Solución Problema de Bombas Ejemplo de clase

N1 (rpm) 1000 N1 (rpm) 1600

Q (l/s) H (m) Q (l/s) H (m)


0 30 0 76.80
50 28 80 71.68
100 26 160 66.56
150 23 240 58.88
200 20 320 51.20
250 15 400 38.40
275 6.5 440 16.64

Solución
z2 (m) 234.4 Kcan 0.5
z1 (m) 210.7 Kcodo 0.9
H (m) 23.7 Kvalv 24
L (m) 550 Kent 1
D (m) 0.457 Suma 26.4
A(m) 0.16402962
e (mm) 0.25
e/D 0.00054705

T (° C) 10
v (m2/s) 1.308E-06

Curva del Sistema

Q (l/s) Q (m3/s) V (m/s) Re f fL/DV2/2g SK (V2/2g) Htotal (m)


320 0.32 1.95087 681610.3 0.017824 4.16282782 5.1231543 32.99
400 0.4 2.43858 852012.9 0.017688 6.45470908 8.00492859 38.16
440 0.44 2.68244 937214.2 0.017637 7.78763287 9.68596359 41.17

Q (l/s) Hbomb (m) Hsis (m)


0 76.80
80 71.68
160 66.56
240 58.88
320 51.20
400 38.40
440 16.64
320 32.99
400 38.16
440 41.17
Curva H vs Q para bomba para riego N = 1000 rpm

35

30

25

20
H (m)

15

10

0
0 50 100 150 200 250 300
Q (l/s)
Solución Problema

90

80

70

60

50
H (m)

40

30

20

10

0
0 50 100 150 200 250 300 350 400 450 500
Q (l/s)