AREA TOPOGRAFICA
DESCRIP CUENCA PROGRESIVA L (m) PI PA PH
(m2)
ALC C-1 0+186 8535.54 45.89 4210.47 4229.28 4219.88
ALC C-2 0+510 14830.50 98.87 4193.61 4234.15 4213.88
ALC C-3 0+795 74165.55 260.23 4173.97 4280.67 4227.32
ALC C-4 1+205 82329.30 322.86 4153.27 4285.64 4219.46
ALC C-5 1+260 19208.75 349.25 4147.13 4290.32 4218.73
ALC C-6 1+455 31716.05 373.13 4135.55 4288.53 4212.04
ALC C-7 1+622 66000.07 395.21 4122.37 4284.41 4203.39
ALC C-8 1+825 85650.56 428.25 4109.61 4285.19 4197.40
ALC C-9 3+805 112680.78 626.00 3979.27 4235.93 4107.60
ALC C-10 5+205 6785.10 150.78 3898.76 3960.58 3929.67
ALC C-11 5+245 6678.78 155.67 3897.47 3961.29 3929.38
ALC C-12 5+770 70293.67 450.60 3865.76 4050.51 3958.13
ALC C-13 6+425 70111.25 560.89 3835.47 4104.70 3970.08
ALC C-14 6+625 91191.45 868.49 3816.22 4233.09 4024.66
ALC C-15 6+705 24750.00 150.00 3805.76 3877.76 3841.76
BAD C-16 7+180 34416.75 458.89 3774.19 3994.46 3884.32
BAD C-17 7+190 114623.23 849.06 3771.27 4178.82 3975.05
ALC C-18 7+660 57670.56 650.98 3736.51 4048.98 3892.75
ALC C-19 7+762 59898.96 680.67 3728.99 4055.71 3892.35
ALC C-20 8+070 101397.66 844.98 3713.35 4118.94 3916.14
ALC C-21 8+300 87127.38 854.19 3703.80 4113.81 3908.81
ALC C-22 8+505 127854.67 852.36 3700.10 4109.23 3904.67
ALC C-23 8+973 70081.21 567.00 3682.17 3954.33 3818.25
ALC C-24 9+170 83584.22 852.90 3680.40 4089.79 3885.10
ALC C-25 9+435 58507.41 475.67 3673.45 3901.77 3787.61
ALC C-26 9+638 50056.87 558.92 3665.00 3933.28 3799.14
ALC C-27 9+754 48647.23 543.17 3664.89 3925.61 3795.25
ALC C-28 9+994 34243.33 434.06 3654.72 3863.07 3758.89
ALC C-29 10+310 31096.47 345.67 3634.73 3800.65 3717.69
ALC C-30 10+425 13102.98 286.78 3638.26 3775.91 3707.09
ALC C-31 10+583 22653.79 236.89 3630.63 3727.75 3679.19
ALC C-32 11+730 143103.75 923.12 3578.36 3956.84 3767.60
ALC C-33 12+540 340805.51 973.73 3543.08 3942.31 3742.70
ALC C-34 12+840 21007.19 234.56 3550.89 3747.06 3648.97
ALC C-35 14+020 380978.34 1022.39 3471.44 3890.62 3681.03
ALC C-36 14+153 16836.31 219.91 3462.47 3638.40 3550.44
ALC C-37 14+252 16683.19 217.36 3450.92 3624.81 3537.86
c.- Altitud Media de Toda la Cuenca (Hm)
AREA % DE AREAS
AREA SOBRE AREA ENTRE
COTA m.s.n.m. ACUMULADA ENTRE COTAS AL
COTA Zi (Km2) COTAS (Km2)
(Km2) AREA TOTAL
4500.00
4000.00 f(x) = 3.8591022074x + 3516.2466839799
3500.00 R² = 0.6670460572
3000.00
2500.00
2000.00
1500.00
1000.00
500.00
0.00
0.00 50.00 100.00
PORCENTAJE 150.00
DE AREA 200.00
SOBRE LA COTA 250.00
X Y
100.00 3454.5
Hm=
∑ a∗e
At
LIMITES
ALTITUD MEDIA
AREA ENTRE
ENTRE DOS a*e
INICIO FIN COTAS (m2)
COTAS (m)
Hm promedio= 3868.66
a.- Superficie o Area Topográfica (A)
PH−PI
S=
L
PH: Punto Hidráulicamente Más Alto (Elevación máxima del cauce en m)
PI: Punto de Interés (Cota del punto donde se ubicarán las obras de drenaje en m)
L: Longitud del Cauce
CUENCA L (m) PH PI S
C-1 45.89 4219.877 4210.47 0.205
C-2 98.87 4213.878 4193.61 0.205
C-3 260.23 4227.318 4173.97 0.205
C-5 349.25 4218.726 4147.13 0.205
C-6 373.13 4212.042 4135.55 0.205
C-7 395.21 4203.388 4122.37 0.205
C-8 428.25 4197.402 4109.61 0.205
C-9 626.00 4107.600 3979.27 0.205
C-10 150.78 3929.670 3898.76 0.205
C-11 155.67 3929.382 3897.47 0.205
C-12 450.60 3958.133 3865.76 0.205
C-13 560.89 3970.084 3835.47 0.240
C-14 868.49 4024.657 3816.22 0.240
C-15 150.00 3841.760 3805.76 0.240
C-16 458.89 3884.324 3774.19 0.240
C-17 849.06 3975.045 3771.27 0.240
C-18 650.98 3892.745 3736.51 0.240
C-19 680.67 3892.351 3728.99 0.240
C-20 844.98 3916.144 3713.35 0.240
C-21 854.19 3908.806 3703.80 0.240
C-22 852.36 3904.667 3700.10 0.240
C-23 567.00 3818.250 3682.17 0.240
C-24 852.90 3885.097 3680.40 0.240
C-25 475.67 3787.611 3673.45 0.240
C-26 558.92 3799.141 3665.00 0.240
C-27 543.17 3795.251 3664.89 0.240
C-28 434.06 3758.895 3654.72 0.240
C-29 345.67 3717.691 3634.73 0.240
C-30 286.78 3707.087 3638.26 0.240
C-31 236.89 3679.192 3630.63 0.205
C-32 923.12 3767.600 3578.36 0.205
