PROPOSED ADMINISTRATIVE BUILDING FOR A.

A RANO LPG TANK


FARM PROJECT AT IJEGUN-EGBA, SATELITE TOWN, LAGOS STATE.

1.0 STRUCTURAL DESIGN INFORMATION

1.1.0 INTENDED USE & BRIEF DESCRIPTION OF THE STRUCTURE

The proposed structure is to provide support for a two storey office development. The building
measures approximately 30.23m x 14.73m on plan with each storey being
3.3m high. There are two access staircases, each at the left and right side of the building. Roof
covering is long span aluminum carried on timber trusses which are supported by roof beams.

The structural solution comprises a reinforced concrete frame having a slab depth between
150mm and 200mm, which span continuously over beams of sizes ranging from 450x230 to
750x230. The loads from the slabs and beams are transferred to the columns, which in turn,
transfer the imposed loads together with their self-weight to the foundations through reinforced
concrete precast driven Piles, square in shape and having dimensions 400x400 x15000mm.

Lateral stability is provided by frame action, the floor slab acting as a large horizontal
diaphragm in distributing the lateral loads among the frames.

1.2.0 GENERAL LOADING CONDITIONS


Imposed Loading
2
Roof =0.25kN/m
2
Floors=2.5kN/m
2
Light weight partitions=1.0kN/m
2
Stairs=4.0kN/m

1.3.0 DURABILITY & FIRE RESISTANCE


Fire resistance: 3 hours for all elements
Minimum cover to all reinforcement – 35mm (Slabs and beams)
- 25mm
(Columns)
- 40mm (Foundations)

DESIGN OF OFFICE BUILDING FOR A.A RANO TANK FARM PROJECT CRUSTEAM NIGERIA LIMITED
1
1.4.0 BUILDING REGULATIONS / CODES OF PRACTICE
BS 8110-1(1997): Structural Use of Concrete, Part 1- Code of Practice for Design and
Construction
BS 8110-1(1985): Structural Use of Concrete, Part 3- Design Charts for Singly Reinforced
Beams, Doubly Reinforced Beams and Rectangular Columns
BS 6399-1-(1996): Loading for Buildings, Part 1- Code of Practice for Dead and Imposed
loads
BS 8110-1-1:1997: Structural Use of Concrete- Code of Practice for Design and Construction

1.5.0 MATERIALS & STRENGTHS


Concrete grade C35
2
- Characteristics Cube strength at 28 days fcu=35N/mm

1.6.0 REINFORCEMENT
High yield deformed bars type 2 to BS 4449
2
Characteristic yield strength fyk=410N/mm

1.7.0 FOUNDATIONS

Assumed Pile capacity = 300kN

(To be confirmed prior to construction)

1.8.0 NOMENCLATURE
Rp = Reaction due to permanent load
Rv = Reactions due to variable load
Rs = Reactions due service load
C.C= Continuity Correction
2.0 DESIGN CALCULATION

D F

01 02

218
8
1800
10 TREADS @ 275=2750

150 150
FFL

2
11
RIS
ER
S@
160
=17
60
150
02-02
381 150
3 BLOCK WALL

10 TREADS @ 275=2750 1288

150

150
11
RISE
RS
@
160=
1760
180
GFL
0

01-01
4

2625

PLAN
2 Nos. Thus

Fig. 1a: Staircase Layout


JOB
CRUSTEAM NIGERIA LIMITED NO. CNL/100-2018 SHEET 1 0F 3 Rev.
PLOT 5A, BLOCK 100 JOB TITLE: PROPOSED ADMINISTRATIVE BUILDING
LADIPO OMOTOSHO COLE STREET, CLIENT: A.A RANO
LEKKI PHASE 1, LAGOS, NIGERIA SE: STAIRCASE MADE BY FIO DATE 28-06-18
CHECKED BY BE DATE 04-07-18
CALCULATION REFERENCE
Design Parameters
3
Unit weight of reinforced concrete = 25 kN/m
RCD 6th
Characteristics cube strength of concrete, fck, cube = 25 N/mm
2 Edition

Characteristics cylinder strength of concrete, fck =0.8fck, cube = 20 N/mm


2 By Bungey, p4
2 EN1992-1-1
Characteristics yield strength of reinforcement, fyk = 410 N/mm
Cl. 4.4.1-2
Exposure condition, class XC-1 for structural element excluding foundation
Table 4.2,
4.4N
Concrete cover, c= 25 mm
Assume bar size, Ø= 12 mm
Preliminary Sizing
Span, L= 6230 mm
Risers, R= 150 mm
Treads, T= 300 mm
2 2 0.5
Slope factor=( R + T ) /T 1.1118
Assume concrete is lightly stressed ( ρ=0.5% ) 0.005
0.5 EN 1992-1-1:
Reference reinforcement ratio, ρo=f ck /1000= 0.0045
Basic ratio, l/d=K(11+1.5f
0.5
(ρ /(ρ-ρ'))+1/12f
0.5 0.5 eq 7.16b
ck o ck (ρ'/ρ o) ) = 17
Correction factors,
f1=7/span, but f1=1 when span< 7 1
f2=500/fyk= 1.2195
f3=Asd/Asb, Assume f3= 1
Minimum effective depth, d=span/( basic ratio x f 1x f2 x f3 )= 132.65 mm
Overall depth of waist, h=d+c+Ø/2= 163.65 mm
Try h= 150 mm

Loading
2
150mm waist =0.15x25x1.157= 4.3385 kN/m
2
50mm finishes=0.05x25= 1.25 kN/m
Step=0.16x25x0.5= + 2 kN/m
2
EN 1991-1-1
2
Permanent Load, gk= 7.5885 kN/m Table 6.1, 6.2

2 RCD 6th
Variable Load, qk= 4 kN/m
Edition
2 By Bungey,
Ultimate Load, n=1.35gk + 1.5qk= 16.245 kN/m p25
Table 2.5

Flight 1
2
n=16.24451kN/m

0 2.75 3.3375 m

V 26.268 18.404 kN/m


M 21.238 kNm/m
Rp 12.271 8.5975 kN/m Rv
STAIRCASE CALCULATION SHEET 2 OF 3 REFERENCE
Flight 2
2
n=16.24451kN/m

0 0.9 3.65 4.2375

V 20.689 23.983 kN/m


M 31.795 kNm/m
Rp 9.6647 11.204 kN/m Rv
5.0944 5.9056 kN/m

Bending Reinforcement
Span Moment, M= 31.795 kNm/m
breadth, b= 1000 mm
Effective depth, d=h-(c+Ø/2)= 119 mm RCD by
2 Bungey
K=M/fckbd = 0.1123
0.5
6th Edition
la=(0.5+(0.25-k/1.134) )= 0.8886
eq.4.7, 4.8
z=lad 105.74 mm
eq.4.9
2
Asb=M/(0.87fykz) 842.95 mm

Deflection EN 1992-1-1
ρ=Asb/bd= 0.0071 eq 7.16b
Basic ratio= 15.235
f3=L/(basic ratio x f1 x f2xd)= 1.2438
2
Asd=f3Asb= 1048.5 mm
2
Provide T12@100BB (As prov.=1130mm /m)

INTERMEDIATE
LANDING
Loading
2
150mm thick landing =0.15x25= 3.75 kN/m
2
50mm finishes=0.05x25= 1.25 kN/m
From Flight 1=8.59749/1.175= + 7.317 kN/m
2

2
Permanent Load, gk= 12.317 kN/m EN 1991-1-1
Table 6.1, 6.2
Imposed load= 4.0000
From Flight 1=4.53184/1.175 + 3.8569 Variable
2
Load, qk= 7.8569 kN/m
2
Ultimate Load, n=1.35gk + 1.5qk= 28.413 kN/m

n=28.41329kN/m2

0 2.625 m

V 37.29 37.292 kN/m M


24.473 kNm/m
Rp 16.17 16.166 kN/m Rv
10.31 10.312 kN/m
STAIRCSE CALCULATION SHEET 3 OF 3 REFERENCE
Bending Reinforcement
Span Moment, M= 24.473 kNm/m
breadth, b= 1000 mm
RCD by
Effective depth, d=h-(c+Ø/2)= 119 mm Bungey
2
K=M/fckbd = 0.0864 6th Edition
la=(0.5+(0.25-k/1.134) )=
0.5
0.9169 eq.4.7, 4.8
z=lad 109.11 mm eq.4.9
2
Asb=M/(0.87fykz) 628.81 mm

Deflection
ρ=Asb/bd= 0.0053
EN 1992-1-1
Basic ratio= 16.677 eq 7.16b
f3=L/(basic ratio x f1 x f2xd)= 1.0846
2
Asd=f3Asb= 682.01 mm
2
Provide T12@150BB (As prov.=754mm /m)

FINAL LANDING
Loading
150mm thk landing =0.15x25= 3.75 kN/m2
2
50mm finishes=0.05x25= 1.25 kN/m
From Flight 2=9.664741/1.80= + 5.3693 kN/m
2

2
Permanent Load, gk= 10.369 kN/m

2
Imposed load= 4.000 kN/m
From Flight 2=5.094395/1.80 + 2.8302 kN/m
2

Variable Load, qk= 6.8302 kN/m


2

2
Ultimate Load, n=1.35gk + 1.5qk= 24.244 kN/m

2
n=24.24389kN/m
2
n=24.244kN/m

0 2.625

V 31.82 31.82 kN/m

M 20.882 kNm/m

Rp 13.61 13.61 kN/m Rv

8.9647 8.9647 kN/m

Bending Reinforcement
Provide the same reinforcement as in intermediate landing

See reinforcement details of Staircase in fig 1b


Fig.1b: RC Details of Staircase

D F

01 02

8T 15 13 7T 21
6T 8T
10 T1 T1 10 88
10 12
05- 00 00 05-
07- 06- 1800
25 5- 5- 25 10 TREADS @ 275=2750
25 15
0 25 25 0
0T 0B
TB 0 0 TB
B B 13
BT BT 15
0

2
12
11
RI
SE
RS
@
16
0=
17
60
5T1204-250BT
5T1008-250BT 09

07 07 07 07 07 07
4
3
11T1209-100TT
02-02
11T1203-100TT 11T1210-100TT 38 06 06 06 06 15
13 10 08 0
BLOCK WALL

9T1211-125BB
11T1202-100BB 10 TREADS @ 275=2750 1288

02 03

07 07 07 07 07 07
11T1201-100
06 06 06 150
4 04 11
4
RIS
ER
S@
160
2x5T1014-250 BT &TT =17
9T1212-125BT 60

9T1213-125TT
18
00

05 05 05

01-01
4

2625

PLAN
2 Nos. Thus
1
M
EA
B

PLAN
SCALE 1:100

A 6000 B D
4000

17 15
5 0

25
01-01
SCALE 1:25

Fig. 1c: First Floor Layout


JOB
DELTEC ENGINEERING LIMITED NO. DEL115-2009 SHEET 1 0F 3 Rev
P0LT 576, 14TH STREET,DDPA JOB TITLE: PROPOSED OFFICE / HALL DEVELOPMENT
ESTATE UGBORIKOKO-EFFURUN CLIENT: LIVING FAITH CHURCH OLEH
TEL:08037262708, 08069395681 SUBJECT: FIRST FLOOR MADE BY MGK DATE 25-05-09
CHECKED
BY SAI DATE 27-05-09
CALCULATION REFERENCE
Preliminary Sizing
Span, L= 6000 mm
Assume concrete is lightly stressed ( ρ=0.5% ) 0.005
Factor for structural system, K= 1.3
EN 1992-1-1
Basic ratio= 22.1
eq 7.16b
Correction factors,
F1=7/span, but f1=1 when span< 7 1
F2=500/fyk= 1.2195
F3=Asd/Asb, Assume f3= 1
Minimum effective depth, d=span/( basic ratio x f 1x f2 x f3 )= 222.62 mm
Overall depth of waist, h=d+c+Ø/2= 253.62 mm
Try h= 175 mm

Panel 1& 2
Loading
2
175mm thick slab =0.175x25= 4.375 kN/m
50mm finishes=0.05x25= + 1.25 kN/m
2

2
Permanent Load, gk= 5.625 kN/m EN 1991-1-1
Table 6.1, 6.2
Imposed load= 3
Light weight partitions + 1
2
Variable Load, qk= 4 kN/m
2
Ultimate Load, n=1.35gk + 1.5qk= 13.594 kN/m

2
n=13.59375kN/m

0 6 4 m
D.F 0.4 0.6
FEM 0 22.026 -16.97 KNm/m
-2.024 -3.037 KNm/m
SM 0 20.002 -20 KNm/m Span
M 17.651 11.021 KNm/m

Bending Reinforcement
Panel 1
Span Moment, Msy= 17.651 kNm/m
breadth, b= 1000 mm
Assume bar size, Ø= 10 mm
Effective depth, d=h-(c+Ø+Ø/2)= 135 mm
2
K=M/fckbd = 0.0484
0.5
la=(0.5+(0.25-k/1.134) )= 0.95
z=lad 128.25 mm
CALCULATION SHEET 2 OF 3 REFERENCE
Panel 2
Span Moment, Msx= 11.021 kNm/m
Try h= 150 d=h-(c+Ø/2)= 120 mm
2
K=M/fckbd = 0.0383
0.5
la=(0.5+(0.25-k/1.134) )= 0.95
z=lad 114 mm
2
Asb=M/(0.87fykz) 271.02 mm
EN 1992-1-1
Minimum area of reinforcement, As, min
Cl. 7.3.2
Stress distribution coefficient, kc= 0.4
Non-linear stress distribution coefficient, k= 1
2
Tensile strength of concrete, fct, eff= 3 N/mm
Area of concrete within the tension zone, Act= 75000 mm
2 EN 1992-1-1
2 eq 7.1
As, min=kckfct, effAct/fyk= 219.51 mm
2
Asb>As, min. Hence Provide T10@200BB (As prov.=393mm )

Support Moment, Msx= 20.002 kNm/m


Assume bar size Ø= 12 mm
Eff. Depth, d=h-(c+Ø/2)= 119
2
K=M/fckbd = 0.0565
0.5
la=(0.5+(0.25-k/1.134) )= 0.9474
z=lad 112.74 mm
2
Asb=M/(0.87fykz)= 497.37 mm
2
Provide T12@200TT (As prov.=565mm )

