RESUMEN GASTOS INSTALADOS POR RECINTO AGUA FRIA DEPTO TIPO

Cantidad QI Lts/min. QI Total Lts/min.


CANTIDAD CANTIDAD QI Total ARTEFACTOS
Recinto QI Lts/min.
Subte 1Piso 2Piso 3Piso 4Piso 5Piso 6Piso 7Piso 8Piso 9Piso 10Piso 11Piso 12Piso 13Piso 14Piso 15Piso TOTALES Lts/min. Wc 1 10 10
Depto Tipo - 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 75 60 4500 Lavamanos 1 8 8
Porteria - 1 - - - - - - - - - - - - - - 1 55 55 Baño Tina 1 15 15
Sala de Basura 1 - - - - - - - - - - - - - - - 1 43 43 Lavaplatos 1 12 12
Total QI 4598 Lavadora 1 15 15
QMP EDIFICIO 581 Total 60
QMP 29
GASTOS INSTALADOS POR ARTEFACTOS AGUA CALIENTE
CANTIDAD CANTIDAD QI QI Total PORTERIA
ARTEFACTO Cantidad QI Lts/min. QI Total Lts/min.
PISOS Subte 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TOTALES Lts/min. Lts/min. ARTEFACTOS
Deptos Gastos Lts/min. Wc 1 10 10
WC 10 - 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 75 10 750 Lavamanos 1 8 8
Lº Lavatorio 8 - 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 75 8 600 Baño Lluvia 1 10 10
B° Baño Tina 15 - 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 75 15 1125 Lavaplatos 1 12 12
Lp Lavaplato 12 - 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 75 12 900 Llave de Jardín 1 15 15
Mlav Lavadora 15 - 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 75 15 1125 Total 55
Sala de Basura QMP 28
Lº 8 1 - - - - - - - - - - - - - - - 1 8 8
Llave de Jardín 15 1 - - - - - - - - - - - - - - - 1 15 15 RESUMEN
Cantidad QI Lts/min. QI Total Lts/min.
Challa 20 1 - - - - - - - - - - - - - - - 1 20 20 ARTEFACTOS
Porteria WC 76 10 760
Wc 10 - 1 - - - - - - - - - - - - - - 1 10 10 Lº Lavatorio 77 8 616
Lavamanos 8 - 1 - - - - - - - - - - - - - - 1 8 8 B° Baño Tina 75 15 1125
Baño Lluvia 10 - 1 - - - - - - - - - - - - - - 1 10 10 Lp Lavaplato 76 12 912
Lavaplatos 12 - 1 - - - - - - - - - - - - - - 1 12 12 Mlav Lavadora 75 15 1125
Llave de Jardín 15 - 1 - - - - - - - - - - - - - - 1 15 15 Llave de Jardín 2 15 30
Total QI 4598 Challa 1 20 20
QMP EDIFICIO 581 Baño Lluvia 1 10 10
Total QI 4598
QMP EDIFICIO 581
Dimensionamiento y Cálculo del Medidor para Instalaciones con Estanque

1) Dotaciones a Considerar

Departamentos
a)
Cantidad Nº Dot. Máx. Consumo
Depto Tipo Nº Hab Q inst.
Depto Tipo Dormitorios Diaria Máx. Día
[Nº] [Nº] [Nº] [lt/min] [lt/hab/día] [m3/día]

A 75 1 2 60 150 22.5

SubTotal 22.5

Conserjería y Servicios: Riego de Jardines:


b) c)
Nº Dot. Máx. Consumo Dot. Máx. Consumo
Superf. de
Personas Diaria Máx. Día Diaria Máx. Día
[lt/hab/día] [m3/día] Riego [m2] [lt/m2/día] [m3/día]

3 150 0.45 200 10 2

SubTotal 0.45

d) Sala de Basura:
Dot. Máx. Consumo
Superf. de
Diaria Máx. Día
Limpieza
[lt/m2/día] [m3/día]
[m2]
15 20 0.30
Total Consumo Maximo Diario: (a+b+c+d) = 25.25 [m3/día]

Consumo Maximo Diario/ 12 Horas: 2.10 [m3/hora]