C-33 973.73 3742.695 3543.08 0.205
C-34 234.56 3648.975 3550.89 0.418
C-35 1022.39 3681.030 3471.44 0.205
C-36 219.91 3550.435 3462.47 0.400
C-37 217.36 3537.864 3450.92 0.400
PRECIPITACION MEDIA MENSUAL
ESTACION :ALLPACHACA
CODIGO :008
LATITUD 13°23´19" FUENTE : PROYECTO "ESPECIAL RIO CACHI"
LONGITUD 74°16´00" SUB GERENCIA DE OPEMAN
ALTITUD 3550 m.s.n.m. UNIDAD DE HIDROLOGIA
Cuadro Nº V,06
Nº AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL PROM
1 1992 220.50 151.60 117.20 34.00 S/D 20.80 23.40 1.30 S/D 144.90 14.50 181.20 909.40 75.78
2 1993 331.60 112.20 212.50 53.40 30.00 3.90 13.00 20.80 22.10 106.40 79.40 186.50 1171.80 97.65
3 1994 71.70 109.20 156.30 86.50 48.20 1.30 S/D 3.90 32.50 17.50 71.60 70.50 669.20 55.77
4 1995 132.10 182.20 185.20 62.00 15.00 4.00 8.50 1.30 24.00 48.80 109.20 75.00 847.30 70.61
5 1996 208.90 215.50 206.40 46.90 9.30 1.80 3.60 15.20 18.70 76.40 60.70 107.20 970.60 80.88
6 1997 157.60 114.50 105.40 41.20 15.90 S/D 2.50 59.00 41.90 25.40 71.30 144.50 779.20 64.93
7 1998 156.50 106.00 149.40 27.50 1.30 6.40 S/D 11.50 8.90 42.70 48.30 118.20 676.70 56.39
8 1999 182.60 147.10 134.80 73.20 16.70 4.10 5.80 S/D 38.30 60.30 60.10 69.40 792.40 66.03
9 2000 172.90 256.30 130.60 62.10 53.60 9.80 21.90 30.10 10.70 73.50 42.50 82.50 946.50 78.88
10 2001 180.60 108.00 190.10 22.10 45.90 5.00 15.70 20.80 23.20 19.10 89.90 71.20 791.60 65.97
11 2002 79.30 265.50 190.10 32.20 14.50 3.70 49.00 14.60 52.40 55.50 81.10 159.60 997.50 83.13
12 2003 124.20 141.50 176.00 55.30 20.20 S/D 2.00 23.60 23.60 17.40 31.10 156.30 771.20 64.27
13 2004 95.40 176.50 123.50 36.80 7.20 36.30 37.70 12.90 142.00 11.90 51.40 183.70 915.30 76.28
14 2005 108.50 72.30 178.20 22.00 5.90 S/D 13.40 24.10 40.80 50.00 34.00 155.92 705.12 58.76
15 2006 138.00 115.60 118.70 72.30 S/D 5.40 S/D 32.10 13.50 85.40 124.20 113.40 818.60 68.22
16 2007 95.80 132.40 226.60 46.40 23.20 S/D 6.90 S/D 11.10 50.80 30.60 149.90 773.70 64.48
17 2008 140.00 173.60 132.30 15.00 30.70 8.20 1.40 1.50 31.10 64.70 39.30 76.50 714.30 59.53
18 2009 130.40 215.40 91.50 90.40 12.00 S/D 18.20 9.20 2.60 57.10 120.10 113.20 860.10 71.68
17 2010 255.00 148.10 108.30 39.00 15.50 0.40 5.90 8.00 25.30 31.90 16.00 136.90 790.30 65.86
PROMEDIO 156.93 154.92 154.37 48.33 21.48 7.94 14.31 17.05 31.26 54.72 61.86 123.77 836.89 69.74
V. MAXIMA 331.60 265.50 226.60 90.40 53.60 36.30 49.00 59.00 142.00 144.90 124.20 186.50 1171.80
V. MINIMA 71.70 72.30 91.50 15.00 1.30 0.40 1.40 1.30 2.60 11.90 14.50 69.40 669.20
D.ESTANDAR 62.63 51.66 39.33 21.20 14.91 9.23 13.03 14.12 29.71 32.59 31.95 40.32 122.31
AL 75% PERS. 142.48 140.05 120.75 53.95 19.63 5.24 10.38 1.20 32.36 55.71 60.06 100.77 755.30 755.30
PRECIPITACION MEDIA MENSUAL
Cuadro Nº V,07
Nº AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL PROM
1 1995 S/D 127.4 141.5 63.2 1.6 0.0 0.8 9.1 19.8 20.8 131.9 105.3 621.40 51.78
2 1996 218.8 175.4 146.3 58.6 0.0 1.0 3.8 5.5 29.5 21.4 22.6 73.4 756.30 63.03
3 1997 163.0 104.1 70.6 21.2 13.3 0.0 2.6 46.7 36.7 9.1 59.4 102.4 629.10 52.43
4 1998 163.2 155.7 127.6 17.3 1.2 13.3 0.0 1.5 6.3 40.4 46.0 62.8 635.30 52.94
5 1999 98.0 225.9 144.1 70.0 2.6 1.7 6.2 0.0 58.2 32.9 39.7 67.3 746.64 62.22
6 2000 84.6 65.0 137.4 29.1 24.1 15.1 3.5 22.5 3.5 96.9 20.0 84.6 586.24 48.85
7 2001 195.0 81.8 218.8 37.1 39.8 7.3 11.8 8.1 15.7 39.8 59.8 28.6 743.47 61.96
8 2002 130.8 155.6 134.0 23.8 10.5 2.0 46.5 13.6 73.2 31.1 132.4 243.1 996.56 83.05
9 2003 155.3 131.4 136.8 52.2 9.5 0.0 0.0 18.5 37.4 40.4 53.8 135.8 771.10 64.26
10 2004 56.8 170.5 131.1 27.3 2.8 9.8 10.9 8.4 37.1 44.1 69.7 119.9 688.40 57.37
11 2005 80.9 67.1 120.8 38.6 0.1 0.0 4.1 34.4 43.9 43.0 29.3 118.5 580.70 48.39
12 2006 220.6 124.3 171.5 41.3 2.1 3.3 0.0 22.8 33.0 37.0 57.0 46.0 758.90 63.24
13 2007 78.7 87.7 169.6 S/D 10.5 0.5 4.7 2.4 32.6 46.6 54.7 128.3 616.30 51.36
14 2008 190.6 175.2 92.1 27.8 6.9 4.8 0.0 3.9 13.1 33.5 66.0 98.7 712.60 59.38
