INTEGRANTES
CONCE CAYETANO JOSE LUIS
GOMEZ MEDOZA ROJHER
PRECIO PRECIO
ITEM DESCRIPCION UNIDAD METRADOS UNITARIO PARCIAL
INDICES
OPERARIO(OP) 47 0.01
OFICIAL(OF) 47 0.00
MANO DE OBRA
PEON 47 0.34
CAPATAZ 47 0.0185268842
0.36
1625.78 26064.49
0.96 38.32
260.3287
240
19.32 69.12 790.26 31.68
27,690.27
10,456.25
27,612.96
3,238.74
68,998.22
5,519.86 6899.822
0.07 0.0847457627
COEFICIENTE DE INCIDENCIA 1.0000000049
0.0677966102 0.0847457627
ITEM DESCRIPCION
02.00.00 EXPLANACIONES
02.01.00 PERFILADO Y COMPACTACION DE SUB-RASANTE EN ZONAS DE CORTE
02.02.00 EXCAVACION EN MATERIAL SUELTO
02.03.00 EXCAVACION EN ROCA SUELTA
02.04.00 EXCAVACION EN ROCA FIJA
02.05.00 CONFORMACION DE TERRAPLENES
COSTO DIRECTO
GASTO GENERAL(8%)
UTILIDAD (10%)
SUB TOTAL
IGV(18%)
PRESUPUESTO
UNIDAD METRADOS PRECIO UNITARIO PRECIO PARCIAL
11,315.31
53,863.73 75,447.88
8,719.88
20,843.99 51,812.21
563.11 104,455.98 124,727.76
97.05 11,597.48 14,581.76
129,311.61
7,110.06 134.15 9,524.79 33,739.23
354,172.58
27,954.05 794.31 125,578.24
0.07 0.00 0.30
COEFICIENTE DE INCIDENCIA
GASTOS GENERALES UTILIDAD
28,333.81 35,417.26
0.07 0.08
ENCIA 1.00
PRECIO
ITEM DESCRIPCION UNIDAD METRADOS UNITARIO
03.00.00 PAVIMENTOS
03.03.00 AFIRMADO m3 15050.84 14.10
COSTO DIRECTO
GASTO GENERAL(8%)
UTILIDAD (10%)
SUB TOTAL
IGV(18%)
PRESUPUESTO
SUBPARTIDAS MANO DE OBRA
16,977.35 21221.684
0.07 0.0847457627
INCIDENCIA 1.000000016
MANO DE OBRA
CLAVOS
BARRENO DE PARA
CAPATAZ PEON GUIA FULMINANTE DINAMITA 7/8" x 5 PIES MADERA
C/C 3"
151.575 4092.525
88.1262 430.8392
658.1835 6480.576 776.319 759.4425 3054.6465 2143.3155
2364.742 43938.432
173.0606 3215.5776
2098.0438 409.3744
3577.0098 17796.4059
267.5504 3327.5904
756.4114 9400.064
4714.8595 17591.9616
3 77
511.475 6387.2
24.069
3774.435 46905.6
169.05 845.25
339.977 2105.664
32.0261 793.4208
3.198 39.936
146 5422
31.119 1154.56
ACEITE
ALAMBRE CEMENTO
MADERA ALAMBRE NEGRO PARA PORTLAND TIPO ALCANTARILLA METALICA
NEGRO
TORNILLO RECOCIDO RECOCIDO # 8 MOTOR 0=36" E = 2.0 MM
# 16 I
SAE-40
102016.5794
PEGAMENTO PARA TUBO PVC SAL 2" TUBO PVC SAL TEKNOPORT DE 1" PINTURA
TUBOS PVC X 3M 4" X 3M ASFALTICA
15.5 168.5
10566.325
36.21
3673.945
151.575
19.5836
270.024
1868.909
136.7737
767.577
1162.7889 881.2167
163.5632
458.9875
778.8108
3
261.975
2.556
109.67
24.7944
2.028
8284 3952 8024 198
35.629
10534.4625
1111.3693
5856.1455 5349.8505 1130.7255
26202.867
1917.6231
1157.5746