Por lo tanto se proyecta un medidor de 19 mm


2) Dimensionamiento y Cálculo Volumen de Estanque de Acumulacion

a) Total Consumo Maximo Diario: (a+b+c+d) = 25.25 [m3/día]

Consumo Medio Diario 16.83 [m3/día]

Volumen Estanque Min 50%de Cmed Diario 8.42 [m3]

b) Caudal de Diseño QMP 581.00 [lts/min]

Una hora de Bombeo de QMP 34.86 [m3]

Por lo tanto se proyecta un estanque de Acumulacion de 34.86 [m3]


separado en dos de 17.43 m3
3) Dimensionamiento y Cálculo Red de Impulsión Alta Presión

CUADRO DE PRESIONES de Piso 11 a Piso 15 (2 B

TRAMO CAUDAL CAUDAL DIAM LONG N° COEF N° COEF N° COEF N° COEF


INSTALADO MAX PROB INTER REAL CODOCODO TEE TEE TEE TEE VALV VALV
(LT/MIN) (LT/MIN) (mm) (M) DIR DIR LAT LAT GLO GLO

Bombas-1 1500 268.52 63.00 1.0 0.0 2.2 0.0 1.2 0.0 4.5 3.0 0.3
1-2 1500 268.52 63.00 1.0 2.0 2.2 1.0 1.2 0.0 4.5 0.0 0.3
2-3 1500 268.52 63.00 1.0 1.0 2.2 0.0 1.2 0.0 4.5 0.0 0.3
3-4 1500 268.52 63.00 1.0 1.0 2.2 0.0 1.2 0.0 4.5 1.0 0.3
4-5 1500 268.52 63.00 26.4 2.2 1.0 1.2 4.5 0.3
5-6 1200 230.24 50.00 2.55 1.7 1.0 1.0 3.6 0.3
6-7 900 188.84 50.00 2.55 1.7 1.0 1.0 3.6 0.3
7-8 600 142.81 50.00 2.55 1.7 1.0 1.0 3.6 0.28
8-9 300 88.57 50.00 2.55 1.0 1.7 1.0 3.6 0.3
9-10 300 88.57 50.00 1.0 1.0 1.7 0.0 1.0 0.0 3.6 0.0 0.3
10-11 300 88.57 50.00 0.75 0.0 1.7 0.0 1.0 1.0 3.6 0.0 0.3
11-Rem 60 29.22 19.00 0.8 1.0 0.6 0.0 0.3 0.0 1.1 1.0 0.1
Rem-12 60 29.22 19.00 0.8 1.0 0.6 0.0 0.3 0.0 1.1 1.0 0.1
12-13 60 29.22 19.00 20.6 1.0 0.6 0.0 0.3 0.0 1.1 0.0 0.1
13-14 60 29.22 19.00 2.68 0.0 0.6 0.0 0.3 1.0 1.1 1.0 0.1
14-15 33 25.00 19.00 0.2 0.0 0.6 1.0 0.3 0.0 1.1 1.0 0.1
15-16 25 25.00 19.00 0.6 0.0 0.6 1.0 0.3 0.0 1.1 0.0 0.1
16-17 15 15.00 13.00 2.8 4.0 0.4 0.0 0.2 0.0 0.8 1.0 0.1

Cálculo de la Impulsión

Cálculo del Consumo =


QTI caudal Instalado 1500 lts/min QMP/2
Caudal máximo probable 268.5 lts/min 134.3 lts/min

Cálculo de Presión de Trabajo


Pérdidas de Carga (roce y altura) 49.28 mts
Pérdida de carga remarcador 2.5 mts
Presión util 7 mts
Total 58.78 mts
Margen de trabajo 10% 5.878 mts
64.658 mts
Altura para determinar la motobomba 65 mts

Elección de Motobomba= Marca Pedrollo 2CP32/200B


(definir número de equipos, siempre dejar uno de reserva)
dos en uso y una de reserva = 3 equipos

Características Técnicas
(diferencial entre 6 y 12 mca)
Pa (Presion de Conexión o Partida) 69 m.c.a
Pb (Presión de desconección) 79 m.c.a.