Panel 1,3,4&5

2
n=13.59375kN/m
4.5 4.5 4.5 6

DF 0.5 0.5 0.5 0.5 0.64 0.36


FEM -14.59 14.589 -14.59 14.589 -14.59 14.589 -23.01 0
2.693 5.386 3.0297
-0.673 -1.347 -1.347
0.1683 0.3366 0.3366
SM -14.42 14.926 -14.93 13.242 -13.24 19.975 -19.98
Span M 11.202 11.791 9.269 19.13

Bending Reinforcement
Panel 1

Span Moment, Msx= 19.13 kNm/m


breadth, b= 1000 mm
Assume bar size, Ø= 10 mm
Effective depth, d=h-(c+Ø/2)= 145 mm
2
K=M/fckbd = 0.0455
0.5
la=(0.5+(0.25-k/1.134) )= 0.95
z=lad 137.75 mm
2
Asb=M/(0.87fykz) 389.31 mm
EN 1992-1-1
eq 7.16b
Deflection
ρ=Asb/bd= 0.0027
FIRST FLOOR CALCULATION SHEET 3 OF 3 REFERENCE
Panel 3,4,5
Span Moment, Msx= 11.781 kNm/m
Provide the same reinforcement as in panel 2

Support Moment, Msx= 19.975 kNm/m


Provide the same reinforcement as in panel 2

Panel 3&Bay 2
2
n=13.59375kN/m

0 6 6 1.8

D.F 0.23 0.77


FEM 0 10.186 -5.506
-1.076 -3.604
SM 0 9.1091 -9.109 0
SSR 12.234 12.234
CC 5.0606 -5.061
V 17.295 7.1738
Span M 8.2456 1.893

Panel 3,4,5
Span Moment, Msy= 8.2456 kNm/m Support Moment, Msy= 9.1091 kNm/m
2 2
K=M/fckbd = 0.0229 Provide T12@200TT (As prov.=565mm )
0.5
la=(0.5+(0.25-k/1.134) )= 0.95
z=lad 114 mm
2
Asb=M/(0.87fykz) 202.77 mm
2
Asb<As, min. Hence Provide T10@200BT (As prov.=393mm )

Ba y 2
Span Moment, Msx= 1.893 kNm/m
2
Asb<As, min. Hence Provide T10@200BT (As prov.=393mm )

Panel 12 & Bay 4


2
n=13.59375kN/m

0 6 1.8

D.F 0.23 0.77


FEM 0 23.005 -5.506 KNm/m
-4.025 -13.47
SM 0 18.98 -18.98 0 KNm/m
SSR 12.234 12.234
CC 10.545 -10.55
V 22.779 1.689 KN/m
Span M 19.63 0.1049 KNm/m

Panel 12
A
01 01 1
01 01 2
01 01
14 14
01 01
14 14
01 01
01 01
01 01
01 01
01 01
01 01
01 01
01 01
01 01
01 01 01
01
05
60
01
175 00

01- 14 14
01 14 14
14 14
SCALE
1:25 14

PL
B
AN
SCALE
06 06
1:100
06 06
06 06
06 06
06
06
06
06
06
06 150
06 40
06 00
05
06
06
06
06
06
1
06
2
06
06 06
06 06

Fig. 1d: RC Details of First Floor


DELTEC ENGINEERING
LIMITED JOB NO. SHEET 1 0F 18 Rev
P0LT 576, 14TH STREET,DDPA JOB TITLE: PROPOSED OFFICE / HALL DEVELOPMENT
ESTATE UGBORIKOKO-
EFFURUN CLIENT: LIVING FAITH CHURCH OLEH
TEL:08037262708, 08069395681 SUBJECT: FIRST FLOOR MADE BY MGK DATE 25-05-09
CHECKED
BEAMS BY SAI DATE 27-05-09
CALCULATION REFERENCE
Preliminary Sizing
Span, L= 6000 mm
Assume concrete is highly stressed ( ρ=1.5% ) 0.015
Factor for structural system, K= 1.3
0.5 0.5 0.5 EN1992-1-1
Basic ratio, l/d=K(11+1.5fck (ρo /(ρ-ρ'))+1/12fck (ρ'/ρo ) ) = 16.9
eq 7.16b
Correction factors,
f1=7/span, but f1=1 when span< 7 1
f2=500/fyk= 1.2195
f3=Asd/Asb, Assume f3= 1
Minimum effective depth, d=span/( basic ratio x f 1x f2 x f3 )= 291.12 mm
Assume size of link, Ø= 10 mm
Assume size of tension bar, Ø= 20 mm
Overall depth of beam, h=d+c+Ø+Ø/2= 336.12 mm
Try h= 450 mm

Beam 1 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.175)x0.225+0.175x0.1125)x25= 2.0391 kN/m
Wall load=2.5x3.5= + 8.75 kN/m
Permanat load, Gk= 10.789 kN/m

Patched Load
From Panel 1, Gk=0.5x6x5.625= 16.875 kN/m
Qk=0.5x6x4= 12 kN/m
From Panel 2, Gk=0.5x4x5= 10 kN/m
Qk=0.5x4x4= 8 kN/m

Gk=16.875kN/m Gk=10.25kN/m
Qk=12kN/m Qk=8kN/m

Gk=10.789063kN/m
0 3 6 2 4 m

M 0 130.66 121.9 -121.9 27.67 0 kNm


V 84.57 126.96 87.766 34.13 kN
Rs 59.76 155.04 15.7 kN
Rp 45.807 118.94 13.77 kN

Bending Reinforcement
Span Moment, M= 130.66 kNm/m EN1992-1-1
Width of web, bw= 225 mm eq 5.7

Effective flange width, beff=bw + ∑beff,i= 1245 mm


FIRST FLOOR BEAMS CALCULATION SHEET 2 OF 18 REFERENCE
RCD by
0.5
la=(0.5+(0.25-k/1.134) )= 0.95 Bungey
z=lad 384.75 mm 6th Edition
Asb=M/(0.87fykz) 952.05 mm
2 eq.4.7, 4.8
eq.4.9

Deflection
ρ=Asb/bd= 0.0104
Factor for structural system, K= 1.3
Basic ratio= 18.033
f3=L/(basic ratio x f1 x f2xd)= 0.6737
Since f3=0.6737<1, Asb controls, deflection ok
2
Provide 4T20B (As prov.=1256mm )

Support Moment, M= 121.9 kNm/m


Width of web, bw= 225 mm
RCD by
Effective depth, d=h-(c+Ø+Ø/2)= 405 mm
Bungey
2
K=M/fckbwd = 0.1652 6th Edition
la=(0.5+(0.25-k/1.134)
0.5
)= 0.8231 eq.4.7, 4.8
z=0.82d 333.34 eq.4.9
2
Asb=M/(0.87fykz) 1025.2 mm
2
Provide3T20T+2T16T (As prov.=1231mm )

Shear Reinforcement
Shear force at face of support, VEf= 125.34 kN
EN1992-1-1
Crushing strength VRd, max of diagonal strut, Ө=22, cotӨ=2.5
eq 6.9
VRd, max=0.124bwd(1-fck/250)fck= 207.91 kN
VRd, max> VEf OK RCD by
Shear at d from face of support, VEd= 117.6 kN Bungey
6th Edition
Asw/s=VEd/0.78dfykcotӨ= 0.3632 eq.5.9, 5.10
0.5
Asw, min/s=0.08fck bw/fyk= 0.1963
Provide T8@200 links (Asw/s prov.=0.5027)

Beam 2 (450mm x 225mm)


Loading
Self wt. of beam=0.45x0.225x25= 2.5313 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 11.281 kN/m

0 2.625

V 19.989 19.989 kN
M 13.118 kNm
Rp 14.807 14.807 kN

Bending Reinforcement
2
Span Moment, M=13.1178kNm Asb=95.58mm
FIRST FLOOR BEAMS CALCULATION SHEET 3 OF 18 REFERENCE
EN1992-1-
Minimum area of reinforcement, As, min 1:2004
Stress distribution coefficient, kc= 0.4 Cl. 7.3.2
Non-linear stress distribution coefficient, k= 1
2
Tensile strength of concrete, fct, eff= 3 N/mm
2
Area of concrete within the tension zone, Act= 50625 mm
EN1992-1-1
2
As, min=kckfct, effAct/fyk= 148.17 mm eq 7.1
2
Asb<As, min. Hence Provide 2T16B (As prov.=402mm )

Shear Reinforcement EN1992-1-1


Shear at d from face of support, VEd= 12.108 kN eq 6.9
RCD by
Asw/s=VEd/0.78dfykcotӨ= 0.0374 Bungey
0.5 6th Edition
Asw, min/s=0.08fck bw/fyk= 0.1963
eq.5.9, 5.10
Asw, min/s>Asw/s
Provide T8@250 links (Asw/s prov.=0.4022)

Beam 3 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225x25= 1.6875 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.438 kN/m

Patched Load
From Panel 1, Gk=0.5x6x5.625= 16.875 kN/m
Qk=0.5x6x4= 12 kN/m

From Panel 2, Gk=0.5x4x5= 10 kN/m


Qk=0.5x4x4= 8 kN/m

From Panel 3, Gk=0.5x4.5x5= 11.25 kN/m


Qk=0.5x4.5x4= 9 kN/m

Gk=16.875kN/m
Qk=12kN/m

Gk=11.25kN/m Gk=10kN/m
Qk=9kN/m Qk=8kN/m
Gk=10.4375kN/

0 2.25 3 3.75 6 2 4

M 0 205.96 190.64 -190.6 19.37 0 kNm


V 127.24 189 101.34 27.65 kN
Rs 89.86 208.32 4.766 kN
Rp 62.146 147.53 7.5151 kN
FIRST FLOOR BEAMS CALCULATION SHEET 4 OF 18 REFERENCE
Bending Reinforcement
Span Moment, M= 288.31 kNm/m
Width of web, bw= 225 mm EN1992-1-1
Effective flange width, beff=bw + ∑beff,i= 2250 mm eq 5.7
Effective depth, d=h-(c+Ø+Ø/2)= 405 mm
RCD by
δ=Moment before redistribution/Moment after redistribution= 0.7144 Bungey
xbal=(δ-0.4)d= 127.32 6th Edition
2
K=M/fckbeffd = 0.0391 eq.7.6b
2
Kbal=0.454(δ-0.4)-0.182(δ-0.4) = 0.1247 >K
0.5
la=(0.5+(0.25-k/1.134) )= 0.95
z=lad 384.75 mm
2
Asb=M/(0.87fykz) 2100.8 mm

Deflection
ρ=Asb/bd= 0.0231
Factor for structural system, K= 1.3
Basic ratio= 15.992
f3=L/(basic ratio x f1 x f2xd)= 0.7597
Since f3=0.759654<1, Asb controls, deflection ok
2
Provide 3T20B +3T25B (As prov.=2415mm )

Support Moment, M= 142.98 kNm/m


Width of web, bw= 225 mm
Effective depth, d=h-(c+Ø+Ø/2)= 405 mm
2
K=M/fckbwd = 0.1937
Since K>Kbal= 0.1244 RCD by
depth to compression reinf., d' = 45 mm ` Bungey
6th Edition
2 2
As' =(M-Kbalfckbd )/(0.87fyk(d-d'))= 398.56 mm eq.7.7, 7.8
z=0.82d 332.1
2
Asb=(Kbalfckbd2)/(0.87fykz)+ As' 1173.5 mm
2
Provide 3T20T+2T16T (As prov.=1344mm )

Shear Reinforcement
Shear force at face of support,
VEf= 187.25 kN Crushing
strength VRd, max of diagonal strut, Ө=22, cotӨ=2.5
VRd, max=0.124bwd(1-fck/250)fck= 207.91 kN
VRd, max> VEf OK
Shear at d from face of support,
VEd= 178.18 kN
Asw/s=VEd/0.78dfykcotӨ= 0.5503
0.5
Asw, min/s=0.08fck bw/fyk= 0.1963
Provide T8@150 links (Asw/s prov.=0.6703)

Beam 4 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225+0.15x0.1125)x25= 2.1094 kN/m
Wall load=2.5x3.5= 8.75 kN/m
From slab=0.5x1.8x5= 4.5 kN/m
FIRST FLOOR BEAMS CALCULATION SHEET 5 OF 18 REFERENCE

Gk=15.35938kN/m
Gk=10.8594kN/m
Qk=3.6kN/m

2.2 2.625

-
M 0 10.26 35.15 24.61 7.7
V 23.16 35.15 24.61 15.01
Rs 16.165 43.73 10.34
Rp 12.656 38.94 10.69

Bending Reinforcement
2
Provide 2T16B & 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.4022)

Beam 5 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225x25= 1.6875 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.438 kN/m

Patched Load
From Panel 3 & 4, Gk=0.5x4.5x5x2= 22.5 kN/m

Qk=0.5x4.5x4x2= 18 kN/m

Gk=22.5kN/m
Qk=18kN/m

10.438 kN/m

0 2.25 3.75 6

M 0 273.19 0 kNm
V 149.9 149.9 kN
Rs 107.25 107.25 kN
Rp 73.502 73.502 kN

Bending Reinforcement
Span Moment, M= 273.19 kNm/m
Width of web, bw= 225 mm
Effective flange width, beff=bw + ∑beff,i= 2100 mm
Effective depth, d=h-(c+Ø+Ø/2)= 405 mm
2
K=M/fckbeffd = 0.0397
0.5
la=(0.5+(0.25-k/1.134) )= 0.95
FIRST FLOOR BEAMS CALCULATION SHEET 6 OF 18 REFERENCE
Deflection
ρ=Asb/bd= 0.0218
Basic ratio= 13
Factor for structural system, K= 1
f3=L/(basic ratio x K x f1 x f2xd)= 0.9345
Since f3=0.93447<1, Asb controls, deflection ok
2
Provide 3T25B+3T20B (As prov.=2415mm )

