METRADOS DEL MES:

DESCRIPCION UNIDAD METRADO


ENSAYO A LA RESISTENCIA DEL CONCRETO (PRUB. COMPR) Und 4
CORTE Y NIVELACIÓN DE TERRENO, MANUAL m3 137.89
EXCAVACIONES DE ZANJAS PARA CIMIENTOS HASTA 0.60M. m3 46.64
EXCAVACIONES DE ZANJAS PARA CIMIENTOS HASTA 2.00 M. m3 128.16
RELLENO Y COMPACTADO DE ZANJAS CON EQUIPO LIVIANO m3 75.45
ELIMINACIÓN DE MATERIAL EXCEDENTE HASTA 30M m3 35.28
CONCRETO EN SOLADO DE 4¨C:H=1:10 +25% P.G m3 6.41
CONCRETO EN SOLADO DE 2¨C:H=1:12 m3 6.66
CIMIENTOS CORRIDOS MEZCLA C:H= 1:10 +30% DE PIEDRA GRANDE
m3 8.17
CONCRETO EN ZAPATAS F"c=210 kg/cm2 m3 51.26
ACERO PARA ZAPATAS F"y=4 200kg/cm2 GRADO 60 kg 3200.16
ACERO EN VIGA DE CIMENTACIÓN Fy=4200kg/cm2 GRADO 60 kg 2514.69
CONCRETO EN COLUMNAS F"c= 210kg/cm2 m3 1.85
ACERO EN COLUMNAS Fy=4200kg/cm2 GRADO 60 kg 3862.96
ACERO EN VIGAS Fy=4200kg/cm2 GRADO 60 kg 482.91
MURO DE CABEZA, LADRILLO KING KONG 18 HUECOS DE ARCILLAm2 68.58
MURO DE SOGA, LADRILLO KING KONG 18 HUECOS DE ARCILLA m2 79.43
FLETE GLP 0.29
TOTAL COSTO DIRECTO
GASTOS GENERALES(10%)
UTILIDADES(10%)
SUB TOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V(18%)
TOTAL

2
DESCRIPCION UNIDAD METRADO
LINEA DE ADUCCION Y RED DE DISTRIBUCION DE AGUA POTABLE
TUBERIAS Y ACCESORIOS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL m 3282.30
TRAZO,NIVELES Y REPLANTEO DE ZANJAS m 3282.30
MOVIMIENTOS DE TIERRAS
REFINE.NIVEL Y FONDOS PARA TUBERIAS m 3282.30
PREPARACION Y COLOCACION DE CAMA DE APOYO E=O.10 m m 3282.30
PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO m 3282.30
SEGUNDO RELLENO MATERIAL PROPIO HASTA H=1.20M m 3282.30
SUMINISTRO DE INSTALACION DE TUBERIAS
TUBERIA PVC SAP CLASE 10 NORMA ISO 4422 m 1955.85
TUBERIA SP NTP 399,002 C-10 DN=1" m 1326.45
SUMINISTRO E INSTALACION DE ACCESORIOS
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63mm und 8.00
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63mm und 8.00
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63mm und 6.00
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63mm und 4.00
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63mm und 20.00
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63mm und 18.00
TEE DE PVC UF 4422 PARA RED DE AGUA POTABLE und 37.00
TEE DE PVC SP NTP 399,002 C-10 und 1.00
TAPON DE PVC UF4422 PARA RED DE AGUA und 1.00
TAPON DE PVC SP NTP und 12.00
TRANSICION PVC SP NTP und 14.00
REDUCCION DE PVC SP NTP und 14.00
REDUCCION DE PVC SP NTP und 14.00
INSTALACIONES DOMICILIARIAS
CONEXIONES DOMICILIARIA
EXCAVACION MAQUINAS) m 1086.80
EXCAVACION MANUAL m 161.20
ROTURA DE PAVIMENTOS ml 83.20
REPOSICION DE PAVIMENTOS ml 83.20
CONEXIONES DOMICILIARIAS DE AGUA und 240.00
RELLENO Y COMP, MAT, PROPIO EN ZANJAS m3 711.36
ELIMINACION DE MATERIAL EXCEDENTE m3 10.40
TOTAL COSTO DIRECTO
GASTOS GENERALES(10%)
UTILIDADES(8%)
SUB TOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V
TOTAL
ANTERIOR PRESENTE ACUMULADO
PRECIO UNIPRES.BASE metrado costo metrado costo metrado costo
75 300 4 300
38.7 5336.34 137.89 5336.34
45.05 2101.13 46.64 2101.13
31.61 4051.14 128.16 128.16 4051.14
282.83 21339.52 75.45 75.45 21339.52
15.69 553.54 35.28 553.54
65.25 418.25 6.41 6.41 418.25
65.25 434.57 6.66 6.66 434.57
382.65 3126.25 8.17 8.17 3126.25
507.99 26039.57 51.26 51.26 26039.57
5.11 16352.82 3200.16 3200.16 16352.82
5.41 13604.47 2514.69 2514.69 13604.47
574.12 1062.12 1.85 1.85 1062.12
5.75 22212.02 3862.96 3862.96 22212.02
5.75 2776.72 482.91 482.91 2776.72
118.68 8139.07 68.58 68.58 8139.07
73.17 5811.89 79.43 79.43 5811.89
66871.26 19392.67 0.29 0.29 19392.67
DIRECTO 153052.09
ALES(10%) 15305.21
S(10%) 15305.21
TAL 183662.51 183662.51
ELACION 0.99302
TAL 182380.54
%) 32828.49786
215209.0416