5245.5198
2131.25
6953.078
4958.33
362.869
2863.275
5747.7
524.8148
CONCRETO
PIEDRA PIEDRA MORTERO EJECUCIÓN DE
F'C=140 JUNTA ASFÁLTICA
CHANCADA SELECCIONADA 1:4 REVESTIMIENTO
KG/CM2
28266.7203
766.8 23812.335
2078.6608 7922.5248
7046.3761 26856.2766
43955.6775 167504.295
5038
16,066.95
1,767.42
28,487.53
95,543.21
2138.1358 9,130.34
0.00
66,728.03
186,411.23
24,579.14
15,602.41
49,721.20
0.00
136,837.82
291.00
19,498.43
122.48
288,102.99
6,931.05
33,782.25
14,487.41
1,375.06
473.23
32,064.00
418.077 1,639.39
1,029,642.53
418.077 2138.1358 82,371.41 102,964.26
0.0003441025 0.0017598141 0.0677966102 0.08474576
COEFICIENTE DE INCIDENCIA 1.00
ITEM
01.00.00
01.01.00
01.02.00
01.03.00
01.04.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
03.00.00
03.03.00
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03.00
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
COSTO DIRECTO
GASTO GENERAL(8%)
UTILIDAD (10%)
SUB TOTAL
IGV(18%)
DESCRIPCIÓN
TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
TOPOGRAFIA TRAZO Y REPLANTEO INICIAL Y FINAL
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40X3.60 M
EXPLANACIONES
PERFILADO Y COMPACTACION DE SUB-RASANTE EN ZONAS DE CORTE
EXCAVACION EN MATERIAL SUELTO
EXCAVACION EN ROCA SUELTA
EXCAVACION EN ROCA FIJA
CONFORMACION DE TERRAPLENES
PAVIMENTOS
AFIRMADO
ESTRUCTURAS DE DRENAJE Y OBRAS DE ARTE
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO
EXCAVACIÓN PARA ESTRUCTURAS EN ROCA SUELTA
EXCAVACIÓN PARA ESTRUCTURAS EN ROCA FIJA
RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO
RELLENO CON MATERIAL GRANULAR COMPACTADO
OBRAS DE CONCRETO
ENCOFRADO Y DESENCOFRADO DE MADERA
CONCRETO F'C=175 KG/CM2
CONCRETO CICLOPEO FC=140 KG/CM2 + 30% PM
MAMPOSTERIA DE PIEDRA ASENTADA EN MORTERO 1:4 PARA BADENES
REVESTIMIENTO DE PIEDRA EMBOQUILLADA C/A 1:4
OTROS
ALCANTARILLA T.M.C. D=36"
TUBERIA DE PVC DE 3"
TUBERIA PERFORADA DIAM. 4"
JUNTAS PARA MUROS
MUROS DE MAMPOSTERIA DE PIEDRA
CUNETAS DE TIERRA
CUNETAS REVESTIDAS
PINTURA ASFÁLTICA
LIMPIEZA DE ALCANTARILLAS
REPARACION DE PARAPETOS
GAVIONES
DEMOLICIÓN DE ESTRUCTURAS EXISTENTES
OSTO DIRECTO
ASTO GENERAL(8%)
TILIDAD (10%)
UB TOTAL
GV(18%)
MANO DE OBRA
68,998.22
g/b 1 27,690.27 27,690.27
KM 24.49 426.96 10,456.25
mes 4 6,903.24 27,612.96
und 2 1,619.37 3,238.74 570.24
354,172.57
m2 59554.27 0.87 51,812.21
m3 28155.25 4.43 124,727.76
m3 2426.25 6.01 14,581.76
m3 6443.03 20.07 129,311.61