PROMEDIO 141.25 131.93 138.73 39.03 8.93 4.19 6.78 14.10 31.43 38.35 60.16 101.06 703.07 58.59
V. MAXIMA 220.60 225.90 218.79 70.00 39.78 15.08 46.54 46.70 73.19 96.85 132.37 243.10 996.56
V. MINIMA 56.80 65.00 70.60 17.30 0.00 0.00 0.00 0.00 3.51 9.10 20.02 28.60 580.70
D.ESTANDAR 54.53 45.68 33.68 16.40 10.71 4.99 11.62 13.11 18.61 19.11 32.91 49.80 104.69
AL 75% PERS. 214.39 183.60 90.74 43.20 13.20 -0.76 -0.41 8.94 8.93 21.28 69.50 196.68 1128.12 108.03
ESTACION :PUTACCA
CODIGO :001
LATITUD 13º23´37´´ FUENTE : PROYECTO "ESPECIAL RIO CACHI"
LONGITUD 74º21´13´´ SUB GERENCIA DE OPEMAN
ALTITUD 3589 m.s.n.m. UNIDAD DE HIDROLOGIA
Nº AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL PROM
1 1991 S/D 20.80 27.30 10.30 9.50 4.00 3.80 S/D 10.50 12.50 12.50 12.00 837.45 69.79
2 1992 67.40 131.30 51.10 17.20 S/D 11.80 23.20 64.60 10.30 100.00 40.00 78.20 701.25 58.44
3 1993 405.80 288.40 354.00 88.20 98.80 6.80 79.40 38.60 74.20 224.00 312.40 394.60 678.85 56.57
4 1994 182.60 173.90 157.50 66.00 27.20 27.70 S/D S/D 15.30 18.90 43.90 83.60 689.23 57.44
5 1995 149.40 248.60 169.80 56.10 1.60 6.00 11.60 5.20 27.80 37.90 127.50 111.70 661.15 55.10
6 1996 277.60 266.40 181.20 50.30 17.90 0.60 3.20 40.70 9.80 54.30 45.60 161.70 786.90 65.58
7 1997 176.60 215.00 98.80 71.00 25.10 S/D 1.70 50.80 29.90 34.80 89.60 242.90 645.90 53.83
8 1998 250.70 116.30 158.90 37.90 1.40 22.00 S/D 17.90 S/D 49.00 62.20 114.10 587.74 48.98
9 1999 175.70 213.10 200.30 129.40 8.20 7.60 10.10 0.70 57.80 122.40 37.30 119.60 879.70 73.31
10 2000 163.80 308.14 175.84 25.34 55.58 62.72 23.24 13.86 13.72 84.14 41.72 158.90 852.10 71.01
11 2001 199.78 124.88 224.40 31.22 56.28 12.60 18.90 9.10 16.52 20.02 105.14 86.52 772.70 64.39
12 2002 114.52 194.46 149.52 45.36 18.90 1.54 89.88 10.60 74.70 94.08 93.94 164.40 709.30 59.11
13 2003 157.60 109.60 113.50 56.90 12.40 0.10 1.90 22.30 23.20 10.60 49.50 164.40 846.20 70.52
14 2004 36.00 130.00 119.47 20.40 10.00 18.10 10.70 16.00 57.30 47.40 35.30 138.20 749.60 62.47
15 2005 143.00 71.50 107.70 26.00 20.80 S/D 15.80 28.80 49.90 38.50 29.50 123.80 849.50 70.79
16 2006 143.80 138.90 117.30 70.60 3.20 7.40 S/D 35.20 13.30 67.50 122.90 88.90 620.90 51.74
17 2007 118.10 89.40 157.30 44.40 15.40 2.20 17.10 2.70 20.10 49.70 27.70 134.00 894.40 74.53
18 2008 226.38 202.44 184.24 17.92 33.04 11.76 3.22 3.22 55.16 100.38 48.58 104.16 1015.30 84.61
19 2009 181.80 175.10 70.80 37.40 15.20 2.70 32.10 5.60 13.40 66.10 119.50 120.40 653.20 54.43
20 2010 202.80 117.20 97.10 38.20 7.80 S/D S/D S/D S/D S/D S/D S/D 930.50 77.54
PROMEDIO 177.55 166.77 145.80 47.01 23.07 12.10 21.62 21.52 31.83 64.85 76.04 136.95 768.09 64.01
V. MAXIMA 405.80 308.14 354.00 129.40 98.80 62.72 89.88 64.60 74.70 224.00 312.40 394.60 1015.30
V. MINIMA 36.00 20.80 27.30 10.30 1.40 0.10 1.70 0.70 74.70 10.60 12.50 12.00 587.74
D.ESTANDAR 77.60 73.42 68.69 27.73 23.43 14.73 25.38 18.20 74.70 48.88 65.59 76.08 113.38
AL 75% PERS. 128.40 102.86 87.65 34.85 3.19 0.16 -0.23 2.20 74.70 35.18 64.03 92.52 719.31 66.62
MUNICIPALIDAD DISTRITAL DE ECHARATI
PROYECTO: “CONSTRUCCION DE LA CARRETERA DE CIRCUNVALACION TINTINIQUIATO MARGEN DERECHA
ABRIL 2008
- DISTRITO DE ECHARATI – PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO”
RELACION: PRECIPITACION-ALTITUD
850.00
800.00
f(x) = 0.4016558045x - 634.9724901139
R² = 0.5923279961
750.00
700.00
650.00
600.00
3300.00 3350.00 3400.00 3450.00 3500.00 3550.00 3600.00 3650.00
ALTITUD (msnm)
Y = aX +b
Y = 0.401X - 634.9
APLICACIÓN
Altitud
Altitud media de la microcuenca (msnm) 3868.66
Precipitacion media anual (mm) 912.57
140.00
120.00
f(x) = -37.5414304665 ln(x) + 181.9076109409
R² = 0.9859064603
100.00
80.00
60.00
40.00
20.00
0.00
0 5 10 15 20 25 30 35
DURACION (Min)
CALCULOS HIDROLOGICOS
CACTERISTICAS FISICAS DE LA CUENCA
CODIGO DE LA CUENCA: C-1 ………
Area topografica (A): Determinada con planimetros en los planos en Km2.
longitud del cauce (L): Determinada en el mismo plano en Km.