ANTERIOR PRESENTE ACUMULADO


PRECIO UNIPRES.BASE metrado costo metrado costo metrado costo
175042.10 320845.37
115508.31 236072.71
3676.18 3741.82
0.36 1181.63 500.00 180
0.76 2494.55 500.00 380
77199.70 181136.60 0
1.01 3315.12 363.00 366.63
7.91 25962.99 498.00 3939.18
11.77 38632.67 498.00 5861.46
2.83 9288.91 498.00 1409.34
29819.81 29819.81 0
10.16 19871.44 151.82 1542.4912
7.5 9948.38 218.93 1641.975
4812.63 4751.47 0
29.18 233.44 2.00 58.36
19.38 155.04 2.00 38.76
28.47 170.82 2.00 56.94
18.98 75.92 2.00 37.96
28.47 569.40 5.00 142.35
18.98 341.64 8.00 151.84
57.12 2113.44 15.00 856.8
19.62 19.62 0
28.07 28.07 0
17.88 214.56 6.00 107.28
20.85 291.90 7.00 145.95
22.14 309.96 7.00 154.98
20.63 288.82 7.00 144.41
59533.78 59533.78 0
59533.78 59533.78 0
15.13 16443.28 450.00 6808.5
25.2 4062.24 66.00 1663.2
11.06 920.19 0
40.47 3367.10 0
100.56 24134.40 100.00 10056
14.68 10442.76 296.25 4348.95
15.75 163.80 4.33 68.1975
DIRECTO 40161.55
ALES(10%) 4016.16
S(8%) 3212.92
TAL 47390.63
ELACION 0.993024411
TAL 47060.05577
8470.810038
55530.86581
SALDO
metrado costo

S/ 4,028,098.36
S/ 4,000,000.00

SALDO
metrado costo
CALCULAR EL PAGO DEL CONTRATISTA CORRESPONDIENTE AL MES DE FEBRERO 2016:

UBICACIÓN DE OBRA: Maraypata-Ambo-Huánuco


MONTO DEL PRESUPUESTO BASE: S/ 4,028,098.36
MONTO DEL CONTRATO: S/ 4,000,000.00
FECHA DE PRESUPUESTO BASE: Jul-15
ADELANTO DIRECTO: S/ 800,000.00
GASTOS GENERALES: 10%
UTILIDADES: 10%
ADELANTO DE MATERIALES: S/ 934,788.25

PRESUPUESTO CONTRACTUAL:

DESCRIPCION MONTO CONTRATO(S. IGV)


A. VALORIZACION CONTRACTUAL
MODULO I: AULAS DIRECCION 1052345.46
MODULO II: AULAS DEPOSITO 612603.05
MODULO III: COMEDOR DEPOSITO 315535.06
MODULO IV: PISOS PEATONALES 595644.98
MODULO V: LOSA DEPORTIVA 147252.47
MODULO VI: CERCO PERIMETRICO 474886.09
MODULO VII: EQUIPAMIENTO Y MOBILIARIO+ 183786.25
MODULO VIII: MITIGACION AMBIENTAL 31589.33
REDONDEO -0.01
COSTO DIRECTO 3413642.68
GG 341364.268
UTILIDADES 341364.268
SUB-TOTAL 4096371.216
IGV(18%) 737346.81888
TOTAL 4833718.03488
VALORIZACION 2

(se canceló enero-2016)