Determinación del Qm (Caudal Promedio de la Motobomba)

Qa (caudal de la motobomba a la presion Pa) 140 lt/min


Qb (caudal de la motoboba a presión Pb) 60 lt/min
Qm (caudal promedio) 100 lt/min

Determinación del T (intervalo entre partidas de la motobombas)

Potencia T Potencia T
HP min HP min
7,5 - 15
1-3 1.2 3
15 - 30
3-5 1.5 4
Sobre 30
5-7,5 2 6

Potencia de la motobomba a usar


Valor tiempo T=tiempo en minutos entre partidas de impulsión

Cálculo del volumen de regulación hidroneumática (Vr)

Vr = (Qm x T) / 4 = 50 lts

Cálculo del VH (volumen del estanque hidropack)

VH = Vr x (Pb + 1) / (Pb - Pa) = 446.00 lts

Se instalará Hidropack de 500 lts Marca Varem

,
Piso 11 a Piso 15 (2 Bombas + 1 de Reserva)

LONG LONG J J PIEZOMET PIEZOMET COTA PRESION VELOC.


EQUIVTOTAL UNIT TOT INICIAL FINAL ARTEF DISPONIB
(M) (M) (mca) (mca) (M) (M) (M) (mca) (MT/SEG)
0
1 2.0 0.0340 0.07 0.0 -0.1 1.0 -1.07 1.44
5.5 6.5 0.0340 0.22 -1.1 -1.3 0.0 -1.29 1.44
2.2 3.2 0.0340 0.11 -1.3 -1.4 0.0 -1.40 1.44
2.5 3.5 0.0340 0.12 -1.4 -1.5 0.0 -1.52 1.44
1.2 27.6 0.0340 0.94 -1.5 -2.5 26.4 -28.85 1.44
1.0 3.5 0.0779 0.27 -28.9 -29.1 2.55 -31.67 1.96
1.0 3.5 0.0550 0.19 -31.7 -31.9 2.55 -34.42 1.61
1.0 3.5 0.0337 0.12 -34.4 -34.5 2.55 -37.09 1.21
1.7 4.3 0.0146 0.06 -37.1 -37.1 2.55 -39.70 0.75
1.7 2.7 0.0146 0.04 -39.7 -39.7 0.0 -39.74 0.75
3.6 4.3 0.0146 0.06 -39.7 -39.8 0.75 -40.55 0.75
0.6 1.4 0.2084 0.30 -40.6 -40.9 0.0 -40.85 1.72
0.6 1.4 0.2084 0.30 -40.9 -41.2 -0.8 -40.35 1.72
0.6 21.1 0.2084 4.40 -40.4 -44.8 0.0 -44.75 1.72
1.2 3.9 0.2084 0.80 -44.8 -45.6 0.0 -45.56 1.72
0.4 0.6 0.1586 0.10 -45.6 -45.7 0.0 -45.65 1.47
0.3 0.8 0.1586 0.13 -45.7 -45.8 0.0 -45.79 1.47
1.5 4.3 0.3937 1.69 -45.8 -47.5 1.8 -49.28 1.89

Resumen Caudales PISO 11-PISO 15


QI lts/min QMP lts/min
Piso 15 300 88.57
Piso 14 300 88.57
Piso 13 300 88.57
Piso 12 300 88.57
Piso 11 300 88.57
Totales 1500 268.51530301
4) Dimensionamiento y Cálculo Red de Impulsión Media Presión