Punto mas alto de la cuenca (PA). Elevacion max de la cuenca en m.
Punto hidraulicamente mas alto (PH). Elevacion maxima del cauce en m.
Punto de interes (PI): Punto hidraulicamente mas bajo donde se ubicaran las obras de arte
Pendiente media de la cuenca o superficial (PMS):
Pendiente media delcauce (S)
√ A 3
Tc= α 1∗ √
Tc= α ∗60 A∗L
S
√S
Ο. 03≤α≤0 . 15
α =(Valor recomendado por diferentes autores) α1 Valor recomendado: 0.13
0.1272
3
L L 3/4
Tc=(0.871∗ )0 .385∗60 Tc=0.3∗( ) ∗60
H S
1/ 4
DONDE:
Tc= Tiempo de concentracion en minutos H=Desnivel del curso de agua mas largo (m).
A=Area de la cuenca en Km2
S=Pendiente media del cuenca en (m/m)
L =Longitud del cauce en Km.
Passini: Metodo planteado para cuencas mayores de 50 Km2 de area, pero sin embargo es utilizado
en pequeñas cuencas variando el coeficiente hasta su valor maximo de 0.13, proporcionando
resultados convincentes
VENTURA HERAS: PENDIENTE MEDIA DE LA CUENCA SUPERFICIAL
PASSINI: PENDIENTE MEDIA DEL CAUCE.
H FORMULA DE
FORMULA FORMULA DE FORMULA DEL TC
CUENCA Diferencia VENTURA
DE PASSINI BENHAN MTC PROM
de altura (m) HERAS
C-1 9.407 1.56 1.26 0.68 2.40 1.48
C-2 20.268 2.05 1.96 1.23 4.27 2.38
C-3 53.348 4.59 4.62 2.60 8.83 5.16
C-5 71.596 2.34 3.25 3.26 11.01 4.96
C-6 76.492 3.00 3.93 3.43 11.57 5.48
C-7 81.018 4.33 5.11 3.59 12.08 6.28
C-8 87.792 4.93 5.72 3.81 12.83 6.82
C-9 128.330 5.66 7.12 5.11 17.05 8.73
C-10 30.910 1.39 1.74 1.71 5.86 2.67
C-11 31.912 1.38 1.75 1.75 6.00 2.72
C-12 92.373 4.47 5.45 3.97 13.32 6.80
C-13 134.614 4.13 5.41 4.42 15.25 7.30
C-14 208.437 4.70 6.84 6.19 21.16 9.72
C-15 36.000 2.45 2.47 1.60 5.67 3.05
C-16 110.134 2.89 3.99 3.79 13.11 5.95
C-17 203.775 5.27 7.32 6.08 20.81 9.87
C-18 156.235 3.74 5.33 4.96 17.05 7.77
C-19 163.361 3.81 5.48 5.13 17.63 8.01
C-20 202.794 4.96 7.02 6.06 20.73 9.69
C-21 205.006 4.60 6.70 6.11 20.90 9.58
C-22 204.567 5.57 7.61 6.10 20.87 10.04
C-23 136.080 4.12 5.43 4.46 15.37 7.35
C-24 204.697 4.50 6.60 6.10 20.88 9.52
CONSULTOR: INGº HECTOR ACURIO CRUZ
CIP.47315
REGISTRO DE CONSUCODE Nº C4606 12 de 55
TELF. FAX 084-236170, 984686809 – 984727812 ESTUDIO HIDROLOGICO
Mail: aquaruna_ha@yahoo.es
MUNICIPALIDAD DISTRITAL DE ECHARATI
PROYECTO: “CONSTRUCCION DE LA CARRETERA DE CIRCUNVALACION TINTINIQUIATO MARGEN DERECHA ABRIL 2008
- DISTRITO DE ECHARATI – PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO”
6.5.-Intensidades de Precipitación
I=−31.2∗LN (Tc)+151 .3
Ce=C 1+C 2+ C 3
VEGETACION
SUELO TOPOGRAFIA
COBERTURA C1 C2 C3
TEXTURA PENDIENTE (%)
(%)
100 0.08 Arenoso 0.08 0.0-0.2 0.04
80-100 0.12 Ligera 0.12 0.2-0.5 0.06
50-80 0.16 Media 0.16 0.5-2.0 0.06
20-50 0.22 Fina 0.22 2.0-5.0 0.10
0-20 0.30 Rocosa 0.30 5.0-10.0 0.15
METODO DE JUSTIN
NOMBRE DE
CODIGO Ce. I A (Ha) S º/OO Q (m3/s)
LA CUENCA
C-1 0.508 139 0.85 205.00 0.60
C-2 0.528 124 1.48 205.00 0.77
C-3 0.534 100 7.42 205.00 1.60
C-5 0.578 101 1.92 205.00 0.80
C-6 0.569 98 3.17 205.00 1.02
C-7 0.555 94 6.60 205.00 1.46
C-8 0.553 91 8.57 205.00 1.64
C-9 0.564 84 11.27 205.00 1.80
C-10 0.563 121 0.68 205.00 0.51
C-11 0.565 120 0.67 205.00 0.50
C-12 0.560 91 7.03 205.00 1.48
C-13 0.577 89 7.01 240.00 1.59
C-14 0.593 80 9.12 240.00 1.71
C-15 0.541 117 2.48 240.00 1.07
C-16 0.585 96 3.44 240.00 1.15
C-17 0.586 80 11.46 240.00 1.92
C-18 0.590 87 5.77 240.00 1.42
C-19 0.591 86 5.99 240.00 1.44
C-20 0.588 80 10.14 240.00 1.81
C-21 0.593 81 8.71 240.00 1.68
C-22 0.583 79 12.79 240.00 2.03
C-23 0.578 89 7.01 240.00 1.59
C-24 0.594 81 8.36 240.00 1.65
C-25 0.574 93 5.85 240.00 1.48
CONSULTOR: INGº HECTOR ACURIO CRUZ
CIP.47315
REGISTRO DE CONSUCODE Nº C4606 18 de 55
TELF. FAX 084-236170, 984686809 – 984727812 ESTUDIO HIDROLOGICO
Mail: aquaruna_ha@yahoo.es
MUNICIPALIDAD DISTRITAL DE ECHARATI
PROYECTO: “CONSTRUCCION DE LA CARRETERA DE CIRCUNVALACION TINTINIQUIATO MARGEN DERECHA ABRIL 2008
- DISTRITO DE ECHARATI – PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO”
C-26 0.585 91 5.01 240.00 1.35
C-27 0.585 91 4.86 240.00 1.34
C-28 0.582 97 3.42 240.00 1.15
C-29 0.574 101 3.11 240.00 1.12
C-30 0.586 108 1.31 240.00 0.74
C-31 0.556 108 2.27 205.00 0.90
C-32 0.577 76 14.31 205.00 1.92
C-33 0.559 71 34.08 205.00 2.87
C-34 0.592 115 2.10 418.17 1.32
C-35 0.558 69 38.10 205.00 3.00
C-36 0.592 117 1.68 400.00 1.16
C-37 0.591 117 1.67 400.00 1.15
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
#REF! #REF! #VALUE! #REF! #VALUE! #REF!