(se canceló enero-2016)

ATO(S. IGV)

56796.3108
258738.7492

378597.5366

4096371.216
METRADOS DEL MES:

ITEM DESCRIPCION UNIDAD


3 PLANTA DE TRATAMIENTO Y RESERVORIO E AGUA POTABLE
3.01 PLANTA DE TRATAMIENTO DE AGUA POTABLE
3.01.01 SEDIMENTADOR
3.01.01.02.03 RELLENO COMPATADO CON MATERIAL PROPIO m3
3.01.01.04.02.01 CONCRETO F'c =210 Kg/cm2 m3
3.01.01.05 REVOQUES Y ENLUCIDOS
3.01.01.05.01 TARRAJEO EXTERIOR C/MORTERO m2
RELLENO COMPATADO CON MATERIAL PROPIO m3
3.01.03.02.03 MUROS REFORZADOS
CONCRETO F'c =210 Kg/cm2 m3
REVOQUES Y ENLUCIDOS
TARRAJEO EXTERIOR C/MORTERO m2
OBRAS DE CONCRETO ARMADO
CONCRETO F'c =210 Kg/cm2 m3
ENCOFRADO Y DESENCOFRADO m2
MUROS REFORZADOS
CONCRETO F'c =210 Kg/cm2 m3
TOTAL COSTO DIRECTO
GASTOS GENERALES(10%)
UTILIDADES(8%)
SUB TOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V
TOTAL

2
DESCRIPCION UNIDAD
LINEA DE ADUCCION Y RED DE DISTRIBUCION DE AGUA POTABLE
TUBERIAS Y ACCESORIOS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL m
TRAZO,NIVELES Y REPLANTEO DE ZANJAS m
MOVIMIENTOS DE TIERRAS
REFINE.NIVEL Y FONDOS PARA TUBERIAS m
PREPARACION Y COLOCACION DE CAMA DE APOYO E=O.10 m
PRIMER RELLENO H=0.30M MATERIAL SELECCIONADO m
SEGUNDO RELLENO MATERIAL PROPIO HASTA H=1.20M m
SUMINISTRO DE INSTALACION DE TUBERIAS
TUBERIA PVC SAP CLASE 10 NORMA ISO 4422 m
TUBERIA SP NTP 399,002 C-10 DN=1" m
SUMINISTRO E INSTALACION DE ACCESORIOS
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63m und
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63m und
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63m und
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63m und
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63m und
CODO DE PVC UF 4422 PARA RED DE AGUA POTABLE DE 63m und
TEE DE PVC UF 4422 PARA RED DE AGUA POTABLE und
TEE DE PVC SP NTP 399,002 C-10 und
TAPON DE PVC UF4422 PARA RED DE AGUA und
TAPON DE PVC SP NTP und
TRANSICION PVC SP NTP und
REDUCCION DE PVC SP NTP und
REDUCCION DE PVC SP NTP und
INSTALACIONES DOMICILIARIAS
CONEXIONES DOMICILIARIA
EXCAVACION MAQUINAS) m
EXCAVACION MANUAL m
ROTURA DE PAVIMENTOS ml
REPOSICION DE PAVIMENTOS ml
CONEXIONES DOMICILIARIAS DE AGUA und
RELLENO Y COMP, MAT, PROPIO EN ZANJAS m3
ELIMINACION DE MATERIAL EXCEDENTE m3
TOTAL COSTO DIRECTO
GASTOS GENERALES(10%)
UTILIDADES(8%)
SUB TOTAL
FACTOR DE RELACION
SUB TOTAL
I.G.V
TOTAL
ANTERIOR PRESENTE ACUMULADO
METRADO PRECIO UNIPRES.BASE metrado costo metrado costo metrado
28436.1398 443272.24
24725.9598 351658.61
4032.6738 31729.01
17.45 29.7 518.265 17.45 518.27
11.13 315.76 3514.4088 11.13 3514.41
3439.3666 4532.7 0.00
56.56 36.46 2062.1776 56.56 2062.18
46.37 29.7 1377.189 46.37 1377.19
9131.7792 34313.64 0.00
28.92 315.76 9131.7792 28.92 9131.78
3289.0566 9634.18 0.00
90.21 36.46 3289.0566 90.21 3289.06
4833.0836 7078.63 0.00
8.21 315.76 2592.3896 8.21 2592.39
53.16 42.15 2240.694 53.16 2240.69
3710.18 13795.8 0.00
11.75 315.76 3710.18 11.75 3710.18
OTAL COSTO DIRECTO 28436.14
STOS GENERALES(10%) 2843.61
UTILIDADES(8%) 2274.89
SUB TOTAL 33554.64
FACTOR DE RELACION 0.993024411
SUB TOTAL 33320.58154
I.G.V 5997.704677
TOTAL 39318.28622