Shear Reinforcement
Shear force at face of support, VEf= 148.15 kN
Crushing strength VRd, max of diagonal strut, Ө=22, cotӨ=2.5
VRd, max=0.124bwd(1-fck/250)fck= 207.91 kN
VRd, max> VEf OK
Shear at d from face of support, VEd= 140.84 kN
Asw/s=VEd/0.78dfykcotӨ= 0.435
0.5
Asw, min/s=0.08fck bw/fyk= 0.1963
Provide T8@200 links (Asw/s prov.=0.50272)

Beam 6 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225)x25= 1.6875 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.438 kN/m

Patched Load
From Panel 5, Gk=0.5x4.5x5= 11.25 kN/m
Qk=0.5x4.5x4= 9 kN/m

From Panel 6, Gk=0.5x4.412x5= 11.03 kN/m


Qk=0.5x4.412x4= 8.824 kN/m

Gk=11.03kN/m
Qk=8.824kN/m

Gk=11.25kN/m
Qk=9kN/m
Gk=10.4375kN/m
1.237 2.737 4.581
1.013 2.206 4.987 1.8

P Cant.
M 0 3.58 -10.47 kNm
-3.58 10.468
SM 3.58 -3.58 10.468 -10.47 kNm
SSR 9.318 11.418 136.52 142.98 26.45 19.57
CC -3.534 3.534 -1.381 1.3812 5.816 -5.816
V 5.784 14.952 135.14 144.36 32.266 13.754 kN
M 0.796 153.8 5.12 kNm
FIRST FLOOR BEAMS CALCULATION SHEET 7 OF 18 REFERENCE
Bending Reinforcement
2
Interior Span Moment, M=153.8kNm la=0.95 z=0.95d Asb=1120.66mm
2
Provide 3T20B + 2T16B (As prov.=1344mm )

2
Support Moment, M=10.468kNm la=0.95 z=0.95d Asb=76.275mm
2
As, min=kckfct, effAct/fyk= 148.17 mm
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@200 links (Asw/s prov.=0.50272)

Beam 7 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225+0.15x0.1125)x25= 2.1094 kN/m
Wall load=2.5x3.5= 8.75 kN/m
From bay 4=0.5x1.8x5= 4. 5
Permanat load, Gk= 15.359 kN/m

Variable load from slab, Qk=0.5x1.8x4= 3.6 kN/m

Gk=15.35938kN/m
Gk=10.8594kN/m
Qk=3.6kN/m
4.2 2.625

M 0 39.7 40.32 -40.32 2.94


V 32.832 64.5 34.6 15.01
Rs 32.832 72.219 3.082
Rp 26.435 61.635 4.943

Bending Reinforcement
2
Provide 2T16B & 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.4022)

Beam 8 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.175)x0.225+0.025x0.1125)x25= 1.6172 kN/m
Wall load=2.5x3.5= 8.75 kN/m
From bay 4=0.5x1.8x5= 4.5
Permanat load, Gk= 14.867 kN/m

Variable load from slab, Qk=0.5x1.8x4= 3.6 kN/m

Patched Load
FIRST FLOOR BEAMS CALCULATION SHEET 8 OF 18 REFERENCE

Gk=10.875 kN/m
Qk=12 kN/m

Gk=14.867 kN/m
0
3 6

M 212.66 kNm V
121.4 121.4 kN Rs
87.914 87.914 kN Rp
69.914 69.914 kN

Bending Reinforcement
2
Span Moment, M=212.66kNm Asb=1550mm
2
Provide 3T20B + 4T16B (As prov.=1746mm )

Shear Reinforcement
Provide T8@200 links (Asw/s prov.=0.50272)

Beam 9 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225)x25= 1.6875 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.438 kN/m

Patched Load
From Panel 10, Gk=0.5x5.475x5= 13.688 kN/m

Qk=0.5x5.475x4= 10.95 kN/m


From Panel 11, Gk=0.5x3.225x5= 8.0625 kN/m
Qk=0.5x3.225x4= 6.45 kN/m

Gk=13.6875 kN/m
Qk=10.95 kN/m

Gk=8.0625 kN/m
Qk=6.45 kN/m
Gk=10.438 kN/m
0 6
1.6125 2.7375 3.2625 4.3875

M
0 260.49 0 kNm

V 144.31 144.31 kN
Rs 103.34 103.34 kN
Rp 71.33 71.33 kN

Shear Reinforcement
FIRST FLOOR BEAMS CALCULATION SHEET 9 OF 18 REFERENCE

Beam 10 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.175)x0.225+0.175x0.1125)x25= 2.0391 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.789 kN/m

Patched Load
From Panel 12, Gk=0.5x6x5.625= 16.875 kN/m
Qk=0.5x6x4= 12 kN/m

From Panel 11, Gk=0.5x3.225x5= 8.0625 kN/m


Qk=0.5x3.225x4= 6.45 kN/m

Gk=8.0625kN/m
Qk=6.45kN/m Gk=16.875kN/m
Qk=12kN/m
Gk=10.789063kN/m
0
1.6125 4.3875 6 3 6

M 0 94.6 162.56 -162.6 125.5 0 kNm


V 68.687 115.9 131.1 82.4 kN
Rs 44.68 178.29 55.5 kN
Rp 35.46 136.28 42.45 kN

Bending Reinforcement
2
Span Moment, M=125.5kNm Asb=914.45mm
2
Provide 3T20B + T16B (As prov.=1143mm )

2 2
Support Moment, M=162.56kNm As' =306.009mm Asb=1346.57mm
2
Provide 3T20T + 3T16T (As prov.=1545mm )

Shear Reinforcement
Provide T8@200 links (Asw/s prov.=0.50272)

Beam 11 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.175)x0.225+0.175x0.1125)x25= 2.0391 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.789 kN/m

Self wt. of beam=((0.45-0.15)x0.225+0.15x0.1125)x25= 2.1094 kN/m


FIRST FLOOR BEAMS CALCULATION SHEET 10 OF 18 REFERENCE
Patched Load
From Panel 1, Gk=0.5x6x5.625= 16.875 kN/m
Qk=0.5x6x4= 12 kN/m

From Panel 3, 4 & 5, Gk=0.5x4.5x5= 11.25 kN/m

Qk=0.5x4.5x4= 9 kN/m

Gk= 11.25 Gk= 11.25 Gk= 11.25 Gk= 16.875


Qk= 9 Qk= 9 Qk= 9 Qk= 12
Gk= 10.86 Gk= 10.79
4.5
2.25 4.5 2.25 4.5 2.25 3 6

M 0 58.9 74.78 -74.78 47.13 30.87 -30.87 30.83 131.73 -131.7 131.13 0 kNm
V 52.66 81.88 75.017 56.5 52.95 87.7 126.82 85.2 kN Rs
35.23 113.34 71.28 154.83 59.87 kN Rd
27.93 88.498 57.148 118.3 45.9 kN
All loads are In kN/m
Bending Reinforcement
2
End Span Moment, M=131.13kNm Asb=955.5mm
2
Provide 2T20B + 3T16B (As prov.=1231mm )

2
Interior Span Moment, M=47.13kNm Asb=343.4mm
2
Provide 2T16B (As prov.=402mm )

2 2
4th Interior Support Moment, M=131.73kNm As' =65.92mm Asb=1106.48mm
2
Provide 3T20T + 2T16T (As prov.=1344mm )

2
1st Interior Support Moment, M=74.78kNm Asb=575.155mm
2
Provide 3T16T (As prov.=603mm )

Shear Reinforcement
Provide T8@200 links (Asw/s prov.=0.50272)

Beam 12 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.175)x0.225+0.1125x0.025)x25= 1.6172 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.367 kN/m

Self wt. of beam=((0.45-0.15)x0.225)x25= 1.6875 kN/m


Wall load=2.5x3.5= 8.75 kN/m
From Bay 3=0.5x1.8x5 4.5
Permanat load, Gk= 14.938 kN/m
FIRST FLOOR BEAMS CALCULATION SHEET 11 OF 18 REFERENCE
Patched Load
From Panel 1, Gk=0.5x6x5.625= 16.875 kN/m
Qk=0.5x6x4= 12 kN/m

From Panel 2, Gk=0.5x4x5= 10 kN/m


Qk=0.5x4x4= 8 kN/m

From Panel 3, 4 & 5, Gk=0.5x4.5x5= 11.25 kN/m Gk=16.875kN/m

Qk=0.5x4.5x4= 9 kN/m Qk=12kN/m

Gk= 11.25 Gk= 11.25 Gk= 11.25 Gk= 10


Qk= 9 Qk= 9 Qk= 9 Qk= 8
Gk= 14.94 Qk= 3.6 Gk= 10.37
2.25 4.5 2.25 4.5 2.25 4.5 2 3 4 6 m

M 0 78.52 101.04 -101 65.86 36.25 -36.25 40.7 194.38 -194.4 200.97 0
V 73.38 112.3 104.2 76.87 72.37 124.9 186.6 125.1
Rs 48.395 115.38 93.589 223.17 87.24
Rp 34.982 110.81 68.845 155.11 60.68

All loads are in kN/m

Bending Reinforcement
2
End Span Moment, M=200.97kNm Asb=1464.37mm
2
Provide 4T20B + 2T16B (As prov.=1658mm )

2
First Span Moment, M=78.52kNm Asb=572mm
2
Provide 4T16B (As prov.=804mm )

2 2
3rd Interior Support Moment, M=194.38kNm As' =553.805mm Asb=1594.36mm
2
Provide 3T20T + 4T16T (As prov.=1746mm )

2
1st Interior Support Moment, M=101.04kNm Asb=813.27mm
2
Provide 5T16T (As prov.=1005mm )

Shear Reinforcement
Provide T8@200 links (Asw/s prov.=0.50272)

Beam 13 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225+0.1125x0.15)x25= 2.1094 kN/m
Wall load=2.5x3.5= 8.75 kN/m
From Bay 2=0.5x1.8x5= 4.5
Permanat load, Gk= 15.359 kN/m

Variable Load
From Bay 2, Qk=0.5x1.8x4= 3.6 kN/m
FIRST FLOOR BEAMS CALCULATION SHEET 12 OF 18 REFERENCE
Gk=8.475kN
Qk=1.18kN

Gk=15.35938kN/m
Qk=3.6kN/m

0.212 4.712 4.5 2.7

-
M 0 50.23 62.63 -62.63 26.86 31.98 31.98 16.16 0
V 63.003 75.5 65.899 55.52 46.65 29.08
Rs 44.24 102.55 71.35 17.35
Rp 36.46 83.13 57.79 14.06

Bending Reinforcement
2
End Span Moment, M=50.23kNm la=0.95 z=0.95d Asb=366mm
2
Provide 3T16B (As prov.=603mm )

2
Interior Support Moment, M=62.63kNm la=0.92 z=0.92d Asb=471.23mm
2
Provide 3T16B (As prov.=603mm )

Shear Reinforcement
Provide T8@200 links (Asw/s prov.=0.50272)

Beam 14 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225+0.1125x0.15)x25= 2.1094 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.859 kN/m

Self wt. of beam=((0.45-0.15)x0.225)x25= 1.6875 kN/m


From final landing=13.60971/1.8= 7.5604 kN/m
Permanat load, Gk= 9.2479 kN/m
Variable load
From final landing, Qk=8.94663/1.8= 4.9704 kN/m

Patched Load
From Panel 2, Gk=0.5x4x5= 10 kN/m
Qk=0.5x4x4= 8 kN/m

Gk=10kN/m
Gk=9.247894kN/m Qk=8kN/m
Qk=4.97035kN/m Gk=10.85938kN/m
3.8125
1.8 2 0.1875 2.1875

M 0 1.658 31.86 -31.86 31.24 37.72 -37.72 6.76 0


V 8.172 35.6 54.54 73.6 53.398 15.69
FIRST FLOOR BEAMS CALCULATION SHEET 13 OF 18 REFERENCE

Bending Reinforcement
2
Interior Span Moment, M=31.24Nm la=0.95 z=0.95d Asb=227.62mm
2
Provide 2T16B (As prov.=402mm )

2
Support Moment, M=37.72kNm la=0.95 z=0.95d Asb=274.85mm
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.402176)

Beam 15 (450mm x 225mm)


Loading
Self wt. of beam=0.45x0.225x25= 2.5313 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 11.281 kN/m

Self wt. of beam=((0.45-0.15)x0.225+0.1125X0.15)x25= 2.1094 kN/m


Wall load=2.5x3.5= 8.75 kN/m
From final landing=13.60971/1.8= 7.5604 kN/m
Permanat load, Gk= 18.42 kN/m

Variable load
From final landing, Qk=8.94663/1.8= 4.9704 kN/m

Gk=18.41977kN/m

Qk=4.97035kN/m Gk=11.28125kN/m

1.8 5.613

M 0 74.52 0
V 68.424 47.65
Rs 49.86 35.136
Rp 42.45 33.72

Bending Reinforcement
2
Span Moment, M=74.52Nm la=0.9012 z=0.9012d Asb=572.4mm
2
Provide 2T20B (As prov.=628mm )
FIRST FLOOR BEAMS CALCULATION SHEET 14 OF 18 REFERENCE
Beam 16 (450mm x 225mm)
Loading
Self wt. of beam=((0.45-0.15)x0.225+0.1125X0.15)x25= 2.1094 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.859 kN/m

Patched Load
From Panel 6, Gk=0.5x4.412x5= 11.03 kN/m
Qk=0.5x4.412x4= 8.824 kN/m

Gk=11.03kN/m
Qk=8.824kN/m
Gk=10.85938kN/m
0
2.206 4.412

M 0 81.229 0
V 63.36 63.36
Rs 45.85 45.85
Rp 36.121 36.121
Bending Reinforcement
2
Span Moment, M=81.229Nm la=0.95 z=0.95d Asb=591.87mm
2
Provide 3T16B (As prov.=603mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)

Beam 17 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225+0.1125X0.15)x25= 2.1094 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.859 kN/m

Patched Load
From Panel 6, Gk=0.5x4.519x5= 11.298 kN/m
Qk=0.5x4.519x4= 9.038 kN/m