2/3 1 /2
A∗R ∗S
Q=
n
Donde:
Q = Caudal de Descarga (m3/seg.)
A = Area de la seccion hidraulica de la cuneta en (m2)
n = Coeficiente de rugosidad de Manning.
S = Pendiente de la cuneta (m/m).
R = Radio Hidraulico en (m)
P = perimetro mojado en m.
SEXAG. RADIAN
240 4.1888
D
θ=240 º=4 . 1888 rad
R
240º
Y
A= 0.6319 D^2
P= 2.0944 D 0.28422
R= 0.3017 D
3/8
D=
[ Q∗n
0 .28422∗S 1/2 ]
n= 0.024
S= 0.02
D= 0.8241688 Q^3/8
3/8
D=0.8241688Q
Diametro
Caudal Perimetro Radio Diametro
Cuenca Obra de arte Progresiva Diametro (m) Area (m2) Comercial
(m3/seg.) Mojado (m) Hidraulico (Pulg)
(Pulg)
C-1 ALC 0+186 0.60 0.68 0.29 1.43 0.21 26.85 36
C-2 ALC 0+510 0.77 0.75 0.35 1.57 0.23 29.43 36
C-3 ALC 0+795 1.60 0.98 0.61 2.06 0.30 38.70 48
C-5 ALC 1+260 0.80 0.76 0.36 1.59 0.23 29.84 36
C-6 ALC 1+455 1.02 0.83 0.44 1.74 0.25 32.71 36
C-7 ALC 1+622 1.46 0.95 0.57 1.99 0.29 37.38 48
C-8 ALC 1+825 1.64 0.99 0.62 2.08 0.30 39.08 48
C-9 ALC 3+805 1.80 1.03 0.67 2.15 0.31 40.43 48
C-10 ALC 5+205 0.51 0.64 0.26 1.34 0.19 25.15 36
C-11 ALC 5+245 0.50 0.64 0.26 1.33 0.19 25.06 36
C-12 ALC 5+770 1.48 0.96 0.58 2.00 0.29 37.62 48
C-13 ALC 6+425 1.59 0.98 0.61 2.06 0.30 38.64 48
C-14 ALC 6+625 1.71 1.01 0.64 2.11 0.30 39.72 48
C-15 ALC 6+705 1.07 0.84 0.45 1.77 0.25 33.23 36
C-16 BAD 7+180 1.15 0.87 0.48 1.82 0.26 34.14
C-17 BAD 7+190 1.92 1.05 0.70 2.21 0.32 41.47
C-18 ALC 7+660 1.42 0.94 0.56 1.97 0.28 37.02 48
C-19 ALC 7+762 1.44 0.94 0.56 1.98 0.29 37.20 48
C-20 ALC 8+070 1.81 1.03 0.67 2.16 0.31 40.56 48
C-21 ALC 8+300 1.68 1.00 0.63 2.10 0.30 39.42 48
C-22 ALC 8+505 2.03 1.07 0.73 2.25 0.32 42.29 48
C-23 ALC 8+973 1.59 0.98 0.61 2.05 0.30 38.62 48
C-24 ALC 9+170 1.65 0.99 0.62 2.08 0.30 39.12 48
C-25 ALC 9+435 1.48 0.96 0.58 2.00 0.29 37.63 48
C-26 ALC 9+638 1.35 0.92 0.54 1.93 0.28 36.31 48
C-27 ALC 9+754 1.34 0.92 0.53 1.92 0.28 36.16 48
C-28 ALC 9+994 1.15 0.87 0.48 1.82 0.26 34.19 48
C-29 ALC 10+310 1.12 0.86 0.47 1.80 0.26 33.86 48
C-30 ALC 10+425 0.74 0.74 0.34 1.54 0.22 28.95 48
C-31 ALC 10+583 0.90 0.79 0.40 1.66 0.24 31.19 36
C-32 ALC 11+730 1.92 1.05 0.70 2.20 0.32 41.40 48
C-33 ALC 12+540 2.87 1.22 0.95 2.56 0.37 48.16 48
C-34 ALC 12+840 1.32 0.92 0.53 1.92 0.28 36.03 48
C-35 ALC 14+020 3.00 1.24 0.98 2.61 0.38 48.97 48
C-36 ALC 14+153 1.16 0.87 0.48 1.82 0.26 34.27 36
C-37 ALC 14+252 1.15 0.87 0.48 1.82 0.26 34.23 36
DISEÑO DE BADEN DE CONCRETO ARMADO
Caudal Q: 2.420 m3/seg
Pendiente S: 0.030 m/m
Coeficiente de rugosidad n: 0.017
Relacion a=h/l: 0.035 m/m
r r
90 - γ
CIA
Q: 2.420 m3/seg Q=
360
γ =2∗arcsen
[ 4a
1+ 4 a2 ] a =h / L
2/3 1 /2
A∗R ∗S A Radio hidraúlico
Q= R=
n P
2
5/ 3 r
r 8/ 3 ( γ − sen γ ) S1/ 2 A = ( γ−sen γ )
2
Q= 5/ 3 2/ 3
n∗2 γ P=rγ
3/ 8
r=
[ Q∗n∗25 /3 γ 2/ 3
( γ − sen γ )5 / 3 S1 /2 ]
Por tanto tenemos:
b: 0.10 m
γ 1 =2 *arccos 1− [ h+b
r ]
γ: 0.34 rad 19.41 º Por consiguiente se tiene:
