RESTORATION PROJECT
By :
Hailemelekot Lecturer: ANTONIO PATRUNO,
Micheal Bogale
Tewodros Haile
Practicing Professional Architect
1. Introduction………… 4. Crack analysis…………
• Urban and historical analysis • Crack location on plans
Location • Crack location on elevations
Site features • Causes of the crack
Urban analysis 5. Material analysis………..
Road network analysis • Structural system materials
Proximity map Foundation
Site features Flooring
• Methodology Wall
Theoretical approach Ceiling
Practical methodology Roofing
2. Architectural analysis……… • Partition material
• Building description Load bearing
Building style analysis None load bearing
Purpose • Window door style, details and material
Over all current condition • Finishing material
PROPOSED PLAN BY TWO ITALIANS GUIDI AND THE MASTER PLAN PROPOSED BY ARCHITECT
VILLE MARIENE
Addis during Menelik II Addis during Italian Occupation Addis during Haile Addis recent plan
Selassie
Historical outlook – Emperor Haile silase Regime
Historical sites in Addis Ababa PIASSA SERATEGNA SEFER (Project sites in 1930)
Theoretical Approach
1. Primary Resources
Physical observation and digitalization
Site visit
2. Secondary Resources
literature views and analysis, and
similar practical approaches.
Building typology
Most houses are single Story and, those above Triple stories are relatively Recent. Most houses
built of stone & timber are of older Period while of concrete are recent.
Most of traditional buildings of different typologies were constructed using similar materials
and finishes, the only difference being in the level of detailing and architectural ornamentation,
as well as in the quality of the workmanship.
LEGEND
Triple & Above
Double Story
Single Story
Based on urban settlement
and the function found
during study building was
constructed for the purpose
of residence but later
changed to a mixed use
building where it can be
seen on the floor plans.
N
North Side Elevation East Side Elevation
Brick wall
Wood beam
As horizontal load bearing
structure
Stone wall
As Vertical Load bearing
structure
Stone wall
Load bearing structure
Section A-A
Building Material used Purpose Building Level Image legend
Masonry Partition and load Ground floor Image 1 and 2
bearing
Wood Load bearing, stair, Ground and first floor Image 3 , 4 ,6 and 7
roofing door/windows
and flooring
Brick Exterior wall First floor Image 2 and 7
(protective shell)
Mud Wattle and Daub Interior and exterior First floor Image 5
wall
Metal Balustrades and Ground and first floor Image 6 and 8
window
Image 1 Image 2 Image 3 Image 4
Image 5 Image 6 Image 7 Image 8
Image/ location on Defect/Crack type Cause Material
plan
Image 1,6, &7 vertical Growth of the tree along the building ,un Stone Masonry
Ground floor even wall settlement and luck of proper
finishes
Image 2 ,4&5 Vertical/diagonal Due to the span of the wall, number of the Brick
First floor windows and lateral movement
Image 3 Vertical Due to the movement of the wall outwards Brick
First floor bending
Image 8,9,10&11 Vertical & diagonal Due to movement of adjacent walls to the Stone masonry
Ground floor opposite direction
Image 12,16,17,18 Moisture Due to un proper maintenance Stone masonry slab
Ground floor
Image 13 14 15 Moisture and age Due to luck of maintenance Wood
Ground floor
Table 1.1
Image 1 Image 2 Image 3 Image 4
Image 5 Image 6 Image 7
Image 8 Image 9 Image 10 Image 11
Image 12 Image 13 Image 14 Image 15
Image 17 Image 18
Image 16
KEY IN JURIES IN PL AN (PL AN )
D ia g o n a l c ra c ks:
Image 18
Fro m b e lo w th ro u g h in ju ry
In ju ry n o t th ro u g h
le f t to to p rig h t
Fro m b e lo w th ro u g h in ju ry
In ju ry n o t th ro u g h
rig h t to to p le f t
Ve rtic a l c ra c ks a n d o th e r sig n s:
c ra c k o n th e c e ilin g
c ra c k o n th e flo o r
A slo p e o n a flo o r
p a ssin g c ra c k o n a p a rt o f a w a ll
c ra c ks w ith le ss th a n a 1 m m
Image 7,8,9,10
Image 6
KEY IN JURIES A N D PROSPEC TUS SEC TION (ELEVATION ):
Image 12
w h e n th e c ra c k i fu rth e r fro m th e o th e r
THROUGH IN JURY
Image 1
SPIN N IN G OR IN JURY LIGHT (o n o n e sid e o f
th e w a ll)
KEY IN JURIES IN PL AN (PL AN )
D ia g o n a l c ra c ks:
Fro m b e lo w th ro u g h in ju ry
In ju ry n o t th ro u g h
le f t to to p rig h t
Image 2,3,4,5
Fro m b e lo w th ro u g h in ju ry
In ju ry n o t th ro u g h
rig h t to to p le f t
Image 17
Ho rizo n ta l c ra c ks:
Ho rizo n ta l (o n o ne sid e o n ly o n o n e sid e o f th e
w a ll)