Gk=11.2975kN/m
Qk=9.038kN/m
Gk=10.85938kN/m
0
2.2595 4.519

M 0 86.449 0
V 65.67 65.67
Rs 47.571 47.571
Rp 37.3 37.3
FIRST FLOOR BEAMS CALCULATION SHEET 15 OF 18 REFERENCE

Shear Reinforcement

Provide T8@250 links (Asw/s prov.=0.40216)

Beam 18 (450mm x 225mm)

Loading

Self wt. of beam=((0.45-0.15)x0.225+0.15x0.1125)x25= 2.1094 kN/m


Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.859 kN/m

Patched Load

From Panel 7, 8 & 9, Gk=0.5x4.5x5= 11.25 kN/m

Qk=0.5x4.5x4= 9 kN/m

From Panel 10, Gk=0.5x5.475x5= 13.688 kN/m

Qk=0.5x5.475x4= 10.95 kN/m

From Panel 11, Gk=0.5x3.225x5= 8.0625 kN/m

Qk=0.5x3.225x4= 6.45 kN/m

Gk= 8.063 kN/m Gk=13.6875kN/m Gk=11.25kN/m Gk=11.25kN/m Gk=11.25kN/m

Qk= 6.45 kN/m Qk=10.95kN/m Qk=9kN/m Qk=9kN/m Qk=9kN/m

Gk=10.85938kN/m
1.6125 2.7375 5.475 2.25 2.25 4.5
3.225 2.25 4.5 4.5

0 18.79 73.42 -73.42 71.91 82.13 -82.13 30.83 44.09 -44.09 41.23 71.47 -71.47 59.7 0

27.56 62.98 88.64 89.5 73.7 60.3 60.2 71.3 81.14 53.04

12.806 107.93 117.87 83.97 110.27 35.8

11.729 83.959 90.669 66.599 86.136 28.4

Bending Reinforcement
2
1st Interior Span Moment, M=71.91kNm la=0.95 z=0.95d Asb=523.97mm
2
Provide 3T16B (As prov.=603mm )

2
Interior Support Moment, M=82.13kNm la=0.8897 z=0.8897d Asb=638.999mm
2
Provide 4T16T (As prov.=804mm )

Shear Reinforcement

Provide T8@250 links (Asw/s prov.=0.402176)


FIRST FLOOR BEAMS CALCULATION SHEET 16 OF 18 REFERENCE
Beam 19 (450mm x 225mm)
Loading
Self wt. of beam=((0.45-0.15)x0.225)x25= 1.6875 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.438 kN/m

Self wt. of beam=((0.45-0.15)x0.225)x25= 1.6875 kN/m


Wall load=2.5x3.5= 8.75 kN/m
From Bay 3=0.5x1.8x5 4. 5
Permanat load, Gk= 14.938 kN/m

Variable load
From Bay 3, Qk=0.5x1.8x4= 3.6 kN/m

Patched Load
From Panel 7, 8 & 9, Gk=0.5x4.5x5= 11.25 kN/m
Qk=0.5x4.5x4= 9 kN/m
From Panel 10, Gk=0.5x5.475x5= 13.688 kN/m
Qk=0.5x5.475x4= 10.95 kN/m

From Panel 11, Gk=0.5x3.225x5= 8.0625 kN/m


Qk=0.5x3.225x4= 6.45 kN/m

From Panel 12, Gk=0.5x6x5.625= 16.875 kN/m


Qk=0.5x6x4= 12 kN/m

Gk=16.875kN/m
Qk=12kN/m
Gk=13.6875kN/m

Gk=8.0625kN/m Qk=10.95kN/m Gk=11.25kN/m Gk=11.25kN/m Gk=11.25kN/m


Qk=6.45kN/m Qk=9kN/m Qk=9kN/m Qk=9kN/m
Gk=10.4375kN/m Gk=14.9375kN/m Qk=3.6kN/m
1.6125 3.225 2.775 2.7 2.25 4.5 2.25 4.5 2.25 4.5
3 2.7375

0 54.23 -54.23 15.44 -15.44 58.45 -58.45 72.77 -72.77 91.9 -91.9 0
43.5 25.8 18.96 57.6 49.6 80.2
49.25 102.6 86.8 44.8 60.19 65.5 91.5 93.2 87.72 94.05 110.2 74.2
33.16 135.16 65.32 109.16 128.38 146.68 49.8
24.7 93.92 46.26 78.7 92.08 105 35.9

Bending Reinforcement
2
End Span Moment, M=80.2kNm la=0.95 z=0.95d Asb=584.38mm
2
Provide 3T16B (As prov.=603mm )

2
Interior Support Moment, M=91.9kNm la=0.874 z=0.874d Asb=727.5mm
2
Provide 4T16T (As prov.=804mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.402176)
FIRST FLOOR BEAMS CALCULATION SHEET 17 OF 18 REFERENCE
Beam 20 (450mm x 225mm)

Loading

Self wt. of beam=((0.45-0.15)x0.225+0.1125x0.15)x25= 2.1094 kN/m


Wall load=2.5x3.5= 8.75 kN/m
From Bay 3=0.5x1.8x5 4.5
Permanat load, Gk= 15.359 kN/m

Variable load

From Bay 3, Qk=0.5x1.8x4= 3.6 kN/m

Point Load

From Beam 6, Gk=8.475kN Qk=1.18kN

From Beam 7, Gk=26.435 Qk=6.397

Gk=26.435kN Gk=8.475kN

Qk=6.397kN Qk=1.18kN

Gk=15.35938N/m Qk=3.6kN/m

0 0.9 4.5 4.5 4.5 4.824

-
M 43.24 43.24 35.08 39.65 -39.65 27.36 62.796 -62.8 54.5

V 59.8 59.6 54.57 76.94 64.7

Rs 87.26 80.84 102.25 45.29

Rd 76.58 63.97 83.28 37.22

Bending Reinforcement
2
End Span Moment, M=54.5kNm la=0.95 z=0.95d Asb=397.11mm
2
Provide 3T16B (As prov.=603mm )

2
Interior Support Moment, M=62.796kNm la=0.92 z=0.92d Asb=472.5mm
2
Provide 3T16T (As prov.=603mm )

Shear Reinforcement
FIRST FLOOR BEAMS CALCULATION SHEET 18 OF 18 REFERENCE

Beam 21 (450mm x 225mm)


Loading
Self wt. of beam=((0.45-0.15)x0.225+0.1125x0.15)x25= 2.1094 kN/m
Wall load=2.5x3.5= 8.75 kN/m
Permanat load, Gk= 10.859 kN/m

Self wt. of beam=((0.45-0.15)x0.225)x25= 1.6875 kN/m


From final landing=13.60971/1.8= 7.5604 kN/m
Permanat load, Gk= 9.2479 kN/m

Variable load
From final landing, Qk=8.94663/1.8= 4.9704 kN/m

Patched Load
From Panel 12, Gk=0.5x6x5.625= 16.875 kN/m
Qk=0.5x6x5.625= 12 kN/m

Gk=16.875kN/m

Qk=12kN/m
Gk=9.247894kN/m

Gk=10.85938kN/m Qk=4.97035kN/m

2.1875 0.8125 3.8125 1.8

-
M 0 6.26 43.035 -43.04 35.43 35.089 35.09 1.292 0
V 15.11 57.37 87.56 58.75 37.35 7.16
Rs 5.385 104.33 68.84 -1.3
Rp 5.836 76.989 51.72 -2.12

Bending Reinforcement
Interior Span Moment, M=35.43kNm 2
la=0.95 z=0.95d Asb=258.16mm
2
Provide 2T16B (As prov.=402mm )

2
Support Moment, M=43.035kNm la=0.95 z=0.95d Asb=313.57mm
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement

See reinforcement details of First Floor Beams in fig 1e and 1f


A 6000
B 4000 D 2625 F

29T1004-200 19T1004-200
2T1605
+3T2003 01
03 03

02
600 02
2T2001 900 12T804-200 C E G
+2T2002 4200 2625
2T1206

BEAM 1 02 16T804-250 10T804-250


2T1615
07
3T1206

38T804-150
2T1605 25T804-150 BEAM 2 2T1615

03
03
+3T2003
03
2 NOS. THUS
BEAM 7

07
600 07 B
3T2001 900 6000
+3T2507 C 2200
29T804-200
8T804-250 10T804-250
BEAM 3 2T1608 08 3T1609
04

29T804-200

05 3T1609 10 10
3T2010
2T1608
48 0
+4T1609 BEAM 8 480

480
10 3T2010
+3T2511
10
480
BEAM 4
BEAM 5 & 9 A 6000

6 NOS. THUS 29T804-200 19T804-200

3T1619
3T1620 09 3T1620
1013 4987 1800 +3T2018
U-Bars 19 18 18 19 U-Bars

4T8
23T804-200 8T804-200

2T1612 06
16 16
3T2016
15 17 +T1617 17
1500

13 13
2T1612
700
+3T2013
700
BEAM 10
BEAM 6
2 NOS.. THUS

05 0305 06 06 03 03 03 08 08
03 03 02 02
450 04 450 450 450
04 04 04
07 7
01 02 01 06 0606 1 01
0 01 08 08
225 225 225 225

01-01
02-02 03-03 04-04
09 0909 12 12 15 15 09 0909 19 1919
18 18

04
450 450 4 450
04 04 04 0
450

13 13 17 7
10 0 10 10
111111 12 13 12
15 15 11 1111 16 1716
225
225 225
225 225

05-05
06-06 07-07 08-08 09-09

Fig 1e: RC Details of First Floor Beams


7 6 5 3 1
4500 4500 4500 6000

21T804-200 21T804-200 21T804-200 29T804-200


2T1624
1000 1000 2T1625 1000 1500 3T2026
10
25 25

26 26 242424
3T1621 22 23
3T1622
BEAM 11 900 900 2T2023 600
04
450
25 25
450
04
23 23
21T804-250 21T804-200 21T804-200 29T804-200
22 2222 21 21
3T1624 11 2T1625 27 2T1626 27
25 26 +3T2027 25 225 225

22 23 23
10-10 11-11
4T1621 4T2023

212
BEAM 12 2700
4 1800
+2T1622
30 30 32 32

22T804-200 21T804-200 12T804-200

450
2T1628 2T1631 450
04 04
12
31 28 3813 2 2187
6T804-250 15T804-250 8T804-250 2828 28 32 32
2T1632 225 225
4412
17T804-250 12-12 13-13
BEAM 13
2T1635 15 34 34 35 35
2T1632

43 43 47 47 BEAM 14 & 21 04 450 450


04
36 36

350 450
450 04 38T1004-150 33 33 35 3635
9 04
BEAM 16 2T1634 14
225 225

1 2121
4519
17T804-250
2225 4545 45 14-14 15-15
225

2T1637 16
18-18 19-19 2T2033
37 37
BEAM 15 450
38 38
2T1637 2 NOS. THUS 04
350 +2T1638 350 10 11 12 15 17
4500 4500 4500 5475 3225
17T804-250 17T804-250 17T804-250 21T804-250 12T804-250 37 3837
BEAM 17 17
2T1624 1000 1000 1000 2T1643
1000 1200
2T1642 800 225
43 41 +2T1641 42 43 +T1641 41

41
16-16
41

3T1621 2T1639 3T1640


900 24 24

BEAM 18 14

2700 2775 04
450
17T804-250 17T804-250 17T804-250 10T804-250
10T804-250 12T804-250
21 2121
2T1624 1000
43 2T1643 2T1642 225
18
+2T1641 41 42 43 +T1641 41

41 41
17-17
3T1621 2T1639 2T1640

BEAM 19
4824 1009

17T804-250 17T804-250 17T804-250 4T804

1200 1000
19 2T1647 2T1648 2T1649
48 47 49 48

3T1645 2T1646

BEAM 20

Fig. 1f: RC Details of First Floor Beams


M C2 2
AE
B 6
ID 1
O MV
A
C2 E
B

EAM
DI 4
O
V 180
C2

13
M
AE
B

C2

DI
O
V

013 BE
AM
6
4824

PLAN
SCALE 1:100

Fig. 1g: Roof Beam layout


DELTEC ENGINEERING LIMITED JOB NO. SHEET 1 0F 12 Rev
P0LT 576, 14TH STREET,DDPA JOB TITLE: PROPOSED OFFICE / HALL DEVELOPMENT
ESTATE UGBORIKOKO-EFFURUN CLIENT: LIVING FAITH CHURCH OLEH
TEL:08037262708, 08069395681 SUBJECT: ROOF MADE BY MGK DATE 25-05-09
BEAMS CHECKED BY SAI DATE 27-05-09
CALCULATION REFERENCE
Beam 1 (300mm x 225mm)
Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x(6x0.5+0.6)= 2.16 kN/m
Permanat load, Gk= 3.8475

Variable load
Roof load, Qk=0.25x(6x0.5+0.6)= 0.9 kN/m

Gk=3.8475kN/m Qk=0.9kN/m

6 4

M 0 19.82 22.904 -22.9 6.32 0


V 16.174 18.814 9.18
Rs 11.47 30.66 5.34
Rp 9.298 24.85 4.38

Bending Reinforcement
2
Span Moment, M=19.82kNm d=300-25-8-8=259 z=0.94d Asb=228.23mm
2
Provide 2T16B (As prov.=402mm )

2
Support Moment, M=22.904kNm z=0.93d Asb=266.58mm
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)

Beam 2 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x(5.6125x0.5+0.6)= 2.0438 kN/m
Wall load=2.5x0.438= 1.095 kN/m
Permanat load, Gk= 4.8263 kN/m

Variable load
ROOF BEAMS CALCULATION SHEET 2 OF 12 REFERENCE

Gk=4.82625kN/m Qk=0.851563kN/m

2.625

M 0 6.712 0
V 10.23 10.23
Rs 7.452 7.452
Rp 6.3345 6.3345

Bending Reinforcement
2
Provide 2T16B & T (As prov.=402mm )

Shear Reinforcement

Provide T8@250 links (Asw/s prov.=0.40216)

Beam 3 (300mm x 225mm)

Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x6x0.5= 1.8 kN/m
Permanent load, Gk= 3.4875 kN/m