CUADRO DE PRESIONES Piso 6 a Piso 10 (2 Bombas

TRAMO CAUDAL CAUDAL DIAM LONG N° COEF N° COEF N° COEF N° COEF


INSTALADO MAX PROB INTER REAL CODOCODO TEE TEE TEE TEE VALV VALV
(LT/MIN) (LT/MIN) (mm) (M) DIR DIR LAT LAT GLO GLO

Bombas-1 1500 268.52 63.00 1.0 0.0 2.2 0.0 1.2 0.0 4.5 3.0 0.3
1-2 1500 268.52 63.00 1.0 2.0 2.2 1.0 1.2 0.0 4.5 0.0 0.3
2-3 1500 268.52 63.00 1.0 1.0 2.2 0.0 1.2 0.0 4.5 0.0 0.3
3-4 1500 268.52 63.00 1.0 1.0 2.2 0.0 1.2 0.0 4.5 1.0 0.3
4-5 1500 268.52 63.00 13.7 2.2 1.0 1.2 4.5 0.3
5-6 1200 230.24 50.00 2.55 1.7 1.0 1.0 3.6 0.3
6-7 900 188.84 50.00 2.55 1.7 1.0 1.0 3.6 0.3
7-8 600 142.81 50.00 2.55 1.7 1.0 1.0 3.6 0.28
8-9 300 88.57 50.00 2.55 1.0 1.7 1.0 3.6 0.3
9-10 300 88.57 50.00 1.0 1.0 1.7 0.0 1.0 0.0 3.6 0.0 0.3
10-11 300 88.57 50.00 0.75 0.0 1.7 0.0 1.0 1.0 3.6 0.0 0.3
11-Rem 60 29.22 19.00 0.8 1.0 0.6 0.0 0.3 0.0 1.1 1.0 0.1
Rem-12 60 29.22 19.00 0.8 1.0 0.6 0.0 0.3 0.0 1.1 1.0 0.1
12-13 60 29.22 19.00 20.6 1.0 0.6 0.0 0.3 0.0 1.1 0.0 0.1
13-14 60 29.22 19.00 2.68 0.0 0.6 0.0 0.3 1.0 1.1 1.0 0.1
14-15 33 25.00 19.00 0.2 0.0 0.6 1.0 0.3 0.0 1.1 1.0 0.1
15-16 25 25.00 19.00 0.6 0.0 0.6 1.0 0.3 0.0 1.1 0.0 0.1
16-17 15 15.00 13.00 2.8 4.0 0.4 0.0 0.2 0.0 0.8 1.0 0.1

Cálculo de la Impulsión

Cálculo del Consumo =


QTI caudal Instalado 1500 lts/min QMP/2
Caudal máximo probable 268.5 lts/min 134.3 lts/min

Cálculo de Presión de Trabajo


Pérdidas de Carga (roce y altura) 36.10 mts
Pérdida de carga remarcador 2.5 mts
Presión util 7 mts
Total 45.60 mts
Margen de trabajo 10% 4.5598 mts
50.158 mts
Altura para determinar la motobomba 50 mts

Elección de Motobomba= Marca Pedrollo 2CP32/200C

(definir número de equipos, siempre dejar uno de reserva)


dos en uso y una de reserva = 3 equipos

Características Técnicas
(diferencial entre 6 y 12 mca)
Pa (Presion de Conexión o Partida) 55 m.c.a
Pb (Presión de desconección) 65 m.c.a.

Determinación del Qm (Caudal Promedio de la Motobomba)

Qa (caudal de la motobomba a la presion Pa) 140 lt/min


Qb (caudal de la motoboba a presión Pb) 60 lt/min
Qm (caudal promedio) 100 lt/min

Determinación del T (intervalo entre partidas de la motobombas)

Potencia T Potencia T
HP min HP min
1-3 1.2 7,5 - 15 3
3-5 1.5 15 - 30 4
5-7,5 2 Sobre 30 6

Potencia de la motobomba a usar


Valor tiempo T=tiempo en minutos entre partidas de impulsión

Cálculo del volumen de regulación hidroneumática (Vr)

Vr = (Qm x T) / 4 = 37.5 lts

Cálculo del VH (volumen del estanque hidropack)

VH = Vr x (Pb + 1) / (Pb - Pa) = 282.00 lts

Se instalará Hidropack de 300 lts Marca Varem

,
6 a Piso 10 (2 Bombas + 1 de Reserva)

LONG LONG J J PIEZOMET PIEZOMET COTA PRESION VELOC.