m3 6707.6 5.03 33,739.23
212,216.84
m3 15050.84 14.10 212,216.84
1,029,642.57
150,995.45
m3 7,578.75 2.12 16,066.95
m3 489.59 3.61 1,767.42
m3 1,687.65 16.88 28,487.53 2008.3035
m3 3,814.10 25.05 95,543.21
m3 279.13 32.71 9,130.34
343,042.01
m3 2,558.59 26.08 66,728.03 16221.4606
m3 521.43 357.5 186,411.23 5506.3008
m3 106.5 230.79 24,579.14
m3 108.32 144.04 15,602.41
m3 367.19 135.41 49,721.20
535,605.11
m 381.77 358.43 136,837.82 3626.815
m 50 5.82 291 24
m 1,247.50 15.63 19,498.43
m2 21.3 5.75 122.48 59.64
m3 1,832.25 157.24 288,102.99
m 16,905.00 0.41 6,931.05
m 775 43.59 33,782.25
m2 1,096.70 13.21 14,487.41 1305.073
m2 103.31 13.31 1,375.06
m 7.8 60.67 473.23 24.726
m3 200 160.32 32,064.00
m3 45.1 36.35 1,639.39
1,665,030.20
133,202.42 29346.5589
166,503.02 0.0149366451
1,964,735.64
353,652.41
MANO DE OBRA
1191.0854 6550.9697
6757.26 844.6575 12106.7575
218.3625 2668.875
871.988 3286.724
7266.3956 2098.0438
2461.1496 3577.0098 17796.4059
4714.8595 17591.9616
3 77
1771.45 511.475 6387.2
24.069
25962.9825 3774.435 46905.6
169.05 169.05 845.25
339.977 2105.664
32.0261 793.4208
3.198 39.936
1000 146 5422
31.119 1154.56
969.44
69.12 790.26
776.319 759.4425
969.44 69.12 790.26 776.319 759.4425
0.0004934201 3.518030555028E-05 0.0004022221 0.000395126 0.0003865367
MATERIALES
1102.05
19.32 1164
3054.6465 2143.3155
409.3744 38378.85
3054.6465 2143.3155 428.6944 40644.9
0.0015547366 0.0010908926 0.0002181944 0.0206872107
MATERIALES
ALAMBRE NEGRO ALAMBRE NEGRO ACEITE PARA MOTOR SAE- CEMENTO PORTLAND
RECOCIDO # 16 RECOCIDO # 8 40 TIPO I
793.1629 793.1629
104.286 97538.6958
793.1629 793.1629 104.286 97538.6958
0.0004036996 0.0004036996 5.30788967681757E-05 0.0496446921
ALCANTARILLA PEGAMENTO PARA TUBO PVC SAL 2" TUBO PVC SAL 4" X TEKNOPORT DE
METALICA 0=36" E = 2.0 TUBOS PVC X 3M 3M 1"
MM
102016.5794
15.5 168.5
10566.325
36.21
102016.5794 15.5 168.5 10566.325 36.21
0.0519238199 7.8891020837574E-06 8.576217427E-05 0.0053779882 0.00001843
PINTURA GAVION 5.0 m x 1.0 m x GAVION 5.0 m x 0.50 m x GAVION 5.0 m x 1.5 m x
ASFALTICA 1.0 m / 3.7 - 4.4 mm 0.50 m / 3.7 - 4.4 mm 0.50 m / 3.7 - 4.4 mm
3673.945
260.3287
240
31.68
11910.854
563.105
97.05
134.152 4091.636
301.0168 24683.3776
151.575
19.5836
270.024
1868.909
136.7737
767.577
1162.7889 881.2167
163.5632
458.9875
778.8108
3
261.975
2.556
109.67
24.7944
2.028
198
35.629
104455.9775
11597.475
9524.792
10534.4625