ANTERIOR PRESENTE ACUMULADO


METRADO PRECIO UNIPRES.BASE metrado costo metrado costo metrado
175042.10 320845.37
115508.31 236072.71
3676.18 3741.82
3282.30 0.36 1181.63 500.00 180
3282.30 0.76 2494.55 500.00 380
77199.70 181136.60 0
3282.30 1.01 3315.12 363.00 366.63
3282.30 7.91 25962.99 498.00 3939.18
3282.30 11.77 38632.67 498.00 5861.46
3282.30 2.83 9288.91 498.00 1409.34
29819.81 29819.81 0
1955.85 10.16 19871.44 151.82 1542.4912
1326.45 7.5 9948.38 218.93 1641.975
4812.63 4751.47 0
8.00 29.18 233.44 2.00 58.36
8.00 19.38 155.04 2.00 38.76
6.00 28.47 170.82 2.00 56.94
4.00 18.98 75.92 2.00 37.96
20.00 28.47 569.40 5.00 142.35
18.00 18.98 341.64 8.00 151.84
37.00 57.12 2113.44 15.00 856.8
1.00 19.62 19.62 0
1.00 28.07 28.07 0
12.00 17.88 214.56 6.00 107.28
14.00 20.85 291.90 7.00 145.95
14.00 22.14 309.96 7.00 154.98
14.00 20.63 288.82 7.00 144.41
59533.78 59533.78 0
59533.78 59533.78 0
1086.80 15.13 16443.28 450.00 6808.5
161.20 25.2 4062.24 66.00 1663.2
83.20 11.06 920.19 0
83.20 40.47 3367.10 0
240.00 100.56 24134.40 100.00 10056
711.36 14.68 10442.76 296.25 4348.95
10.40 15.75 163.80 4.33 68.1975
OTAL COSTO DIRECTO 40161.55
STOS GENERALES(10%) 4016.16
UTILIDADES(8%) 3212.92
SUB TOTAL 47390.63
FACTOR DE RELACION 0.993024411
SUB TOTAL 47060.05577
I.G.V 8470.810038
TOTAL 55530.86581
ACUMULADO SALDO
costo metrado costo

ACUMULADO SALDO
costo metrado costo
FORMULAS POLINOMICAS

SUBPRESUPUESTO N°1: DIRECCION, 03 AULAS, SALA DE COMPUTO,DEPOSITO, ESCALERA Y SS.HH.

�= 0.155(�_�/�_0 )+0.24(�_�/�_0 )+0.156(�_�/�_0 )+0.34( 〖��〗 _�/ 〖��〗 _0


+0.109(𝐻_�/𝐻_0 )

Jul-15
SIMBOLO ELEMENTO REPRESENTATIVO CODIGO incidencia Iuo
H HORMIGON 38 0.109 870.71
A ACERO DE CONSTRUCCION LISO 2 0.155 460.88
C CEMENTO PORTLAND TIPO I 21 0.24 389.65
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.156 417.07
MO MANO DE OBRA INC. LEYES SOCIALES 47 0.34 523.15
1
Jul-15 Feb-16
870.71 870.27
��〗 _�/ 〖��〗 _0 ) 460.88 485.47
VALORIZACION 389.65 408.4
182380.544 417.07 424.99
Feb-16 523.15 544.12
IU r K REAJUSTE
870.27 0.109 6748.08
485.47 0.163
408.4 0.252
424.99 0.159
544.12 0.354
1.037
ADELANTO DIRECTO:

AMORTIZACION DEL ADELANTO DIRECTO

Monto de la Obra 4,000,000.00 A = Adelanto Otorgado x Valorización


Monto del Contrato
Adelanto Directo 800,000.00
Porcentaje de Adelanto Directo (%) 20

AMORTIZACION DE
N° VALORIZACION SALDO
ADELANTO
1 33320.58 6664.12 793335.88
2 47060.06 9412.01 783923.87
… … 16076.13 …

DEDUCCIONES QUE NO CORRESPONDEN

COEFICIENTES DE REAJUSTE AL MES DE OTORGAMIENTO DEL ADELANTO DIRECTO Y COEFICIENTES DE REA

SUBPRESUPUESTO N°3: PLANTA DE TRATAMIENTO Y RESERVORIOS DE AGUA POTAB

�=0.093(𝐻_�/𝐻_0 )+ 0.113(�_�/�_0 )+0.144(�_�/�_0 )+0.196(�_�/�_0 )+0.145(�_�/�_0 )