Variable load
Roof load, Qk=0.25x6x0.5= 0.75 kN/m

Gk=3.4875kN/m Qk=0.75kN/m

6 4

-
M 0 17.783 20.416 20.42 5.69 0
V 14.41 20.9 16.77 8.15
Rs 10.24 27.37 4.77
Rp 8.428 22.52 3.92

Bending Reinforcement
2
Provide 2T16B & T (As prov.=402mm )

Shear Reinforcement
ROOF BEAMS CALCULATION SHEET 3 OF 12 REFERENCE

Beam 4 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x(5.6125x0.5+0.6)= 2.0438 kN/m
Permanent load, Gk= 3.7313 kN/m

Variable load
Roof load, Qk=0.25x(5.6125x0.5+0.6)= 0.8516 kN/m

Gk=3.73125kN/m Qk=0.851563kN/m

2.37 2.625

M 0 2.72 4.938 -4.938 3.561 0


V 5.851 9.53 10.13 6.891
Rs 3.894 14.27 4.623
Rp 3.1845 11.673 3.7814

Bending Reinforcement
2
Provide 2T16B & T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)

Beam 5 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Permanent load, Gk= 1.6875 kN/m

Gk=1.6875kN/m

6 1.8

M 0 5.725 8.099 -8.099 0


V 5.494 8.14 6.55 -2.75
Rs 4.063 10.914 -1.814

Bending Reinforcement
2
Provide 2T16B & T (As prov.=402mm )
ROOF BEAMS CALCULATION SHEET 4 OF 12 REFERENCE

Beam 6 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x4.412= 2.6472 kN/m
Permanent load, Gk= 4.3347 kN/m

Variable load
Roof load, Qk=0.25x4.412)= 1.103 kN/m

Wall load, Gk =2.5x0.78= 1.95 kN/m

Gk=1.95kN/m

Gk=4.3347kN/m Qk=1.103kN/m
1.013 2.887 4.987 1.8

M 0 18.01 -18.01 9.986 16.015 -16.02 0


V -15.5 17.896 23.281 23.08 16.382 -4.508
-
Rs 10.03 32.659 28.703 -1.311
-
Rp 8.519 27.232 23.969 -1.267

Bending Reinforcement
2
Provide 2T16B & 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)

Beam 7 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x(5.6125x0.5+0.6)= 2.0438 kN/m
Permanent load, Gk= 3.7313 kN/m

Variable load
Roof load, Qk=0.25x(5.6125x0.5+0.6)= 0.8516 kN/m

Self wt. of beam=0.3x0.225x25= 1.6875 kN/m


Roof load=0.6x(1.8x0.5+0.6)= 0. 9 kN/m
Permanent load, Gk= 2.5875 kN/m
ROOF BEAMS CALCULATION SHEET 5 OF 12 REFERENCE

Gk=3.73125kN/m Qk=0.851563kN/m

Gk=2.5875kN/m Qk=0.375kN/m

4.2 2.625

M 0 5.779 4.938 -4.938 2.988 0

V 6.912 10.325 11.181 6.153

Rs 4.9027 15.665 3.9052

Rp 4.3035 13.27 3.6889

Bending Reinforcement
2
Provide 2T16B & 2T16T(As prov.=402mm )

Shear Reinforcement

Provide T8@250 links (Asw/s prov.=0.40216)

Beam 8 (300mm x 225mm)

Loading

Self wt. of beam=0.3x0.225x25= 1.6875 kN/m


Roof load=0.6x(6+1.8)x0.5= 2.34 kN/m
Permanent load, Gk= 4.0275 kN/m

Variable load

Roof load, Qk=0.25x(6+1.8)x0.5= 1.35 kN/m

Gk=4.0275kN/m Qk=1.35kN/m

M 0 33.579 0

V 22.39 22.39

Rs 16.133 16.133

Rp 12.083 12.083

Bending Reinforcement
2
Provide 3T16B (As prov.=603mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
ROOF BEAMS CALCULATION SHEET 6 OF 12 REFERENCE

Beam 9 (300mm x 225mm)

Loading

Self wt. of beam=0.3x0.225x25= 1.6875 kN/m


Roof load=0.6x3.225x0.5= 0.9675 kN/m
Permanent load, Gk= 2.655 kN/m

Variable load
Roof load, Qk=0.25x3.225x0.5= 0.4031 kN/m

Gk=2.655kN/m Qk=0.4.03125kN/m `

M 0 18.85 0

V 12.57 12.57
Rs 9.1743 9.1743
Rp 7.965 7.965

Bending Reinforcement
2
Provide 3T16B & 2T16T (As prov.=402mm )

Shear Reinforcement

Provide T8@250 links (Asw/s prov.=0.40216)

Beam 10 (300mm x 225mm)

Loading

Self wt. of beam=0.3x0.225x25= 1.6875 kN/m


kN/m
Roof load=0.6x(6x0.5+0.6)= 2.16
Permanent load, Gk= 3.8475 kN/m

Variable load
Roof load, Qk=0.25x(6x0.5+0.6)= 0.9 kN/m

Gk=3.8475kN/m Qk=0.9kN/m

6 6

M 0 18.918 29.448 -29.45 18.918 0

V 15.735 24.54 24.54 15.735


Rs 10.682 35.606 10.682
Rp 8.6569 28.856 8.6569
ROOF BEAMS CALCULATION SHEET 7 OF 12 REFERENCE

Bending Reinforcement
2
Provide 3T16B (As prov.=603mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement

Provide T8@250 links (Asw/s prov.=0.40216)

Beam 11 (300mm x 225mm)

Loading

Self wt. of beam=0.3x0.225x25= 1.6875 kN/m


Roof load=0.6x(6x0.5+0.6)= 2.16 kN/m
Permanent load, Gk= 3.8475 kN/m

Variable load
Roof load, Qk=0.25x(6x0.5+0.6)= 0.9 kN/m

Gk=3.8475kN/m Qk=0.9kN/m

4.5 4.5 4.5 6

M 0 11.28 14.74 -14.74 8.197 7.288 -7.288 5.87 22.365 -22.37 20.32 0

V 12.155 16.38 13.25 12.66 18.08 23.36 16.32


Rs 8.305 24.94 17.73 30.06 11.538

Rp 6.73 20.214 14.37 24.361 9.35

Bending Reinforcement
2
Provide 2T16B (As prov.=402mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement

Provide T8@250 links (Asw/s prov.=0.40216)

Beam 12 (300mm x 225mm)

Loading

Self wt. of beam=0.3x0.225x25= 1.6875 kN/m


Roof load=0.6x(6+1.8)x0.5= 2.34 kN/m
Permanent load, Gk= 4.0275 kN/m

Variable load
Roof load, Qk=0.25x(6+1.8)x0.5= 0.975 kN/m
ROOF BEAMS CALCULATION SHEET 8 OF 12 REFERENCE

Gk=4.0275kN/m Qk=0.975kN/m Gk=1.6875kN/m

6
4.5 4.5 4.5

M 0 11.178 14.703 7.234 7.234 11.045 -11.05 8.256 10.976 -10.98 6.508 0
V 12.917 18.79 16.34 14.9 15.539 15.89 8.66 5.015
Rs 8.885 25.478 21.898 17.677 3.72
Rp 7.141 20.592 17.311 15.621 3.832

Bending Reinforcement
2
Provide 2T16B (As prov.=402mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)

Beam 13 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x(1.8x0.5+0.6)= 0. 9 kN/m
Permanent load, Gk= 2.5875 kN/m

Variable load
Roof load, Qk=0.25x(1.8x0.5+0.6)= 0.375 kN/m

Point Load
From beam 6, Gk=-1.2665kN Qk=-0.0447kN

Gk=-1.2665kN
Qk=-0.0447kN

Gk=2.5875kN/m Qk=0.375kN/m

0 0.212 4.712 4.5 2.7

M 0 7.69 9.703 -9.703 4.048 4.94 -4.94 2.4 0


V 9.479 11.69 10.22 8.545 7.24 4.4
Rs 6.727 16.01 11.154 2.7
Rp 5.99 13.992 9.739 2.367

Bending Reinforcement
2
Provide 2T16B (As prov.=402mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)
ROOF BEAMS CALCULATION SHEET 9 OF 12 REFERENCE

Beam 14 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Permanent load, Gk= 1.6875 kN/m

Wall load, Gk=2.5x0.438= 1.095 kN/m

Gk=1.095kN/m

Gk=1.6875kN/m

1.8 3.8125 2.1875

M 0 0.274 2.227 -2.227 1.823 2.591 -2.591 0.87 0


V 1.123 3.29 4.286 4.438 4.754 2.077
Rs
Rp 0.6021 5.5816 6.809 1.3675

Bending Reinforcement
2
Provide 2T16B (As prov.=402mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)

Beam 15 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Permanat load, Gk= 1.6875 kN/m

Gk=1.095kN/m

Gk=1.6875kN/m
3.9 5.6125

M 0 0
V 11.455 13.187
Rs
Rp 8.3576 9.6585

Bending Reinforcement
2
Provide 2T16B (As prov.=402mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)
ROOF BEAMS CALCULATION SHEET 10 OF 12 REFERENCE

Beam 16 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Permanent load, Gk= 1.6875 kN/m

Wall load, Gk=2.5x0.88= 2.2 kN/m

Gk=2.2kN/m

Gk=0.5kN/m

Gk=1.6875kN/m
4.412

M
0 9.978 0
V 8.202 9.89
Rp 6.0757 7.3258

Bending Reinforcement
2
Provide 2T16B (As prov.=402mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)

Beam 17 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Permanent load, Gk= 1.6875 kN/m

Wall load, Gk=2.5x0.88= 2.2 kN/m


Gk=0.5kN/m

Gk=1.6875kN/m
4.519

M 0 10.467 0
V 8.401 10.13
Rp 6.223 7.503

Bending Reinforcement Shear Reinforcement


2
Provide 2T16B (As prov.=402mm ) Provide T8@250 links (Asw/s prov.=0.40216)
2
Provide 2T16T (As prov.=402mm )
ROOF BEAMS CALCULATION SHEET 11 OF 12 REFERENCE

Beam 18 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x(6x0.5+0.6)= 2.16 kN/m
Permanent load, Gk= 3.8475 kN/m

Variable load
Roof load, Qk=0.25x(6x0.5+0.6)= 0.9 kN/m

Gk=3.8475kN/m Qk=0.9kN/m

4.5
4.5 4.5 5.475 3.225

-
0 11.39 14.26 -14.26 7.34 9.24 -9.24 7.18 15.05 -15.05 11.568 13.85 13.85 4.71 0
12.22 15.839 13.79 13.84 16.02 18.133 18.05 14.85 7.87
8.38 24.47 19.62 24.77 23.61 4.5
6.794 19.832 15.9 20.077 19.13 3.68

Bending Reinforcement
2
Provide 2T16B (As prov.=402mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement
Provide T8@250 links (Asw/s prov.=0.40216)

Beam 19 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x(6+1.8)x0.5= 2.34 kN/m
Permanent load, Gk= 4.0275 kN/m

Variable load
Roof load, Qk=0.25x(6+1.8)x0.5= 0.975 kN/m

Gk=4.0275kN/m Qk=0.975kN/m Gk=1.6875kN/m

4.5 2.7 2.775


4.5 4.5 3.225

-
0 14.74 14.74 11.5 -11.5 9.64 -9.64 2.15 -2.15 2.3 -2.3 0
12.08 6.93 8.398 2.65 1.24 2.1
12.9 18.8 16.22 15.13 15.97 15.8 12.3 8.14 2.8 3.96 4.4 3.1
8.9 25.4 22.33 19.87 6.6 5.87 2.2
7.186 20.43 17.98 15.96 5.727 5.926 2.182

Bending Reinforcement Shear Reinforcement


2
Provide 2T16B (As prov.=402mm ) Provide T8@250 links (Asw/s prov.=0.40216)
2
Provide 2T16T (As prov.=402mm )
ROOF BEAMS CALCULATION SHEET 12 OF 12 REFERENCE

Beam 20 (300mm x 225mm)


Loading
Self wt. of beam=0.3x0.225x25= 1.6875 kN/m
Roof load=0.6x(1.8x0.5+0.6)= 0.9 kN/m
Permanent load, Gk= 2.5875 kN/m

Variable load
Roof load, Qk=0.25x(1.8x0.5+0.6)= 0.375 kN/m

Point Load
From beam 6, Gk=-1.2665kN Qk=-0.0447kN
From beam 7, Gk=-4.3035kN Qk=-0.5992kN

`
Gk=-1.2665kN Gk=4.3035kN
Qk=-0.0447kN Qk=0.0447kN

Gk=2.5875N/m Qk=0.375kN/m

0.324 4.824 4.5 4.5 0.9

0
M 7.84 9.467 -9.467 4.059 5.979 5.979 5.402 7.68 -7.68 v
6.496 11.625 9.9 8.54 9.2 9.5 10.36
Rs 4.489 15.723 12.489 14.511
Rd 3.8097 13.721 10.905 12.701

Bending Reinforcement
2
Provide 2T16B (As prov.=402mm )
2
Provide 2T16T (As prov.=402mm )

Shear Reinforcement

See Reinforcement details in fig. 1h and 1i.