ht [m]: 0.31
Lt [m]: 7.39
r
r
90 - γ1
ht: 0.31 m
Lt: 7.39 m
Caudal
Obra de arte Progresiva (Estudio Y (rad) r (m) h (m) L (m) Yt (rad) ht (m) Lt (m) Ltf (m)
Hidrológico)
BAD 0+720 0.56 0.280 12.69 0.12 3.54 0.38 0.22 4.74 8
BAD 0+855 1.09 0.280 16.25 0.16 4.53 0.36 0.26 5.77 8
BAD 1+735 2.66 0.280 22.73 0.22 6.33 0.34 0.32 7.62 8
BAD 2+230 2.49 0.280 22.15 0.22 6.17 0.34 0.32 8.04 9
BAD 2+340 2.43 0.280 21.96 0.21 6.12 0.34 0.31 7.98 8
BAD 2+480 2.40 0.280 21.87 0.21 6.09 0.34 0.31 7.95 8
BAD 2+620 0.55 0.280 12.59 0.12 3.51 0.38 0.22 4.72 8
BAD 2+740 1.15 0.280 16.61 0.16 4.63 0.36 0.26 5.88 8
BAD 2+860 0.92 0.280 15.24 0.15 4.25 0.36 0.25 5.48 8
BAD 3+060 0.19 0.280 8.36 0.08 2.33 0.42 0.18 3.74 8
BAD 3+117 1.52 0.280 18.40 0.18 5.13 0.35 0.28 6.89 8
BAD 4+226 2.16 0.280 20.99 0.20 5.85 0.34 0.30 7.68 9
BAD 4+307 2.06 0.280 20.65 0.20 5.75 0.34 0.30 7.03 8
BAD 4+526 2.01 0.280 20.44 0.20 5.70 0.34 0.30 6.97 8
BAD 4+561 0.60 0.280 12.96 0.13 3.61 0.37 0.23 5.20 8
BAD 4+672 1.46 0.280 18.13 0.18 5.05 0.35 0.28 6.80 8
BAD 4+842 1.79 0.280 19.58 0.19 5.46 0.35 0.29 7.25 8
BAD 5+189 2.71 0.280 22.89 0.22 6.38 0.34 0.32 7.67 8
BAD 5+378 1.13 0.280 16.47 0.16 4.59 0.36 0.26 5.84 8
BAD 5+428 3.12 0.280 24.12 0.24 6.72 0.33 0.34 8.01 9
BAD 5+960 1.66 0.280 19.04 0.19 5.30 0.35 0.29 7.08 8
BAD 6+102 2.58 0.280 22.45 0.22 6.25 0.34 0.32 8.13 9
BAD 6+552 1.59 0.280 18.72 0.18 5.22 0.35 0.28 6.99 8
BAD 6+617 1.73 0.280 19.34 0.19 5.39 0.35 0.29 6.66 8
BAD 7+112 1.22 0.280 16.97 0.17 4.73 0.35 0.27 5.98 8
BAD 7+243 1.94 0.280 20.17 0.20 5.62 0.34 0.30 6.89 8
BAD 7+342 1.01 0.280 15.77 0.15 4.39 0.36 0.25 6.08 8
BAD 9+342 1.52 0.280 18.41 0.18 5.13 0.35 0.28 6.89 8
BAD 13+200 2.31 0.280 21.55 0.21 6.01 0.34 0.31 7.85 8
BAD 15+363 2.62 0.280 22.59 0.22 6.29 0.34 0.32 7.58 8
BAD 15+487 2.67 0.280 22.74 0.22 6.33 0.34 0.32 7.62 8
BAD 15+891 3.11 0.280 24.10 0.24 6.72 0.33 0.34 8.01 8
BAD 16+289 3.91 0.280 26.25 0.26 7.31 0.33 0.36 9.29 9
BAD 17+359 2.65 0.280 22.68 0.22 6.32 0.34 0.32 8.20 9
BAD 19+040 0.80 0.280 14.50 0.14 4.04 0.37 0.24 5.68 8
BAD 21+914 8.24 0.280 34.72 0.34 9.67 0.32 0.44 11.00 12
BAD 39+021 1.23 0.280 17.03 0.17 4.74 0.35 0.27 6.00 8
BAD 39+202 1.39 0.280 17.83 0.17 4.97 0.35 0.27 6.23 8
BAD-B 3+955 3.52 0.280 25.25 0.25 7.03 0.33 0.35 8.98 8
BAD-B 26+831 1.69 0.280 19.15 0.19 5.33 0.35 0.29 7.12 8
BAD-B 28+746 3.81 0.280 25.99 0.25 7.24 0.33 0.35 9.21 9
BAD-B 29+881 6.02 0.280 30.85 0.30 8.60 0.32 0.40 9.92 9
BAD-B 41+973 8.26 0.280 34.75 0.34 9.68 0.32 0.44 11.01 12
RESUMEN
BADENES DE 8m = 33
BADENES DE 9 m = 8
BADENES DE 12 m = 2
TOTAL BADENES = 43
DISEÑO DE CUNETA
a=0 . 75 m a=0 . 75 m
d=0.30m
A∗R2/3∗S1 /2
Q=
n
Donde:
Q = Caudal de Descarga (m3/seg.)
A = Area de la seccion hidraulica de la cuneta en (m2)
n = Coeficiente de rugosidad de Manning.
S = Pendiente de la cuneta (m/m).