1111.3693
5856.1455 5349.8505
26202.867
1917.6231
5245.5198
2131.25
6953.078
125578.2445 17501.9773 12302.9285 35497.2599
0.0639161026 0.0089080571 0.0062618748 0.018067194
MEZCLADORA DE
MARTILLO VIBRADOR DE CONCRETO TAMBOR MOTONIVELADORA DE 125
NEUMATICO DE 29 Kg CONCRETO 4 HP 2.40" HP
18 HP
20843.9945
7110.056
42894.894
1130.7255
1157.5746 3462.2952
5747.7
1130.7255 1157.5746 3462.2952 76596.6445
0.0005755103 0.0005891758 0.0017622194 0.0389857257
INSTALACION Y MOVILIZACION Y
CAMION VOLQUETE DESINSTALACION DE DESMOVILIZACION DE AGUA PARA RIEGO
6x4 330 HP 10 M3. SARANDA EQUIPOS
1,625.78 26,064.49
11315.3113
8719.88
19566.092
524.8148
524.8148 1625.78 26064.49 39601.2833
0.0002671173 0.0008274803 0.0132661563 0.0201560366
EXCAVACION, DESQUINCHE Y PERFORACION Y DISPARO AGUA PARA OBRAS ARENA
PEINADO DE TALUDES EN ROCA EN ROCA FIJA DE ARTE ZARANDEADA
FIJA
53863.7308 75447.8813
4958.33
362.869
1042.86 23453.9214
2863.275
53863.7308 75447.8813 6364.059 26317.1964
0.0274152562 0.0384010347 0.0032391427 0.0133947774
SUBPARTIDAS
0.96 38.32
28266.7203
766.8 23812.335
2078.6608 7922.5248
7046.3761 26856.2766
43955.6775 167504.295
2456.75 5200.25
5038
28266.7203 61343.2244 23850.655 202283.0964 5200.25
0.014387035 0.0312221264 0.0121393711 0.1029569031 0.0026467937
EXCAVACION NO DEMOLICIÓN DE
CONCRETO
JUNTA ASFÁLTICA CLASIFICADA ENSERCHADO ESTRUCTURAS
F'C=175 KG/CM2
P/CUNETAS (MANUAL)
209.118 21.294
2061.5 2503.25 15724.618 3913.75 21.294
0.0010492506 0.00127409 0.0080034269 0.0019919983 1.0838099340099E-05
ELIMINACIÓN DE COSTO PARCIAL GASTOS
ENCOFRADO Y (DISGREGADO) GENERALES
MATERIAL MATERIAL
DESENCOFRADO DE EXCEDENTE A GRANULAR
MADERA BOTADERO
27,690.27
10,456.25
27,612.96
3,238.74
51,812.21
124,727.76
14,581.76
129,311.61
33,739.23
115289.4344 212,216.84
16,066.95
1,767.42
28,487.53
95,543.21
2138.1358 9,130.34
66,728.03
186,411.23
24,579.14
15,602.41
49,721.20
136,837.82
291.00
19,498.43
122.48
288,102.99
6,931.05
33,782.25
14,487.41
1,375.06
172.926 473.23
32,064.00
418.077 1,639.39
1,029,642.53
172.926 418.077 117427.5702 133,202.42
8.80148946410213E-05 0.0002127905 0.0597676186 0.0677966102
COEFICIENTE DE INCIDENCIA
UTILIDAD
166,503.02
0.0847457627
1.00
OPERARIO(OP) 0.01493665
OFICIAL(OF) 0.03709941
MANO DE OBRA
CAPATAZ 0.01300323
PEON 0.11648200
CORDEL 0.00000661
YESO DE 28 Kg 0.00013163
PINTURA ESMALTE SINTETICO 0.00010734
BANDERINES 0.00021279
