1. SIPOC diagram is employed in
which phase of DMAIC methodology
Control
Define
Measure
Analyse
Improve
2. A Belt has used the 5S approach of Lean to set up a
control method with frequently used tools organized
as shown in this graphic. The Belt has applied the
______________ principle of 5S.
Stabilize
Sort
Sustain
Shine
Standardize
3. When in the process of trying to identify the
Critical X’s one does a(n)_____________ because
frequently it is 20% of the inputs that have an 80%
impact on the output.
FMEA
Pareto
SMED
NP Chart
C Chart
4. Which of the test is a cross functional
business process
Employee induction
Cheque Issuing
Quality testing
Mean
Median
Range
Both A and B
Green Belt
Champion
Black belt
Site Champion
Lean
PDAC
DMAIC
Balanced Scorecard
DMADV
8. Which of the following are the examples of
internal failure costs
Purchasing
Accounting
9. The Risk Priority Number (RPN) in FMEA
exercise is derived from
Six Sigma
Control Chart
Scatter Diagram
Random experiment
Standard Deviation
Pareto analysis
14. Which of the following is NOT one of the 8
wastes
Waiting
Skills of people
Inventiveness
Motion waste
Inventory excess
15. There is difference between problem fixing
and problem solving. Fixing a problem eliminates
the symptoms and not necessarily the root cause
16. The main focus of any Continuous
improvement project should be the elimination
of ______
Flexibility
Errors
Defects
Waste
Inventory
17. Small group of workers in the same work
area meet regularly to discuss problems
Quality Circle
Demonstration
Conference
Strike
Problem identification
Field visits
Problem analysis
Vendor surveys
93
78
91
83
62
24. Which of the following is not an
abstract of Six Sigma:
Reduced costs
Increased production
Increased profit
4.3
5.4
4.9
3.6
26. Which of the following is not a
focus of six sigma projects
Cost savings
Defects
Defective
Bob Smith
Jack Welch
Philip Crosby
None of them
30.Pareto Chart is read by the user
to find out
X-Y Diagram
Correlation Coefficient
Linear Regression
Multiple Regression
32. Quality and the Critical-to-Quality
(CTQ’s) are both subjective terms that
are defined by the _______________.
Customer
Management team
Line Supervisor
Design team
33. The relationship matrix in QFD shows whether
the final technical requirements
adequately address the customer requirements
34. QFD is the way to
Average
Range