A
6000
B D F
4000 2625

23T804-250 15T804-250

31601
01

2T1601
10T804-250 C E G
4200 2625
2T1202
BEAM 1 & 3 02 16T804-250 9T804-250

2T1607
06
2T1202

BEAM 2 2T1607
2 NOS. THUS
BEAM 7
C 2200

8T804-250 10T804-250
B 6000
2T1603
03
23T804-250

07 2T1608
2T1603

23T804-250 7T804-250
3T1608
04 2T1605
BEAM 4 BEAM 8 & 9
2T1605

BEAM 5 A 6000 6000


5 NOS. THUS
23T804-250 23T804-250

21610 3T1609
08 2T1610
1013 4987 1800 U-Bars U-Bars

4T8 19T804-250 6T804-250

2T1606 05 3T1609

BEAM 10
2T1606

BEAM 6
2 NOS. THUS

Fig. 1h: RC Details of Roof Beams


01 01 02 02 03 03 05 05 06 06

30 04 30 04 30 04 30 04
30 04
0 0 0 0 0

01 01
02 02 03 03 05 05 06 06
225
225 225 225 225

01-01 02-02 03-03 04-04 05-05

07 07
08 08 0909 09
30 04
30 04 30 04
0
0 0

07 07 08 0808 090909
225
225 225

06-06 07-07 08-08


7 6 5 3 1
4500 4500 4500 6000 12 12 16 16

17T804-250 17T804-250 17T804-250 23T804-250 30 30


04 04
0 0
2T1612 11 2T1613 13 2T1614
13
10 10 15 15
225 225
2T1610 2T1611
BEAM 11 & 12 11-11 12-12
212 2700

18T804-250 18T804-250 10T804-250 18 18 19 19

30 04 30 04
12 2T1616 2T1617
0 0

18 18 19 19

2T1615 2T1617 225 225


2
1800 3813 2187

BEAM 13 6T804-250 14T804-250 8T804-250 13-13 14-14


2T1618
13
20 20 21 21

04 04
30 30
2T1618
0 0

20 20 21 21

2 NOS. THUS 225 225


17T804-250

2T1620 15 15-15 16-16


5613

27T804-200
2T1620 14
2T1619 12 12 12 12

30 04 30 04
BEAM 16 9
0 0

2T1619
4519 10 10 10 10
17T804-250
BEAM 15 225 225
2T1621 16 2 NOS. THUS
17-17 18-18
2T1621

BEAM 17 17T804-250 17T804-250 17T804-250 21T804-250 12T804-250


30
04
17 3T1612 3T1613 3T1622 0
13 13
24 24
225

BEAM 18 14 19-19
2700
2775

17T804-250 17T804-250 17T804-250


10T804-250 10T804-250 12T804-250

18 3T1612
13 3T1613 3T1622
13

2T1610
2T1623 2T1627
BEAM 19
4824 1009

18T804-250 17T804-250 17T804-250 4T8

19 2T1625
3T1626

2T1624
26 24
2T1626

BEAM 20

Fig. 1i: RC Details of Roof Beams


DELTEC ENGINEERING LIMITED JOB NO. SHEET 1 0F 4 Rev
P0LT 576, 14TH STREET,DDPA JOB TITLE: PROPOSED OFFICE / HALL DEVELOPMENT
ESTATE UGBORIKOKO-EFFURUN CLIENT: LIVING FAITH CHURCH OLEH
TEL:08037262708, 08069395681 SUBJECT: COLUMNS MADE BY MGK DATE 25-05-09
CHECKED BY SAI DATE 27-05-09
CALCULATION REFERENCE
COL. C1 C2 C3 C4 C5 C6
LOAD Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk
Roof
Load 18.648 4.36 28.682 5.698 5.7475 1.6695 13.144 1.1175 15.993 1.1175 32.789 7.511
S/wt 4.4297 4.4297 4.4297 4.4297 4.4297 4.4297
Total 23.078 4.36 33.112 5.698 10.177 1.6695 17.573 1.1175 20.423 1.1175 37.219 7.511
1st
Floor 91.707 27.924 179.62 62.66 20.26 2.06 82.737 23.55 48.526 1.416 180.45 64.004
S/wt 4.455 4.455 4.455 4.455 4.455 4.455
Total 119.24 32.284 217.19 62.66 34.892 3.7295 87.192 24.668 52.981 2.5335 184.9 71.515
S/wt 1.5188 1.5188 1.5188 1.5188 1.5188 1.5188
Fnd 120.76 32.284 218.71 62.66 36.411 3.7295 88.71 24.668 54.5 2.5335 186.42 71.515

COL. C7 C8 C9 C10 C11 C12


LOAD Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk
Roof
Load 38.141 6.9065 9.5016 0.85 5.5515 1.0525 12.275 2.597 13.44 0.8416 18.433 3.3602
S/wt 4.4297 4.4297 4.4297 4.4297 4.4297 4.4297
Total 42.57 6.9065 13.931 0.85 9.9812 1.0525 16.705 2.597 17.87 0.8416 22.863 3.3602
1st
Floor 302.64 128.85 56 13.363 26.716 6.799 37.762 6.0135 53.15 7.031 130.65 47.88
S/wt 4.455 4.455 4.455 4.455 4.455 4.455
Total 349.67 135.76 60.455 14.213 41.152 7.8515 58.922 8.6105 75.475 7.8726 157.97 51.24
S/wt 1.5188 1.5188 1.5188 1.5188 1.5188 1.5188
Fnd 351.18 135.76 61.974 14.213 42.671 7.8515 60.441 8.6105 76.993 7.8726 159.49 51.24

COL. C13 C14 C15 C16 C17 C18


LOAD Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk
Roof
Load 28.225 4.587 7.925 1.415 24.277 4.726 31.506 4.886 12.178 2.6178 -1.789 0.0627
S/wt 4.4297 4.4297 4.4297 4.4297 4.4297 4.4297
Total 32.655 4.587 12.355 1.415 28.707 4.726 35.936 4.886 16.608 2.6178 2.6405 0.0627
1st
Floor 142.35 58.492 57.79 13.56 162 78.69 184.31 78.318 83.318 19.42 31.686 7.6202
S/wt 4.455 4.455 4.455 4.455 4.455 4.455
Total 179.46 63.079 74.6 14.975 195.16 83.416 224.7 83.204 104.38 22.038 38.782 7.6829
S/wt 1.5188 1.5188 1.5188 1.5188 1.5188 1.5188
Fnd 180.98 63.079 76.119 14.975 196.68 83.416 226.22 83.204 105.9 22.038 40.3 7.6829

COL. C19 C20 C21 C22 C23 C24


LOAD Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk
Roof
Load 27.396 12.571 31.11 6.4789 8.5332 6.4789 -1.752 0.0737 33.455 7.6043 33.455 5.4263
S/wt 4.4297 4.4297 4.4297 4.4297 4.4297 4.4297
Total 31.825 12.571 35.54 6.4789 12.963 6.4789 2.6777 0.0737 37.885 7.6043 37.885 5.4263
1st
Floor 109.02 39.729 122.06 45.642 82.155 17.03 73.421 19.362 32.096 7.7802 101.2 40.207
S/wt 4.455 4.455 4.455 4.455 4.455 4.455
Total 145.3 52.3 162.06 52.121 99.573 23.509 80.554 19.436 74.436 15.385 143.54 45.634
S/wt 1.5188 1.5188 1.5188 1.5188 1.5188 1.5188
Fnd 146.82 52.3 163.58 52.121 101.09 23.509 82.072 19.436 75.955 15.385 145.06 45.634
COLUMNS CALCULATION SHEET 2 OF 4 REFERENCE
COL. C25 C26 C27 C28 C29 C30
LOAD Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk
Roof
Load 31.137 6.466 23.895 4.6385 31.344 4.97 11.907 2.0019 19.963 3.7202 28.894 4.35
S/wt 4.4297 4.4297 4.4297 4.4297 4.4297 4.4297
Total 35.567 6.466 28.324 4.6385 35.774 4.97 16.336 2.0019 24.393 3.7202 33.324 4.35
1st
Floor 122.98 46.129 159.84 57.882 176.5 77.428 83.28 18.97 140.1 51.119 165.58 70.048
S/wt 4.455 4.455 4.455 4.455 4.455 4.455
Total 163 52.595 192.62 62.521 216.73 82.398 104.07 20.972 168.95 54.839 203.36 74.398
S/wt 1.5188 1.5188 1.5188 1.5188 1.5188 1.5188
Fnd 164.52 52.595 194.14 62.521 218.25 82.398 105.59 20.972 170.47 54.839 204.88 74.398

COL. C31 C32 C33 C34 C35 C36


LOAD Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk
Roof
Load 9.0905 1.584 24.14 4.693 26.874 3.91 10.887 1.8104 13.872 2.3952 12.047 0.2163
S/wt 4.4297 4.4297 4.4297 4.4297 4.4297 4.4297
Total 13.52 1.584 28.57 4.693 31.304 3.91 15.316 1.8104 18.302 2.3952 16.476 0.2163
1st
Floor 63.97 16.87 164.17 60.949 152.2 64.208 76.58 10.58 59.515 11.404 47.393 5.549
S/wt 4.455 4.455 4.455 4.455 4.455 4.455
Total 81.945 18.454 197.2 65.642 187.96 68.118 96.351 12.39 82.272 13.799 68.324 5.7653
S/wt 1.5188 1.5188 1.5188 1.5188 1.5188 1.5188
Fnd 83.464 18.454 198.71 65.642 189.48 68.118 97.87 12.39 83.79 13.799 69.843 5.7653

COL. C37 C38 C39 C40 C41 C42


LOAD Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk Gk Qk
Roof
Load 17.81 4.923 17.664 4.05 27.095 5.6893 13.891 1.2093 13.144 1.1175 15.993 1.1175
S/wt 4.4297 4.4297 4.4297 4.4297 4.4297 4.4297
Total 22.239 4.923 22.094 4.05 31.525 5.6893 18.321 1.2093 17.573 1.1175 20.423 1.1175
1st
Floor 116.17 37.06 121.63 35.12 155.29 55.981 165.25 73.25 91.796 27.34 48.527 1.416
S/wt 4.455 4.455 4.455 4.455 4.455 4.455
Total 142.87 41.983 148.18 39.17 191.27 61.671 188.03 74.46 113.82 28.457 73.404 2.5335
S/wt 1.5188 1.5188 1.5188 1.5188 1.5188 1.5188
Fnd 144.39 41.983 149.7 39.17 192.79 61.671 189.54 74.46 115.34 28.457 74.923 2.5335

COL. C43 C44 C45


LOAD Gk Qk Gk Qk Gk Qk
Roof
Load 12.337 2.8451 31.038 6.7677 10.024 2.0251
S/wt 4.4297 4.4297 4.4297
Total 16.767 2.8451 35.468 6.7677 14.454 2.0251
1st
Floor 47.189 10.297 160.98 50.47 48.287 12.984
S/wt 4.455 4.455 4.455
Total 68.411 13.142 200.9 57.238 67.196 15.009
S/wt 1.5188 1.5188 1.5188
Fnd 69.929 13.142 202.42 57.238 68.715 15.009
COLUMNS CALCULATION SHEET 3 OF 4 REFERENCE
Column Type1
b l1 l2 I
4
(mm) h (mm) (mm) (mm) (mm )
Assume column size=225mm x 225mm 225 225 2E+08

Beam size =450mm x 225mm 225 450 6000 4500 2E+09

Slab size =150mm x 1000mm 1000 150 6000 4500 3E+08

Column height, lcol= 3520 mm Column load


Gk
2
Area of column, Ac= 50625 mm (kN) Qk (kN)
349.67 135.76
NEd=1.35Gk + 1.5Qk= 675.69 kN
RCD by
Bungey
Top of column Bottom of column
6th Edition
k1=Icol/Lcol =0.0457 k2=Icol/Lcol =0.2774
P254
∑(2Ibeam/Lbeam) ∑(2Islab/Lslab)

EN1992-1-1
Effective height of unbraced column, lo=l(1+k1/(1+k1))(1+k2/(1+k2))= 4471.4 mm
eq 5.16

2
Concrete design strength, fcd=fck/1.5= 13.333 N/mm EN1992-1-1
0.5
Slenderness ratio, ‫=ג‬lo/(I col/Ac) = 68.842 eq 5.14
Limiting slenderness ratio, ‫ג‬lim=10.8/(NEd/Acfcd)
0.5
= 10.795 ( <68.842 ) eq 5.13N
Hence the column is slender, the second order effect should be considered.
RCD by
A slender column should be design for an ultimate axial load ( NEd ) plus an increased moment given by
Bungey
Mt=NEdetot 6th Edition

etot=eo + ea +e2 P275

eo=0 since the end moments of the column are zero P276,P277

ea=lo/(2x200)= 11.179 mm k 1= 1 k 2= 1
Effectiive depth, d=h-(c+Ø+Ø/2)= 184 mm
2 2
e2=k1k2lo fyk/(π *103500d)= 43.602 mm
etot= 54.78 mm Mt=NEdetot= 37.014 kNm
NEd/bhfck= 0.6673
2
Mt/bh fck= 0.1625 P261
From design chart
Asfyk/bhfck=0.75 k2=0.48
P279

1 2 3 4 5 k2
2
Mt Mt/bh fck Asfyk/bhfck k2
1 37.014 0.16 0.75 0.56
0.56 24.124 0.11 0.54 0.45
0.45 20.874 0.1 0.5 0.43

2
As=0.5bhfck/fyk= 1234.8 mm and k2=0.43 P275
EN1992-1-1
Check Cl. 9.5.3(2)
Nbal=0.29fckAc=293.625kN Nud=0.567fckAc+0.87fykAs=1014.52kN NEd=675.687kN Cl. 9.5.3(3)
COLUMNS CALCULATION SHEET 4 OF 4 REFERENCE
Column Type 2
b h l1 l2 I
4
(mm) (mm) (mm) (mm) (mm )
Assume column size=225mm x 225mm 225 225 2E+08

Beam size =450mm x 225mm 225 450 4500 4500 2E+09

Slab size =150mm x 1000mm 1000 150 4500 4500 3E+08

Column height, lcol= 3520 mm Column load


Gk
2
Area of column, Ac= 50625 mm (kN) Qk (kN)
226.22 83.204
RCD by
NEd=1.35Gk + 1.5Qk= 430.21 kN Bungey

Top of column Bottom of column 6th Edition

k1=Icol/Lcol =0.04 k2=Icol/Lcol = 0.2427 P254

∑(2Ibeam/Lbeam) ∑(2Islab/Lslab)
EN1992-1-1
eq 5.16
Effective height of unbraced column, lo=l(1+k1/(1+k1))(1+k2/(1+k2))= 4369.1 mm