SIMBOLO ELEMENTO REPRESENTATIVO


H HORMIGON
A ACERO DE CONSTRUCCION LISO
T TUBERIA DE ACERO NEGRO Y/O GALVANIZADO
C CEMENTO PORTLAND TIPO I
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MO MANO DE OBRA INC. LEYES SOCIALES

SUBPRESUPUESTO N°4: LINEA DE ADUCCION Y RED DE DISTRIBUCION DE AGUA POT

�=0.157(�_�/�_0 )+ 0.213(�_�/�_0 )+0.215(�_�/�_0 )+0.151(�_�/�_0 )+0.264( 〖��〗

SIMBOLO ELEMENTO REPRESENTATIVO


A AGREGADO GRUESO
T TUBERIA PVC PARA AGUA
M MAQUINARIA Y EQUIPO IMPORTADO
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MO MANO DE OBRA INC. LEYES SOCIALES
ado x Valorización
rato

16076.13

O Y COEFICIENTES DE REAJUSTE AL MES DE VALORIZACIO

RVORIOS DE AGUA POTABLES

�_0 )+0.145(�_�/�_0 )+0.309( 〖��〗 _�/ 〖��〗 _0 )

Mar-15 Oct-15 VALORIZACION N° 03


CODIGO incidencia Iuo IU r Kad
38 0.093 860.82 864.73 0.093422423 A
2 0.113 522.30 468.27 0.101310569 C
65 0.144 245.76 234.54 0.137425781 V oct.-2015
21 0.196 389.65 389.65 0.196 K oct.-2015
39 0.145 409.90 419.35 0.148342889 K mar.-2015
47 0.309 523.15 544.59 0.321663596
1 0.998165257 D ad =

TRIBUCION DE AGUA POTABLE

�/�_0 )+0.264( 〖��〗 _�/ 〖��〗 _0 )

Mar-15 Oct-15 VALORIZACION N° 04


CODIGO incidencia Iuo IU r Kad
5 0.157 400.70 404.23 0.158383105 A
72 0.213 400.61 409.93 0.217955343 C
49 0.215 277.02 291.08 0.225912209 V oct.-2015
39 0.151 409.90 389.65 0.143540254 K oct.-2015
47 0.264 523.15 419.35 0.211618847 K mar.-2015
1 0.957409757
D ad =
VALORIZACION N° 03

800,000.00
4,000,000.00
33,320.58
1.037
0.998

259.27

VALORIZACION N° 04

800,000.00
4,000,000.00
47,060.06
0.000
0.957

-9412.01
ADELANTO MATERIAL:

SUBPRESUPUESTO N°3: PLANTA DE TRATAMIENTO Y RESERVORIOS DE AGUA POTABLES

MONTO DE ADELANTO DE MATERIL 934788.25

Jun-15
MONTO OTORGADO IU
MATERIAL: CEMENTO PORTLAND TIPO I 60408.83 389.65

SUBPRESUPUESTO N°4: LINEA DE ADUCCION Y RED DE DISTRIBUCION DE AGUA POTABLE

Jun-15
MONTO OTORGADO IU
MATERIAL: AGREGADO 26411.09 401.55
MATERIAL: TUBERIA PVC PARA AGUA 12231.61 403.95

DEDUCCIONES POR ADELANTO DE MATERIALES

MATERIAL Cl V Imr Ima Imo


CEMENTO PORTLAND TIPO I 0.196 60408.83 389.65 389.65 389.65
AGREGADO 0.157 26411.09 404.23 401.55 398.02
TUBERIA PVC PARA AGUA 0.213 12231.61 409.93 403.95 396.49
Amortización = Material Utilizado x Ima
Donde:
I
mo

Amortización = Amortización del Adelanto otorgado


Oct-15 P.U. = Precio Unitario del presupuesto base
AMORTIZACION
IU Ima = IUPC del material a la fecha efectiva del adelanto
389.65 15.4743644265 Imo = IUPC del material a la fecha del presupuesto base