LAMPARA INTERMITENTE 0.00084083
CONO DE SEGURIDAD 0.00025025
CILINDRO DE SEGURIDAD 0.00020168
LETREROS - AVISOS DE TRANSITO 0.00178719
TRANQUERA 0.00049342
PERNOS DE 3/4"x1/2" CON TUERCA Y HUACHA 0.00003518
TRIPLAY DE 4'x8'x12 mm 0.00040222
GUIA 0.00039513
FULMINANTE 0.00038654
DINAMITA 0.00155474
BARRENO DE 7/8" x 5 PIES 0.00109089
MATERIALES CLAVOS PARA MADERA C/C 3" 0.00021819
MADERA TORNILLO 0.02068721
ALAMBRE NEGRO RECOCIDO # 16 0.00040370
ALAMBRE NEGRO RECOCIDO # 8 0.00040370
ACEITE PARA MOTOR SAE-40 0.00005308
CEMENTO PORTLAND TIPO I 0.04964469
ALCANTARILLA METALICA 0=36" E = 2.0 MM 0.05192382
PEGAMENTO PARA TUBOS PVC 0.00000789
TUBO PVC SAL 2" X 3M 0.00008576
TUBO PVC SAL 4" X 3M 0.00537799
TEKNOPORT DE 1" 0.00001843
PINTURA ASFALTICA 0.00186994
GAVION 5.0 m x 1.0 m x 1.0 m / 3.7 - 4.4 mm 0.00421634
GAVION 5.0 m x 0.50 m x 0.50 m / 3.7 - 4.4 mm 0.00201147
GAVION 5.0 m x 1.5 m x 0.50 m / 3.7 - 4.4 mm 0.00408401
PETROLEO DIESEL # 2 0.00059183
HERRAMIENTAS MANUALES 0.00382851
CHALECO DE SEGURIDAD 0.00012215
RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T 0.02070806
TRACTOR DE ORUGAS DE 140-160 HP 0.06391610
RETROEXCAVADOR S/LLANTAS 90 HP 1.5 YD3 0.00890806
COMPRESORA NEUMATICA 87 HP 250-330 PCM 0.00626187
EQUIPOS
EQUIPOS
COMPACTADOR VIBR. TIPO PLANCHA 7 HP 0.01806719
MARTILLO NEUMATICO DE 29 Kg 0.00057551
VIBRADOR DE CONCRETO 4 HP 2.40" 0.00058918
MEZCLADORA DE CONCRETO TAMBOR 18 HP 0.00176222
MOTONIVELADORA DE 125 HP 0.03898573
CAMION VOLQUETE 6x4 330 HP 10 M3. 0.00026712
INSTALACION Y DESINSTALACION DE SARANDA 0.00082748
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 0.01326616
AGUA PARA RIEGO 0.02015604
EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES EN ROCA FIJA 0.02741526
PERFORACION Y DISPARO EN ROCA FIJA 0.03840103
AGUA PARA OBRAS DE ARTE 0.00323914
ARENA ZARANDEADA 0.01339478
PIEDRA CHANCADA 0.01438703
PIEDRA SELECCIONADA 0.03122213
CONCRETO F'C=140 KG/CM2 0.01213937
SUBPARTIDAS
MORTERO 1:4 0.10295690
EJECUCIÓN DE REVESTIMIENTO 0.00264679
JUNTA ASFÁLTICA 0.00104925
EXCAVACION NO CLASIFICADA P/CUNETAS 0.00127409
CONCRETO F'C=175 KG/CM2 0.00800343
ENSERCHADO 0.00199200
DEMOLICIÓN DE ESTRUCTURAS (MANUAL) 0.00001084
ENCOFRADO Y DESENCOFRADO DE MADERA 0.00008801
ELIMINACIÓN DE MATERIAL EXCEDENTE A BOTADERO 0.00021279
MATERIAL GRANULAR 0.05976762
COSTO PARCIAL (DISGREGADO)
GASTOS GENERALES 0.06779661
UTILIDAD 0.08474576
0.9999999856
0.05