinking of wells cum/hour 1.5 to 2.00
P&M-040 Prestressing Jack with Pump & access Stressing of steel wires/stands
P&M-044 Smooth Wheeled Roller 8 tonne Soil Compaction /BM Compaction cum/hour 70/25
P&M-050 Transit Mixer 4/4.5 cum Transportation of Concrete Mix to site cum/hour 4.5
P&M-051 Transit Mixer 3.0 cum Transportation of Concrete Mix to site cum/hour 3
P&M-052 Transit Mixer 3.0 cum Transportation of Concrete Mix to site cum/hour 3
P&M-056 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5
P&M-057 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5
P&M-058 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5
P&M-059 Vibratory Roller 8 tonne Earth or soil / GSB / WBM cum/hour 100/60/60
P&M-063 Air compressor with pneumatic chisel attachment for cutting hard clay.
P&M-064 Batch type cold mixing plant 100-120 TPH capacity producing an average output of 75 tonne per hour
Output of
Sl. No. Description of Machine Activity Output
Machine
P&M-066 Boat to carry atleast 20 persons
P&M-067 Cement concrete batch mix plant @ 175 cum per hour (effective output)
P&M-077 Drum mix plant for cold mixes of appropriate capacity but not less than 75 tonnes/hour.
P&M-085 Piling rig Including double acting pile driving hammer (Hydraulic rig)
P&M-092 Vibrating Pile driving hammer complete with power unit and accessories.
Unit Rate
hour 206
hour 1440
hour 1200
hour 692
hour 128
hour 1850
hour 165
hour 10
hour 150
hour 150
hour 825
hour 550
hour 230
hour 2400
hour 1423
hour 516
hour 520
hour 450
hour 240
hour 670
hour 15100
hour 11167
hour 8930
hour 7150
hour 1700
hour 840
hour 5590
hour 11760
hour 200
hour 232
hour 230
hour 1545
Unit Rate
hour 650
Unit Rate
hour 1725
hour 629
hour 3525
hour 802
hour 2690
hour 585
hour 83
hour 18
hour 11
hour 60
hour 297
hour 738
km 15.6
tonne.km 1.74
hour 200
hour 600
tonne.km 4.94
hour 550
tonne.km 4.0
hour 234
hour 245
hour 252
km 14.5
hour 150
tonne.km 1.6
hour 994
hour 160
km 15.6
hour 777
Unit Rate
hour input
hour input
hour input
Unit Rate
hour input
hour 7200
hour 2880
hour input
hour 230
hour input
hour input
hour input
hour 550
hour 230
hour input
hour 6169
hour input
hour 240
hour 450
hour 600
hour input
hour 1423
day 200
hrs input
hour 50
hour input
hour 450
hour 420
t.km 420
hour input
hour input
hour 777
hour 777
t.km 8.37
hour 230
hour 900
hour 250
4.30
Pre moulded Joint filler, 25 mm thick for sqm
M-050 expansion joint. 215.00
M-051 Joint sealant kg 53.75
M-052 Sealant primer kg 4.84
M-053 Plastic sheath,1.25 mm thick for dowel bars sqm 5.38
M-054 Curing compound liter 107.50
Super plastisizer admixture IS marked as kg
M-055 per 9103-1999 @ 0.5 per cent by weight of 125.00
cement
M-056 Farm yard manure @ 0.18 cum per 100 sqm cum
at site of work 350.00
M-057 Stone (weighing not less than 40 kg each) cum 335.00
M-058 Stone spalls cum 586.00
M-059 Brick work ( 19 x 9 x 9) cm cum 2397.60
M-060 1:3 cement plaster sqm 90.00
M-061 Steel Reinforcement kg 33.33
M-062 RCC hume pipe 300 mm dia m 155.17
M-063 Collars @ every 2.5 m No. 49.00
M-064 GI pipe 50 mm dia m 201.0
Corrugated sheet,3 mm thick, "W" beam
M-065 kg
section railing,4.5 m in length 37.63
Channel post 150 x 75 x 5 mm,1.8 m long,3
M-066 kg
Nos @ 16.4 kg per metre 32.25
Spacer 150 x 75 x 5 mm channel 0.33 m
M-067 kg
long,3 Nos @ 16.4 kg per metre 32.25
M-068 EarthWork For Foundation cum 50.00
M-069 PVC coated chain link fence(3"x3") sqm 87.08
M-071 Painting with cement paint sqm 48.38
Paint conforming to requirement of clause
M-072 litre 134.38
803.3
M-073 Binding wires kg 38.70
M-074 Hot applied thermoplastic compound Litre 188.13
M-075 Reflectorising glass beads kg 107.50
M-076 Road marking Paint as per IS :164 Litre 156.95
M-077 Painting angle iron post two coats sqm 29.03
M-078 Mild steel angle iron 75 x 75 x 6 mm kg 29.56
M-079 Sign Board Sheets sqm 10750.00
Aluminium studs 100 x 100 mm fitted with
M-080 Nos. 322.50
red flash
M-081 Deliniators Nos. 537.50
M-082 Red reflectors each 483.75
M-083 Bitumen 80/100 MT 12551.57