EQUIVTOTAL UNIT TOT INICIAL FINAL ARTEF DISPONIB
(M) (M) (mca) (mca) (M) (M) (M) (mca) (MT/SEG)
0
1 2.0 0.0340 0.07 0.0 -0.1 1.0 -1.07 1.44
5.5 6.5 0.0340 0.22 -1.1 -1.3 0.0 -1.29 1.44
2.2 3.2 0.0340 0.11 -1.3 -1.4 0.0 -1.40 1.44
2.5 3.5 0.0340 0.12 -1.4 -1.5 0.0 -1.52 1.44
1.2 14.9 0.0340 0.51 -1.5 -2.0 13.7 -15.67 1.44
1.0 3.5 0.0779 0.27 -15.7 -15.9 2.55 -18.49 1.96
1.0 3.5 0.0550 0.19 -18.5 -18.7 2.55 -21.24 1.61
1.0 3.5 0.0337 0.12 -21.2 -21.4 2.55 -23.90 1.21
1.7 4.3 0.0146 0.06 -23.9 -24.0 2.55 -26.52 0.75
1.7 2.7 0.0146 0.04 -26.5 -26.6 0.0 -26.56 0.75
3.6 4.3 0.0146 0.06 -26.6 -26.6 0.75 -27.37 0.75
0.6 1.4 0.2084 0.30 -27.4 -27.7 0.0 -27.67 1.72
0.6 1.4 0.2084 0.30 -27.7 -28.0 -0.8 -27.17 1.72
0.6 21.1 0.2084 4.40 -27.2 -31.6 0.0 -31.57 1.72
1.2 3.9 0.2084 0.80 -31.6 -32.4 0.0 -32.38 1.72
0.4 0.6 0.1586 0.10 -32.4 -32.5 0.0 -32.47 1.47
0.3 0.8 0.1586 0.13 -32.5 -32.6 0.0 -32.61 1.47
1.5 4.3 0.3937 1.69 -32.6 -34.3 1.8 -36.10 1.89

Resumen Caudales PISO 6-PISO 10


QI lts/min QMP lts/min
Piso 10 300 88.57
Piso 09 300 88.57
Piso 08 300 88.57
Piso 07 300 88.57
Piso 06 300 88.57
Totales 1500 268.515303
5) Dimensionamiento y Cálculo Red de Impulsión Baja Presión

CUADRO DE PRESIONES Subterraneo a Piso 5 (2 Bombas

TRAMO CAUDAL CAUDAL DIAM LONG N° COEF N° COEF N° COEF N° COEF


INSTALADO MAX PROB INTER REAL CODOCODO TEE TEE TEE TEE VALV VALV
(LT/MIN) (LT/MIN) (mm) (M) DIR DIR LAT LAT GLO GLO

Bombas-1 1598 280.48 63.00 1.0 0.0 2.2 0.0 1.2 0.0 4.5 3.0 0.3
1-2 1598 280.48 63.00 1.0 2.0 2.2 1.0 1.2 0.0 4.5 0.0 0.3
2-3 1598 280.48 63.00 1.0 1.0 2.2 0.0 1.2 0.0 4.5 0.0 0.3
3-4 1598 280.48 63.00 1.0 1.0 2.2 0.0 1.2 0.0 4.5 1.0 0.3
4-5 1598 280.48 63.00 0.9 2.2 1.0 1.2 4.5 0.3
5-6 1200 230.24 50.00 2.55 1.7 1.0 1.0 3.6 0.3
6-7 900 188.84 50.00 2.55 1.7 1.0 1.0 3.6 0.3
7-8 600 142.81 50.00 2.55 1.7 1.0 1.0 3.6 0.28
8-9 300 88.57 50.00 2.55 1.0 1.7 1.0 3.6 0.3
9-10 300 88.57 50.00 1.0 1.0 1.7 0.0 1.0 0.0 3.6 0.0 0.3
10-11 300 88.57 50.00 0.75 0.0 1.7 0.0 1.0 1.0 3.6 0.0 0.3
11-Rem 60 29.22 19.00 0.8 1.0 0.6 0.0 0.3 0.0 1.1 1.0 0.1
Rem-12 60 29.22 19.00 0.8 1.0 0.6 0.0 0.3 0.0 1.1 1.0 0.1
12-13 60 29.22 19.00 20.6 1.0 0.6 0.0 0.3 0.0 1.1 0.0 0.1
13-14 60 29.22 19.00 2.68 0.0 0.6 0.0 0.3 1.0 1.1 1.0 0.1
14-15 33 25.00 19.00 0.2 0.0 0.6 1.0 0.3 0.0 1.1 1.0 0.1
15-16 25 25.00 19.00 0.6 0.0 0.6 1.0 0.3 0.0 1.1 0.0 0.1
16-17 15 15.00 13.00 2.8 4.0 0.4 0.0 0.2 0.0 0.8 1.0 0.1

Cálculo de la Impulsión

Cálculo del Consumo =


QTI caudal Instalado 1598 lts/min QMP/2
Caudal máximo probable 280.5 lts/min 140.2 lts/min