Image 11
Ve rtic a l c ra c ks a n d o th e r sig n s:
ve rtic a l (o n o n e sid e o n ly o n o n e sid e o f th e
w a ll)
c ra c k o n th e c e ilin g
c ra c k o n th e flo o r
A slo p e o n a flo o r
p a ssin g c ra c k o n a p a rt o f a w a ll
c ra c ks w ith le ss th a n a 1 m m
w h e n th e c ra c k i fu rth e r fro m th e o th e r
THROUGH IN JURY
D ia g o n a l c ra c ks:
Fro m b e lo w th ro u g h in ju ry
In ju ry n o t th ro u g h
le f t to to p rig h t
Fro m b e lo w th ro u g h in ju ry
In ju ry n o t th ro u g h
rig h t to to p le f t
Ve rtic a l c ra c ks a n d o th e r sig n s:
3.5000 3.4000
+ 6.37
ve rtic a l (o n o n e sid e o n ly o n o n e sid e o f th e + 6.37
w a ll)
c ra c k o n th e c e ilin g
p a ssin g c ra c k o n a p a rt o f a w a ll
2.3778
+ 0.00
c ra c ks w ith le ss th a n a 1 m m + 9.77
w h e n th e c ra c k i fu rth e r fro m th e o th e r
3.4000 Joint cladding
Joint cladding
THROUGH IN JURY
+ 6.37
windows
• Diagonal crack along
the edge of the
windows
Joint cladding
D
Colored siloxane
undercoat
Repairs /Interventions
Building Restoration Proposal
Crack Repair
Hand or power chiseling and cleaning by metal brushing
• Removal of the cortex of deteriorated cementitious conglomerate, using hand or
power chisels, to remove all deteriorated concrete and/or prepare the adhesion
surface between old and new cast concrete without compromising either the
integrity and anchorage of exposed steel reinforcement, or the structural integrity of
mortar around the demolished areas.
Repairs /Interventions
Building Restoration Proposal
Crack Repair
MANUAL AND/OR MACHINE APPLICATION OF LIME AND ECO-POZZOLAN SCRATCH-COAT MORTAR
• Supply and application of stainless steel mesh dimensioned according to design specifications (for any
diameter of steel wire and any size of mesh) with relative certificate of origin and quality, to reinforce
thixotropic, natural hydraulic lime structural mortar in renovation and cladding work.
• Although zinc plated steel reinforcement is the recommended one due to its high resistance to rust, the
value of the solution is high so it is better to use cheaper solutions
4
1
3
2
2 1
Detail section
Detail elevation
Wood repair
By following techniques of investigations and observation we have made the followingt solution to
help the wood found on the interior of the building be preserved will help the wood have its
original furnish
A
1 2 3
a) Remove the warren out wood
b) Replace with similar new
wood
1. Clean the Floor
2. Prep the Perimeter 4 5 6
3. Scuff-sand the Finish
4. Vacuum and Tack B
5. Cut in Along the Edges
6. Roll Out the Poly
Wet area defect treatments
Repairs /Interventions
BUILDING RESTORATION PROPOSAL
BOQ
DESCRIPTION UNIT Qty. UNIT RATE AMOUNT
WALL
Scrap and remove damaged brick and stone masonry by
replacing with similar material Pcs 30 2000 60,000
Scrap & remove loose plastered wall surface and apply three coats of
plastering(white lime) up to fine finish to interior side of façade area,
price shall include injection of cracked surfaces with the proposed
material. (sika antique lime) m2 40 740.00 29,600
Application of Wire mesh on front face EWM ⏀8@10mm c/c
m2 10 132 1,320
Scrap / remove plastering and apply of anti-bio deteriorating organisms
m2 120 700 84,000
Apply two coats of painting to all internal existing painted wall surfaces,
type of painting shall be decided according to the proposal.
m2 150 105 157,750
Ditto but to all external painted wall surfaces, price shall incudes ditto.
m2 60 115 6,900
DESCRIPTION UNIT Qty. UNIT RATE AMOUNT
FLOORING -
Remove broken ceramic & stone pavement around the building and supply
& replace with similar material properly.
m2 20 120.00 2,400
Repair and remove broken wood on the interior and exterior of the
building by supplying similar material if it exists
m2 100 360 36,000
Scrap / remove plastering on the slab and apply coats of proposed
material (sika antique lime)
m2 15 2030 30,450
MAINTENANCE
Scrap & remove dirt on gutters and down pipes, apply two coats of oil
paint. Price shall include maintaining damaged parts where necessary. Pcs 6 2000.00 12,000
Maintain damaged and malfunctioned windows
Pcs 13 850.00
Polish & apply two coats of varnish painting to all wooden doors
Pcs 10 250 11,050
Scrap & remove ceiling and apply two coats of paint to all wooden part of
the ceiling, type of remover shall be decided according to the proposal.
m2 120 50 6,000
All price are inclusive of 20% labor cost
TOTAL 337,470