2
EN1992-1-1
Concrete design strength, fcd=fck/1.5= 13.333 N/mm
eq 5.14
0.5
Slenderness ratio, ‫=ג‬lo/(I col/Ac) = 67.266 eq 5.13N
0.5
Limiting slenderness ratio, ‫ג‬lim=10.8/(NEd/Acfcd) = 13.528 ( <67.27 )
Hence the column is slender, the second order effect should be considered.
A slender column should be design for an ultimate axial load ( NEd ) plus an increased moment given by RCD by
Bungey
Mt=NEdetot 6th Edition
etot=eo + ea +e2 P275, P276

eo=0 since the end moments of the column are zero P277

ea=lo/(2x200)= 11.179 mm k1= 1 k 2= 1


Effective depth, d=h-(c+Ø+Ø/2)= 184 mm
2 2
e2=k1k2lo fyk/(π *103500d)= 41.629 mm
etot= 52.807 mm Mt=NEdetot= 22.718 kNm
NEd/bhfck = 0.4249
2
Mt/bh fck = 0.0997
P261
From design chart
k2
Asfyk/bhfck =0.23 =0.7
P279

1 2 3 4 5 k2
2
Mt Mt/bh fck Asfyk/bhfck k2
1 22.718 0.1 0.23 0.7
0.7 17.939 0.08 0.16 0.68
0.68 17.564 0.08 0.16 0.68
P276

2
EN1992-1-1
As=0.16bhfck/fyk= 395.12 mm and k2=0.68
Cl. 9.5.3(2)
Check
Cl. 9.5.3(3)
See reinforcement details of Columns in fig. 1h
DELTEC ENGINEERING LIMITED JOB NO. SHEET 1 0F 4 Rev
P0LT 576, 14TH STREET,DDPA JOB TITLE: PROPOSED OFFICE / HALL DEVELOPMENT
ESTATE UGBORIKOKO-EFFURUN CLIENT: LIVING FAITH CHURCH OLEH
TEL:08037262708, 08069395681 SUBJECT: FOUNDATIONS MADE BY MGK DATE 25-05-09
CHECKED
BY SAI DATE 27-05-09
CALCULATION REFERENCE
Footing type 1
Column Load Gk (kN) Qk (kN)
C7 351.18 135.76
Assume depth of footing, h= 350 mm
2
Assume soil bearing capacity= 125 kN/m RCD by
Bungey
Serviceability Limit
2
6th Edition
S/wt of footing=0.35x25= 8.75 kN/m
P292
2
Safe soil bearing capacity=120-8.75= 116.25 kN/m
P=1.0Gk+1.0Qk= 486.94 kN
2
Required base area=486.9435/116.25= 4.1888 m
2
Provide 2.1m square base= 4.41 m
Ultimate Limit P288
Column axial load=1.35Gk+1.5Qk= 677.74 kN
2 2
Earth pressure=677.738/2.1 = 153.68 kN/m
Shear
At column face,
Exposure condition class XC-2, Cover to reinforcement, c= 40 mm EN1992-1-1
Assume bar size, Ø= 12 mm eq 6.32
Effective depth, deff=0.5(dy+dz)=h-c-Ø= 298 mm
Column perimeter, u=4x225= 900 mm P289
Max. shear resistance, VRd,max=0.5ud(0.6(1-fck/250))fck/1.5= 986.98 kN
VRd,max=986.976kN>N=677.7377kN ok
EN1992-1-1

Punching shear 2d from column face Cl. 6.4.2(1)

Critical Perimeter=col peri. + 4πd 4645.3 mm


2 2 2 EN1992-1-1
Area within perimeter=(b+4d) -(4-π)(2d) = 1.7031 m
eq 6.48,eq
Punching shear force, VEd,red=153.682(4.41-1.703114)= 416 kN 6.49
2 eq 6.50
Punching shear stress, vEd=VEd,red/(peri.xd)= 0.3005 N/mm
1/3
Cl. 6.4.4(1)
Shear stress of a concrete section without shear reinforcement, vRdc=0.12k(100fckAs/bd)
eq 6.50
0.5
k=(1+(200/d) )= 1.8192
3 2
As=(vEd/(0.12k)) (bd/(100fck))= 388.67 mm RCD by
Bungey
Shear at 1.0d from column face
6th Edition
x=0.5(L-bcol)-1.0d= 0.6395 P294
Design shear force, VEd=153.682x0.6395= 98.28 kN/m run eq 6.50
2
Shear stress, vEd=VEd/bd= 0.3298 N/mm
3 2
RCD by
As=(vEd/(0.12k)) (bd/(100fck))= 513.71 mm Bungey
Bending Reinforcement 6th Edition

2
eq.4.7, 4.8
M=153.682(2.1-0.225) x0.125= 67.536 kNm
2
eq.4.9
K=M/fckbd = 0.038
FOUNDATIONS CALCULATION SHEET 2 OF 4 REFERENCE
Footing type 2
Column Load Gk (kN) Qk (kN)
C16 226.22 83.204
Assume depth of footing, h= 300 mm
2
Assume soil bearing capacity= 125 kN/m

RCD by
Serviceability Limit Bungey
2 6th Edition
S/wt of footing=0.3x25= 7.5 kN/m
2 P292
Safe soil bearing capacity=120-7.5= 117.5 kN/m
P=1.0Gk+1.0Qk= 309.43 kN
2
Required base area=309.4255/117.5= 2.6334 m
2
Provide 1.65m square base= 2.7225 m

Ultimate Limit
P288
Column axial load, N=1.35Gk+1.5Qk= 430.21 kN
2 2
Earth pressure=430.205/1.65 = 158.02 kN/m
Shear
At column face,
Cover to reinforcement, c= 40 mm EN1992-1-1
Assume bar size, Ø= 12 mm eq 6.32
Effective depth, deff.=0.5(dy-dz)=h-c-Ø= 248 mm
Column perimeter, u=4x225= 900 mm P289
Maximum shear resistance, VRd,max=0.5ud(0.6(1-fck/250))fck/1.5= 821.38 kN
VRd,max=821.376kN>N=430.205kN ok
EN1992-1-1
Punching shear 2d from column face Cl. 6.4.2(1)
Critical Perimeter=col peri. + 4πd= 4016.9 mm
2 2 2
Area within perimeter=(b+4d) -(4-π)(2d) = 1.27 m EN1992-1-1
Punching shear force, VEd,red=158.0184(2.7225-1.27007)= 229.52 kN eq 6.48,
eq 6.49
2
Punching shear stress, vEd=VEd,red/(peri.xd)= 0.2304 N/mm eq 6.50

Shear stress of a concrete section without shear reinforcement, vRdc=0.12k(100fckAs/bd)


1/3 Cl. 6.4.4(1)
0.5 eq 6.50
k=(1+(200/d) )= 1.898
RCD by
3 2
As=(vEd/(0.12k)) (bd/(100fck))= 128.36 mm Bungey
6th Edition
Shear at 1.0d from column face
P294
x=0.5(L-bcol)-1.0d= 0.4645
Design shear force, VEd=158.0184x0.4645= 73.4 kN/m run
eq 6.50
2
Shear stress, vEd=VEd/bd= 0.296 N/mm
3 2
As=(vEd/(0.12k)) (bd/(100fck))= 272.08 mm
RCD by
Bungey
Bending Reinforcement
6th Edition
2
M=148.8599(1.65-0.225) x0.125= 40.11 kNm eq.4.7, 4.8
2
k=M/fckbd = 0.0326 eq.4.9
FOUNDATIONS CALCULATION SHEET 3 OF 4 REFERENCE
Footing type 3
Column Load Gk (kN) Qk (kN)
C1 120.76 32.284
Assume depth of footing, h= 300 mm
2
Assume soil bearing capacity= 125 kN/m

Serviceability Limit
2
S/wt of footing=0.25x25= 7.5 kN/m
2
Safe soil bearing capacity=125-7.5= 117.5 kN/m
P=1.0Gk+1.0Qk= 153.04 kN
2
Required base area=153.0415/117.5= 1.3025 m
2
Provide 1.2m square base= 1.44 m

Ultimate Limit
Column axial load=1.35Gk+1.5Qk= 211.45 kN
2 2
Earth pressure=211.4486/1.2 = 146.84 kN/m
Shear
At column face,
Cover to reinforcement, c= 40 mm
Assume bar size, Ø= 12 mm
Effective depth, deff.=0.5(dy+dz)=h-c-Ø= 254 mm
Column perimeter, u=4x225= 900 mm
Maximum shear resistance, VRd,max=0.5ud(0.6(1-fck/250))fck/1.5= 841.25 kN
VRd,max=841.248kN>N=211.4486kN ok

Punching shear 2d from column face


Critical Perimeter=col peri. + 4πd 4092.3 mm
2 2 2
Area within perimeter=(b+4d) -(4-π)(2d) = 1.3187 m
Punching shear force, VEd=146.839(1.44-1.318662)= 17.817 kN
2
Punching shear stress, vEd=VEd/(peri.xd)= 0.0171 N/mm
1/3
Shear stress of a concrete section without shear reinforcement, vRdc=0.12k(100fckAs/bd)
0.5 RCD by
k=(1+(200/d) )= 1.8874 Bungey
3 2
As=(vEd/(0.12k)) (bd/(100fck))= 0.0551 mm 6th Edition

Shear at 1.0d from column face P294

x=0.5(L-bcol)-1.0d= 0.2335
eq 6.50
Design shear force, VEd=146.8393x0.2335= 34.287 kN/m run
2
Shear stress, vEd=VEd/bd= 0.135 N/mm
3 2
As=(vEd/(0.12k)) (bd/(100fck))= 26.89 mm

Bending Reinforcement RCD by


2
Bungey
M=146.8393(1.2-0.225) x0.125= 17.449 kNm
2
6th Edition
k=M/fckbd = 0.0135
Tb. 6.11
0.5
la=0.5+(0.25-k/1.134) = 0.95 Tb. 6.8
2
Asb=M/0.95fyklad 185.65 mm
2
Mean tensile strength of concrete, fctm= 2.2 N/mm
FOUNDATIONS CALCULATION SHEET 4 OF 4 REFERENCE
Footing type 4 SERVICE ULTIMATE
Column Load Gk (kN) Qk (kN) kN kN
C18 40.3 7.683 47.983 65.93
C19 146.82 52.3 199.12 276.66
Total 247.1 342.59
Serviceability Limit
Deteermination of centroid of load
RCD by MB&H
Distance between column C18 & C19, dc= 1.013 m
6th Edition
Taking moment about the action of C19
P293
X=(47.9833x1.013)/247.1036= 0.1967 m
Edge clearance, ec= 0.4 m
Total length of base, L=2(dc-X+0.40) 2.4326 m
Length of base provided, L= 2.45 m
Column axial load, N=1.0Gk+1.0Qk= 247.1
Assume depth of footing, h= 350 mm
2
Assume soil bearing capacity= 125 kN/m
2
S/wt of footing=0.35x25= 8.75 kN/m
2
Safe soil bearing capacity p=125-8.75= 116.25 kN/m
Required base width, B=N/pL 0.8676 m
Width of base provided, B= 1 m
2
Provide 2.45m x 1m rectangle base= 2.45 m
Ultimate Limit
Column axial load, NEd=1.35Gk+1.5Qk= 342.59 kN
2
Earth pressure, p=NEd/A= 139.83 kN/m
65.93 276.66

0.4 1.013 1.037

139.8316x1= 139.83 kN/m

V 55.933 9.9973 131.65 145.01


M 11.187 -15.99 77.967
Shear
At column face,
Cover to reinforcement, c= 40 mm
Assume bar size, Ø= 12 mm
Mean effective depth, deff.=0.5(dy+dz)=h-c-Ø= 298 mm
Column perimeter, u=4x225= 900 mm
Max. shear resistance, VRd,max=0.5ud(0.6(1-fck/250))fck/1.5= 986.98 kN
VRd,max=986.976kN>NEd=276.6574kN ok
Shear at 1.0d from column face
1.0d from column face 298 mm
Design shear force, VEd=145.0053x(1.037-0.298)/1.037= 103.34 kN
2
Shear stress, vEd=VEd/bd= 0.3853 N/mm
0.5
k=(1+(200/d) )= 1.8192 RCD by MB&H
3 2
As=(vEd/(0.12k)) (bd/(100fck))= 737.21 mm 6th Edition
Bending Reinforcement eq.4.7, 4.8
Design Moment, M= 77.967 kNm eq.4.9
Effective depth, d=h-c-Ø/2= 304
2
k=M/fckbd = 1050
0.0469
1050

10
50
14T1201-150BB 14T1 150BT
201-
400 2050 04
50
0
8T1206-125BB

50 16T1207-150BT
0
10
01
50

FT 4
2 NOS. THUS

35
00
FT 1
4T1609 4T1609

45 45
0 0
FGL 2x
10 10
FGL
5T
00 5T 00
8T1602 2x4T1602
80
80 3-
01 3- 17
17 06
5
5
35
0 30
0
01 01 01 01 01 01 01 01 01 01 01 01 01 01
07 07 07 07 07 07 07 07 07 07 07 07 07 07 07 07
2100 2450

01-01 04-04

825
825

17 17 600
35 T8 T8 600
20 03 03
- - 9T1205-200BB
17 8T1608 17 4T1608
82 6T1204-200BB
5 5
LI LI 5 60
N N 9T1205-200BT 0 6T1204-200BT
KS
05 KS 06

60
82 0 03
5 02

FT 3
STARTER BARS STARTER BARS FT 2 (22 NO. THUS)
(18 NO. THUS)
COL 1 COL 2
(44 NO. THUS)

45 45
0 0
FGL 5T 10
FGL 5T
10
225 225 80 00 80
00
08 08 08 3-
4T1602 3-
4T1602
08 08
17 17
03 05 5 04 5
22 08 08 22 03
5 5
30 30
08 08 08 08 08 0 0

05-05 06-06 05 05 05 05 05 05 05 05 05 04 04 04 04 04 04
1650 1200

02-02 03-03

Fig. 1j: RC Details of Columns & Footings


A B C
6000 4000

BRC MESH/TYPE A193 TOP 15 25 12


0 5

45
0 FGL

Hollow Block
90
150mm thick conc. slab
22
0 50mm thick conc. blinding
5
200mm thick hard core filling
82

337.5 337.5 675 675

4824
01-01
SCALE 1:25

PLAN
SCALE 1:00

Fig. 1k: Ground Floor Foundation Layout


3.0 BAR BENDING SCHEDULE

Job Drawing No. Sheet Rev

DELTEC No. No.