Cálculo de Presión de Trabajo


Pérdidas de Carga (roce y altura) 22.96 mts
Pérdida de carga remarcador 2.5 mts
Presión util 7 mts
Total 32.46 mts
Margen de trabajo 10% 3.246 mts
35.706 mts
Altura para determinar la motobomba 36 mts

Elección de Motobomba= Marca Pedrollo CP200

(definir número de equipos, siempre dejar uno de reserva)


dos en uso y una de reserva = 3 equipos

Características Técnicas
(diferencial entre 6 y 12 mca)
Pa (Presion de Conexión o Partida) 36 m.c.a
Pb (Presión de desconección) 46 m.c.a.

Determinación del Qm (Caudal Promedio de la Motobomba)

Qa (caudal de la motobomba a la presion Pa) 150 lt/min


Qb (caudal de la motoboba a presión Pb) 100 lt/min
Qm (caudal promedio) 125 lt/min

Determinación del T (intervalo entre partidas de la motobombas)

Potencia T Potencia T
HP min HP min
1-3 1.2 7,5 - 15 3
3-5 1.5 15 - 30 4
5-7,5 2 Sobre 30 6

Potencia de la motobomba a usar


Valor tiempo T=tiempo en minutos entre partidas de impulsión

Cálculo del volumen de regulación hidroneumática (Vr)

Vr = (Qm x T) / 4 = 37.5 lts

Cálculo del VH (volumen del estanque hidropack)

VH = Vr x (Pb + 1) / (Pb - Pa) = 210.75 lts

Se instalará Hidropack de 300 lts Marca Varem

,
raneo a Piso 5 (2 Bombas + 1 de Reserva)

LONG LONG J J PIEZOMET PIEZOMET COTA PRESION VELOC.


EQUIVTOTAL UNIT TOT INICIAL FINAL ARTEF DISPONIB
(M) (M) (mca) (mca) (M) (M) (M) (mca) (MT/SEG)
0
1 2.0 0.0367 0.07 0.0 -0.1 1.0 -1.07 1.50
5.5 6.5 0.0367 0.24 -1.1 -1.3 0.0 -1.31 1.50
2.2 3.2 0.0367 0.12 -1.3 -1.4 0.0 -1.43 1.50
2.5 3.5 0.0367 0.13 -1.4 -1.6 0.0 -1.56 1.50
1.2 2.1 0.0367 0.08 -1.6 -1.6 0.9 -2.53 1.50
1.0 3.5 0.0779 0.27 -2.5 -2.8 2.55 -5.35 1.96
1.0 3.5 0.0550 0.19 -5.4 -5.5 2.55 -8.10 1.61
1.0 3.5 0.0337 0.12 -8.1 -8.2 2.55 -10.76 1.21
1.7 4.3 0.0146 0.06 -10.8 -10.8 2.55 -13.38 0.75
1.7 2.7 0.0146 0.04 -13.4 -13.4 0.0 -13.42 0.75
3.6 4.3 0.0146 0.06 -13.4 -13.5 0.75 -14.23 0.75
0.6 1.4 0.2084 0.30 -14.2 -14.5 0.0 -14.53 1.72
0.6 1.4 0.2084 0.30 -14.5 -14.8 -0.8 -14.03 1.72
0.6 21.1 0.2084 4.40 -14.0 -18.4 0.0 -18.43 1.72
1.2 3.9 0.2084 0.80 -18.4 -19.2 0.0 -19.24 1.72
0.4 0.6 0.1586 0.10 -19.2 -19.3 0.0 -19.33 1.47
0.3 0.8 0.1586 0.13 -19.3 -19.5 0.0 -19.47 1.47
1.5 4.3 0.3937 1.69 -19.5 -21.2 1.8 -22.96 1.89

Resumen Caudales Subte-PISO 05


QI lts/min QMP lts/min
Piso 05 300 88.57
Piso 04 300 88.57
Piso 03 300 88.57
Piso 02 300 88.57
Piso 01 355 99.47
Subterrán 44 23.60
Totales 1599.0 280.605728
PVC C10 E PPR
110 5.3 99.4 20 14.4
75 3.6 67.8 25 18
63 3 57 32 23.2
50 2.4 45.2 40 29