Está en la página 1de 4

Power Plant Operator Resume Sample

Adam Rothman
1503 Sixth Avenue
Any Village, USA 33333
888-888-8888
arothman@sample~resume.com

PROFESSIONAL SUMMARY
Successful Power Plant Operator seeking new position, based on five years of experience
operating and troubleshooting the equipment used to produce electrical power.

CAREER EXPERIENCE/RELATED ACCOMPLISHMENTS


Citywide Power Plant, Center City, USA (2005-2010)
 Insured that plant operated properly, safely, and efficiently
 Fixed problems as quickly as possible
 Used computers, tools, and electrical devices to manage and operate the equipment used to
generate power
 Worked with management to insure all details were covered
EDUCATION/DEVELOPMENT
Any Town University, USA, B.A. in Electronics Technology

RECOGNITION
Technology Professionals of America: Member of the Year (2007)

Curriculum Vitae

Candidate's Name
Father&#Street Address ;s Name : Ehsan-ul-Haq(Late)

Date of Birth : Dec. Street Address , 1976

Postal Address : Sector Street Address -A House No. A-752


North KARACHI
Phone : PHONE NUMBER AVAILABLE & PHONE NUMBER AVAILABLE
Nationality : Pakistani
E-mail : EMAIL AVAILABLE
: EMAIL AVAILABLE

Objective
To excel an institution that boots professional excellence and
refines extensive technical and communication skills.

Education
03 YRS.DIPLOMA OF
ASSOCIATE ENGINEER
(MECHANICAL) 1995 1st Div
WAPDA Public School Guddu
Matriculation 1990
1st Div

Special Training
I have passed the Special Training of Basic Operator Course with
"First" Position from Training Center WAPDA TPS Guddu. Pakistan.
I have passed RECTIFYING TRANSFORMER Course/Training from
ABB Company Dubai, UAE in 2008.
I have attended Gas Turbine combined cycle units Technical
training at Nanshan Power Plant, CHINA, from May 2009 to June 2009,
specified by Shenzhen Nanshan Power Co., Ltd, CHINA.

PRESENTLY WORKING:

Presently working as "CONTROL ROOM OPERATOR '' at


Bin Qasim Power Station, 560MW Combined Cycle Power Plant, KARACHI ELECTRIC
SUPPLY COMPANY KARACHI, PAKISTAN(KESC), 120MW x 3 FRAME 9E Gas Turbines
(Mark-VI e) with 200MW Steam Turbine of Harbin Electric China.(Emerson
Ovation Control). Steam Turbine has sea water cooling system.

Power Plant Experience

> GULF EXPERIENCE:


* As a POWER PLANT OPERATOR with Dubai Aluminium Company Limited,
Dubai,
UAE. Dubai Aluminium Company has an aluminium smelter & Power Plant
with an installed capacity of 2500MW. (Worked from July 2007 to
April
2009)

Responsible for operation of:

> 1095 MW Combine Cycle Plant (6 X Frame 9E GE gas turbines-Mark-V


Control, 6 X CMI HRSGs, & 3 X Alstom steam turbines-ALSPA P320
Control).
> 495MW Combine Cycle Plant (2 X GT13E2 ALSTOM gas turbines-
EGATROL Control, 2 X CMI HRSG & ALSTOM steam turbine-ALSPA P320
Control).
> 170MW Gas turbine 13E2 with Co-generation HRSG.
> Responsible of remote operation 132 KV, 33 KV & 11 KV switchgear
(GE- SCADA).
> Responsible for ABB-SCADA controls for rectifier transformers
supplying pot lines 4, 5, 6, 7 & 9 and console controls for
rectifier transformers supplying pot lines 1, 2, & 3
> Deaeration system for All WHBs (Two Dearators interchangeable)
> Instrument air supply system ( 4 centrifugal compressor with
chiller dryers)

JOB DESCRIPTION
> Operate the power generation equipment to enable the safe and
efficient supply of electric power to satisfy the requirements
of the DUBAL site and 3rd party customers.
> Operate the compressed air plant to enable the continuous
generation of Compressed air and the HRSG for uninterrupted
supply of steam to satisfy the DESAL operation needs.
> Ensured that all department personnel strictly adhere to all
safety policies, practices and procedures to minimise the risk
of accidents and injuries.
> Carry out high voltage switching from the control room, as
instructed by the Shift Manager.
> Carries out routine operational checks using data processor,
recorders etc. to evaluate performance of GT, ST & HRSG and
makes adjustment to maximise the efficiency of the plant.
> Monitors gas/distillate fuel and compressed air flow and
pressure, fire control panel and initiate actions according to
established requirements.

> More than 14 years experience of operation of Steam Turbine and Gas
Turbines (combined cycle) Power Plants.

> 03 years Experience in Operation of Steam turbine (110 MW) and


Boiler (375 Ton) of SKODA (CZECHOSLOVAKIA) located at Wapda
Thermal Power Station Guddu Pakistan. (1996 to 1999).

> 08 years Experience in Operation & Maintenance of 415 MW Combined


Cycle Power Plant (V.94.2) of SIEMENS (GERMANY) located at Wapda
Thermal Power Station Guddu Pakistan. (2000 to June 2007)

> Additional Experience of Operation of Switch yard (132 & 500 KV),
air compressors, Cooling Tower, Pumps and also of Control Room
Operation of Combined Cycle Power Plant.

SUMMARY.

I have worked at Wapda Thermal Power Station Guddu Pakistan. I was


working at 415 MW Combined Cycle Power Plant (V.94.2 SIEMENS
GERMANY) on the post of Sub-Engineer and my duty was in the Control
Room of this unit. I was working as Power Operator with Dubai
Aluminium Company Limited(DUBAL) on Frame-9E Gas turbines with
Steam Turbine (combined cycle power plant) made by GE ALSTOM and on
13E2 Gas Turbine made by Alstom, located at DUBAI,UAE. Presently I
am working as Control Room Operator at Karachi Electric Supply
Company Karachi, Pakistan, Bin Qasim Power Station 560MW Combined
cycle power plant.

Computer skill

ENVIRONMENTS: Windows/Win2000, XP, MS Office


I can read, write and speak English
easily.

También podría gustarte