R = Radio Hidraulico en (m)
P = perimetro mojado en m.
l=0 . 62 m
h=0 .25 m
0.62∗0.25
A= =0.08875
2
A= 0.0775
P= 0.9367
A 0.24
R= = =0.16437m
PR= 0.08274
1.46011
Q=2.66725∗S 1/2
Dimensiones para el caudal
hidrologico
C-1 0 0+186 0.604 0.20 0.121 0.061 0.212 0.067 0.087 0.121 0.134 ok! 1.792
C-2 0+186 0+510 0.771 0.50 0.385 0.066 0.323 0.156 0.133 0.385 0.140 ** 2.470
C-3 0+510 0+795 1.600 0.15 0.240 0.610 0.178 0.047 0.073 0.240 0.426 ok! 5.056
C-5 0+795 1+260 0.800 0.25 0.200 0.405 0.179 0.048 0.074 0.200 0.347 ok! 4.143
C-6 1+260 1+455 1.021 0.25 0.255 0.267 0.213 0.068 0.087 0.255 0.282 ok! 3.767
C-7 1+455 1+622 1.458 1.00 1.458 0.399 0.379 0.215 0.156 1.458 0.344 ** 6.773
C-8 1+622 1+825 1.642 1.00 1.642 0.284 0.422 0.268 0.174 1.642 0.290 ** 6.138
C-9 1+825 3+805 1.798 0.20 0.360 0.147 0.270 0.110 0.111 0.360 0.209 ** 3.278
C-10 3+805 5+205 0.507 0.10 0.051 0.374 0.109 0.018 0.045 0.051 0.333 ok! 2.854
C-11 5+205 5+245 0.502 0.15 0.075 0.606 0.115 0.020 0.047 0.075 0.424 ok! 3.776
C-12 5+245 5+770 1.484 0.15 0.223 0.627 0.172 0.044 0.071 0.223 0.432 ok! 5.014
C-13 5+770 6+425 1.594 0.50 0.797 0.234 0.334 0.167 0.137 0.797 0.264 ** 4.769
C-14 6+425 6+625 1.714 0.10 0.171 0.526 0.161 0.039 0.066 0.171 0.395 ok! 4.397
C-15 6+625 6+705 1.066 0.10 0.107 0.527 0.135 0.027 0.055 0.107 0.396 ok! 3.908
C-16 6+705 7+180 1.145 0.15 0.172 0.560 0.159 0.038 0.066 0.172 0.408 ok! 4.505
C-17 7+180 7+190 1.923 0.15 0.289 0.498 0.198 0.059 0.081 0.289 0.385 ok! 4.907
C-18 7+190 7+660 1.422 0.10 0.142 0.487 0.152 0.035 0.063 0.142 0.380 ok! 4.076
C-19 7+660 7+762 1.440 0.10 0.144 0.498 0.153 0.035 0.063 0.144 0.385 ok! 4.126
C-20 7+762 8+070 1.813 0.23 0.418 0.510 0.226 0.077 0.093 0.418 0.389 ** 5.431
C-21 8+070 8+300 1.680 0.21 0.356 0.522 0.212 0.068 0.087 0.356 0.394 ok! 5.263
C-22 8+300 8+505 2.027 0.30 0.608 0.418 0.271 0.110 0.111 0.608 0.352 ** 5.536
C-23 8+505 8+973 1.591 0.20 0.318 0.229 0.238 0.085 0.098 0.318 0.261 ** 3.761
C-24 8+973 9+170 1.647 0.25 0.412 0.819 0.206 0.064 0.085 0.412 0.493 ok! 6.463
C-25 9+170 9+435 1.485 0.10 0.148 0.026 0.269 0.109 0.111 0.148 0.087 ** 1.364
C-26 9+435 9+638 1.350 0.25 0.337 0.641 0.200 0.060 0.082 0.337 0.436 ok! 5.611
C-27 9+638 9+754 1.335 0.13 0.174 0.067 0.239 0.085 0.098 0.174 0.141 ** 2.034
C-28 9+754 9+994 1.149 0.15 0.172 0.699 0.153 0.035 0.063 0.172 0.456 ok! 4.901
C-29 9+994 10+310 1.120 0.15 0.168 0.580 0.157 0.037 0.065 0.168 0.415 ok! 4.539
C-30 10+310 10+425 0.738 0.12 0.089 0.408 0.132 0.026 0.054 0.089 0.348 ok! 3.389
C-31 10+425 10+583 0.900 0.10 0.090 0.422 0.132 0.026 0.054 0.090 0.354 ok! 3.448
C-32 10+583 11+730 1.915 0.11 0.211 0.507 0.175 0.046 0.072 0.211 0.388 ok! 4.568
C-33 11+730 12+540 2.867 0.15 0.430 0.349 0.246 0.091 0.101 0.430 0.322 ** 4.745
C-34 12+540 12+840 1.322 0.10 0.132 0.345 0.158 0.038 0.065 0.132 0.320 ok! 3.517
C-35 12+840 14+020 2.997 0.10 0.300 0.443 0.205 0.063 0.084 0.300 0.363 ok! 4.741
C-36 14+020 14+153 1.157 0.10 0.116 0.647 0.134 0.027 0.055 0.116 0.438 ok! 4.307
C-37 14+153 14+770 1.153 0.10 0.115 0.164 0.173 0.045 0.071 0.115 0.220 ok! 2.570
ALCANTARILLAS PROYECTADOS
Diametro
Obra de Caudal Diametro Area Perimetro Radio Diametro
N" Cuenca Prog. Comercial
arte (m3/seg.) (m) (m2) Mojado (m) Hidraulico (Pulg)
(Pulg)
Diametro
Caudal Diametro Area Perimetro Radio Diametro
NumeroCuenca Obra de arte
Progresiva Comercial
(m3/seg.) (m) (m2) Mojado (m) Hidraulico (Pulg)
(Pulg)
Diametro
Caudal Diametro Area Perimetro Radio Diametro
Cuenca Obra de arte
Progresiva Comercial
(m3/seg.) (m) (m2) Mojado (m) Hidraulico (Pulg)
(Pulg)
DES N° H