Oct-15
AMORTIZACION
IU
404.23 35.1591209501
409.93 75.3091124705

DEDUCCION
0
27.9200297181
39.2945368645
orgado
RESUMEN DE VALORIZACION RECALCULADA

Fecha Base : Enero. - 2015


Mes de Valorizacion : Febrero. - 2016

1. VALORIZACION CONTRACTUAL
001 MODULO I: AULAS DIRECCION
002 MODULO II: AULAS DEPOSITO
003 MODULO III: COMEDOR DEPOSITO
004 MODULO IV: PISOS PEATONALES
005 MODULO V: LOSA DEPORTIVA
006 MODULO VI: CERCO PERIMETRICO
007 MODULO VII: EQUIPAMIENTO Y MOBILIARIO+
008 MODULO VIII: MITIGACION AMBIENTAL

REDONDEO

2. REAJUSTES
001 TRABAJOS PRELIMINARES
002 CAPTACION,DESARENADOR Y LINEA DE CONDUCCION
003 PLANTA DE TRATAMIENTO Y RESERVORIO DE AGUA POTABLE
004 LINEA DE ADUCCION Y RED DE DISTRIBUCION DE AGUA
005 SISTEMA DE ALCANTARILLADO
006 CAPACITACION, EDUCACION SANITARIA y medio ambiente
007
008

3. AMORTIZACION DE ADELANTO
3.01 Amortizacion del adelanto directo
3.02 Amortizacion del adelanto por materiales

4. DEDUCCIONES POR ADELANTO


4.01 Deduccion por el adelanto directo
4.02 Deduccio por adelanto por materiales

5.RESTRICCIONES

MONTO A PAGAR
RESUMEN DE VALORIZACION RECALCULADA N° 02 FEBRERO DEL 2016

015
2016
VALORIZACION
MONTO
ANTERIOR ACTUAL ACUMULADO
CONTRACTUAL
2,840,792.47 80,380.64 80,380.64
107,937.66 - - -
533,287.51 - - -
512,600.02 - 33,320.58 33,320.58

371,025.59 - 47,060.06 47,060.06


1,315,941.69 - - -
- - -
- - -
- - - -
% 0% 3% 3%

6,748.08
-
UCCION -
AGUA POTABLE 6,748.08
DE AGUA -
-
o ambiente -
-
-

16,202.07
237,359.60 16,076.13
80,314.14 125.94

-9,085.52
-9,152.74
67.21

- -

80,012.17
RESUMEN DE VALORIZACION RECALCULADA N° 02 FEBRERO DE

Fecha Base : Enero. - 2015


Mes de Valorizacion : febrero. - 2016

MONTO
CONTRACTU
AL
1. VALORIZACION CONTRACTUAL 2,901,551.85
001 TRABAJOS PRELIMINARES 107,937.66
002 CAPTACION,DESARENADOR Y LINEA DE CONDUCCION 533,287.51
003 PLANTA DE TRATAMIENTO Y RESERVORIO DE AGUA POTABL 512,600.02
004 LINEA DE ADUCCION Y RED DE DISTRIBUCION DE AGUA 371,025.59
005 SISTEMA DE ALCANTARILLADO 1,315,941.69
006 CAPACITACION, EDUCACION SANITARIA y medio ambiente 60,759.38

REDONDEO -
%

2. REAJUSTES
001 TRABAJOS PRELIMINARES
002 CAPTACION,DESARENADOR Y LINEA DE CONDUCCION
003 PLANTA DE TRATAMIENTO Y RESERVORIO DE AGUA POTABL
004 LINEA DE ADUCCION Y RED DE DISTRIBUCION DE AGUA
005 SISTEMA DE ALCANTARILLADO
006 CAPACITACION, EDUCACION SANITARIA y medio ambiente
007
008

3. AMORTIZACION DE ADELANTO
3.01 Amortizacion del adelanto directo 237,359.60
3.02 Amortizacion del adelanto por materiales 80,314.14

4. DEDUCCIONES POR ADELANTO


4.01 Deduccion por el adelanto directo
4.02 Deduccio por adelanto por materiales

5.RESTRICCIONES -

MONTO A PAGAR
CULADA N° 02 FEBRERO DEL 2016

VALORIZACION

ANTERIOR ACTUAL ACUMULADO

80,380.64 80,380.64
- - -
- - -
- 33,320.58 33,320.58
- 47,060.06 47,060.06
- - -
- - -
- - -
- - -
- - -
0% 3% 3%

6,748.08
-
-
6,748.08
-
-
-
-
-

16,202.07
16,076.13
125.94

-9,085.52
-9,152.74
67.21

80,012.17

También podría gustarte