Engineering Limited RC 178520


BENDING SCHEDULE Revision A B C
FOOTINGS Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of
of in number each code with BS 4466
Type Size No. groups each bar
A B C D E/R
mm mm mm mm mm mm
FT 1
T1201 1 28 28 2200 35 2000
T1602 1 8 8 2180 34 2080
T0803 1 5 5 676 51 145 145

FT2
T1205 18 18 324 1750 35 1550
T1602 18 4 72 2180 34 2080
T803 18 5 90 676 51 145 145

FT3
T1204 22 12 264 1300 35 1100
T1602 22 4 88 2180 34 2080
T803 22 5 110 676 51 145 145

FT4
T1207 2 8 16 1100 35 900
T1602 2 8 16 2180 34 2080
T803 2 10 20 676 51 145 145

FT= Footing Type


R= Round mild steel reinforcement BS 4449
T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.
Job Drawing No. Sheet Rev

DELTEC No. No.

Engineering Limited RC 178520


BENDING SCHEDULE Revision A B C
COLUMNS Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of
of in number each code with BS 4466
Type Size No. groups each bar
A B C D E/R
mm mm mm mm mm mm
COL 1
T1608 1 8 8 4240 20 4240
T1609 1 4 4 3560 34 200 3400
T0810 1 36 36 796 51 175 175

COL 2
T1608 44 4 176 4240 20 4240
T1609 44 4 176 3560 34 200 3400
T0810 44 36 1584 796 51 175 175

COL= Column Type


R= Round mild steel reinforcement BS 4449
T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.
Job Drawing No. Sheet Rev

DELTEC
No. No.

Engineering Limited RC 178520


BENDING SCHEDULE Revision A B C
STAIRCASE Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of
of in number each code with BS 4466
Type Size No. groups each bar
A B C D E/R
mm mm mm mm mm mm

T1201 1 11 11 1795 99
T1202 1 11 11 3710 62 3440 300
T1203 1 11 11 2085 45 1175 900 50
T1204 1 5 5 1780 45 740 1090 50
T1005 1 43 43 1100 20 1100
T1206 1 8 8 2575 20 2575
T1007 1 6 6 2575 20 2575
T1208 1 5 5 1790 45 550 1230 50
T1209 1 11 11 2205 45 710 1445 50
T1210 1 11 11 1500 62 1000 530
T1211 1 9 9 3940 62 3375 595
T1212 1 9 9 2225 45 585 1620 50
T1213 1 9 9 2595 45 1100 1475 50
T1014 2 5 10 1735 20 1735

R= Round mild steel reinforcement BS 4449


T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.

DELTEC
Job Drawing No. Sheet Rev
No. No.
Engineering Limited RC 178520
BENDING SCHEDULE Revision A B C
FIRST FLOOR BEAMS Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of
of in number each code with BS 4466
Type Size No. groups each bar
A B C D E/R
mm mm mm mm mm mm
BEAM 1
T2001 1 2 2 10400 35 10180
T2002 1 2 2 4500 20 4500
T2003 1 2 2 2500 20 2500
T804 1 48 48 1245 51 400 175
T1605 1 3 3 10380 20 10180

BEAM 2
&9 T1206 2 5 10 3005 35 2805
T804 2 12 24 1245 51 400 175

BEAM 3
T2001 1 3 3 10400 35 10180
T2507 1 3 3 4500 20 4500
T2003 1 3 3 2500 20 2500
T804 1 63 63 1245 51 400 175
T1605 1 2 2 10380 20 10180

BEAM 4 `
T1603 1 4 4 6205 35 6005
T804 1 18 18 1245 51 400 175

BEAM 5
&9 T1609 6 3 18 6380 20 6180
T2010 6 3 18 5040 35 5040
T2511 6 3 18 6540 35 6180
T804 6 29 174 1245 51 400 175

BEAM 6
T1612 2 4 8 8180 35 7980
T2013 2 3 6 3590 20 3590
T804 2 35 70 1245 51 400 175

BEAM 7
T1615 1 4 4 7205 35 7005
T804 1 26 26 1245 51 400 175

R= Round mild steel reinforcement BS 4449


T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.

Job Drawing No. Sheet Rev

DELTEC No. No.

Engineering Limited RC 178520


BENDING SCHEDULE Revision A B C
FIRST FLOOR BEAMS Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of
of in number each code with BS 4466
Type Size
No. groups each bar
A B C D E/R
mm mm mm mm mm mm
BEAM 8
T2010 1 3 3 5040 20 5040
T1609 1 7 7 6380 20 6180
T804 1 29 29 1245 51 400 175

BEAM 10
T2016 1 3 3 11500 20 11500
T1617 1 1 1 5550 20 5550
T1618 1 3 3 3000 20 3000
T1619 1 3 3 11500 20 11500
T1620 2 3 6 3290 38 1500 370 1500
T804 1 48 48 1245 51 400 175

BEAM 11 T1624 1 2 2 5690 34 5590


T1625 1 2 2 11500 20 11500
T1626 1 3 3 7190 34 7090
T1621 1 3 3 10190 34 10090 `
T1622 1 3 3 11590 34 11490
T2023 1 2 2 4200 20 4200 4200
T804 1 92 92 1245 51 400 175
BEAM 12
T1621 1 4 4 10190 34 10090
T1622 1 2 2 11590 34 11490
T1623 1 4 4 4200 20 4200
T1624 1 3 3 5690 34 5590 `
T1625 1 2 2 11500 20 11500
T1626 1 2 2 7190 34 7090
T2027 1 3 3 2500 20 2500
T804 1 92 92 1245 51 400 175

BEAM 13
T1628 1 5 5 5905 34 5705
T1629 1 3 3 7280 34 5705
T1631 1 2 2 8390 34 8190
T804 1 55 55 1245 51 400 175

R= Round mild steel reinforcement BS 4449


T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.

Job Drawing No. Sheet Rev

DELTEC No. No.

Engineering Limited RC 178520


BENDING SCHEDULE Revision A B C
FIRST FLOOR BEAMS Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of
of in number each code with BS 4466
Type Size No. groups each bar
A B C D E/R
mm mm mm mm mm mm
BEAM 14
& 21 T1632 2 4 8 8180 35 7980
T804 2 29 58 1245 51 400 175

BEAM 15
T2033 1 2 2 6015 35 5795
T1634 1 2 2 5995 35 5795
T804 1 38 38 1245 51 400 175

BEAM 16
T2035 1 4 4 4792 35 4792
T1636 1 2 2 3175 20 3175
T804 1 17 17 1245 51 400 175

BEAM 17
T1637 1 4 4 4900 35 4700
T1638 1 2 2 3820 38 3620 `
T804 1 17 17 1245 51 400 175

BEAM 18
&19 T1621 2 3 6 10190 34 10090
T1639 2 2 4 5585 20 5585
T1640 2 3 6 8775 34 8675
T1624 2 2 4 5690 34 5590 `
T1641 2 3 6 2000 20 2000
T1642 2 2 4 9890 34 9790
T1643 2 2 4 11200 20 11200
T804 2 84 168 1245 51 400 175

BEAM 20
T1645 1 3 3 10715 34 10615
T1646 1 2 2 5560 34 5460
T1647 1 2 2 6015 34 5915
T1648 1 2 2 6700 20 6700
T1649 1 2 2 6585 34 6485
T804 1 55 55 1245 51 400 175

R= Round mild steel reinforcement BS 4449


T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.

Job Drawing No. Sheet Rev

DELTEC No. No.

Engineering Limited RC 178520


BENDING SCHEDULE Revision A B C
FIRST FLOOR SLAB Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of in number of each code with BS 4466
Type Size No. groups each bar
A B C D E/R
mm mm mm mm mm mm

T1201 1 162 162 6000 20 6000


T1202 1 29 29 5750 20 5750
T1003 1 235 235 6600 20 6600
T1204 1 29 29 8775 20 8775
T1205 1 29 29 4600 20 4600
T1006 1 18 18 7775 20 7775
T1207 1 8 8 6570 20 6570
T1008 1 129 129 1655 20 1655
T1009 1 28 28 11500 20 11500
T1010 1 8 8 1450 20 1450
T1211 1 328 328 3000 20 3000
T1212 1 366 366 2040 38 1200 100 800
T1213 1 186 186 3650 20 3650
T1014 1 10 10 6000 20 6000
T1015 1 10 10 8775 20 8775
T1016 1 17 17 6570 20 6570
T1217 1 38 38 9500 20 9500
T1218 1 29 29 9800 20 9800
T1219 1 29 29 4275 20 4275
T1220 1 26 26 6660 20 6660
T1021 1 14 14 5775 20 5775
T1022 1 21 21 2450 20 2450
T1023 2 8 16 3495 20 3495
T1024 1 11 11 6000 20 6000
5000- 5000-
T1225 2 32 64 1600 20 1600
T1026 2 6 12 6500 20 6500
T1027 1 11 11 4275 20 4275
T1028 1 11 11 9800 20 9800
T1029 1 11 11 9500 20 9500
T1030 1 15 15 6000 20 6000

R= Round mild steel reinforcement BS 4449


T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.
Job Drawing No. Sheet Rev

DELTEC No. No.

Engineering Limited RC 178520


BENDING SCHEDULE Revision A B C
ROOF BEAMS Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of
of in number each code with BS 4466
Type Size No. groups each bar
A B C D E/R
mm mm mm mm mm mm
BEAM 1
&3 T1601 2 5 10 10280 35 10180
T804 2 38 76 946 51 250 175

BEAM 2
T1602 2 4 8 3005 35 2805
T804 2 10 20 946 51 250 175

BEAM 4
T1603 1 4 4 5205 35 5005
T804 1 18 18 946 51 250 175

BEAM 5
T1605 5 4 20 8180 35 7980
T804 5 30 150 946 51 250 175

BEAM 6
T1605 2 4 8 8180 35 7980
T804 2 29 58 946 51 250 175

BEAM 7
T1607 1 4 4 7205 35 7205
T804 1 25 25 946 51 250 175

BEAM 8
&9 T1607 2 5 10 6380 35 6180
T804 2 23 46 946 51 250 175

BEAM 10
T1609 1 3 3 11500 20 11500
T1610 1 4 4 3170 38 1515 220 1515
T804 1 46 46 946 51 250 175

R= Round mild steel reinforcement BS 4449


T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.
Job Drawing No. Sheet Rev

DELTEC No. No.

Engineering Limited RC 178520


BENDING SCHEDULE Revision A B C
ROOF BEAMS Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of
of in number each code with BS 4466
Type Size No. groups each bar
A B C D E/R
mm mm mm mm mm mm
BEAM 11
& 12 T1610 2 2 4 10390 34 10290
T1611 2 2 4 10580 34 10580
T1612 2 2 4 5690 34 5690
T1613 2 2 4 8525 20 8525
T1614 2 4 8 7190 34 7090
T804 2 40 80 946 51 250 175

BEAM 13
T1615 1 2 2 5590 34 5490
T1616 1 2 2 7000 34 6900
T1617 1 4 4 7175 34 7075
T804 1 46 46 946 51 250 175

BEAM 14
T1618 2 4 8 8180 35 7980
T804 2 28 56 946 51 250 175

BEAM 15
T1619 2 2 4 5995 35 5795
T804 2 27 54 946 51 250 175

BEAM 16
T1619 1 4 4 4795 35 4595
T804 1 17 17 946 51 250 175

BEAM 17
T1621 1 4 4 4900 35 4700
T804 1 17 17 946 51 250 175

R= Round mild steel reinforcement BS 4449


T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.
Job Drawing No. Sheet Rev

DELTEC No. No.

Engineering Limited RC 178520


BENDING SCHEDULE Revision A B C
ROOF BEAMS Made by MGK
Chd by/Date SAI
Location Bar Mark Number Number Total Length Shape All bending dimensions are in accordance
of
of in number each code with BS 4466
Type Size No. groups each bar
A B C D E/R
mm mm mm mm mm mm
BEAM
18
& 19 T1610 2 2 4 10390 34 10290
T1611 2 2 4 10580 34 10580
T1612 2 2 4 5690 34 5690
T1613 2 2 4 8525 20 8525
T1622 2 3 6 9890 34 9790
T1623 2 2 4 5585 20 5585
T1627 2 2 4 8775 34 8675
T804 1 167 167 946 51 250 175

BEAM
20
T1624 1 2 2 6030 34 5930
T1625 1 2 2 6215 34 6115
T1626 1 5 5 9750 34 9650
T804 1 56 56 946 51 250 175

R= Round mild steel reinforcement BS 4449


T=High yield reinforcement BS 4449 and BS 4461 Type 1 or Type 2 ref CP110 Appendix E
X= General abbrevations for other than R and Y.

4.0 ESTIMATION OF QUANTITIES AND COSTING


41 Take off Sheet

Item 1- Strip footing

Excavation, LxBxD L=230.493m


B=0.675m
D=1.4m
3
V=217.816m

Concrete
Blinding LxBxD L=230.493m
B=0.675m
D=0.05m
3
V=7.78x1.2=9.33m

Strip LxBxD L=230.493m


B=0.675m
D=0.225m
3
V=35.006x1.2=42.0m

2- Pad footing
Footing Type 1

Excavation, LxBxD
L=2.1m L=0.7125m
B=0.7125m B=0.7125m
D=1.35m D=1.35
3 3
V=2.019m V=0.68534x2=1.37067m
3
VT=3.3906x1.2=4.06872m

Concrete

Blinding LxBxD L=2.1m


B=2.1m
D=0.05m
3
V=0.2205m

Pad LxBxD L=2.1m


B=2.1m
D=0.35m
3
V=1.5435m

Item Column LxBxD L=0.225m


B=0.225m
D=1.075m
3
V=0.05442m
Reinforcement
16mm Starters bar, LxAx7.7 L=17.440
A=0.000201m2
W=0.027 tonnes

8mm Links, LxAx7.7 L=3.380


A=0.000201 m2
W=0.52 tonnes

Block wall LxH L=230.493m


H=1.075m
2
A=247.78m

4.2 Bill of Engineering Measurement and Evaluation