BADEN 12m 1 2.6
BADEN 9m 3 1.5
BADEN 9m 3 2.6
BADEN 8m 7 1.5
BADEN 8m 13 2.6
BADEN 8m 9 3.2
BADEN 8m 2 3.8
total 38
Caja
Caja
Aletas
Caja
Aletas
Aletas
Aletas
Aletas
Aletas
Caja
Aletas
Aletas
Aletas
Aletas
Aletas
Aletas
Aletas
Aletas
Aletas
Caja
Aletas
Aletas
Aletas
Aletas
Caja
Caja
Aletas
Caja
Aletas
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Aletas
Aletas
Caja
Aletas
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Caja
Aletas
Caja
Aletas
Caja
Caja
Caja
Caja
Aletas
Caja
Caja
Caja
Aletas
Aletas
Caja
H
3.2
3.8
2.6
1.5
1.5
2.6
2.6
2.6
2.6
2.6
2.6
3.2
2.6
3.2
2.6
3.2
3.2
3.6
3.2
3.2
2.60
3.2
2.60
2.60
3.2
3.2
3.2
1.5
2.6
1.5
1.5
1.5
1.5
3.2
1.5
2.6
1.5
1.5
Caudal Perimetro Radio
Cuenca Obra de arte Progresiva Diametro (m) Area (m2)
(m3/seg.) Mojado (m) Hidraulico
73
9 12
6 1
2 1
8 2 43
Cuenca Obra de arte Progresiva
C-1 ALC 0+227 C-97 ALC 16+463
C-2 ALC 0+321 C-98 ALC 16+730
C-3 ALC 0+665 C-99 ALC 17+240
C-4 BAD 0+720 C-100 BAD 17+359
C-5 BAD 0+855 C-101 ALC 17+478
C-6 ALC.B 0+965 C-102 ALC 18+000
C-8 ALC 1+080 C-103 ALC 18+218
C-9 ALC 1+220 C-104 ALC 18+341
C-11 ALC 1+575 C-105 ALC 18+432
C-12 BAD 1+735 C-107 ALC 18+882
C-13 ALC 1+800 C-109 BAD 19+040
C-14 ALC 2+075 C-111 ALC-B 19+421
C-15 ALC 2+195 C-112 ALC-B 19+732
C-16 BAD 2+230 C-113 ALC 20+122
C-17 BAD 2+340 C-114 ALC-B 20+597
C-18 ALC 2+410 C-115 ALC 20+871
C-19 BAD 2+480 C-116 ALC 21+030
C-20 ALC-B 2+568 C-117 ALC 21+472
C-21 BAD 2+620 C-118 ALC 21+561
C-22 BAD 2+740 C-119 BAD 21+914
C-24 BAD 2+860 C-120 ALC-B 22+027
C-25 BAD 3+060 C-121 ALC-B 22+245
C-26 BAD 3+117 C-122 ALC 22+398
C-27 ALC 3+187 C-123 ALC-B 22+567
C-28 ALC 3+260 C-124 ALC-B 22+785
C-29 ALC 3+430 C-126 ALC-B 23+586
C-30 ALC 3+818 C-127 ALC-B 23+941
C-31 BAD- B 3+955 C-128 ALC-B 24+218
C-32 ALC 4+015 C-129 ALC 24+427
C-33 ALC 4+179 C-130 ALC 24+609
C-34 BAD 4+226 C-131 ALC-B 24+706
C-35 BAD 4+307 C-132 ALC 24+838
C-36 BAD 4+526 C-133 ALC 25+917
C-37 BAD 4+561 C-134 ALC 26+121
C-38 BAD 4+672 C-135 ALC-B 26+539
C-39 ALC 4+742 C-136 BAD-B 26+831
C-42 BAD 4+842 C-137 ALC-B 27+045
C-43 ALC-B 4+984 C-138 ALC 28+062
C-44 ALC 5+111 C-139 ALC-B 28+672
C-45 ALC 5+140 C-140 BAD-B 28+746
C-46 BAD 5+189 C-141 ALC 28+858
C-47 BAD 5+378 C-143 ALC 29+334
C-48 BAD 5+428 C-144 ALC 29+478
C-49 ALC 5+623 C-145 BAD-B 29+881
C-50 ALC 5+752 C-146 ALC 30+313
C-51 BAD 5+960 C-147 ALC-B 30+758
C-52 BAD 6+102 C-148 ALC 30+921
C-53 ALC-B 6+275 C-149 ALC 31+667
C-54 BAD 6+552 C-150 ALC-B 31+862
C-55 BAD 6+617 C-151 ALC-B 32+178
C-56 ALC-B 6+878 C-152 ALC-B 32+353
C-57 ALC 7+022 C-153 ALC 32+573
C-58 BAD 7+112 C-154 ALC 32+938
C-59 BAD 7+243 C-155 ALC-B 34+001
C-60 BAD 7+342 C-156 ALC-B 34+272
C-61 ALC 7+398 C-157 ALC-B 34+598
C-62 ALC-B 7+429 C-158 ALC 34+953
C-63 ALC 7+612 C-159 ALC-B 35+698
C-64 ALC 7+655 C-160 ALC-B 35+838
C-65 ALC-B 8+048 C-161 ALC-B 36+186
C-66 ALC-B 8+478 C-162 ALC-B 36+334
C-67 ALC 8+528 C-163 ALC-B 36+355
C-68 ALC 8+665 C-164 ALC-B 36+720
C-69 ALC 9+053 C-165 ALC-B 36+998
C-70 ALC 9+260 C-166 ALC-B 37+443
C-71 BAD 9+342 C-168 ALC-B 37+671
C-72 ALC 9+543 C-169 ALC-B 37+768
C-73 ALC 9+962 C-170 ALC-B 38+528
C-75 ALC-B 10+335 C-171 ALC-B 38+781
C-76 ALC 10+482 C-172 ALC-B 38+868
C-77 ALC 10+798 C-173 BAD 39+021
C-78 ALC-B 10+835 C-174 BAD 39+202
C-79 ALC 11+035 C-176 ALC 39+810
C-80 ALC 11+238 C-177 ALC-B 39+942
C-81 ALC 12+258 C-178 ALC-B 41+458
C-82 ALC-B 12+300 C-179 BADEN- BUE41+973
C-83 ALC 12+453 C-180 ALC 42+289
C-84 ALC-B 12+605
C-86 ALC 12+961
C-87 BAD 13+200
C-88 ALC 13+316
C-89 ALC 13+467
C-90 ALC-B 15+224
C-92 BAD 15+363
C-93 BAD 15+487
C-94 BAD 15+891
C-95 ALC 16+183
C-96 BAD 16+289